You are on page 1of 1

1 SECTION THRU "A-A"

SP- 2 SP-2

2 SECTION THRU "B-B"


SP- 2 SP-2

AS-BUILT PLAN

CIVIL ENGINEER DRAWN DATE REVISION NO. CADD BY: PROJECT TITLE: SHEET CONTENTS: SHEET NO.

DATE DRAWN:
DESIGN BY:
NEW FEEDMILL CEBU 1. SECTION THRU "A-A"
2. SECTION THRU "B-B"
ENGR. ALVIN L. CROBALDE SP-2
CHECKED BY:
APPROVED BY:
(Slope Protection)
PTR. NO. 5327584 REG. NO. 0081996 DATE APPROVED
LOCATION: CONSOLACION CEBU CITY 2 OF 3
TIN NO. 158-414-672 DATE/ PLACE: 06/09/2021, CONSOLACION CEBU

You might also like