You are on page 1of 1

SHOP DRAWING

PROJECT :

the
CRUISE
OWNER :

approved by

OWNER REP.

approved by

PANEL ROOM
SFL -2.625

ELECTRONIC ROOM
SFL -2.625 KEVIN KURNIAWAN
PROJECT MANAGER

PLN
BUILDER :

GENSET
prepared by performed by

GOING
STAFF ROOM AREA CLEAN WATER TANK

OUT
LVMDP
SFL -2.625 SFL -2.625

GOING
OUT
REVAN HERI AGUS ADNYANA
BALANCING TANK
POOL PUMP ROOM AREA SFL -2.625
SFL -2.625

DRAWING TITLE

PENGAJUAN POSISI KWH METER


CORIDOR
SFL -2.625

2800.0000
STP NOTE :
SFL -2.625 SFL -2.625
GENZET AREA
SFL -3.125

HYDRANT AREA
SFL -2.625
ARCHITECT
Approved by :

STRUCTURE ENGINEER
Approved by :
PLN

MEP ENGINEER
Approved by :

LAYOUT PLAN BASEMENT


WAYAN

SCALE PAPER SIZE CODE REVISI


A3
DATE DRAWING NO. SHEET

23/10/23

You might also like