You are on page 1of 7
LODHA LODHA UPPERTHANE es ANJUR, False Ceiling Work Type.of Document : METHOD,STATEMENT >) Title of Document. f FALSE CEILING WORK Document Reterence No. : LUT-MS-029RO.Dt, 10-06-2019 Discipline < Givil/ Arch AMER. LODHA Review & Approval: Revision 0 Issue Date:] 10-06-2019 Name Designation Signature & Date Prepared & Quality Compliances Reviewed by Vipul Pandya GM-OA By Safety compliances Reviewed by: _ ‘Specification and Co-ordination Reviewed by. Pradeep Pillai Manager-EHS Be AVP-Planning & Sudheesh R. Co-ordination Contract terms Reviewed by: Virendra Bhanushali GM-Commercial Construction Sequence Reviewed by Manoj Pawar GM. CM ay Construction ‘Sequence Reviewed by Construction ‘Sequence Reviewed by: _ Approved by: Namdev Londhe GM-cM ec yt Z Tribhuvan Thakur GM. cM Shrikanth Kami PD-CM = LODHA LODHA UPPERTHANE False Ceiling Work TS none a seren ute ANJUA METHOD STATEMENT Title: FALSE CEILING WORK Doc. No.: |Lurats-0 Ro 0% 10-062018 Originator: Lodha Group Discipine: [civ [Rev:0 | Date: | 10-06-2019 INDEX Sr. No. Contents Page No. 1 Purpose 3 2 Scope 3 3 Reterence documents 3 4 Responsibilities 3 5 Resources- Equipment Details, 3 6 Raw Materials, their Inspection and Acceptance Criteria 4 7 Methodology 4 8 _| Access / Egress, Logistics & Housekeeping 6 9 Quality Issues, Environmental Issues 7 10 EHS Measures 7 Attachments + Inspection and Test Plan (ITP) QA Card a + isk Assessment a | | Method Statement Page 2of7 = LODHA UPPERTHANE False Ceiling Work stone 4 verre ise ANJUR METHOD STATEMENT Title: FALSE CEILING WORK Doc. No.: fiut-ws-0 Ro ot 10-06-2018 Originator: Lodha Group [ Discipline: | CIVIL | Rev.:0 Date: | 10-06-2019 1. Purpose : ~ The purpose of this method statement is to describe the methodology and sequence of activity of False Coiling Works at Lodha Upper Thane site. 2. Scope: This procedure is applicable for False Gelling works for lobby and Toilet ceiling of the building cartied out at Lodha Upper thane sites as specttied in Contract document or Project Specification. 3. Reference documents: Work Order No: IS: 2095-201 1-Part1- Code of practice for Plain Gypsum Plaster Board Specification IS: 2095-201 1-Part'- Code of practice for Coated/Laminated Gypsum Plaster Board Specification 4, Responsibilities: ‘The Project Director is over all responsible for implementation of this Method Statement and to ensure that his site team is aware of this Methodology and all resources such as manpower, material and equipment are available to carry out all works as planned. © The Project Manager will co-ordinate with the Construction Manager/Project for a safe and proper execution to accomplish the works on time as planned and with respect to the quality of the finished works. © Construction Manager will coordinate with Project Engineer / Site Engineer along with Site Supervisor / Surveyor and Foremen will ensure that the works are carried out according to the Specifications / Drawings and this Method Statement * Project Engineer / Site Engineer along with Site Supervisor / Surveyor and Foremen will Monitor & ensure that the works are carried out according to the Specifications / Drawings and this Method Statement & perform inspections & maintained required records for suitability & completeness. © QE Engineer/Technician, in close interaction with site personnel, will ensure that the works are carried out as per the project requirements. He is also responsible for the implementation of QA related to works as detailed in this procedure and for completing Quality documents for all related works. Equipment Used: Measuring Tapes Plaster Board Cutting Saw Metal Cutter Cutting Knife Dry walll Screw Driving Machine Plumb Bob & Level Thread Spirit Level Marker Sanding Tool and Taping Knite Method Statement Page 3017 — - LODHA UPPERTHANE False Ceiling Work enone a serren ure an METHOD STATEMENT Title: FALSE CEILING WORK Doc. No.: [Lure Root 1.062018 Originator: Lodha Group Discipline: | cIviL | Rev.: 0 Date: | 10-06-2019 Temporary Facilities «Platforms © Walkways + Night lamps. Ete, 6. Raw Materials, their Inspection and Acceptance Criteria: ‘Approved Material List Sr.No. Catagary Name of Manufacturer Saieae Remarks 7 Gypsum Plas 1 ees Gyproc, USG Boral mrc 2 Gypsum MA Board | Gyproc, USG Boral MTC False Ceiling | Elephant, JK steel, USG, ‘Make Approval 3 Aluminum Section | western, keerat & co. Based on Gauge ‘and Weight, a Fiber Mesh 7 Z5GSM S| BoardJoint | Gyproc, USG Boral Mc Compound a Walt Puy Bia, Burger, Asian pat, wall ime ‘© Anchors Fastener for supports form RCC ceiling shall be approved brand(Mark) and Board fixing screws should more than finch. 7. WORK Procedure Preparation of Work: ‘+ Draw the required false Ceiling Finish line from the finish Floor by using Laser line marker or Water Level. * Transfer this line on all corners of room. Mark a line on periphery of wall by using chalk line, Framing Work: ‘+ Fix the perimeter channel on the periphery of wall with suitable fasteners. ‘+ Mark the position of fasteners on true slab at 1000-1200 mm cic both direction, * Atjunction of two lines, drill a hole with the help of 8mm dia. Drillbit. Insert 8mm dia & 45mm long fastener inside a hole, Method Statement Page 4007 = LODHA LODHA UPPERTHANE False Ceiling Work SS ovsons a serren ure AUEI METHOD STATEMENT Title: FALSE CEILING WORK Doc, No.: |Lur-s-00 Roos. 1005-2019 || Originator: Lodtta Group Discipline: | CIVIL | Rev.:0 Date: | 10-06-2019 Fix the soffit cleat to the Fastener Ensure the nut of fastener Is properly lightened with Soffit cleat. Fix the Ceiling angle of suitable length to the soffit cleat at 1000-1200 mm cic with help of M6 Nut &bolt ‘+ Take a pipe for water level and transfer the perimeter top flange level on to the Gelling Angle Then mark the position of intermediate Channel ‘+ Fix the intermediate channel to the flange of Ceiling angle with M6 Nut & bolt. Ensure Intermediate channel resting on Perimeter Channel. Fix Celling Section perpendicular to the intermediate channel. Ensure distance between two ceiling section should not be more than 600mm cl. Ensure the overlapping of Ceiling section & Intermediate channel should not be less the 150mm. Gross -Check the level of all rame work to ensure entire frame is in Line & Level. Framing Work @ Opening: * Cut the Ceiling section at the location of opening like Light opening / Ac Opening / Access panel * Ensure additional support at both cutting ends by using intermediate channel suspended from soffit ‘© Put perimeter channel at the periphery of opening, Board Fixing Work: ‘+ Do boarding by 6xatt size gypsum board. Ensure that the length of board perpendicular to Geiling Seaton. + Ensure that, the drywall screws are 1mm away from tapered edge & 13mm away from square edge to avoid breakage of the gypsum board Method Statement Page Sof? = LODHA LODHA UPPERTHANE False Ceiling Work SS sutonc 4 serren Ure: ANJUR METHOD STATEMENT Title: FALSE CEILING WORK Doc. No.: |LuT-MS-00 ROD. 10-06-2019 Originator: Lodha Group Rev.: 0 Date: | 10-06-2019 Board Fixing @ Openings: Cut the board at opening by using board cutting saw. Put Edge bead at periphery of board opening to protect expose edges of boards. + Used Shadow line bead to creat $mm groove at the periphery of Ceiling. Attach this bead along with the edge of board and fixed on perimeter channel and finished with jointing compound. Jointing/Finishing of Gypsum Boards: ‘+ Finish all the joints of boards with the jointing compound & paper tape. Don't remove paper from square edge joint of Gypsum board. Fill he joints of boards with jointing compound & embed the paper taperfiber mesh. ‘Spread coat of jointing compound 100mm -1S0mm on mesh. Do sanding after drying of each coat and handover for painting, 8. istic isekeepii All the work places should be cleaned from the scrap materials derived from their work to maintain free access and egress to enter or exit the project normally as well as in the event of emergency. Access at the working area shall be making clear/available and are soundly constructed with suitable entry points to site, Storage of materials, equipment, tools etc. are not to impede access or ‘egress to and from work areas. Workers will be instructed to clean up, and keep their places of work clean and tidy after completion of their day to day works. Method Statement Page 6of7 = LODHA LODHA UPPERTHANE False Ceiling Work —_ ANAUR METHOD STATEMENT Title: FALSE CEILING WORK Dos. No, LUTaNS0 Root. 10-08-2018 Originator: Lodha Group Discipline; | CIVIL | Rev.:0 Date: | 10-06-2019 9. Quality Issues, Environment Issues: Quality control Inspection for the subject work shall be carried oul in accordance with attached Inspection and Test Plan — Attachment 1 Quality assurance cards shall be filled to ensure the work complies with the Specifications. Care should be taken during cutting of Gypsum Board as per size regarding dust creation and control the dust with safety precaution. 10. EHS Control Measures: * Contractor workmen and staff involved in Block work shall undergo EHS Induction before entering Construction site. + Contractor workmen shall wear adequate Personal protective Equipment (PPE) lke safety shoes with steel toe/ gum boot with steel toe, high visibilty vest, safety helmet and rubber hand gloves, safety goggles and dust mask while working. ‘+ Tool Box talk to be provided to all workmen before starting the activity on daily basis which will cover the hazards and risk and the related control measures for ensuring safe working environment. ‘+ Adequate supervision to be provided to identity and control At Risk behavior and ensure the work is carried out as per process mentioned in the Method statement. + Portable power tools and any other electrical tools shall be routed through ELCB/ RCCB of 30 mA rating to avoid electrocution. ‘+ Licensed electrician is authorized to attend to electrical problems like m/c repair + Lodha Associates and Contractor staff shall conduct inspection to review the implementation of Control measures and is authorized to stop work in case adequate control measures are not implemented. + Adequate illumination arrangement shall be done prior to starting work during night time. ‘+ _ Night work permit system shall be implemented if work needs to be carried out after 6:30 pm. ‘+ Permission to carry out Night work shall be given by Project Head and EHS In-charge. No work shall be carried out after 10 pm ‘+ While working at height, height work permit requirements shail be followed. Fall arrestor and full Body safety harness shall be used while working at edge of the structure. Attachment: Inspection and Test Plan (ITP) * QC Card + Risk Assessment

You might also like