KALPATARU PROJECT INTERNATIONAL LTD.

NRL PROJECT ,SNPA


PLANT AND MACHINERY
DAILY KM./ RUNNING REPORT/EQUIPMENT BILL
W.O NO :- 8400004746 BILLING PERIOD
VENDOR NAME :- SREEJI CONSTRUCTION EQUIPMENT MAKE/MODEL ACE/F150 FROM:- 01-Jan-23
EQUIPMENT NAME :- FARANA CRANE EQUIPMENT CODE ACEOF150JP026555 TO :- 31-Jan-24
INT.METER FINALMETER
Sr.NO: DATE TOTAL WORKING KM / HMR. ACTIVITY B/D DAY HSD ISSUE REMARKS
READING READING

1 01-Jan-24 1005.1 1005.1 0 PIPE YARD IDLE


0 0 KPTL WORK
WATER PUMP LOADING ,HEADER
2 02-Jan-24 1005.1 1006.1 1
0 40 KPTL WORK
LOADING AT YARD
WQT WORK PIPE YARD TO NEW PIPE
3 03-Jan-24 1006.1 1009.7 3.6
0 0 KPTL WORK
YARD PD LOADING
PIPE BENDING TO NEW YARD TO OLD
4 04-Jan-24 1009.7 1015.2 5.5
0 40 KPTL WORK
YARD

5 05-Jan-24 1015.2 1015.2 0 IDLE AT YARD


0 0 KPTL WORK
PIPE BENDING AT YARD TO NEW YARD
6 06-Jan-24 1015.2 1021.4 6.2
0 0 KPTL WORK
CWC PIPE LOADING
PIPE BENDING AY TARD TO NEW YARD
7 07-Jan-24 1021.4 1025.7 4.3
0 30 KPTL WORK
CWC PIPE LOADING

8 08-Jan-24 1025.7 1026.8 1.1 PIPE LOADING AT YARD


0 20 KPTL WORK

9 09-Jan-24 1026.8 1026.8 0 MAINTENANCE


0 0 KPTL WORK

10 10-Jan-24 1026.8 1026.8 0 MAINTENANCE


0 0 KPTL WORK
PIPE YARD TO IP002 MACHINE
11 11-Jan-24 1026.8 1035.5 8.7
0 31 KPTL WORK
UNLOADING TO PIPE YARD
PIPE BENDING TO NEW YARD CWC PIPE
12 12-Jan-24 1035.5 1041.4 5.9
0 0 KPTL WORK
LOADING TO YARD
BEND PIPE LOADING YARD TO NEW
13 13-Jan-24 1041.4 1044.9 3.5
0 30 KPTL WORK
YARD CWC PIPE LOADING

14 14-Jan-24 1044.9 1046.9 2 PIPE LOADING ,BEND LOADING AT YARD


0 0 KPTL WORK

15 15-Jan-24 1046.9 1046.9 0 IDLE AT YARD


0 0 KPTL WORK

16 16-Jan-24 1046.9 1046.9 0 BREAK DOWN (O/P N/A)


1 0 KPTL WORK
PIPE YARD TO NEW YARD CWC PIPE
17 17-Jan-24 1046.9 1048.1 1.2
0 40 KPTL WORK
LOADING
NEW PIPE YARD TO SV05A PIPING
18 18-Jan-24 1048.1 1054.4 6.3
0 0 KPTL WORK
WORK
SV05A TO NEW YARD CWC PIPE
19 19-Jan-24 1054.4 1059.3 4.9
0 0 KPTL WORK
LOADING TO KPTL YARD BEND
PIPE BENDING ,PIPE LOADING ,ROD
20 20-Jan-24 1059.3 1066.4 7.1
0 40 KPTL WORK
LOADING
PIPE BENDING ,NEW YARD CWC PIPE
21 21-Jan-24 1066.4 1072 5.6
0 0 KPTL WORK
LOADING ,ROD LOADING
PIPE BENDING ,CWC PIPE LOADING
22 22-Jan-24 1072 1077.3 5.3
0 40 KPTL WORK
,PIPE YARD TO CH 126 DG
PIPE BENDING ,CWC PIPE LOADING
23 23-Jan-24 1077.3 1082.5 5.2
0 40 KPTL WORK
,ELECTRICAL MATERIAL UNLOAD
PIPE BENDING ,TO NEW YARD CWC
24 24-Jan-24 1082.5 1087.5 5
0 0 KPTL WORK
PIPE LOADING
BEND PIPE LOADING ,CWC PIPE
25 25-Jan-24 1087.5 1095.1 7.6
0 40 KPTL WORK
LOADING ,PIPE YARD TO IP002 PIPING

26 26-Jan-24 1095.1 1095.1 0 HOLIDAY


0 0 KPTL WORK

27 27-Jan-24 1095.1 1097.3 2.2 IP002 TO SV008


0 0 KPTL WORK

28 28-Jan-24 1097.3 1097.3 0 SV008 IDLE


0 0 KPTL WORK

29 29-Jan-24 1097.3 1097.3 0 SV008 IDLE


0 20 KPTL WORK

30 30-Jan-24 1097.3 1101.5 4.2 PIPING WORK SV008 TO SV007


0 0 KPTL WORK

31 31-Jan-24 1101.5 1105.1 3.6 PIPING WORK SV007 0 0


TOTAL 100 1 411

Monthly Rent:- Amount Rs:- ₹ 1,15,000.00


Monthly Working Days:- 31 Days Amount Rs:- ₹ 1,15,000.00
Break down days/Hours:- 0 Days Amount Rs:- 0

Actual working Days:- 30 Days Amount Rs:- 111290 WORKING HOUR 100
Standard Working hours in Month:- 260 Hours DIESEL ISSUE 411
Actual Working Hours in Month:- 100 Hours O.T. HRS:- 0.00

Standard Rate of fuel Consumption:-(Pipe Shifting) 4 LTR/HRS O.T.Amount Rs:- 0 Previous Month Balance 0
Actual Rate of fuel Consumption:-(Pipe Shifting) 4 LTR/HRS This month issue 411
Actual Working Hours in Month:-(Machine Shifting) 0 Hours Fuel Balance in tank 0
Standard Rate of fuel Consumption:-(Machine Shifting)
4 LTR/HRS Actual consumption 4
Actual Rate of fuel Consumption:-(Machine Shifting)4 LTR/HRS
Excess fuel Consumption:- LTR/HRS Fuel Consumption as per standard norms 103
Excess Fuel Consumption 0
Total Amount after all deduction:- Rs. 111290
HSD rate per Ltr 90.8
IGST@18%:- Rs 20032 Total HSD Amount 0.0
30% Handling Charges 0.0
Total Gross Amount:- Rs 131323 Total debit amount 0.0

PREPARE BY (P&M) CHECKED BY (P&M) STORE RCM /PROJECT MANAGER