: ‘CUSTOMI VINFAST JCONTRACTOR| R&B
END USER VINFAST DOCUMENT TRANSMITTAL JOB No. RB2021-01
ToeaTion | CATHANTP ana Twa
“a He Ta a a Salo
Salas SUBMISSION TOR INFORMATION
Purpose: Oo {or Approval for information — [[) for Confirmation [] for Review C1 torReference:
aoe ee
caeen
Oo Varation Order (1 Progress Report — [7] Safety / Quality Clothes
DesonsaiNo
oe ‘axon | Genin | Rawle
Me
Ji
rm Ties sas_[ Rona
1 [RRRGLAVOOT BRA i
annie’
co
eer
comment Dat
Copies Received by] Check ‘Check Check, ‘Approved ‘Approved
Por No
Frat
‘Notes: When VinFast approve this document, Please return one of it by .
_-with Sign & Some Comments.
[After 05 working days if we have not received information from Vinfast this document is evidently acceptedRed & Blue
Technology Co.,Ltd.
CLIENT: VINFAST TRADING AND PRODUCTION | Doe. No.: RB2021-01-
LIMITED LIABILITY COMPANY PD-FPD-001
GENERAL PLOT PLAN, Date: 02 Dec 2021
Page: lof
PROJECT TITLE: | Project: Ventilation For Solvent Recovery System & Distillation System
Location: Dinh Vu - Cat Hai Economic Zone, Cat Hai island, Cat Hai District, Hai Phong
City, Vietnam
PIPING LAYOUT DRAWING
Job No.: RB2021-01
Document No.: RB2021-01-PD-PPD-001
REVISION STATUS
I ' | e 7.
REV. No. DATE DESCRIPTION REMARKS
A 02/12/2021 FOR INFORMATION
PREPARED BY | CHECKED BY APPROVED BY
NAME. Dio Ngoc Chinh Hoang Phi Hoa
)
SIGNATURE pe
Design Engineer _| Design leader Design Manager
DATE 02/12/2021 02/12/2021 02/12/2021VINFAST oO
VINFAST TRADING AND PRODUCTION RED & BLUE TECHNOLOGY CO.,LTD.
LIMITED LIABILITY COMPANY
PIPING PLAN
DRAWING
PROJECT: VENTILATION FOR SOLVENT RECOVERY SYSTEM &
DISTILLATION SYSTEM
CUSTOMER: VINFAST TRADING AND PRODUCTION
LIMITED LIABILITY COMPANY
CONTRACTOR: RED & BLUE TECHNOLOGY CO.,LTD.
DECEMBER. 2021WT Wo & aE
TSE) FE WFD Hew | ove
SEPT |
VINFAST TR
Lite
RED & BLUE TECHNO!
im
VENTILATION STEM &
Tian THE
AE Heat [NOTES:
i 1. ALL DIVENSIONS AND ELEVATIONS ARE IN MIM UNLESS
ATCHUNE FoR oir bio, RBBea-ouPo-PPDGn SHEET oanats OF ro snc]
poco
ro. 50
al
Dae IE
WT Wo & aE
pti. -sa
| Sou FR RPOWATIN [ONE | HOw | OWE
SEPT ma pom [|
& BLUE TECHNOLOGY CO.,LTD.
BUNT HTT A, oe
eT, | on a VENTILATION FOR SOLVENT RECOVERY SYSTEM &
ISTILLATION SYSTEM
im toon 000 gy | OMYING TE
PIPING LAYOUT DRAWING
TTT
[TT SOE, ANG NUMBER sweet [RE
HT By SED & ALUE TEORNOTES:
1. ALL DIVENSIONS AND ELEVATIONS ARE IN MIM UNLESS
ae] Fe
oT oa ata FCTPE PC 7 t be
1 | F i i
i BS j rs prawns
1 d |
i 3 oe
aE mE
wT Te aE
a c SEERA a a
To &
& BLUE TECHNOLOGY CO.,LTD.
VENTILATION FOR SOLVENT RECOVERY SYSTEM &
ISTILLATION. SYSTEM
a
E . . TaN WE
Ls mm tno ten
F PIPING LAYOUT ORAWING
TFL
VIEW EL. 10600 TO EL. 11700 Se iS MN EET [Br
HB AED & ALUE TORj
;
ofl in 2
t2-Fb
it
te
NOTES:
1. ALL DIVENSIONS AND ELEVATIONS ARE IN MIM UNLESS
fp
go
Dae IE
WT Wo & aE
z ai[_Wsue FoR RrOWATON | ONG | HPM | EWE
SEPT ma pom [|
fe BLUE TECHNOLOGY c0,LTD
:
VENTILATION FoR SOLVENT RECOVERY SYSTEM &
t ISTLLTDN SITE
View EL. 630070 EL. 100 4 —_ PIEING LAYOUT ORANG
] LI SOE, ANS NINGER sweet [RE
HT By SED & ALUE TEORNOTES:
1. ALL DIVENSIONS AND ELEVATIONS ARE IN MIM UNLESS
Te a Hy 5
| _ Wf] : == “ in
x pe TaCot ip fear or pO) ti \?
E F Nae tis ora
* |
a Dae IE
rE we Sane
TREO.
VIEW EL. 00 TO EL. 3000
| Sou FR RPOWATIN [ONE | HOw | OWE
aoe ota Ra =
TP “ te
: : & BLUE TECHNOLOGY cO,UID
z
t net t VENTILATION FOR SOLVENT RECOVERY SYSTEM &
; et Tce 5 ISTILLATION SYSTEN
k a
aa ja PIPING LAYOUT DRAWING
pe TMI
ViEW E9000 TO EL. 4500 | LUI Ge ae nT oa Pe
HB AED & ALUE TORNOTES:
1. ALL DIVENSIONS AND ELEVATIONS ARE IN MIM UNLESS
Tih
[BUND WALL -
3
| 8 oe
aI J
ime He
= WAST RED & BLE
a
& BLUE TECHNOLOGY CO.,LTD.
VENTILATION FOR SOLVENT RECOVERY SYSTEM &
ISTILLATION. SYSTEM
co xy | PAINT
PIPING LAYOUT DRAWING
TTT
[TT SOE, ANG NUMBER sweet [RE
HT By SED & ALUE TEORNOTES:
1. ALL DIVENSIONS AND ELEVATIONS ARE IN MIM UNLESS
cn em or en [ --
| | come | sono |
g ! 1
a |
| : bp
3 [
q 3 oe
; | goss q
i ‘ 3 aE aE
ores. -ra0 * [ 3 WRT waa
3 | i 3
: : ons
: | 1 cms
: él
oa}
ome]
| f at Tm Re ee Lt fone [aT
t TS Foe een | war pone Purr
| XY DESCRIPTION oe. [cue | a
| em
& BLUE TECHNOLOGY CO.,LTD.
VENTILATION FOR SOLVENT RECOVERY SYSTEM &
ISTILLATION. SYSTEM
Tian THE
TTT
[TT SOE, ANG NUMBER sweet [RE
HT By SED & ALUE TEORNOTES:
1. ALL DIVENSIONS AND ELEVATIONS ARE IN MIM UNLESS
Dae IE
WT Wo & aE
mp wat ur
SUED FO XN ur
eo RED & BLUE TECHNO!
aoe
VENTILATION F
VIEW B-B_N 32500 TO N 34700
Tian THE
TTT
[TT SOE, No UNGER sweet [RE
FER HT By SED & ALUE TEORNOTES:
1. ALL DIVENSIONS AND
/ATIONS ARE IN MM UNLESS.
IE
Wo & aE
TF
Hew | ove
3am
FAN
ca
Lite
WINFAST TRAD
AND
LIABILITY c
eo RED & BLU
JE TECHN
VENTILATION FOR SOL
VENT REC
VERY SYSTEM &
TLLATION SYSTEW
= ae fon 00000 aay | AIS TE
iG LAYOUT DRAM
VIEW C-¢ N 34700 TON 37100 Tay THE aaNOTES:
1. ALL DIVENSIONS AND
/ATIONS ARE IN MM UNLESS.
fp
Dae IE
WT Wo & aE
Ta Fe Noma | One | Pw | LAO
Sata SSCA ma pom |
WINFAST TRAD
LIVITED LISI
AND
my
eo RED & BLUE TECHN
VENTILATION FOR SOLVENT RECOVERY SYSTEM &
TILLATION SYSTEM
Tian THE
cus
UT DAY
VIEW D-D E 63850 TO E 67900 VIEW E-E N 67900 TON 71450 TH TH
AE one NN