YF Crlon POWERGRID CORPORATION OF INDIA LTD. (Environment & Social Management Deptt.) REF: CC/ESMD/ROW/17 DATE: 06.06.2017 SUB: Right of Way (Process & Compensation) Guidelines. Implementation of the transmission projects are invariably getting affected due to severe ROW problem on account of resistance by the landowners/farmers, who are demanding enhanced compensation, In order to streamline, the process of ROW assessment and compensation issues and to formulate the uniform approach for all our projects, management constituted a committee of senior officials to look into the aspects and suggest possible solutions. The committee has submitted its recommendation and based on approved recommendations, detailed guidelines for ROW process and compensation has been drawn and same is enclosed for implementation with immediate effect. Pee (AK Sinha) ED (ESMD & CSR) Encl: As above Distribution: 4. ED- NR+I/ NR-l/ NR-Ill/ SR-1/ SR-Il/ WR / WRI ER4I/ NER /W-NIC | Raigarh-Pug HVDC / Engg. / CMG / QA&I,CMD Cell / Fin / AM 2. GM (WC)- Odisha 3. GM{TBCB) Copy for kind information to: 1. CMD 5 Dir (Pers) / Dir (Oprn) / Dir (Proj) / Dir (Fin) | CVO Copy. - Gala) GulPreqeat) _ ay Paw\N) [AGH Lorton 9 lee) dn (Engg) a Paelt H° Ara |i. cu: Pesy / He] Seas} [Lean fa CUE a Right of Way (RoW) (Process & Compensation) Guidelines 1. Survey 1.1.Land Scheduling including details of ownership, Rights, Tenancy and Crop (RTC) details along with maps are to be included as part of detail survey. 1.2.To optimize time such survey may be allowed as a parallel activity in portion/ section along with construction activity. 1.3.The data of survey including details of ownership shall be verified by POWERGRID in consultation with local revenue authorities before release of payment. 2. Damaged Area Assessment 2.4. Tower Bass i, The area damaged during the process of foundation, erection and stringing to be recorded along with tree and crop description. ji, The maximum area for all three activities in respect of 400 KV & 765 KV DIC line have been finalized and is enclosed as Annexure-I. il, The said area shall be treated as maximum limit for caloulation of tree/crop damage. In case the damaged area crosses the stipulated limit, approval of GM/ AGM for additional area shall be required with juslification for release of compensation 2.2. Line Corridor: i. The following width below each conductor shall be allowed for damage/ compensation and any deviation towards higher width shall require approval of Regional ED. ‘S. | Transmission line voltage with | Max. permitted width clearance No. type of Conductor/Bundle below each conductor/bundle in the Corridor 1. | Upto 400 KV Twin 3 meter 2. | 400 KV Triple 5 meter 3. 400 /* 500 / 765 KV Quard 7 meter (4. [= 8007765 KV Hexa e 10 meter ii, Contractor be advised to reduce the damages and compens corridor be restricted to: or a a) Tip to tip or b) maximum outer width (Tip to tip + 50% of width as per above table on either side) or ¢) Complete width of Right of Way e.g. 46 m in 400 kV DIC, if clearly Notified or advised by DM/DC as per MoP guidelines clause 2.0 (IV). ili, To reduce extent of damage, use of suitable rope in place of tractor be encouraged for laying of pilot wire. 3. Cost of Land 3.1 For compensation towards land cost and diminishing land value (85% for tower base & 15% max. for corridor), rate of land compensation, shall be obtained from concerned DM/DC/ Revenue Authorities in line with provisions of MoP guidelines. 4. Compensation for structure / Bore well | Hutments 4.1 Compensation towards such structure shall be restricted in the area falling under the conductor to conductor width plus 3 meter on each side. 4.2 CEA safety regulation of September 2010 shall be used as a basis of calculation for any other structure requiring removal! shifting. 3.4 Legal notice is to be issued to the owners of such structures, where actual shifting/removal has not taken place in spite of payment of compensation before commissioning, 5. Compensation for Fruit/Non Fruit Bearing Trees 5.1 In-Principle approval of Regional Head, once, for total estimate of tree compensation in one go or section wise is mandatory. 5.2 Supreme Court directives ie maximum 08 years for fruit bearing trees be followed in cases where no specific state regulation exist. 5.3 For felling/compensation of trees in the Orchard or Plantation documentation annexed with visual proof like GPS tagged photos / videos etc. are must for assessment! release of compensation 5.4 Separate approval of Regional Head is must for release of compensation beyond Rs 10 Lakhs per person. = ‘ 5.5 Required clearances/permission for felling of trees including "Excise trees” shall be obtained from concerned authorities. The requirement/process of different States for obtaining such permissions is available on POWERGRID intranet on following link: atusitnebeons power newinangiioesC/8 lessee 2OetingArequtement%0M2Will 420s. 6. Control and Reconciliation of Notices 6.1 All control/ protocol like Printing, Numbering, and Regulation for its issuance use etc. applicable to measurement book (MB) shalll also apply to notice books henceforth. 6.2 All notices for tree crop compensation shall be countersigned by the executive/ office in-charge before issuance to affected person with proper documentation. 7. Verification by Revenue Authorities. A. Ownership: land ownership certification by the revenue officials at least by Patwari or equivalent (Custodian of land record). B. Compensation: 7 Verification of revenue officials as per DOP clause 25 (C) for release of compensation in normal cases. 7.2 In exceptional cases, where inordinate delay is encountered in obtaining such Verification from revenue authorities in spite of documented concerted efforts, verification may be approved by a project level committee of Sr. officials constituted with approval of Regional Head based on rates obtained/ recommended by officials of revenue / Horticulture/Forest departments of concerned State, 8. Authority for approving orders of local authorities 8.1 Following procedure shall be followed for orders of local revenue authorities regarding compensation beyond the prevailing norms. Activity | Approving Authority Written Orders/directives of DM/DC_ Regional ED Orders/directives without written approval of | Director (Projects)* DM/DC * Approval shalll be initiated by site and processed through RHQ and ED (ESMD). Excise tree’ includes the tree of Mehwa, Coconut, Palm, Palmyrah, Date, Bagani, Sago, Sendhi, or any tree of the species of palm or palmyrah from fermented or unfermented juice of which toddy or liquor can be prepared. eS 9: Release of Advance 9.1 To reduce the resistance by the landowners, advance compensation’ based on land rates. obtained from DC/DM or estimated total compensation. towards damages in all three activities an advance of up to 25% (Rs. 1 Lakh Maximum). May be released with the approval of GM. along with the first notice based on Prevailing site situations and self-certified undertaking/affidavit by the: land ‘owners. 40. Payment of Compensation 40.1 All compensation payment shail be made through online transfer. 10.2 Crop compensation to actual cultivator (other than owner) with the approval of Regional head can also be released after verification of tenancy’ by’ Local Panchayat! Gram Sabha. ANNEX. 1 A lisag FShest USL exes & Sshad at assent RE paOS beh eeeubern| saan whe os \ a . ae sgh Shake SO® | Ss oteh Geos “ato. Oa, Ls e noes Ms ey, i & wasE= SUK Tau Yea uany ‘ta, SEES sexes ‘\ . Levee sts N0als Waa AOR TT) NOTLI2 {SACU Ses to ay, ak SCAG MANOL OFT. ONTSCISWO YR NOLIVeR aaa: Crop Damages area in Square Meter of 765 KV D/C Line Hype ot |TPEof sL.No. Foundatio|Foundation Erection stringing, Remark [Tower |" a Dry 2700] 3509] 1800 2 Wet 2709} 3509] 1800 Sh pagal 2700 3509] 1800] 4 Fs 2700} 3509] 1800 5 Dry 3500] 4000] 1800) 5 Dir 3500 4000] 1800] 7| Dry 2909] 3500 2000] 3] Wet 2900] 3500 2000] Oia. 2900] 3500 2000] 19] Fs 2900] 3500] 2000] 14] Dry 3509] 2000] 2000] 2 Dir 3509] 4000] 2000] 2 Dry 3100 3500] 2400] 4 Wet 3100] 3500} 2409] ma Aer 3109] 3500] 2400] 16] Fs 3109] 3500] 2400 a7] Dry 3600] 4200] 2400 18] DF 3600] 4209] 2400 19] Dry 3300 4000] 3000 29] Wet 3300] 4000] 3000 SL a SES 3300] 4000 3000] 22| Fs 3300] 4000 3000] 23] Dry 4000] 4500 3000] 24 DF 4000] 4500] 3000] 25| Wet 4500] 5009] 4509] 26 Ps 4500] 5000] 4500] 27] basis [Fs 4500] 5000] 4500] 23] Dry Nal N/A 4509] 23] Dir N/A NAal 4500] 30} Wet 5200] 5500 6000] 31] Ps 5209] 5509] ‘6000 32] oa+25 [Fs 5209] 5509] ‘6000 33] Dry N/A wal 6009] 34] Dir N/A| Nal 6009] 35 Dry 3500] 4000] 2409] 36| wet 3500] 4000] 2400 37| Ps 3509] 4000] 2400 3a) OPO Tes 3509] 4000] 2400 39] Dry 4000 5000] 2400} 40) Dir 4000} 5009] 2400 ail Dry 4000} 4500] 3000] a2 Wet 4000] 4500] 3000] Sl opus 4000] 4500] 3000] 4) Fs 4009] 4500} 3000} 45] Dry 4000] 5000} 3009] 46 fr 4000] 5000} 3000} a7] Dry 4200] 5000] 3500] 4g| Wet 4200| 5000} 3500] 1 ee (E 4200| 5000} 3500} 50} Fs 4200| 5000] 3500} 51 Dry N/A N/A 3500} 52 Dir N/A N/A 3500} 53] Dry 4500] 5500] 4500] 5a] lwet 4509] 5500} 4500] Bh inate alee 4500| 5500] 4500] 56| Fs 4500| 5500] 4500] 7 Dry 4900| 6000} 4500] Ee Df 4900] 6000} 4500} 59] Dry 4000] 5000} 3000} 60 wet 4000] 5000} 3000} 61] Ps 4000} 5000} 3000} eae les 4000} '5000} 3000} 63] Dry 4000} '5000} 3000} a] Dfr 4000} 5000 3000} 65 Dry 4200} '5000} 3500} 66| lWet 4200} 5000] 3500} SH ig IES 4200} '5000| 3500] 68 Fs 4200} 5000| 3500] 69| Dry 4200} 5200| 3500] 70| Dir 4200} 5200| 3500] 74 Dry 4500} 5500| 4000] 72 Wet 4500} '5500| 4000] Tale ogee Ps. 4500] '5500| 4000] 74| Fs 4500] '5500| 4000] 75) Dry N/Al N/A 4000} 76) Dir N/A Nal '4000| 77 Dry. 4700] 6000} 4500] 78 [Wet 4700} 6000} 4500] 73] Ps. 4700] 6000} 4500] eo} es 4700} 6000} 4500] EH Dry Nal NAAl 4500] 22] Dir N/Al N/Al 4500] 33] Dry 5200} 7000} 5500] 84] DFR '5600} 7500| '5500| 85| Wet '5500| 7500} 5500| 86] 0040 [Ps 6000] 8000} 5500| 87 Fs 6000] 8000} '5500| 83 Dry 5500| 8000} '5500| 89] [pfr 5500| 8000] 5500] 30] Dry 5500} 7000] 5500} | Wet 6000} 7500} 5500} Salen ec les 6500} 8000] 5500] Drum Point 93] Fs 6500} 2000] 5500] Area and 94] Dry 5500] 2000] '5500| Deadman{fix 95] Dir 5500] 2000] '5500| ed Stay) is 96] Dr '5700| 7500] 6000] extra 97 Wet 6000 8000} 6000] Sal eee 6500] 8500) 6009] {99 Fs 6500] 8500} 6000] 100] Dry '5500| 8000] 6000] 101] Dir '5500| EI) 6000] 102] Dry 6000] 8000} 6000] 103] Wet 6500| 8500} 6000] 104) ong (Ps 7500| 9000} 6000] 105] Fs 7500| 9000} 6000] 106] Dry 6500| ‘2000} 6000] 107| Dir 6500| 2000} 6000] 108] Wet 8000] 11000 9000] [“tos]on+18 [Dry 7500} 10000 9000] {_21o| Dir 7500| 10000 9000} 113] [Wet 10000| 12500 12000] 12] pp+25 [Dry NAAl N/Al 12000] 113] Dir N/A N/Al 12000] {a14] lwet 12000] 14000 14000] 115] 0D+30 [Dry N/A N/Al 14900] {aie Dir N/Al N/Al 14000 Note:- Color line(Yellow) shows of Ajmer group datalaverage of actual paid) for Foundation type DRY & DFR. The other type of foundations have not classified. _vaunspay, ober @ yrs pros © Buon ame yep yunuamn A571 D ajay. aon /gprsl@e © Lyep PYPMDXZ © spc pou) © Hd wgypunes @ ea se Won BJ : = Uae saie sale aI, 4 = wag |= AGbxIvoy = Gabyuva vay Xouddt/ veyopunoas wamF41 wa BLN Pa AOOy 0 Fy. com PATH (Bom) TRN (una? “ag? TDN 9S a 33604 Whip ‘ ne (wer; diva gual wos Hits yoy. MRS ee eo Ania wae, ae CE, a ibs byt 3SVD Bieaoy Se {_= ek. (woe> I ee

You might also like