You are on page 1of 1

D C B A

MRL Home elevator Steel belt traction NOTE Technical Requirement


Control cabinet size HW HOISTWAY WIDTH CW CAR INSIDE WIDTH type TJJ 320 / 0.4
Hoistway Structure
HD HOISTWAY DEPTH CD CAR INSIDE DEPTH F/P/D 3 /3 /3 Door type Center open
Concrete Brick & Concrete Other Schematic diagram of hook OP DOOR OPENING WIDTH CH CAR HEIGHT load 320 kg Speed 0.4 m/s
ROP WALL OPENING WIDTH OH OVERHEAD HEIGHT Machine Roping 2:1
OPH DOOR OPENING HEIGHT T/sheave ∅ 100 D/sheave ∅

Controller
Before installation, make sure that CAR DBG DISTANCE BETWEEN CAR GUIDE RAILS car sheave ∅ 100 CW sheave ∅ 100
1

1
the steel belt wheels are level.
CWT DBG DISTANCE BETWEEN COUNTERWEIGHT GUIDE RAILS Shaft HW 1720 mm x HD 1200 mm
Cabin CW 1100 mm x CD 900 mm
Door OP 750 mm x OPH 2000 mm
Speed 0.4 (m/s)
Power 2.0 (KW)
The hook(15kn,indicate on the hook)
OH (mm)

≥350
Door beam Note:Can't break into the elevator shaft
Pit (mm)
Lop hole
(See table) current
760 830 130

300
400
150 380V 3p 50Hz,Light240V
650 70 290
The hook Support Force (N)
R1 R2 R3 R4 P1 P2 P3 P4

Net height=2100

Shaft wall

Shaft wall

800
45000 34000

OPH=2000
210 200

600 600 HD=1200

Thickness≤50
The work that the owner and the

CH=2200(Ceiling net height2050)


1300
construction party should complete
2

2
OH 3000
645

1.The constrution and waterproofing


E of pit about the shaft and machine
Finished floor room;
2.The dynamic power from the
OP=750 receving box,piping of lighting
HW=1720
385 ROP=950 385
earth line project and including
the main switch;
HW=1720
3.Reserved hole about each exists
Overhead plan and machine room floor;

Hoistway Liight Per≤7000


Finished floor

CAR&CWT.RAIL BRACKET SPACING≤2000


E direction Doorway schematic 4.The filling and whitewash project
Facing Hoistway after finishing theinstallation
about elevators door frane;
5.Machine room
base station remaining stations
door,ventilation,lighting and the
Bottom box Lop 100 Wx500 H 100 Wx400 H cinder and concreate on the floor
No bottom box ∅50 hole after finishing the construction;
3

3
6.Piping and wring about the
emergency call from machine room to
management room;

Rise=6000
760 830 130 760 960
Others:
In accrodance with the provising og
the building ordinance,it is not
allowed to arrange water
OH 3000 pipe,electricity pipe, wind pipe in
200×200*H700 200×200 Rise 6000 the shaft that are inprespective
WT DBG=560

CAR DBG=1220
HD=1200

HD=1200
CD=900

with the elevator.


P1 P2
530

5F
645

645

100 830
Finished floor 4F
3F OH
Pit Depth
30

115

1000

2F 3000
4

4
50
88 OP=750 288

300
700
1F 3000
210 CW=1100 410 -1F
HW=1720 Drawing Approver
HW=1720 -2F Drawing No. FT-J 320 -08-W24030468
-3F Manufacturing no.
Pit 1000 Project name FUJIPRE2400304-ZGF01
Hoistway plan Pit plan
FUJI PRECISION
D C B A

You might also like