component machine, amount power Work part Introduction to Statistics, selected distribution patterns
maintenance, price sell And profit product, price can be seen from mark Index of Fit ( Correlation
component maintenance And function Work machine. Coefficient ) the biggest. The distribution pattern tested
Furthermore grouping elements machine in accordance is distribution normal, lognormal, exponential and
with its function Which related. Step furthermore do weibull.
process calculation And comparison between
breakdown maintenance And modularity design . 3.1. Determination Time Replacement Component
2.4. Variable Study The following table is a comparison of the length of time
Which required For do replacement component in a
The independent variable in this research is age way preventive And in a way breakdown in unit O'clock.
components and the absence of a maintenance
schedule. Variable dependent in study This is damage Table 1. Comparison Time Preventive with
machine. Breakdown
Time Time
Machine
2.5. Type Collection Data Breakdown Preventive
Components
Fix Jaw 6.58 6.12
Data Which used only form data secondary between Move Jaw 6.30 5.95
other station production, amount types machine Toggle
2.57 2.33
production, amount component maintenance Which Plates
needed, dot, dot, dot component maintenance on Jaw
Toggle
machine, order processing maintenance, intervals Crushers 3.81 3.39
Seats
damage component, time maintenance And Sip Plate 8,45 8,01
replacement of damaged components, labor costs Fan Belt 1,65 1,33
related to maintenance activities , selling price per units, Bearing 3,39 3,01
profit And capacity production per day along with with Fix Cone
price component purchases per units. 5,42 5,11
Plates
Mantle 5,60 5,13
2.6. Instrument And Technique Collection Data Cone
Fan 1,48 1,08
Crushers
Belts
Technique collection data in study This is 6,41 6,01
Cutting
Ring
observation, documentation And interview. In
Bearings 3.48 3.11
In this research, the research instrument used is
worksheets . Worksheets are used to record data
The table above shows the disassembly process time
research-related companies done. Data obtained from
And installation components each machine.
data collection, then processed to get an image
Components This taken based on data company Which
regarding preventive implementation modularity design
most often experience damage. From table can seen
.
comparison between time breakdown carried out by
the company over time preventive after carrying out the
3. RESULTS AND DISCUSSION
simulation. The result is time process maintenance
components machine more small from the initial state.
Data historical damage/failure machine Which used in
this research were taken from historical data year 2008
3.2. Analysis Cost Power Work
until year 2012. Furthermore data the used as analysis
For get machines And components critical. Furthermore
Cost power Work is cost power Work Which do
pattern damage component machine critical analyzed
replacement component on the machine.
based on data intervals damage component. According
Cost power Work consequence breakdown And
to Ronald E. Walpole in book preventive
3
e-Jurnal Teknik Industri FT USU Vol 3, No. 3, Oktober 2013 pp. 35-
39
is:
4
e-Jurnal Teknik Industri FT USU Vol 3, No. 3, Oktober 2013 pp. 35-
39
5
e-Jurnal Teknik Industri FT USU Vol 3, No. 3, Oktober 2013 pp. 35-
39
LIST REFERENCES