You are on page 1of 12

SUNARMI

SUNARMI
SUNARMI
SUNARMI
SUNARMI
+3.00 +3.00

±0.00 ±0.00

SUNARMI
+3.00 +3.05

±0.00 -0.05

SUNARMI
BUBUNGAN
DETAIL IV
REUTER 2/20
B. GANTUNG 5/12 NOK 5/7

USUK 5/7

B. GAPIT 5/10
DETAIL KUDA-KUDA
GORDING 5/7 KALA

DETAIL II DETAIL V

TUPAI-TUPAI KAKI KUDA-KUDA


5/10

Asbes Gelombang 80x240


B. TEMBOK 10/8 DETAIL III RENG 2/3
BEGEL U
DETAIL I
B. PENGUNCI RING BALOK 15/15
B. TARIK 8/12 8/12 x 100 CM

LISTPLANK 2/20

B. GANTUNG 5/12
BUBUNG
B. GANTUNG 8/12 B. PENGERAT 5/12
BEGEL U
B. PENGUNCI
BAUT B. PENGAPIT Asbes REUTER 2/20 5/12
BAUT
8/10 Gelombang
NOK 5/7 B. TARIK 5/12
USUK 5/7
DETAIL V BEGEL

B. GANTUNG 5/12 KAKI KUDA-KUDA


5/10
DETAIL III SUNARMI
USUK 5/7
DETAIL IV BEGEL
Asbes Gelombang
GORDING 5/7 B. TEMBOK 10/8 KAKI KUDA-KUDA
TUPAI-TUPAI 5/10
B. TARIK 5/12
RENG 2/3
B. PENGAPIT 5/10 LISTPLANK 2/20
KAKI KUDA-KUDA RING BALOK 15/15
B. PENGERAT
5/10
5/12

DETAIL II DETAIL I
SUNARMI
SUNARMI
100 100

PIPA 4 " PIPA 4 " PIPA 4 "

120

100
30
50

DENAH RESAPAN DENAH SEPTICTANK DENAH BAK KONTROL


SKALA 1:20 SKALA 1:20 SKALA 1:20

120 PIPA UDARA TUTUP


TUTUP SEPTICTANK
BAK KONTROL
12 PIPA 4 " PIPA 4 "

45
PIPA 4 "
60

BATU KOSONG

50

150
POT. BAK KONTROL
180
60

200

KERIKIL SKALA 1:20

40
60

KERIKIL SUNARMI

POT. RESAPAN 100 100


SKALA 1:20 200
POT. SEPTICTANK
SKALA 1:20
KERAMIK
SPESI
BETON

20000

PASIR URUG

70000

DETAIL PONDASI 1
SKALA 1:20 SLOOF 15x20
TANAH URUG
PONDASI BATU KALI
ANSTAMPING
65

75

KERAMIK
SPESI
BETON 150

Ø 12mm
150

Ø 8 -150

DETAIL KOLOM
5

20000

SKALA 1:20
5

PASIR URUG 150

Ø 12mm

Ø 8 -150 200
70000

SUNARMI
DETAIL SLOOF
SLOOF 15x20 SKALA 1:20
TANAH URUG
PONDASI BATU KALI
20000

80000
ANSTAMPING 150

100000

Ø 12mm

Ø 8 -150 100000

DETAIL PONDASI 2 DETAIL BALOK


SKALA 1:20
SKALA 1:20