[SIN] DESCRIPTION UNIT | QTY | _RAT| AMOUNT
1|SCOPE OF WORK E
[This scope of work defines the minimium
requirements for the remedial civil works on OLD
IELF ROAD in OGBOGU Community. The work
include but not limited to; construction of culvert,
scripping of lateritic ‘muddy soil on the existing
road surface, compaction, filling, asphalt etc on
road surface etc as directed by
4.4|Site Works Engineer(s).
2|PRELIMINARY
[Mobilisation & Demobilization of ALL tools (wheel
lbarrow, shovels etc), manual Stee! Roller
(compactor), Asphalt paver, tar boiler etc, material
(asphalt, MCO, stone base etc), personnel, safety
lwears, road signs, flagmen, dispensary etc and
lcompliance with Health, Safety, Environment and
[Security (HSES) as
2.1]Citected by Site Works Engineer(s). us _|_1_ |1.750.000| __1.750.000.00]
PRELIMINARY | 1,750,000.00]
‘3|EARTHWORKS AND ROAD BASE REPAIRS
DAMAGED AREAS; (9m x 21m) + (12m x 7.3m) +
(2.7m x 7.8m) + (Sm x 49.5m) + (5m x 7.4m).
3.1}TOTAL;- 580.66SQM
inspect all failed raod sections and potholes in the
ldesignated area, With services of tools, cut out
|square/rectangular shaped road sections and
potholes and clean free of loose particles, sand
lbags and water as directed by Site Works
3.2|Engineer. w_| 90 6,000] 540,000.00}
[Provide equipment (MANUAL STEEL
ICOMPACTOR,, level and compact surface to a
relative compaction of not less than 95% standard
proctor compaction, camber 4-6% to
3.|receive Granite hardcores and Looms
[Prepare and regulate existing road base with 0/50mm
[stone base granite 150mm compacted thickness to
stabilize, grade and compact to 95% MDD at optimum | To
3.a}moisture content, (OMC) to receive MCO prime coat. | N
Provide and apply prime coat of MCO bitumen
blinded with sharp sand on the entire regulated
3,5|fOad surface at the rate of 1.2 Itrsim?.
EARTHWORKS AND ROAD BASE REPAIRS| >
<8
2__| 500,000] _1,000,000.00]
431 | 15,000] _1,965,000.00)
109] {638,000.00
S 4,143,000.00]
oma
Ww Website: http://www egitarmsagrotrustacademy com ng Email: inf tarmsagrotrustacademy com ng
Tet: 08064621690 ecimenatarmsandacrotrustacadem@amai.comRC 1662890
EGI MEGA FARMS
®
AGRO TRUST ACADEMY L.T.D (EMFATAL)
RE-SURFACING (OVERLAY)
[Sweep clean the road surface to be free of any loose
Imaterials, provide and apply bond tack coat of
lcolas A on road surface ready to receive asphaltic
Saleen ewe roee: ne_| 7,248 .850| _6,160,800.00]
[Provide and lay Hot rolled asphalt (Wearing course)
in appropriate mix, 40mm compacted thickness laid
Ito camber on the road cross
3,7[Seetion as directed by Site Works Engineer. He | daca [tal St aceasta
RE-SURFACING SUB-TOTAL| '57,621,600.00|
| ‘CONSTRUCTION OF CULVERT(BY OB-5 LOCATION)
DIMENSION; 9M LONG, 6.6M WIDE, 2.4M HIGH
‘4.1]EARTH WORK
[Allow provisional sum for cutting of the
4.2|esphalt with asphalt cutter to ensure straight edges us| 4 =| 200,000.00
[Backfil and compact excavated materials around the
culvert using manually operated roller compactor.
ICompaction shall be in layers of 150mm
4,3to 100% BS. wo_|_8t 900} 72,900.00]
4.4|Cartaway excess excavated materials from site us | 1 | 250,000 250,000.00}
EARTH WORKS) 522,300.00}
“4.5|CONCRETE WORKS:
Provide materials, mix and place 1:3:6 conerete as aa
4 Sletinding with 50mm thickness. 36 | 65,000) 227,500.00)
[Provide materials, mix and place 1:3:6 concrete at ns
4-7ltne base and top slabs. 6m x 9m x 0.3) 2 35.64 | 62,000 _2,209,680.00)
Pi terials, %: te at
1.|P'@de mateals, mix and place 1:56 concrete a % | sa4a| 62,000] 1,208,28000
the four wall (1.8m x 9.0m x 0.3) 4
[Provide materials, mix and place 1:3:6 concrete at «
the aprons (1/2(6+9.3)2.5}x0.2 x 2.
4a) 7.65 | 62,000] 474,300.00
[Provide materials, mix and place 13:6 concrete at 2
seul Ithe aprons [1/2(6+9.3)2.5]x0.2 x 2. 7.65 62,000} 474,300.00
[Provide materials, mix and place 1:3:6 concrete at ~
4 ""Ithe wing walls (1/2(2.4* 1.0) 2.5}x0.2 x 4. 34 | 82,000] 240,800.00
[Provide materials, mix and place 1:3:6 concrete at e
4'2lthe toem beams (0.6 x 9.3)0.3 x 2 3.35 | 62,000) 207,700.09)
CONCRETE WORKS | 5,009,560.00)
Rreade ‘and fix 18mm construction plywood properly
106d with 50mm x 100mm x 3600mm wood. The
* shall for the walls and soffit ofthe top slab,
tS include loosing of forwork after casting. we 268 7,150] 1,916,200.00}
FORMWORKS 1,916,200.00|
Ww Website: http://www egitarmsagrotrustacademy com ng Email info@egtarmsagrotrustacademy com ng
Tet: 08064621690 ecimenslesmecntecrcetacetenfamelcomRC 1662890
EGI MEGA FARMS
®
AGRO TRUST ACADEMY L.T.D (EMFATAL)
415 REINFORCEMENT
-s1e|Provce and fix the following reinforcement in culver,
lwing wall, apron and toe beams.
[4-17|(@) 116 @200 cetres (Base and top slab) KG | 4293 ‘900| __3,863,700.00|
7B|(b) T16 @ 200mm centres for wails (vertical) KG_| 2020 900] 1,818,000.09]
4.19](d) T12_@ 200mm cetres for walls (horizontal) KG | 1110 900] 999,000.00}
4.2\(e) T12_@ 200mm cetres for aprons KG | 499 900] 499,100.00]
r42i]() 112, @ 200mm cetres for wing walls KG | 510 300] 459,000.00]
'4-22](q) 2x 6116 for toe beams KG | 510 ‘300| “459,000.00
[423] hn) T10 @ 200mm centres as stimups KG | 118 ‘300| 108,200.09]
REINFORCEMENT| 3,204,000.00]
CULVERT SUB-TOTAL| 15,652,660. 00]
5| RETAINING WALL CONSTRUCTION (ON BOTH SIDES)
DIMENSION; 358M LONG, 0.3M WIDE, 1.2M HIGH
5.1 |CONGRETE WORKS
Provide materials, mix and place 1:3:6 concrete as
5.2 blinding with 50mm. ere ey] 51.100} 855,400.00)
Provide materials, mix and place 1:3°6 conorete at the
base (0.75m x 0.3m x 179m) and wall (179m x 0.3m x
1.2m) luding the Road shoulder. a
5.3] 225 60,000] _13,500,000.00}
CONCRETE WORKS: 14,355,400.00}
3.d| EXCAVATION
|Excavate not more than 800mm, and compact the r
5.5aso of excation to rece bind concrete. e142 [000] 142,000.00
EXCAVATION} 142,000.00}
3.6|FORMWORKS
Provide and fix Tomm construction plywood properly
braced with 50mm x 100mm x 3600mm wood. The
lformwork shall form the walls of the edge beam.
Rate include loosing of forwork after casting
51 we_| 350 | 7,000] _2,480,000.00]
FORMMORRS| 2,450,00.00]
REINFORCEMENT
5.9|(@) T12 @200 cetres (Base and toe) KG | 2,220 900] __1,998,000.00]
5.1](6) T12 @ 200mm centres for walls (ertical) KG | 3.260 [ _900[ _2.934,000.00] __
‘REINFORCEMENT | 4,932, jnAne
RETAINING WALL SUB-TOTAL 21,879, 409-06] 2)
GRAND-TOTAL 101,046, 66040, i
‘One Hundred and One Million, Forty Six Thousand, Six
Website: http:iiwww.egifarmsagrotrustacademy.com.ng
Tel: 08064621690
Hundred and Sixty Thousand Naira, on! =
“Ty Fos
Email: info@egitarmsagrotrustacademy.com.ng
ecimensiammacntnartentecetanGemehcon