POST CONCRETE CHECKLIST REF.

NO……………………

DRAWING NO. INSPECTION DATE / TIME

REVISION CASTING DATE

DATE CONTRACTOR

CONTRACTOR CORNERSTONE
ITEM COMMENTS
SIGNATURE DATE SIGNATURE DATE

1 WATER STOP/BAR: JOINTS SUPPORT

2 COVER: TOP/ BOTTOM SIDE / SIDE

3 ENCAST: LINE LEVEL

4 STEPS: LINE LEVEL

5 FORMWORK: SURFACE TIGHTNESS JOINTS

6 M3: ACTUAL:

TEST CUBES NO. ID NOS.

PRE CONCRETE SHEET REF. NO.