Professional Documents
Culture Documents
ADA BLANC
CA FASE 2
Job 00
J No: 2580
Rev No: 1
ES&H MA
ANAGEMEN
NT PLAN
1 INTR
RODUCTION
N ............................................................................................................................................................... 5
2 SCO
OPE.................................................................................................................................................................................. 5
3 REL
LATIONSHIP TO OTHER PLANS ............................................................................................................................ 6
4 OBJECTIVES AN
ND PURPOSE
E OF THE ES&H PLAN ................................................................................................ 6
5 LEA
ADERSHIP AN
ND COMMIT
TMENT ............................................................................................................................. 7
5.1. Management team
t organiz
zation ............................................................................................................. 7
5.2. Management ............................................................................................................................................. 7
5.3. En
nvironmenta &H) ............................................................................................. 8
al safety and health (ES&
5.4. Liine Supervision (BECHTE ctor) .................................................................... 9
EL, OWNER and Contrac
mployees .............................................................................................................................................. 10
5.5. Em
6 STR ND OBJECTIIVES ................................................................................................................................ 11
RATEGIES AN 1
y ................................................................................................................................. 11
6.1. Prroject Policy
6.2. Sttrategy ........................................................................................................................................... 12
6.3. Objectives & Targets
T ..................................................................................................................... 12
6.4. Ke ors .......................................................................................................... 13
ey Performance Indicato
7 ORG
GANIZATION
N AND RESO
OURCES .......................................................................................................................... 13
3
7.1. Sttructure & Re y............................................................................................................. 13
esponsibility
7.2. Ac
ccountability sibility .................................................................................................... 14
y & Respons
dditional Roles & Responsibilities .............................................................................................. 23
7.3. Ad
8 CON
NSULTATION
N ............................................................................................................................................................. 25
5
9 ES&
&H COMMITT
TEES ..................................................................................................................................................... 26
6
10 ES&
&H COMMUN
NICATION ............................................................................................................................................ 27
7
10.1. Prre-Start Meettings ......................................................................................................................... 28
oolbox Meetings .......................................................................................................................... 29
10.2. To
10.3. ES
S&H Represe
entatives’ Bii-Weekly Coo Meeting........................................................... 29
ordination M
S&H Briefs .................................................................................................................................... 30
10.4. ES
10.5. ES
S&H Bulletin s ............................................................................................................. 30
ns and Alerts
10.6. ES
S&H Recogn ams ........................................................................................................ 30
nition Progra
10.7. Co
ommunicatio utory Authorrities .................................................................................. 31
on with Statu
10.8. Da
ata, Records ment Control ....................
s and Docum . ...................................................................... 31
11 MAN
NAGING HAZ
ZARDS AND ES&H RISK
K ................................................................................................................ 33
3
11.1. Ha
azard and Riisk Identifica sessment .......................................................................... 33
ation and Ass
Electronic
c documents once printed,
p are uncontrrolled and may beccome outdated. Reffer to the electronicc documents in Info
oWorks for current revisions.
Bechtel Confide
ential © Bechtel Co
orporation 2016.
Bechtel
B Chile Limita
ada (BChile), 2016.. All rights reserved d.
This docum
ment contains inform
mation that is confidential and proprieetary to BChile or itss affiliates, and ma
ay not be reviewed,, transmitted, distrib
buted used
reproduced orr disclosed without BChile´s prior writtten permission and d the taking of any a action whatsoever in reliance on.
2 of 72
QUEBRA
ADA BLANC
CA FASE 2
Job 00
J No: 2580
Rev No: 1
ES&H MA
ANAGEMEN
NT PLAN
Electronic
c documents once printed,
p are uncontrrolled and may beccome outdated. Reffer to the electronicc documents in Info
oWorks for current revisions.
Bechtel Confide
ential © Bechtel Co
orporation 2016.
Bechtel
B Chile Limita
ada (BChile), 2016.. All rights reserved d.
This docum
ment contains inform
mation that is confidential and proprieetary to BChile or itss affiliates, and ma
ay not be reviewed,, transmitted, distrib
buted used
reproduced orr disclosed without BChile´s prior writtten permission and d the taking of any a action whatsoever in reliance on.
3 of 72
QUEBRA
ADA BLANC
CA FASE 2
Job 00
J No: 2580
Rev No: 1
ES&H MA
ANAGEMEN
NT PLAN
18.3. Su
upply of Goo ces .......................................................................................................... 51
ods & Servic
18.4. Pe t ............................................................................................................. 52
erformance Management
M
19 ES&
&H IMPLEME
ENTATION AND
A MONITO
ORING .................................................................................................... 53
3
19.1. Im on .............................................................................................................................. 53
mplementatio
19.2. Monitoring, su
urviellence and ons .................................................................................... 53
a inspectio
esting ............................................................................................................................................ 55
19.3. Te
20 HEA
ALTH SURVE
EILLANCE ........................................................................................................................................... 56
6
21 STO
OP WORK AU
UTHORITY ........................................................................................................................................... 57
7
22 INCIIDENT NOTIIFICATION, INVESTIGAT
I TION AND R
REPORTING ................................................................... 57
7
23 COR
RRECTIVE / PREVENTAT
P TIVE ACTION
N ............................................................................................................. 59
9
24 LESSONS LEARN
NED PROGR
RAM ................................................................................................................................. 59
9
25 HABILITATIO
REH ON AND RET
TURN TO WO
ORK ........................................................................................................ 60
0
26 ES&
&H COMPLIA
ANCE ENFOR
RCEMENT ..................................................................................................................... 60
0
27 AUD
DITS, ASSESS
SMENTS AND
D REVIEWS ........................
. ......................................................................................... 61
1
28 EXT
TERNAL ASSESSMENT AND AUDITS ........................
. ......................................................................................... 62
2
29 INTE
ERNAL ASSE
ESSMENTS .......................................................................................................................................... 62
2
30 SYST
TEM AUDITS
S AND REVIE
EWS ............................................................................................................................... 63
3
31 ATT
TACHMENTS
S .............................................................................................................................................................. 64
4
Electronic
c documents once printed,
p are uncontrrolled and may beccome outdated. Reffer to the electronicc documents in Info
oWorks for current revisions.
Bechtel Confide
ential © Bechtel Co
orporation 2016.
Bechtel
B Chile Limita
ada (BChile), 2016.. All rights reserved d.
This docum
ment contains inform
mation that is confidential and proprieetary to BChile or itss affiliates, and ma
ay not be reviewed,, transmitted, distrib
buted used
reproduced orr disclosed without BChile´s prior writtten permission and d the taking of any a action whatsoever in reliance on.
4 of 72
QUEBRA
ADA BLANC
CA FASE 2
Job 00
J No: 2580
Rev No: 1
ES&H MA
ANAGEMEN
NT PLAN
1 INTR
RODUCTION
The Quebrada Blanca
B Fase 2 (QB-2) (the
( “Project””) Environme
ental, Safetyy and Health
h (ES&H)
agement Plan
Mana n (the “Plan”)), is a Projec
ct-level docum
ment that pro
ovides an ove
erarching man
nagement
syste
em that the Project
P will use
u to guide ES&H progrrams over the constructio
on and pre-operational
phases of the Pro
oject. This Plan is aligned
d with the ten
n (10) elemen
nts of the BE
ECHTEL Proje
ect ES&H
agement Systtem and esta
Mana ablishes the Project
P ES&H program req
quirements. T
This Plan describes the
ES&H
H organization, its roles, re s, and practicces, along witth strategies for interface w
esponsibilities with other
mana
agers and the
e OWNER.
2 SCOPE
ses ES&H pro
This Plan address ogram elemen
nts applicable
e to all person
nnel working o
on the Projectt.
CONTRACTORSs
s shall perforrm their Work
k in accordan
nce with the Plan and refferenced procedures
h shall be dee
which emed the minimum require
ements for the
e Work to be performed to.
ss otherwise specified, CO
Unles ONTRACTOR
R shall be re
esponsible forr providing itss own Jobsite
e workers
and associated
a su
ubcontractors
s, vendors an
nd visitors witth the approp
priate equipm
ment, suppliess, training,
and supervision as
a specified in the Projec
ct ES&H pla
ans and proccedures, and Contract Do
ocuments.
HTEL will be responsible for managing
BECH g of CONTRA
ACTOR, whicch shall inclu
ude ES&H ovversight of
the CONTRACTO
C ORs to ensure complianc
ce, as a min
nimum, with the Project Plan and prrocedures,
contrractual obligattions, and the
e CONTRACT
TORs ES&H IImplementatio
on Plan.
Electronic
c documents once printed,
p are uncontrrolled and may beccome outdated. Reffer to the electronicc documents in Info
oWorks for current revisions.
Bechtel Confide
ential © Bechtel Co
orporation 2016.
Bechtel
B Chile Limita
ada (BChile), 2016.. All rights reserved d.
This docum
ment contains inform
mation that is confidential and proprieetary to BChile or itss affiliates, and ma
ay not be reviewed,, transmitted, distrib
buted used
reproduced orr disclosed without BChile´s prior writtten permission and d the taking of any a action whatsoever in reliance on.
5 of 72
QUEBRA
ADA BLANC
CA FASE 2
Job 00
J No: 2580
Rev No: 1
ES&H MA
ANAGEMEN
NT PLAN
3 RELA
ATIONSHIP TO
T OTHER PLANS
P
This Plan establishes program elements tha
at apply throu
ughout the life
e cycle of the Project, and forms the
s for development of relatted project prrocedures an
basis nd plans, ES&
&H related trraining, and ssafe work
practtices during construction,
c and pre-operrational testin
ng. Safety an
nd environmental integrity in design
will be covered ins
side the engin
neering proce
edures.
Construction
C n ES&H Exec
cution Plan, which descriibes the prog
grams and pro
ocedures neccessary to
implement
i th
he requirements outlined in this Plan , and Bechte
el Core Proccesses as m
modified to
include
i applicable OWNE
ER requireme
ents. The Co
onstruction E
ES&H Execu
ution Plan wiill provide
guidance
g on the
t execution
n of the constrruction work p
packages.
Construction
C n Environme
ental Contro
ol Plan, a Co
onstruction E n (CECP)
Environmental Control Plan
shall
s be prep ordance with the Project Social and Environmenta
pared in acco al Impact Asssessment
(SEIA)
( and BECHTEL
B Standard Work
k Process Prrocedure (SW
WPP), SWPP 4MP-T81-01
1105. The
CECP
C will su
upport the Prroject Environ
nmental Man agement Sysstem to clearrly define the
e Project’s
environmenta
e al objectives and
a requireme
ents.
4 OBJE
ECTIVES AN
ND PURPOSE
E OF THE ES
S&H PLAN
This Plan establishes a bas
sis for management of E
ES&H requirrements, pro
ocedural requ
uirements,
mum program
minim m requirementts, and define
es responsibil ities for imple
ementation. T
The Plan obje
ectives are
to:
Provide
P guide
elines for the
e integration and
a uniform iimplementatio &H program to ensure
on of the ES&
compliance
c with
w requirem
ments for the
e Project acttivities during
g construction and pre-operational
phases.
p
Electronic
c documents once printed,
p are uncontrrolled and may beccome outdated. Reffer to the electronicc documents in Info
oWorks for current revisions.
Bechtel Confide
ential © Bechtel Co
orporation 2016.
Bechtel
B Chile Limita
ada (BChile), 2016.. All rights reserved d.
This docum
ment contains inform
mation that is confidential and proprieetary to BChile or itss affiliates, and ma
ay not be reviewed,, transmitted, distrib
buted used
reproduced orr disclosed without BChile´s prior writtten permission and d the taking of any a action whatsoever in reliance on.
6 of 72
QUEBRA
ADA BLANC
CA FASE 2
Job 00
J No: 2580
Rev No: 1
ES&H MA
ANAGEMEN
NT PLAN
Establish role
es, responsibiilities and acc
countability fo
or the ES&H p
program on th
he Project.
Develop
D the requirements
s for special ES&H proced
dures and prrograms for W
Work efforts d
during the
construction
c and
a pre-opera
ational phase
es.
Provide
P an ou
utline for initia
al and continu
uing ES&H tra
aining.
5 DERSHIP AN
LEAD ND COMMITM
MENT
5.1. Mana
agement team organizatiion
The Project
P management team
m (BECHTEL, OWNER and
d CONTRACT
TOR) managers and supe
ervisor are
respo
onsible and accountable for providin
ng Project e
employees w
with a safe and healthyy working
environment. To accomplish th
his, the Proje
ect manageme
ent team will plan and exe
ecute their wo
ork for the
ect ensuring that
Proje t ES&H re
emains an es
ssential value
e in the way the work is cconducted. A
All Project
mana
agers and su
upervisors are
e responsible
e for effective mportance of ES&H to
ely communicating the im
perso
onnel under their
t jurisdiction and shall hold their d
direct reportss accountable
e for ensuring
g that the
elements of the ES
S&H Plan are
e implemented according tto project requirements. Management w
will ensure
that necessary re
esources are in place to provide app ropriate leve ls of protectiion to their rrespective
Jobsiite workers, subcontractor
s rs, visitors, vendors,
v the g
general publiic and the en
nvironment. It shall be
mana
agement’s co
ommitment th
hat the work
kforce is aw
ware of, and understandss the projecct’s ES&H
objec
ctives and pro
ograms.
5.2. Mana
agement
BECH
HTEL, OWNE
ER and CONT
TRACTOR management iss responsible for assisting in the plannin
ng for and
execu
uting of the Project ES&
&H procedurres and prog
grams that e
ensure work is conducte
ed safely;
occup
pational hea
alth hazards are controlled; construcction work m
minimizes ne
egative impact to the
environment; and appropriate emergency responses p
processes arre in place that provide maximum
ection for emp
prote ployees, visito
ors, the public
c and the envvironment in tthe event of JJobsite emerg
gencies or
naturral disasters.
agement’s key
Mana y strategies in
nclude:
Promoting
P BE
ECHTEL’S “Z
Zero Accident”” philosophy a
and OWNER
R’S “Courageo
ous Safety Le
eadership”
philosophy
p an
nd values as demonstrated
d by their beh
haviors.
Identify, and put in plac
ce the neces
ssary resourcces, skills, e
equipment an
nd the Proje
ect ES&H
procedures
p to
o meet Projec
ct objectives.
Ensure comp
pliance and re
eport in accord
dance with al l statutes and
d other related
d requiremen
nts.
Electronic
c documents once printed,
p are uncontrrolled and may beccome outdated. Reffer to the electronicc documents in Info
oWorks for current revisions.
Bechtel Confide
ential © Bechtel Co
orporation 2016.
Bechtel
B Chile Limita
ada (BChile), 2016.. All rights reserved d.
This docum
ment contains inform
mation that is confidential and proprieetary to BChile or itss affiliates, and ma
ay not be reviewed,, transmitted, distrib
buted used
reproduced orr disclosed without BChile´s prior writtten permission and d the taking of any a action whatsoever in reliance on.
7 of 72
QUEBRA
ADA BLANC
CA FASE 2
Job 00
J No: 2580
Rev No: 1
ES&H MA
ANAGEMEN
NT PLAN
Ensure the pe
erformance of
o the Work, at
a a minimum , follows all P
Project ES&H plans and prrocedures
for
f all work on
n the Project.
Hold all Proje
ect personne
el accountable
e for the succcess and im
mplementation
n of the Proje
ect ES&H
Plan
P and proc
cedures. Prov
vide systemattic processess for:
Planning
g the work.
Identifyin
ng, assessing ds and risks.
g and controlliing the hazard
Reportin
ng and investigating inciden
nts.
Planning ng necessary resources be
g and obtainin efore starting work.
Evaluatin
ng and implem
menting meth
hods for impro
oving perform
mance.
Promotin
ng the particip
pation of all Project
P person
nnel.
Recognizing and rewa
arding good individual and
d team perform
mance.
Defining the ES&H re
esponsibilities and duties a
all personnel, including ES&
&H staff.
Monitorin
ng and record
ding the effec
ctiveness of E
ES&H plans an
nd procedure
es.
Setting and
a reviewing
g objectives and targets forr both individu
uals and team
ms.
Promotin
ng safe practices through a behavior ba
ased system o
observation p
program.
Impleme
enting continu
uous improvem
ment practice
es.
Establish
hing working relationship amongst the
e OWNER, B
BECHTEL, a
and CONTRA
ACTOR to
promote the Project ES&H
E objectiv
ves.
5.3. Envirronmental sa
afety and health (ES&H)
BECH
HTEL, OWN
NER and CO
ONTRACTOR
R managem ent has an overall ressponsibility ffor ES&H
mana
agement sys
stem and ES
S&H perform
mance. To ssupport these
e efforts, th
he ES&H De
epartment
estab
blishes a quallified group off ES&H professionals unde
er the directio
on of the ES&
&H Manager, tto provide
techn
nical and func
ctional oversig
ght of activitie
es that occur o
on the Projecct.
Envirronmental, Safety
S and Health
H Mana
ager: The ES
S&H Manage
er in conjuncction, with th
he Project
mana
ager, is respo
onsible for implementing and administe ring ES&H prrocedures ap
pplicable to th
he Project.
The ES&H
E manag
ger serves as the coordinattor in matterss relating to ES
S&H.
Envirronmental, Safety
S and Health
H Repre
esentatives: ES&H repre
esentatives w
will provide d
day-to-day
tradittional ES&H support
s to the
e project duriing daily activvities. These representativves will be re
esponsible
for as
ssisting mana
agement in es
stablishing ES
S&H criteria ffor activities ffor inclusion into planning activities,
briefings and worrk packages. They will ro
outinely surve
ey work activvities to ensu
ure ES&H hazards are
Electronic
c documents once printed,
p are uncontrrolled and may beccome outdated. Reffer to the electronicc documents in Info
oWorks for current revisions.
Bechtel Confide
ential © Bechtel Co
orporation 2016.
Bechtel
B Chile Limita
ada (BChile), 2016.. All rights reserved d.
This docum
ment contains inform
mation that is confidential and proprieetary to BChile or itss affiliates, and ma
ay not be reviewed,, transmitted, distrib
buted used
reproduced orr disclosed without BChile´s prior writtten permission and d the taking of any a action whatsoever in reliance on.
8 of 72
QUEBRA
ADA BLANC
CA FASE 2
Job 00
J No: 2580
Rev No: 1
ES&H MA
ANAGEMEN
NT PLAN
prope
erly identified and controlle
ed. They will serve as the technical spe
ecialist in theiir area of expertise and
shall be used by construction
c personnel
p to implement prrovisions in th
he constructio
on work areas with the
goal of improving ES&H perforrmance. BEC
CHTEL’S ES&
&H representa
atives are ressponsible for oversight
e CONTRACT
of the TOR’S comp
pliance to the Project ES&
&H Plan and p
procedures, ccontractual ob
bligations,
a additional ES&H requirements spec
and any cified in the C
CONTRACTOR’S ES&H Im
mplementation
n Plan.
Adopt
A a prac
ctical safe work
w philosophy that emp loyees will re
espect includ
ding setting a positive
example
e with regard to ES
S&H, and never directing th
heir workers tto take shortccuts or disrega
ard ES&H
rules
r and procedures.
Ensure their work
w task is conducted
c in a safe, health
hy, and enviro
onmentally so
ound way.
Promote
P and
d demonstra
ate commitment to the BECHTEL “Zero Accide
ent Performa
ance” and
“Courageous
“ Safety Leade
ership” conce
ept.
Communicate
C e ES&H policies and rules to the employyees and enfforce compliance.
Instructing th
heir employee g the hazards of their jobs and commun
es concerning nicate applica
able ES&H
rules,
r guidelin
nes, and inforrmation.
a tasks to identify enviro
Review jobs and onmental, sa fety, health a
and fire hazarrds and assurre that job
hazard
h analy
yses (JHA) an
nd work perm
mits adequate
ely address h
hazard contro
ols, personal protective
equipment,
e and job ES&H precautions.
Provide
P pre-ttask briefings
s and commu
unications reg
garding safetyy, health, and the environ
nment, as
necessary,
n fo
or employees to implementt the appropri ate controls tto mitigate the
e potential of incidents.
Ensure that direct
d reports
s working in and/or
a visiting
g their area have comple
eted all requirred ES&H
training
t and have
h any requ
uired compete
encies or auth
horizations.
Provide
P to the s and ensure the use of re quired protecctive equipme
eir employees ent.
Ensure their
t employees, or visitors
s, are properlyy instructed in d limitations of PPE.
n the use and
Electronic
c documents once printed,
p are uncontrrolled and may beccome outdated. Reffer to the electronicc documents in Info
oWorks for current revisions.
Bechtel Confide
ential © Bechtel Co
orporation 2016.
Bechtel
B Chile Limita
ada (BChile), 2016.. All rights reserved d.
This docum
ment contains inform
mation that is confidential and proprieetary to BChile or itss affiliates, and ma
ay not be reviewed,, transmitted, distrib
buted used
reproduced orr disclosed without BChile´s prior writtten permission and d the taking of any a action whatsoever in reliance on.
9 of 72
QUEBRA
ADA BLANC
CA FASE 2
Job 00
J No: 2580
Rev No: 1
ES&H MA
ANAGEMEN
NT PLAN
5.5. Employees
All Prroject Employ ponsible and accountable for assuring ttheir own ES&H and contrributing to
yees are resp
the ES&H
E of otherrs by:
Maintaining
M a proactive role in the imple
ementation o f this Plan, an
nd other ES&
&H plans, imp
plementing
procedures
p without
w deviattion, and em
mbracing the ““Zero Accide
ent Performan
nce” and “Co
ourageous
Safety
S Leade
ership” concep
pt.
Being
B aware of project env
vironmental re
equirements and discharg
ging their workk in an enviro
onmentally
sound
s fashion
n.
Exercising the
eir “Stop Worrk” authority whenever
w the y perceive an
n imminent da
anger to them
mselves or
other
o Jobsite personnel.
Electronic
c documents once printed,
p are uncontrrolled and may beccome outdated. Reffer to the electronicc documents in Info
oWorks for current revisions.
Bechtel Confide
ential © Bechtel Co
orporation 2016.
Bechtel
B Chile Limita
ada (BChile), 2016.. All rights reserved d.
This docum
ment contains inform
mation that is confidential and proprieetary to BChile or itss affiliates, and ma
ay not be reviewed,, transmitted, distrib
buted used
reproduced orr disclosed without BChile´s prior writtten permission and d the taking of any a action whatsoever in reliance on.
10 of 72
QUEBRA
ADA BLANC
CA FASE 2
Job 00
J No: 2580
Rev No: 1
ES&H MA
ANAGEMEN
NT PLAN
Exercising the
eir right to obtain relevant information a
about the haza
ards of a partticular job tassk, or work
environment
e before performing the job.
Alerting
A their supervisor and/or their ES
S&H Represe
entative to an
ny potential hazards or near-missed
in
i their work or
o Jobsite are
ea and correc
cting those ovver which theyy have direct o
operational co
ontrol.
Adhering
A to safe
s practices
s and proced
dures specifie
ed by their su d/or included in the job
upervisor and
documentatio
d on such as pe
ermits.
Remaining alert for Jobsite
e and task rellated hazardss.
Reporting alll work-related egardless of lack of sevverity, to their supervisorr, medical
d injuries, re
services
s and their ES&H Representativ
R ve.
Reporting all fires, propertty damage, orr environmen
ntal releases, regardless off perceived severity, to
their
t supervis
sor and their ES&H
E represe
entative.
Attending
A and
d participating
g in ES&H-rellated training sessions.
Engaging in employee
e ograms such as “People B
parrticipation pro Based Safety””, “Zero Accid
dent Team
(ZAT)”,
( and in
n the capacity
y of employee
e representatiive (if elected
d) for any speccial committe
ees.
Properly
P using personal prrotective equipment and en hers around them do the same.
nsure that oth
6 STRA
ATEGIES AN
ND OBJECTIV
VES
6.1. Proje
ect Policy
The Project’s
P polic
cy is to provid
de and mainttain a safe an
nd healthy wo
orking enviro
onment, where
e hazards
are controlled,
c for the purpose of
o protecting its employeess, visitors, pro
operty and minimizing or e
eliminating
the im
mpact to the environment
e and
a local com
mmunities. The
e Project’s po
olicy is derive
ed from:
Attachment
A A-1:
A Bechtel Policy
P 111- En
nvironmental Safety and H
Health (and asssociated man
nagement
instruction
i 111.01)
Attachment
A A-2:
A Teck Res
sources Limite
ed - Charter o
of Corporate R
Responsibilityy
Attachment
A A-3:
A Teck Res
sources Limite
ed Code of Su
ustainable Co
onduct
Attachment
A A-4:
A Teck Res
sources Limite
ed Safety and
d Health Policcy
These documents
s form the hig policy and dirrect all other activities. In
ghest level off the Project p n addition,
Zero Acciden
the “Z nt” and “Courrageous Safe
ety Leadership” Philosophyy will be inco
orporated into
o banners
and bulletins and
d displayed in prominent places throu
ughout the JJobsite, as w
well as comm
municated
through the projec
ct orientation programs.
p
Electronic
c documents once printed,
p are uncontrrolled and may beccome outdated. Reffer to the electronicc documents in Info
oWorks for current revisions.
Bechtel Confide
ential © Bechtel Co
orporation 2016.
Bechtel
B Chile Limita
ada (BChile), 2016.. All rights reserved d.
This docum
ment contains inform
mation that is confidential and proprieetary to BChile or itss affiliates, and ma
ay not be reviewed,, transmitted, distrib
buted used
reproduced orr disclosed without BChile´s prior writtten permission and d the taking of any a action whatsoever in reliance on.
11 of 72
QUEBRA
ADA BLANC
CA FASE 2
Job 00
J No: 2580
Rev No: 1
ES&H MA
ANAGEMEN
NT PLAN
6.2. Strattegy
BECH
HTEL’S ES&
&H Managem
ment System, Core Proce
esses (CP’s) and Constru
uction Standard Work
Proce
ess Procedurres (SWPP’s) form the ba
asis of this P
Plan. Where essential intterfaces existt between
consttruction and operations,
o co
onstruction pe
ersonnel shalll be appraise
ed of operatio
ons procedure
es that will
dopted and be trained as necessary to perform the work alongsiide operational personnel utilizing a
be ad
stand
dard approach
h.
The Project
P proce
edures will be considered the
t minimum standards to
o apply to all aspects of th
he Project.
Wherre CONTRAC
CTOR’S proc
cedure excee
eds the minim
mum requirem
ment of any Project proccedure, or
coverrs a specific application not
n covered by Project p rocedures, B
BECHTEL’S E
ES&H Deparrtment will
review n the Project. CONTRACT
w the procedure for use on TOR’S new orr enhanced procedures shall ensure
any new
n training, special
s equip
pment, or othe
er requiremen
nts are implem
mented prior tto working un
nder these
proce
edures.
edures will be
Proce b reviewed annually, at a minimum, to include im
mprovementss and reflect changing
conditions. The Zero
Z Accident Team (ZAT
T) shall be rresponsible fo
or developing
g, communiccating and
ementing shorrt term strateg
imple gy and improv
vement planss.
6.3. Obje
ectives & Tarrgets
BECH
HTEL´S Man
nagement tea
am will establish key obje
ectives and p
performance ttargets for th
he Project
during the Execu
ution Phase. The primary
y ES&H obje
ective for the
e project will be complette project
engagement in th
he “Zero Accidents” and “Courageous
“ Safety Lead
dership” philo
osophies. Lo
ower level
ctives and targets shall be
objec b used to measure/moni
m itor the success level of the effective
eness and
imple
ementation of the ES&H Management System.
S Thes e objectives a
and targets w
will be set and
d reviewed
by the ZAT on a quarterly
q basis
s and used to
o develop an annual ES&H
H Improvemen
nt Plan. The o
objectives
and targets
t shall be Specific, Measurable,
M Achievable, R
Realistic, and
d Time-bound
d (SMART). O
Objectives
and targets
t will be
e based on bo
oth leading an
nd lagging ind
dicators and will be review
wed on a regu
ular basis,
or wh
here there arre changes to
o the scope of work or w
work processe
es. Objectives and targetss shall be
comm
municated to all Project pe
ersonnel. These objectivess and targets will be share
ed with CONT
TRACTOR
for its
s understanding and involv
vement in meeting and imp
proving on the
e objectives a
and targets.
Electronic
c documents once printed,
p are uncontrrolled and may beccome outdated. Reffer to the electronicc documents in Info
oWorks for current revisions.
Bechtel Confide
ential © Bechtel Co
orporation 2016.
Bechtel
B Chile Limita
ada (BChile), 2016.. All rights reserved d.
This docum
ment contains inform
mation that is confidential and proprieetary to BChile or itss affiliates, and ma
ay not be reviewed,, transmitted, distrib
buted used
reproduced orr disclosed without BChile´s prior writtten permission and d the taking of any a action whatsoever in reliance on.
12 of 72
QUEBRA
ADA BLANC
CA FASE 2
Job 00
J No: 2580
Rev No: 1
ES&H MA
ANAGEMEN
NT PLAN
Addittionally, BECH
HTEL is required to complete the Proje ct Safety Sum
mmary Review
w (PSSR) mo
onthly that
provides a uniforrm approach to evaluatin performance and identifying areas
ng the Proje ct’s ES&H p
requiring focus forr improvemen
nt. The PSSR
R key ingredie
ent categoriess (leading Indicators) includ
de:
Leadership
L
Engagement
People
P Based
d Safety
Risk Management
Planning
P
Recognition
7 ORG
GANIZATION AND RESOU
URCES
7.1. Struc
cture & Resp
ponsibility
A key
y feature of organizationa
o s its adaptabi lity to quicklyy and efficiently detect hazzards and
l capability is
contrrol the changing operating environment, as well as ta
ake advantag
ge of opportunities withoutt exposing
the Project
P to und
due risk. This
s is achieved by having ro
obust systemss in place tha
at routinely checks the
work environment and extract the
t appropria
ate information
n so informed
d decisions ca
an be made in a timely
ner at all levels throughoutt the organiza
mann ation.
Electronic
c documents once printed,
p are uncontrrolled and may beccome outdated. Reffer to the electronicc documents in Info
oWorks for current revisions.
Bechtel Confide
ential © Bechtel Co
orporation 2016.
Bechtel
B Chile Limita
ada (BChile), 2016.. All rights reserved d.
This docum
ment contains inform
mation that is confidential and proprieetary to BChile or itss affiliates, and ma
ay not be reviewed,, transmitted, distrib
buted used
reproduced orr disclosed without BChile´s prior writtten permission and d the taking of any a action whatsoever in reliance on.
13 of 72
QUEBRA
ADA BLANC
CA FASE 2
Job 00
J No: 2580
Rev No: 1
ES&H MA
ANAGEMEN
NT PLAN
7.2. Acco
ountability & Responsibillity
Accountability and
d responsibilitties shall be assigned to p hin the organ
positions with nizational stru
ucture, not
individuals and sh
hall be defined
d in a way tha
at is appropri ate for the po a of control. There shall
osition’s area
be no
o change to the organiza
ational structu
ure without re
eview of the impact to the
e Plan respo
onsibilities,
accou
untabilities, and assignments in accorda
ance with the
e Change Man
nagement Pro
ocess.
Each
h person assigned to a position
p shall be delegate
ed with ES&H
H responsibillities under tthe ES&H
Mana
agement Systtem and shall have the qu
ualifications, e
experience, a
and personal capability to fulfill their
duties. They shall have the ne
ecessary auth
hority, compettency, and exxperience nee
eded to comp
plete their
ctives.
objec
The following
f gene
eric responsib
bilities apply to
t the ES&H M
Managementt System:
Electronic
c documents once printed,
p are uncontrrolled and may beccome outdated. Reffer to the electronicc documents in Info
oWorks for current revisions.
Bechtel Confide
ential © Bechtel Co
orporation 2016.
Bechtel
B Chile Limita
ada (BChile), 2016.. All rights reserved d.
This docum
ment contains inform
mation that is confidential and proprieetary to BChile or itss affiliates, and ma
ay not be reviewed,, transmitted, distrib
buted used
reproduced orr disclosed without BChile´s prior writtten permission and d the taking of any a action whatsoever in reliance on.
14 of 72
QUEBRA
ADA BLANC
CA FASE 2
Job 00
J No: 2580
Rev No: 1
ES&H MA
ANAGEMEN
NT PLAN
TECK
T EHSC Standards, policies
p and process for u
use in develo
oping the QB--2 ES&H Man
nagement
System.
S
Identification, appointmentt and supportt of an individ
dual within th
he TECK QB--2 team to asssume the
roles
r and re
esponsibilities
s of a TECK
K Environme ntal, Health, Safety, and
d Communityy (EHSC)
Manager
M in support of the QB-2 EHSC Managementt System.
Bechtel
B Chile Limita
ada (BChile), 2016.. All rights reserved d.
This docum
ment contains inform
mation that is confidential and proprieetary to BChile or itss affiliates, and ma
ay not be reviewed,, transmitted, distrib
buted used
reproduced orr disclosed without BChile´s prior writtten permission and d the taking of any a action whatsoever in reliance on.
15 of 72
QUEBRA
ADA BLANC
CA FASE 2
Job 00
J No: 2580
Rev No: 1
ES&H MA
ANAGEMEN
NT PLAN
Champion
C th olicies and expectationss to the QB
he communication of po B-2 Construcction and
Contractors
C te
eams with reg
gard to ES&H
H.
Communicate
C e to QB-2 Construction
C and Works Contractor staff that the emphasis on cost,
schedule,
s and
d quality will not
n override th
he importanc e of ES&H im
mplementation
n.
Leading
L the development of a strong ES&H mana
agement cultu
ure, including
g a commitme
ent to the
“Zero
“ Acciden
nt” and “Courrageous Safetty Leadership
p” philosophie
es on the QB--2.
Management
M t of all day-to-day consttruction activvities in acco
ordance with
h the Projecct’s ES&H
commitments
c s, requirements and proced
dures.
Effective and timely comm
munication of ES&H
E compli ance issues tto the project and ES&H M
Managers.
Serving
S as the primary Em
mergency Res
sponse Coord
dinator.
Ensuring that any change nicated to the ES&H Man
es in activity are commun nager that ap
ppropriate
amendments
a can be made
e to the ES&H
H system.
Ensure that Bechtel
B and TECK
T project team membe
ers are inform
med of hazard
dous condition
ns or near
miss
m incidents.
Participate
P in
n formal ES&H
H assessmen
nts and intera
act with all te
eam members and organizations to
identify
i metho
ods to improv
ve safe work practices.
p
Promote
P open communica
ation, co-operration, and tru
ust between p
project team m
members, Co
ontractors,
and
a custome
ers/clients with focus on optimizing
o nvironmental, Health, and Safety programs and
En
initiatives.
i
Recognize ou
utstanding ES
S&H performa
ance in orderr to increase commitment and participa
ation (i.e.,
positive
p reinfo
orcement).
Facilitate com
mpliance with applicable statutory re
egulations an
nd all requirements of th
he ES&H
Management
M t Plan.
7.2.4. TECK EH
HSC Manage
er
The TECK
T EHSC Manager is the Custome presentative responsible ffor the oversight of the
er’s ES&H rep
project’s alignmen
nt with the TECK EHSC Ma
anagement S
Standards and
d to act as the
e interface be
etween the
project and TECK and Quebrad
da Blanca Op
perations on isssues affectin
ng ES&H com
mpliance.
Electronic
c documents once printed,
p are uncontrrolled and may beccome outdated. Reffer to the electronicc documents in Info
oWorks for current revisions.
Bechtel Confide
ential © Bechtel Co
orporation 2016.
Bechtel
B Chile Limita
ada (BChile), 2016.. All rights reserved d.
This docum
ment contains inform
mation that is confidential and proprieetary to BChile or itss affiliates, and ma
ay not be reviewed,, transmitted, distrib
buted used
reproduced orr disclosed without BChile´s prior writtten permission and d the taking of any a action whatsoever in reliance on.
16 of 72
QUEBRA
ADA BLANC
CA FASE 2
Job 00
J No: 2580
Rev No: 1
ES&H MA
ANAGEMEN
NT PLAN
Bechtel
B Chile Limita
ada (BChile), 2016.. All rights reserved d.
This docum
ment contains inform
mation that is confidential and proprieetary to BChile or itss affiliates, and ma
ay not be reviewed,, transmitted, distrib
buted used
reproduced orr disclosed without BChile´s prior writtten permission and d the taking of any a action whatsoever in reliance on.
17 of 72
QUEBRA
ADA BLANC
CA FASE 2
Job 00
J No: 2580
Rev No: 1
ES&H MA
ANAGEMEN
NT PLAN
Bechtel
B Chile Limita
ada (BChile), 2016.. All rights reserved d.
This docum
ment contains inform
mation that is confidential and proprieetary to BChile or itss affiliates, and ma
ay not be reviewed,, transmitted, distrib
buted used
reproduced orr disclosed without BChile´s prior writtten permission and d the taking of any a action whatsoever in reliance on.
18 of 72
QUEBRA
ADA BLANC
CA FASE 2
Job 00
J No: 2580
Rev No: 1
ES&H MA
ANAGEMEN
NT PLAN
Coordinate
C th
he completion
n of Bechtel Corporate
C ES&
&H audits on the project.
Review proje
ect procedure
es, when req
quired, and a
any variationss from the B
Bechtel corporate Core
Processes
P wh
here applicab
ble.
Serve
S as tech
hnical resourc
ces to ensure consistencie
es.
Reviewing an
nd understan
nding the req
quirements o
of all QB-2 E
ES&H proced
dures, standa
ards, field
instructions
i and
a policies as
a they apply to the scope
e of work and with their ind
dividual respo
onsibilities
regarding
r its implementatio
on and enforc
cement.
Demonstratin
D ng commitme
ent to the ES&H
E progra
am through their actionss on site an
nd during
discussions
d and
a meetings with QB-2 Co
ontractors.
Electronic
c documents once printed,
p are uncontrrolled and may beccome outdated. Reffer to the electronicc documents in Info
oWorks for current revisions.
Bechtel Confide
ential © Bechtel Co
orporation 2016.
Bechtel
B Chile Limita
ada (BChile), 2016.. All rights reserved d.
This docum
ment contains inform
mation that is confidential and proprieetary to BChile or itss affiliates, and ma
ay not be reviewed,, transmitted, distrib
buted used
reproduced orr disclosed without BChile´s prior writtten permission and d the taking of any a action whatsoever in reliance on.
19 of 72
QUEBRA
ADA BLANC
CA FASE 2
Job 00
J No: 2580
Rev No: 1
ES&H MA
ANAGEMEN
NT PLAN
Taking
T all pra
acticable mea
asures to ass
sure the prote
ection of hea
alth, safety an
nd welfare off staff and
workers
w unde
er his/her area
a of responsib
bility.
Taking
T all pra
acticable mea
asures to ass
sure the prote
ection of envvironmental re
esources adjo
oining the
site
s and which may be imp
pacted throug
ghout the execcution of the W
Work.
Promoting,
P supporting, an
nd actively participating in
n the "Zero A
Accident" and “Courageous Safety
Leadership”
L philosophies.
p
Facilitating and
a supporting risk redu
uction throug
gh STARRT meetings, Job Hazard Analysis
completion,
c applicable Hazardous
H Work
W Permitss, briefings and commu
unications an
nd review
information
i necessary for the mber to work in a safe man
t team mem nner.
Implementing
g immediate action to co
orrect reporte
ed or observe
ed unaccepta
able ES&H cconditions
and/or
a behav
viors.
Conducting
C ongoing
o asse
essments of the work arreas and takke necessaryy corrective a
actions to
eliminate
e sub
bstandard pra
actices, cond
ditions, and/o
or behaviors in accordancce with proje
ect ES&H
standards
s and guidelines.
Continually
C coach
c team members
m in safe practice
es and recog
gnise those w
who demonstrate safe
behaviors.
b
Conducting
C and
a actively participate
p in site safety m
meetings inclu
uding toolboxx talks, safetyy bulletins,
site
s based tra
aining, and People
P Based Safety. Ensu
uring the com
mmunication iis clearly rece
eived and
any
a open issu
ues are prope
erly evaluated
d and feedbacck provided.
Assisting
A in accident, environmenta
e l incident, ssignificant prroperty damage, and n
near miss
investigations
i s and the prep
paration of the required rep
ports.
Assisting
A in th
he implementtation of the Emergency
E Re
esponse Plan
n.
Enforcing Job
bsite Work Ru
ules and take action, as re quired, to enssure complian
nce.
he safety performance of assigned team mem
Evaluating th mbers and re
eport finding
gs to the
Construction
C Site Manager.
Participating
P g and risk analysis a
in pre-project planning and the pre
eparation of required
documentatio
d on.
Keeping
K daily
y diaries on alll ES&H even
nts.
Electronic
c documents once printed,
p are uncontrrolled and may beccome outdated. Reffer to the electronicc documents in Info
oWorks for current revisions.
Bechtel Confide
ential © Bechtel Co
orporation 2016.
Bechtel
B Chile Limita
ada (BChile), 2016.. All rights reserved d.
This docum
ment contains inform
mation that is confidential and proprieetary to BChile or itss affiliates, and ma
ay not be reviewed,, transmitted, distrib
buted used
reproduced orr disclosed without BChile´s prior writtten permission and d the taking of any a action whatsoever in reliance on.
20 of 72
QUEBRA
ADA BLANC
CA FASE 2
Job 00
J No: 2580
Rev No: 1
ES&H MA
ANAGEMEN
NT PLAN
desig
gns for ES&H issues and working
w to res
solve these wiith representa
atives from th
he constructio
on function
and ES&H,
E where applicable.
withstanding the
Notw t responsibilities for Field
F Superv isors which also apply to the PFE
E, specific
respo
onsibilities forr the PFE include:
Assure
A risks are managed
d for the desig
gn of tempora
ary works and
d construction
n aids are ade
equate for
safety
s purpos
ses.
Work
W alongside ES&H, co
onstruction an
nd Works Co
ontractor perssonnel to con
nduct risk asssessments
and
a designs safe
s work me
ethods for projject constructtion tasks;
Reviews des ction, coordin ates with En
signs issued for Construc ngineering, an
nd implemen
nts design
amendments
a where a risk is identified.
Spec
cific responsib
bilities include
e:
The
T health and safety of their
t workers deployed un
nder the applicable Contra
act in terms o
of Chilean
regulations
r and
a the Conttract. Providin
ng a safe an
nd healthy w
working enviro
onment for their team
members.
m
Assisting
A in the
t developm
ment of the Contractor’s E S&H Implem
mentation Plan
n, supplemen
ntal ES&H
plans,
p progra
ams, and prrocedures ap
pplicable to tthe unique h
hazards of th
heir work sccope, and
development
d of implementtation schedu
ule prior to mo
obilization to tthe job site.
Attending
A Co
ontractor pre--mobilization meetings, C
Contractor saffety meetingss, and other meetings
held
h in the intterest of ES&H.
Coordination
C with the Bec
chtel ES&H Manager
M on m
matters relatin
ng to ES&H ffield and management
system
s comp
pliance.
Coordination
C of Contractors internal training prog
grams, toolb ox talk sesssions, and cconducting
periodic
p safetty meetings fo
or supervisors
s and employyees.
Electronic
c documents once printed,
p are uncontrrolled and may beccome outdated. Reffer to the electronicc documents in Info
oWorks for current revisions.
Bechtel Confide
ential © Bechtel Co
orporation 2016.
Bechtel
B Chile Limita
ada (BChile), 2016.. All rights reserved d.
This docum
ment contains inform
mation that is confidential and proprieetary to BChile or itss affiliates, and ma
ay not be reviewed,, transmitted, distrib
buted used
reproduced orr disclosed without BChile´s prior writtten permission and d the taking of any a action whatsoever in reliance on.
21 of 72
QUEBRA
ADA BLANC
CA FASE 2
Job 00
J No: 2580
Rev No: 1
ES&H MA
ANAGEMEN
NT PLAN
Review of QB
B-2 ES&H Ma
anagement System proced
dures and en
nsuring Contra
actors compliiance with
the
t applicable
e requirementts thereof.
Actively
A partticipating in the Project’s "Zero Acccident" and “Courageous Safety Le
eadership”
philosophies.
p
Prior
P to each shift, conduc
cting pre-startt & STARRT briefings with
h all craft and
d supervisory staff prior
to
t the comme
encement of construction
c operations
o on site.
Ensuring new
w team mem dance at QB-2 ES&H ind
mbers’ attend duction and any other sp
pecialised
training
t required prior to co
ommencing work
w on site.
Conducting
C daily
d and we
eekly inspectiions and asssessments to
o monitor co
ompliance witth Project
ES&H plans, programs, prrocedures, an
nd safety initia
atives.
Designating
D a single point of contact to
t operate ass the ES&H Manager or Representativve for the
duration
d of the works. This
s person mustt be pre-apprroved by the B
Bechtel ES&H
H Manager.
Jointly
J condu
ucting root-ca
ause investig ncidents and near miss incidents witth Project
gations of in
construction
c management
m and Bechtel ES&H staff m
members.
Providing
P co
opies of incid
dent investig
gation reportss, statistical reports, firsst-aid logs, a
and other
documents
d as
s requested.
Complying
C with
w the applicable medic
cal examinattions/qualifica
ations, Fitnesss for Work Program
requirements
r , and the Projject’s Drug an
nd Alcohol Prrogram requirrements.
Assuring
A thatt all staff that operate vehicles and truccks on site, a
as well as anyy piece of co
onstruction
equipment
e ha
ave the correc
ct authorizatio
ons and certiffications acco
ording to QB-2
2 Jobsite Worrk Rules.
Actively
A partiicipating in the ES&H prrograms, succh as but no
ot limited to, People Base
ed Safety
Observations
O s, near miss re
eporting syste
em, resource conservation
n.
7.2.10. Employe
ees
All prroject team members are responsible
r fo
or:
Accepting
A ind
dividual respo
onsibility for th
heir safe beha
avior.
Maintaining
M a proactive ro plementation of the ES&H
ole in the imp H Manageme
ent Plan and the "Zero
Accident"
A and
d “Courageou
us Safety Leadership” philo
osophies.
Working
W in a safe manner at all times.
Wearing
W the correct
c PPE and
a seeking replacement
r P
PPE in the evvent of loss an
nd/or damage
e.
Electronic
c documents once printed,
p are uncontrrolled and may beccome outdated. Reffer to the electronicc documents in Info
oWorks for current revisions.
Bechtel Confide
ential © Bechtel Co
orporation 2016.
Bechtel
B Chile Limita
ada (BChile), 2016.. All rights reserved d.
This docum
ment contains inform
mation that is confidential and proprieetary to BChile or itss affiliates, and ma
ay not be reviewed,, transmitted, distrib
buted used
reproduced orr disclosed without BChile´s prior writtten permission and d the taking of any a action whatsoever in reliance on.
22 of 72
QUEBRA
ADA BLANC
CA FASE 2
Job 00
J No: 2580
Rev No: 1
ES&H MA
ANAGEMEN
NT PLAN
Attending
A the
e QB-2 Site new hire ind
duction and completing a
applicable ES
S&H and Co
onstruction
Training
T priorr to working on the Projec
ct Site or witth the tools, equipment, o
or work proce
esses that
require
r such specific training as defined
d by the Proje
ect Training P
Program.
Learning
L and
d abiding by
y ES&H prac procedures applicable to their work ttasks and
ctices and p
reporting
r substandard prac
ctices, conditions, or beha
aviours to their Team Leader.
Promptly
P porting injuries, environme
rep ental incidentts, property d
damage, and
d near misse
es to their
Supervisor
S an
nd ES&H Rep
presentative.
Complying
C wiith the require
ements of the
e Project ES&
&H Manageme
ent Plan and applicable prrocedures;
any
a applicable Contractor’s ES&H pro
ocedures or standards; tthe QB-2 Job
bsite Work R
Rules and
Employee ES
S&H Practices
s Handbook.
Stopping
S worrk in cases off unsafe work
k or conditionss which pose
es a risk to the safety and wellbeing
of
o themselves
s or other Pro
oject Personnel, the enviro
onment or proj
oject facilities and/or equipm
ment.
Not g any vehicles or equipme
N operating ent for which they are not qualified for and for whicch they do
not
n have the correct autho
orisation and certification
c to
o operate.
Participating
P proactively and constru
uctively in th
he QB-2 Pe
eople Based
d Safety traiining and
observation
o process.
p
Leading
L the development
d of a strong ES&H
E manage
ement culture
e within the e
engineering and design
teams.
t
Ensuring that all ES&H legal
l requirem
ments and th
he Customerr standards a
and specifica
ations are
regularly
r reviewed and changes of revisions are inccorporated intto project spe
ecifications and design
guidelines
g to they are up to
o date.
Electronic
c documents once printed,
p are uncontrrolled and may beccome outdated. Reffer to the electronicc documents in Info
oWorks for current revisions.
Bechtel Confide
ential © Bechtel Co
orporation 2016.
Bechtel
B Chile Limita
ada (BChile), 2016.. All rights reserved d.
This docum
ment contains inform
mation that is confidential and proprieetary to BChile or itss affiliates, and ma
ay not be reviewed,, transmitted, distrib
buted used
reproduced orr disclosed without BChile´s prior writtten permission and d the taking of any a action whatsoever in reliance on.
23 of 72
QUEBRA
ADA BLANC
CA FASE 2
Job 00
J No: 2580
Rev No: 1
ES&H MA
ANAGEMEN
NT PLAN
Management
M t of all day-tto-day projec
ct-wide engin eering and d
design activitties, as perfo
ormed by
Bechtel
B and its subcontrractors and direct hire p
personnel in accordance with projecct’s ES&H
commitments
c s, requirements and proced
dures.
Effective and timely comm
munication of potential envvironmental ccompliance isssue arising d
during the
design
d proces
ss to the Project Director, Project Mana
ager, and ES&
&H Managerss.
Ensuring thatt any changes in activity are
a communiccated to the E
ES&H Manag
ger so that ap
ppropriate
amendments
a e to the ES&H
can be made H system.
Conduct
C ES&
&H design reviews, ES&
&H hazard a nalysis on d
design and e
engineering tto ensure
compliant
c des
signs.
All
A Contracto
ors are con
ntractually ob
bliged to co
omply with tthe QB-2 E
ES&H Policie
es, ES&H
Management
M t Plan and ass
sociated proc
cedures.
All
A Contracto
ors are contra
actually oblige
ed to producce their own QB-2 ES&H Implementattion Plans
and
a associate ance with theiir scope of wo
ed procedure(s) in accorda orks.
Communicati
C on with the ES&H
E Manager to identify ES&H requirrements whicch need to be
e included
in
i contract pa
ackages depe
ending on the nature / scop
pe of work.
Only
O Contrac
ctors with a sa
atisfactory his
storical ES&H
H performance
e and may prre-qualify to b
bid on QB-
2 construction
n contracts.
That
T the ES&
&H Managerr evaluates te
enders and is involved in the recommendation o
of contract
award.
a
That
T only ES&H
E d equipment and materi als approved
related d by the ES&H Departtment are
purchased.
p
Electronic
c documents once printed,
p are uncontrrolled and may beccome outdated. Reffer to the electronicc documents in Info
oWorks for current revisions.
Bechtel Confide
ential © Bechtel Co
orporation 2016.
Bechtel
B Chile Limita
ada (BChile), 2016.. All rights reserved d.
This docum
ment contains inform
mation that is confidential and proprieetary to BChile or itss affiliates, and ma
ay not be reviewed,, transmitted, distrib
buted used
reproduced orr disclosed without BChile´s prior writtten permission and d the taking of any a action whatsoever in reliance on.
24 of 72
QUEBRA
ADA BLANC
CA FASE 2
Job 00
J No: 2580
Rev No: 1
ES&H MA
ANAGEMEN
NT PLAN
Sufficient
S stocks of PPE and
a other ES
S&H related e
equipment is retained by B
Bechtel on sitte, or that
local
l supplierrs have been identified and
d contacted to
o ensure PPE
E is available at all times.
Suppliers
S and
d vendors enttering the site
e are aware off and complia
ant with ES&H
H requirements.
eets (MSDSss) are requessted with every purchase order that
Ensures that Material Saffety Data She
involves
i chem
micals and/or chemical sub
bstances.
Includes ES&H requirem
ments for pa aterials and dunnage is included in
ackaging ma n material
specification
s prior to purc
chase, with an
a emphasiss on impact tto material h
handling requ
uirements,
transport
t to site, and waste
e minimization.
8 CONSULTATION
ctive management of ES&
Effec &H issues req
quires the co
ooperation of all Project p
personnel to d
develop a
supportive organiz
zational cultu
ure. Knowledge and expe
erience throu
ughout the workforce is a valuable
urce. Project managementt shall engag
resou ge Project pe rsonnel in strructured conssultation proccesses for
plann
ning and exec
cuting work to
t enlist theirr buy-in and a
access the vvalued knowle
edge they po
ossess. All
Proje
ect personnel shall:
Electronic
c documents once printed,
p are uncontrrolled and may beccome outdated. Reffer to the electronicc documents in Info
oWorks for current revisions.
Bechtel Confide
ential © Bechtel Co
orporation 2016.
Bechtel
B Chile Limita
ada (BChile), 2016.. All rights reserved d.
This docum
ment contains inform
mation that is confidential and proprieetary to BChile or itss affiliates, and ma
ay not be reviewed,, transmitted, distrib
buted used
reproduced orr disclosed without BChile´s prior writtten permission and d the taking of any a action whatsoever in reliance on.
25 of 72
QUEBRA
ADA BLANC
CA FASE 2
Job 00
J No: 2580
Rev No: 1
ES&H MA
ANAGEMEN
NT PLAN
Be
B encourage
ed to participate in the dev
velopment an
nd implementtation of planss and system
ms through
consultation
c and
a involvement in the settting of goals a
and targets.
B involved in the development, imple
Be ementation an
nd review of policies and procedures ffor hazard
identification,
i hazard risk assessment
a and
a control off hazards/riskss.
Be
B consulted where there are any chan
nges that affecct workplace ES&H.
Select
S those who
w represen
nt them on ES
S&H matters.
Be
B aware who their ES&H representativ
ves are and h
how to contacct them.
Various
V forum
ms will be us
sed to promo
ote ES&H thro
rough commu
unication, awa
areness, and
d planning
and
a continuou
us improveme
ent activities. These will in clude but nott be limited to
o:
The
T Zero Acc
cident Team (ZAT).
(
CONTRACTO
C OR Safety and Health com
mmittees.
Behavior
B observation and feedback pro
ograms.
Daily
D pre-starrt meetings.
Weekly
W toolbo
ox meetings.
BECHTEL
B pre-bid and kick
k off meetings
s.
BECHTEL
B co
oordination an
nd progress meetings.
m
Project
P ES&H
H representatiives’ weekly coordination
c m
meetings.
Daily
D safety reports.
Safety
S bulletin
ns and alerts.
Notice
N boards
s.
Signs,
S labels and tags.
9 ES&H
H COMMITTE
EES
The Project
P shall develop
d differrent committe
ees that supp
port the strate
egy of Projectt managemen
nt; set and
monittor overall Prroject ES&H performance
p at the work fa
face; and ES&
&H issues raiised are asse
essed and
resolv
ved.
Electronic
c documents once printed,
p are uncontrrolled and may beccome outdated. Reffer to the electronicc documents in Info
oWorks for current revisions.
Bechtel Confide
ential © Bechtel Co
orporation 2016.
Bechtel
B Chile Limita
ada (BChile), 2016.. All rights reserved d.
This docum
ment contains inform
mation that is confidential and proprieetary to BChile or itss affiliates, and ma
ay not be reviewed,, transmitted, distrib
buted used
reproduced orr disclosed without BChile´s prior writtten permission and d the taking of any a action whatsoever in reliance on.
26 of 72
QUEBRA
ADA BLANC
CA FASE 2
Job 00
J No: 2580
Rev No: 1
ES&H MA
ANAGEMEN
NT PLAN
The Zero
Z Acciden
nt Team (ZAT
T) will be cre
eated in each
h area of the
e Project (mine, port, pipe
eline, and
tailing
gs managem
ment) chaired
d by the BE
ECHTEL site//construction manager in
n each area with the
rema
ainder of the
e team bein
ng made up
p of an OW
WNER representative, BECHTEL co
onstruction
superintendents, BECHTEL
B ES
S&H Managerr, and CONTR
RACTOR'S P
Project Manag
gers.
The team’s
t primarry function is to on for the enttire project with the focus o
t provide strrategic directio on:
Planning
P for safe
s methods
s of work.
Incident preve
ention and strrategies to ac
chieve zero in
ncident perforrmance.
Review of recommendatio
ons made by BECHTEL’S
S safety and h
health committees and prrovision of
resources
r forr implementattion and comm
munication wh
here required
d.
Effectiveness
s of the ES&H
H Managemen
nt System and
d continual im
mprovement in
nitiatives.
Identification and control of nstruction activities.
o risks associiated with fortthcoming con
The ZAT
Z will mee and thereafterr on at least a monthly
et bi-weekly during the initial stages of the Project a
basis
s.
CONTRACTOR shall
s establis
sh a Health
h & Safety Committee to promote
e internal aw
wareness,
munications and
comm a resolve is
ssues within their area off responsibilitty. The Comm
mittee will co
omprise of
various CONTRAC
CTORS’ pers
sonnel includin
ng nominated
d craft representatives, ele
ected safety a
and health
esentatives,
repre construction
n managers
s and sup
perintendentss and ES
S&H repressentatives.
CONTRACTORS’ Health and Safety Comm
mittees will pa
articipate and
d review beha
avior observa
ation data,
ective action lo
corre ogs, and pre-start and toolbox meetingss to identify im
mprovement a
activities.
The CONTRACTO
C ORS’ Health and
a Safety Co
ommittee will initially meet every month and their perrformance
will be monitored by
b the ZAT.
10 ES&H
H COMMUNICATION
Two-way communication of ES&H
E inform
mation betwe
een all levelss of the Pro
oject’s workfforce and
agement is very
mana v importan
nt for achieviing the desirred ES&H cu
ulture and ou
utcomes the first time
aroun
nd. Systems to
t support effe
ective two-wa
ay communica
ation shall incclude:
Electronic
c documents once printed,
p are uncontrrolled and may beccome outdated. Reffer to the electronicc documents in Info
oWorks for current revisions.
Bechtel Confide
ential © Bechtel Co
orporation 2016.
Bechtel
B Chile Limita
ada (BChile), 2016.. All rights reserved d.
This docum
ment contains inform
mation that is confidential and proprieetary to BChile or itss affiliates, and ma
ay not be reviewed,, transmitted, distrib
buted used
reproduced orr disclosed without BChile´s prior writtten permission and d the taking of any a action whatsoever in reliance on.
27 of 72
QUEBRA
ADA BLANC
CA FASE 2
Job 00
J No: 2580
Rev No: 1
ES&H MA
ANAGEMEN
NT PLAN
Effective toolb
box and pre-s
shift meetings
s.
Involvement of
o the workforrce in safety committees.
c
Craft
C peer to
o peer observ
vation feedba
ack process through the People Base
ed Safety an
nd Human
Performance
P Improvement (PBS/HPI) Process.
P
ES&H posterrs, hazard ale
erts from extternal parties and similar material to b
be displayed on notice
boards
b in multiple locations on a rotatio
onal basis.
Newsletters.
N
Work
W planning.
Innovation an
nd identificatio
on of improve
ement initiative
es.
Project
P perso
onnel surveys.
The Project
P comm
munity relation
ns activities an
nd cultural he
eritage contro
ols will be dire
ected by the O
OWNER’S
comm
munity relatio
ons departme
ent and any cultural herita
age monitoring plans devveloped by O
OWNER’S
mana
agement. The
e OWNER EH
HSC Manager or OWNER community rrelations man
nager shall be
e the point
of contacts for com
mmunity and cultural
c herita
age issues an
nd activities.
Previous
P day’s safety perfo
ormance (incidents and po
ositive outcom
mes).
Electronic
c documents once printed,
p are uncontrrolled and may beccome outdated. Reffer to the electronicc documents in Info
oWorks for current revisions.
Bechtel Confide
ential © Bechtel Co
orporation 2016.
Bechtel
B Chile Limita
ada (BChile), 2016.. All rights reserved d.
This docum
ment contains inform
mation that is confidential and proprieetary to BChile or itss affiliates, and ma
ay not be reviewed,, transmitted, distrib
buted used
reproduced orr disclosed without BChile´s prior writtten permission and d the taking of any a action whatsoever in reliance on.
28 of 72
QUEBRA
ADA BLANC
CA FASE 2
Job 00
J No: 2580
Rev No: 1
ES&H MA
ANAGEMEN
NT PLAN
Requirements
s prior to wo
ork starting (p
pre-lift plan, JJob Hazard A
Analysis, Hazzardous Workk Permits,
etc.).
e
Any
A special controls
c requirred for the ha
azards associa
ated with the planned criticcal tasks.
Interactions id
dentified at th
he previous da
ay’s daily mee
eting.
Concerns
C and
d follow-up to
o previously ra
aised concern mployee may raise.
ns that any em
10.2. To
oolbox Meetings
BECH
HTEL, OWNE
ER and CONT
TRACTOR sh
hall, at a min imum, hold w
weekly toolbox meetings b
by all work
group
ps to:
10.3. ES
S&H Representatives’ Bii-Weekly Coo
ordination M
Meeting
ES&H
H Representa
atives’ meetin
ngs shall be conducted bi-w
weekly to coo
ordinate consttruction envirronmental,
safety
y and health activities and communicattions; plan forr training and the provision
n of resourcess to match
the construction
c ninety
n (90) da
ay look ahead
d plan and E
ES&H Manage
ement System
m; resolve isssues; and
review
w and commu
unicate lessons learned fro
om any projecct or related incidents.
The meeting
m shall be sponsore
ed by the BE
ECHTEL’S ES
S&H Manage
er. Attendees will include a
all Project
ES&H
H supervisors
s and represe
entatives (BE
ECHTEL, OW
WNER, CONTR
RACTORS and subcontra
actors and
vendors), and the BECHTEL Site Manager will
w be invited as guest to tthese meeting
gs.
Electronic
c documents once printed,
p are uncontrrolled and may beccome outdated. Reffer to the electronicc documents in Info
oWorks for current revisions.
Bechtel Confide
ential © Bechtel Co
orporation 2016.
Bechtel
B Chile Limita
ada (BChile), 2016.. All rights reserved d.
This docum
ment contains inform
mation that is confidential and proprieetary to BChile or itss affiliates, and ma
ay not be reviewed,, transmitted, distrib
buted used
reproduced orr disclosed without BChile´s prior writtten permission and d the taking of any a action whatsoever in reliance on.
29 of 72
QUEBRA
ADA BLANC
CA FASE 2
Job 00
J No: 2580
Rev No: 1
ES&H MA
ANAGEMEN
NT PLAN
10.4. ES
S&H Briefs
ES&H
H Briefs shall be issued electronically to
o all office ba
ased Project p
personnel and CONTRAC
CTORS on
a reg
gular basis to
o be used as a supplemen
nt to pre-starrt meetings. T
The briefs sh
hall provide in
nformation
and advice
a on eve
ents/activities affecting con
nstruction incl uding:
Progress
P to plan
p
Injuries and in
ncidents
Notices,
N alertts and bulletin
ns
Traffic
T manag
gement
Major
M deliveriies
10.5. ES
S&H Bulletin
ns and Alerts
s
ES&H
H bulletins an
nd alerts sha
all be regularrly distributed
d to Project p
personnel an
nd CONTRAC
CTORS to
provide advice of significant inc
cidents, trend
ds, or high po
otential near m
misses occurrring on the Jo
obsite and
those
e at other jobs
sites relevant to Project ac
ctivities.
Electronic
c documents once printed,
p are uncontrrolled and may beccome outdated. Reffer to the electronicc documents in Info
oWorks for current revisions.
Bechtel Confide
ential © Bechtel Co
orporation 2016.
Bechtel
B Chile Limita
ada (BChile), 2016.. All rights reserved d.
This docum
ment contains inform
mation that is confidential and proprieetary to BChile or itss affiliates, and ma
ay not be reviewed,, transmitted, distrib
buted used
reproduced orr disclosed without BChile´s prior writtten permission and d the taking of any a action whatsoever in reliance on.
30 of 72
QUEBRA
ADA BLANC
CA FASE 2
Job 00
J No: 2580
Rev No: 1
ES&H MA
ANAGEMEN
NT PLAN
Sepa
arate reward programs will
w be implem
mented to recognize outsstanding indivvidual performance or
initiattive and assis
st in enforcing
g project ES&H proceduress.
A rew
ward and reco
ognition prog
gram will be developed
d in conjunction w
with the BEC
CHTEL Labor Relations
function and separately documented.
10.7. Communicatio
on with Statu
utory Authorrities
NER will be responsible for all comm
OWN munication w
with Statutory Authorities. When requested to
partic
cipate by OW
WNER, the BECHTEL
B ES
S&H manage ee shall be participate w
er or designe with these
Autho
orities in the presence
p of th
he OWNER.
10.8. Data,
D Records and Docum
ment Controll
The BECHTEL´S
B ES&H Manag
gement Syste
em, associate
ed Core Proce
ess and SWPPs shall form
m the basis
of this
s Plan. The ES&H
E Manage
ement System
m has four levvels of docum
mentation:
OWNER
O and BECHTEL policies,
p OWN
NER standard
ds, and regullatory complia
ance and the
e Contract
Documents
D
Project
P plans and program
ms
Project
P proce
edures
Forms and re
ecords
ect procedure
Proje es shall be us
sed as the primary
p docum
ment for ES&
&H compliancce when plan
nning and
execu
uting work, and
a describe the hazard controls and processes tto be implem
mented for co
onstruction
activities on the Project.
P Project procedures are control led documen
nts and form an integral p
part of the
ES&H ent System and shall be considered
H Manageme c th
he minimum sstandards to apply to all a
aspects of
the Project.
P
Electronic
c documents once printed,
p are uncontrrolled and may beccome outdated. Reffer to the electronicc documents in Info
oWorks for current revisions.
Bechtel Confide
ential © Bechtel Co
orporation 2016.
Bechtel
B Chile Limita
ada (BChile), 2016.. All rights reserved d.
This docum
ment contains inform
mation that is confidential and proprieetary to BChile or itss affiliates, and ma
ay not be reviewed,, transmitted, distrib
buted used
reproduced orr disclosed without BChile´s prior writtten permission and d the taking of any a action whatsoever in reliance on.
31 of 72
QUEBRA
ADA BLANC
CA FASE 2
Job 00
J No: 2580
Rev No: 1
ES&H MA
ANAGEMEN
NT PLAN
BECH
HTEL Contro
olled Document Policy provides
p a fframework fo
or the creation, review, approval,
disse
emination, retention, and disposal
d of all controlled d
documents. T
The intent of tthe policy is to ensure
that required
r docu
uments are readily availab
ble, incorrectt/obsolete doccuments are not mistaken
nly issued
and appropriate
a prrocedures are
e in place to securely
s store
e records.
H controlled documents
ES&H d sh
hall be:
Governed
G by the regulation of the contrrolled docume
ent policy.
Created
C and managed as prescribed by
y the BECHT EL core proce
ess.
Created
C using
g standard co
ontrolled docu
ument templattes.
Deemed
D unco
ontrolled untill classified an
nd approved b
by the approvval authority.
Distriibution of doc
cuments will be made to appropriate p
personnel, an
nd non-sensittive documen
nts will be
made
e available electronically
e to Project personnel.
p A
All Contract Documents generated, issued, or
receiv
ved will be controlled
c within BECHTE
EL´S InfoWorkks documentt control systtem., includin
ng but not
limite
ed to, copies of incident re
eports and inv
vestigations, STARRT Ca
ards, behavior observation
ns, hazard
reporrts, inspectio
on and auditt reports sh
hall be main
ntained by B
BECHTEL´S ES&H manager and
department and where
w require
ed provided to
t the OWNE
ER for inform
mation, data e
entry or comp
pilation of
nal reports, an
intern nd recorded in InfoWorks.
The CONTRACTO
OR ES&H Manager
M will be
b responsib
ble for mainta
aining the ES
S&H related controlled
documents (plans and procedu
ures), includin
ng reviews in
n light of upda
ates or chang
ges to primarry sources
such as OWNER’’S EHSC standards; BEC
CHTEL Core Processes an
nd legislation
n. The OWNE
ER EHSC
ager will be re
Mana esponsible forr advising of changes
c to O
OWNER’S EHS
SC Policies a
and standardss that may
affectt the Project plans
p and pro
ocedures.
H records sha
ES&H all be identifie
ed, securely stored, and rreadily retrievvable. They shall have esstablished
reten
ntion times ba
ased on legal requirements
s and/or know
wledge prese
ervation and rresponsible ccustodians
assig
gned.
Electronic
c documents once printed,
p are uncontrrolled and may beccome outdated. Reffer to the electronicc documents in Info
oWorks for current revisions.
Bechtel Confide
ential © Bechtel Co
orporation 2016.
Bechtel
B Chile Limita
ada (BChile), 2016.. All rights reserved d.
This docum
ment contains inform
mation that is confidential and proprieetary to BChile or itss affiliates, and ma
ay not be reviewed,, transmitted, distrib
buted used
reproduced orr disclosed without BChile´s prior writtten permission and d the taking of any a action whatsoever in reliance on.
32 of 72
QUEBRA
ADA BLANC
CA FASE 2
Job 00
J No: 2580
Rev No: 1
ES&H MA
ANAGEMEN
NT PLAN
11 MANAGING HAZA
ARDS AND ES&H
E RISK
11.1. Hazard and Risk Identifica
ation and Assessment
ard identificatiion shall be initiated
Haza i at the planning p hase of each
h task and element of con
nstruction,
and pre-operation
p s. The Projec
ct will conductt risk assessm
ments prior to
o starting consstruction and at regular
interv
vals througho
out the duratio
on of the Projject to assesss the phasess of constructiion and the a
associated
changing risks and
d hazards. Th
he risk assessment metho
odology will fo
ollow the ES&
&H procedure
e titled risk
review
ws and registter. In all cas
ses a risk ran
nking matrix w
will be used w w numerical ranking of
which will allow
risks and identify the risks and
d any existing or required mitigating me he Project riskk register.
easures on th
The risk assessm
ments will be he field to initially analyze generic
e conducted before mobillization to th
consttruction work and planned work for the first
f 90-days. Subsequent risk assessm
ments will be cconducted
in co
onjunction witth the 90-day
y look ahead es of construcction, major upcoming
d and addresss the phase
tasks
s, and new or emerging challenges
c to the existing ES&H planss and program
ms and theirr specified
contrrols methods.
11.2. Project
P Plann
ning and Dev
velopment Prrocess
The Project
P planning and deve
elopment proc
cess will be u
used as the h
high level tooll to identify ha
azards on
the Project.
P It wiill work in conjunction
c with
w the risk assessment activities off the Projectt to allow
sequencing of ES
S&H activities
s. The proces
ss will be imp
plemented ea
arly in the Prroject and me
eetings to
w and refresh
review h the Project timeline will occur
o not late
er than each tthree month ((90-day look ahead). A
Proje
ect timeline wiill be developed which will include actio
ons, responsib
ble parties and completion targets.
The actions
a identiified during th
he 90-day rev
view shall be
e captured on
n a review action item list. Changes
shall be made to the project exe
ecution plan and
a project tim
meline based
d on the review
w.
Electronic
c documents once printed,
p are uncontrrolled and may beccome outdated. Reffer to the electronicc documents in Info
oWorks for current revisions.
Bechtel Confide
ential © Bechtel Co
orporation 2016.
Bechtel
B Chile Limita
ada (BChile), 2016.. All rights reserved d.
This docum
ment contains inform
mation that is confidential and proprieetary to BChile or itss affiliates, and ma
ay not be reviewed,, transmitted, distrib
buted used
reproduced orr disclosed without BChile´s prior writtten permission and d the taking of any a action whatsoever in reliance on.
33 of 72
QUEBRA
ADA BLANC
CA FASE 2
Job 00
J No: 2580
Rev No: 1
ES&H MA
ANAGEMEN
NT PLAN
11.4. Ze
ero Accidentt Team
The Zero Acciden
nt Team (ZA
AT) will be organized as required by the Project procedure tittled, Zero
Accid
dent Team. The
T ZAT, work to identify
y and abate h
hazards, as well as offerr recommend
dations for
impro
ovement base
ed on Projec
ct data and in
ncidents. ZA
AT members will conduct Jobsite walk--downs to
observe work area
as, equipmen d specific tasks to identify hazardous cconditions.
nt, employee practices and
e team will take action to ccorrect such ccondition. Siignificant issu
e a hazard is identified, the
Once ues will be
discu
ussed by the team
t and/ or referred to Jo
obsite manag ement who h nsibility to evaluate the
has the respon
condition and initia
ate the neces
ssary action to abate the h
hazard. Hazards and their corrective acctions that
have been identified by the ZA
AT will be followed to clo ack on findings and actions will be
osure. Feedba
relayed to employees to enhance awareness
s.
ZAT
Z Team Members, Construction Superi ntendents /Field Eng
gineers, and
d ES&H
Representat
R ives these Project
P person
nnel are anticcipated to be
e the first ind
dividuals notiffied of an
ES&H concerrn or hazard because
b of th
heir proximity to the majoritty of the workkforce.
ES&H
E Depa e ES&H Department ha
artment: The esponsibility to evaluate the risk
as primary re
associated
a with a given ha
azard, elevate
e the issue fo
or manageme
ent attention a
and ensure th
he issue is
tracked
t to clo
osure. Issues or concerns identified by e
employees ca
an be reporte
ed directly to tthe ES&H
Manager.
M
Management
M t. ES&H con
ncerns can be
e reported to a
any member of the Projecct managemen
nt team. If
an
a employee has not rece
eived a satisfa
actory respon
nse to a reported concern,, he/she can report the
concern
c to an
ny member off managemen
nt without fearr of reprisal.
Spot
S the Hazard or Near Miss Repo
orting Progra
am Workers will be engag
ged to active
ely identify
and
a report ha
azards or nea
ar misses. To
o accomplish this each wo
orker will be e
encouraged tto use the
spot
s the haz
zard or nearr miss reportting cards. These cards will be reviewed by the ES&H
department
d and
a constructtion managem
ment for corre
ective actionss. Hazards an
nd near-missses will be
tracked
t on a log for trendin
ng purposes.
Electronic
c documents once printed,
p are uncontrrolled and may beccome outdated. Reffer to the electronicc documents in Info
oWorks for current revisions.
Bechtel Confide
ential © Bechtel Co
orporation 2016.
Bechtel
B Chile Limita
ada (BChile), 2016.. All rights reserved d.
This docum
ment contains inform
mation that is confidential and proprieetary to BChile or itss affiliates, and ma
ay not be reviewed,, transmitted, distrib
buted used
reproduced orr disclosed without BChile´s prior writtten permission and d the taking of any a action whatsoever in reliance on.
34 of 72
QUEBRA
ADA BLANC
CA FASE 2
Job 00
J No: 2580
Rev No: 1
ES&H MA
ANAGEMEN
NT PLAN
Wherre hazards ca
annot be elim
minated, haza
ard control m easures will be instituted.. These haza
ard control
meas
sures, in theirr preferred ord
der of applica
ation are:
Substitution
S of
o lower hazarrd practices, materials,
m uipment.
equ
Engineered controls
c and re
edesign.
Administrative
A e controls (i.e
e. use of perm
mits, authoriza
ations, specia
al procedure).
Personal
P Prottective Equipment (as a last resort).
Previous
P day’s safety perfo
ormance (incidents and po
ositive outcom
mes)
Work
W es and associated major ris
activitie sks
Electronic
c documents once printed,
p are uncontrrolled and may beccome outdated. Reffer to the electronicc documents in Info
oWorks for current revisions.
Bechtel Confide
ential © Bechtel Co
orporation 2016.
Bechtel
B Chile Limita
ada (BChile), 2016.. All rights reserved d.
This docum
ment contains inform
mation that is confidential and proprieetary to BChile or itss affiliates, and ma
ay not be reviewed,, transmitted, distrib
buted used
reproduced orr disclosed without BChile´s prior writtten permission and d the taking of any a action whatsoever in reliance on.
35 of 72
QUEBRA
ADA BLANC
CA FASE 2
Job 00
J No: 2580
Rev No: 1
ES&H MA
ANAGEMEN
NT PLAN
Requirements
s prior to work starting (pre
e-lift plan, Job
b Hazard Ana
alysis, work pe
ermits, etc.)
A planned critical task observations
Any o
Interactions id
dentified at th
he previous da
ay’s daily mee
eting
Worker
W comm
ments and con
ncerns
Wherre appropriate
e, work group
ps in each are
ea will combin
ne with other work groups for part of the
e pre-start
meetting where clo
ose interaction
n and co-activ
vity is require
ed throughout the day.
ng Project co
Durin onstruction ne
ew hire orien
ntation, emplloyees will b
be trained reg
garding their purpose,
respo
onsibilities, an
nd process for completing the pre-task a
analysis using
g the STARR
RT program.
RRT Meetings
STAR s shall be doc
cumented forr reference th roughout the day and for ssubmitted to tthe ES&H
Depa
artment after the
t shift for arrchiving purpo
oses.
Electronic
c documents once printed,
p are uncontrrolled and may beccome outdated. Reffer to the electronicc documents in Info
oWorks for current revisions.
Bechtel Confide
ential © Bechtel Co
orporation 2016.
Bechtel
B Chile Limita
ada (BChile), 2016.. All rights reserved d.
This docum
ment contains inform
mation that is confidential and proprieetary to BChile or itss affiliates, and ma
ay not be reviewed,, transmitted, distrib
buted used
reproduced orr disclosed without BChile´s prior writtten permission and d the taking of any a action whatsoever in reliance on.
36 of 72
QUEBRA
ADA BLANC
CA FASE 2
Job 00
J No: 2580
Rev No: 1
ES&H MA
ANAGEMEN
NT PLAN
The supervisor
s orr observer willl then call the crew togetther and revie
ew the STAR
RRT card for the job to
identify the additio
onal controls that
t need to be
b taken to m inimize the rissk associated
d with the cha
ange.
Agree
ed outcomes,, actions and the names off participants are to be reccorded on a R
Re-STARRT C
Card.
“Wha
at–if” analyses will also be
e conducted to highlight p utcomes and how they
possible conssequences/ou
may affect the individual, their family,
f the tea
am, and the P
Project.
11.9. Jo
ob Hazard Analysis and Hazardous
H Work
W Permits
s
Job Hazard
H Analy
ysis (JHA) will be prepared at involve higher levels
d to address specific workk activities tha
of ris
sks. Prior to
t work, JHA
A preparation
n meetings involving the
e supervisor directing the
e activity,
member(s) of the
e work crew, and the ES
S&H represe
entative will be held whe
erein the JHA will be
developed and methods
m of mitigation
m inco
orporated into
o the approp
priate work p
process. The
e JHA will
ss the steps to
asses t be taken to
o complete th
he work activiity, the hazarrds for each o
of these stepss, and the
required controls to mitigate the
t corresponding hazard
ds. The JHA
A will be reviewed, discusssed, and
ed onto by each supervisorr and crew member before
signe e engaging in
n the activity. Periodic revie
ews of the
JHA will be condu
ucted to verify
y the hazards
s and controlss are appropriately addresssed and imp
provement
sures are inco
meas orporated.
Radiological examinations
e s of welds
Confined
C Spa
ace Entry
Hot Work whe
ere combustib
bles cannot be
b removed frrom the affectted area
Electronic
c documents once printed,
p are uncontrrolled and may beccome outdated. Reffer to the electronicc documents in Info
oWorks for current revisions.
Bechtel Confide
ential © Bechtel Co
orporation 2016.
Bechtel
B Chile Limita
ada (BChile), 2016.. All rights reserved d.
This docum
ment contains inform
mation that is confidential and proprieetary to BChile or itss affiliates, and ma
ay not be reviewed,, transmitted, distrib
buted used
reproduced orr disclosed without BChile´s prior writtten permission and d the taking of any a action whatsoever in reliance on.
37 of 72
QUEBRA
ADA BLANC
CA FASE 2
Job 00
J No: 2580
Rev No: 1
ES&H MA
ANAGEMEN
NT PLAN
Working
W in ex
xcavations
Use of suspended persona
al platforms (m
man baskets))
Lockout/Tago
L out of energized equipmen
nt or systems
Critical
C lifts with
w cranes
High Pressure testing of piping or vesse
el systems
The permits
p and processes
p e addressed in the corresp
are ponding Proje
ect ES&H pro
ocedure, or th
he Project
proce
edure, Hazard
dous Work Pe
ermits if a spe
ecific permit fo
orm is not pro
ovided or nee
eds suppleme
enting.
12 H PLANNING
ES&H G
12.1. Sttandards, Prractices and Procedures
The ES&H Manag
gement Syste
em Procedurres, as noted
d in Attachme
ent B, are prrovided to co
omply with
HTEL Core Processes
BECH P (CP
P’s) and Stan
ndard Work Process Proce
edures (SWPP
P´s), OWNER
R’S EHSC
policiies and stand
dards and prrovided proce
edures, appli cable Chilea
an laws and legislation. B
BECHTEL,
OWN
NER and CON
NTRACTOR shall
s comply with
w all appliccable ES&H M
Management System Proccedures in
the execution of th
heir work for the Project.
The monitoring
m an
nd implementtation of the ES&H
E Manag
gement Syste
em shall be th
hrough regula
ar auditing
of pro
ocess in acco
ordance with the audit sch
hedule in Atta chment C-1, Inspection an
nd Audit Sche
edule and
Attac
chment C-2 – Personal ES&
&H Engagem
ment Matrix.
Electronic
c documents once printed,
p are uncontrrolled and may beccome outdated. Reffer to the electronicc documents in Info
oWorks for current revisions.
Bechtel Confide
ential © Bechtel Co
orporation 2016.
Bechtel
B Chile Limita
ada (BChile), 2016.. All rights reserved d.
This docum
ment contains inform
mation that is confidential and proprieetary to BChile or itss affiliates, and ma
ay not be reviewed,, transmitted, distrib
buted used
reproduced orr disclosed without BChile´s prior writtten permission and d the taking of any a action whatsoever in reliance on.
38 of 72
QUEBRA
ADA BLANC
CA FASE 2
Job 00
J No: 2580
Rev No: 1
ES&H MA
ANAGEMEN
NT PLAN
12.2. Le
egal and Oth
her Prescribe
ed Requirements
The Project
P shall establish, imp
plement, and maintain pro
ocedures to id
dentify and have access tto all legal
and other
o relevant requirements (e.g. acts, regulations, standards, a
and guideliness etc.) that are directly
applic
cable to cons
struction activities.
13 CHANGE MANAG
GEMENT
The impact of cha
anges on ES&
&H risks will be
b documente
ed and undersstood. Reque
ests for chang
ges will be
wed and approved in acco
review ordance with the change m
management Project proce
edure to ensu
ure that all
changes are analyzed system horized by a n appropriate
matically, auth e authority, a
and impleme
ented in a
ner that does
mann s not presentt an unaccep
ptable risk to the construcction/commissioning workkforce, the
opera
ations workforce, the envirronment or the
e community..
ems shall be
Syste d, implementted, docume nted, and m
e established maintained to
o manage pe
ermanent,
temporary, or incrremental change. The durration of a te
emporary cha
ange shall not be exceede
ed without
w and approv
review val by the responsible man
nager.
uments, plans
Docu s, and records
s shall be upd
dated to be co
onsistent with
h the change.. Change management
will be controlled in two (2) partts:
Specific
S activ
vities for which
h change con
ntrol protocolss are mandato
ory
Activities
A resu
ulting in chang
ge where there is a moderrate or higherr risk of:
seriously
y affecting the
e health and safety
s of perssons to the exxtent that med
dical treatmen
nt will be
required
severely
y damaging eq
quipment or th
he environme
ent
significan
ntly interruptin
ng constructio
on or affecting
g quality
having detrimental
d im
mpact on opera
ations or com
mmunity relatio
ons
nge managem
Chan ment issues will
w be identifie
ed, evaluated ented. Any rrequest for ch
d, and docume hange that
would
d deviate fro
om the requirements esta
ablished bas ed on comp
pliance with tthe BECHTE
EL’S Core
Electronic
c documents once printed,
p are uncontrrolled and may beccome outdated. Reffer to the electronicc documents in Info
oWorks for current revisions.
Bechtel Confide
ential © Bechtel Co
orporation 2016.
Bechtel
B Chile Limita
ada (BChile), 2016.. All rights reserved d.
This docum
ment contains inform
mation that is confidential and proprieetary to BChile or itss affiliates, and ma
ay not be reviewed,, transmitted, distrib
buted used
reproduced orr disclosed without BChile´s prior writtten permission and d the taking of any a action whatsoever in reliance on.
39 of 72
QUEBRA
ADA BLANC
CA FASE 2
Job 00
J No: 2580
Rev No: 1
ES&H MA
ANAGEMEN
NT PLAN
Proce
ess will also
o require a change re
equest as s pecified in BECHTEL’S Core Proccess 116-
Docu
umentation of Core Process Changes.
14 ERGENCY RE
EME ESPONSE AN
ND MEDICAL
L SUPPORT
The ability
a of the Project workfforce and vis
sitors to prom
mptly take app
propriate actions in the evvent of an
emerrgency is ess
sential to their well-being and
a the ES&
&H performance. The resp
ponses to emergencies
will vary
v with the type
t ess, and Jobssite status. Alll emergency response
of emergency, activitties in progre
action
ns must be th
horoughly coo
ordinated with
h BECHTEL’S
S Project man
nagement team and consid
der impact
or co
oordination to
o the OWNER
R operations and the loca es. Howeverr, the Project will have
al communitie
intern
nal emergenc
cy and medica
al resources to
t respond to the majority o
of foreseeable events.
The Project
P emerg
gency action plan
p provides
s the requirem
ments and guiidance for Pro
oject personn
nel actions
during an emerge
ency. This pla
an and its imp
plementing prrocedures ap
pply to person
nnel and visittors at the
ect Jobsite.
Proje
12.3. Em
mergency Pllanning
12.3.1. General
An analysis
a of possible
p cris
sis and eme
ergency scen
narios will b
be conducted
d and an emergency
mana
agement plan
n developed and
a maintaine
ed to identify ccontrol processses to mitiga
ate loss. The plan shall
be aligned with the
t OWNER Operations emergency m
management plans and e
external orga
anizations’
onse capabilitties, if and where
respo w defined
d and agreed upon. Emerrgency respon
nse capabilityy shall be
provided through the
t provision of appropriate equipment, facilities and
d trained personnel and incclude:
Firefighting ca
apability
First aid
Rescue respo
onse (such as
s high angle, confined spa ce, vehicle acccident, etc.)
Medical
M emerrgencies
Natural
N disas
sters and adve
erse climate response
r (su ch as earthqu
uakes, electriical storms, a
avalanche,
flooding,
f tsun
nami, etc.)
Electronic
c documents once printed,
p are uncontrrolled and may beccome outdated. Reffer to the electronicc documents in Info
oWorks for current revisions.
Bechtel Confide
ential © Bechtel Co
orporation 2016.
Bechtel
B Chile Limita
ada (BChile), 2016.. All rights reserved d.
This docum
ment contains inform
mation that is confidential and proprieetary to BChile or itss affiliates, and ma
ay not be reviewed,, transmitted, distrib
buted used
reproduced orr disclosed without BChile´s prior writtten permission and d the taking of any a action whatsoever in reliance on.
40 of 72
QUEBRA
ADA BLANC
CA FASE 2
Job 00
J No: 2580
Rev No: 1
ES&H MA
ANAGEMEN
NT PLAN
Emerrgency respon
nse drills shall be schedule
ed and condu
ucted regularly, minimum o
of every six (6
6) months,
includ
ding liaison with
w and invo
olvement of external
e resp
ponse organizzations and o
other stakeho
olders, as
appro
opriate. Emergency respo
onse or evacuation drillss will be coo
ordinated on routine bassis to test
proce
edures, work crews response, and eme
ergency resp
ponders’ skillss to evaluate program effe
ectiveness
mprovements to be implem ented.
and identify opporrtunities for im
Lesso
ons learned from
f emergency response
e drills and in
ncidents shall be documen
nted, incorpo
orated into
revisiions of plans and resource
es, and shared with stakeh
holders and otthers, as appropriate.
Emergency contact
c numbe
ers
Emergency ra
adio channel
Area
A emergency coordinattors names
Diagrams
D sho
owing exit rou ngs or jobsite
utes and pointts from buildin e
Emergency assembly
a poin
nts
Infras
structure, equ
uipment, and procedures shall
s be in pla
ace to rapidlyy and efficienttly respond to
o and gain
contrrol of the rang
ge of crisis an
nd emergency
y situations. T
These will be detailed in th
he Project’s emergency
action
n plan. The range of poten
ntial crisis an
nd emergencyy situations th
he Project needs to be pre
epared for
shall be determine
ed through a crisis
c and emergency scen
nario analysiss.
Electronic
c documents once printed,
p are uncontrrolled and may beccome outdated. Reffer to the electronicc documents in Info
oWorks for current revisions.
Bechtel Confide
ential © Bechtel Co
orporation 2016.
Bechtel
B Chile Limita
ada (BChile), 2016.. All rights reserved d.
This docum
ment contains inform
mation that is confidential and proprieetary to BChile or itss affiliates, and ma
ay not be reviewed,, transmitted, distrib
buted used
reproduced orr disclosed without BChile´s prior writtten permission and d the taking of any a action whatsoever in reliance on.
41 of 72
QUEBRA
ADA BLANC
CA FASE 2
Job 00
J No: 2580
Rev No: 1
ES&H MA
ANAGEMEN
NT PLAN
Medical evacuatio
on by medicallly equipped ambulances
a a
and/or air-tran
nsport shall b
be available fo
or serious
ed or ill Projec
injure ct personnel or
o visitors.
12.3.3. Fires
Imme
ediate respon
nse to a fire
e in the incipient stage will be provvided by the
e use of porrtable fire
exting ONTRACTOR or its subcontractors perrforming hot w
guishers. CO work or storin
ng or using fflammable
liquid
ds or gases sh
hall supply an
nd maintain appropriately rrated fire extin
nguishers. Th
he selection a
and use of
the fire
f extinguishers shall be
e consistent with the req of the Projecct fire prevention and
quirements o
prote
ection procedu
ure and level of risk.
The use
u of a traine
ed and equipped firefightin
ng crew will b
be required for larger structtural, vehicle,, chemical
and gas,
g or fires beyond
b the in
ncipient stage
e. Within the camp, a Pro
oject provided
d fire water lo
oop will be
availa
able for connecting firefigh
hting hoses. For areas ou
utside the cam
mp area, wate
er will be supplied by a
BECH
HTEL supplie
ed water tanke
er and/or fire pumper truckk.
A Jo
obsite evacua
ation process
s will be dev
veloped as part of the Project’s em
mergency man
nagement
proce
edure to ensure the timely evacuation
n of all Proje
ect personnel. A process for accountiing for all
perso
ons on the Pro
oject Jobsite to ensure the
ey can be acccounted for wiill also be established.
Electronic
c documents once printed,
p are uncontrrolled and may beccome outdated. Reffer to the electronicc documents in Info
oWorks for current revisions.
Bechtel Confide
ential © Bechtel Co
orporation 2016.
Bechtel
B Chile Limita
ada (BChile), 2016.. All rights reserved d.
This docum
ment contains inform
mation that is confidential and proprieetary to BChile or itss affiliates, and ma
ay not be reviewed,, transmitted, distrib
buted used
reproduced orr disclosed without BChile´s prior writtten permission and d the taking of any a action whatsoever in reliance on.
42 of 72
QUEBRA
ADA BLANC
CA FASE 2
Job 00
J No: 2580
Rev No: 1
ES&H MA
ANAGEMEN
NT PLAN
15 SITE SECURITY
The main
m construc
ction areas shall
s be enclo
osed with fenccing or other methods for isolating una
authorized
perso
ons from ente
ering the Jobs
site. The maiin constructio
on areas shalll be provided with electron
nic access
or pe
ersonal securrity manning on the entran
nce gate. All construction
n areas will a
also be barriccaded and
mark
ked with sign Construction Site No Acccess to Una
ns stating “C authorized Persons” toge
ether with
mand
datory PPE re
equirements.
16 EMPLOYEE COM
MPETENCY AND
A BEHAVIOR MANAGE
EMENT
16.1. Competency
C and Training
g
Train
ning needs an
nalysis will be
e conducted to
t identify spe
ecific ES&H ttraining requirements base
ed on this
Plan. Task-specific training will be identified
d through the
e analysis and a formal pllan developed
d defining
the training
t cours
se, presentation means, time require
ed and targe
et audience. CONTRACT
TOR shall
develop training matrices
m for the
t level and
d scope of th
heir work and
d the matrices will be forw
warded to
HTEL´S Proje
BECH ect training coordinator
c for consolidatio
on and coord
dination. The training matrrices shall
also indicate frequency of any
y retraining or
o refresher ccourse, and a
at a minimum
m of those sp
pecified in
ect procedures or plans. Th
Proje he ES&H Manager in conssultation with the training ccoordinator w
will provide
and approve
a fund
ding for the Project’s
P ES&
&H training, e
except the fu
unding of CO
ONTRACTORS
S specific
training (tools and
d unique proc
cesses/proced
dure) which sshall be identtified, funded and completted by the
CONTRACTOR. CONTRACTO
ORS shall fo
orward traini ng packagess or course outlines and
d training
recorrds to BECHT
TEL’S training coordinatorr. Documenta
ation of trainiing records sshall be main
ntained by
BECH
HTEL’S ES&H
H departmentt and training coordinator.
Electronic
c documents once printed,
p are uncontrrolled and may beccome outdated. Reffer to the electronicc documents in Info
oWorks for current revisions.
Bechtel Confide
ential © Bechtel Co
orporation 2016.
Bechtel
B Chile Limita
ada (BChile), 2016.. All rights reserved d.
This docum
ment contains inform
mation that is confidential and proprieetary to BChile or itss affiliates, and ma
ay not be reviewed,, transmitted, distrib
buted used
reproduced orr disclosed without BChile´s prior writtten permission and d the taking of any a action whatsoever in reliance on.
43 of 72
QUEBRA
ADA BLANC
CA FASE 2
Job 00
J No: 2580
Rev No: 1
ES&H MA
ANAGEMEN
NT PLAN
16.2. In
nductions/ NE
EW EMPLOY
YEE Orientation
A site-wide induc
ction program
m (new hire orientation) sshall be developed for a
all constructio
on Project
onnel. Visitors
perso s will be prov
vided a sepa
arate visitor b
briefing, as de
escribed in section 7.8, th
hat will be
provide basic sa
afety require
ements. The induction sshall be sup
pplemented by Project approved
CONTRACTOR-specific, task-s
specific, and/o
or area-speci fic inductionss.
Each
h new emplo
oyee will re
eceive the in
nduction to familiarize h
him/her with the Projecct general
requirements. ES&
&H topics cov
vered shall at a minimum in
nclude:
ES&H Policie
es
Jobsite
J work rules and con
nsequences
Safety
S absolu
utes/ life critic
cal activities
Environmenta
al programs and
a responsib
bilities
Hazard comm
munication/rig
ght-to-know
Chemical
C haz
zards
Emergency re
esponse
General
G safetty and occupa
ational hygien
ne hazards an
nd controls on
n the construcction Jobsite
Fire preventio
on and fire ex
xtinguisher use
Electrical safe
ety
Vehicle
V and traffic safety
Personal
P prottective equipm
ment
Manual
M material handling
Hazard recog
gnition
STARRT,
S JHA
A, and hazard
dous work pe
ermits
Employee ES
S&H responsibilities
d responding to incidents, near-misses,, and unsafe cconditions
Reporting and
Community
C re
elations issue
es and interac
ction
Introduction to courageous
s safety leade
ership
Electronic
c documents once printed,
p are uncontrrolled and may beccome outdated. Reffer to the electronicc documents in Info
oWorks for current revisions.
Bechtel Confide
ential © Bechtel Co
orporation 2016.
Bechtel
B Chile Limita
ada (BChile), 2016.. All rights reserved d.
This docum
ment contains inform
mation that is confidential and proprieetary to BChile or itss affiliates, and ma
ay not be reviewed,, transmitted, distrib
buted used
reproduced orr disclosed without BChile´s prior writtten permission and d the taking of any a action whatsoever in reliance on.
44 of 72
QUEBRA
ADA BLANC
CA FASE 2
Job 00
J No: 2580
Rev No: 1
ES&H MA
ANAGEMEN
NT PLAN
Respirator us
ser
Confined
C spa
ace entry
Wearing
W and using fall pro
otection harne
ess and equip
pment
Exposure to regulated
r che
emicals (carcinogen such a
as hexavalentt chromium. ssilica, etc.)
Lockout/Tago
L out
Working
W in ex
xcavations
Hot work (welding & cutting)
Unexploded ordnances
o
High pressure
e testing of piipes or vessels
Any other
o g deemed necessary by th
training he constructio
on managem &H department, or line
ment, the ES&
supervision should
d be identifie
ed to the train
ning coordina
ator, and a tra
aining module will be devveloped to
ess the new training.
addre
Bechtel
B Chile Limita
ada (BChile), 2016.. All rights reserved d.
This docum
ment contains inform
mation that is confidential and proprieetary to BChile or itss affiliates, and ma
ay not be reviewed,, transmitted, distrib
buted used
reproduced orr disclosed without BChile´s prior writtten permission and d the taking of any a action whatsoever in reliance on.
45 of 72
QUEBRA
ADA BLANC
CA FASE 2
Job 00
J No: 2580
Rev No: 1
ES&H MA
ANAGEMEN
NT PLAN
Heavy equip
pment or veh
hicle operatorrs (including haul trucks , tractor traillers, buses, front end
loaders,
l exca
avators, etc.)
Forklift operators
Powder
P actua
ated tool userr
Horizontal life
e-line inspecto
or
Diver
D
Blaster
B (explo
osive handler)
Transporter
T of
o dangerous goods
Hazardous waste
w handler and transportter
Evacuation and rescue specialist
Scaffold
S erec
ctor and inspe
ector
ve evaluation specialist (ra
Nondestructiv
N adiological wo
orker)
16.5. ES
S&H Leaders
ship Training
g
Addittional ES&H training will be given to
o first line su ncluding CONTRACTORS
upervisors, in S and all
subco
ontractors, to
o provide them
m with the es
ssential skills and knowled
dge to executte their respo
onsibilities.
This training is de
esigned to co
omplement ba
asic compete
ency requirem
ments and the
e application of ES&H
principals and req
quirements to
o provide them
m with the to
ools necessarry to identify and correct p
potentially
hazardous conditions within their area of re
esponsibility o
on the Projecct. Training w
will be conduccted within
e (3) months of the first lin
three ne supervisor commencin
ng their job, b
but shall be ccompleted ass soon as
reaso
onably possib
ble. Such train
ning shall include:
Leadership
L ex
xpectations and
a responsib
bilities
Communicati
C on and comm
munication sys
stems
People
P based
d safety (princ
ciples and pra
actices)
Risk management and pre
e-work plannin
ng (JHAs, ST
TAART cards,, hazardous w
work permits)
Project
P proce
edures
Emergency and
a incident re
eporting (project reporting requirementss)
Electronic
c documents once printed,
p are uncontrrolled and may beccome outdated. Reffer to the electronicc documents in Info
oWorks for current revisions.
Bechtel Confide
ential © Bechtel Co
orporation 2016.
Bechtel
B Chile Limita
ada (BChile), 2016.. All rights reserved d.
This docum
ment contains inform
mation that is confidential and proprieetary to BChile or itss affiliates, and ma
ay not be reviewed,, transmitted, distrib
buted used
reproduced orr disclosed without BChile´s prior writtten permission and d the taking of any a action whatsoever in reliance on.
46 of 72
QUEBRA
ADA BLANC
CA FASE 2
Job 00
J No: 2580
Rev No: 1
ES&H MA
ANAGEMEN
NT PLAN
Resources av
vailable to the
e supervisor
OWNER’S
O Co
ourageous Sa
afety Leaders
ship conceptss and applicattion
The Site/Construc
S ction Manage
er will provide
e a message to the leade
ership training
g attendees rreinforcing
the commitments and expectations of the atttendees in su
upporting the ES&H progra
ams and perfo
ormance.
BECH
HTEL’S PBS//HPI observation process shall be used
d as one of th
he key progra
ams to allow a
all Project
craft members to assist
a each otther with the goal
g to achievve a 100% sa
afe behavior level. Observe
er training
will in
nclude:
An
A overview of the objectives of the
e PBS/HPI o
observation p
program and how it linkss the key
successes
s off the Plan
An
A overview of
o behavior based psychollogy
Hazard identiification
Recognition and
a acknowle
edgement of safe
s behaviorrs and correcttion of at risk behaviors
Use of data and
a reports
Development
D t of interventio
ons
Undertake fie
eld observatio
ons and provid
de positive re
einforcing feed
dback to the ccraft.
Complete
C beh
havior observ
vation checklis
sts completel y and accura
ately.
Participate
P in BECHTEL PBS/HPI
P meettings and Zerro Accident Te
eam meetingss where appliicable.
Electronic
c documents once printed,
p are uncontrrolled and may beccome outdated. Reffer to the electronicc documents in Info
oWorks for current revisions.
Bechtel Confide
ential © Bechtel Co
orporation 2016.
Bechtel
B Chile Limita
ada (BChile), 2016.. All rights reserved d.
This docum
ment contains inform
mation that is confidential and proprieetary to BChile or itss affiliates, and ma
ay not be reviewed,, transmitted, distrib
buted used
reproduced orr disclosed without BChile´s prior writtten permission and d the taking of any a action whatsoever in reliance on.
47 of 72
QUEBRA
ADA BLANC
CA FASE 2
Job 00
J No: 2580
Rev No: 1
ES&H MA
ANAGEMEN
NT PLAN
Support
S the PBS/HPI
P proc
cess through proactive
p and
d positive eng
gagement with
h the craft.
Project
P ES&H
H requirementts.
General
G ES&H requiremen
nts and rules.
ES&H require
ements speciffic to the area
a to be visited
d.
Emergency re
esponse and evacuation procedures.
p
Use of standa
ard issued pe
ersonal protec
ctive equipme
ent (PPE) provvided.
Requirement to be escorte
ed at all times
s while in consstruction workk areas.
Prohibition
P fro
om performing construction
n work using any tools or e
equipment, or performing any of the
following
f activ
vities:
Entering excavations or trenches.
Entering confined spa
aces.
Entering red barricade
ed areas.
Accessin
ng yellow or red barricaded
d scaffolds.
Working on electrical systems or other
o systemss containing sttored energy..
Handling
g chemical, ra
adiological, orr hazardous m
materials.
Riding in
n or operating
g aerial lifts orr scissor lifts.
Operatin
ng vehicles orr equipment.
Use of PPE
P beyond th
he standard is
ssues visitor PPE.
Electronic
c documents once printed,
p are uncontrrolled and may beccome outdated. Reffer to the electronicc documents in Info
oWorks for current revisions.
Bechtel Confide
ential © Bechtel Co
orporation 2016.
Bechtel
B Chile Limita
ada (BChile), 2016.. All rights reserved d.
This docum
ment contains inform
mation that is confidential and proprieetary to BChile or itss affiliates, and ma
ay not be reviewed,, transmitted, distrib
buted used
reproduced orr disclosed without BChile´s prior writtten permission and d the taking of any a action whatsoever in reliance on.
48 of 72
QUEBRA
ADA BLANC
CA FASE 2
Job 00
J No: 2580
Rev No: 1
ES&H MA
ANAGEMEN
NT PLAN
The briefing
b will provided by a training perso
on or by watcching a visitor orientation vvideo. The visitor must
sign a training atttendance form
m that confirm
ms the visitorr has received the training
g and undersstand their
onsibilities wh
respo hen visiting the Project. The
T visitor’s h
host will be rresponsible tto assure the
e visitor is
inform
med of the req
quirement and completes the training b
before given a
access to the Project. The visitor will
be is
ssued the ba d provided a visitor safetty card that rreinforces the ES&H requirements
asic PPE and
provided in the tra
aining. The host
h will then be able to esscort the visittor, providing the host hass attended
the new
n employee
e orientation and
a has know
wledge of the d controls of tthe current activities in
e hazards and
the area the visitor needs to conduct their wo
ork.
17 NER INTERFA
OWN ACE
17.1. Weekly
W ES&H
H coordinatio
on conferenc
ce
A weekly
w coordination confference shalll be held between BECHTEL’S ES&H mana
ager and
site/c
construction manager
m d OWNER’S Project ES&
and &H Manager and site/con
nstruction ma
anager to
discu
uss Project achievements,, ES&H miles
stones, ES&H
H Implementtation Plans and any issu
ues which
may arise. The me
eeting shall:
Electronic
c documents once printed,
p are uncontrrolled and may beccome outdated. Reffer to the electronicc documents in Info
oWorks for current revisions.
Bechtel Confide
ential © Bechtel Co
orporation 2016.
Bechtel
B Chile Limita
ada (BChile), 2016.. All rights reserved d.
This docum
ment contains inform
mation that is confidential and proprieetary to BChile or itss affiliates, and ma
ay not be reviewed,, transmitted, distrib
buted used
reproduced orr disclosed without BChile´s prior writtten permission and d the taking of any a action whatsoever in reliance on.
49 of 72
QUEBRA
ADA BLANC
CA FASE 2
Job 00
J No: 2580
Rev No: 1
ES&H MA
ANAGEMEN
NT PLAN
Lessons
L Learrned from incidents or near-misses whe
en applicable to the Projecct work.
ES&H improv
vement technologies (new tools, techniq
ques, processses, etc.).
Product
P recallls.
Safety
S alerts or bulletins (b
both originatin
ng from on-sitte and off-site
e activities).
17.4. he Project
Closing Out th
The Project
P will de
evelop a close
e out plan tha
at will include close out req
quirements forr ES&H.
18 WOR
RKING WITH CONTRACTORS AND SU
UBCONTRAC
CTORS
18.1. Se
election and Oversight Program
P
The management
m of CONTRACTORS and subcontracto
ors shall comp
ply with the P
Project CONT
TRACTOR
evalu
uation, selectiion and moniitoring manag
gement proce
edure. CONT
TRACTORS a
and subcontra
actors will
be prrovided with in
nformation as
s part of:
The
T pre-tende
er and tenderr meeting processes.
Tender
T docum
mentation.
Project
P CONT
TRACTOR management
m uding desktop
system (inclu p risk assesssment, CONT
TRACTOR
checklist/auth
c hority to work,, etc.).
Inductions.
Onsite
O trainin
ng.
Toolbox
T and planning mee
eting sessions
s.
CONTRACTO
C OR progress and performa
ance meetingss.
Bechtel
B Chile Limita
ada (BChile), 2016.. All rights reserved d.
This docum
ment contains inform
mation that is confidential and proprieetary to BChile or itss affiliates, and ma
ay not be reviewed,, transmitted, distrib
buted used
reproduced orr disclosed without BChile´s prior writtten permission and d the taking of any a action whatsoever in reliance on.
50 of 72
QUEBRA
ADA BLANC
CA FASE 2
Job 00
J No: 2580
Rev No: 1
ES&H MA
ANAGEMEN
NT PLAN
will be
b regularly monitored th
hrough the allocation
a of dedicated prroject manag
gement teams, weekly
coord
dination meettings, health and
a safety com
mmittees, aud
dits, behaviorr observationss, and inspecctions.
18.2. Contractor Co
ompany Requ
uirements
After award, the successful
s bid
dder will subm
mit their ES&
&H Implementtation Plan th
hat fully desccribes how
they will comply th
he Project ES
S&H plans an
nd proceduress. The CONTRACTORS ES&H Implementation
Plan will be review
wed and accepted prior to CONTRACTO
C g to the Jobsitte.
OR mobilizing
pliers shall co
Supp omply with the
e Project Veh
hicle Safety M
Managementt Plan (VSMP
P) if vehicles, including
light trucks,
t are to
o be operated
d on the Proje
ect Jobsite orr access road
ds to the Projject. The veh
hicle shall
meett the minimum
m Jobsite veh
hicle requirem
ments specifi ed in the VS
SMP and the operator sha
all have a
valid Municipal lice
ense and a Project operato
or’s license.
Electronic
c documents once printed,
p are uncontrrolled and may beccome outdated. Reffer to the electronicc documents in Info
oWorks for current revisions.
Bechtel Confide
ential © Bechtel Co
orporation 2016.
Bechtel
B Chile Limita
ada (BChile), 2016.. All rights reserved d.
This docum
ment contains inform
mation that is confidential and proprieetary to BChile or itss affiliates, and ma
ay not be reviewed,, transmitted, distrib
buted used
reproduced orr disclosed without BChile´s prior writtten permission and d the taking of any a action whatsoever in reliance on.
51 of 72
QUEBRA
ADA BLANC
CA FASE 2
Job 00
J No: 2580
Rev No: 1
ES&H MA
ANAGEMEN
NT PLAN
Working
W abov
ve 1.8 m in height which
h requires uti lizing fall pre
evention or protection sysstems (i.e.
working
w from ladders, scaffolds or aeria
al lifts, using body harnessses with lanyyards anchore
ed to fixed
o horizontal life lines, worrking from a suspended ma
or an basket, etcc.).
Operating
O an
n elevated wo
ork platform or aerial liftin
ng device (i.e
e. JLG, articu
ulating boom platform,
scissor
s lift, etc.).
Working
W with hazardous, toxic, flamma
able, explosivve, reactive, compressed gasses, or ra
adioactive
material
m or so
ources.
Working
W overr or in water.
Lifting
L and rig
gging operatio
ons (i.e. crane
es, hoists, rigg
ging, forklifts,, etc.).
At the
e discretion of
o BECHTEL’S
S site/constru
uction manage
ement and ES
S&H departm
ment, the supp
pliers may
be re
equired to submit an ES&
&H Implementtation Plan a nd require th
heir personne
el to develop their own
safety
y procedures and complette the approprriate training prior to working on the Job
bsite.
18.4. Performance
P Managemen
nt
Proce
esses shall be in place to ensure th
he ES&H pe
erformance o
of suppliers, CONTRACTORS and
subco
ontractors in accordance with
w the Project ES&H plan
ns and proced
dures and the
eir compliance
e with any
ES&H
H obligations specified in their contrac
cts, are mon itored and re
eported. Each
h CONTRAC
CTOR and
subco
ontractor sha ed a Contract superintende
all be assigne ent who shalll act as a single point of ccontact for
all contractual issues and who
w shall fac
cilitate weeklly contract ccoordination meetings. A
All Project
ding procedurres, work ins
documents includ structions, ho
olds, non-con
nformances e
etc. shall be provided
through the Contra
act superinten
ndent and reg
gistered in InffoWorks. CO NTRACTORS
S will also be
e assigned
a BECHTEL ES&H
H resource who
w will act as
s the single p
point of conta
act for all ES&
&H issues and
d who will
provide coaching and
a instructio
on in the application of the ES&H Mana
agement Syste
em and proce
esses and
edures, partic
proce cipate in area inspections, conduct
c auditts, and provid
de feedback o
on performancce.
CONTRACTOR and
a actor Project managers w
subcontra will also play a
an active parrt in the proje
ect ES&H
mittees who shall
comm s work coo
operatively to
o implement th
he ES&H Ma
anagement Syystem (proced
dures and
proce
esses), monito
or performanc
ce, develop im
mprovement plans etc.
Electronic
c documents once printed,
p are uncontrrolled and may beccome outdated. Reffer to the electronicc documents in Info
oWorks for current revisions.
Bechtel Confide
ential © Bechtel Co
orporation 2016.
Bechtel
B Chile Limita
ada (BChile), 2016.. All rights reserved d.
This docum
ment contains inform
mation that is confidential and proprieetary to BChile or itss affiliates, and ma
ay not be reviewed,, transmitted, distrib
buted used
reproduced orr disclosed without BChile´s prior writtten permission and d the taking of any a action whatsoever in reliance on.
52 of 72
QUEBRA
ADA BLANC
CA FASE 2
Job 00
J No: 2580
Rev No: 1
ES&H MA
ANAGEMEN
NT PLAN
Serio
ous CONTRA
ACTOR or sub
bcontractor no
on-compliancce to Project E
ES&H plans a
and procedurres will be
captu
ured on a non
n-compliance notice and trransmitted to the applicable CONTRAC
CTOR or subccontractor.
CONTRACTORS or subcontra
actors shall respond
r in w
writing within in one (1) w
working day to outline
edial action to
reme o be taken to
t correct no
on-compliance
es. In some instances BE
ECHTEL´s P
Project/site
mana
agers, working with the OW
WNERS site/c
construction m
managers, m
may elect to ha
ave CONTRA
ACTOR or
subco
ontractor cea
ase work until an apprroved plan has been implemented to correct the non-
comp
pliance(s).
19 ES&H
H IMPLEMEN
NTATION AN
ND MONITOR
RING
19.1. Im
mplementatio
on
mencement off construction, a strategy w
Prior to the comm will be develo
oped to guide
e the impleme
entation of
the Plan
P and provide the basis for monitoring improveme
ents to the Pla
an and standa
ards througho
out the life
of the
e Project. Objectives and ta
argets will be
e set and mon
nitored as parrt of this proce
ess.
19.2. Monitoring,
M su
urviellence and
a inspectio
ons
The implementatio
on and effectiveness of the or controlling risks shall
e Plan and p rocedures in eliminating o
be monitored
m by Project man
nagement and the Projecct ZAT utilizing a range of both lead
d and lag
indica
ators.
sures used to
Meas o review perrformance, predict future performance
e, and identiffy improveme
ent areas
includ
de:
Audit
A results.
Inspection res
sults.
KPIs
K (Key Pe
erformance Indicators).
Monthly
M PSSR.
Electronic
c documents once printed,
p are uncontrrolled and may beccome outdated. Reffer to the electronicc documents in Info
oWorks for current revisions.
Bechtel Confide
ential © Bechtel Co
orporation 2016.
Bechtel
B Chile Limita
ada (BChile), 2016.. All rights reserved d.
This docum
ment contains inform
mation that is confidential and proprieetary to BChile or itss affiliates, and ma
ay not be reviewed,, transmitted, distrib
buted used
reproduced orr disclosed without BChile´s prior writtten permission and d the taking of any a action whatsoever in reliance on.
53 of 72
QUEBRA
ADA BLANC
CA FASE 2
Job 00
J No: 2580
Rev No: 1
ES&H MA
ANAGEMEN
NT PLAN
Proje
ect managem
ment and sup
pervision sha
all conduct ro
outine and im
mpromptu su
urveillances o
of Project
activities to ensure
e that ES&H is properly im
mplemented o
on the Projectt. Unsafe pracctices or cond
ditions will
be re
eported to the
e responsible supervisor at the time of inspection. W
Whenever pra
actical, violatio
ons of the
ES&H
H Program requirements
r ards or regullations shall be corrected immediate
and standa ely. ES&H
profe
essionals will use
u nonconfo
ormance repo
orts where tren
nds or significcant violations occur and w
will send a
forma
al copy of th
he report to the
t responsib
ble manager identifying th
he deficiencies and recommended
corre
ective action. Those items d immediatelly will be doccumented in a hazard
s that cannott be corrected
tracking system an
nd tracked to closure.
Spot
S checks of work activ
vities, housek
keeping, pracctices, conditiions of equip
pment and wo
ork areas,
and
a complian
nce with estab
blished ES&H
H policy and p
procedures.
Daily
D frequen
nt checks of work
w areas.
Weekly
W mented housekeeping insp
docum pections.
Formal surveillance as req
quested by the
e ES&H man ager or otherr line or functional manage
er.
The project’s
p insp e shall be established to ccheck compliance and performance off executed
pection regime
work and activities
s are to plan. The inspectio
on regime inccludes:
Statutory
S insp
pections
Inspections re
elated to the risk
r register
Safety
S compliance inspecttions, e.g. fire
efighting equip
pment
Equipment co
ompliance/ fitn
ness for purpose
Hazards and housekeepin
ng
Electronic
c documents once printed,
p are uncontrrolled and may beccome outdated. Reffer to the electronicc documents in Info
oWorks for current revisions.
Bechtel Confide
ential © Bechtel Co
orporation 2016.
Bechtel
B Chile Limita
ada (BChile), 2016.. All rights reserved d.
This docum
ment contains inform
mation that is confidential and proprieetary to BChile or itss affiliates, and ma
ay not be reviewed,, transmitted, distrib
buted used
reproduced orr disclosed without BChile´s prior writtten permission and d the taking of any a action whatsoever in reliance on.
54 of 72
QUEBRA
ADA BLANC
CA FASE 2
Job 00
J No: 2580
Rev No: 1
ES&H MA
ANAGEMEN
NT PLAN
The frequency
f of inspection shall be determined accordin
ng to:
Prescribed
P equencies in legislation, sttandards, cod
fre des of practice
es, etc.
Prescribed
P fre
equencies in Project ES&H
H procedures
Recommende
ed by design standards an
nd guidelines
The
T severity of
o consequen
nce of the haz
zard
The
T level of risk
T availability and capability of electro
The ng and control systems
onic monitorin
Envirronmental mo
onitoring sha
all take place nce with the
e in accordan e Project envvironmental m
monitoring
proce
edure which provides
p guidance to BECHTEL, CONT
TRACTOR an
nd subcontracctors and perrsonnel on
field environmenta
al compliance
e inspections, monitoring rrequirements and upward reporting to B
BECHTEL
and OWNER.
O It will:
Describe
D the responsibilitie
es and action CONTRACTO
ns required byy BECHTEL, C OR and subco
ontractors
personnel.
p
Define
D enviro
onmental mon
nitoring progra
ams during co
onstruction.
Summarize
S monitoring
m freq
quency, locattions, and sam
mpling protoccols.
Provide
P a fram
mework for re
ecording and reporting envvironmental m
monitoring datta.
h this procedure will help ensure that onsite constrruction activitties, including
ormance with
Confo g those of
CONTRACTORS, are conductted in accord
dance with P
Project enviro
onmental requ
uirements an
nd verified
ated environm
through an integra mental inspecttion program.
19.3. esting
Te
The Project’s
P testing and monittoring regime shall be esta
ablished based on:
Those
T situattions where workforce health
h surveiillance is identified and appropriate systems
implemented
i sonnel shall have access to
. Project pers o their own in
ndividual results.
Prevalence
P and incidence of work-related illness sha
all be recorde
ed, assessed and reviewed
d.
Records of ongoing
o ES&H
H inspection, testing and monitoring sh
hall be mainttained and avvailable to
stakeholders,
s , based on co
onfidentiality and
a need to kknow.
Appropriate
A processes
p ce to ensure the reliabilityy of data, succh as the caliibration of
shall be in plac
instruments,
i test
t equipmen
nt, and softwa
are and hardw
ware function
nality.
Electronic
c documents once printed,
p are uncontrrolled and may beccome outdated. Reffer to the electronicc documents in Info
oWorks for current revisions.
Bechtel Confide
ential © Bechtel Co
orporation 2016.
Bechtel
B Chile Limita
ada (BChile), 2016.. All rights reserved d.
This docum
ment contains inform
mation that is confidential and proprieetary to BChile or itss affiliates, and ma
ay not be reviewed,, transmitted, distrib
buted used
reproduced orr disclosed without BChile´s prior writtten permission and d the taking of any a action whatsoever in reliance on.
55 of 72
QUEBRA
ADA BLANC
CA FASE 2
Job 00
J No: 2580
Rev No: 1
ES&H MA
ANAGEMEN
NT PLAN
20 HEAL
LTH SURVEIILLANCE
All Project person
nnel who will work at an altitude of 30
000 meters a
above sea le
evel or greate
er, will be
required to be medically evalu
uated and co
omplete all p
prescribed tessts in order to determine
e they are
medically fit to work at these ellevations. Th
hese medical evaluations a
and tests musst be completted before
travelling to the Jo
obsite if the lo
ocation is abo
ove 3000 m in
n altitude, and
d annually the
ereafter. Thesse Project
onnel reportin
perso ng to the Jobs
site over 3000
0 meters in a ltitude for the
e first time or away from th
his altitude
for more
m than thre
ee (3) months will also ne
eed to reportt to the policllinics for a brrief medical e
evaluation
imme
ediately upon arrival to the Jobsite to ve
erify they are n
not experienccing any physsical difficultie
es.
As to
o the Projectt Jobsite, occ
cupational he
ealth risks sh
hall be evalua
ated and con
ntrolled as part of the
occup
pational healtth plan. The plan
p will inclu
ude an Occup
pational Exposure Assessm
ment (OEA) p
process to
develop an exposure base line
e matrix of all potential con
nstruction hea
alth hazards. The OEA will be used
dentify speciffic exposures
to id s to various
s occupationa
al health ha
azards and classify expo
osures in
accorrdance with the
t predicted level of risk utilizing prevvious representative monittoring data an
nd Project
conducted evaluattions and monitoring. The OEA will be periodically u
updated base
ed on changin
ng phases
onstruction orr newly introd
of co duced chemic
cal products n
not previouslyy evaluated. Personal and medical
surve
eillance requirements for specific
s expos
sures will be determined for those individuals or grroups that
appro
oach known occupational exposure limits for spe
ecific hazard
ds, such as chemical su
ubstances,
radiation, noise, and vibration.
Electronic
c documents once printed,
p are uncontrrolled and may beccome outdated. Reffer to the electronicc documents in Info
oWorks for current revisions.
Bechtel Confide
ential © Bechtel Co
orporation 2016.
Bechtel
B Chile Limita
ada (BChile), 2016.. All rights reserved d.
This docum
ment contains inform
mation that is confidential and proprieetary to BChile or itss affiliates, and ma
ay not be reviewed,, transmitted, distrib
buted used
reproduced orr disclosed without BChile´s prior writtten permission and d the taking of any a action whatsoever in reliance on.
56 of 72
QUEBRA
ADA BLANC
CA FASE 2
Job 00
J No: 2580
Rev No: 1
ES&H MA
ANAGEMEN
NT PLAN
Base
ed on the high
h altitude of many
m work arreas, the long
g workdays a
and workshifts, commute d
distances,
and other
o factors, managemen
nt of fatigue will
w require sig
gnificant supe
ervisor attentio
on. The assessment of
the risk of fatigue will
w be include
ed in the follo
owing conside
erations:
Overtime
O or extended
e work shifts.
Tasks
T ng high level of calculation
requirin ns or precision
n.
High risk work.
Driving
D long distances
d or in
n adverse we
eather, or num
mber of hours operating the
e vehicle.
Workers’ ada
aptation to the
e high altitude
e.
21 STOP
P WORK AUT
THORITY
All Project person
nnel have the
e right to refuse to perform
m a task thatt they believe
e is unsafe or stop the
work of others the
ey deem unsa
afe. That is an
a activity wh
hich, if allowe
ed to continue
e, could reaso
onably be
expected to resultt in death, se
erious physic
cal harm to p
personnel, serious environ
nmental relea
ase, major
erty damage,, or endange
prope er or negativ
vely impact o
others includ
ding the local communitie
es. Each
employee has the
e duty to eva
aluate the ES&H aspectss of the jobss they perform and to require that
satisffactory contro
ols are in plac
ce prior to be
eginning workk. Along with this authorityy is the respon
nsibility to
take an active role
e in the resolu
ution of ES&H
H issues.
h employee is
Each e for adherence to safe w
s responsible work procedurres and to pe
erform work in a safe,
efficie
ent manner. The right to
o refuse uns
safe work or to stop work that is pe
erceived as unsafe is
guara
anteed to eac
ch worker. Ex
xercise of this
s authority sh
hall not resultt in any form of reprisal orr negative
perso
onnel action by
b manageme
ent.
22 DENT NOTIF
INCID FICATION, INVESTIGATIO
ON AND REP
PORTING
All in
njuries, illness
ses, environm
mental release
e, near-miss,, property damage that occcur while ca
arrying out
Work
k on the Jobsiite shall be re
eported immed
diately by the
e affected perrson or witnessses to the evvent to the
respo
onsible superrvisor and are
ea ES&H reprresentative. A
As needed, th
hose injured w
will be stabilizzed in the
Electronic
c documents once printed,
p are uncontrrolled and may beccome outdated. Reffer to the electronicc documents in Info
oWorks for current revisions.
Bechtel Confide
ential © Bechtel Co
orporation 2016.
Bechtel
B Chile Limita
ada (BChile), 2016.. All rights reserved d.
This docum
ment contains inform
mation that is confidential and proprieetary to BChile or itss affiliates, and ma
ay not be reviewed,, transmitted, distrib
buted used
reproduced orr disclosed without BChile´s prior writtten permission and d the taking of any a action whatsoever in reliance on.
57 of 72
QUEBRA
ADA BLANC
CA FASE 2
Job 00
J No: 2580
Rev No: 1
ES&H MA
ANAGEMEN
NT PLAN
The investigation
i n the correcti ve action tracking system
reports shall be logged in m (OWNER’S program-
site lines and BEC
CHTEL’S pro
ogram- WebS
SDS) and a ro
oot cause analysis initiate
ed when applicable per
the Project
P investtigation proce
ess. An accident summarry report, com
mpleted by th
he ES&H De
epartment,
shall be included in the Project weekly/montthly progress report.
Electronic
c documents once printed,
p are uncontrrolled and may beccome outdated. Reffer to the electronicc documents in Info
oWorks for current revisions.
Bechtel Confide
ential © Bechtel Co
orporation 2016.
Bechtel
B Chile Limita
ada (BChile), 2016.. All rights reserved d.
This docum
ment contains inform
mation that is confidential and proprieetary to BChile or itss affiliates, and ma
ay not be reviewed,, transmitted, distrib
buted used
reproduced orr disclosed without BChile´s prior writtten permission and d the taking of any a action whatsoever in reliance on.
58 of 72
QUEBRA
ADA BLANC
CA FASE 2
Job 00
J No: 2580
Rev No: 1
ES&H MA
ANAGEMEN
NT PLAN
CONTRACTOR management
m and ES&H representative
r e with the p
participation o
of BECHTEL’’S Project
H Department and responsible Project supervisor w
ES&H will conduct investigation and root cause
e analysis
of serious acciden
nts/incidents in
nvolving CON
NTRACTORS
S work activityy or personne
el.
23 COR
RRECTIVE / PREVENTATI
P VE ACTION
The findings,
f conc
clusions, and
d recommend
dations reache
ed as a resu
ult of inspectio
on and testin
ng, audits,
review
ws, and incid
dent investiga
ations shall be
b documente opriate correcctive actions identified,
ed and appro
with the
t aim of en
nsuring a rep
petition will no
ot occur. Befo nd preventative action,
ore planning corrective an
suffic
cient investiga
ation shall be completed to
o identify both
h the immedia nderlying causes of the
ate and the un
incide
ent or non-c
compliance. Corrective and
a preventa
ative actionss shall includ
de considera
ations for
imme
ediate solution
ns for safely resuming
r the activity and llong term cha
anges to prevvent the simila
ar incident
from reoccurring.
24 LESS
SONS LEARN
NED PROGR
RAM
Regu
ular communications can provide critiical informatiion on issue
es and proble
ems. Sharing
g lessons
learned about pro
ograms, proce
esses, equipm
ment and isssues such ass injuries, pro
ovide basic in
nformation
that may
m result in avoidance off a repeat of a mishap. Th
he lessons lea
arned program
m will be use
ed to allow
mana
agement to make
m informed
d decisions ba
ased on the in
nformation fro
om other Project jobsites.
Electronic
c documents once printed,
p are uncontrrolled and may beccome outdated. Reffer to the electronicc documents in Info
oWorks for current revisions.
Bechtel Confide
ential © Bechtel Co
orporation 2016.
Bechtel
B Chile Limita
ada (BChile), 2016.. All rights reserved d.
This docum
ment contains inform
mation that is confidential and proprieetary to BChile or itss affiliates, and ma
ay not be reviewed,, transmitted, distrib
buted used
reproduced orr disclosed without BChile´s prior writtten permission and d the taking of any a action whatsoever in reliance on.
59 of 72
QUEBRA
ADA BLANC
CA FASE 2
Job 00
J No: 2580
Rev No: 1
ES&H MA
ANAGEMEN
NT PLAN
25 REHA
ABILITATION
N AND RETU
URN TO WOR
RK
The Project
P is com
mmitted to the
e prompt reha
abilitation and
d return to wo
ork of any Pro
oject personn
nel injured
during the course of their employment. CONTRACTO
ORS shall ccoordinate th
heir own reh
habilitation
esses with th
proce he oversight of BECHTE
EL’S ES&H manager or designated person who will also
coord
dinate the reh
habilitation needs of CONT Project perso nnel.
TRACTOR’S P
The management
m of the rehab
bilitation and return to worrk of injured o
or ill Project personnel sh
hall be the
respo
onsibility of BECHTEL
B and CONTRAC
CTORS who sshall nominate a case ma
anager or co
oordinator.
CONTRACTOR’S rehabilitation
n programs shall
s be conssistent with le
egislation and
d shall be sub
bmitted to
the BECHTEL
B ES&H Manager prior to mobilization for ap
pproval.
26 ES&H
H COMPLIAN
NCE ENFORC
CEMENT
Violations of the ES&H
E requirem
ments shall be
b cause for d
disciplinary acctions as defin
ned in the Pro
oject work
rules. Deliberate violation
v of ES
S&H rules an
nd requiremen
nts may subje
ect the violato
or to disciplinary action
up to and including
g dismissal or removal from
m the jobsite..
1) Violating
V the Project alcohol and drug program inclu
g policy and p uding driving or working under the
influence
i of drugs
d and alco
ohol.
Electronic
c documents once printed,
p are uncontrrolled and may beccome outdated. Reffer to the electronicc documents in Info
oWorks for current revisions.
Bechtel Confide
ential © Bechtel Co
orporation 2016.
Bechtel
B Chile Limita
ada (BChile), 2016.. All rights reserved d.
This docum
ment contains inform
mation that is confidential and proprieetary to BChile or itss affiliates, and ma
ay not be reviewed,, transmitted, distrib
buted used
reproduced orr disclosed without BChile´s prior writtten permission and d the taking of any a action whatsoever in reliance on.
60 of 72
QUEBRA
ADA BLANC
CA FASE 2
Job 00
J No: 2580
Rev No: 1
ES&H MA
ANAGEMEN
NT PLAN
2) Working
W on surfaces
s with a potential fall
f of 6 ft. (1
1.8 meters) o
or greater witthout fall prevvention or
protection
p sy
ystems or wo
orking from an
a aerial lift or suspended platform without fall protection
connected.
c
3) Entering a posted
p permitt required co e without a permit, training, authorization and
onfined space
indicated
i ntrols in place as identified on the permitt.
con
4) Violating
V lock o commencing work on a system that has not had all energy
k out / tag outt procedures or
sources
s identtified and isolated.
5) Unauthorized
d workers ope
erating cranes
s or conductin
ng rigging ope
erations.
6) Intentionally defeating or removing a safety syste
em such as a machine g
guard, safety interlock,
pressure
p switch, etc. This includes any
a disabling , by-passing,, modifying o
or removing tthe safety
device
d withou
ut proper auth
horization.
7) Disregarding
D ed entry into a clearly
or bypassing signage orr barricades, in particularr unauthorize
established
e re
ed barricaded
d (posted dan
nger) work zon
ne.
8) Operating
O aerial lift devices without the required train
ning and quallifications.
9) Entering onto
o a scaffold th
hat has not be
een made safe
e by the authorized scaffold crew.
10) Entering an excavation
e tha
at has not be
een made saffe by sloping, shoring, or o
other approve
ed means,
as
a indicated on
o the permit and daily tren port.
nch safety rep
27 AUDITS, ASSESS
SMENTS AND
D REVIEWS
ular Project ES&H assessm
Regu ments will be conducted in
n accordance with the Projject ES&H insspections,
audits and self-ass
sessments prrocedure. The
e assessmentts will be con
nducted to ide
entify conform
mance with
H requirements, areas for
ES&H f improvem
ment, and ellements of positive ES&
&H performa
ance. The
proce
edure will defiine requireme
ents for two (2
2) Jobsite spe
ecific audits o
or assessmen
nt processes:
1) External
E Ass
sessment Te
eams- Jobsite
e assessmentts or audits to
o be conductted by external or non-
project
p personnel (BECHT
TEL corporate
e, BECHTEL Mining and M
Metals functio
onal managerss, Chilean
regulators,
r OW
WNER Corpo
orate, etc.)
2) Internal
I Ass
sessment Teams-
T Jobs ments to be conducted by Project personnel
site assessm
(BECHTEL,
( OWNER Prroject manag
gement, and
d CONTRAC
CTORS’ man
nagement an
nd ES&H
representativ
r es.
Electronic
c documents once printed,
p are uncontrrolled and may beccome outdated. Reffer to the electronicc documents in Info
oWorks for current revisions.
Bechtel Confide
ential © Bechtel Co
orporation 2016.
Bechtel
B Chile Limita
ada (BChile), 2016.. All rights reserved d.
This docum
ment contains inform
mation that is confidential and proprieetary to BChile or itss affiliates, and ma
ay not be reviewed,, transmitted, distrib
buted used
reproduced orr disclosed without BChile´s prior writtten permission and d the taking of any a action whatsoever in reliance on.
61 of 72
QUEBRA
ADA BLANC
CA FASE 2
Job 00
J No: 2580
Rev No: 1
ES&H MA
ANAGEMEN
NT PLAN
A sys
stem will be im
mplemented for
f entering all assessmen t and audit fin
ndings, assign
ning responsibilities for
corre
ecting the findings, and trac
cking to closu
ure to ensure timely and efffective response.
28 EXTERNAL ASS
SESSMENT AND
A AUDITS
The four
f (4) levels
s of oversight (audits and assessments)
a ) for the Proje
ect ES&H systtems are:
Corp
porate level – BECHTEL’S
S ES&H corp
porate assesssors will be sscheduled to perform two (2) audits
per year
y during construction.
c Additional assessments can be perfo
ormed based on the request of the
Proje
ect or function
nal manageme
ent.
Func
ctional level - BECHTEL’S
S regional an
nd global bussiness unit m
managers and support stafff will plan
and conduct asse
essments of the Project ES&H Plan a
and procedures. These will include functional
asses
ssment during
g design phas
se, constructiion phase, an
nd the start-up
p phase.
Fede
eral Agencie
es- Upon nottification, fed n) and local agencies m
deral (Chilean may conduct an audit,
inspe
ection, or asse
essment of th
he Project. Th
hese assessm
ments will be conducted in
n accordance to Project
ES&H
H procedure- Government agency inspe
ection and invvestigation.
29 ERNAL ASSE
INTE ESSMENTS
Ongo
oing Project self-assessm ey factor in assessing compliance to the Proje
ment is a ke ect ES&H
proce
edures with th
he goal of ach
hieving a “Zerro Accident” w
work environm
ment. This sellf-assessmen
nt program
shall be establishe
ed based upo
on the principlle of continuo
ous improvem
ment, and will be identified in Project
H procedure- ES&H asses
ES&H ssment proces
ss.
The self-assessme
s s intended to include particcipation by bo
ent process is oth BECHTEL Project man
nagement
and CONTRACTO
C ORS’ manage
ement and ES&H represe
entatives and
d will typicallyy use the question set
from the self-assessment softw
ware- AuditXL. The questiions align with
h the requirem
ments of the a
applicable
HTEL Core Processes, for which th
BECH he Project E
ES&H proced
dures are de
eveloped from
m. These
Electronic
c documents once printed,
p are uncontrrolled and may beccome outdated. Reffer to the electronicc documents in Info
oWorks for current revisions.
Bechtel Confide
ential © Bechtel Co
orporation 2016.
Bechtel
B Chile Limita
ada (BChile), 2016.. All rights reserved d.
This docum
ment contains inform
mation that is confidential and proprieetary to BChile or itss affiliates, and ma
ay not be reviewed,, transmitted, distrib
buted used
reproduced orr disclosed without BChile´s prior writtten permission and d the taking of any a action whatsoever in reliance on.
62 of 72
QUEBRA
ADA BLANC
CA FASE 2
Job 00
J No: 2580
Rev No: 1
ES&H MA
ANAGEMEN
NT PLAN
asses
ssments will be scheduled and deve
eloped by B
BECHTEL’S E
ES&H deparrtment as directed by
BECH
HTEL’S consttruction and ES&H
E management.
This self-assessm
ment process will
w be schedu
uled and impllemented by B
BECHTEL an
nd include eng
gagement
ONTRACTOR
of CO RS to assess the Project’s compliance w
with Project p
procedures, ru
ules, and requ
uirement’s
EL’S and the OWNER’S ES&H
based on BECHTE E corpora
ate standards..
Phase
P of construction.
Incidents invo
olving complia
ance with spe
ecific procedu
ures.
Time
T since la
ast assessmen
nt.
High risk work activities.
Regional or corporate
c requ
uest.
Any deficiencies,
d weakness
w or opportunities
s for improve ment and the
e proposed re
emedies will be placed
in the
e corrective action trackin
ng system. Items entered
d into the syystem will be
e regularly re
eported to
mana
agement and tracked to closure.
c The corrective acction tracking
g system willl contain imp
provement
opportunities in the areas of qu
uality assuran
nce, environm
mental complia
ance and hea
alth and safetty that are
identified during audits
a and/ or inspections
s. Items relatiing to design
n or engineerring improvem
ments are
enterred into a haz
zard tracking system
s and fo
ollowed to ressolution.
30 TEM AUDITS
SYST S AND REVIE
EWS
There
e shall be perriodic ES&H audits
a or revie
ew of the Projject to:
Determine
D whether
w this system
s is beiing properly implemented
d and mainta
ained (including policy,
procedures
p and KPI’s).
Determine
D wh
hether the sys
stem’s objectives and targ ets are being
g achieved.
Status
S of internal and exte
ernal audits an
nd reviews.
Status
S of corrrective actions and recomm
mendations fo
or improveme
ent.
Electronic
c documents once printed,
p are uncontrrolled and may beccome outdated. Reffer to the electronicc documents in Info
oWorks for current revisions.
Bechtel Confide
ential © Bechtel Co
orporation 2016.
Bechtel
B Chile Limita
ada (BChile), 2016.. All rights reserved d.
This docum
ment contains inform
mation that is confidential and proprieetary to BChile or itss affiliates, and ma
ay not be reviewed,, transmitted, distrib
buted used
reproduced orr disclosed without BChile´s prior writtten permission and d the taking of any a action whatsoever in reliance on.
63 of 72
QUEBRA
ADA BLANC
CA FASE 2
Job 00
J No: 2580
Rev No: 1
ES&H MA
ANAGEMEN
NT PLAN
Assessment
A of complianc
ce with releva
ant legislation
n, stakeholde
er expectations, structurall changes
and
a non-confformance.
These audits or re
eviews shall be
b at frequen
ncies approprriate to the le
evel of the ES
SH risk, unlesss specific
frequencies are nominated in Project stand
dards. They shall be con
nducted by ap
ppropriately ccompetent
perso
ons and be co
onducted so as
a to ensure appropriate
a o bjectivity and
d impartiality.
31 ACHMENTS
ATTA
Attac
chment A-1 –-- Bechtel ES&
&H Policy 111
Attac e Responsibil ity
chment A-2 – Teck Charterr of Corporate
Attac
chment A-3 – Teck Code of Sustainable
e Conduct
Attac
chment A-4 – Teck Safety and
a Health Po
olicy
Attac
chment B – Frramework of ES&H
E Manag
gement Syste
em Procedure
es
Attac
chment C-1 – Inspection an
nd Audit Sche
edule
Attac
chment C-2 – Personal ES&
&H Engagem
ment Matrix
Electronic
c documents once printed,
p are uncontrrolled and may beccome outdated. Reffer to the electronicc documents in Info
oWorks for current revisions.
Bechtel Confide
ential © Bechtel Co
orporation 2016.
Bechtel
B Chile Limita
ada (BChile), 2016.. All rights reserved d.
This docum
ment contains inform
mation that is confidential and proprieetary to BChile or itss affiliates, and ma
ay not be reviewed,, transmitted, distrib
buted used
reproduced orr disclosed without BChile´s prior writtten permission and d the taking of any a action whatsoever in reliance on.
64 of 72
QUEBR
RADA B BLANCA A FASE 2
Job No
o: 25800
0
R
Rev No: 1
ES&H M
MANAGEMENT
T PLAN
N
Attach
hment A--1
Bechtel En
nvironme
ent, Safe
ety & He
ealth Policy State
ement
E
Electronic do
ocuments on
nce printed, a
are uncontro
olled and maay become outdated. Reffer to the ele
ectronic docu
uments in InffoWorks for current revissions.
Bechtel Co
onfidential © Bechtel Corporation 2016.
Be
echtel Chile L Limitada (BC Chile), 2016. All rights resserved.
Chile or its afffiliates, and may not be reviewed, tra
This document ccontains inforrmation that is confidential and proprrietary to BC ansmitted, distributed ussed reproducced or disclo
osed without BChile´s prior written
permission and the e taking of an ny action whatsoever in reliance on.
65
5 of 72
QUEBR
RADA B BLANCA A FASE 2
Job No
o: 25800
0
R
Rev No: 1
ES&H M
MANAGEMENT
T PLAN
N
Attach
hment A--2
Teck
k Charter of Corp
porate R
Respons
sibilities
E
Electronic do
ocuments on
nce printed, a
are uncontro
olled and maay become outdated. Reffer to the ele
ectronic docu
uments in InffoWorks for current revissions.
Bechtel Co
onfidential © Bechtel Corporation 2016.
Be
echtel Chile L Limitada (BC Chile), 2016. All rights resserved.
Chile or its afffiliates, and may not be reviewed, tra
This document ccontains inforrmation that is confidential and proprrietary to BC ansmitted, distributed ussed reproducced or disclo
osed without BChile´s prior written
permission and the e taking of an ny action whatsoever in reliance on.
66
6 of 72
QUEBR
RADA B BLANCA A FASE 2
Job No
o: 25800
0
R
Rev No: 1
ES&H M
MANAGEMENT
T PLAN
N
Attach
hment A--3
T
Teck Cod
de of Sus
stainable
e Condu
uct Polic
cy Statem
ment
E
Electronic do
ocuments on
nce printed, a
are uncontro
olled and maay become outdated. Reffer to the ele
ectronic docu
uments in InffoWorks for current revissions.
Bechtel Co
onfidential © Bechtel Corporation 2016.
Be
echtel Chile L Limitada (BC Chile), 2016. All rights resserved.
Chile or its afffiliates, and may not be reviewed, tra
This document ccontains inforrmation that is confidential and proprrietary to BC ansmitted, distributed ussed reproducced or disclo
osed without BChile´s prior written
permission and the e taking of an ny action whatsoever in reliance on.
67
7 of 72
QUEBR
RADA B BLANCA A FASE 2
Job No
o: 25800
0
R
Rev No: 1
ES&H M
MANAGEMENT
T PLAN
N
Attach
hment A--4
Te
eck Safety & Hea
alth Polic
cy State
ement
E
Electronic do
ocuments on
nce printed, a
are uncontro
olled and maay become outdated. Reffer to the ele
ectronic docu
uments in InffoWorks for current revissions.
Bechtel Co
onfidential © Bechtel Corporation 2016.
Be
echtel Chile L Limitada (BC Chile), 2016. All rights resserved.
Chile or its afffiliates, and may not be reviewed, tra
This document ccontains inforrmation that is confidential and proprrietary to BC ansmitted, distributed ussed reproducced or disclo
osed without BChile´s prior written
permission and the e taking of an ny action whatsoever in reliance on.
68
8 of 72
QUEBRA
ADA BLANC
CA FASE 2
Job
J No: 258
800
Revv No: 1
ES&H MA
ANAGEMEN
NT PLAN
Attachmen
nt B
Framew
work of ES&
&H Management System Procedures
P
Electro
onic documents on
nce printed, are unccontrolled and may become outdated. Refer to the electrronic documents in InfoWorks for currrent revisions.
Bechtel Con
nfidential © Bechtel Corporation 2016.
Attachm
ment C-1 – Ins
spection and
d Audit Sche
edule
W – Weekly Work
W Area Q – Quarterly B – Biannual A – An
nnual
KEY
Inspection Audit Audit Audit
Frequency
y
W Q B A
Eleme
ent 1 Managem
ment
ESH Management Plan
n
Orientation and Training
Pre-Start Meetings and
d STARRT Cards
Change Management
Hazard Reporting
R
Toolbox Meetings
Consulta
ation
Incident Reporting, Rec
cording and Inv
vestigation
Job Haza
ard Analysis
ent 2 Safety
Eleme
General Requirements
Houseke
eeping
Hazardous Substances
s and Dangerou
us Goods
Emergen
ncy Response
Isolation
Personal Protective Equipment
Powder Actuated
A Powe
ered Tools
Mobile Plant
P and Vehic
cles
Tools
Cranes and
a Lifting Equipment
Excavation
Fire Prev
vention and Pro
otection
Fall Prev
vention and Pro
otection
Scaffoldiing
Barricades
Electronic do
ocuments once prin
nted, are uncontrolled and may becomme outdated. Refer to the electronic d ocuments in InfoW
Works for current revvisions.
Bechtel Confidential © Bechtel Corpo
oration 2016.
Floor and
d Wall Opening
gs
Confined
d Space
Suspend
ded Personnel Platforms
Portable Ladders
Elevated
d Working Platfforms
Compres
ssed Gas Cylin
nders
Electrica
al Equipment
Traffic Management
M
Night Wo
ork and Extend
ded Work Hours
Work Ov
ver Water
ent 3 Health
Eleme
Medical and First Aid
Health and Hygiene
Drinking Water and Ice
e
Bloodborrne Pathogens
s
Radiation
Respiratory Protection
Noise
ent 4 Environm
Eleme ment
Field Inspection
Construc
ction Environmental Control Plan
P
Permits and
a Approvals
Electronic do
ocuments once prin
nted, are uncontrolled and may becomme outdated. Refer to the electronic d ocuments in InfoW
Works for current revvisions.
Bechtel Confidential © Bechtel Corpo
oration 2016.
Attachmen
nt C-2 – Personal ES&H E
Engagementt Matrix
K
Key Functio
onal Line / Ma
anagement
D - Daily
ES&H Representative
ESH Manager / ES&H
W – Weekly / WW
W – Twice Weekly
W
Contractor Manager
Foremen /General
Construction Site
B – Bi-Weekly
Superintendent
Field Engineer
M - Monthly
Supervisor
A - Annually
Foremen
Manager
Leads
A
AR - As Required
Lead M
Zero Accident Team Meeting
M
Attend M M AR
Contrac
ctor H&S Committee Lead M
Meeting
g Attend M M M
Attend W W
Area Ins
spections
Lead M B B W W
Engagementt IIndicators
Attend WW WW D AR W
WW D D D
di t
Audits Attend M M AR
K ESH E
Inductio
ons Attend AR AR AR
Lead Q Q Q B W
Key
Toolbox
x Meetings
Attend W W W W W W W
Develop AR A
AR
Job Haz
zard Analysis
Review AR AR
R AR A
AR AR
Incidentt Investigation
n – Serious Participate AR AR AR A
AR AR AR
Incidentt Investigation
n – Non- Review AR AR AR
Serious Participate AR A
AR AR A
AR AR
Electronic do
ocuments once prin
nted, are uncontrolled and may becomme outdated. Refer to the electronic d ocuments in InfoW
Works for current revvisions.
Bechtel Confidential © Bechtel Corpo
oration 2016.