You are on page 1of 7
__ re BR — Ba HT Rajeev Verma aaa ates ole aries HIST sta aah was — 226011 Executive Director/B&S so ee Seaaares Organisation arent Fea / Fe CF TT ‘Lucknow. 226011 Phone / Fax :0522-2485704 No. CBS/insp/ROB Date 24.02.2020 Chief Bridge Engineers All Zonal Railways ‘Sub: Modification in standard QAP for fabrication of Bow String Girder Ref: (i) Meeting of Group of Infrastructure (25.02.2020)-Issues of Road Wing, Ministry of Road Transport & Highway of India, (SCR 76, 77, 78 & 79) (ji) Railway Board letter no. 2016/54/CE-II/BR/RDSO Misc Date: 15.07.2019 4. RDSO has been entrusted the work of inspection of Bow String Girder by Railway Board vide letter referred at (i) above. Accordingly QAP for fabrication of Bow String Girder was standardized by RDSO in Nov. 2019. In addition to above, approval of WPSS & WPQR is also done by RDSO on case to case basis 2. Atpresent, RDSO is involved in the following three stages:- i. Inspection of Layout Plan at workshop. ii, Inspection of Components at workshop. ii, Inspection of Assembly of Bow String Girder at site before launching. 3, To make inspection at faster rate, the Inspection of Layout Plan at workshop Tay be lant ihe discretion of Zonal Railways instead of RDSO. As per this modified QaP, EBSo inspection shall be involved at two stages i.e. Stage 1: components inspection at workshop and Stage 2: Assembly at site before launching 4, Accordingly standard QAP is modified and enclosed herewith. Zonal Railways are requested to submit QAP accordingly in future. DA: As above Lane ne (Rajeev Verma) Executive Director/B&S Copy to: (i) Director CE/B&S, Railway Board, Rail Bhavan New Delhi-110001 for information. (ji) Executive Director M&C/RDSO for information and necessary action JousBy Buneauaes yoameudss cosa yo renosddy voypadsuy soz | _proes (ens con | camweviy | seooe | | eon jens a aaoeibe pence pute SUED ‘wowsanbe) ‘ods aq yeus eos yo Ayjen’ pue ‘apelB eu. at ovred ope8 pormude | 42 $1008 avn oosil ‘O9SiL ‘ews! Aluo yoo, TWws "°° g0sri06red ‘woy osay | suddng wos epes6 Aq paunbe: eqBOyH2D yo 018 96PUq, uawndop ‘sise} anupoon | _ pcos: opuaige)o puro. uop22s reimionas ciaeasty, szseaumes | _ x00 onwouHen, vied 5 ssored ats | reueen Mee | O° uo ov 6 2 L s * € z L coeedery | 150 a ° sunzedeu epequo pioo0w so wevd ose quauinsog | joodh 49049 suoneiedo: euruny |oottlay | fasatt | evewpucnoodsu | swcizounes | coven | fovenbers | ansunetavo usuodwo | NS sauppy dousioN -auymesp panoiddy 1ad se (BuIpe01 ul) pa Buyas mos PEPIOM Nyid SoNVunssy ALND saTdINVS so Ayqui9ssy [e140 OSM (os yo yenoxddy eo uonsadsuy Suipuas 210}94 1951, Anes PINOUS P ongequasaiday ABmeu joameudis ue siaad! nb sauxo pue seouesa|o% /eU0|SUAU sovenuey joamendis vuonsadsuy quavodtuo se si om ‘geam panoddde sad se Sulpem yo Auto sv9piam panoxdde Osay AlvO eK neva oF SHEN Miq auop 94 01 uonadsut[euseiu ‘wOREOUGE) Bund "TON ToRIpUBS i paquiesse ut cosas fa prooey jous ve OSC eauBse8i9 soyeouges ka voxoeasu reuy pue "2 1240 ey skemey fq vonsedsuy osc [pue sfenwew yempnas ® vonsedsut jeuodsy | pus Aemien! |kq uonoadsut pcosy | reuoeuamg | Aauessy | eoues20Io Tenia | voozase | vowedsu | Aaxoo, | feperfea souseopabeis| ens 94009 reuld | 08 2% piocey | Supeai ou0 | Aempers oc w weuiansean | unui oweinseow_| Sunosvo 140 00 0 hemes 00: 0 suppeuo | Sunuied seye vensin_|_usiuy eoeyng | oy sedaue Femens ‘sp10081 08pns 1eu0z eoueseae Looz-ra | 1 eouaveye: fq ens foxes 26238 ‘sure Bumesd ta eq us picoai jouoyeoyuen LUoveouges | Suxoau soveeain | 18 Sul suoveouaes panoidy TeRsIA on pu0s9y femeu 00 0 uw juaweinsean ewainseeW oa -og- remyeu 00" “0a Burpeuo sy soeuns 089%. Aewey | 19068 hemes spio0es sur e.001 revoz_ | ‘sigec9 si sq.uopver | feyey | UEP ooz-18 2 eid fauenié | WAxpueddy ‘puoieoude) 26048 sul 9 6umtela suysea | tous Aa 2 1eus Loo piooes | ka 4001 yo uoneayen, woneauded oye uogpuco | uoperedosd |_eoueiesio | 18 SL sioyeauges panouddy eoeyns eoeuns | 08 uw o 6 8 z 2 $ + € z L woReedsay | ASUIBY ay co jowwarxa | Sunsedsu ae eyo piosey | eee Auten quownsog | joadhve | xoeuo2 | suonejedo suewey | aouerdesoy | _soedAl, resp uopoedsu) | svoreouqes | eoueseieu | fouonbais | psuorreisio. quouodwon | NS. i z 3 a 5 é 7 e 3 0 W 73 | Paints Verification of | Visual Challan., | Verification of | Each Batch | Manufacturer | As per | Paints to be Manufacturer's Manufacturer’ | Reference sTest_ | 81-2001 | procured from Test Certificate, s Test Document Cortfcate vendors Inspection Cerificate approved by Certificate, RDSO Challan Tests as per | Lab testat Verification of Random | Lab. Test | 18 702 “Do- Spectication | Govt Reference Report | Contract, Appval Document agreemen Lab t 14_| Welding Fe per Any test Verification of ‘Asper_| Fabricators - | Consumables Consumables | specification and | as Reference requiremen | Record should be of 8 approved by | required Document t RDSO appvd. RDSO Brand 18 | Studs ‘As per Tab Test TO0% MTC specification and | at Govt ‘88 approved by | App Lab ROSO 20 | Manufacturing Process: 24] Lay out Dimension | Weasurem | Approved | Measurement 00% | Inspection | Relevant | Lay outat entwwith | Drawing | of Dimension | ‘Railway Reportof | IS/IRS | Workshop calibrated Inspecting | Codes & Stee! tape Offical” | Approved & gauges M Drawings, 22] Layout of | Dimension | Measurem | Approved | Measurement 100% —|~ inspection | Relevant | Lay outat Components & entwith | Drawing | of Dimension Report of | IS/IRS | Workshop Joints(if calibrated Inspecting | Codes & Bolted) Steel tape Official” | Approved & gauges Drawings, 23°] Templates “& | Dimension, | Measurem | Approved | Measurement | RDSO | 700% Record of | iRSBT- | Clearance by Gaugestif Intersection ines | entwith | Drawing | of Dimension Templates @ | 2001 RDSO bolted calibrated Gauges as connection) stee! tape per Performa & gauges issued by ROSO 24 Cuting, Dimension, | Viewal” inspection Visual a, TOR Thspection | IRS Bi- ightoning, Freedom from | Measureme | Reportof_ | Measurement | Raliway Reportof | 2001, 1S Edge preparation detect at Inspection | ofaimension Inspecton | 4952.85 Ofc! & Official & Fabrcaior’s Fabricator Record Record 3.0_| Welding: a) WSS Review of WPSS| Verification | 1RSBI-2001 1S | Variicaton of | RDS 100% Fabricators | IRSBI- | Only RDSO 9895.95 WEC- | Reference Record \S_| cortified welders 2001 Decument 9535.96 | ‘tobe engaged wrec-2001 | inthe ob, Signature of Signature of ‘Approval of RDSO Contractor Railway Representative Fabricating Agency Rallway Representative z z a 5 é 7 7 3 70 1 3) WPOR ‘Visual DT | As parcode ROSO | 100% | WPOR Sheet | 1S 757007 | — Only requrement ‘ove ta | RDSO Becument recorded in certified Witnessing of presence of wolsere Welder ROSO Rep tobe Qualification engaged ‘est inthe ist P a job _| )Preheating | Weasurement | Vieualwity | As per approved | Vailicaion of Random | nspecion | IRS BY of thermal Wess Reference Reportof | 200" Temperature | "Chale Becument inspection Official 8 Fabricators Record @)Bakingof | —Tohave | Veual Check | Raper Venison oF TO | Tnepeston | TRS BT Electrode, Flux | moiswre ree | of ecrodes | Manufactres Reference Reportof | "2001 Elecwode & | &beatng | recommendations | Document Inspection i | Ofticals & Fabricators Record | Selection of| Reference te | Visual —| As per approved | Vi a Tao —| Tnspecion | As perlat rect WPSS, IRS ‘WPSS | Reference Report of | of vendors froes &| Clase ote Decument ingpecion | approves offical | by ROSO Fabricators Record ‘f)Current Measurement |” Visual with | “As per approved |” Verification of Random inspection IRS B1- Condition ofAmp.& | Ammeter& | WPSS Reference Repor of | 2001 Votage | “Votmeter Bocument Inspeetion Official & Fapncators Record _| g) Sequence of |" To control Visual ‘As per approved of Random Inspection IRS B1- Wetaing dstoton Wess: ce Repot ot | 2001 Document Ingpecton Offical & Faprcator’s Record h) Provision of To avoid Visual As per IRS B1- ‘Verification of 100% Inspection Runon & Run | crater detects oot Reference Repor of off Plates Document Inspection offal & Fabreators Record Ea Signature of Sigatare of Approval of R050 7 2 3 a s é 7 8 3 © 1 Visual, | Approved org & | __ Visual ROSO| 100% | Fabricators | Relevant | Inspection Gauge & Wess Ingpection & | Record | IS/IRS at Macro Verfeation of Code, | Workshop Etching dimension by Approved | and gauges, Drg.& | Clearance wec- | by RDSO. 2001 Visual | Approved ig | __ Visual ROSO | 100% | Fabjicafor's | Relevant | Inspection Assembly at | joint Gauge ete Wess Inspection & Record | IsiRS | atfield sito configuration Verfiction of Code, and dimension by Approved | Clearance gauges, Dig. & | by RDSO wec- pl il eas [Ea aiaze eas | ae 2001 42 | Stud Welding |For stud | Visualand | Approved Dra. & | 100% Visual | Railway | 100% | Testrepot | ISO. | Clearance welds: Visual | Hammertest | WPSS relevant | inspection & 13918. by inspection for ISIRS code, | Venfieaton of 2008 | Railway. good Apord. Org & | Dimension by | Penetration & wec-2001 gauge cack fee | wld 50 | Components Visual ® | Approved. Drg RDSO| Aspens | Inspection | IRSBI- | Daytoday Inspection Dimensional Report of inspection by | Inspection Railways an | Ofte! & tinal Fabricator's inspection Record RDSO at workshop | Signature of Signature of Signature of| ‘Approvalof ROSO Contractor Fabricating Agency Rallnay Representative ‘SN'] Gomponeni” | Charactoris | Frequency | Reference | Fabricators | Inspection dotalls Type of | Acceptance | Remarks Operations | check | &typoot | Document | Quality Rocord criteria chock Contret | Inspecting | Extent of ‘Agency. | inspection i z a 4 5 é 7 2 30 | Surface] Surface] Viswa Fabricators reparation | condition ater | checking 100% by | record Shot | blasting | wth eiway | fricaon & & reference to y Random by Metalzing surface Railway preparation Visual ‘checking -Do- -Do- Railway -Do- -Do- DFT checking | Weasureme Tinimam | Weeaurement m™ Do- -Do- Railway | onereachg | Record perma | ‘Surface | Visual Fabricators RSET Verication of recers stage ‘clearance: Rees)! records checkrg | -Do- De Reiley Do- : DFT checking | Measureme ‘Minimum Measurement m Do- De- alway | onoreading |" Record por M2 | a0 Tonle Vaual | Stage clearance Dayo day | 700% by | ~ Inepection | RSBI-2001 Clearance | Assemtly | Dimensional | Record inspection by) Ravay and 2 Structural clearance |Ratways and RDSO Record final inscection by ROSO a ste Inassembied | condition Ba intemal inspection to be done by Rallways to ensure that only ROSO approved welders carry out welding as per approved WPSS, jonal tolerances and other quelity aspects and should sai If before sending Insp inspection, Note: 1, During f work is as component Signature of Contractor Signature of Approval of DSO Railway Representative

You might also like