You are on page 1of 1

STANDARD No.

SKIRT BASE DETAILS 7-12-0004 Rev. 6


wriumwrosame (A Govt. of India Undertaking)
Page 1 of 1

CHAIR CAP
NOTCH GUSSET TO WASHER WELD AT SITE
CLEAR WELD CONTINUOUS RING
NOTCH GUSSET TO
CLEAR WELD
EARTHING LUG
ir
// BOLT 0
+ 3mm
H 20

//
W
n A K
AK +V BOLT 0
-17
I-
II BOLT 0
+ 12mm
L + 12mm
(ALL DIMENSIONS AND DETAILS ARE
BCD BCD SAME AS SHOWN FOR TYPE-2
BCD EXCEPT CONTINUOUS RING)
BOLT 0 + 12mm
[WIDE SLOT RADIUS
+ 6mm
TYPE-1 TYPE-2 SLOT DETAIL TYPE-3
(SEE NOTE-6) (FOR CONTINUOUS RING ONLY)

BOCTO t1 * t2 * t3 * Av B C E F H K L* W TYPE REMARKS


24 20 — 10 60 — — — — 250 75 165 10
1
27 20 — 10 60 — — — — 250 80 170 10
30 25 25 12 55 60 150 12 60 300 80 180 10
33 25 25 12 58 65 150 12 70 300 80 185 10
36 25 25 12 66 70 150 12 80 300 90 200 10
39 32 25 12 70 70 160 14 80 300 95 215 12
42 32 25 12 72 70 160 14 90 300 100 230 12
45 32 25 12 80 75 160 14 90 300 105 245 12 2
48 32 30 14 83 75 180 16 100 380 110 260 14 AND
52 38 30 14 87 80 180 16 110 380 110 275 14 3
56 38 30 16 91 85 180 18 120 380 115 280 14
60 38 35 18 95 85 200 20 120 430 125 285 14
64 38 35 18 104 90 200 25 130 430 135 300 16
68 42 40 20 108 90 220 25 140 450 145 320 16
72 42 40 20 112 95 220 25 150 450 150 340 16

NOTES
ALL DIMENSIONS ARE IN mm UNLESS OTHERWISE STATED.
BOLT CIRCLE DIAMETER ( BCD ), NUMBER AND SIZE OF THE BOLTS SHALL BE AS PER ENGINEERING DRAWING.
* 3. DIMENSIONS t1, t2, t3 AND 'I: ARE TO BE CHECKED IN EVERY CASE.
IN CASE OF ANY CONFLICT THE ENGINEERING DRAWING SHALL GOVERN.
NUMBER OF BOLTS USED IS TO BE A MULTIPLE OF 4 AND BOLTS SHALL STRADDLE VESSEL NORTH—SOUTH
CENTRE LINE IN PLAN.
USE CONTINUOUS RING ( CHAIR CAP ) IF DISTANCE BETWEEN CONSECUTIVE BOLTS IS LESS THAN 400 mm.
CIRCULAR WASHER SHALL BE SHIPPED LOOSE AND WELDED AT SITE AFTER ANCHOR BOLTS ARE IN POSITION.
♦ 8. PREFERRED DIMENSION 'A'
EARTHING LUG SHALL BE LOCATED BETWEEN THE ANCHOR BOLTS AND SHALL BE AS PER STANDARD 7-12-0026.
WHEN THE ANCHOR CHAIR CAP IS NOT CONTINUOUS, THE BASE PLATE SHALL BE SUITABLY STIFFENED USING
REMOVABLE STRUCTURAL SECTIONS (BEAM/SPIDER) AT SITE DURING ERECTION.
t*/
6 30.06.2011 REAFFIRMED AND REISSUED AS STANDARD POREL RKT M/SC DM
5 08.09.2006 REAFFIRMED AND REISSUED AS STANDARD POREL DNN AKM VC
Rev. Prepared Checked Stds. Committee Stds. Bureau
Date Purpose Convenor Chairman
No. by by
Approved by
Page 5023Rev.0
Format No. 8-00-0001-F4 of 10496 Copyright EIL - All rights reserved

You might also like