You are on page 1of 1

 Develop a parking availability/location mobile device application

to reduce the circling of vehicles

7. Use of Recyclables
 Recyclable Resources
 Replace all light bulbs in office environments with compact
fluorescent bulbs
 Replace concrete parking and traffic products with those made
from 100% recycled rubber (e.g., wheel stops, speed humps, sign
bases, etc.)
 Implement a parking garage lighting recycling program (especially
if fluorescent lighting fixtures are in use.)
 Offer recycle bins for patrons & employees
 Purchase recycled, organic or local products
 Recycle disposed materials, use local labor, or source local or
recycled materials when undergoing new construction or
renovations

8. Energy Saving/Generation Strategies


 Energy Related Strategies
 Have climate controlled occupied areas (programmable
thermostats/sensor controls)
 Have an open air design with no ventilation system in the parking
areas
 Ventilate the decks with variable controlled air flow (i.e. VFD) or
sensor activated (i.e. DCV) technology
 Generate renewable energy (i.e. solar PV, wind turbines,
hydroelectric)
 Cover parking lots and garage roofs with solar panels.
 Generate renewable energy strategies (i.e. solar PV, wind turbines,
etc.)

P a g e | 58

You might also like