Professional Documents
Culture Documents
Programming
Programmable Logic Controllers (PLCs) are industrial computers used
to automate and control a wide range of processes and equipment.
Learn the fundamentals of PLC programming, including ladder logic,
input/output configuration, and programming techniques to optimize
industrial automation.
PA by Prafull Desale
PLC Hardware Components
Processor Input/Output Modules
The central processing unit (CPU) of a PLC, These modules connect the PLC to various
responsible for executing the control field devices, allowing it to read sensor data
program and managing the system's and control actuators.
operations.
2 Sequential Execution
Ladder logic programs execute step-by-step, with each rung being
evaluated in order from top to bottom.
3 Relay-based Logic
The ladder logic language was originally designed to mimic the wiring
and operation of relay-based control systems.
Structured Text
Programming
Structured Text (ST) is a high-level programming language used with
Programmable Logic Controllers (PLCs). It provides a more flexible and
readable syntax compared to traditional ladder logic programming.
In an FBD program, each function block represents a specific action or operation, such as
mathematical calculations, Boolean logic, or timer functions. Programmers arrange these blocks on
the screen and connect them with lines to depict the flow of data and control signals within the PLC
program. This visual representation allows for easier troubleshooting and modification of the
control system as needed.
PLC Input/Output Addressing
In PLC programming, input/output (I/O)
addressing refers to the unique identification
of each input and output device connected to
the PLC. This addressing scheme allows the
PLC to precisely communicate with and
control these physical devices.
Analyzing Logs
2
Review error messages and system data
Isolating Problems
3
Pinpoint the root cause of malfunctions
Effective PLC troubleshooting involves a systematic approach to identify, analyze and isolate issues.
By closely monitoring error logs and diagnostic data, technicians can quickly detect hardware faults
or programming errors. Methodical testing and inspection helps narrow down the problem area,
enabling efficient repair and system restoration.
PLC Programming Best Practices