You are on page 1of 2

P

PLTP Jaboi Krueng PLTMG Sumbagut-2 Peaker, 240 PT PLN (Persero)


5/2.5/2.5 MW
– COD 2023/ Raya MW Unit Induk Pembangunan Sumatera Bagian Utara September 2022
2027/2030 ACSR 2x430mm2
90 kmr COD 2022 PLTMG Arun (LNG) ke
D
Ulee Semen 180 MW PETA JARINGAN TRANSMISI GI Kiliranjao
BIDANG PERENCANAAN UMUM
Indonesia 4CCT ACSR 1x240mm 2
PROVINSI ACEH
Kareng 18 kmr COD 2025 (Sumatera GIBarat)
Banda Existing 70 kV Kit Eksisting U PLTU D PLTD GI Eksisting
Rencana
150 kV
Sigli 150 kV
Aceh Persiapan Lelang,
Normalisasi T/L 275kV Nagan Raya – Sigli G G
Existing 150 kV Kit konstuksi G PLTG A PLTA
GI Eksisting
GI Rencana
150/70 kV
ACSR 1x240mm2
Rencana 150 kV Commited/
2 kmr COD 2018
Arun Panton Rencana 275 kV Procurement GU PLTGU P PLTP
70 kV GITET
GI Eksisting
Jantho Samalanga Labu Rencana 500 kV Kit Rencana 150/70 kV GI Switching

Lhokseumawe Rencana Kabel 150 kV Kontrak On Going UIP SBU


ACCC 1x310 mm2
Rencana 500 kV HVDC Existing 275 kV
Bireun 2.1 kmr COD 2019 ACSR 2x430mm2
(Pekerjaan 2pi) 224 kmr COD 2023
ACSR 2x430mm2 Persiapan Lelang,
SUTET 275kV Sigli – Arun
166.5 Kmr
(Konstruksi 275 kV;
Idie
Operasi 150kV s/d 2020) ACSR 2x240mm2
43 kmr COD 2018/19

Kontrak On Going PLTA


Calang PLTA Peusangan II Peusangan I&II

2x21.5 MW
COD-2022
ACSR 2x240mm2
11 kmr COD 2018/19
PLTA Peusangan I Langsa
2x22.5 MW Peusangan
COD-2023 Takengon
I & II
Kontrak On Going IPP PLTU ACSR 2x240mm2
Tualang Cut
Nagan Raya 3,4
7 kmr COD 2018/19
U
PLTA Krueng Isep #1
ACSR 2x430mm2
Meulaboh 1 kmr COD 2023 10 MW
A
PLTU MT Meulaboh Ke GITET 275 kV
(Nagan Raya) 3,4 Pangkalan Susu
2x200 MW Kontrak On Going,

COD-2023
Penyempurnaan Konfigurasi Nagan Raya 150kV
(Sumut)
U Blangkjeren
ACSR 2x430mm2
10 kmr COD 2020 Ke GI 150 kV
P.Brandan
PLTU Meulaboh (Nagan
Raya) 1,2 (Sumut)
2x110 MW

Kontrak On Going SUTT 150kV


Blangpidie – Tapak Tuan

Kutacane
Blangpidie

Ke GI 150 kV
Tapak Tuan
Brastagi
(Sumut)

ACSR 1x240mm2
55 kmr COD 2018
Ke GI 150 kV
Subulussalam Sidikalang
(Sumut)

Persiapan Lelang,
Lot 1 A Pembangunan Base Camp PLTA Kumbih-3

ACSR 1x240mm2
5 kmr- 2028

PLTA Kumbih-3
45 MW COD-2025

Singkil
Ke GITET 275 kV PLTU SUMUT-1
- PLT EBT Peaker/BESS Sumatera 150 MW – COD 2030 Ke GI 150 kV Arun (Aceh) PLTU Pangkalan Susu 1,2 PLTGU Belawan
2x220 MW 2x(2x150+150) MW U 2x150 MW-2023
Langsa (Aceh)
Ke GITET 275 kV U MPP Paya Pasir
PLTU Pangkalan Susu 3,4 Pangkalan Susu Belawan
2x200 MW GU 75 MW
Pangkalan Labuhan
Susu Lamhotma
Pangkalan Kontrak On Going
ACSR 4x430 mm2
Brandan 60 kmr COD 2023 Ke GITET 275 kV Ext 2 LB GI 150 kV Kualanamu
Pangkalan Susu 1
Tanjung G Kontrak On Going
Pura Ke GI 150 kV Mabar KIM SUTT 150kV Perbaungan -
Pangkalan Brandan Kualanamu
Medan Barat Medan 7
Medan Barat Timur/
Binjai Binjai Percut
3 4
2
PLTA Wampu ACSR 2x240mm Perbaungan
3x15 MW
36 kmr COD 2025
Ke GI 150 kV Paya 5 Pancing Kualanamu
Kuala Geli Glugur
GIS Kesawan Sei
Kuta Cane Kuala Galang Tebing PT. MNA
A rotan
Tinggi Kuala
2 6
Wampu Listrik Perbaungan
PLTA Pump Storage-1 Tanjung
Negeri Denai
2x250 MW Kontrak On Going
Dolok Titi Tanjung Ext 2 LB GI 150 kV
COD 2029/2030 Selayang 8 Perbaungan
Gunung Kuning Morawa
Brastagi Para Tanjung
PLTP Sibanyak Balai
10 MW Perdagangan
Pematang Galang
Namorambe
Siantar Kontrak On Going
PLTA Hasang
PLTA Renun Ext 2 LB GI 150kV Siantar Kisaran
A Ke GI 150 kV
2x41 MW ACSR 1x240 mm2
26 MW Tebing Tinggi
Ke GI 150 kV
15 kmr COD 2022
PT. DPM Tanah Jawa
Brastagi
Ke GITET 500 kV
A PLTA Asahan III Rantau Prapat
Subulussalam A 174 MW- COD
Kontrak On Going Negeri Ke GITET 275 kV
SUTT 150kV Siantar – Tanah Jawa 2023 & 2024 Dolok Simangkuk
Sidikalang A
Ke GI 150 kV Pangururan ACSR 2x240 mm2
Ke GITET 500 kV
Pumpstorage-1
Singkil (Aceh) 11 kmr COD 2023
Aek Labuhan
Tele A
Sibisa (DPSP Toba) Kanopan Bilik Sistem Kota Medan
Salak Porsea
1. GITET Medan Barat – Pangkalan Susu : 2 cct, ACSR 4x430 mm2, 60 kmr – COD 2023
Kontrak On Going 2. Medan Barat – 2pi Inc. (arah Glugur) : 2 cct, HTLS 2x415 mm2 (setara), 1 kmr – COD 2023
PLTA Asahan PLTA Asahan - 3
Parlilitan 3. Medan Barat – 2pi Inc. (arah Payageli) : 2 cct, HTLS 1x360 mm2 (setara), 1 kmr – COD 2023
Dolok 2x87 MW 4. Medan Barat – Glugur (Uprate) : 2 cct, HTLS 2x415 mm2, 5 kmr – COD 2029
Simangkuk
Sanggul Kontrak On Going 5. GIS Glugur – GIS Kesawan : 2 cct, XLPE CU 800 mm2, 2 kmr – COD 2024
Ext IBT 275/150kV 250 MVA 6. GIS Kesawan – GIS Listrik : 1 cct, XLPE CU 800 mm2, 2 kmr – COD 2029
A GITET Simangkuk 7. Medan Timur – Pancing : 2 cct, ACSR 2x240 mm2, 10 kmr – COD 2027
8. GITET Medan Timur – GITET Galang : 2 cct, ACSR 4x240 mm2, 20 kmr – COD 2026
PLTA Simonggo ACSR 1x240 mm2
90 MW – COD 2029 36 kmr COD 2029
Rantau
Tarutung Prapat

P
Kota
Labuhan Sarulla Pinang
Angin
A P
PLTU Labuhan Angin PLTP Sarulla I #1,2
U A 2x110 MW
2x115 MW
Sibolga
PLTA Batang Toru A ACSR 2x430 mm2 PLTP Sarulla I #3
510 MW-2025 Batang 20 kmr COD 2026 1x110 MW Ke GI 150 kV
Toru Padang
Gunung
Ke GITET 500 kV
Kontrak On Going Sidempuan Bagan Batu
IPP PLTA Batang Toru Martabe Tua (Riau) New Garuda Sakti
(Riau)
Gunung New Padang
Sitoli Sidempuan
PLTMG MPP Nias Sibuhuan
34 MW
Nias Barat / Utara
PLTMG Nias #2
ACSR 1x210mm2, 20 MW COD-2024
110 kmr, 2018 Ke GI 150 kV
Panyabungan P.Pangarayan
PLTMG Nias #3
(Riau)
PT PLN ( Persero) Edit 5 MW COD-2027
Unit Induk Pembangunan Sumatera Bagian Utara
September 2022 Kontrak On Going
November
ke 2015 P IPP PLTP Sorik Marapi
PETA JARINGAN TRANSMISI GI Kiliranjao
BIDANG PERENCANAAN UMUM Teluk
PROVINSI SUMUT Natal
( SumateraGI Rencana
Barat) Dalam PLTP Sorik Merapi
Existing 70 kV Existing 275 kV U PLTU D PLTD GI Eksisting
150 kV
150 kV 45/50/50/50 MW COD –
Existing 150 kV Kit Eksisting GI Rencana

Rencana 150 kV Kit On Going


G PLTG A PLTA
GI Eksisting 150/7 0 kV 2021/22/23/24
PLTGU P PLTP 70 kV GITET Existing
Rencana 275 kV Commited /
GU

Rencana 500 kV Procurement


GI Eksisting
150/7 0 kV GI Switching Ke GITET 275 kV
Rencana Kabel 150 kV Kit Rencana Ke GI 150 kV Ujung
Rencana 500 kV HVDC Kontrak On Going UIP SBU
GITET
Rencana
Gading
Payakumbuh
(Sumbar) (Sumbar)