VIEW 'D' HIGHER LEVEL

RAFTER
6 7
5 x CFLC PURLINS ROOF GUTTER
PURLIN RESPRESENTATION LOWER LEVEL LOWER LEVEL
TRUNCATES RAFTER RAFTER
1 2 3 4 5
LOWER LEVEL
3200 RAFTER
1600 806 794
GUTTER MID-SPAN
SUPPORT PLATE ROOF GUTTER GUTTER DETAIL
10mm THK. BECOMES HIDDEN
STEEL STRUT SUPPORT
71 POST. 114.3x3.2 CHS
16

247
770 (T.B.C)

16
71
FALSE RAFTER
SEE VIEW 'D' FOR DETAILS
TIE BEAM TIE BEAM
100

INTERNAL
PERIPHERAL
COLUMN
COLUMN
(NO GUTTER)
3045 (T.B.C)

101.6 CHS
STEEL RWDP

PAVING LVL BASE PLATE BASE PLATE PAVING LVL

VIEW 'D'
ELEVATION ON REVISED CANOPY STRUCTURE
1:50

50x50x3 VERTICAL POSTS (TRIMMERS)


TO SUPPORT SIDE SHEETING
ON EACH SIDE OF COLUMN.
HIGER-LEVEL
ROOF SHEET
203x133X25
RAFTER

(T.B.C)
LOWER-LEVEL

768
O ROOF SHEET
11.0

(T.B.C
753
)
TOP OF EXISTING BLDG AT THE FRONT

100x100 SHS
FALSE RAFTER

389
TOP OF EXISTING BUILDING AT THE BACK
100x100 SHS
640
HAUNCH
259

LINE OF BUILDINGS (EACH SIDE OF COLUMN)


4899 (
T.B.C)

0 ISSUED FOR CONSTRUCTION GUIDANCE 23.06.2023 KKM

3510 (T.B.C)
REV COMMENTS DATE BY

Consulting Engineers:

BOTSWANA OTHER OFFICES:


PAVING LVL BASE PLATE TOP LVL Plot 10231, Mokolwane Road
P.O. Box 53127 Broadhurst

200
N.G.L GABORONE
TEL: (267) 311 0825
MOBILE: (267) 7709 0295
E-MAIL: ics2020.bw@gmail.com

Architect:

VIEW D: CONNECTION OF THE DIFFERENT ROOF LEVELS


1:50

Client:

CHOBE DISTRICT COUNCIL

Project:

KASANE CENTRAL MARKET

ADDITIONAL NOTES CHANGES TO CONSIDER / EEFECT


Buiding Type:
MUNICIPAL / COMMERCIAL
1. SEE GENERAL NOTES AS PER DRG No. 5006_SS_001 (Rev 5).
1. EXTENDING GUTTER AT COLUMNS 7
2. PURLIN SPLICES AND ALL FABRICATION DETAILS Drawing Title:
TO BE READ FROM SHOP DRAWINGS & SPECIFICATIONS. 2. PUNCH NEW BOLT HOLES TO CONNECT TIE BEAM TO COLUMN 6
SCHEMATIC LAYOUT
3. GUTTER LEVELS TO BE CAREFULLY CONSIDERED TO 3. GUTTER SUPPORT DETAIL AT COLUMN 6, COMING FROM COLUMN 5
ROOF CANOPY WITH HEIGHTENED COLUMNS
ENSURE CONTROLLED FLOW OF ROOF RUNOFF DURING\ 4. SITE PAVING SURFACE DRAINAGE IS SLOPING FROM COLUMNS 1 - 7.
PEAK PERIODS OF RAIN. ENGINEER, FABRICATOR & CONTRACTOR GUTTER TO SLOPE FROM 6-7, 5-4 & 1-4. LEVELS TO BE CAREFULLY CONTROLLED & FALSE RAFTER
HAVE DISCUSSED USE OF PLATES ABOVE COLUMN TOP PLATES BY THE USE OF COLUMN TOP PLATES.
TO CONTROL GUTTER LEVELS. 5. HOW WILL PURLINS FROM THE LOWER ROOF BE SUPPORTED AT COLUMN 6?
Consultants Signature:
CONCEPT OF FLOW TO BE FROM 6-to-7 @ HIGHER LEVEL ROOF;
6-to-4 @ LOWER LEVEL; & 1-to-4 @ LOWER LEVEL. 6. HAUNCH FOR THE FALSE RAFTER? YES? NO?

4. ALL DIMENSIONS ARE APPROXIMATE & INDICATIVE. 7. ROOF FLASHING & WATERPROOFING? ..................................................................................................
CONTRACTOR/FABRICATOR TO CONFIRM ALL MEASUREMENTS
Drawn: Checked: Designed: Scale:
& DIMENSIONS BEFORE FASTENING & INSTALLATION. LIST OF ABBREVIATIONS
T.O.C = TOP OF CONCRETE KKM MKD KKM AS SHOWN
T.B.C = TO BE CONFIRMED
I.J. = ISOLATION JOINT
S.C.J = SAW-CUT JOINT
Job Number: Discipline: Dwg. Number: Rev: Dwg. Size
U.N.O = UNLESS NOTED OTHERWISE
RNFT = REINFORCEMENT 5006 SS 002 0 A1
ea = EACH
N.G.L = NATURAL GROUND LEVEL