You are on page 1of 4

| Surpac

Underground Mine Planning


Solution for GEOVIA SURPAC™

Benefits • Automation is built into design and scheduling, freeing engineers from repetitive
tasks so they can spend more time analysing and improving end results.

• Manual importing and exporting of data is eliminated as data flows


3ds.com/GEOVIA

seamlessly between design, scheduling and analysis, saving engineers time


and reducing potential errors.

• Development precedence logic is built into designs which is automatically


read and understood by the scheduling component.

• Schedule analysis capability allows engineers to interrogate and supplement


the data used in development schedules.

• GEOVIA’s mining experts provide training and support for the whole solution.
Easier to Use
Underground Mine Planning
With GEOVIA’s underground mine Design – Advanced The underground mine planning
planning solution for GEOVIA Surpac™, solution provides a logically
design, scheduling and analysis are
Underground
linked design, scheduling and
seamlessly linked together to provide Design Module analysis process.
mine planners with more control over With the Advanced Underground
mine development and economic return.
Design module, testing a large number
Surpac, its Advanced Underground
of different mine designs to determine
Design module and GEOVIA MineSched™
deliver an end-to-end system for the most effective one becomes
turning orebody models into optimal simple: Mine planners can create and
mine designs and production schedules, schedule several alternative mine
streamlining and automating key designs in the time it would normally
processes along the way. take to create just one.

The underground mine planning


Define the orebody
solution for Surpac can be applied to Auditability and
any underground mine layout: Repeatability
• Narrow reef/seam conventional
• All mine designs in the Advanced
mining
Underground Design module are
• Narrow reef/seam mechanised mining created by following a logical,
• Conventional long hole open stoping easy to use, and visual flowchart
design process.
• Mechanised retreat long hole
open stoping • The user defines the parameters for
each element of the design, which
• Cut and fill operations
is saved in an embedded database,
• Sub-level caving
ensuring designs are both auditable Construct the design
• Block caving and repeatable.

Develop the schedule

REPORT
• Dilution
• Geoloss
• Waste
• ROM
• Ore
• Schedule Details

Mine design is easy with a visual, flowchart-driven approach. Analyse

2 GEOVIA Surpac Solution


Design Automation “I have been in the mining game for more than twenty-six
• The Advanced Underground Design years doing mine layouts, mining statistics, strategic planning
module offers mine planners
flexibility with its staged design
and capital projects, and my view is that the Surpac Advanced
process and the ability to easily Underground Design module is an excellent tool that can be
copy and modify other designs with applied to assist mine planning and project teams no matter
little effort.
what type of mining method is used.”
• With the module, design parameters
are used to build a complete mine — Len Backhouse, Mine Designer,
design in Surpac that can be PTM, Platinum Group Metals (RSA) (PTY) Ltd.
constructed with Surpac data types
as complete or partial designs.

• The design environment frees mine


planners from mundane drafting
tasks, allowing more time to be
spent optimising designs and
testing alternatives.

Schedule – MineSched
MineSched is used by underground
mining operations of all types and
sizes to produce long-term and short-
term schedules and to meet blending
targets. MineSched offers a broad
set of capabilities, proven scheduling
algorithms, and the ability to output
results in a wide variety of formats. Generate detailed analyses and reports.

• Integrated development and


production scheduling.
• Repeatedly re-create long or
short-term schedules to explore
alternative scheduling scenarios with
MineSched’s simple setup capability.
• Create schedules that meet
quality and material ratio targets
while considering practical
mining constraints and suitable
mining methods.
Underground networks with thousands of headings Completed design including ramps, crosscuts,
• Produce schedules with complete can be designed and scheduled with ease. and draw points.
reports and graphical results in
just minutes.
• Ensure resource capacities are never Analyse projected economic efficiency of
exceeded with resource allocation the results produced.
The underground mine planning
and leveling. solution offers mine planners the
ability to review both mine designs and MineSched
• Schedule using “actual” dates to
create the most accurate mine plans. schedules. Using an iterative review • Use 2D and 3D graphics to visually
process, the best mine designs and validate and communicate activities
• Change scheduling parameters at any schedules can quickly be determined. and engineering drawings.
point along a development heading.
• Utilise reporting functions that
• Use powerful constraint definitions Advanced Underground provide clear insight into the
on any group of headings. Design Module period by period grade, tonnes,
• Allocate resources to headings • Compare mine designs by applying equipment requirements, and
calculated fields based on existing economics of a plan.
based on user defined priorities
and constraints. values from MineSched schedules. • Produce complete Microsoft®
• Audit the analysis process with Project Gantt charts and network
• Schedule based on heading length,
diagrams with ease that allow
volume, tonnage or quantity of parameters for data extraction that
mining activities to be reviewed
any product. can be stored, reviewed
by sequence and time. The Gantt
and compared.
• Report on development tonnage charts MineSched creates include
and grades from block, polygonal • Employ an iterative process to full task dependency links and
and grid models. adjust designs based on the organised activity groups.

GEOVIA Surpac Solution 3


Underground Mine
Planning Solution
for GEOVIA surpac

GEOVIA Surpac™: GEOVIA MineSched™:


Geology and Mine Surface and Surpac
Planning Underground
Scheduling
GEOVIA Surpac is the world’s most
popular geology and mine planning GEOVIA MineSched provides
software. The software delivers scheduling for surface and
efficiency and accuracy through underground mines of all sizes and
types. It incorporates a broad set
ease-of-use, powerful 3D graphics,
of built-in functionality, proven
and workflow automation that can be
scheduling algorithms, and multiple
aligned to company-specific processes
output results such as graphics and
and data flows. Surpac addresses charts. MineSched creates schedules
all the requirements of geologists, that improve productivity and profits
surveyors, and mining engineers in the beyond what could be achieved by
resource sector. manual scheduling. MineSched

For more information email GEOVIA.Surpac@3ds.com or visit www.3ds.com/GEOVIA/Surpac.

Dassault Systèmes, the 3DExperience Company, provides a Business Platform on


premise, online, in the cloud, powered by 10 software applications that permits social
and industrial collaboration.

B.13.1
Dassault Systèmes, the 3DEXPERIENCE Company, provides business and people
with virtual universes to imagine sustainable innovations. Its world-leading
solutions transform the way products are designed, produced, and supported.
www.3ds.com/GEOVIA/Surpac © Dassault Systèmes 2013. All rights reserved.

Dassault Systèmes’ collaborative solutions foster social innovation, expanding


possibilities for the virtual world to improve the real world. The group brings value
to over 170,000 customers of all sizes, in all industries, in more than
140 countries.

CATIA, SOLIDWORKS, SIMULIA, DELMIA, ENOVIA, GEOVIA, EXALEAD, NETVIBES,


3DSWYM and 3DVIA are registered trademarks of Dassault Systèmes or its
subsidiaries in the US and/or other countries.

For more information, visit www.3ds.com/GEOVIA

The mining solutions you expect. From the people you trust.

You might also like