You are on page 1of 8

#NAME?

ABC Construction Corporation


Project : #NAME?

Date Prepared PCIR No.


PRE-CONCRETING
INSPECTION REQUEST Date of Pouring

REQUESTED BY : Name/ Designation :

Contractor : Signature :

PRE REQUISITE INSPECTIONS: Inspected and Approved INSPECTED BY


Rebar Name of Inspector

Certified by Date Inspected


AREA (Pls. enclose key plan) GRIDLINE/LOCATION LEVEL STRUCTURE

INSPECTION CERTIFIED &


PREPARED BY CHECKED BY INSPECTED BY
APPROVED BY
CHECK ITEMS
CONTRACTOR PROJECT SUPERVISOR QC VP-CONSTRUCTION OPERATIONS

1.0 Shape & Dimension, Line


and Grade.
2.0 Chamfer Strips
3.0 Mortar Tightness
4.0 Construction/Control /
Expansion Joints.
5.0 Block-outs / Embedments
6.0 Joint Filler / Waterstops
7.0 Shoring / Supports
8.0 Embeds for Electrical
9.0 Embeds for Mechanical
10.0 Embeds for Plumbing
11.0 Embeds for Fire-Protection

Rev. 0 August 27, 2019


12.0 Embeds for windows
13.0 Others
REMARKS :

CHECKED BY : RECOMMENDING APPROVAL :

PROJECT SUPERVISOR QC

APPROVED BY : NOTED BY:

VP-CONSTRUCTION OPERATIONS

NOTE : This form must be submited to The QC TEAM, duly accomplished including the work inspection report for the
pre-concreting and signed by the corresponding Contractor's Personnel-in-Charge at least 24 hours before
actual pouring.

Rev. 0 August 27, 2019


CTION CERTIFIED &
PPROVED BY

RUCTION OPERATIONS

Rev. 0 August 27, 2019


Rev. 0 August 27, 2019
#NAME?
Trans-Phil Real Estate Development
Corporation
Project : #NAME?

Date of Contractor's Notice of Completion of the Works:

INSPECTION OF THE WORKS REPORT Area to be Inspection:

CONTRACTOR: Date of Inspection:

Attendees:
Name of Representatives Name of Organization

As a result of the final inspection of the works conducted by the above personnel, it was agreed that the contractor had
completed all works in accordance with the terms and conditions of the contract.

A. CIVIL / STRUCTURAL:

B. ARCHITECTURAL:

Rev. 0 August 27, 2019


C. PLUMBING / SANITARY:

D. ELECTRICAL:

E. FIRE PROTECTION:

F. MECHANICAL:

G. FDAS:

FOR CONTRACTOR: FOR QC:

RECOMMENDED FOR ACCEPTANCE: ACCEPTED BY:

PROJECT SUPERVISOR VP-CONSTRUCTION OPERATIONS

Rev. 0 August 27, 2019


anization

Rev. 0 August 27, 2019


Rev. 0 August 27, 2019