You are on page 1of 118
Units and Abbreviations Units (Note the S1 system for units has been applied except where conformity with the original document requires otherwise) cumm3 cubic metre br. hour Lt Litre m metre mr milimetre sq.m square metre m-day man day Mt. Metric tone Nr. number t tonne R-m Running meter Abbreviations AC Asbestos Cement Agarts Aggregates Aprox Approximate Beler Boiler Bistone Blockstone Carbor Carborundum CGI. Corrugated Galvanized tron Ch. Cast tron Cone. Concrete Const. Construction Dia or dia Diameter Dist. Distance D-nator Detonator er Engineer Forms Formwork F-Wire Fuse wire F-stone Flagstone Gen Generator Gh Galvanized Iron HDPE High Density Polythene Pipe Procedures for obtaining Total Rate of Item of Works Labour Costs w Materials Costs ) Machinery (Including Fuel) (Nn) Total Rate (L)+(M)+(N) = (J) Contractor's Overhead (15% of J) Besirreeepfegr, vers O10 (GF Total (Without Tax) + 3 VAT 10% of (K) = 0.010 X (k) 45X W) 1.145 X (J) Total Rate (Z) = 1.2565 X (J) Note: Take rate of Item as (J) if works are executed departmentally Take rate of Item as (Z) if works are executed through contractor Take rate of !tem as 1.2075 of (L) if works as executed through labour contract only {All the machinery and materials are supplied departmentally). ena a) Lead Lift Mat. Mech MS. Ovsr PCC or P.C.C P.G. Tiles Preserv. Pvc RBorRB RCC of R.C.C Rein Ruler Skilt ‘Semi-skl ‘Spysr. S.W.G. or SWG S-yer, Spyer Turpent U-hooks Unio Unskt Helper High speed Diesel uniplasticised Poly Vinyl Chloride Including J-shaped hooks Kilometers per hour Kilovolt Horizontal Distance Vertical Distance Materials Mechanical Mild steel Overseer Plain Cement Concrete Porcelain Glazed Tiles Preservative Polyviny1 Chloride Reinforced Bricks Reinforced Cement Concrete Reinforced or reinforcing Roller Skilled Semiskilled Supervisor Standard Wire Gauge Sprayer Turpentine U shaped hooks Unload Unskilled Procedites for obtaining Total Rate of Item of Works Labour Costs u Materials Costs iM) Machinery (Including Fuel) ) Total Rate (L)+(M)+(N) = (d) Contractor's Overhead (15% of J). = 015 (d) Total (Without Tax) + ik) = 1.48X (0) VAT 10% of (K) = 0.010 X (K) = 0.115 X (J) Total Rate (Z) = 1.2565 X (J) Take rate of Item as (J) If works are executed departmentally Take rate of Item as (Z) if works are executed through contractor Take rate of Item as 1.2075 of (L) if works as executed through labour contract only (All the machinery and materials are supplied departmentally) Preparation = Resources SN Description of work wnt Labour Const Moerala | _Machine’y ——_} es | fttase Tuoi | iy | Type f Unt [ atiy. [Type [Unit [ary T. | i Fellirees, cut up & dispose 5 m away from the const. ste (the dia. of tee i is measured ‘1m above the ground), 2. 12:30 omdia, each 013 .34-60 om dia, : 039 ©. 61-900ndia c 098 4. 91-120 omdia. pal eet | ne) 8. 121-180om dia, spe ys | 600 181-240 cmdia. <-, sales ae aoe g. 241-300 om dia, ns | ae ideo || habove 301 om dia, =) el Si ater. 2. Upooting trees & Disposal 15m far fom the cons} sil. a. 1230 1Sne/toome 4. Cutting thn vegetation, | Sqm] unskl | may] 003 ‘grbing their roots & disposal | 25m far rom the const, Site. (the vegetation dia. <=30cm & densi <=45n1/300m2) 5. Cutting uprooting & | Sq.m | unsK! ) may | 0.023, disposal of grasses with light compaction, leveling & leering the site 8. Culling, uprooting &| cum | unski | may | 280 aisposal of bamboa (measure |_| Yolne of excavation) 7. Surface dressing works | Sqm ) unskl | may | O01 including fling digcessions, cating mounds & ground levelling (service roads etc.) Remarks Rate Analysis Norms SN. Description of work unit Constr. Materials Machinery Remarks Unit 18 Type_| Unit | Gy eT % Removal of top sols & 10cm ) with cfsposal up to 10m lead and 16m. 24. Dry foundation excavation in hard gravel mixed soils ia. of gravel< 10cm ) wth disposal up to 10m lead and 4.5m 22. Foundation “excavation under shatlow water depth in hard gravel mixed soli (dia of grave > 10cm) with disposal Upto 10m lead and 4.5m it 23. Foundation excavation under shalow waler depth in hard gravel mixed soils ( a, of gravel < 10cm ) with cisposal up to 10m lead and 4.5m 24, Fourdation excavation under water in boulder and gravel mixed sols including cisposal up to 10m lead 2. 1.00m deep excavation & 4,00m lift b. 2.00m deep excavation & 4.00 lift cc. 3.00m deep excavation & 400m lift 1d. 4.0m deep excavation & 4.00mi lift 500m deep excavation & 7.50mi £.6.00m deep excavation & 750m lift. 25, Fling with ordinary sos in 15om thick layers and hand ‘compaction (haulage distance 10m} ‘a. with sprinkling wale. 'b. no sprinkling water. cm cum cum cum cum cum com cum cum cum Uunsk! vunskd tunskd ‘unskd unsk! vunsk! unsk! vunskl unskl unskd vunskl vunskl meday | 1.68 mday | 1.38 imday | 2.50 meday | 2.30 day | 1.51 meday | 3.80 maey | 370 metay | 3.80 medey | 4.20 medey | 430 my | 050 Reduce one lsbour for foundation, excavation in ‘gravel & bouler in ‘ty condition Haulage of water noticed Rate Analysis Norms 8. Description of work unit Labour Remarks u Class_[_Unt_[ arty iy 2 | 26 Fling wath stones in40om | cum | unskl | may | 1.00 anlage of water thick layers, sprinkling water notinehded and tiand compaction {haulage distance 10m) 27, Each axiitiona raulage | cum | unsil | may | 0.12 distance of 10m {60% by basket and 50%by wheel | barrow) 28. Each cxdiional sit of | cum | wsht | mday | 008 100 8 at 1 Dt sing ietour se ihe” lebout Teeded for aatonal(each}| > ‘im ‘eaa 12h ot otheer matenaals cn | bec taen ss] = ors may. 29, Foundation excavation in| cum | unskl | may | 2.25 | ordinary Soils under shallow | | water depth (10m lead and | 1.5m) | 30, Foundation excavation in| cu | unskl | mday | 3.33 Caan soft rocks under shallow water | day, dpi (10m lead & 4.5m it) | 31, Excavation of foundation | cum | unskl | mday | 7.30 | Getalin | Kg | 0.25 | in hard rocks under shallow ski 0.06 | O-nator | we | 200 | waior depth using diling & Fave | m | 200 basting, disposal (up to 10m teal & 15m) 32. Additional for sawing and | cum } unskt | mday | 0:50 planking in the case of deep foundation excavation 33. Bottom trimming of | Cum | unsid | mday | 061 foundalion excavated on rocks 4 34, Pumping water out of | 5000 pump | Fir ae foundation or depression Ur | eo . of 35, Compacting sis by roller eae in 200m thick layers i foal | Hr | 1.67 Using road calle. Sam | Pole | at | Rate Analysis Norms . Resources is Description of work Labour Const. Matera machinery Romarks i. Unit] @y_| Type | Unit [ Gy | Type | Unit 2 |. Using 1 ton ROC and may | 630 Rec } roler Roller 4.001 | Hour 36, Cutting steps in sols and removing them (Slope 65% ‘ # "| 443 | «Hilly areas | accu amc Aa (excavating deposits) i 2. Collection, scfeening and | 4 providing of ravel {haulage distance 10m a. Smm-7Omm & above cum | unskt | mday | 250 - Simm 40mm (upto) sets os | 400 ‘nm-20mm pa | on ee es 2. Snm-80mm Seer | ae || 3. otection of stor |_| incuting soresning 8 stacking (eulage distance 10m) | 2. 40min-70mm cum | unstt | mday | 5.00 . 7Ommn-t00mm ee | 400 | | 4 Collection of rubble stone of | cum | unskl | mday | 1.40 | required sie induding | siaciong (haulage dis. 10m) 5. Breaking, collection and screening of stone inctuding stacking (haulage dis. 10%) 2. 7Omm-t00mm cusn | unstl | may | 7.00 40nm-70mm Sel adele Sir| SEO | 6. 200am-40mm ee ft | hon | 4 10mm-20mm [is | estate, | | e.¢5mm-tomm fos |" | 2900 . {6 Making requiced size rough | cum | unsk! | mday | 845 | Gelatin | kg. | 048 blocks from Boulders including skit | mdey | 005 | D-nator | Ne | 1.00 f dilirg, blasting, _ breaking, Fenire 4.00 |_| dressing one side, hauling up | to a distance of 10m and |_| staking | 7. Making requited size rough | cum | unski | mday | 9.63 blocks from boulder incuding cone see dressing, Nauing Up to a distance of 10m and stacking but not blasting | Rate Analysis Norms SK. | Description of work unig ~Tabour Renais Glass | Unit [unit | Gy | @ Making requ size blocks | cum | unsk | day from bedking rocks, hammer dressing, hang up to 2 dist ‘of 10m and stacking 9, Making required size bocks from boulders using. cisels ' inctuding haulage up to 10m and stacking | 2. Three sides rough and one | cum | unski | mday | 200 sie smooth | a, Square bkcks with five | cum | unskl | mday | 94.48 sides rough and one side | smoot 410. Meking rubble stone of | cum | unski | méay | 450 | Gelatin | Kg | 045 | required size inuding dling, sk |" | 005 | Dnator | Nr | 1.00 | basing, hauling up fo a cst Fwire | m | 4.00 of 10m & stacking, | 11, Making rubble stone of | cum | unskl | mday | $50 required — size _—_Including breaking using __ chisel hauling up to a distance of i 10m and stacking, | 42. Wasing & cleaning by wale a Sand cum | unskt | méay | 2.00 b.Cut stones cum | unskl | may | 1.75 ¢. Rubble stones cum | unsti | mtay } 850 | 4. Gravel. cum | nsit | mday | 1.75 413. Ping 2qgreuates, stones {its etc inthe const, sie. a. Bricks 1000 | unskt | may | 0.30 Nr | cum | unsil | mday | 0.34 | Bag | unski | mday | 008 | 10 Rate Analysis Norms 4, Mortar Preparation work for masonry | si Description of work 1 Makiig” coment mote, 1 | | iting and hauling up 10 a distance of 10m including sig with water, 1:3 (t cement :3 sand) | cum | unstd | mday | 1.89 | coment | Mt | 037 sor | cum | 1.10 b. 14 (1eement:4 sand) — | cum | unski | mday 11.89 | cement | mt | 029 send | cum | 147 { 6. 16(1cement:6 sand) | cum | unskl | mday | 189 j coment | Mt | O21 send | cum | 126 | | 6.4-8¢r coment: asana) eum | unsél | mday [1.89 [coment | mt | 019 | sand | cum | 430 | 2 Mating time moray, itrg } and texting up (6 a distance i of 30m including mixing wit | | wale, a1:2(tLime:2sand) | cum | uns | mday | 1.89 | Lime | cum } 0475 | sand | cum | 0.95 | 1 b4-2¢ Lines 2surhij — feum funskt fmday | 1.89 | ime | cum | 0.475 sutkhi | cum | 095 Rate Analysts Norms 0 5. Brickworks 8. Description of work | uit Labour Remarks N Case [Unit [0 a & | 1 Brek masonry works along Ske oh _bvicks with supplying bricks, making constlered Is 224 ‘cement: sand mortar & const | 108 X 7 (mm)3. of brick walls ioluding | femal For the other size haulage distanos | of bricks number of 2 Matin oa ks up 0 30H. | eu} ski | malay | 1.50 | Bricks | Ne | 8300 bricks canbe =1°3.cament sand mortar unski | mday | 220 | cement | Mt | 0.13 increased of sand cum | 027 decreased simitaly __ | amount of moriar 414 cemenisand mortar | cum | skil | mday | 1.50 | Bricks | Nr | 530.0 can also be adjust | | unski | mday | 2.20] cement | Mt | 0.10 Nr. of bricks the | sand | cum | 027 considered size | ako induded 1:5 cement sand mortar | cum | skill} meday | 150 | Bricks ] Nr | 630.0 wastage due to | unski | mday | 220 | cement | att | 0.09 bricking et. | | sand | cum | O34 Further engineer can estimate the =18 coment sand mortar | cum) skit | mday | 150 | Bricks | hr | 5300 required Ne of unski | ovday | 2.20) cement | wt | 0.70 bricks as per thei sand} cam | 030 | size | | ®crinmey hata) ies | cum | abil | may | 1.59 Bricks | we | $600 -teement send mortar | | unskl | day | 2.20 | cement | mt | 0.13 | sand | oun | 027 20cm. sq.m | unskt | mday | 340 8. Forms for valine. selection ‘of_-mal. hauling up to 30m distance, erection, _fiting, ‘aiing, bolting, dismantle and removal a. Width ofwallup to Soom & | 10 | skit | mday | 2.40. height up fo Sm sqm | unskt | mday | 3.80 | , Width ofwallupo Sdn. & | 10 | skit | mday | 264 height up fo10m, sqm | unskt | mday | 396 . Wath of wall upto 100om. | 10 | skid | malay | 216 @ height up to Sm, sqm | unskh | may | 3.24 4. Width of wall up 10 400cm, | 10 | skill | mday | 240 & height up to 10m, sqm | unskt | mday | 3.60 | Rate Analysis Norms me Resources Description of work uit Tabeut Constr, Materials Machi Remarks Unit_[Oiy | Type | Unit | ory | Tree { Unt | Oy | L elao lo| ie 10. Forms for intake inal f | | saeco of at ang up 1 30m , distanoe, erection, fiting, | | nailing, potting, dismantle and | | removal feta) Side ach, 10 | si | maay | 172 sqm | unslt | mday | 2.75 } |b. Crowmarch, 10 | skin | mday | 201 | sqm | unskl | mday | 201 «6. Transition 40 | skit | mdey | 268 squn | uns | mday | 398 1 Selection of various types of ‘materials for foums, hautng up to . 3m . distance, erection, fiting, naling, bolting, dismantle and removal a. Minor wooden house 10. | skit | may | 2.104 sqm | unskl | mday | 3:28 | manhole 10 | skit | matey | 0.80 sqim | unekt | may | 1.20 |_| c. Holes for ventilation 10 | skill | mday | 1.332 | sqm | unskl | mday | 200 4, Door opening 40 | skit} mdey | 400 sam | unstt | mday | 6.00 412, Selection of materials for key- way forms, hauling up to 20m | distance, erection, fing, nailing, bolting, cismante and removel | (etc) 2 Horizontal key - way 10 | ski | mday | 0.40 sqm | unskl | mday | 060 |b Vertical bey -way 10. | stil | mday | 0.75 sqm | unsil [ mday | 1.13 Horizontal Key - way to | skit | may | 1.20 sqm | unsid | mday | 180 13. Open types of woodworks. needed for trench works incl Sage ave of supply of materials & fiting. tibet shal be 25% Upto 1.5m depth 400 | skit | mday | 0.25 | Planks | Sqm | 3333 of i tga ost sqm | unsel | mstay | 0.25 | Walling ater wg em si & Struts | Cum | 203 tines L B Rate Analysis Norms Resouroes 8 Description of work sit Labour ‘Const Waters Remarks [\v lass [_Unt_{ Qity.| Type | Unit , 8 | 13.6. Between 15m € 30m 70} skit | m4oy | 090 [Planks | sym | 3 sqm | unski |, | 4.00 | Waling &Siuts | cu. ) 208 More than 3.0m 100 | skin | may } 1.00 | Planks | sym | 3393 | } sqm | uns |, | 1.75 | wating aStuts | Cu | 203 \ 14, Closed types of timber works needed for trench works inc supply of materials and ting. | 100 | skit} mday | 050 | Planks | Sqm] 1000 Sohage wae of 2. Less than 1.5m depth Som | uns |. | 4.00 | Waling Unter sal te 25% &Sints | cu. | 247 dt is oigne cost alr wing bem si b, Between 1.5m & 3.0m 100 | skill | mday | 1,00 | Planks j Sqm) 1000 ke Sqm | uns}, ) 200) Waling a Sins | ca. | 247 | |. tae than 3.6m 100 | skit | mday | 150 | Planks | sym} 1000 Sqm | uns}, | 200 | Waling asints | cu | 247 | 15, Open types of wood works in and neat excaredon nd oun supply of materials & fixing, of sore cost a. Less than 1m depth 100. | ski | mday | 025 | Planks | sym | 98:33, eciety fea Sqm { unskt | | 050 | Waling times & Sins} Cu | 465 b. Between 1.6m & 3.0m | 100 | skill | mday } 0.50 | Planks | Sqm | $3.33 | sum | vsti |. | 100 | walig Sinfs | ou | 185 Mote than 3.0m 100 {skit | may | 1.00 | Pranks | sym} 33:33 { sqm | uns |, | 1.75 | Waling &Sinfs | Ou | 185 | 18. Closed types of wood works in ant nearby excavation incl j Satan sate | ‘supply of materials and fixing P te ele 2. Less than 4.5m depth 100 | “skit } may | 050 | Planks | sam } 1000 oo sqm | uns |, | 1.00 | Waling “lai Sits | cu | 1.38 oo | b, Between 1.5m & 3.0m 100 | skit | maay | 1.00 | Planks | sym | 1000 sqm | urs |. | 200 | Waling asius | cu | 138 ©, Mote than 3.0m 100 | skit | may } 1.50 | Planks. | sqm 1000 | Sqm | unsit |, | 260. | Waling aSiuts | cu | 1.36 . | ” Rate Analysis Norms 9. Roofworks eee 8K. | Description of work | unit ‘aur ~~ [Const tara Machinony_——"| Remarks | Class [Unit -iy._|-— Type | Unt | y| Type [Unt [1 CGI sheet wooing works] 10 | skil | mday | 1.00 [Ci shee | sam] 12.0 with supply of mates | sqm | unskl |, | 1.25 | 22x24 complete, swe uvboll | Nr | 30.00 nm jshooks | Ne | 2500 Bitumen ‘ wesher | Nr. | 65.00 2.Mokng ridge of C.G1 plans | each | skit | mday | 200 | Plain sheet | m. | 1200 sheets & fiting wih supply of | 40m | unski |, | 300] Notbott | Nr. | Approx . tmaleials complete 3. Corrugated asbestos | 10m] skil | mday | 1.00] sheet | sqm | 1200 . cement sheet rooting works unstt |, | 1.00} Nutbot | Nr | 30.00 with supply of materials &nm complete j-hooks | Nr. | 25.00 Bitumen collar Ne, | 25.00 4. king ridge of AC. sheets | 10m | skit | may | 0.50 | Ridge mM. ] 1200 and filing with supply of ust |, | 050 materials complet 5 Making ste root wth| 10. | stil | mday | 400 | Sites | Sam | 24.00, supply of materials complete. | sam | unskt |, | 5:00 | Nais ‘pone 6. Making olay tle roof wih | 10 | skit | mday | 0:50 | Tie Ne. | 1250 supply ofmaterils compte. | sqm | unstt |, | 1.60 7. Making ridge of clay tes | each | skit | mday | 050 | Ridge | Nr. | 800 with supply of materials 10m | unski | | 050 8. Lime concrete (1:1: 3)| 10. | skit | mday | 1.80 | Brick aggrs | cum | 1.25 roof teracing works of t0om | sqm | unski |, | 120 | me suki | hg. 4.50 * thickness with supply of (Sond) | cum} 040 malerils comple 8. Making woofs of grass (09 | 23s Khar, babiyo et.) including | | supply of mates, foming bamboo frames & fixing 2. tlekness of roof em 10 | skit | méay | 1.50 | Kher find | 8:30 perimeter sqm | usk |, |150] Bamboo | Ne | 300 oa Ropes | kg. | 350 bundle of Mal san | 1200 Kher is ‘6m Rate Analysis Norms 25 Resources, SM. | Description of work st Labour Const Materials r Remarks ‘Gast ]_Unit [Gh | Type | Und | Oly. | Type | Unt | Oy | 9 | Sb, Thickness oot Team] 10] skil | mday [200] Khar — [ound | 1650 Use mat sqm | umskl |, | 200 | Bamboo | Ne. | 40.00 only when Ropes | tg. | 5:00 required Mat | san | 12.00 10. 20mm thick wooden | 10 | skit | mday | 180 | Timber] Cum | 0.26 caling fiting work with 40X] sam | urs |, | 150] Nais | ig | 040 For 20 mm beading join's and 40mm frame, supply of materials complete. screw | We | 1600 see 10116) 41, 20mm thick wooden | 10 | ski | may | 2.00 | Pian cling iting work with supply | sqm | unskl |, | 200 | asbestos | ‘of materials complete sheet | Sum | 10.50 | ‘wooden | beating | cum | 0.03 screw somm — | Ne | 70.00 soew 6 mm| & | 1600 rails som | Ne. | 038 26 Rate Analysis Norms 26. Timber works L = = Resources SN. | Description of work nt Labour Const. Materials Main Chass | Unit] Qty. ‘Type Unk yy 10 Making sal wood Tame © > ee fixing a Door size 900x2400mm | each | sa | méay | 150 | Salwood cum | 0.044 ansti | mday | 0.15 | Holdfast 50mm Ne | 4.00 Screw nc’ | 800 b. Door size 100 x 75mm each | ski | malay | 34.00 | Sal wood cum! 1.10 nal | may | 340 | Holifast Wr. | 92.00 Sorew Nr. | 184.00 ° 2. Making shutter in 8mm. | each | sel | may | 10.00 | Sal wood thick Sal wood frame (shutter uns | mday | 1.00 | 100mm. cum | 0.084 size 1.07m x 1.982m Hinges 150mm, Ne | 6.00 © Bolts. | 2. 250mm Ne | 1.00 b, 300mm Ne [4.00 Locking set Me. ) 4,00 Handles Mw | 200 Sarow Ni} Approx 3. Making & fitting Smm} each | seit | mday | 9.00 | Sal wood cum | 0.049 glazed shutter in 38 x 76mm. unss! | mday | 0.90 | Glass 3mm ‘Sqm | 1.085 ‘sal wood frame, Hinges 75mm Me. } 800 Bolts 100mm Ne. | 4:00 Handles Nw. | 200 ‘Serews Approx 4, Making & fitfing 3mm} each | stit | mday | 900 | Sal wood Cum | 0.049 glazed shutter in 38 X 75mm. unsk | mday | 0.90 | Glass 4mm ‘Sqm { 1.085 ‘sal wood frame (shutter size Hinges 75mm Ne |} 8.00 1,892 x 1.22 = 2,238q.m) Botts 100mm we | 400 Handles Ne. | 2.00 [Screws Approx 5, Making & fixing 55mm th. | each | stil | may | 9.00 | Saiwood Glass | Cum | 0.049 - glazed shutter in 38 X 75mm, uns | may | 090 | 55mmbHinges | Sqm | 1.085 thick sal wood frame (size of 75mm Bolts we | 8.00 shutters 4.829 X 1.22) 400mm wi. | 4.00 | Handles Ni. | 200 ‘Screws Approx. 6, Making & fixing 6mm thick | each | sk@ | m-day ; 9.00 | Sat wood Cum | 0.049 slazed shutter in 38 X 75mm unstl | méay | 090 | Glass 6 mm | Sym) 1.085, thick sal wood frame (size of Hinges 75mm Nw, | 8.00 Shutter is 1.829 X 1.22) Bolts 100mm Nw. | 4.00 { Handles Me | 200 Screws ogc Rate Analysis Norms SN, Description of work | unit | [—Wachinery | Remarks Class ye | Unk | oy | | TO) 7. Making & fining Sim. trick commercial plywood fhsh shutter (Plywood both sides) in 38mm. ‘thick sal_wood \ frame with shutter se | 4.092 X 2.058) each | skit | mday | 7.00 | Salwood | cum | 0.0048 unsk! | mday } 0.70. | comm, Plywood | Sqm | 465 | Hinges | joomm | on, | 300 Bolts 450mm. ] oN. | 200 Matise Lock fr. | 1.00 i Screws Approx | 8. Making & fixing 2mm. thick tpl fash shutter (ply both sides) In 38mm. thick sal wood frame wi shutter size “082m, x2.088m each | shit | may | 7.00 | Salwoos | cum | 00346 uns | may | 0.70} tiply sqm | 465 Hinges 100mm | Ne | 300 Balls \ 1somm. | Ne | 200 Mortse Lock Nw. ] 1.00 Screws Approx | 9. Making and fing 18 gauge Gi. olan sheet stuctue (6. plain shoel both ses) in 8mm. thick sal wood frame with shutter size 1.092m, x 2.056m each | stat | may | 7.00 | Satwood | cum | 0.0346 uiisKl | meday } 070} Gi plein sheet 18g sqm | 466 Hinges toomm | oe | 300 Boks ‘60mm. | Ne | 200 Morse Leck we | 100 Screws Approx | Handle Ne | 1.00 \ | | L | Rate Analysis Norms Resources SN Description of work unit Labour Constr. Materials Machi Remarks ‘Gass Unit | Of. Type. nit [Gly | Type | unit [Oy 76 | 10, Making & fing 24 gauge moscisto proof wite mesh shutler in 38mm. thick sal wood frame with shutter size 11082 x 2.06m, east | skit | mday | 500 | sal wood cum | 0.028 Uunskl | malay | 0.50 | Giwitemesh | sam | 213 hinges 100mm | Nt. | 3.00 Bols 150mm | Nr. | 200 Handle Spring | Nr | 200 ‘Soew Ne. | 1.00 41. Fixing glass of ‘various | thickness in frame using a.Gass thickness 3mm. | Sq. | skit | mday | 0.06 | Gizss3mm. | Sym | 1.00 im | unskl | may | 0.006 | Tinberteds | om | 405 nals ‘Aoprox b.Glass thickness drm. | Sq. | skit | may | 0.08 | Giass4mm | Sam | 1.00 ‘m | unskl | mday | 0.006 | Timberbeds | m | 405 | nals ‘aprox 6. Glass thickness 55mm. | Sq [skit | mday | 008 | Glass5.5mm | sem | 1.00 m | unskl | may | 0.006 | Timverbeds | m | 4.05 rails ‘Approx 4. Glass thickness 6m Sq} ski | mday | 0208 | Glass mm — | Sqm | 1.00 m | unskl | mday | 0006 | Timberbeds | m | 405 ris Aprox 12 Foing 3mm, commercial | q. | ski } mdoy | 008 | Prywood 3mm. | Sqm | 1.05 plywood in frame using timber | m | unski | mday | 0006 | Timberteds | ar | 405 beads (isti) 1, Fixing 3mm, asbestos | Sq. | ski | mday | 0.06 | Asbestos sheet | Sqm | 105 plain sheet in frame using | m | unskd | mday | 0.006 | Timberbeds | m | 405 timber beads (list) Neils ‘Approx 14, Making. wooden parttion | | wall rom frame of size 061m] | x 0.915m, using sal wood of sve 38m. x Toma atachiag 3am. com. plywood one both sides incl. covering of he joints by timber beads. a. Preparation wall size 9.7m x 3.65m, each | ski | mday | 23.00 | salwoodtimber | oxm | 0.35 unskt | mday | 230 | Plywood 3mm. | Sqm | 75.00 Beads | Approx als Approx Rate Analysis Norms » Resources: i 8N. Description of work | unt Labour ‘Const. Materials Wachinery | Remaris [Glass [Unit Type | Unit | Qty | Type | Unit | Oty 70. [14 b. Preparation wal of| each | skill | mday al wood Simm. asbesios plain seet & wunstt | meday timber | cum | 034 975m x:3.65m, Asbestos 3mm | Sam | 75.00 Beads | =m | Anprox | Nails Approx «. Preparation of wall of | cache | skit. may | 28.00 | sal wood ‘nm, hardboard and. size ust | mday | 230 | timber | cum | 034 | 9.751 x3.65m. Asbestos is 3mm. | Sam | 7500 Beads | m_ | Approx Nails | ‘Approx | 16. Making wooden partition | | wal from frame of size 0.8%. | x 0.915m. using sal_ wood of sia 38mm. x 76mm & attaching 19mm, sa planks on | i both sides inci covering of the | } joins by timber beads. } | partion wall sze 8.75m x3.65m. each | skal |-mday | 23.00 | sai wood unstd | mday | 300 | timber. | cum | 1.767 Beads | m. | Approx als Approx 418. Naking various types of flush caiing using sal wood frame of size 600mm. x | 800mm. made from sal wood of size 60 x75mm, celing size 9.75mi x3.66mm. 4. Using 3mm, Commercial | each | skit | may | 23.00 | salwood | cum | 045 plywood sunsid | mday | 230 | plywood | 3mm, | Sqm | 97.50 Beads Approx Nails ‘Approx b. Using yen. asbestos | each | skill | mday | 23.0 | salwood | Cum | 046 piainsheet | uns | meday | 230 | Asbestos 3mm. | Sqm | 37.50 | Beads | Aprox | als | Aprox ‘cUsing 12mm hardboard | ach | skit | mday | 230 | Satwood | Cum | 045 | unski | mday | 230 | Hboard HsHord tamm | Sam | 97.50 | Beads Aprox | Nails Aprox 30 Rate Analysis Norms C i | SS } | SN. |Description ofwork | nit [Labour Const ata Wedhinery | Remarks ‘ Glass] Type | Unit [Gy Ape [Unt [Oy] 10._| 17. Making main beam, cross | Gem [skill | m-day | 17.65 | Sawood | oum | 1.05 “Rppieable beam etc, ftom sal wood and uns! | meday | 178. | Nails Aprox wp to Sm ‘iting. span 418, Making truss of sal wood | 10 | skil | may | 1795 cum | 105 and fiting cum | unskt | may | 2600 Agrox Aprox Aprox 419, Making 25mm, sal yood | 10 | stat | may | 143 em |o2s| | eaves- board ting. | Sqm | unsit | mday | 0.143 prox. | | | 20, General labour needs for | doors, windows & their 9 fixtures | | 2 Frame cum | skit | meay | 340 | > ung | may | 340 | o. Shutter Gum | skit | mday | 68.35 unskl | may | 683 . Plywood som | stil | mday | 1.108 unsit | may | 0.011 4.Gless sam | skit | may | 0.108 unt | may | 0011 @ Hinges san | stat} may | 008 tHande san | sit | day | 0:10 | ' @, Bott 00mm sam | stil | may | 004 1. Mortse Look sqm | skit | mday | 067 i Tower bolt san | skit | may | 0.17 i Door closer | * = hydraulic san | sil | méay | 0.25 = Spring: sqm | skill | mday | 0.10 1 Beads san | stil | mday | 0033 21, Cutting 16-20 mm. ia.) | | sleel bars & fiting in window frame incl boring noes in| Ky. | skit | mday | 2000 | steel | Kg | 105 frame unssi | mday | 20.00 | rods 1 = | Rate Analysis Norms a Resources SN. | Description ofwork | unit [Labour Remarks Pe [est | ___d 10, | 22 Saving nbor ops nel Messi our | Heating, unloading, caving, sides # beam hauling & ping & measure a. Dry timber saving sqm] skit | maay | 050 one site ask |, | 0168 | lanis Wet imber sawing sqm | ski | méay | 0625 ust |, | 0208 | 2. Making column of 34m | Nc | skit | may | 1.785, , | long round or square ber uns | | 0595 jogs stiging by axe and somthing by jack plane incl. | boring poles | 24, Plain by axe and pain by | az | stat | méay | 3.00 | jack and boring bole uns |, | 1.00 25. Making 5m ong sieicase | | sk | m-day | 12.00 | Irom mbes tos inet, sting uk | | 400 four sides, snooting by jack plane, boring holes and fiting. | 26. Smoothicg planks by jack | | skill | m-oy | 0.135 plane & meking af oF equal uk | | 045 vidih | 27. Making square from 4-5m. | | ski} mdey | 0.975 tong timber log by axe and ust | | 0325 fing | j | - 1c 32. Rate Analysis Norms 11. Flooring works T Resour S. | Description of work unit Labour Constr. Matos Machin Remarks N iass_|_ Unit [Gly | Type | _Unit_| 5 | Type | Unit | Oy 11] & 24 cement concrete floor casting incl. Brishing by ‘cement rubbing, 2. Foor thickness 25mm. 10 | sk | mday | 110 | Cement | MT. | 009 . sqm | unskt | méay | 150 | sand | cum | 0.42 sagt. tomm, | cum | 0.23 b.. Floor thickness 38mm | 10 | Skil | mday | 1.25 | Cement | ut. } 043 Sqm | unski | mday | 200 | sand cum | 0.18 m aggrts. tamm =| Cum | 0.36 . ¢.Ploorthickness 60mm | 10 | Skit | mday | 1.25 | Cement | ut. | 0.17 Sqm | unskl | may | 25 | sand cum | 0.23 agg. tamm | cum | 046 4. Floor thickness 75am | 10 | Skil | mday | 1.25 | Cement | mt. | 0.26 Sam | unskl | méay | 30 | sand cum | 0.34 agarts Yamm | cum | 068 2. 25mm, thick mosaic| 10 | Skil | mday | 3.25 | Cement | mi. | 0.065 flooring wih 20mm, thick | Sqm | unsk! | mday | 1600 | sand | Cum | 0.088 1:24 coment concrete base | aggrts. course & Smm. thick 1:1 125mm | cum | 0.176 white coment & marble whit | || ehies surtace course inl cement | MT. | 0061 finish by rubbing and Marble palshing chips3m | cum | 0081 | Oxiiser | powder | Kg. | 0.365 (xa Act) wa | a pbish | 4g | 0.118 Tarpent. | Lt | 0538 (lapendine) | Carbor. Approx (Caters) 3, 25mm thick mosaic] 10 | Skil | mday | 350 | Cement | mq. | 0.121 flooring with 19mm. thick | Sqm | unski | may | 36.00 } sand Gum | 0.465 cement concrete plaster whit (1:2) base course & 6mm. cement | Mt. | 0.069 thick marble chips white Marble cement (1:1) surface course chips3m | Cum | 0.047 inc. rubbing and polishing Oraic acid | Kg. | 0.34 veax pls | Kg. | 0:4 Tapent. | Li | 080 Carbor Rate Analysis Norms 3 c Resourses a SN. Description of works Unit Labour Constr. Materials: ‘Machinery Remarks: ‘Oy |— Type [Unt | ay | Type | Unit [ay _| [Ai Borne tick (47 mosaic | 70 3.50 | Cement [ML | 0089 flooring with 13.5mm thick | sq.m | unsk) ) .. 36.0 | Sand Cum | 0122 | cement plaster (1:2) base Wine cement | att. | 0.064 course and 6.5mm thick Mearble marble chips white cement | chips 3mm | Cum | 0.089 (it) surface couse | | Oxaicacid | Ke. | 07 Including —cubbing and Wax polish | Kg. | 0.118 polishing Taspentine | Lt. 0.538 Carbor. ‘Stone Aprox 5, 20mm thick terazo tiles | 10 | skill may | 2.00 | Tiles ‘Sqm {11.00 | Rub fioaring on 20mm thick 1:4 | sqm | unskl | ,, 12.6 | 20mm machine | Hr. | 6.0 | For no cement sand mortar incl ‘Cement Mt. 0.061 machine, rubbing and plastering ‘Sand Cum | 0.22 add 13.5. Onalie acid in-days of powder | Ka. | 037 skied Wax polish | Kg. O18 labour Tarpenting | Lt. 0.538 Carbor. ‘Stone ‘Aprox | 6, 25mm thick marble of size | 10 | skill | mday | 2.00 } Martie Sqm | 11.00 ; Rub | Hr. | 60 |For no 450mm X 450mm on 20mm | sqm | unsk! | ,, 8.00 | 25mm tine machine, thick surkhi mortar incl. ‘Surkhi Cum | 0.183 wid 135 rubbing and polishing. Lime: Cum | 0.091 m-days of Oxalic acid | Kg. 0.37 unskilled: | Wax polish | Kg. 0.118 labour ‘Farpentine | Lt. 0.538 Carbor. ‘Stone Aprox 7. Porcelain glazes ties | 10 | skit | mday | 120} P.G.e | sam | 14.00 flooring in 1:8 cement sand | sqm | uns 450 Cement | Nt | 0.056 imotar Send | Cum | 0462 White cement Cum | 3.228 8, 50mm thick flagstone | 10 | skill | m-day | 2.00 | F-stone Sqm | 11.00 oorng on 1:4 cement sand | sgn | unskl |, | 450 | 0mm mortar Cement Mt 0.063 3 sod | Gum } 0.171 } 9. Flagstone (Up 10] 10. | skit | mday | 1.00 | Stone | Sym | 4400 thickness 60mm) flooring on | sqm j unskl | 3.00 | Sand cum | 071 sand 1. Flooring of flagstone | 10 | skit | mday | 2.00 | Stone having thickness of 375mm | sqm] uns |, $450 | 37mm | Sqm | 11.00 ‘14 cement sane mortar Cement | mt | 0.06, Sand C. 0.165 34 Rate Analysis Norms Resources SN.| Description of works | Unit about onst. Materials Wachin Remarks Glass | Unit | Oy" [~~ Type [Unt [iy “Type [Unit Wf, | 1. 20mm thick fat sione | 70 [ski | meday | 1.50 | Stone flooring on 1:4 cement sand | sqm j uns |, | 450} 20mm | Sqm | 41.00 ‘mortar Cement — | Mt | 0.056 sand cum | 0.152 12, 26mm thick dense brick | 10 | skil | may | 460 | Densed | on 1:2 lime suri mortar | sam | unset |, | 4.0 | bricks Ne | 440.0 with 4-1 cement sand mortar Lime cum | 0122 pointing suki | Cum | 0.244 Cement | Me | 0.016 Sand cum | 0.11 13. Flat brick flooring on | 10 | skill | mday | 2.25 | Brick Nc | 4300 | send with 12 cement sand | sam | unskl |, | 325) Cement | Mt | 0078 ‘mortar pointing in joints, Sand cum | 0.229 | 14, Brick on edge flooring on | 10 | skill | mday | 1.1. | Brick Ne. | 7500 | “:B.cament send mortar with | sam | unskl |, | 18 | Cement | ML | 0.121 4:2 cement sand mortar Sand cum | 0431 pointing at joints. | 45. Laying parquet floor, | 10 | skit | mday | 175} Parquet | Sqm | 10.50 sandpaper rubbing and | sam | unskl |, | 0.75 | Sand | polishing, Paper ‘Aprox Wax polish Aprox. 46, Dry brick eying | a.fial 10 | ski | may | 0.0 | Brick Ne | 4200 sam | unsk |, | 1.00 | Sand cum| 0.71 | bon edge 10 | skit | mday | 1.00 | Brick Ne. | 75000 | sqm | unskl |, | 925 | Sand cum | 071 47. Dry stone laying 10 | skit | mday | 1.00 | stone | cum | 1.10 sqm | unski |, | 360 | Send cum | 071 18. 125mm thick on edge | 10 | skit | mday | 200] Cement | Me ] 0.02 soling of bricks inc, fiting | sqm | unskl |, | 4.00 | Bricks Ne | 7500 sand in joints and fash Send cum | 0.10 pointing on the top surface ‘of the joint by 1:3 cement sand mortar 49, 1:1 cement sand mortar | 10 | skil | mday | 050 | Cement | tg. | 4.20 pointing on joints of stone | sqm | unsk! |, | 060 | Sand cum | 0.003 pavement works (stone size is 46m X 48cm} 35 Rate Analysis Norms Resources made trem 80mm X 75mm sal fimbor and fixing 25mm thick sal timber planks on {op surface as timber flor. SH. | Deccetion etwerks | Uni abou Const, Materials Wachinery | Remarks | Case | Unit [oly | Type [Unt | GR | Type | Unit | ay TT | 30 Filing wots Sens a. By sand 10 | skit | may | 6.50 | Sand Gum | 11.00 water & sim \ | ramming by rae +b, 15-150cm brick bats 10 | skill | mday | 70.0 | Brickbats | Cum | 11.00 sain 21, 3mrn thick fine cement | 10 | skill | mdey | 4.00 | Cement ig. 83.25 rubbing works sym | unski ww, 41.00 2. Laying G0Omm X/} 1) | skill | mday | 6.60 | Sal wood Cum | 0421 600mm sal timber frames | sqm) unskl |, | 0.65 | Nits ‘Aprox Rate Analysis Norms Plastering works 7 Resouces Ss. Description of works Unit ‘Labour Constr. Materia's ‘Machinery ‘Remarks N “ Glass [Unit [Oy [Type J Unit_| “Gly [Type [unit | Oty 1 [1. 12.5mm thick cement sand 2. | plastering works a.1:2ratlo 100 { skill | mday | 12.0 | Cement Mt | O90 Add 25% sqm | unt], | 160 | Sand cum | 122 sre bow for ceing 6.453 ratio: 400 | skill | m-day | 12.0 | Cement ML | 0.625 plaster Woks sqm | unskl ie 16.0 | Sand Cum | 1:28 V 1:4 rallo 100| skit | mday | 120| Cement | Mt. | 0598 sqm | unskl » 18.0 | Sand cum | 1.46 f d. 1:6 ratio 100 | skill | mday | 12.0 | Cement ML | 0.382 sq.m | unskl * 16.0 | Sand Cum | 1.57 a 2. 10.5mm thick cement, lime | and sand plastering works. 1:2: 12 ratio 100 | skill | mday | 12.0 | Cement Mt 0338 sqm | unskh . 16.0 | Lime | cum { 023 Sand Cum | 137 | |b 1:2:6raio 100 | ski | may] 120) cament | me | 048 sqm | unstt |. | 160 | Lime cum | 024 Sard Cum | 146 3. 425mm thick cement line ‘surkhi plastering works in 1:2 ratio. 100 | skit | medey | 120 | Lime cum | 064 ‘sq.m | unskt w 16.0 | Surkhi Cum | 122 4. 20mm thick cement sand 7 plaster 21:3 ratio 100.) ski) | mday | 14.0 | Sand Cum | 1.95 sq.m | unskl « 19.0 | Cement ML | 096 b. 1:4 ratio: 100 | skill | m-day | 14.0 | Sand Cum | 220 san | uns |, [190 | Cement] ML | OB = 2.16 ratio 100 | sk | mday | 140 | Sand Cum | 238 ! ‘sq.m | unski 19.0 | Cement Mt O87 5, 25cm thick mud plaster | 100 | skit | m-day | 20.0 | Solls Cum | 300 works incl. mud preparation, | sq.m | unskl 4 25.0 | Grain cells | Kg. 19.00 hauling up fo 30mt, distance, Cow dungs | Kg. | 1200 | y cleaning and soaking plastering surface by water 6. 12nm thick mud plastering | 100) ski? | mday | 18.0 | Soils Cum } 1.50 works in walls incl, mud | sqm | unskl |, | 20.0 | Graincats | Kg, | 50.00 ‘mortar preparation, trauling up Cow dungs | Kg. | 80.00 to 30m dist, cleaning and |__| soaking plastering by water. Rate Analysis Norms 7 13, Painting works. Resources $N.| Description of works | Unit Labour Constr. Materia Machinery Remaris ‘iass [Unit Gy | Type [Unit [Oty | Type | Unit [any 49 | 1. Whitewashing (now sac] 2. One coat 100 | skit | may} 180 | Whilelime | Ko. | 12.00 syn unskt |, | 050 | Gumete | Kg | 048 b. Two coat 400 { skit | mday | 150 | Whiletime } Kg. | 2200 Sqm | unskt |. | 1.10 | Gumete | kg | 0.88 ©. Three coat 100} skit | mday | 350 | Whietime | Kg | 3200 Sqm | usr |, | 270 |Gumet. } Ka | 1.28 2 Whitewashing old | 100 | skit | mday | 0.80 | Whitetime | Kg, | 10.00 surface) sym | uns |, | 070 | Gum.etc. | Ka | 040 3. Distemper paint works 2. Base coal (ining) 100 | skit | may} 200 | Lining uw | 800 Sym) uns |, | 200 . One coal 100 | skit | mday | 200 | Dry distem | Kg. | 650 sqm | unskl |, | 200 | powder ©. Second coat and | 100 | ski | mday| 1.80 | Dry Distem. | Kg. | 500 ‘addtional coats Sqm | unskl |, | 4.80 | powder 4. Waterproof cement paint application a. One coat 400 | skit | may | 170 | Waterproof | kg | 30.00 Sym | uns |. | 4.70 | coment point b. Two coats 100 | skill | mday | 5.00 | Waterproot | Zig | 4850 sam | unsk |, | 5.00 | cement paint 5, Prepared enamel paint or prepared plastic emulsion ‘int appication 2. Base or fing coat 400 | skit | mday | 3.00 | Lining uw | 810 Sqm { unskh |, | 3.00 b.Fisteoat 100 | skin | mday} 500 | Prepared | Li | 900 Sqm] uns |, | 200 | paint «©. Second coat 400 | skit | may} 4.00 | Prepared | it | 7.00 Sqm} uns |, | 3.00 | paint 8. Two coat of prepared | 100 | skil | mday | 10.75 | Primer u | B10 aluminium point appication | Sam | unsk |, | 10.75 } (lining) in addition to one bese or allum. paint |u| 1076 lining coat Send paper (sheet) Ne | 400 7. Deleted by 1993 revision ne = Rate Analysis Norms Resources SN. Desoripton ot works | Unit Labour Const. Materials Machinery | Remares De |__['etaes [unit [ay [Type [unit “Tony Type [unit | Oy 13” |& Double boled inseed of application 2: Single coat 100 | stil | may | 200 | Linseed | i | 6.00 sam | uns |, | 200 b, Second & addtional | 100 | skill | mday} 200 | Linseedot | UL | 6.00 coals | sqm | unsti |. | 200 9. Vamish application a, Single coat 100 | stat | may | 300 | varnesh | Lt | 00 | sqm | usd |, | 200 I |b. Secong & additonal | 100 | skit | mday | 300 | Varesh | LL | 500 coats sum | usd |, | 200 10. Blumen paint application | a.one coat 100 | skit | mday | 1.5. | Bitumen Som | uns |, | 10 | Paint u | 7.00 |b Two coats | 100 | skit | mday | 280 | Bitumen j som | uns |, | 20. | Paint ut. | 1200 {1 Thiee coat chapra | 100 | ski | mday | 10.00 | Chapra resin) paish application | Sqm | unsk |, | 800 | (resin) Kg. | 200 work Sprit u | 10.00 12 Painting works. of plastoved surface by cement paint «Fist coat 100 | sit | adey | 350 | Snowcem | Kg | 30.00 sem | uns |, | 350 », Second coat 100 | sat | may | 300 | Snowcem | Kg. | 2000 sim | unst |, ) 300 | 38 Rate Analysis Norms 14, Pointing works, 1 a ee Resources 8. | Description of works Unit Labour Gonsir. Maerais Wachinoy, Remarks N # |__| lass [Unit [Oy | Type | Unit | Gy | Type | Unit | any =| [14] 7. Flush poining in bck ‘asonary a Cament sand 1:1 100 | skit | may} 105 | Cement | MT | 0.316 Add 50% sam | unsk | may | 1200 | Sand | Cum | 022 ‘nore labours ‘ for aded b, Cement sand 1:2 400 | skit | mday| 105 | Cement | MT | 021 ponding Sqn | unskt | may } 1200 | Sand | Cum | 029 6. Cement sand 1.3 100 | skit | mday | 105 | Cement | MT | 0:156 sqim | usnkl | mday | 1200 | Sand) Cum | 032 4, Cement time & sand | 100 | stil | mday} 105 | Cement | mT | 0.728 143 sqm | unskl | mday | 42.00 | ime | Cum | 0.085 Sand | Cum | 0.255 Lime sur 44 40 | skit | mday | 105 | ime | cum | 0:22 Sqn} vnsk! | mday | 1200 | Surshi | Cum | 022 | {Lime surkhi 1:2 100 | skit | matay | 105 | Lime) cum | 0.15 Sqn | unsit | may | 4200 | Surhi | Cum | 029 2, Flush ruled pointing works ‘in boulder stone masonry wal a. Cement sand 1:1 100 | sii | miday | 1000 | Cement | MT | 0612 sqm | unskl | mday | 14.00 | Sand | Cum | 043 . Cement sand 1:2 100 | skit | mday | 1000 | Cement | MT | 0.408 sqm | unskl | mday | 1400 | Send | Cum | 057 ©. Coment sand 13 400 | sit | may | 1000 | Cement | MT | 0306 sam | unset | may | 1400 | Sand | Cum | 063 3. Flush rule pointing in asler | 100 | skill | may | 8.00 } cement | MT | ot masonry works using 1:3) Sqm | unsht | mday | 10.00 | sand | Cum | 0.20 ‘cement sand mortar 4.13 cement cand pointing | 100 | skit | maday} 500 | Cement | ma | 0.042 on fat stone pavement works | Sym | unsk | mday | 600 | Sand | Cum | 003 | (stone size 45 cm. X 46cm) 5, 4:1 cement sand pointing | 100 | skill | m-day | 10.00 | Cement | MT | 015 or dense brick pavement Sqm | unskt | matay | 1000 | Sana | Cum } 0.10 8.3mm, flushing plaster] 100 | ski) | mday | 1000 | Cement] ma | 0.396 Using 1:1 cement sandmorter. | Sqm | unskl | meday | 1000) Sand | Cum | 0.23 73mm. flushing plaster} 100 | ski | mday } 1000 | Cement } mt | 0.16 sing me Sqm | unskt | may | 10.00 | Sand |+Cusm 8. 3mm, fshing plaster | 100 | skit | mday | 10.00 | Cement | MT | o5t8 using cement _ Sam | anski | matay | 10.00 | Sand ale a Rate Analysis Norms 15. Road works, Resources sn. | Description orworks | Ua ‘abour Const Matra | wachinoy Unit | Giy | Type [Unit | Gty | Type | Unit 15 | 7, Making toad side ditch from rubble sine -masonry and cement sand mortar incl supply of mateias, preparing mortar & hauling up t0 30. a. Cement masonry 1:3 cum | Skil | may | 2.50 | Cement | MT | 0.194 Unski | mefay | 480 | Sand — | Cum | 0.42 Blokstone | Cum | 7.00 Bondsioe | Cum | 0.10 - b. Cement masonry 1:4 Cum | Skil | mday | 1.50] Cement | MT | 0.159 Unskt | may | 4.80 | Sang | Cum | 045 Bloctstone | Cum | 1.00 - Bondstone | Cum | 0.10 ©. Cement masonry 1:8, Cum | skit | mday } 1.50] Cement | MT | 0.106 Boostone | Cum | 100 Bondstone | Cum | 0.10 2 Making road side ditch form | Cum | Skil | mday | 0.47 | Blockstone | Cum | 1.00 . cry rubble masonry inc! Unstd | m-day | 4.25 | Bondstone | Cum | 9.10 | hhautage upto 30m. distance 3. Cleaning subgrade by | Sqm | Unskl | mday | 0.05 cating 97238, hauling and removing up to 10m, dlstanoe from const. site | 4 Sub -grade preaperation by | eating common sos having and removing uplo 10m ‘aay form the const. sit ‘a. Upto 10cm. depth Sqm | Unski.| m-day | 0.12 . b, Upto20om depth Sqm | Unski | mday | 0.18 Ss . Upto 30cm depth Sqm | Unskl | meday | 0.24 | | 5, Sub grade preparation by cutting stone mixed common soils incl, haullng & removal up to 10 me, away form the const. site a Stone 20%-40% and Sqm | Unskl | may | 0.28 om. deep by Stone 409%-50% and Sqm | Unskl | mday | 0.29 40cm. deep | ©. Stone 209%-40% Sqin | Unskt | mday | 0.38 | 20m, deep d. Stone 40% 60% and sqm | Unstl | mday | 041 20m. deep 2 7 = Rate Analysis Norms Description of werks Unit Resources Remarks Labour Conse Materials Machina 5 Cia | vat_[ iy | Type | wat | oy | Tape unt {ay |__| @ SloneAOHAVH and Sim | unskl | mday | 047 30cm. deep f. Stone 4%-608 and Sqm | unsti | may | 053 30cm. deep. | | 6. Making sub-grade by bringing | | scis & filing inc. leveling. & hauling up 0 10m, distance @. Upto {Cem high Sqm | unsit | may | 0.41 \ Upto 20cm. high Sqm | unski | maay | 046 6, Up!030 om, high Sam | unskl | may | 024 7, Roting fled soisin ayers | 100 Road | H. | 167 ; cum toler e10 Mt 8 Water sprinting works | MT | unski | may | 050 including hauing up 10 10 m distance 8, Laying sub - base course of sand mixed gravel including loading & transporting mat | eveling surface, & hauling up to 10m. cstance a. 10cm. solid depth Sqm | unskl | may | 0.15 | Gravel | Cum | 0.128 | Road roller 8- | Hr. | 0.009 10M. | 'b, 125 om. solid depth ‘Sqm j uns | mday | 017 | ,, = 0.16 7 » | 0.011 ¢. 15.em. solid depth Sqn | uns | may | 0.19 |, » | 0492 1. | oo 1d. 20cm. sold depth Sqm | unskl / mday| O21 |, a | 0256 . » | 0018 | 2. 25 om, soild depth Sm | unski | mday | 0.20 |, =) 032 “ » | 0.023 £30 cm. soild depth j Sam { unski | m-day | 035 |, » | 0.384 ” » | 0.028 4 9. 40cm. soild depth Sqm | unskl | mday| O45 |, » | 0512 ” » | 0.038 Rate Analysis Norms Resources, Description of works Unit, [Labour i tn tomers Ny Gass | Unt [Op 16 | 10. Laying sub-grade of broken | stones of required size gravel Jincl loading & wansporting | materials, surface leveling & hauling up 10 10 m, cistance in the const ste a 1.0m. sod thickness | sq.m | unski } mday | 0.14 | Coase aoats, | Cum | 01352 | Road | Hr. | 0.028 binding AO meat Cum | 008 b. 150m, sole thickness, Sqm | cnstl | mday | 0.21 | Coarse aggis. | Cum | 02025 | , ee) Sang, | Cum | 0083 pat | Cum | ants ¢. 25cm. sold thickness ‘Sqm | unskt | mday | 0.32 | Coase aggts | cum | 03375 | Roa |, | 007 Song. | Cum | 9.105 | roller 8 ‘binding 10MT mat | Cum | 0005 | 41, Roling by road roller of 8-10 MT Foal [Hr | 300 2, Sub-base course 100 roller 8 cum “OMT , Base course Sed 4.00 42 4. Laying base couse of broken stone, send and clay (clay bound macadem) incl arranging stone in layers, spreading dey & hauling up to 40m distance (etc) 13.6 om, sold thickness sqm | unsk) | may | 0.10 | Coase Road | Hr. | 0.002 aggts. | Cum | 00794 ] roler 8 4 Song. | Cum | 00164 | -10MT mat | Cum | 00072 b. 7.5m sold thickness sqm J unskl | may | 0.12 | Coase atone aggts. | Cum | 0.10 0.003 Sema. | Cum | 0.12 bindng Rate Analysis Norms: 43 Resources, s. Description of works Unit [~ Labour Constr. Materials ‘Machinery Remsrks x. Class | Unit [Oy | Tye | Uni | cy | Type | Wt) aly 15 | c. Bom solid thickness ‘Sym | Unskt | m-day 76.13 | Coarse Road | Hr | 0.032 aggis. Cum | 0.1087 | roller 8} | ‘Seang, Cum | 0.0213. | -10@7 binding mat | Cum | 0.0096 | | 100m sold thickness | Sqm | Unskt | matay | 0.15 | Coase als, ww | 01004 agi, | cum | 0.1999 Samy. cum | 0.0266 bindingmat | Cum | 0.012 e. 12cm soitd thickness ‘Sqm | Unskl | m-day | 0.18 } Coarse aggits. Cum | 0.16 « » | 0.048 sam. | Cun | 003 | bindngamet | Cum | 0.0144 £. 14.00m solid thickness: ‘Sqm | unsk! | m-day | 0.32 | Coarse agg. cum | 0.1866 |, » | 0.056 Sang Cum | 0.0373 | ndingmat | Cum | 0.0168 | | 9. 150m solid thickness ‘Sqm | Uns | m-day | 0.23 | Coarse aggits, cum | 0.20 ie Hr | 0.006 Song Cum | 008 | | bindingmal | Cum | 0.018 412.2. Mixing sione dust in broken slones & eying them incl arranging stones. in layers, spreading sfone dust & having up to 10m, distance (Stone dust bound ‘macadam) sqm | Unski | m-day | 0.10 | Coarse 1.6 om. solid thickness aggrts. | Cum | 0.0794 | Road | Hr | 0.024 Stone dust | Cam | 0.016 roller 8 OMT sqm | Unsk) | mday | 0.13 | Coarse b. Bom. solid thickness agarts. Cum | 0.1087 |, » | 0.0032 Stone dust | Cum | 0.0213 sqm | unskl | m-day | 0.1 | Coarse w a | 0.004 <. Bom sol thickness aos. | cum | 0.1930 Stone dust | Cum | 0.0268 sqm} onskl | m-day | 0.18 | Coarse x » | 0.0048 4, fom soli thickness aoars. | Cum | 0.48 Stone dust | Cum | 0.032 | \ Rate Analysis Norms Resources, 8. Description ofworks | Unit Latour Const. Material Machinery Remarks | N. Giese [_Unit_[ Gy | Type [unit | iy | Type [at | Oty 15 | 1226. tem soidthicnness | sqm | uns | mday | 0.21 | Coarse | cum) 01866 [Road [Fw | 0an56 aagts, toler 8 Stone dust | Cum | 0.0373 | -f0MLT £.15em. solid thickness sqm | wed | may |023 | Coarse | cum}o20 |, | | 0006 agar, Stone dust. | Cum | 0.04 13, Laying base course of solid thickness of broken stones ina. surface leveling & hauling upto 40m, thickness 2. 75am. thickness sgn | une | malay |0.12 | Broken | cum} oto |, |, | 0003 e sfone Sn, .10om. thickness sqm | ost | mday | 015 | Broken |) cum]o.us |, |, | 0004 * stone 0m 44. Laying wearing course of | syn | uns | mday | 0095 ‘sand clay mixture on the top surface of lay bound ‘macadam Indl surface leveling, | | water sprinkling & hauiing up the 10m. distance 45. Sione edging works inc. | m | unsil | m-day | 0.15 adjustment of ina, excavation of fooing 7 hauling up to 10m, distence 16. Cleaning top surface by wire brush & broom before pitching ‘a.on water bound macadam — | 10 | unstt | mday | 0.25 sum on other road surface 10 | ult | mesay | 0.20 sqm 17. Tack coat application inc, supply of materials : | aon old pitch surface 10 | unski | mday | 0.20 | Bitumen | Kg. | 730 | Ber | Hr | 0.04 | (Boiler; qm Kerosene | it | aprox | Ser Firewood : ka, | 3.00 Ino - wg | 1200 Ins wrk {Opn ure) - tg, | 1800 Tp nk (Open tumace) Rate Analysis Norms: 48 Resources 8 Description of work | unit Labour Const. Materials Remarks N. Cass | Unit [Oty | Type | unit | Oy ‘oy 115 | 77,6. On base course W] | Unsth | maay 10.20 | Bitumen | Kg. | 1220 | Bier | Hr sqm Kerosene | Lt | Approx | Ser} Hr Firewood 2 Ko. | 500 InBolier H Kg. | 20.00 InMass wok (Open umace) : kg. | 3000 In patch work (pen umace) 418, Applying priming coat incl ‘supply of materials, \ 2. On od plch surface 10. | Uneil | may | 0.20 | Bitumen | Kg. | 490 | Ber) Hr | O08 Sam | Kerosene | LU. | Approx | Slee} Hr | - Firewood : Kg | 200 In Boller : kg | 800 Indes work (Open fumace) | : Kg. | 1200 Jn alc work (Open tumase) », On base course 410 | Uns | mday | 0.20 | Bitumen | Kg. | 975 | Bier] Hr | 004 Sqm Kerosene | i. | Approx | Ser} Hr | - Firewood - vg. | 40 In Boiler - Kg. | 16.00 Inass work (Open mace) : Kg. | 24.00 | In patch wok | ‘Open furnace) | 19. One coat surface dressing | 10 | Umsti| méay | 0.45 | Bitumen | Kg. | 20.00 | Bier | Hr | 0.04 including compaction Sqm Kerosene] Lt | Approx | Siler | Hr) - | Firewood Rler | Hr | 0.04 | (Roter . Kg. | 8.00 In Boller 7 kg | 3200 In ass wot {Open fumace) : Kg | 48.00 Inpatch work Agar {Open tunace) 42mm, | cum} 015 20, Two cnet surtace dressing | 10 | unt | may | 0.80 | Bitumen | Ko, | 3400 | Bier | Hr | 0.07 including compaction. sam Kerosene | Li | Approx | sier} Hr | = Ficewood Rec | He | 0.07 | : ke. | 1300 In Boiler 2 Ko, | 5200 Ins work (Oper tunaoe) : Ko. | 78.00 Inpatch work Agar (Open tamace Yam | am | 0.18 fom, cum | 0.10 46 Rate Analysis Norms Rate Analysis Norms. 8. Deseription of work ‘unit Tabour Constr. Materiale Machi Remarks N Ga [Unit [ty | Type [Unit [ty | Type [unt 15 [21 Semigroutag work ind compaction 4 specication ‘Som. thickness 40° | unck | may | 1.20 | Bitumen | ko, | 38.00 | Beer | He) 007 | mention 50K Sun Kerosene | Lt | Aprox | Sler | Hr |- | bomen, then Fuchiood Sper | Hr | 0:07 | adopt” Sok, Bier ko | 1200 hee 100, Mésswork | Kg, | 4800 Same re is Patios | Ka, | 72.00 axpicable for Sire ats wood aso : 38mm. | Gum | 0.66 | vamm. | Cum | 045 dom. thickness 10. | Ura} may | 200 | Bitumen | Kg, [6000 | Bier | Hr | O07 Sim Kerosene | U | Aprox | Ster | Hr | - Fuelwood Spe | He | - Bier ig, | 18.00 Masswork | Kg. | 72.00 Patt | Kg. | 1080 Sone aggts 38mm, | Cum | 4.20 2mm. | cum | 0:30 22. Som. thick bridge grouting | 10 | Um | medey | 120 | Siumen | Kg. | 6000 | Bier | Hr | 07 | | works inc, compaction sam Kerosene | Lt | Aprox | Sler | Hr | ~ | Fusiaood soe [He | - Bler Kg. | 2000 | Masswork | Kg, | 6000 Pachwork | Ka, | 1200 Sere ats 36mm, | Cum | 060 Yamm. | cum | 0.48 2.1. Seal coat works incl | 10 | unsit | maay | 045 | Bitumen — | Kg. | 1800 | Ber | Hr | 0.08 | compaction Sqn Kerosene | U | Apox | Ster | Hr | - Felwood Spe | Hr | 0.08 Bier ka. | 600 Masswork | Ka, | 24.00 (open ac) Patchwork | Ka, | 36.00 {hope ac) Sie ons, 6mm. | Gum | 0.42 23, 2 Seal coat works wih | 10 | uns! | mday | 045 | Cutback Ble |Hr | 004 coarse sandind. compaction | Sqm Bitumen Ste [Hr | - Cheese | Ko |} 960 | Sue | Hr | oot | Kerosene | it | Aprox Fuetwood Bier | kg | 400 Masswork |g | 16.00 {nopentmae) Peictwork | Kg | 2400 opens) Goacesad «| Cum | 007 | L ”

You might also like