You are on page 1of 30

Plan & Profile

BIRHU
LATHIANI

LEGEND
Proposed Center Line
Proposed Median
Proposed Carriageway Edge
Proposed Toe Line
Proposed Right of Way
Existing Right of Way
Proposed Box Culvert

Proposed Vehicular Underpass

Proposed Vehicular Overpass

Toe Wall Toe Wall


Proposed ROW
Proposed Carriageway Retaining Wall / Brest Wall
Proposed Center Line Gate Temporary/Permanents
GPS GP

TBM
Temporary Bench Mark
Religious Structures
Telephone Box T B

Transformer Points
TRF

Pylon
Lamp Post
AT CH : 0+798
HIP NO : 3

CH.0+800
Ls(m) 45.000 TBM
Tree-T1,T2,T3,T4,T5,T6,
R(m) 125
S.T.(m) 15.046
28.3910 Tube Well
CH.0+

Well
Dc(deg) Tube Well, Well
L.T.(m) 351
Lc(m) 61.940
D(deg) 49.0175
Ts(m) 79.772 Hand Pump
7.00

CH
13.119 e%=
CH.0+

Es(m)
DESIGN SPEED (V) : 50
kmph Kilometer Stone KM
STONE
000

.0
CH
OFC Pillar

CH.1+0
+90
CH.0+

CS 828
PROW

.0+
Petrol Pump
100

Propo

SC
PROW OW
PR se
Ch.0+ d Bus Sto

0
PROW
CH.0+30

76

ST
70
North Symbol

.31
PR
142 ( p PROW
PROW

6.37
PROW O PROW
LHS)

CH.0+400

873
Taper =
W
W

100m PROW W

CH.0+500
2

PRO

CH.0

0
PRO

0
TS
<<TOVILL.UNA PRO Railway Track

.31
W
00

0
PROW

72
OW PRO
PR

1.3
PROW
4m
4m PROW W Existing Paved Road

7
PROW Taper=90 PROW PRO

+600
m OW W
Existing Unpaved Road
PROW PROW PR
0

PRO
PROW W
PROW
OW PROW PROW Telephone Line
Traffic P PROW
PR W PROW TP

Atten ROW PRO PROW


PROW
uator PROW PRO
High Tension Lines
S

W
PROW PROW OW OW
PR
TART

PROW PR PRO
PROW

PC
PROW W Low Tension Line LT
PROW PROW OW RO
W PRO
PR

899
PROW P W Canal
PROW PROW PROW PROW PROW PRO
Drain
PROW PROW

.99
PROW PROW PROW W Invert Level
OF

Propo OW PROW
PROW PR HFL Line
se
Ch.0+ d Bus Sto
PROW

MATCH
PROW
PROJ

W
100 ( p Water Pipe Line
PC 22

ST
RHS) PROW PR WPL
PROW

64
PROW OW Building

9.9
4.99

PROW PR
PLAN

4
PROW
ECT

CS
PROW PROW W
PT 402.02

PROW PROW PROW PRO

SC 582.

LINE
Str. No. : 1/ PROW PROW

TS 537.66
PROW

604
1 R - Radius of Curve
Proposed C Str. N

.94
hainage: 0+ o
Existing Type 030 Prop . : 1/2 Dc - Degree of Curvature

66
: --NA-- osed Lc - Length of Circular Curve
Existing Siz Exist Chain
ing T a
Proposed Ty
e : --NA--
Exist ype : ge: 0+20 Str. No. : 1/3 HIP NO : 4 AT CH : 1+006 Ts - Tangent Length
in --N 0 Str. No. : 1/4
Proposed S
pe : Box Cul
vert Prop g Size : - A-- Proposed Chainage: 0+2 Proposed Chainage:
R(m) -500 Ls(m) 00 Es - Apex Distance
ize : 1x2x2. osed -NA-- 60 0+402
Proposal : N 0m Prop T ype : Existing Type : --NA-- Dc(deg) 23.8512 S.T.(m) 00
LS - Length of Spiral Curve
os VOP Existing Type : --NA--
ew Constru Prop ed Size :
Lc(m) 208.141 L.T.(m) 00
ction osal Existing Size : --NA-- Existing Size : --NA-- S - Shift
: New 1x20.610
Ts(m) 105.600 D(deg) 23.8512

cons x5 Proposed Type : Box Cul Proposed Type : Box - Deflection Angle
tructio .5m
Es(m) 11.030 e%= 2.50
vert Culvert
n Proposed Size : 1x2x2. Proposed Size : 1x3x3. DESIGN SPEED (V) : 50 kmph
V - Design Speed Km/Hr
0m
Proposal : New Constru 0m Str. No. : 1/6
ction Proposal : New Const e: 0+778 e% - Superelevation
ruction Proposed Chainag
Str. No. : 1/5 Ty pe : --N A-- PC - Point of Curvature
Existing
HIP NO
:1 Proposed Chainage: 0+680 A-- PT - Point of Tangent
R(m) AT CH : Existing Size : --N
-1000 0+314 AT CH : 0+594 Existing Type : --NA-- x Culvert
Proposed Type :Bo
Dc(deg) Ls(m) HIP NO : 2 HIP - Horizontal Intersection Point
10.1430 00 Ls(m) 45.000
Lc(m) S.T.(m) R(m) -125 Existing Size : --NA-- Siz e : 1x2x 2.0m L - PROFILE
177.028 00
Dc(deg) 10.2128 S.T.(m) 15.046 Proposed
Ts(m) L.T.(m) Proposed Type : VOP nstruction
Proposal : New Co
00 351 G - Gradient %
88.746
Lc(m) 22.281 L.T.(m)
D(deg)
Es(m)
3.930 10.1430
Ts(m) 57.138 D(deg) 30.8392 Proposed Size :1 x 20.610 x 5.5m Lv - Length of Vertical Curve
DESIGN e %= L - Length of Grade(m)
SPEED (V
) : 50 km
ph
2.50
Es(m) 5.367 e%= 7.00 Proposal : New construction K - Ratio Between vertical curve Length &
kmph
DESIGN SPEED (V) : 50 Change of Gradient {Lc/(G2-G1)}
e - Superelevation (%)
D - Straight Length of Horizontal Alignment
Lc - Length of Circular Curve

REVISION DATE AMENDMENT \ ISSUE DESCRIPTION CLIENT CONSULTANT: RODIC CONSULTANTS PVT. LTD. Project CONSTRUCTION OF MISSING LINK FROM BIRHU TO LATHIANI INTO 4-LANE & PAVED SHOULDER
R0 Aug-22 2 Lane Standard 1, JAI SINGH MARG (FIRST FLOOR), YMCA CONFIGURATION FROM KM 35/550 (DESIGN CHAINAGE 0.000) TO 42/800 (DESIGN CHAINAGE 8.153) ON
DETAILED PROJECT REPORT
Ministry of Road Transport & Highways CULTURAL CENTRE BUILDING NH-503A INCLUDING CABLE STAYED BRIDGE (0.860 KM) ON BACK WATER OF GOVIND SAGAR RESERVOIR
R1 Feb-23 4 Lane Standard
Government of India NEW DELHI - 110001 (INDIA) AND ITS APPROACHES IN HIMACHAL PRADESH ON EPC MODE
R2 Nov-23 4 Lane Standard Designed:
(Ministry of Road Transport & Highways Transport Bhawan, 1, Parliament Street New In Association with Scale PLAN & PROFILE
Drawn: H=:-1:2500 Drawing Title (Km.0+000 to Km.1+000)
Delhi-110001) Monarch Surveyors and Engineering
Consultants Pvt. Ltd.,
Checked: V=:-1:250
Approved:
Sheet size: A2 RC/1587/HO/HWB/RD/DWG/P&P/01 /R2
BIRHU
LATHIANI

602

600

598 Proposed Road Level at Centerline (m)

596 Existing Ground/Road Level at Centerline (m)

594 Ground/Road Level at 15 Right Side(m ) LEGEND


Proposed Center Line
Str. No. : 1/2 Ground/Road Level at 15 Left Side(m )
592 Proposed Chainage: 0+200 Proposed Median
Existing Type : --NA-- Str. No. : 1/4 Proposed Carriageway Edge
590 Existing Size : --NA-- Proposed Chainage: 0+402
Proposed Toe Line
Proposed Type : VOP Existing Type : --NA--
Proposed Size : 1x20.610x5.5m Existing Size : --NA-- Proposed Right of Way
588 Str. No. : 1/5
Proposal : New construction Proposed Type : Box Culvert Existing Right of Way
Proposed Chainage: 0+680
Proposed Size : 1x3x3.0m
586 Existing Type : --NA-- Proposed Box Culvert
Str. No. : 1/3 Proposal : New Construction
Existing Size : --NA--
Proposed Chainage: 0+260
Proposed Type : VOP Proposed Vehicular Underpass
584 Str. No. : 1/1 Existing Type : --NA--
Proposed Size : 1x20.610x5.5m
Proposed Chainage: 0+030 Existing Size : --NA--
Proposal : New construction
582 Existing Type : --NA-- Proposed Type : Box Culvert Proposed Vehicular Overpass
Existing Size : --NA-- Proposed Size : 1x2x2.0m
Str. No. : 1/6 Toe Wall Toe Wall
Proposed Type : Box Culvert Proposal : New Construction

Chainage=445.270m
580 Proposed Size : 1x2x2.0m
Proposed Chainage: 0+778
Existing Type : --NA--

Level=574.311m
Retaining Wall / Brest Wall

Chainage=329.713m
Proposal : New Construction

Chainage=545.270m
578 Existing Size : --NA--
Gate Temporary/Permanents

Level=573.048m
Proposed Type : Box Culvert

Level=572.618m
Proposed Size : 1x2x2.0m GPS GP
576

Chainage=229.713m
Proposal : New Construction

Chainage=613.844m
Level=570.002m
Temporary Bench Mark

Level=569.545m
574
Religious Structures

Chainage=673.844m

Chainage=678.572m
572 Telephone Box

Level=567.269m
T B

Level=567.122m
Transformer Points

Chainage=738.572m
TRF
570 Pylon

Level=564.690m
Lamp Post
568
Tree-T1,T2,T3,T4,T5,T6,
566 Tube Well, Well
Tube Well Well

Hand Pump
Chainage=0.000m

564
Level=558.516m

Kilometer Stone KM
STONE

OFC Pillar
562
Petrol Pump
560 North Symbol
Railway Track
558
Existing Paved Road
Existing Unpaved Road
556
Telephone Line TP

554 High Tension Lines


Low Tension Line LT

552 Drain Canal


Invert Level
HFL Line
550 Water Pipe Line WPL

Building
548
PLAN
R - Radius of Curve
546
Dc - Degree of Curvature
Lc - Length of Circular Curve
544
Ts - Tangent Length

DATUM (m)= 542


452
Es - Apex Distance
LS - Length of Spiral Curve
Proposed Road Level at S - Shift
558.516

559.766

561.016

562.266

563.516

564.766

566.016

567.266

568.516

569.766

570.936

571.866

572.551

572.993

573.270

573.543

573.817

574.090

574.357

574.390

574.075

573.411

572.406

571.286

570.166

569.060

568.075

567.233

566.384

565.340

564.119

562.869

561.619

560.369

559.119

557.869

556.619

555.369

554.119

552.869

551.619
Centerline (m) - Deflection Angle
V - Design Speed Km/Hr
Existing Ground/Road Level at e% - Superelevation
561.711

559.207

566.992

565.444

567.326

572.797

576.660

575.754

576.757

575.136

569.012

572.287

574.004

574.912

576.015

577.526

579.451

586.402

590.401

589.374

589.186

589.027

584.401

576.360

576.761

576.858

575.190

575.001

578.965

577.949

574.439

563.628

564.700

569.263

566.079

563.868

563.756

560.503

562.306

558.775

554.493
Centerline (m) PC - Point of Curvature
PT - Point of Tangent
Ground/Road Level at 15m
574 .358 574 .370

560.002
HIP - Horizontal Intersection Point
560.846

558.662

565.068

564.845

569.840

574.249

579.134

575.065

574.942

569.129

572.744

572.060

569.514

571.105

572.510

569.294

577.472

582.694

581.297

580.744

581.445

577.684

575.340

574.919

574.353

573.088

576.857

578.838

571.769

568.458

560.651

562.871

561.924

563.782

562.868

558.424

555.529

551.866

550.036
Left Side (m) L - PROFILE
G - Gradient %
563.571

566.734

566.440

566.161

568.089

571.300

573.937

576.691

579.471

573.713

572.688

574.929

578.159

583.908

585.151

586.592

592.009

596.765

597.451

598.719

597.720

590.927

584.827

579.099

579.042

577.545

577.403

576.719

581.192

581.678

574.246

569.392

574.400

573.822

573.012

569.741

566.752

565.025

561.090

560.754
Ground/Road Level at 15m Lv - Length of Vertical Curve
L - Length of Grade(m)
Right Side (m) K - Ratio Between vertical curve Length &
Change of Gradient {Lc/(G2-G1)}
Proposed Vertical Alignment L=229.71m L=115.56m G=-4.48% K=43.70 G G=-5.00% e - Superelevation (%)
Lv=100.00m Lv=100.00m Lv=60.00m Lv=60.00m D - Straight Length of Horizontal Alignment
Schematic G=5.00% K=-25.59 G=1.09% K=-17.94 L=68.57m L K=-31.70 L=396.43m Lc - Length of Circular Curve

Lc=61.9m Ls=45.0m
Proposed Horizontal Alignment D=225.0m Lc=177.0m D=135.6m Ls=45.0m D=71.4m Ls=45.0m D Lc=208.1m
L Ls=45.0m R=125.0m
Schematic R=-1000.0m R=-500.0m
R
e=7.0% e=7.0%
Superelevation/Crossfall (%)
e=2.5% e=7.0% e=2.5% e=2.5% e=7.0%

Chainage (Km)

1+000
100

125

150

175

200

225

250

275

300

325

350

375

400

425

450

475

500

525

550

575

600

625

650

675

700

725

750

775

800

825

850

875

900

925

950

975
25

50

75
0

REVISION DATE AMENDMENT \ ISSUE DESCRIPTION CLIENT CONSULTANT: RODIC CONSULTANTS PVT. LTD. Project CONSTRUCTION OF MISSING LINK FROM BIRHU TO LATHIANI INTO 4-LANE & PAVED SHOULDER
R0 Aug-22 2 Lane Standard 1, JAI SINGH MARG (FIRST FLOOR), YMCA CONFIGURATION FROM KM 35/550 (DESIGN CHAINAGE 0.000) TO 42/800 (DESIGN CHAINAGE 8.153) ON
DETAILED PROJECT REPORT
Ministry of Road Transport & Highways CULTURAL CENTRE BUILDING NH-503A INCLUDING CABLE STAYED BRIDGE (0.860 KM) ON BACK WATER OF GOVIND SAGAR RESERVOIR
R1 Feb-23 4 Lane Standard
Government of India NEW DELHI - 110001 (INDIA) AND ITS APPROACHES IN HIMACHAL PRADESH ON EPC MODE
R2 Nov-23 4 Lane Standard Designed:
(Ministry of Road Transport & Highways Transport Bhawan, 1, Parliament Street New In Association with Scale PLAN & PROFILE
Drawn: H=:-1:2500 Drawing Title (Km.0+000 to Km.1+000)
Delhi-110001) Monarch Surveyors and Engineering
Consultants Pvt. Ltd.,
Checked: V=:-1:250
Approved:
Sheet size: A2 RC/1587/HO/HWB/RD/DWG/P&P/01A/R2
BIRHU
LATHIANI

49
2+0 :
3/1 inage
ha
C
Str osed
o .:
p
.N
Pro
oad
kR

LEGEND
/Lin
Slip
OW W O
PR PR

00
RO
W Proposed Center Line

1
P oad OW

.7
kR
/Lin PR

95
Slip

.2+
OW Proposed Median

1
20
PR

.7
80
SC
OW

20
CH
W
PR
O d
oa
kR PR Proposed Carriageway Edge

TS
/Lin p
Sli

0
OW OW
Proposed Toe Line

+20
PR PR

NE
Proposed Right of Way

LI
OW

.2
PR OW
m PR Existing Right of Way

CH
30
r=

CH
pe
Ta

AT
OW Proposed Box Culvert

9
PR OW

.0
M
PR

83
0
AT CH : 1+908

19
HIP NO : 7

+1
Proposed Vehicular Underpass

ST
OW W R(m) -125 Ls(m) 45.000
PR O

.2
PR S.T.(m) 15.046
Dc(deg) 27.6896
Proposed ROW

CH
Lc(m) 60.409 L.T.(m) 351
09
OW Proposed Vehicular Overpass

W
PR 8. D(deg) 48.3161

O
Ts(m) 78.845
Proposed Carriageway

PR
3
19 Es(m) 12.737 e%= 7.00
CS Toe Wall Toe Wall
Proposed Center Line W
PR
O DESIGN SPEED (V) : 50 kmph

OW
PR
0
Retaining Wall / Brest Wall

W
O
+0

PR
Gate Temporary/Permanents

OW
.2

PR
CH
GPS

OW
GP

PR
8
1877.6

PROW
SC Temporary Bench Mark
00
1+9

PROW
. Religious Structures
CH

Proposed Bus Stop


Ch.1+840 (LHS)
Telephone Box

PROW
T B

PROW
Transformer Points
TRF

TS 1832.68 Pylon

PROW
Lamp Post

PROW
Tree-T1,T2,T3,T4,T5,T6,
CH.1+800

PROW
TB
M
Slip/Link Road ST 1792.01 Tube Well, Well
Tube Well Well

PROW
Hand Pump
Kilometer Stone

PROW
CH
KM
STONE

ad
l Ro

CH.1+600
.1

PROW
CH.1+500
a OFC Pillar

CH.1+400
CH.

Loc +7

CH.1+300
CH.1+200

Proposed Bus Stop


0 0 CS 17 Petrol Pump
CH.1+100

PROW
47.01
CH.1+000
0+90

0+000
55 North Symbol
Ch.1+190 (LHS) 0+1

OW
PR
Railway Track
0

0+

OW
ST 8

Traffic Attenuator PROW


PROW PROW Existing Paved Road

1
OW

PR
PROW
PROW PROW PROW

00
PR
73.3

PROW PR
Existing Unpaved Road
PT 1237.99

PROW OW OW
PROW PR
1

PC 1140.8

PRO Str. No

W
W Taper=90m
PROW Telephone Line TP

O
PROW PROW PROW PROW . : 2/3

PR
PRO PROW PROW PROW PROW
W PROW PROW PROW PROW Slip/Link Road Propo
PROW PROW PROW Tap er=40m 4.m
4.m
Slip/Link Road
sed Ch High Tension Lines
PROW
Existin ain
PROW PROW OW g Type age: 1+640
0

PROW PROW Low Tension Line


PROW PROW PR Existin : --NA--
LT

g Size
Propo : Drain Canal
PR
OW
sed Ty --NA-- Invert Level

SC 1
Slip/Link Road
Slip/Link Road
Propo pe
sed Siz : VUP
PRO PROW

TS 1588.58
HFL Line
PC 8

W PROW PROW
PROW PROW PROW
PROW e : 1x1

633.5
PRO
W PROW PROW PROW PROW PROW Propo 2x5.5m
PROW PROW PROW 4.m
4.m
sal : N Water Pipe Line
99.9

Taper=85m
PROW
PROW
PROW ew con WPL
structi
PT 1108.1

8
PROW PROW
PROW

on
9

PROW PROW Building


PROW

PROW PROW Taper=90m


MATCH LIN

Str. No. : 2/2


Proposed Chainage: 1+548 PLAN
3

Existing Type : --NA-- R - Radius of Curve


Proposed Bus Stop
PROW
PROW

Existing Size : --NA-- Dc - Degree of Curvature


Ch.1+190 (RHS) Proposed Type :Box Culvert Lc - Length of Circular Curve
Str. No. : 2/1 Proposed Size : 1x2x2.0m
E

Ts - Tangent Length
Proposed Chainage: 1+249 PROW Proposal : New Construction TB
M
Es - Apex Distance
Existing Type : Slab Culvert LS - Length of Spiral Curve
AT CH : 1+006
HIP NO : 4
00
Existing Size : 1x1.6 S - Shift
Ls(m)
R(m) -500
00 Proposed Type : Box Culvert HIP NO : 6 AT CH : 1+697
Dc(deg) 23.8512 S.T.(m)
R(m) -100 Ls(m) 45.000
TB
M
- Deflection Angle
208.141 L.T.(m) 00 Proposed Size : 1x3x3.0m
Lc(m) Dc(deg) 64.9868 S.T.(m) 15.073 V - Design Speed Km/Hr
Ts(m) 105.600 D(deg) 23.8512
AT CH : 1+189 Proposal : Reconstruction Lc(m) 113.423 L.T.(m) 380
2.50 HIP NO : 5 e% - Superelevation
11.030 e%= Ls(m) 00 90.7699
Es(m) R(m) 1000 Ts(m) 124.669 D(deg)
DES IGN SPEED (V) : 50
kmph
5.5681 S.T.(m) 00
Es(m) 43.580 e%= 7.00 PC - Point of Curvature
Dc(deg)
L.T.(m) 00
Lc(m) 97.182 DESIGN SPEED (V) : 50 kmph PT - Point of Tangent
D(deg) 5.5681
Ts(m) 48.629 HIP - Horizontal Intersection Point
e%= 2.50
Es(m) 1.182
L - PROFILE
(V) : 50 kmph
DESIGN SPEED
G - Gradient %
Lv - Length of Vertical Curve
L - Length of Grade(m)
K - Ratio Between vertical curve Length &
Change of Gradient {Lc/(G2-G1)}
e - Superelevation (%)
D - Straight Length of Horizontal Alignment
Lc - Length of Circular Curve

REVISION DATE AMENDMENT \ ISSUE DESCRIPTION CLIENT CONSULTANT: RODIC CONSULTANTS PVT. LTD. Project CONSTRUCTION OF MISSING LINK FROM BIRHU TO LATHIANI INTO 4-LANE & PAVED SHOULDER
R0 Aug-22 2 Lane Standard 1, JAI SINGH MARG (FIRST FLOOR), YMCA CONFIGURATION FROM KM 35/550 (DESIGN CHAINAGE 0.000) TO 42/800 (DESIGN CHAINAGE 8.153) ON
DETAILED PROJECT REPORT
Ministry of Road Transport & Highways CULTURAL CENTRE BUILDING NH-503A INCLUDING CABLE STAYED BRIDGE (0.860 KM) ON BACK WATER OF GOVIND SAGAR RESERVOIR
R1 Feb-23 4 Lane Standard
Government of India NEW DELHI - 110001 (INDIA) AND ITS APPROACHES IN HIMACHAL PRADESH ON EPC MODE
R2 Nov-23 4 Lane Standard Designed:
(Ministry of Road Transport & Highways Transport Bhawan, 1, Parliament Street New In Association with Scale PLAN & PROFILE
Drawn: H=:-1:2500 Drawing Title (Km.1+000 to Km.2+000)
Delhi-110001) Monarch Surveyors and Engineering
Consultants Pvt. Ltd.,
Checked: V=:-1:250
Approved:
Sheet size: A2 RC/1587/HO/HWB/RD/DWG/P&P/02 /R2
BIRHU
LATHIANI

570

568

566

564

562 LEGEND
Proposed Road Level at Centerline (m) Proposed Center Line
560 Existing Ground/Road Level at Centerline (m) Proposed Median
Proposed Carriageway Edge
558 Str. No. : 2/1 Ground/Road Level at 15 Right Side(m ) Proposed Toe Line
Proposed Chainage: 1+249
556 Existing Type : Slab Culvert Ground/Road Level at 15 Left Side(m ) Str. No. : 2/3 Proposed Right of Way
Existing Size : 1x1.6 Proposed Chainage: 1+640
Existing Right of Way
Existing Type : --NA--
554 Proposed Type : Box Culvert
Proposed Box Culvert
Proposed Size : 1x3x3.0m Existing Size : --NA--
Proposal : Reconstruction Proposed Type : VUP
552 Proposed Size : 1x12x5.5m Proposed Vehicular Underpass

Chainage=1135.000m
Proposal : New construction
Str. No. : 2/2

Chainage=1806.165m
550 Proposed Vehicular Overpass

Level=544.869m
Proposed Chainage: 1+548

Chainage=1681.165m

Level=544.073m
Chainage=1195.000m
Existing Type : --NA-- Toe Wall Toe Wall
548 Existing Size : --NA--

Level=542.858m
Level=542.630m
Proposed Type :Box Culvert Retaining Wall / Brest Wall
546 Proposed Size : 1x2x2.0m
Gate Temporary/Permanents
Proposal : New Construction

Chainage=1994.771m
544 GPS GP

Chainage=1562.655m

Level=538.309m
Chainage=1472.677m
542 Temporary Bench Mark

Chainage=1472.655m

Level=536.933m
Religious Structures

Level=535.791m
540 Telephone Box T B

Transformer Points
538 TRF

Pylon

536 Lamp Post


Tree-T1,T2,T3,T4,T5,T6,
534 Tube Well, Well
Tube Well Well

Hand Pump
532
Kilometer Stone KM
STONE

530 OFC Pillar


Petrol Pump
528
North Symbol

526 Railway Track


Existing Paved Road
524 Existing Unpaved Road
Telephone Line TP

522 High Tension Lines


Low Tension Line LT

520 Canal
Drain
Invert Level
HFL Line
518
Water Pipe Line WPL

516 Building
PLAN
514 R - Radius of Curve
Dc - Degree of Curvature
DATUM (m)= 512
452 Lc - Length of Circular Curve
Ts - Tangent Length

543.686

544.431

544.773

544.712

544.249

543.497

542.733

541.969

541.205

540.441

539.677

538.913

538.160
Proposed Road Level at
558.516
551.619

550.369

549.119

547.869

546.619

545.369

544.166

543.207

542.507

541.891

541.275

540.659

540.044

539.428

538.812

538.196

537.581

536.965

536.349

535.736

535.428

535.638

536.366

537.550

538.800

540.050

541.300

542.550
Es - Apex Distance
Centerline (m) LS - Length of Spiral Curve
S - Shift

545.860

551.300

555.516

556.811

555.192

545.101

541.780

538.770

539.778

536.960

537.586

535.103

533.200
Existing Ground/Road Level at
561.711
554.493

550.362

546.198

544.699

543.690

542.993

541.717

541.318

540.195

539.570

539.017

539.232

539.032

538.878

537.775

536.977

536.114

535.274

535.252

534.940

534.159

534.012

533.368

533.849

534.391

532.507

534.918

540.915
- Deflection Angle
Centerline (m) V - Design Speed Km/Hr
e% - Superelevation

542.940

547.475

552.347

554.080

544.661

537.683

539.334

539.546

540.754

539.304

539.473

540.334

540.620
Ground/Road Level at 15m
560.846
550.036

548.473

545.284

544.567

543.806

543.203

541.751

540.552

540.604

539.460

539.184

540.273

539.609

539.345

538.567

537.711

536.602

535.873

536.559

534.763

534.205

534.172

531.963

534.326

532.171

533.105

534.781

539.489
PC - Point of Curvature
Left Side (m) PT - Point of Tangent
HIP - Horizontal Intersection Point
563.571
560.754

557.308

548.323

546.105

543.686

542.381

541.752

541.439

540.405

539.804

538.855

538.097

536.783

538.033

536.861

536.552

535.275

534.559

535.294

534.702

533.938

534.508

533.715

533.348

532.361

533.114

537.440

542.108

547.505

553.263

557.809

558.195

554.679

546.634

542.191

540.100

538.053

530.310

529.615

525.452

528.918
Ground/Road Level at 15m
L - PROFILE
Right Side (m) G - Gradient %
Lv - Length of Vertical Curve
Proposed Vertical Alignment K=23.65 G=-2.46% K=12.06 L=118.51m G=-3.06% L - Length of Grade(m)
Lv=60.00m Lv=90.00m Lv=125.00m K - Ratio Between vertical curve Length &
Schematic L=277.65m G=5.00% K=-15.52 L=188.61m Change of Gradient {Lc/(G2-G1)}
e - Superelevation (%)
Proposed Horizontal Alignment D=32.7m Lc=97.2m D=350.6m Ls=45.0m Lc=113.4m D=40.7m Ls=45.0m Lc=60.4m D - Straight Length of Horizontal Alignment
Lc=208.1m m Ls=45.0m
R=-500.0m R=1000.0m Ls=45.0 Lc - Length of Circular Curve
Schematic R=-125.0m
R=-100.0m
e=7.0% e=5.7%
Superelevation/Crossfall (%)
e=2.5% e=7.0% e=2.5% e=5.7%

1+700

1+725

1+750

1+775

1+800

1+825

1+850

1+875

1+900

1+925

1+950

1+975

2+000
Chainage (Km)
1+000

1+025

1+050

1+075

1+100

1+125

1+150

1+175

1+200

1+225

1+250

1+275

1+300

1+325

1+350

1+375

1+400

1+425

1+450

1+475

1+500

1+525

1+550

1+575

1+600

1+625

1+650

1+675
0

REVISION DATE AMENDMENT \ ISSUE DESCRIPTION CLIENT CONSULTANT: RODIC CONSULTANTS PVT. LTD. Project CONSTRUCTION OF MISSING LINK FROM BIRHU TO LATHIANI INTO 4-LANE & PAVED SHOULDER
R0 Aug-22 2 Lane Standard 1, JAI SINGH MARG (FIRST FLOOR), YMCA CONFIGURATION FROM KM 35/550 (DESIGN CHAINAGE 0.000) TO 42/800 (DESIGN CHAINAGE 8.153) ON
DETAILED PROJECT REPORT
Ministry of Road Transport & Highways CULTURAL CENTRE BUILDING NH-503A INCLUDING CABLE STAYED BRIDGE (0.860 KM) ON BACK WATER OF GOVIND SAGAR RESERVOIR
R1 Feb-23 4 Lane Standard
Government of India NEW DELHI - 110001 (INDIA) AND ITS APPROACHES IN HIMACHAL PRADESH ON EPC MODE
R2 Nov-23 4 Lane Standard Designed:
(Ministry of Road Transport & Highways Transport Bhawan, 1, Parliament Street New In Association with Scale PLAN & PROFILE
Drawn: H=:-1:2500 Drawing Title (Km.1+000 to Km.2+000)
Delhi-110001) Monarch Surveyors and Engineering
Consultants Pvt. Ltd.,
Checked: V=:-1:250
Approved:
Sheet size: A2 RC/1587/HO/HWB/RD/DWG/P&P/02A/R2
BIRHU .13
108
PT 1
LATHIANI

PRO
PRO

W
W
0
+10 1
CH.

PRO
PRO

W
W
0.80
114
PC

PRO

Ch osed
P ro
W

.1
p
+ 190 us S
PR

(LH top
B
OW

S)
PR
OW
200 +
H.1 C LEGEND
TaP
pR
erO9
7.9 Proposed Center Line
=4W

123
Proposed ROW
0m

PT
Proposed Median
Proposed Carriageway
Proposed Carriageway Edge
PR

Proposed Center Line


OW

Slip/Link Road Proposed Toe Line


OW

616
AT CH : 2+
PR

10 45.000
HIP NO :
PR

Ls(m) Proposed Right of Way


OW

100 15.073
R(m) S.T.(m)
52.4610
Dc(deg) L.T.(m)
380 Existing Right of Way
91.562 78.2441
0 Lc(m) D(deg)

CH.2+600
+30 .1 Ts(m)
104.479
29.984
e%=
7.00 Proposed Box Culvert
Es(m)
CH DESIGN SP
EED (V) :
50 kmph
Tr

Proposed Vehicular Underpass


a ff icA

Proposed Vehicular Overpass


tten

W
O
PR
ua

Toe Wall Toe Wall

Taper=3
tor

SC 2

W
PR
Str. No. : 3/3

O
CH

OW

0m
PR
Retaining Wall / Brest Wall

567.0
PROW CH Proposed Chainage: 2+848

4m
.2+

4.m
W
PRO

CS
Gate Temporary/Permanents
op Existing Type : --NA--

5
TS
St
PR .2

26
0 OW OW

50
+40 PR Existing Size : --NA--

25
s S)
+7

58
u GPS GP

22

.61
. 1 B H

CH
0 Proposed Type : Viaduct Cum Bridge

0
d (L PR

.0 5
H W 0
C RO OW
o se 70 P
Proposed Size : 2x30m

.2+
op +4 W
ST
Proposal : New construction
Temporary Bench Mark
Pr h.2 PRO
PROW
PROW 27

PR
40
03
C W PR Religious Structures

O
ad
OW
O
.6

W
Ro OW
PR PR
ink
1

0
p/L
Sli
Telephone Box T B

OW PR

PT

PR
OW PR
PR O

O
W
CH Transformer Points

W
24
TRF

0
OW

2.7
OW
PR PR
.2
Pylon

1
+8

PR
CH

PR

O
OW

W
O
OW
00

W
PR Lamp Post
PR

.2
+3
OW

PR
Tree-T1,T2,T3,T4,T5,T6,

TBM

PR
W PR

O
O

W
O
PR

W
PC
Tube Well Well

0
RO
W Tube Well, Well

23
W P

PR
18
RO

PR
Hand Pump

O
.3
P d

W
O
a
Ro W

W
ink
O
p/L PR
Sli CH
O
W PROW Kilometer Stone KM
STONE

PROW

PR
PR

CH.3+100
PROW
PR
CH

PROW
Str. No. : 3/2
W

O
RO
.2 PROW

W
O
OFC Pillar
age: 2+521
P PROW

W
+9
Proposed Chain

CH.3+000
.

W
2+

O
--NA--
PR :
00 Petrol Pump
Existing Type
W

PR

PROW
O

PR
PR

O
20

A--

W
O
Si ze : --N

W
ing

PROW
W Exist North Symbol
x Culvert
0

RO : Bo
P
kR
oa
d
O
W
Proposed Ty pe

PR
in
PR 2.0m Railway Track

PR
/L
: 1x 2x

O
Proposed Size
p
Sli
CH

W
O

PROW
W
W

TBM
PR
O
al : Ne w Co ns truction Existing Paved Road
Propos

TS 3093.5
OW PR
.2+

PR

TBM
O

PR
W
Existing Unpaved Road
OW

O
W
d TS
PR oa
10

kR OW PR
/Lin
PR
28
OW Telephone Line TP

9
Slip 98
0

.3

PR
OW
CH

High Tension Lines


1

O
PR
Taper=3

W
W
O
Ro
ad PR Low Tension Line LT
.2+

0m

W ink PR
RO p/L
CH.1+900

OW

SC
Sli
ST

P
Drain Canal
OW

29
21
000

PR Invert Level
CS

OW
75

PR

43
PR OW PROW HFL Line
.6

.31
21

PROW

ST 3039.0
4

CS 2994.04
PROW
6

W OW PROW
RO
0.

PROW
P PR Water Pipe Line
64

MATCH LINE
WPL

OW
PR OW Building
PR

4
OW PLAN
SC

PR W
O
TS

PR
209

PR
OW Str. No. : 3/1 AT CH : 2+361 R - Radius of Curve
208

OW HIP NO : 9

HI
.71

PR 00
Proposed Chainage: 2+049 Ls(m)

P
Dc - Degree of Curvature
0.7

R(
PRO 500

NO
R(m)

m
S.T.(m) 00

Dc
PROW OW

)
1

Existing Type : --NA--

:1
Dc(deg) 9.6706
PR Lc - Length of Circular Curve

(d

1
Lc
00

eg
L.T.(m)

(m
84.392

)
Ts
Existing Size : --NA-- Lc(m)

-1
)
OW 9.6706 Ts - Tangent Length

(m
D(deg)

00
TBM

Es
PR 42.296

2
)

9.
Ts(m)

(m
Proposed Type :Box Culvert 2.50

DE
ST

0
e%=

50 785
Es - Apex Distance

62
MA 3.09

1.786

.7
OW Es(m)

8
IG

74 .608 ) :

24
PR Proposed Size : 1x6x6.0m
198

Ls
50 kmph

AT
N
D (V) :

(m m)
DESIGN SPEE LS - Length of Spiral Curve

13
SP

S.

CH 45 .073
)
TC

T. m)
W

EE
PRO Proposal : New Construction
CS 1

L.

:2
T.
D
S - Shift

+9 0
D(

(
(V
PROW PROW
H

69
de

.
e

0
938.0

15
g

0
- Deflection Angle

50

)
LIN

38 .845
km

0
54 00
ph
V - Design Speed Km/Hr
9

7.
E

9
e% - Superelevation
AT CH : 2+128
HIP NO : 8 PC - Point of Curvature
-300 Ls(m) 15.000
R(m)
12.4022 S.T.(m) 5.000 PT - Point of Tangent
Dc(deg)
L.T.(m) 100 HIP - Horizontal Intersection Point
DE

Lc(m) 64.938
E
SIG

15.2670
s
Ts(

D(deg) L - PROFILE
(

47.711
m)

Ts(m)
Lc(
m)
NS

Dc

e%= 3.70
m)

R(m O : 7

Es(m) 2.714 G - Gradient %


(de

HIP
P E

DESIGN SPEED (V) : 50 kmph


g
)

Lv - Length of Vertical Curve


E
12.

N
D(

78.
737

60.

L - Length of Grade(m)
V)

845

27.
40

-12
: 50

K - Ratio Between vertical curve Length &


6
9
8
5
9

Change of Gradient {Lc/(G2-G1)}


e

6
km

D(d
%
ph

L.T

e - Superelevation (%)
=

S.
eg
.(m

L
T
)

D - Straight Length of Horizontal Alignment


s
.(
(
)
m)
m)

Lc - Length of Circular Curve


7.0

AT
48.
0

C
5
316

15.
1

H
4 5.0
046

: 1+
1

00
908

REVISION DATE AMENDMENT \ ISSUE DESCRIPTION CLIENT CONSULTANT: RODIC CONSULTANTS PVT. LTD. Project CONSTRUCTION OF MISSING LINK FROM BIRHU TO LATHIANI INTO 4-LANE & PAVED SHOULDER
R0 Aug-22 2 Lane Standard 1, JAI SINGH MARG (FIRST FLOOR), YMCA CONFIGURATION FROM KM 35/550 (DESIGN CHAINAGE 0.000) TO 42/800 (DESIGN CHAINAGE 8.153) ON
DETAILED PROJECT REPORT
Ministry of Road Transport & Highways CULTURAL CENTRE BUILDING NH-503A INCLUDING CABLE STAYED BRIDGE (0.860 KM) ON BACK WATER OF GOVIND SAGAR RESERVOIR
R1 Feb-23 4 Lane Standard
Government of India NEW DELHI - 110001 (INDIA) AND ITS APPROACHES IN HIMACHAL PRADESH ON EPC MODE
R2 Nov-23 4 Lane Standard Designed:
(Ministry of Road Transport & Highways Transport Bhawan, 1, Parliament Street New In Association with Scale PLAN & PROFILE
Drawn: H=:-1:2500 Drawing Title (Km.2+000 to Km.3+000)
Delhi-110001) Monarch Surveyors and Engineering
Consultants Pvt. Ltd.,
Checked: V=:-1:250
Approved:
Sheet size: A2 RC/1587/HO/HWB/RD/DWG/P&P/03 /R2
BIRHU
LATHIANI

562

560

558 Proposed Road Level at Centerline (m)

556 Existing Ground/Road Level at Centerline (m) LEGEND


Proposed Center Line
Str. No. : 3/1 Ground/Road Level at 15 Right Side(m )
554 Proposed Median
Proposed Chainage: 2+049 Str. No. : 3/2
Ground/Road Level at 15 Left Side(m ) Proposed Carriageway Edge

Chainage=2242.323m

Chainage=2392.323m
Existing Type : --NA-- Proposed Chainage: 2+521
552 Existing Size : --NA-- Existing Type : --NA-- Proposed Toe Line

Level=546.381m

Level=546.283m
Proposed Type :Box Culvert Existing Size : --NA-- Proposed Right of Way
550 Proposed Size : 1x6x6.0m Proposed Type : Box Culvert
Proposal : New Construction Proposed Size : 1x2x2.0m Existing Right of Way
548 Proposal : New Construction Proposed Box Culvert

546 Proposed Vehicular Underpass

Chainage=2094.771m
Chainage=1994.771m

544 Proposed Vehicular Overpass

Level=539.211m
Level=538.309m

Elev. = 536.781m

Toe Wall
Ch. = 2044.771m

Toe Wall
542 Str. No. : 3/3
Proposed Chainage: 2+848 Retaining Wall / Brest Wall
540 Existing Type : --NA-- Gate Temporary/Permanents
Existing Size : --NA--
Proposed Type : Viaduct Cum Bridge GPS GP
538
Proposed Size : 2x30m
Proposal : New construction Temporary Bench Mark
536
Religious Structures

Chainage=2748.805m
534 Telephone Box T B

Level=528.497m

Chainage=2808.805m
Transformer Points
TRF
532

Level=527.000m
Pylon
Lamp Post
530
Tree-T1,T2,T3,T4,T5,T6,
528 Tube Well, Well
Tube Well Well

Hand Pump
526
Kilometer Stone KM
STONE

524 OFC Pillar


Petrol Pump
522 North Symbol
Railway Track
520
Existing Paved Road

518 Existing Unpaved Road


Telephone Line TP

516 High Tension Lines


Low Tension Line LT

514 Drain Canal


Invert Level
HFL Line
512 Water Pipe Line WPL

Building
510
PLAN
R - Radius of Curve
508
Dc - Degree of Curvature
Lc - Length of Circular Curve
506
Ts - Tangent Length

DATUM (m)= 504


452
Es - Apex Distance
LS - Length of Spiral Curve
538.160

537.747

537.828

538.405

539.465

540.680

541.894

543.109

544.324

545.539

546.734

547.618

548.091

548.154

547.807

547.049

545.900

544.653

543.405

542.158

540.911

539.663

538.416

537.169

535.921

534.674

533.427

532.179

530.932

529.685

528.438

527.475

527.032

527.000

527.000

527.000

527.000

527.000

527.000

527.000

527.000
Proposed Road Level at S - Shift
558.516

- Deflection Angle
Centerline (m)
V - Design Speed Km/Hr
533.200

527.764

528.736

533.583

537.153

539.147

541.166

544.356

544.553

543.577

545.368

547.679

549.612

550.644

549.313

547.913

544.884

542.360

539.135

537.522

536.129

535.716

535.423

536.486

536.454

536.810

535.590

526.520

524.010

521.796

519.929

519.960

522.616

518.735

511.825

514.737

521.911

529.233

529.727

530.305

531.921
Existing Ground/Road Level at e% - Superelevation
561.711

Centerline (m) PC - Point of Curvature


PT - Point of Tangent
540.620

531.847

531.521

533.599

536.522

536.297

537.653

541.491

541.189

541.963

543.830

545.243

546.900

546.772

546.175

545.243

544.402

542.342

538.239

535.496

532.552

532.642

531.960

533.144

533.500

536.198

534.247

525.110

522.544

520.706

519.215

518.662

522.197

516.403

510.572

514.522

520.916

526.853

527.429

526.519

529.606
Ground/Road Level at 15m HIP - Horizontal Intersection Point
560.846

L - PROFILE
Left Side (m)
G - Gradient %
563.571
528.918

528.091

529.748

533.864

540.501

542.669

544.768

546.421

546.611

544.398

546.528

548.813

551.875

552.603

550.745

547.666

546.093

544.722

541.735

539.734

539.068

537.978

537.938

538.855

540.946

541.530

538.628

529.343

527.596

523.976

520.574

520.999

522.696

517.334

512.233

515.966

523.140

532.016

533.952

533.858

535.635
Ground/Road Level at 15m Lv - Length of Vertical Curve
L - Length of Grade(m)
Right Side (m) K - Ratio Between vertical curve Length &
Change of Gradient {Lc/(G2-G1)}
Proposed Vertical Alignment K=12.63 L=147.55m G=-4.99% K=12.03 G=0.00% e - Superelevation (%)

Lv=100.00m Lv=150.00m Lv=60.00m D - Straight Length of Horizontal Alignment


Schematic G=4.86% K=-15.23 L=356.48m L=377.83m Lc - Length of Circular Curve

5 .0 m Lc=91.6m Ls=45.0
Proposed Horizontal Alignment D=97.6m L Lc=64.9m D=142.7m Lc=84.4m D=119.3m Ls = 4 R=100.0m m D=194.7m Ls=45.0 Lc=50.7m
L m
R=500.0m m Ls=45.0
Schematic R=-300.0m
R=-100.0m
e=3.7% e=7.0% e=7.0%
Superelevation/Crossfall (%)
e=2.5% e=3.7% e=2.5% e=7.0% e=2.5% e=7.0%
2+000

2+025

2+050

2+075

2+100

2+125

2+150

2+175

2+200

2+225

2+250

2+275

2+300

2+325

2+350

2+375

2+400

2+425

2+450

2+475

2+500

2+525

2+550

2+575

2+600

2+625

2+650

2+675

2+700

2+725

2+750

2+775

2+800

2+825

2+850

2+875

2+900

2+925

2+950

2+975

3+000
Chainage (Km)
0

REVISION DATE AMENDMENT \ ISSUE DESCRIPTION CLIENT CONSULTANT: RODIC CONSULTANTS PVT. LTD. Project CONSTRUCTION OF MISSING LINK FROM BIRHU TO LATHIANI INTO 4-LANE & PAVED SHOULDER
R0 Aug-22 2 Lane Standard 1, JAI SINGH MARG (FIRST FLOOR), YMCA CONFIGURATION FROM KM 35/550 (DESIGN CHAINAGE 0.000) TO 42/800 (DESIGN CHAINAGE 8.153) ON
DETAILED PROJECT REPORT
Ministry of Road Transport & Highways CULTURAL CENTRE BUILDING NH-503A INCLUDING CABLE STAYED BRIDGE (0.860 KM) ON BACK WATER OF GOVIND SAGAR RESERVOIR
R1 Feb-23 4 Lane Standard
Government of India NEW DELHI - 110001 (INDIA) AND ITS APPROACHES IN HIMACHAL PRADESH ON EPC MODE
R2 Nov-23 4 Lane Standard Designed:
(Ministry of Road Transport & Highways Transport Bhawan, 1, Parliament Street New In Association with Scale PLAN & PROFILE
Drawn: H=:-1:2500 Drawing Title (Km.2+000 to Km.3+000)
Delhi-110001) Monarch Surveyors and Engineering
Consultants Pvt. Ltd.,
Checked: V=:-1:250
Approved:
Sheet size: A2 RC/1587/HO/HWB/RD/DWG/P&P/03A/R2
BIRHU
LATHIANI

LEGEND
Proposed Center Line
Proposed Median
Proposed Carriageway Edge

Str. No. : Proposed Toe Line


4/2
Proposed Proposed Right of Way
Chainage:
AT CH : 3+6
44
Existing T 3+697
HIP NO : 14 20.0
ype : --NA Existing Right of Way
200
Ls(m) Existing S --
R(m )
S.T.(m)
6.668 ize : --NA
Dc(deg)
51.4333 Proposed -- Proposed Box Culvert
179.536
L.T.(m)
13.335 Type : Box
Proposed ROW Lc(m) 57.1628 Proposed Culvert
119.004
D(deg) Size : 1x6x
Ts(m)
e % = 6.94 Proposal : 6.0m Proposed Vehicular Underpass
ridge
HIP NO : 12 AT CH : 3+178 Proposed Carriageway Es(m)
27.849
kmph
New Const
ruction Str.
N
mB R(m) 150 EE D (V) : 50
Prop o. : 4/3
t Cu DESIGN SP
Ls(m) 30.0
duc Dc(deg) 40.015 S.T.(m) Proposed Center Line osed Proposed Vehicular Overpass
: Via
110
Exis Cha
ype Lc(m) 104.760 tin in
Exis g Type age: 3+8
L.T.(m) 210
ed T
opos Ts(m) 87.426 D(deg) 51.4745 ting : --N 56 Toe Wall

CH.3+7
Pr Prop Size A
Toe Wall
Es(m) 16.797 e%= 7.00
osed : --N -- Str.
A N
Prop Type -- Prop o. : 4/4
DESIGN SPEED (V) : 50 kmph

CH.
o Retaining Wall / Brest Wall
Prop sed Size : Box Cu Exis
osed
osal : 1x6 lvert tin Cha
: Ne in Gate Temporary/Permanents
w Co x6.0m Exis g Type age: 3+

3+6

CH.
00
ting 941
e
nstru
ction Prop Size : --NA-- GPS GP
by osed : --N

00
PROW PROW

CH.3+
PROW
y PROW
Prop Type A--
La

3
o
ck Prop sed Size : Box C

+80
W
PRO
rt u 550 ulve Temporary Bench Mark

CS 3
PR
OW osal : 1x3
PR

: Ne rt
ed 3+ w C x3.0m
W

ST

CH.
O

PROW
OW
CH

PR
os Ch.

726.9
W onst Religious Structures

0
RO

37
P
op ructio

200
PRO
Pr OW W

46.9
n

CH
.3+

PR

2
OW Telephone Box

3
T B
PR PRO

SC
PR

+90
2
C

.3
CH
OW

35
OW OW
100

PROW PRO Transformer Points


PR PR W

47
H.

+5

TS

CH.
TRF
CH.3

.38
PRO PRO

CH.3+4

0
35
OW

.3+
SC

PROW
2+

W Pylon
PR

00
CS

27
W
RO PROW
PR

PRO
PROW
312

.3
PR P PROW

4+0
PROW W

3
9

PROW O

8
OW

W Lamp Post

3
228
TS

W
PRO
OW

W PRO
00

3.59

PRO

ST
PRO

TBM
+000

00
W W
309

PR

.35
OW
PR

OW W

3
PR RO PRO PRO Tree-T1,T2,T3,T4,T5,T6,

25

00
P W
3

W
.59

00
PR

.35
OW PRO PRO Tube Well Well

RO
W OW W W Tube Well, Well
TBM

PR
OW

P
PRO PRO PRO
W
PR

W PROW W
Hand Pump
PROW PROW OW PRO
W PRO
PR W PRO PR W
OW
PRO W PRO PRO Kilometer Stone KM
STONE

W W
PROW
RO
W PR
OW OW PRO PRO
W OFC Pillar
P PR

ST
W
PRO
W

34
OW PR PRO
PR OW W Petrol Pump

79
OW
PR

.1
ST

TS
PR
OW

1
PR OW

CS
PR OW North Symbol
303

330

OW

34
PRO PR

M
SC 2

ROW PR

SC
9.0

4.2

PRO
CS 29

W P OW

44
W Railway Track
MAT

ATC
PROW PROW PROW

.11
2
4

333
PROW
943.3

PROW PR
OW Existing Paved Road
94.04

9.22

H
1

PRO
W Existing Unpaved Road
H LI

LIN
PRO
W
Telephone Line TP

E
NE

High Tension Lines


Low Tension Line LT

Drain Canal
Invert Level
HFL Line
Water Pipe Line WPL

AT
CH
Building
:2
45
+9
69 PLAN
.00
15 0
.07
3
R - Radius of Curve
e% 38
0
= 54
.84
Dc - Degree of Curvature
7.0 5 9
0 Lc - Length of Circular Curve
Ts - Tangent Length
95
Str. No. : 4/1 AT CH : 3+3
Es - Apex Distance
HIP NO : 13 35.000
Proposed Chainage: 3+351 R(m)
-125 Ls(m)
LS - Length of Spiral Curve
11.688
S.T.(m)
Existing Type : --NA-- Dc(deg)
48.0768
23.357 S - Shift
104.887 L.T.(m)
Existing Size : --NA-- Lc(m)
D(deg)
64.1197
96.034 - Deflection Angle
Proposed Type : Box Culvert Ts(m)
22.975 e%= 7.00
Es(m) V - Design Speed Km/Hr
Proposed Size : 1x3x3.0m SIGN SP EED (V) : 50
kmph
DE e% - Superelevation
Proposal : New Construction
PC - Point of Curvature
PT - Point of Tangent
HIP - Horizontal Intersection Point
L - PROFILE
G - Gradient %
Lv - Length of Vertical Curve
L - Length of Grade(m)
K - Ratio Between vertical curve Length &
Change of Gradient {Lc/(G2-G1)}
e - Superelevation (%)
D - Straight Length of Horizontal Alignment
Lc - Length of Circular Curve

REVISION DATE AMENDMENT \ ISSUE DESCRIPTION CLIENT CONSULTANT: RODIC CONSULTANTS PVT. LTD. Project CONSTRUCTION OF MISSING LINK FROM BIRHU TO LATHIANI INTO 4-LANE & PAVED SHOULDER
R0 Aug-22 2 Lane Standard 1, JAI SINGH MARG (FIRST FLOOR), YMCA CONFIGURATION FROM KM 35/550 (DESIGN CHAINAGE 0.000) TO 42/800 (DESIGN CHAINAGE 8.153) ON
DETAILED PROJECT REPORT
Ministry of Road Transport & Highways CULTURAL CENTRE BUILDING NH-503A INCLUDING CABLE STAYED BRIDGE (0.860 KM) ON BACK WATER OF GOVIND SAGAR RESERVOIR
R1 Feb-23 4 Lane Standard
Government of India NEW DELHI - 110001 (INDIA) AND ITS APPROACHES IN HIMACHAL PRADESH ON EPC MODE
R2 Nov-23 4 Lane Standard Designed:
(Ministry of Road Transport & Highways Transport Bhawan, 1, Parliament Street New In Association with Scale PLAN & PROFILE
Drawn: H=:-1:2500 Drawing Title (Km.3+000 to Km.4+000)
Delhi-110001) Monarch Surveyors and Engineering
Consultants Pvt. Ltd.,
Checked: V=:-1:250
Approved:
Sheet size: A2 RC/1587/HO/HWB/RD/DWG/P&P/03 /R2
BIRHU
LATHIANI
562

560

558

556

554 Proposed Road Level at Centerline (m)

552
Existing Ground/Road Level at Centerline (m) LEGEND
Proposed Center Line
Ground/Road Level at 15 Right Side(m )
550 Proposed Median
Ground/Road Level at 15 Left Side(m ) Proposed Carriageway Edge
548 Proposed Toe Line
Proposed Right of Way
546
Existing Right of Way
544 Str. No. : 4/1 Str. No. : 4/4
Proposed Box Culvert
Proposed Chainage: 3+351 Proposed Chainage: 3+941
Existing Type : --NA-- Existing Type : --NA--
542 Existing Size : --NA--
Proposed Vehicular Underpass
Existing Size : --NA--
Proposed Type : Box Culvert Proposed Type : Box Culvert
540 Proposed Vehicular Overpass
Proposed Size : 1x3x3.0m Str. No. : 4/2 Proposed Size : 1x3x3.0m
Proposal : New Construction Proposed Chainage: 3+697 Proposal : New Construction Toe Wall Toe Wall
538 Existing Type : --NA--
Existing Size : --NA-- Retaining Wall / Brest Wall
Proposed Type : Box Culvert Str. No. : 4/3
536 Gate Temporary/Permanents
Proposed Size : 1x6x6.0m Proposed Chainage: 3+856
Proposal : New Construction Existing Type : --NA-- GPS GP
534 Existing Size : --NA--

Chainage=3186.638m

Chainage=3246.638m
Proposed Type : Box Culvert Temporary Bench Mark
532 Proposed Size : 1x6x6.0m

Level=527.000m

Level=526.879m
Proposal : New Construction Religious Structures

530 Telephone Box T B

Transformer Points
TRF
528 Pylon
Lamp Post
526
Tree-T1,T2,T3,T4,T5,T6,
524 Tube Well, Well
Tube Well Well

Hand Pump
522
Kilometer Stone KM
STONE

520 OFC Pillar


Petrol Pump
518 North Symbol
Railway Track
516
Existing Paved Road

514 Existing Unpaved Road


Telephone Line TP

512 High Tension Lines


Low Tension Line LT

510 Drain Canal


Invert Level
HFL Line
508
Water Pipe Line WPL

Building
506
PLAN
DATUM (m)= 504
452
R - Radius of Curve
Dc - Degree of Curvature
527.000

527.000

527.000

527.000

527.000

527.000

527.000

527.000

526.994

526.950

526.865

526.764

526.663

526.562

526.461

526.360

526.259

526.158

526.057

525.956

525.855

525.754

525.652

525.551

525.450

525.349

525.248

525.147

525.046

524.945

524.844

524.743

524.642

524.541

524.440

524.339

524.238

524.137

524.036

523.934

523.833
Proposed Road Level at
558.516

Lc - Length of Circular Curve


Centerline (m) Ts - Tangent Length
Es - Apex Distance
531.921

528.886

528.202

531.572

533.925

530.116

526.094

529.879

528.470

528.978

527.481

527.539

529.756

526.769

523.731

526.061

526.659

526.296

525.634

523.292

523.036

524.310

524.681

524.524

527.546

527.773

524.205

518.882

516.361

518.466

520.956

524.681

521.314

513.890

513.150

516.131

525.989

526.036

521.854

525.311

530.494
Existing Ground/Road Level at
561.711

LS - Length of Spiral Curve


Centerline (m) S - Shift
- Deflection Angle
529.606

527.490

523.887

525.104

528.324

526.283

524.606

534.248

529.895

524.217

522.087

522.443

525.976

522.937

521.030

522.776

523.576

523.538

522.570

520.320

520.651

522.678

519.670

520.708

522.767

521.736

519.001

514.182

510.554

513.405

515.028

518.149

517.443

512.923

509.720

512.313

515.561

516.452

514.255

519.163

525.923
Ground/Road Level at 15m
560.846

V - Design Speed Km/Hr


Left Side (m) e% - Superelevation
PC - Point of Curvature
563.571
535.635

535.887

533.609

537.410

538.732

534.113

530.324

530.241

532.654

533.939

532.170

532.114

532.532

530.234

528.094

530.541

531.090

530.473

530.226

526.812

524.561

527.256

528.343

529.462

531.524

531.714

529.865

524.284

521.097

524.531

528.956

532.470

529.338

517.363

521.412

521.895

533.688

528.174

527.015

529.377

532.401
Ground/Road Level at 15m
PT - Point of Tangent
Right Side (m) HIP - Horizontal Intersection Point
G=0.00% G=-0.40% L - PROFILE
Proposed Vertical Alignment
Lv=60.00m G - Gradient %
Lv - Length of Vertical Curve
Schematic L=377.83m K=-148.43 L=1135.36m L - Length of Grade(m)

Proposed Horizontal Alignment L Lc=104.8m L L Lc=179.5m L K - Ratio Between vertical curve Length &
m D=54.6m D=45.9m Ls=35.0 Lc=104.9m m D=48.3m
Ls=45.0 Ls=35.0
Change of Gradient {Lc/(G2-G1)}
m e - Superelevation (%)
Schematic R=150.0m R=-125.0m R=200.0m D - Straight Length of Horizontal Alignment
e=7.0% e=7.0% e=5.6% Lc - Length of Circular Curve

Superelevation/Crossfall (%)
e=2.5% e=7.0% e=2.5% e=7.0% e=2.5% e=5.6%
3+000

3+025

3+050

3+075

3+100

3+125

3+150

3+175

3+200

3+225

3+250

3+275

3+300

3+325

3+350

3+375

3+400

3+425

3+450

3+475

3+500

3+525

3+550

3+575

3+600

3+625

3+650

3+675

3+700

3+725

3+750

3+775

3+800

3+825

3+850

3+875

3+900

3+925

3+950

3+975

4+000
Chainage (Km)
0

REVISION DATE AMENDMENT \ ISSUE DESCRIPTION CLIENT CONSULTANT: RODIC CONSULTANTS PVT. LTD. Project CONSTRUCTION OF MISSING LINK FROM BIRHU TO LATHIANI INTO 4-LANE & PAVED SHOULDER
R0 Aug-22 2 Lane Standard 1, JAI SINGH MARG (FIRST FLOOR), YMCA CONFIGURATION FROM KM 35/550 (DESIGN CHAINAGE 0.000) TO 42/800 (DESIGN CHAINAGE 8.153) ON
DETAILED PROJECT REPORT
Ministry of Road Transport & Highways CULTURAL CENTRE BUILDING NH-503A INCLUDING CABLE STAYED BRIDGE (0.860 KM) ON BACK WATER OF GOVIND SAGAR RESERVOIR
R1 Feb-23 4 Lane Standard
Government of India NEW DELHI - 110001 (INDIA) AND ITS APPROACHES IN HIMACHAL PRADESH ON EPC MODE
R2 Nov-23 4 Lane Standard Designed:
(Ministry of Road Transport & Highways Transport Bhawan, 1, Parliament Street New In Association with Scale PLAN & PROFILE
Drawn: H=:-1:2500 Drawing Title (Km.3+000 to Km.4+000)
Delhi-110001) Monarch Surveyors and Engineering
Consultants Pvt. Ltd.,
Checked: V=:-1:250
Approved:
Sheet size: A2 RC/1587/HO/HWB/RD/DWG/P&P/04A/R2
BIRHU
LATHIANI

LEGEND
Proposed Center Line
Proposed Median
Proposed Carriageway Edge
Proposed Toe Line
Proposed Right of Way
Existing Right of Way
Proposed Box Culvert

Proposed Vehicular Underpass

Proposed Vehicular Overpass

Toe Wall Toe Wall


Str. No. : 4/4
Proposed Chainage: 3+941 Retaining Wall / Brest Wall
Existing Type : --NA--
Gate Temporary/Permanents
Existing Size : --NA--
Proposed ROW
Proposed Type : Box Culvert GPS GP
Proposed Size : 1x3x3.0m TB
M
Proposed Carriageway
Proposal : New Construction Proposed Center Line Temporary Bench Mark

Start of Major Bridge


CH.3+900

CH.4+000

CH.4+100

CH.4+200

CH.4+300
Religious Structures

CH.4+400

CH.4+500
Ch.4+442
Proposed Toll Plaza Telephone Box T B

Ch.4+125 Transformer Points


Parking TRF

Pylon
TB

Movable Median Movable Median


M

Lamp Post
Traffic Attenuator
A1 P1 Tree-T1,T2,T3,T4,T5,T6,
PROW PROW PROW PROW PROW
PROW PROW PROW PROW PROW PROW Tube Well Well
PROW PROW PROW PROW PROW Tube Well, Well
PROW PROW PROW PROW PROW PROW PROW PROW
LANE-1

LANE-2

LANE-3
Hand Pump
LANE-4

LANE-5

LANE-6
Kilometer Stone KM
STONE

LANE-7

LANE-8
OFC Pillar
PROW PROW PROW PROW MATCH LINE PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW

MATCH LINE
PROW PROW PROW PROW PROW PROW Petrol Pump
PROW PROW PROW PROW

North Symbol
at or
Traffic Attenu Railway Track
Parking
Existing Paved Road
Existing Unpaved Road
Telephone Line TP

High Tension Lines


Low Tension Line LT

Drain Canal
Invert Level
HFL Line
Water Pipe Line WPL

Building
PLAN
R - Radius of Curve
Dc - Degree of Curvature
Lc - Length of Circular Curve
Ts - Tangent Length
Es - Apex Distance
LS - Length of Spiral Curve
S - Shift
- Deflection Angle
V - Design Speed Km/Hr
e% - Superelevation
PC - Point of Curvature
PT - Point of Tangent
HIP - Horizontal Intersection Point
L - PROFILE
G - Gradient %
Lv - Length of Vertical Curve
L - Length of Grade(m)
K - Ratio Between vertical curve Length &
Change of Gradient {Lc/(G2-G1)}
e - Superelevation (%)
D - Straight Length of Horizontal Alignment
Lc - Length of Circular Curve

REVISION DATE AMENDMENT \ ISSUE DESCRIPTION CLIENT CONSULTANT: RODIC CONSULTANTS PVT. LTD. Project CONSTRUCTION OF MISSING LINK FROM BIRHU TO LATHIANI INTO 4-LANE & PAVED SHOULDER
R0 Aug-22 2 Lane Standard 1, JAI SINGH MARG (FIRST FLOOR), YMCA CONFIGURATION FROM KM 35/550 (DESIGN CHAINAGE 0.000) TO 42/800 (DESIGN CHAINAGE 8.153) ON
DETAILED PROJECT REPORT
Ministry of Road Transport & Highways CULTURAL CENTRE BUILDING NH-503A INCLUDING CABLE STAYED BRIDGE (0.860 KM) ON BACK WATER OF GOVIND SAGAR RESERVOIR
R1 Feb-23 4 Lane Standard
Government of India NEW DELHI - 110001 (INDIA) AND ITS APPROACHES IN HIMACHAL PRADESH ON EPC MODE
R2 Nov-23 4 Lane Standard Designed:
(Ministry of Road Transport & Highways Transport Bhawan, 1, Parliament Street New In Association with Scale PLAN & PROFILE
Drawn: H=:-1:2500 Drawing Title (Km.4+000 to Km.4+442)
Delhi-110001) Monarch Surveyors and Engineering
Consultants Pvt. Ltd.,
Checked: V=:-1:250
Approved:
Sheet size: A2 RC/1587/HO/HWB/RD/DWG/P&P/05 /R2
BIRHU
LATHIANI
562

560

558

556

554

552 LEGEND
Proposed Center Line

550 Proposed Median


Proposed Carriageway Edge
Proposed Road Level at Centerline (m)
548 Proposed Toe Line
Existing Ground/Road Level at Centerline (m)
Proposed Right of Way
546
Ground/Road Level at 15 Right Side(m ) Existing Right of Way
544 Proposed Box Culvert
Ground/Road Level at 15 Left Side(m )
542 Proposed Vehicular Underpass

540 Proposed Vehicular Overpass

Toe Wall Toe Wall


538
Retaining Wall / Brest Wall
536 Gate Temporary/Permanents
GPS GP
534
Temporary Bench Mark
532

Start of Major Bridge.Ch.4+442


Religious Structures

530 Telephone Box T B

Transformer Points

Chainage=4382.002m
TRF
528 Pylon

Chainage=4442.002m
Level=522.289m
Lamp Post
526

Level=522.168m
Tree-T1,T2,T3,T4,T5,T6,
524 Tube Well, Well
Tube Well Well

Hand Pump
522
Kilometer Stone KM
STONE

520 OFC Pillar


Petrol Pump
518 North Symbol
Railway Track
516
Existing Paved Road

514 Existing Unpaved Road


Telephone Line TP

512 High Tension Lines


Low Tension Line LT

510 Drain Canal


Invert Level
HFL Line
508
Water Pipe Line WPL

Building
506
PLAN
DATUM (m)= 504
452
R - Radius of Curve
Dc - Degree of Curvature
523.833

523.732

523.631

523.530

523.429

523.328

523.227

523.126

523.025

522.924

522.823

522.722

522.621

522.520

522.419

522.318

522.227

522.178
Proposed Road Level at
558.516

Lc - Length of Circular Curve


Centerline (m) Ts - Tangent Length
Es - Apex Distance
530.494

530.385

534.746

537.723

532.910

530.978

533.056

532.502

531.729

531.104

530.131

528.292

526.019

519.671

514.514

511.951

510.781

513.480
Existing Ground/Road Level at
561.711

LS - Length of Spiral Curve


Centerline (m) S - Shift
- Deflection Angle
525.923

524.263

527.043

531.708

530.621

529.799

532.303

531.968

531.157

530.015

528.684

526.955

525.158

517.941

513.594

512.778

509.752

512.851
Ground/Road Level at 15m
560.846

V - Design Speed Km/Hr


Left Side (m) e% - Superelevation
PC - Point of Curvature
563.571
532.401

533.975

539.402

540.749

535.199

531.994

533.395

533.220

532.347

531.837

531.128

529.618

527.321

521.354

515.480

513.056

511.759

513.986
Ground/Road Level at 15m
PT - Point of Tangent
Right Side (m) HIP - Horizontal Intersection Point
L - PROFILE
Proposed Vertical Alignment K=148.43
G - Gradient %
Lv=60.00m Lv - Length of Vertical Curve
Schematic
L - Length of Grade(m)
K - Ratio Between vertical curve Length &
Proposed Horizontal Alignment D=1314.3m Change of Gradient {Lc/(G2-G1)}
e - Superelevation (%)
Schematic
D - Straight Length of Horizontal Alignment
Lc - Length of Circular Curve

Superelevation/Crossfall (%)
4+000

4+025

4+050

4+075

4+100

4+125

4+150

4+175

4+200

4+225

4+250

4+275

4+300

4+325

4+350

4+375

4+400

4+425

Chainage (Km)
0

REVISION DATE AMENDMENT \ ISSUE DESCRIPTION CLIENT CONSULTANT: RODIC CONSULTANTS PVT. LTD. Project CONSTRUCTION OF MISSING LINK FROM BIRHU TO LATHIANI INTO 4-LANE & PAVED SHOULDER
R0 Aug-22 2 Lane Standard 1, JAI SINGH MARG (FIRST FLOOR), YMCA CONFIGURATION FROM KM 35/550 (DESIGN CHAINAGE 0.000) TO 42/800 (DESIGN CHAINAGE 8.153) ON
DETAILED PROJECT REPORT
Ministry of Road Transport & Highways CULTURAL CENTRE BUILDING NH-503A INCLUDING CABLE STAYED BRIDGE (0.860 KM) ON BACK WATER OF GOVIND SAGAR RESERVOIR
R1 Feb-23 4 Lane Standard
Government of India NEW DELHI - 110001 (INDIA) AND ITS APPROACHES IN HIMACHAL PRADESH ON EPC MODE
R2 Nov-23 4 Lane Standard Designed:
(Ministry of Road Transport & Highways Transport Bhawan, 1, Parliament Street New In Association with Scale PLAN & PROFILE
Drawn: H=:-1:2500 Drawing Title (Km.4+000 to Km.4+420)
Delhi-110001) Monarch Surveyors and Engineering
Consultants Pvt. Ltd.,
Checked: V=:-1:250
Approved:
Sheet size: A2 RC/1587/HO/HWB/RD/DWG/P&P/05A/R2
BIRHU
LATHIANI

LEGEND
Proposed Center Line
Proposed Median
Proposed Carriageway Edge
Proposed ROW Proposed Toe Line
Proposed Carriageway Proposed Right of Way
Proposed Center Line Existing Right of Way
Proposed Box Culvert

Proposed Vehicular Underpass


20
AT CH : 5+1
HIP
HIP NO : 15 00 NO
-650 Ls(m) R(m : 16
R(m) 00 ) Proposed Vehicular Overpass
10.3275 S.T.(m) Dc(
Dc(deg) 00
deg
)
117.161 L.T.(m) Lc(m
Lc(m) 10.3275 ) Toe Wall Toe Wall
58.740 D(deg) Ts(
m)
Ts(m) 2.50
2.649 e%= Es(
m)
Es(m)
D (V) : 50 km
ph DES
IGN
Retaining Wall / Brest Wall
DESIGN SPEE SPE
ED
Str. No. : 5/1
(V)
:50 k
Gate Temporary/Permanents
mph
Proposed Chainage: 4+872 GPS GP
Existing Type : --NA--
Existing Size : --NA-- Temporary Bench Mark
Proposed Type : Major Bridge
U/S Proposed Size : 115.0m + 250m
+
115.0m+ 12 x 30m+1x20m
Religious Structures
Telephone Box T B

Proposal : New construction

CH.5+
Transformer Points
TRF

CH.5+
Start of Major Bridge

Pylon

CH.5+100
CH.5+000
CH.4+900
CH.4+800
CH.4+700
CH.4+600
CH.4+500

302PC 5307.31
Lamp Post
Ch.4+442

200
Tree-T1,T2,T3,T4,T5,T6,

2 Tube Well, Well


Tube Well Well

P15 AW
P14 PROW

P13
TB
M
PRO Hand Pump
TB
M

P11 P12 PROW


PROW
Kilometer Stone KM

P10
STONE

A1 P1 P2 P3 P4 P5 P6 P7 P8 P9 PROW
PROW

24.609
PROW OFC Pillar
PROW PROW
PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW
Petrol Pump
PROW
PROW

End of
PROW North Symbol

MATCH
PROW
PROW Railway Track

PT 517
PROW
PROW
PROW Existing Paved Road

PC 5061.26
PROW

MATCH LINE
PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW
MATCH LINE

8.42

Major
TB
M

LINE
Existing Unpaved Road
Telephone Line TP

High Tension Lines

Bridge
Low Tension Line LT

Drain Canal
Invert Level

D/S
HFL Line
Water Pipe Line WPL

Building

GOVBIND PLAN
SAGAR R - Radius of Curve
Dc - Degree of Curvature
Lc - Length of Circular Curve
Ts - Tangent Length
Es - Apex Distance
LS - Length of Spiral Curve
S - Shift
- Deflection Angle
V - Design Speed Km/Hr
e% - Superelevation
PC - Point of Curvature
PT - Point of Tangent
HIP - Horizontal Intersection Point
L - PROFILE
G - Gradient %
Lv - Length of Vertical Curve
L - Length of Grade(m)
K - Ratio Between vertical curve Length &
Change of Gradient {Lc/(G2-G1)}
e - Superelevation (%)
D - Straight Length of Horizontal Alignment
Lc - Length of Circular Curve

REVISION DATE AMENDMENT \ ISSUE DESCRIPTION CLIENT CONSULTANT: RODIC CONSULTANTS PVT. LTD. Project CONSTRUCTION OF MISSING LINK FROM BIRHU TO LATHIANI INTO 4-LANE & PAVED SHOULDER
R0 Aug-22 2 Lane Standard 1, JAI SINGH MARG (FIRST FLOOR), YMCA CONFIGURATION FROM KM 35/550 (DESIGN CHAINAGE 0.000) TO 42/800 (DESIGN CHAINAGE 8.153) ON
DETAILED PROJECT REPORT
Ministry of Road Transport & Highways CULTURAL CENTRE BUILDING NH-503A INCLUDING CABLE STAYED BRIDGE (0.860 KM) ON BACK WATER OF GOVIND SAGAR RESERVOIR
R1 Feb-23 4 Lane Standard
Government of India NEW DELHI - 110001 (INDIA) AND ITS APPROACHES IN HIMACHAL PRADESH ON EPC MODE
R2 Nov-23 4 Lane Standard Designed:
(Ministry of Road Transport & Highways Transport Bhawan, 1, Parliament Street New In Association with Scale PLAN & PROFILE
Drawn: H=:-1:2500 Drawing Title (Km.4+442 to Km.5+302)
Delhi-110001) Monarch Surveyors and Engineering
Consultants Pvt. Ltd.,
Checked: V=:-1:250
Approved:
Sheet size: A2 RC/1587/HO/HWB/RD/DWG/P&P/06 /R2
BIRHU
LATHIANI
540

538
Str. No. : 5/1
536 Proposed Chainage: 4+872
Proposed Road Level at Centerline (m) Existing Type : --NA--
Existing Size : --NA--
534 Proposed Type : Major Bridge
Proposed Size : 115.0m + 250.0m +
532 115.0m+ 12 x 30.0m+1x20.0m

Start of Major Bridge.Ch.4+442

End of Major Bridge.Ch.5+302


Proposal : New construction
530
LEGEND
Proposed Center Line

528 A1 P1 P2 Proposed Median

Chainage=4442.002m
Proposed Carriageway Edge
P3 P4 P5 P6 P7 P8 P9 P10 P11 P12 P13 P14 P15
526 A2

Level=522.168m
Proposed Toe Line
Proposed Right of Way
524
Existing Right of Way

522 Proposed Box Culvert

520 Proposed Vehicular Underpass

Proposed Vehicular Overpass


518
Toe Wall Toe Wall
516
Retaining Wall / Brest Wall
514
HFL= 515.112m HFL= 515.112m HFL= 515.112m Gate Temporary/Permanents
GPS GP
512
Temporary Bench Mark
510
Religious Structures

508 Telephone Box T B

Transformer Points
TRF

506 Pylon
Lamp Post
504
Tree-T1,T2,T3,T4,T5,T6,
Tube Well Well
502 Tube Well, Well
Hand Pump
500 Kilometer Stone KM
STONE

OFC Pillar
498
Petrol Pump
496 North Symbol
Railway Track
494
Existing Paved Road
Existing Unpaved Road
492 Existing Ground/Road Level at Centerline (m)
Telephone Line TP

490 High Tension Lines


Ground/Road Level at 15 Right Side(m ) Low Tension Line LT

488 Ground/Road Level at 15 Left Side(m ) Drain Canal


Invert Level
HFL Line
486 Water Pipe Line WPL

Building
484 PLAN
R - Radius of Curve
482
Dc - Degree of Curvature
Lc - Length of Circular Curve
480 Ts - Tangent Length

DATUM (m)= 452


478
Es - Apex Distance
LS - Length of Spiral Curve
522.178

522.168

522.168

522.168

522.168

522.168

522.168

522.168

522.168

522.168

522.168

522.168

522.168

522.168

522.168

522.168

522.168

522.168

522.168

522.168

522.168

522.168

522.168

522.168

522.168

522.168

522.168

522.168

522.168

522.168

522.168

522.168

522.168

522.168

522.168

522.168
Proposed Road Level at S - Shift
558.516

Centerline (m) - Deflection Angle


V - Design Speed Km/Hr
513.480

520.028

521.970

514.912

504.347

497.114

485.984

460.101

453.166

453.012

453.085

453.269

454.348

467.192

477.684

486.067

497.954

501.924

503.433

505.058

505.705

506.154

506.643

506.946

507.595

507.981

508.279

508.525

508.413

502.861

500.494

505.611

511.831

514.115

514.950

513.179
Existing Ground/Road Level at e% - Superelevation
561.711

Centerline (m) PC - Point of Curvature


PT - Point of Tangent
512.851

519.402

521.185

523.254

509.488

507.152

493.286

462.963

455.372

452.962

453.303

453.118

453.600

468.303

474.212

482.664

491.998

498.458

502.071

504.982

505.659

506.108

506.402

506.968

507.489

507.883

508.030

507.951

506.284

497.996

498.732

507.939

513.021

514.716

515.715

515.706
Ground/Road Level at 15m HIP - Horizontal Intersection Point
560.846

Left Side (m) L - PROFILE


G - Gradient %
563.571

513.986

519.952

518.818

510.810

500.063

491.199

477.978

456.932

452.368

452.886

452.909

453.014

455.581

466.137

477.037

484.479

495.085

501.203

503.905

504.830

505.572

506.075

506.597

506.741

507.116

507.262

508.358

509.895

510.301

508.852

507.902

505.242

509.019

512.308

512.063

513.013
Ground/Road Level at 15m Lv - Length of Vertical Curve
L - Length of Grade(m)
Right Side (m) K - Ratio Between vertical curve Length &
Change of Gradient {Lc/(G2-G1)}
Proposed Vertical Alignment K=148.43 L=1126.57m e - Superelevation (%)
D - Straight Length of Horizontal Alignment
Lv=60.00m
Schematic G=0.00%
Lc - Length of Circular Curve

Proposed Horizontal Alignment


D=1314.3m Lc=117.2m D=128.9m
Schematic R=-650.0m

Superelevation/Crossfall (%)
e=2.5%
4+425

4+450

4+475

4+500

4+525

4+550

4+575

4+600

4+625

4+650

4+675

4+700

4+725

4+750

4+775

4+800

4+825

4+850

4+875

4+900

4+925

4+950

4+975

5+000

5+025

5+050

5+075

5+100

5+125

5+150

5+175

5+200

5+225

5+250

5+275

5+300
Chainage (Km)
0

REVISION DATE AMENDMENT \ ISSUE DESCRIPTION CLIENT CONSULTANT: RODIC CONSULTANTS PVT. LTD. Project CONSTRUCTION OF MISSING LINK FROM BIRHU TO LATHIANI INTO 4-LANE & PAVED SHOULDER
R0 Aug-22 2 Lane Standard 1, JAI SINGH MARG (FIRST FLOOR), YMCA CONFIGURATION FROM KM 35/550 (DESIGN CHAINAGE 0.000) TO 42/800 (DESIGN CHAINAGE 8.153) ON
DETAILED PROJECT REPORT
Ministry of Road Transport & Highways CULTURAL CENTRE BUILDING NH-503A INCLUDING CABLE STAYED BRIDGE (0.860 KM) ON BACK WATER OF GOVIND SAGAR RESERVOIR
R1 Feb-23 4 Lane Standard
Government of India NEW DELHI - 110001 (INDIA) AND ITS APPROACHES IN HIMACHAL PRADESH ON EPC MODE
R2 Nov-23 4 Lane Standard Designed:
(Ministry of Road Transport & Highways Transport Bhawan, 1, Parliament Street New In Association with Scale PLAN & PROFILE
Drawn: H=:-1:2500 Drawing Title (Km.4+442 to Km.5+302)
Delhi-110001) Monarch Surveyors and Engineering
Consultants Pvt. Ltd.,
Checked: V=:-1:250
Approved:
Sheet size: A2 RC/1587/HO/HWB/RD/DWG/P&P/06A/R2
BIRHU
LATHIANI

LEGEND
TBM
Proposed Center Line
Proposed Median
Proposed Carriageway Edge
Proposed Toe Line
Proposed Right of Way
Existing Right of Way
Proposed Box Culvert

Proposed Vehicular Underpass

Proposed ROW TBM

Proposed Vehicular Overpass


Proposed Carriageway
Toe Wall Toe Wall
Proposed Center Line
21
Slip/Link Road NO
:
80 1 Retaining Wall / Brest Wall
HIP 84
8.8
( m) 04
R e g) 1 2.4 Gate Temporary/Permanents
(d 4
Dc .94 ph
m ) 63 km
( 0
Lc :5 GPS
TBM
( m ) (V) GP
Ts ED
(m
) PE
Es NS
SIG
DE Temporary Bench Mark
Religious Structures
AT CH : 5+344
HIP NO : 16
R(m) 600 Ls(m) 00 Telephone Box T B

7.0841 S.T.(m) 00
Dc(deg)
AT CH : 5+917 Transformer Points
CH

CH.5+5
74.185 L.T.(m) 00
Lc(m) HIP NO : 19 TRF
7.0841 Ls(m) 35.000
Ts(m) 37.140
1.148
D(deg)
e%= 2.50
R(m) 125
7.3123 S.T.(m) 11.688 .6+ Pylon
Es(m)
DESIGN SPEED (V) : 50 kmph
Dc(deg)
L.T.(m) 23.357 10 Lamp Post
15.953
0

CH
Lc(m) 23.3552

CH.6
43.408 D(deg)
Ts(m) 7.00

00
3.059 e%= Tree-T1,T2,T3,T4,T5,T6,

.5+
Es(m)
D (V) : 50 km
ph TBM
TBM
CH

DESIGN SPEE
Tube Well Well
Tube Well, Well

60

+000
.5+

Hand Pump

0
TBM

TBM

CH
SC

OW
TBM

PR
PROW Kilometer Stone
400

PROW
546

KM
STONE
W PROW
PRO

.5+
TS

5.48

PR OFC Pillar
OW O
543

PR W
OW

ST 596
90
Prop PR

CS
5.4

PR
OW OW o sed Petrol Pump

CS
PR W

56
Insp
8

0
PRO
CH

PT

ec

28
Ch.5 tion Bun

0.27
PROW

SC

592
OW North Symbol

.8
538

PR
PR +750 glow PROW

590
OW
.

5.27
ST

CH
5+

PROW PROW
1

ad W
Ro
PRO
.50

W ink W Railway Track

56

9.3
RO Sli
p/L
PRO PRO
P W W

58

CS 603
O
30

TS
.5
PR

1
PR OW

SC
.8
OW

CH.
PR PR Existing Paved Road

1
O

60 2.32
58
OW PR

+7
O W
2 PC 5

PR W

37
W

74
PRO

.39
Existing Unpaved Road

.31
OW OW
PR PR PROW

TS 597
OW PR

A2
PR

5+8
30

PR OW O PROW

MA7T
W Telephone Line TP
7.3

W W
5 P RO
OW PRO

P1 PRO
1

PRO
W PR
High Tension Lines
BALCONY

00
BALCONY

OW

.32
PR
WG3

PR
Str. No. : 6/1
TWIN
SHARING
FHC
3500
ROOM
x 4500
TWIN
SHARING

OW
3500
ROOM
x 4500

O PR
KITCHEN
SG1
& PANTRY
TOI. 4300
2700x1600 x 4000

O
TOI.
D2A 2700x1600

CH
PR
BALCONY

W
UP
MEETING
D1A ROOM/WAITIN WG3
D2A
V2ASHAFT
D1AV G LOUNGE

PRO
7300
V2A x 4000 BALCONY
DINNING

W
D1A'
ROOM WG3
3000

4
D1A x 4000
UP
TWIN
SHARING

OW
JA01
2000 3500
ROOM
MM x 4500 TWIN
JA01 WIDE SHARING
CORRIDOR

Proposed Chainage: 5+461


JA01 3500
ROOM
D1AV x 4500
LVL

ELECTRICAL
JA01 + 900

Low Tension Line

NICHE
10 PASSENGER
JA01 FUTURE

PR
LIFT
SHAFT

LT
D1AV 2100
JA01 x 1800

P1
JA01 TOI.
1600x2700
D2A TOI.
1600x2700
JA01

JA01
D1AV D2A

OW
SHAFT
LVL
V2A
JA01 + 900

TS
V2A
D1A'

D1AV

JA01
24.609

W
D1A

OW
WG8

GRO
UND D2A

JA01

TWIN
PR
FLOO

OW

3500

SHARING
V2A
D1A'
R PLAN

x 4500
TOI.

SHAFT
2700x1600

JA01
BALCONY

V2A

ROOM
TOI.
2700x1600

Existing Type : --NA-- PR

LINE
WG3

JA01
D1A
D2A

TWIN
56
PR

3500

SHARING
PR

x 4500
Canal
BALCONY

Drain

ROOM
UP
WG3

86
3 O
W Invert Level

ST
Existing Size : --NA--
P1

.8
OW
OW

8
PR OW HFL Line
En TCH

58
PR
PR
Proposed Type : Box Culvert PR ye

48
OW yb
M

a Water Pipe Line

.56
Proposed Size : 1x2x2.0m
d o LIN

kL
W WPL
OW O
PR
A

SC
PR
Proposal : New Construction
PR
t ruc 40

CS 5
OW d 8 Building
fM E

PROW

5
PROW
ose h.5+

741
OW op C PLAN

793.5
PR Pr

.88
ajo

R - Radius of Curve

6
OW
rB

PR
Str. No. : 6/2 Str. No. : 6/3
Dc - Degree of Curvature
Proposed Chainage: 5+880
r

Proposed Chain
idg

OW Lc - Length of Circular Curve


PR age: 5+525 Existing Type : --NA--
PT

Existing Type Ts - Tangent Length


51

: --NA--
e

HIP NO : 17 AT CH : 5+555 Existing Size : --NA--


78

Existing Size Es - Apex Distance


: --NA-- Proposed Type : Box Culvert
.42

R(m) 160 Ls(m) 30.0


Proposed Type LS - Length of Spiral Curve
Dc(deg) 58.4915 S.T.(m) 108 : Minor Bridge Proposed Size : 1x6x6.0m
Lc(m) 163.339 L.T.(m) 209 Proposed Size
: 2x20m Proposal : New Construction S - Shift
Ts(m) 125.605 D(deg) 69.2344 Proposal : Ne
34.704 e%= 6.94
w construction - Deflection Angle
Es(m)
DESIGN SPEED (V) : 50 kmph V - Design Speed Km/Hr
AT CH : 5+769
HIP NO : 18
-80 Ls(m) 55.000 e% - Superelevation
R(m)
37.0187 S.T.(m) 18.542 PC - Point of Curvature
Dc(deg)
51.688 L.T.(m) 36.896
Lc(m)
76.4096
PT - Point of Tangent
Ts(m) 91.591 D(deg)
23.803 e%= 7.00 HIP - Horizontal Intersection Point
Es(m)
DESIGN SPEED (V) : 50 kmph
L - PROFILE
G - Gradient %
Lv - Length of Vertical Curve
L - Length of Grade(m)
K - Ratio Between vertical curve Length &
Change of Gradient {Lc/(G2-G1)}
e - Superelevation (%)
D - Straight Length of Horizontal Alignment
Lc - Length of Circular Curve

REVISION DATE AMENDMENT \ ISSUE DESCRIPTION CLIENT CONSULTANT: RODIC CONSULTANTS PVT. LTD. Project CONSTRUCTION OF MISSING LINK FROM BIRHU TO LATHIANI INTO 4-LANE & PAVED SHOULDER
R0 Aug-22 2 Lane Standard 1, JAI SINGH MARG (FIRST FLOOR), YMCA CONFIGURATION FROM KM 35/550 (DESIGN CHAINAGE 0.000) TO 42/800 (DESIGN CHAINAGE 8.153) ON
DETAILED PROJECT REPORT
Ministry of Road Transport & Highways CULTURAL CENTRE BUILDING NH-503A INCLUDING CABLE STAYED BRIDGE (0.860 KM) ON BACK WATER OF GOVIND SAGAR RESERVOIR
R1 Feb-23 4 Lane Standard
Government of India NEW DELHI - 110001 (INDIA) AND ITS APPROACHES IN HIMACHAL PRADESH ON EPC MODE
R2 Nov-23 4 Lane Standard Designed:
(Ministry of Road Transport & Highways Transport Bhawan, 1, Parliament Street New In Association with Scale PLAN & PROFILE
Drawn: H=:-1:2500 Drawing Title (Km.5+302 to Km.6+000)
Delhi-110001) Monarch Surveyors and Engineering
Consultants Pvt. Ltd.,
Checked: V=:-1:250
Approved:
Sheet size: A2 RC/1587/HO/HWB/RD/DWG/P&P/07 /R2
BIRHU
LATHIANI
562

560

558
Proposed Road Level at Centerline (m)
556 Existing Ground/Road Level at Centerline (m)
554 Ground/Road Level at 15 Right Side(m )

552 Ground/Road Level at 15 Left Side(m )


LEGEND
550 Proposed Center Line
Str. No. : 6/3
Proposed Median
Proposed Chainage: 5+880
548
Existing Type : --NA-- Proposed Carriageway Edge
Existing Size : --NA-- Proposed Toe Line
546 Proposed Type : Box Culvert
Proposed Size : 1x6x6.0m Proposed Right of Way
544 Proposal : New Construction Existing Right of Way
Proposed Box Culvert
542
Proposed Vehicular Underpass

Chainage=6010.441m
540 Str. No. : 6/1

Chainage=5920.441m
Proposed Chainage: 5+461

Level=534.143m
Proposed Vehicular Overpass
Existing Type : --NA--

Level=533.362m
538 Existing Size : --NA-- Toe Wall Toe Wall
Proposed Type : Box Culvert Str. No. : 6/2
536 Proposed Size : 1x2x2.0m Proposed Chainage: 5+525 Retaining Wall / Brest Wall
Proposal : New Construction Existing Type : --NA--
Gate Temporary/Permanents
534 Existing Size : --NA--
Proposed Type : Minor Bridge GPS GP
Proposed Size : 2x20m
532
Proposal : New construction Temporary Bench Mark

End of Major Bridge.Ch.5+302


530 Religious Structures

Chainage=5628.570m
Telephone Box T B

Chainage=5568.570m
528

Level=523.211m
Transformer Points

Level=522.168m
TRF

526A2 Pylon
Lamp Post
524 Tree-T1,T2,T3,T4,T5,T6,
Tube Well Well
Tube Well, Well
522
Hand Pump

520 Kilometer Stone KM


STONE

OFC Pillar
518 Petrol Pump
North Symbol
516
Railway Track
514 Existing Paved Road
Existing Unpaved Road
512 Telephone Line TP

High Tension Lines


510 Low Tension Line LT

Drain Canal
508 Invert Level
HFL Line

506 Water Pipe Line WPL

Building
504 PLAN
R - Radius of Curve
502 Dc - Degree of Curvature
Lc - Length of Circular Curve
DATUM (m)= 500
452 Ts - Tangent Length
Es - Apex Distance
522.168

522.168

522.168

522.168

522.168

522.168

522.168

522.168

522.168

522.168

522.168

522.180

522.454

523.091

523.957

524.826

525.696

526.565

527.435

528.304

529.174

530.043

530.913

531.782

532.652

533.515

534.137

534.397

534.294
Proposed Road Level at
558.516

LS - Length of Spiral Curve


Centerline (m) S - Shift
- Deflection Angle
513.179

513.455

515.944

516.975

517.593

518.125

518.488

519.365

516.593

507.229

515.352

522.684

523.655

526.271

523.595

523.949

524.970

521.966

526.345

524.787

527.959

529.690

530.499

522.152

529.566

533.181

536.796

534.321

533.707
Existing Ground/Road Level at
561.711

V - Design Speed Km/Hr


Centerline (m) e% - Superelevation
PC - Point of Curvature
515.706

515.963

516.610

517.384

517.773

518.263

518.514

519.469

519.448

510.028

515.089

522.469

523.860

525.188

526.569

526.924

528.867

528.648

528.619

529.097

529.440

529.973

530.903

529.806

532.412

533.886

533.986

534.998

535.510
Ground/Road Level at 15m
560.846

PT - Point of Tangent
Left Side (m) HIP - Horizontal Intersection Point
L - PROFILE
563.571
513.013

513.297

515.196

516.011

516.510

517.101

514.363

509.783

512.501

502.073

516.780

520.699

523.994

523.677

517.702

511.486

511.878

511.127

520.241

520.728

526.092

521.532

515.709

508.617

524.730

533.020

533.958

529.860

527.890
Ground/Road Level at 15m
G - Gradient %
Right Side (m) Lv - Length of Vertical Curve
L - Length of Grade(m)
Proposed Vertical Alignment K=17.25 L=291.87m K - Ratio Between vertical curve Length &

Lv=60.00m Lv=90.00m Change of Gradient {Lc/(G2-G1)}


Schematic G=3.48% K=-17.24 e - Superelevation (%)
D - Straight Length of Horizontal Alignment
Lc=163.3m m L Ls=35.0m
Proposed Horizontal Alignment L L Ls=35.0
Lc - Length of Circular Curve
Lc=74.2m D=54.0m D Ls=55.0 Lc=51.7m m D R D Ls=55.0
R=600.0m R=160.0m m R=-80.0m Ls=55.0 m
Schematic
e=6.9% e=7.0% e=5.7%
Superelevation/Crossfall (%)
e=6.9% e=2.5% e=7.0% e=2.5% e=2.5% e=5.7% e=2.5%
5+300

5+325

5+350

5+375

5+400

5+425

5+450

5+475

5+500

5+525

5+550

5+575

5+600

5+625

5+650

5+675

5+700

5+725

5+750

5+775

5+800

5+825

5+850

5+875

5+900

5+925

5+950

5+975

6+000
Chainage (Km)
0

REVISION DATE AMENDMENT \ ISSUE DESCRIPTION CLIENT CONSULTANT: RODIC CONSULTANTS PVT. LTD. Project CONSTRUCTION OF MISSING LINK FROM BIRHU TO LATHIANI INTO 4-LANE & PAVED SHOULDER
R0 Aug-22 2 Lane Standard 1, JAI SINGH MARG (FIRST FLOOR), YMCA CONFIGURATION FROM KM 35/550 (DESIGN CHAINAGE 0.000) TO 42/800 (DESIGN CHAINAGE 8.153) ON
DETAILED PROJECT REPORT
Ministry of Road Transport & Highways CULTURAL CENTRE BUILDING NH-503A INCLUDING CABLE STAYED BRIDGE (0.860 KM) ON BACK WATER OF GOVIND SAGAR RESERVOIR
R1 Feb-23 4 Lane Standard
Government of India NEW DELHI - 110001 (INDIA) AND ITS APPROACHES IN HIMACHAL PRADESH ON EPC MODE
R2 Nov-23 4 Lane Standard Designed:
(Ministry of Road Transport & Highways Transport Bhawan, 1, Parliament Street New In Association with Scale PLAN & PROFILE
Drawn: H=:-1:2500 Drawing Title (Km.5+302 to Km.6+000)
Delhi-110001) Monarch Surveyors and Engineering
Consultants Pvt. Ltd.,
Checked: V=:-1:250
Approved:
Sheet size: A2 RC/1587/HO/HWB/RD/DWG/P&P/07A/R2
BIRHU
LATHIANI

TB
M

O
F
C
TB
M

TB
LEGEND

M
Proposed Center Line
Proposed Median
Proposed Carriageway Edge

TB
Proposed Toe Line

TB
M
Proposed Right of Way
Existing Right of Way
Proposed Box Culvert

Slip/Link Road Proposed Vehicular Underpass

TB
M
Proposed Vehicular Overpass

TB
M
TB
M
Proposed ROW HIP NO : 23 AT CH : 6+783 Toe Wall Toe Wall

CH.6+800
125 R(m) 150 Ls(m) 30
7.3
123
AT Proposed Carriageway Dc(deg) 64.4876 S.T.(m) 110 Retaining Wall / Brest Wall
Ls( CH
m) : 5+
S.T
.(m 35.
917 HIP NO : 21 AT CH : 6+187 Proposed Center Line Lc(m) 168.828 L.T.(m) 210
Gate Temporary/Permanents
DE L ) 000 Ts(m) 132.271 D(deg) 75.9468
SIG .T.( 11. R(m) 80 Ls(m) 55.000
NS D(d
m) 688 Es(m) 40.601 e%= 7.00 Str. N
Prop o. : 8/1
PE eg) 23. Dc(deg) 8.8841 S.T.(m) 18.542 GPS
ED e% 357 DESIGN SPEED (V) : 50 kmph Proposed GP
(V)
: 50 = 23.
355
Lc(m) 12.404 L.T.(m) 36.896 Bus Stop osed
km 2 Ch.6+950 Exis Chain
ph 7.0 Ts(m) 63.944 D(deg) (LHS) ting

CH
48.2749
Type age: 7+
0

CH.6+
Es(m) 9.384 e%= 7.00 Exis : 020 Temporary Bench Mark
tin

CS 6
DESIGN SPEED (V) : 50 kmph Prop g Size : --NA--

CH

.6
CH.5+900

osed --NA Religious Structures

CH
857.5

ST
PROW Prop Type --

+90
PROW
PROW

.6
os :
Prop ed Size Box Cu
PRO

688
W W Telephone Box

+7
T B

PRO

5
200

.7+
osal : lv
CH

: New 1x3x3.0 ert

7.5
PR

0
00
OW
OW m Transformer Points
TB

7/3 Cons

5
TB

CH.6

Str. No. : PR
M

00
6+540 TRF
M

truct
.6+

PR
Chainage:

CH
OW
ion

TS
Pro po sed Pylon
SC 6180.58

CS 6192.98

0
N A -- W
ype : --

696
SC O PR
PR OW
Existing T
100

. 6
-- 66 PROW Lamp Post
ize : --NA
+000

7
W PROW
SC 5909.31

.71
88 PRO PR
Existing S

+30
Culvert
OW
CS 59

.7
TS

PROW : B ox PR

SC
e 2

ST
PROW
Typ OW OW
Tree-T1,T2,T3,T4,T5,T6,
Proposed
W

O
PRO TS PR PR

PR
612

3. 0m

70
3x OW

624
66
ST

PR
Size : 1x PR
25.27

0
Proposed
OW 58 O

1
OW Tube Well

ruction
W Well
5

2.7
PROW PR Tube Well, Well

CH
.72
5

7.9
st
.58

C on

ian
O
960

N ew
Proposal :
PR PR

1
PRO PR PR

OW
8
W W OW OW Slip OW

ed
RO /L ink
.27

P Roa
Hand Pump

PR
.
d

M
PRO

6+4
PR PR
W W
CH OW

OW
OW
PRO

ble
Kilometer Stone

CH.6+500
PRO KM

PR
STONE
W
.6+ PR

PR
a
PROW

MA
OW
PROW PR OW

ov
00

OW
W PRO OW
PRO

PR
W OFC Pillar
60

TC
PR PR

OW
PRO
PR
OW PR
OW OW
0 O

Sli
W W Petrol Pump

PR

p/
H

PR
Lin
OW
ST

PRO PR

kR
OW PR O

OW
W

oa
TS

LIN
W

PR
PR OW
Str. No. : 7/4

d
North Symbol
609

PRO
597

OW
MA

W W PR

PR
PRO PR OW
Proposed Chainage: 6+795
2.3

OW

E
CS 6037.39
SC 6032.32

PR
PROW

OW
PROW Str. No. : 7/1 Railway Track
7.32

W
9

ST Existing Type : --NA--

PROW
PR

O
TC

PR OW

PR
Proposed Chainage: 6+157 OW 66
02 Existing Paved Road
Existing Size : --NA--

OW
HL

PR .95
Existing Type : --NA-- PR OW

PROW
W

PR
OW O
PROW PR Proposed Type : Box Culvert Existing Unpaved Road
Existing Size : --NA--
INE

PR CS 7109.25
Proposed Size : 1x3x3.0m

PROW
OW Telephone Line TP
Proposed Type : Box Culvert O
W
PR PR Proposal : New Construction
Proposed Size : 1x6x60m OW High Tension Lines

PROW
TS

CS
Proposal : New Construction PR
OW Low Tension Line

6
OW LT
PR

65
438

PROW
Proposed Bu
Ch.7+180 (R
47
PRO Canal
Drain

.53

SC 6493.53
W PROW

.95
PROW
Invert Level

PRO
HIP NO : 20 AT CH : 6+035 Str. ST 71
54.25 HFL Line
N
Prop o. : 7/2

W
Ls(m) 55.000
R(m) -80 Str. No. : 8/2

PRO
S.T.(m) 18.542 osed Water Pipe Line WPL
Dc(deg) 3.6267
Exis Cha Proposed Chainage: 7+070

W
L.T.(m) 36.896 tin in Building
Exis g Type age: 6

HS)
s Stop
Lc(m) 5.064

PRO
59.537 D(deg) 43.0176
ting : --N +340 Existing Type : --NA-- 99.97
Ts(m) +522 PLAN
TB

S H:6 TS 71

W
Prop iz A
osed e : --N -- AT C Existing Size : --NA--
7.00
M

e%=

PRO
Es(m) 7.674 0
55.00
DESIGN SPEED (V) : 50 kmph Prop Type A-- O:2
2 Ls(m
)
18.54
2 Proposed Type : VUP R - Radius of Curve

W
os
Prop ed Size : Viadu HIP N )
-80 m

TB
S.T.( 6 19.97

PROW
osal :1x5 ct C R(m) 9 4 36.89 Proposed Size : 1x12x5.5m SC 72 200 Dc - Degree of Curvature

M
.9 7 ) +
TB

um B 38 m
: Ne 0+
w co 1 x 50+ ridge eg) L.T.( 78.37
03
Proposal : New construction CH.7 Lc - Length of Circular Curve
M

Dc(d 54 .4 2 6 g )

PROW
1x50 D(de 7.00
nstru Lc(m
)
.8 8 3
ction 9 3 e% = Ts - Tangent Length

TB
)
Ts(m 25.23
5
kmph

PROW
Es(m
)
D (V)
: 50 Es - Apex Distance
P E E
IG NS
DE S LS - Length of Spiral Curve

PROW
S - Shift
CS 7267.10
- Deflection Angle

PROW
DESIGN SPEED
Es(m)
Ts(m)
Lc(m)
Dc(deg)
R(m)
HIP
V - Design Speed Km/Hr

PROW
NO
ST 7287.10 CH.7+300 e% - Superelevation

: 25
2.935
43.898
PC - Point of Curvature

47.1

PROW
13.5
-200
31
(V) : 50 kmph

021
PT - Point of Tangent

PROW
HIP - Horizontal Intersection Point

e%=
D(deg)
L.T.(m)
S.T.(m)
Ls(m)
L - PROFILE

PROW
AT CH : 7+244
G - Gradient %

PROW
Lv - Length of Vertical Curve

5.56
19.2317
13.335
6.668
20.0
L - Length of Grade(m)

PROW
K - Ratio Between vertical curve Length &
Change of Gradient {Lc/(G2-G1)}

PROW
TS 7368.35 e - Superelevation (%)
D - Straight Length of Horizontal Alignment
CH.7+ Lc - Length of Circular Curve

PROW
400

PROW
REVISION DATE AMENDMENT \ ISSUE DESCRIPTION CLIENT CONSULTANT: RODIC CONSULTANTS PVT. LTD. Project CONSTRUCTION OF MISSING LINK FROM BIRHU TO LATHIANI INTO 4-LANE & PAVED SHOULDER
R0 Aug-22 2 Lane Standard 1, JAI SINGH MARG (FIRST FLOOR), YMCA CONFIGURATION FROM KM 35/550 (DESIGN CHAINAGE 0.000) TO 42/800 (DESIGN CHAINAGE 8.153) ON
DETAILED PROJECT REPORT
Ministry of Road Transport & Highways CULTURAL CENTRE BUILDING NH-503A INCLUDING CABLE STAYED BRIDGE (0.860 KM) ON BACK WATER OF GOVIND SAGAR RESERVOIR
R1 Feb-23 4 Lane Standard
Government of India NEW DELHI - 110001 (INDIA) AND ITS APPROACHES IN HIMACHAL PRADESH ON EPC MODE
R2 Nov-23 4 Lane Standard Designed:
(Ministry of Road Transport & Highways Transport Bhawan, 1, Parliament Street New In Association with Scale PLAN & PROFILE
Drawn: H=:-1:2500 Drawing Title (Km.6+000 to Km.7+000)
Delhi-110001) Monarch Surveyors and Engineering
Consultants Pvt. Ltd.,
Checked: V=:-1:250
Approved:
Sheet size: A2 RC/1587/HO/HWB/RD/DWG/P&P/08 /R2
BIRHU
LATHIANI
566

564 Proposed Road Level at Centerline (m)


Existing Ground/Road Level at Centerline (m)
562
Str. No. : 7/4
Ground/Road Level at 15 Right Side(m ) Proposed Chainage: 6+795
560 Existing Type : --NA--
Ground/Road Level at 15 Left Side(m )
Existing Size : --NA--
558 Proposed Type : Box Culvert
Str. No. : 7/3 Proposed Size : 1x3x3.0m
556 Proposed Chainage: 6+540 Proposal : New Construction
LEGEND

Chainage=6751.950m
Existing Type : --NA--
554 Existing Size : --NA-- Proposed Center Line

Level=549.097m
Proposed Type : Box Culvert
Proposed Median
Proposed Size : 1x3x3.0m
552 Proposed Carriageway Edge
Str. No. : 7/1 Proposal : New Construction
Str. No. : 7/2

Chainage=6651.950m
Proposed Chainage: 6+157 Proposed Toe Line
550 Existing Type : --NA-- Proposed Chainage: 6+340

Level=544.522m
Existing Size : --NA-- Existing Type : --NA-- Proposed Right of Way
548 Proposed Type : Box Culvert Existing Size : --NA-- Existing Right of Way
Proposed Size : 1x6x60m Proposed Type : Viaduct Cum Bridge
Proposed Size :1x50+1 x 50+1x50 Proposed Box Culvert
546 Proposal : New Construction
Proposal : New construction
Proposed Vehicular Underpass
544

Chainage=6476.591m
Proposed Vehicular Overpass

Chainage=6297.971m

Chainage=6416.591m
542

Level=537.245m
Toe Wall Toe Wall

Chainage=6197.971m

Level=536.000m

Level=536.000m
Chainage=6010.441m

540 Retaining Wall / Brest Wall

Level=534.887m
Chainage=6126.916m
Chainage=6066.916m
Level=534.143m

Gate Temporary/Permanents
538

Level=533.304m
Level=533.159m GPS GP
536
Temporary Bench Mark

534 Religious Structures


Telephone Box T B

532
Transformer Points
TRF

Pylon
530
Lamp Post
528 Tree-T1,T2,T3,T4,T5,T6,
Tube Well Well
Tube Well, Well
526
Hand Pump

524 Kilometer Stone KM


STONE

OFC Pillar
522 Petrol Pump
North Symbol
520
Railway Track

518 Existing Paved Road


Existing Unpaved Road
516 Telephone Line TP

High Tension Lines


514 Low Tension Line LT

Drain Canal
512 Invert Level
HFL Line

510 Water Pipe Line WPL

Building
508 PLAN
R - Radius of Curve
506 Dc - Degree of Curvature
Lc - Length of Circular Curve
504 Ts - Tangent Length
Es - Apex Distance
DATUM (m)= 502
452 LS - Length of Spiral Curve
S - Shift
534.294

533.890

533.454

533.040

532.945

533.263

533.818

534.375

534.931

535.407

535.744

535.941

536.000

536.000

536.000

536.000

536.000

536.024

536.386

537.180

538.216

539.254

540.292

541.329

542.367

543.404

544.442

545.502

546.615

547.781

549.000

550.250

551.500

552.750

554.000

555.250

556.500

557.750

559.000

560.250

561.500
Proposed Road Level at
558.516

- Deflection Angle
Centerline (m) V - Design Speed Km/Hr
e% - Superelevation
533.707

531.530

534.996

531.529

531.959

530.157

527.563

529.746

537.391

537.192

536.878

536.527

520.675

509.354

497.509

506.626

522.950

539.013

540.710

546.372

541.139

538.748

540.513

541.277

542.754

543.005

543.555

545.457

544.615

544.282

545.224

541.912

548.440

549.469

551.613

553.122

553.593

554.540

555.235

555.942

555.987
Existing Ground/Road Level at
561.711

PC - Point of Curvature
Centerline (m) PT - Point of Tangent
HIP - Horizontal Intersection Point
535.510

536.143

536.894

535.270

534.395

533.367

533.671

534.089

537.586

538.074

537.784

536.620

525.710

511.413

497.373

506.503

522.691

535.229

543.239

544.255

540.433

538.075

536.557

536.150

537.633

539.026

536.762

540.098

536.163

535.689

537.990

536.564

542.654

548.344

550.250

553.231

554.007

554.986

555.586

556.454

557.244
Ground/Road Level at 15m
560.846

L - PROFILE
Left Side (m) G - Gradient %
Lv - Length of Vertical Curve
563.571
527.890

522.597

529.339

531.882

529.643

523.364

523.822

534.962

536.671

538.256

535.048

523.633

514.936

502.928

497.644

511.305

525.069

538.834

540.307

542.003

542.045

541.395

542.336

543.673

545.156

545.762

545.229

547.896

547.316

546.535

546.682

545.641

547.606

550.126

551.871

553.390

553.121

553.993

555.040

555.609

555.111
Ground/Road Level at 15m L - Length of Grade(m)
K - Ratio Between vertical curve Length &
Right Side (m) Change of Gradient {Lc/(G2-G1)}
e - Superelevation (%)
Proposed Vertical Alignment G=-1.74% K=15.12 L=71.06m G=-0.00% K=14.46 L=175.36m K=117.67 L=311.36m D - Straight Length of Horizontal Alignment

Lv=60.00m Lv=100.00m Lv=60.00m Lv=100.00m Lc - Length of Circular Curve


Schematic L=56.48m G=2.23% K=-44.91 L=118.62m G=4.15% G=5.00%
m L Ls=55.0 m
Proposed Horizontal Alignment
Ls=55.0 L D=33.2m Ls=55.0 R m D=190.5m Ls=55.0 Lc=54.4m D=55.8m L Lc=168.8m L D=80.2m Ls=45.0
m m
m R Ls=55.0 m R=-80.0m Ls=55.0 R=150.0m
Schematic
e=7.0% e=7.0% e=7.0% e=7.0%
Superelevation/Crossfall (%)
e=2.5% e=7.0% e=2.5% e=2.5% e=7.0% e=2.5% e=2.5% e=7.0% e=2.5% e=2.5% e=7.0% e=2.5%
6+000

6+025

6+050

6+075

6+100

6+125

6+150

6+175

6+200

6+225

6+250

6+275

6+300

6+325

6+350

6+375

6+400

6+425

6+450

6+475

6+500

6+525

6+550

6+575

6+600

6+625

6+650

6+675

6+700

6+725

6+750

6+775

6+800

6+825

6+850

6+875

6+900

6+925

6+950

6+975

7+000
Chainage (Km)
0

REVISION DATE AMENDMENT \ ISSUE DESCRIPTION CLIENT CONSULTANT: RODIC CONSULTANTS PVT. LTD. Project CONSTRUCTION OF MISSING LINK FROM BIRHU TO LATHIANI INTO 4-LANE & PAVED SHOULDER
R0 Aug-22 2 Lane Standard 1, JAI SINGH MARG (FIRST FLOOR), YMCA CONFIGURATION FROM KM 35/550 (DESIGN CHAINAGE 0.000) TO 42/800 (DESIGN CHAINAGE 8.153) ON
DETAILED PROJECT REPORT
Ministry of Road Transport & Highways CULTURAL CENTRE BUILDING NH-503A INCLUDING CABLE STAYED BRIDGE (0.860 KM) ON BACK WATER OF GOVIND SAGAR RESERVOIR
R1 Feb-23 4 Lane Standard
Government of India NEW DELHI - 110001 (INDIA) AND ITS APPROACHES IN HIMACHAL PRADESH ON EPC MODE
R2 Nov-23 4 Lane Standard Designed:
(Ministry of Road Transport & Highways Transport Bhawan, 1, Parliament Street New In Association with Scale PLAN & PROFILE
Drawn: H=:-1:2500 Drawing Title (Km.6+000 to Km.7+000)
Delhi-110001) Monarch Surveyors and Engineering
Consultants Pvt. Ltd.,
Checked: V=:-1:250
Approved:
Sheet size: A2 RC/1587/HO/HWB/RD/DWG/P&P/08A/R2
BIRHU
LATHIANI

TB
M

TB
M

O
F

F
C

C
TB
M

TB
M
LEGEND
Proposed Center Line
Proposed Median
Proposed Carriageway Edge
Proposed Toe Line
HIP NO : 23 AT CH : 6+783
R(m) 150 Ls(m) 30 Proposed Right of Way
Dc(deg) 64.4876 S.T.(m) 110
Lc(m) 168.828 L.T.(m)
Existing Right of Way
210
Ts(m) 132.271 D(deg) 75.9468
Slip/Link Road
Proposed Box Culvert
Es(m) 40.601 e%= 7.00 Str. N
DESIGN SPEED (V) : 50 kmph Proposed
Bus Stop Prop o. : 8/1
osed Proposed Vehicular Underpass
Ch.6+950 Exis Chain
(LHS) ting
CH
Exis Type age: 7+
ting : --N 020
CS 6

Prop Size A-- Proposed Vehicular Overpass


.6+

o : -
Prop sed Type -NA--

C
8

ST

PROW
57.5

os :

H.7
Prop ed Size Box Cu Toe Wall
900

PRO
6

W
W
O Toe Wall
887

ER
5

osal : lv
PR
: New 1x3x3.0 ert
.55

OW

O
F
m

C
Cons Retaining Wall / Brest Wall

00
PR
OW truct
ion
T

TB
M
S6

O
0

F
C
Gate Temporary/Permanents

EROW
PR

EROW
O
967

W
PROW
GPS
.7

PETROL
PR GP
O W
1

HIP NO

PETROL
PR

SC
OW : 28
PR R(m) AT CH

70
PR OW 95.50 : 7+958

40
O W 12 Dc(deg) Ls(m) Temporary Bench Mark
161.2748 25.000
.71

Lc(m)

W
PR S.T.(m)

ERO
PR

ERO
OW Slip
/L OW 268.811 8.347
ink
Roa Ts(m) L.T.(m) Religious Structures

W
d
PR 2956.679 16.682
OW Es(m) D(deg)
2850.243 176.2737 Telephone Box T B
DESIG e%=
PR N
PR

SPEED
MA

OW (V) : 50 7.00
OW

kmph OW
PR Transformer Points

OW
TRF
T

ERO
W
PR

Propose
PRO

RHS (Una
C

ER
Pylon
Sli

W
p
HL

/L

PR
ink

W
80
TB
Ro

PRO
O

TB
M
ad

Lamp Post
W

M
IN E

PR

d
W
Tree-T1,T2,T3,T4,T5,T6,
OW

PRO
CH

B
EROW
PROW

ERO

us
W

Side)
Tube Well Well

PRO
CH.7+100 Tube Well, Well

W
.7+

Stop
C
PROW

065

H.

OW
AT CH : 7+ Hand Pump

PR
HIP NO :
24 45.000

8+
CS 7109.25
Ls(m)

00
PROW

PROW
R(m)
100 15.073 Kilometer Stone KM
STONE

S.T.(m)

EROW
00
55.3129

EROW
380 W
Dc(deg) L.T.(m) RO OFC Pillar
PROW

96.539 P

0
Lc(m) 81.0960
D(deg)
108.736 7.00 PROW PROW W
Ts(m) e%= W PRO Petrol Pump
PROW

PRO

PROW
Proposed Bu
Ch.7+180 (R

32.711 PROW
Traff
Es(m) kmph
SPEED (V
) : 50 OW ic Att
DESIGN PR enua North Symbol
tor
PRO

EROW
4.25

EROW
5
ST 71
Railway Track
W

W
Str. No. : 8/2
PRO

PROW
PR
Proposed Chainage: 7+070 Proposed ROW 11.5
Existing Paved Road
W
HS)
s Stop

W PROW
PRO

40
Existing Type : --NA-- PRO
Proposed Carriageway

OW
99.97 PR
OW
Existing Unpaved Road
TS 71
W

PR
Existing Size : --NA-- OW

OW
PRO

ER
Proposed Center Line PR Telephone Line

OW
TP

TB

OW

ER
Proposed Type : VUP Traffic A

M
W

PR
SC tt enuator

PR
High Tension Lines
TB

19.97 78

W
PROW

Proposed Size : 1x12x5.5m 200

O
23.5

F
C
OW
SC 72

OW
PRO
M

+ 7
CH.7

PR
Proposal : New construction Low Tension Line LT
CH.7+

OW
PROW

800

PR
Ch.8+1 Bus Stop
Propos

OW
Drain Canal

PRO

ER
Traffic A
PROW

OW

ER
TS 77 ttenuato Invert Level

PROW
PROW

9P8R.5O7W

W
r HFL Line

W
PRO
ed
30 (RH
PROW

CS 8092.38 Water Pipe Line WPL

PROW
PROW

CS 7267.10
Building

EROW
CH.8+100
PROW

EROW
PROW

ST 77
DESIGN SPEED

PROW
Es(m)

S)
77.30
Ts(m)

PLAN
Lc(m
Dc(d
R(m
HIP NO : 25

CH
PROW

8
)

ST 8117.3
)
eg)

ST 7287.10 CH.7+300 R - Radius of Curve

PROW
.7+ ECT
OW

PROJ
W
2.935
43.8

Dc - Degree of Curvature
47.1

PROW

70
13.5
-200

ND OF
PR

PRO

PROW
CS 7 E
0

EROW
98
31

747.3
(V) : 50 kmph

021

EROW
Lc - Length of Circular Curve

80
0
PROW

3
CH.8+15

120
Ts - Tangent Length

PROW
OW
e%=
D(deg)
L.T.(m)
S.T.(m)
Ls(m)

W
PR

Es - Apex Distance
PROW

O
AT CH : 7+244

PR

Traffic Att

PROW
SC LS - Length of Spiral Curve
7
PROW

71
5.56
19.2317

6.6
13.335

EROW
6.668
20.0

S - Shift

EROW
PROW

Propo
Towards B
O

4
PR

OW

- Deflection Angle
PROW

PR

PROW
CH

e
TS
V - Design Speed Km/Hr

se
nuator

40
76
OW
PROW

732

.7+
TS 7368.35
86

d
PR

.64 e% - Superelevation
OW

PROW
: 7+

60

B
707
30

hota (LHS
110
PR

EROW
CH

u
CH.7+
210

PROW PC - Point of Curvature


PROW

EROW
23.1

0 1

s
10 1
0
AT

400
CH.7+5

.0
W

Stop
TO
BHOTA>
PT - Point of Tangent
7
O

)
m)
.(m
PR
PROW

)
OW

m
Ls(

eg)
S.T

HIP - Horizontal Intersection Point


.T.(
PR

ph
=
D(d
L
OW

e%
km

L - PROFILE

)
PRO

115
PR

: 50
0

ST
61
-15

G - Gradient %
11.7
W

97
27

76
30.6
PR

(V)
0

18
45.7

Lv - Length of Vertical Curve


75
PR

:
OW

SC
.97
NO

W
ED
3.3
0

RO
742
L - Length of Grade(m)
)

P
PE
deg

3.3
HIP

)
R(m

PR
PR

5
OW K - Ratio Between vertical curve Length &
NS
m)
Dc(

PROW
OW

m)
W

Lc(

m)

Change of Gradient {Lc/(G2-G1)}


O

SIG
Ts(
PR

Es(

e - Superelevation (%)
DE

PR
O D - Straight Length of Horizontal Alignment
W
OW
CS

Lc - Length of Circular Curve


PR
75

PR
63

OW W
PRO
.97

PROW
Str. No. : 8/3 PROW
4
Proposed Chainage: 7+442 Str. No. : 8/ 632
hainage: 7+
Existing Type : --NA--
HIP N
O:2 Proposed C N A--
6
pe : --
Existing Ty
R(m)
Existing Size : --NA-- Dc(d -80 AT C
e : --NA--
Existing Siz
eg) H:7
Proposed Type : Box Culvert
Ls(m +520
vert
pe : Box Cul
Lc(m 100.7 )
) 169
140.6 S .T .(m)
55.00
0
Propose d Ty
Proposed Size : 1x2x2.0m
Ts(m
) 2 7
L.T.( 18.54
iz e : 1x 5x 5.0m
Proposed S
Es(m 252.1 m) 2
Proposal : New Construction
) 58 36.89 ruction
New Const
159.1 D(de 6
Proposal :
DES 09 g)
IGN e%= 140.1
SPEE 078
D (V)
: 50 7.00
kmph

REVISION DATE AMENDMENT \ ISSUE DESCRIPTION CLIENT CONSULTANT: RODIC CONSULTANTS PVT. LTD. Project CONSTRUCTION OF MISSING LINK FROM BIRHU TO LATHIANI INTO 4-LANE & PAVED SHOULDER
R0 Aug-22 2 Lane Standard 1, JAI SINGH MARG (FIRST FLOOR), YMCA CONFIGURATION FROM KM 35/550 (DESIGN CHAINAGE 0.000) TO 42/800 (DESIGN CHAINAGE 8.153) ON
DETAILED PROJECT REPORT
Ministry of Road Transport & Highways CULTURAL CENTRE BUILDING NH-503A INCLUDING CABLE STAYED BRIDGE (0.860 KM) ON BACK WATER OF GOVIND SAGAR RESERVOIR
R1 Feb-23 4 Lane Standard
Government of India NEW DELHI - 110001 (INDIA) AND ITS APPROACHES IN HIMACHAL PRADESH ON EPC MODE
R2 Nov-23 4 Lane Standard Designed:
(Ministry of Road Transport & Highways Transport Bhawan, 1, Parliament Street New In Association with Scale PLAN & PROFILE
Drawn: H=:-1:2500 Drawing Title (Km.7+000 to Km.8+153)
Delhi-110001) Monarch Surveyors and Engineering
Consultants Pvt. Ltd.,
Checked: V=:-1:250
Approved:
Sheet size: A2 RC/1587/HO/HWB/RD/DWG/P&P/09 /R2
622
BIRHU
620 LATHIANI

Chainage=8153.007m
Level=613.673m
618

616

614

612

610
Str. No. : 8/4
608 Proposed Chainage: 7+632 LEGEND
Existing Type : --NA-- Proposed Center Line
606 Existing Size : --NA-- Proposed Median
Proposed Type : Box Culvert
Proposed Carriageway Edge
604 Proposed Size : 1x5x5.0m
Proposal : New Construction Proposed Toe Line

602 Proposed Road Level at Centerline (m) Proposed Right of Way


Existing Right of Way
600 Existing Ground/Road Level at Centerline (m)
Proposed Box Culvert

598 Ground/Road Level at 15 Right Side(m )


Proposed Vehicular Underpass
Ground/Road Level at 15 Left Side(m )
596 Proposed Vehicular Overpass

Toe Wall Toe Wall


594
Retaining Wall / Brest Wall
592 Str. No. : 8/3
Gate Temporary/Permanents
Proposed Chainage: 7+442
590 Existing Type : --NA-- GPS GP
Existing Size : --NA--
Proposed Type : Box Culvert Temporary Bench Mark
588 Str. No. : 8/1 Proposed Size : 1x2x2.0m
Proposed Chainage: 7+020 Religious Structures
Proposal : New Construction
586 Existing Type : --NA-- Telephone Box T B

Existing Size : --NA--


Proposed Type : Box Culvert Transformer Points
584 TRF

Proposed Size : 1x3x3.0m Pylon


Proposal : New Construction
582 Lamp Post
Tree-T1,T2,T3,T4,T5,T6,
580 Tube Well, Well
Tube Well Well

Str. No. : 8/2


Proposed Chainage: 7+070 Hand Pump
578 Existing Type : --NA--
Kilometer Stone KM
STONE

Existing Size : --NA--


576 Proposed Type : LVUP OFC Pillar
Proposed Size : 1x12m Petrol Pump
Chainage=7266.848m

574 Proposal : New construction


North Symbol
Chainage=7143.308m

Level=568.007m
Chainage=7206.848m

572 Railway Track


Level=566.604m

Level=566.507m

Existing Paved Road


Chainage=7063.308m

570 Existing Unpaved Road


Level=564.665m

Telephone Line TP

568 High Tension Lines


Low Tension Line LT

566 Canal
Drain
Invert Level
HFL Line
564
Water Pipe Line WPL

562 Building
PLAN
560 R - Radius of Curve
Dc - Degree of Curvature
558 Lc - Length of Circular Curve
Ts - Tangent Length
556 Es - Apex Distance
LS - Length of Spiral Curve
S - Shift
DATUM (m)= 554
- Deflection Angle
452
V - Design Speed Km/Hr
561.500

562.750

564.000

565.206

566.066

566.524

566.594

566.555

566.517

566.625

567.264

568.427

569.715

571.004

572.292

573.580

574.869

576.157

577.445

578.733

580.022

581.310

582.598

583.887

585.175

586.463

587.752

589.040

590.328

591.617

592.905

594.193

595.481

596.770

598.058

599.346

600.635

601.923

603.211

604.500

605.788

607.076

608.364

609.653

610.941

612.229

613.518
613.673
Proposed Road Level at
e% - Superelevation
Centerline (m) PC - Point of Curvature
PT - Point of Tangent
555.987

553.596

555.332

557.862

560.213

560.981

563.458

564.082

564.395

567.199

568.371

569.516

573.309

574.048

571.627

574.278

577.357

572.987

571.126

575.445

579.495

579.478

579.147

582.701

582.784

581.856

582.594

589.133

600.233

599.127

592.304

590.339

592.874

598.541

603.885

610.092

605.703

602.603

601.939

604.046

611.385

607.005

617.482

623.042

610.390

611.759

613.450
613.658
Existing Ground/Road Level at
HIP - Horizontal Intersection Point
Centerline (m) L - PROFILE
G - Gradient %
557.244

556.269

556.538

558.414

561.654

557.883

558.740

556.161

559.750

564.552

567.051

572.999

573.198

570.764

573.006

578.208

575.755

572.162

571.090

572.770

575.436

576.427

574.756

577.110

577.173

578.240

581.925

589.297

593.151

594.275

585.601

584.348

585.643

590.681

599.289

606.418

600.461

596.876

595.307

598.579

604.680

603.672

620.403

608.061

610.508

610.635

612.616
611.915
Ground/Road Level at 15m Lv - Length of Vertical Curve
L - Length of Grade(m)
Left Side (m) K - Ratio Between vertical curve Length &
Change of Gradient {Lc/(G2-G1)}
555.111

553.279

555.382

558.042

559.452

561.077

561.715

564.284

565.028

569.382

575.018

576.167

575.694

574.490

573.050

573.569

576.494

577.630

573.297

575.483

580.918

576.924

583.538

588.291

588.395

587.446

587.264

594.571

604.713

608.529

606.196

598.296

601.160

606.401

608.482

613.766

610.932

608.331

607.814

609.092

617.189

611.820

612.436

627.258

629.252

623.709

620.160
620.327
Ground/Road Level at 15m e - Superelevation (%)
D - Straight Length of Horizontal Alignment
Right Side (m) Lc - Length of Circular Curve

Proposed Vertical Alignment G=-0.15% K=11.31 L=886.16m


Lv=80.00m Lv=60.00m
Schematic K=-15.53 L=63.54m G=5.15%
m Lc=96.5m Ls=45.0 Lc=268.8m L
Ls=45.0
Proposed Horizontal Alignment R=100.0m m D=45.7m L Lc=47.1m L D=81.2m Ls=55.0 Lc=140.6m m D=67.7m L L D L
R=95.5m D=35.6m
m R=-80.0m Ls=55.0 L
Schematic R=-200.0m R
e=7.0% e=5.6% e=7.0% e=7.0% e=4.2%
Superelevation/Crossfall (%)
e=7.0% e=2.5% e=2.5% e=5.6% e=2.5% e=7.0% e=2.5% e=7.0% e=2.5% e=4.2% e=2.5%
7+000

7+025

7+050

7+075

7+100

7+125

7+150

7+175

7+200

7+225

7+250

7+275

7+300

7+325

7+350

7+375

7+400

7+425

7+450

7+475

7+500

7+525

7+550

7+575

7+600

7+625

7+650

7+675

7+700

7+725

7+750

7+775

7+800

7+825

7+850

7+875

7+900

7+925

7+950

7+975

8+000

8+025

8+050

8+075

8+100

8+125

8+150
8+153
Chainage (Km)

REVISION DATE AMENDMENT \ ISSUE DESCRIPTION CLIENT CONSULTANT: RODIC CONSULTANTS PVT. LTD. Project CONSTRUCTION OF MISSING LINK FROM BIRHU TO LATHIANI INTO 4-LANE & PAVED SHOULDER
R0 Aug-22 2 Lane Standard 1, JAI SINGH MARG (FIRST FLOOR), YMCA CONFIGURATION FROM KM 35/550 (DESIGN CHAINAGE 0.000) TO 42/800 (DESIGN CHAINAGE 8.153) ON
DETAILED PROJECT REPORT
Ministry of Road Transport & Highways CULTURAL CENTRE BUILDING NH-503A INCLUDING CABLE STAYED BRIDGE (0.860 KM) ON BACK WATER OF GOVIND SAGAR RESERVOIR
R1 Feb-23 4 Lane Standard
Government of India NEW DELHI - 110001 (INDIA) AND ITS APPROACHES IN HIMACHAL PRADESH ON EPC MODE
R2 Nov-23 4 Lane Standard Designed:
(Ministry of Road Transport & Highways Transport Bhawan, 1, Parliament Street New In Association with Scale PLAN & PROFILE
Drawn: H=:-1:2500 Drawing Title (Km.7+000 to Km.8+153)
Delhi-110001) Monarch Surveyors and Engineering
Consultants Pvt. Ltd.,
Checked: V=:-1:250
Approved:
Sheet size: A2 RC/1587/HO/HWB/RD/DWG/P&P/09A/R2
Plan & Profile

LInk Road/Slip Road


Ch.1+840 (L
BIRHU
LATHIANI
CH
oad

CH.1+600
al R .1

CH.1+500
CH.1+400
Loc +7

CH.1+300
0 0

0+000
55
0+1

OW
PR
0+
Traffic Attenuator PROW
PROW PROW

10
PROW
PROW PROW PROW OW
PR PR

0
PROW OW OW
PROW PR
Taper=90m
PROW PROW PROW PROW
PROW PROW PROW PROW
PROW PROW PROW PROW
Slip/Link Road Slip/Link Road

PR
OW LEGEND
Proposed Center Line
OW
PR

SC 1
Slip/Link Road
Slip/Link Road
PROW Proposed Median

TS 1588.58
PROW PROW PROW PROW
PROW PROW

633.5
PROW PROW PROW
PROW 4.m PROW
4.m
Proposed Carriageway Edge

8
PROW
PROW
Taper=90m
Str. No. : 2/2 Proposed Toe Line
Proposed Chainage: 1+548 Proposed Right of Way
Existing Type : --NA--
Existing Right of Way

PROW
PROW
Existing Size : --NA--
Proposed Type :Box Culvert Proposed Box Culvert
Proposed Size : 1x2x2.0m
Proposed Chainage: 1+249 PROW Proposal : New Construction Proposed Vehicular Underpass
Existing Type : Slab Culvert
Proposed Vehicular Overpass
Proposed Type : Box Culvert HIP NO : 6 AT CH : 1+697
R(m) -100 Ls(m) 45.000 Toe Wall
Proposed Size : 1x3x3.0m Dc(deg) 64.9868 S.T.(m) 15.073
Toe Wall

Lc(m) 113.423 L.T.(m) 380


Retaining Wall / Brest Wall
Ts(m) 124.669 D(deg) 90.7699
Es(m) 43.580 e%= 7.00 Gate Temporary/Permanents
DESIGN SPEED (V) : 50 kmph
GPS GP

Temporary Bench Mark


Religious Structures
Telephone Box T B

Proposed Road Level at Centerline (m) Transformer Points


TRF

Existing Ground/Road Level at Proposed Centerline (m) Pylon


Lamp Post
Ground Level at Service road Right Side(m) Tree-T1,T2,T3,T4,T5,T6,
Tube Well Well
Ground Level at Service road left Side (m) Tube Well, Well
Hand Pump
Kilometer Stone KM
STONE

Str. No. : 2/3


OFC Pillar
Proposed Chainage: 1+548
Existing Type : --NA-- Petrol Pump
548 Existing Size : --NA-- North Symbol
Proposed Type :Box Culvert
Railway Track
Proposed Size : 1x2x2.0m
546 Existing Paved Road
Proposal : New Construction
Existing Unpaved Road
544

Chainage=1472.677m
Telephone Line TP

Chainage=1562.677m
542 High Tension Lines

Chainage=1646.386m
Level=535.792m
Low Tension Line LT

Level=534.426m

Level=533.945m
540 Drain Canal
Invert Level
HFL Line
538 Water Pipe Line WPL

Building
536 PLAN
R - Radius of Curve
534
Dc - Degree of Curvature
Lc - Length of Circular Curve
532 Ts - Tangent Length
Es - Apex Distance
530 LS - Length of Spiral Curve
536.843 539.622 539.032 540.044

538.047 539.339 538.878 539.429

536.872 538.558 537.775 538.813

536.562 537.700 536.977 538.197

535.281 536.593 536.114 537.582

534.555 535.860 535.274 536.966

535.289 536.554 535.252 536.351

534.698 534.755 534.940 535.735

533.945 534.212 534.159 535.198

534.509 534.170 534.012 534.791

533.709 532.061 533.368 534.515

533.347 534.357 533.849 534.355

532.360 532.167 534.391 534.211

533.156 533.117 532.507 534.068

536.767 534.845 534.918 533.945


Proposed Road Level at S - Shift
- Deflection Angle
Centerline (m) V - Design Speed Km/Hr
Existing Ground/Road Level at e% - Superelevation
PC - Point of Curvature
Proposed Centerline (m)
PT - Point of Tangent
Ground Level at Service road HIP - Horizontal Intersection Point
L - PROFILE
Left Side (m) G - Gradient %
Lv - Length of Vertical Curve
Ground Level at Service road L - Length of Grade(m)
K - Ratio Between vertical curve Length &
Right Side (m) Change of Gradient {Lc/(G2-G1)}

Proposed Vertical Alignment G=-2.46% K=47.66 G=-0.57% e - Superelevation (%)


D - Straight Length of Horizontal Alignment
Lv=90.00m Lc - Length of Circular Curve
Schematic L=277.68m L=83.71m
Proposed Horizontal Alignment D=350.6m Ls=45.0m
Schematic

Superelevation/Crossfall (%)
e=2.5%
1+300

1+325

1+350

1+375

1+400

1+425

1+450

1+475

1+500

1+525

1+550

1+575

1+600

1+625

1+646

Chainage (Km)

REVISION DATE AMENDMENT \ ISSUE DESCRIPTION CLIENT CONSULTANT: RODIC CONSULTANTS PVT. LTD. Project CONSTRUCTION OF MISSING LINK FROM BIRHU TO LATHIANI INTO 4-LANE & PAVED SHOULDER
R0 Aug-22 2 Lane Standard 1, JAI SINGH MARG (FIRST FLOOR), YMCA CONFIGURATION FROM KM 35/550 (DESIGN CHAINAGE 0.000) TO 42/800 (DESIGN CHAINAGE 8.153) ON
DETAILED PROJECT REPORT
Ministry of Road Transport & Highways CULTURAL CENTRE BUILDING NH-503A INCLUDING CABLE STAYED BRIDGE (0.860 KM) ON BACK WATER OF GOVIND SAGAR RESERVOIR
R1 Feb-23 4 Lane Standard
Government of India NEW DELHI - 110001 (INDIA) AND ITS APPROACHES IN HIMACHAL PRADESH ON EPC MODE
R2 Nov-23 4 Lane Standard Designed:
(Ministry of Road Transport & Highways Transport Bhawan, 1, Parliament Street New In Association with Scale PLAN & PROFILE (Link Road)
Drawn: H=:-1:2500 Drawing Title (Km.1+300 to Km.1+646)
Delhi-110001) Monarch Surveyors and Engineering
Consultants Pvt. Ltd.,
Checked: V=:-1:250
Approved:
Sheet size: A2 RC/1587/HO/HWB/RD/DWG/P&P/ 01 /R2
BIRHU
LATHIANI

00
.1+4
CH
0
+ 50
Proposed ROW

.1
LEGEND

CH
Proposed Carriageway
Proposed Center Line Proposed Center Line
Slip/Link Road Proposed Median
Proposed Carriageway Edge
Proposed Toe Line
Proposed Right of Way
Existing Right of Way
Proposed Box Culvert

Proposed Vehicular Underpass

Proposed Vehicular Overpass

Toe Wall Toe Wall

Retaining Wall / Brest Wall


CH.2

HI
PN
R(
m)
O
:1
Gate Temporary/Permanents
Dc 0
(de
Lc g) 10 GPS GP

CH.2+300
(m 0

CH.2+

CH.2+400
+000

CH.2+200
Ts ) 52
(m .46 AT
) 91 1 Ls
Es
(m .56 0 (m CH
DE ) 10 2 S.T ) :2
+6
SIG 4.4
79 L.T
.(m 45 16 Temporary Bench Mark
N 29 ) .00
SP . 98 .(m 0
EE 4 D ) 1 5
(de .07 Religious Structures
100 D
(V e % g) 38 3

CH.2+50
): 0
50 = 78
km .24 Telephone Box T B
ph 41
Bus Stop
7.0
0
Proposed

PC 2318.32
Ta

Transformer Points
(LHS)
pe

PT 2402.7
+ 47 0
r=3

PROW TRF
Ch.2
0m

C
PROW
Pylon

H.
PROW

TS 2522.0
PROW PROW PROW PROW

0
PROW PROW PROW PROW
PROW Lamp Post

2
PROW PROW

1
Slip/Link Road PROW
PROW

+
SC
Slip/Link Road Slip/Link Road
Slip/Link Road PRO

60
W

TBM
PROW Tree-T1,T2,T3,T4,T5,T6,

256
Slip/Link Roa
d PROW

0
7.05
Tube Well Well
PROW PR Tube Well, Well
OW
PROW
TS 20

SC 20

PROW PR Hand Pump


PROW PROW PROW OW
PROW PROW PROW
CS 2160.64

PROW
ST 2175.64

PROW PROW PROW


PROW PROW
80.71

PROW PROW Kilometer Stone KM


95.71

STONE

PROW PROW
PROW

Ta
PRO

4m
W

p
PROW OFC Pillar

e
St

r=3
4.m
Pr r. N

0
PR

m
OW
o Petrol Pump
Ex po o. :
Ex istin sed 3/1 North Symbol

PR

PR
Pr isti g T Ch

O
St

OW
W
Pr opo ng S ype aina Pr r. No
CS 2
658.6 Railway Track
o
Pr po sed ize : - ge o
Ex pos . : 3
1
op se T : - :

PR
Existing Paved Road
os d y - NA 2+0 i
Ex tin ed C /2
s

PROW
OW
al Siz pe : -NA -- 49 Pr istin g Ty hain Existing Unpaved Road
: N e Bo --
ew : 1x x C Pr opos g Si pe : age
o z Telephone Line
Pr pos ed T e : --NA : 2+
TP
Co 6x6 ulv

PROW
ns .0 ert op e yp --N -- 521

PROW
os d CH.2+700 High Tension Lines
HI
tru m al Size e : B A--
P
NO
cti :N o
ST 2703.61
R(
m) :8
on ew : 1x x C Low Tension Line LT
St
Co 2x2 ulve
D
Pr r. N
c(d

PROW
e Drain Canal
Lc
(m g) -3 ns .0m rt

PROW
Ts ) 12
00
tru o
Ex po o. : Invert Level
(m
Es ) 6
.40 cti Ex istin sed 3/3 HFL Line
(m
)
4.9 22 Ls A
(m T CH on
Pr isti g T Ch
DE 47 38
S. ) HI
SI .71 T. :2 Water Pipe Line
Pr opo ng S ype aina
GN + P WPL
2 1 L.T (m) 15 128
NO

PROW
SP .714 .(m
R(
m) :9
.0
Pr opo sed ize : -- ge
EE

PROW
D( ) 5.0 00 Dc Building
D d eg (de
(V
):
50 % =
e ) 10
00
Lc g) 50 op se T : NA : 2
(m 0
PLAN

TBM
0
os d y - +8
al Siz pe : -NA --
km 15 Ts ) 9.6
(m
ph .26
70 Es ) 84
70
6 Ls AT 48
3.7 (m .39 (m CH :N e V -- R - Radius of Curve

PROW
0 DE ) 42 2 S.
T.(
) :2
+3 ew : 2x iad

PROW
SI .29
co 30 uct
GN 1.7 6 m) 61
SP 86
L.T
.(m
00 Dc - Degree of Curvature
EE
D
D(
de ) 00 ns m Cu
(V
): e% g ) 00 CH.2+800 tru m Lc - Length of Circular Curve
50 = 9.6 cti Br Ts - Tangent Length
on

PROW
km
ph 70 idg
2.5 6

PROW
0 e Es - Apex Distance
LS - Length of Spiral Curve
S - Shift

PROW
- Deflection Angle
V - Design Speed Km/Hr
e% - Superelevation
PC - Point of Curvature
PT - Point of Tangent
HIP - Horizontal Intersection Point
L - PROFILE
G - Gradient %
Lv - Length of Vertical Curve
L - Length of Grade(m)
K - Ratio Between vertical curve Length &
Change of Gradient {Lc/(G2-G1)}
e - Superelevation (%)
D - Straight Length of Horizontal Alignment
Lc - Length of Circular Curve

REVISION DATE AMENDMENT \ ISSUE DESCRIPTION CLIENT CONSULTANT: RODIC CONSULTANTS PVT. LTD. Project CONSTRUCTION OF MISSING LINK FROM BIRHU TO LATHIANI INTO 4-LANE & PAVED SHOULDER
R0 Aug-22 2 Lane Standard 1, JAI SINGH MARG (FIRST FLOOR), YMCA CONFIGURATION FROM KM 35/550 (DESIGN CHAINAGE 0.000) TO 42/800 (DESIGN CHAINAGE 8.153) ON
DETAILED PROJECT REPORT
Ministry of Road Transport & Highways CULTURAL CENTRE BUILDING NH-503A INCLUDING CABLE STAYED BRIDGE (0.860 KM) ON BACK WATER OF GOVIND SAGAR RESERVOIR
R1 Feb-23 4 Lane Standard
Government of India NEW DELHI - 110001 (INDIA) AND ITS APPROACHES IN HIMACHAL PRADESH ON EPC MODE
R2 Nov-23 4 Lane Standard Designed:
(Ministry of Road Transport & Highways Transport Bhawan, 1, Parliament Street New In Association with Scale PLAN & PROFILE (Link Road)
Drawn: H=:-1:2500 Drawing Title (Km.2+100 to Km.2+650)
Delhi-110001) Monarch Surveyors and Engineering
Consultants Pvt. Ltd.,
Checked: V=:-1:250
Approved:
Sheet size: A2 RC/1587/HO/HWB/RD/DWG/P&P/ 02 /R2
BIRHU
LATHIANI

LEGEND
Proposed Road Level at Centerline (m) Proposed Center Line

Existing Ground/Road Level at Proposed Centerline (m) Proposed Median


Proposed Carriageway Edge
Ground Level at Service road Right Side(m) Proposed Toe Line
Ground Level at Service road left Side (m) Proposed Right of Way
Existing Right of Way
Proposed Box Culvert

Proposed Vehicular Underpass

556 Proposed Vehicular Overpass

Str. No. : 3/2 Toe Wall Toe Wall


554 Proposed Chainage: 2+521

Chainage=2403.511m
Existing Type : Slab Retaining Wall / Brest Wall
552 Existing Size : 1 x1.22

Chainage=2253.511m
Gate Temporary/Permanents
Proposed Type : Box Culvert

Level=545.107m
Proposed Size : 1x2x2.0m GPS GP

Level=543.915m
550 Proposal : Reconstruction
Temporary Bench Mark
548

Chainage=2197.245m

Chainage=2468.874m
Religious Structures

Chainage=2528.874m

Chainage=2540.564m
Level=539.982m
546

Level=541.577m
Telephone Box T B

Level=538.882m
Chainage=2137.245m

Level=538.464m
Transformer Points
TRF
544

Chainage=2100.000m

Chainage=2600.564m
Pylon

Level=537.008m
Lamp Post

Level=535.920m

Level=535.893m
542
Tree-T1,T2,T3,T4,T5,T6,
540

Chainage=2650m
Tube Well Well
Tube Well, Well

Level=533.426m
Hand Pump
538
Kilometer Stone KM
STONE

536 OFC Pillar


Petrol Pump
534 North Symbol
Railway Track
532
Existing Paved Road

530 Existing Unpaved Road


Telephone Line TP

528 High Tension Lines


Low Tension Line LT

526 Drain Canal


Invert Level
HFL Line
524
Water Pipe Line WPL

Building
522
PLAN
520 R - Radius of Curve
Dc - Degree of Curvature
Lc - Length of Circular Curve
518
Ts - Tangent Length
Es - Apex Distance
516
LS - Length of Spiral Curve
540.578 536.521 537.153 535.920

542.304 536.340 539.147 536.651

544.456 537.632 541.166 537.436

545.934 541.554 544.356 538.595

546.341 541.274 544.553 540.175

544.403 542.002 543.577 541.922

546.396 543.842 545.368 543.670

548.587 545.268 547.679 545.227

551.773 546.910 549.612 546.272

552.598 546.794 550.644 546.802

550.639 546.232 549.313 546.815

547.351 545.281 547.913 546.311

545.714 544.418 544.884 545.292

544.247 542.303 542.360 543.946

541.067 538.236 539.135 542.596

539.732 535.535 537.522 541.251

538.708 532.569 536.129 540.043

537.678 532.686 535.716 539.023

537.857 531.937 535.423 538.116

538.466 533.075 536.486 537.092

540.381 533.440 536.454 535.921

540.757 536.178 536.810 534.674

538.398 534.243 535.590 533.427


Proposed Road Level at S - Shift
Centerline (m) - Deflection Angle
V - Design Speed Km/Hr
Existing Ground/Road Level at e% - Superelevation
Proposed Centerline (m) PC - Point of Curvature
PT - Point of Tangent
Ground Level at Service road HIP - Horizontal Intersection Point
Left Side (m) L - PROFILE
G - Gradient %
Ground Level at Service road Lv - Length of Vertical Curve
L - Length of Grade(m)
Right Side (m) K - Ratio Between vertical curve Length &
Change of Gradient {Lc/(G2-G1)}
Proposed Vertical Alignment L K=14.75 L=56.27m G=-5.40% K=32.94 G e - Superelevation (%)
Lv=60.00m Lv=150.00m Lv=60.00m Lv=60.00m D - Straight Length of Horizontal Alignment
Schematic G G=6.99% K=-12.11 L=65.36m L K=-42.56 Lc - Length of Circular Curve

Lc=91.6m
Proposed Horizontal Alignment
Lc=64.9m L D=142.7m Lc=84.4m D=119.3m Ls=45.0m R=100.0m
Schematic R=-300.0m R=500.0m

Superelevation/Crossfall (%)
e=2.5%
2+100

2+125

2+150

2+175

2+200

2+225

2+250

2+275

2+300

2+325

2+350

2+375

2+400

2+425

2+450

2+475

2+500

2+525

2+550

2+575

2+600

2+625

2+650
Chainage (Km)
0

REVISION DATE AMENDMENT \ ISSUE DESCRIPTION CLIENT CONSULTANT: RODIC CONSULTANTS PVT. LTD. Project CONSTRUCTION OF MISSING LINK FROM BIRHU TO LATHIANI INTO 4-LANE & PAVED SHOULDER
R0 Aug-22 2 Lane Standard 1, JAI SINGH MARG (FIRST FLOOR), YMCA CONFIGURATION FROM KM 35/550 (DESIGN CHAINAGE 0.000) TO 42/800 (DESIGN CHAINAGE 8.153) ON
DETAILED PROJECT REPORT
Ministry of Road Transport & Highways CULTURAL CENTRE BUILDING NH-503A INCLUDING CABLE STAYED BRIDGE (0.860 KM) ON BACK WATER OF GOVIND SAGAR RESERVOIR
R1 Feb-23 4 Lane Standard
Government of India NEW DELHI - 110001 (INDIA) AND ITS APPROACHES IN HIMACHAL PRADESH ON EPC MODE
R2 Nov-23 4 Lane Standard
(Ministry of Road Transport & Highways Transport Bhawan, 1, Parliament Street New In Association with
Designed: Scale PLAN & PROFILE (Link Road)
Drawn: H=:-1:2500 Drawing Title (Km.2+100 to Km.2+650)
Delhi-110001) Monarch Surveyors and Engineering
Consultants Pvt. Ltd.,
Checked: V=:-1:250
Approved:
Sheet size: A2 RC/1587/HO/HWB/RD/DWG/P&P/02A/R2
BIRHU
LATHIANI
HIP
N
R(m O : 1
) 6
Dc
(de 600
Lc( g)
m) 7.0 AT
Ts 84 Ls( CH
(m 74. 1 m)
) 185 : 5+
Es S.T 344
(m 37. .(m
DE ) 140 00
L.T )
SIG 1.1 .(m 00
NS 48 D )
PE (de
ED g) 00
(V) e%
:5 = 7.0
0 841
km
ph 2.5
0

Proposed ROW
Proposed Carriageway LEGEND

CH.5+400
Proposed Center Line Proposed Center Line

CH.5+302PC 5307.31

CH
Slip/Link Road Proposed Median
Proposed Carriageway Edge

+50 .5
Proposed Toe Line

PT 5381.50

TS 5435.48
Proposed Right of Way

0
SC 5465
P13 P14 P15 A2 Existing Right of Way
PROW PROW PROW PROW
PROW PROW PROW
PROW

.48
PROW Slip/Link Road PRO Proposed Box Culvert
PROW W

TB
M
PR
OW
Proposed Vehicular Underpass

24.609
PR
OW

PROW PROW PROW PROW PROW PROW PR Proposed Vehicular Overpass


PROW PROW O

End of Major
PROW Str W

MATCH LINE
PROW
Pro . No. PR
OW Toe Wall Toe Wall
:
Ex pose 6/1

PR
i dC PR
Ex sting

OW
OW
ha Retaining Wall / Brest Wall
i
Pro sting Type inage
p o S i : : Gate Temporary/Permanents
Pro sed e : --NA 5+4
z

PR
Pro pose Typ --NA -- 61

O
W
d GPS GP
po e
sal Size : Bo --
:N : x

Bridge
ew 1x2x Culv

PR
OW
Co 2.0 ert Temporary Bench Mark
nst m
ruc Religious Structures
tion

PR
OW
Telephone Box T B

Transformer Points
TRF

PRO
Pylon

W
Str. No. : 6/1 Lamp Post
Proposed Road Level at Centerline (m)
Proposed Chainage: 5+461
Existing Ground/Road Level at Proposed Centerline (m) Tree-T1,T2,T3,T4,T5,T6,
Existing Type : --NA--
Tube Well Well
Ground Level at Service road Right Side(m) Existing Size : --NA-- Tube Well, Well
Ground Level at Service road left Side (m) Proposed Type : Box Culvert Hand Pump
Proposed Size : 1x2x2.0m
Proposal : New Construction Kilometer Stone KM
STONE

OFC Pillar

Chainage=5500.000m
Petrol Pump

Chainage=5479.498m
Chainage=5456.750m
Chainage=5452.632m
526 North Symbol

Level=519.591m
Level=519.276m
Level=518.554m
Chainage=5402.632m

Level=518.356m
Railway Track
524

Chainage=5378.453m
Existing Paved Road

Chainage=5348.453m

Level=516.543m
Chainage=5339.800m
Existing Unpaved Road

Level=515.952m
522

Chainage=5309.800m
Telephone Line TP

Level=514.715m
Level=514.214m
520 High Tension Lines

Level=513.083m
Low Tension Line LT

518 Drain Canal


Invert Level
HFL Line
516 Water Pipe Line WPL

Building
514
PLAN
R - Radius of Curve
512
Dc - Degree of Curvature
Lc - Length of Circular Curve
510
Ts - Tangent Length
Es - Apex Distance
508 LS - Length of Spiral Curve
S - Shift
506 - Deflection Angle
512.060 515.725 514.950 512.478

513.010 515.686 513.179 512.913

513.279 516.057 513.455 513.504

515.183 516.612 515.944 514.804

515.883 517.378 516.975 515.861

516.476 517.767 517.593 516.478

517.148 518.264 518.125 517.208

517.239 518.512 518.488 518.231

509.883 519.482 519.365 519.192

512.541 519.625 516.593 519.591


Proposed Road Level at V - Design Speed Km/Hr
e% - Superelevation
Centerline (m)
PC - Point of Curvature
Existing Ground/Road Level at PT - Point of Tangent
HIP - Horizontal Intersection Point
Proposed Centerline (m) L - PROFILE
Ground Level at Service road G - Gradient %
Lv - Length of Vertical Curve
Left Side (m) L - Length of Grade(m)
K - Ratio Between vertical curve Length &
Ground Level at Service road Change of Gradient {Lc/(G2-G1)}
e - Superelevation (%)
Right Side (m) D - Straight Length of Horizontal Alignment
Lc - Length of Circular Curve
Proposed Vertical Alignment L K L L K=21.15 L L
L L Lv=50.00m L
Schematic G=1.74% G K G G K G
Proposed Horizontal Alignment Lc=74.2m D=54.0m L
Schematic R=600.0m

Superelevation/Crossfall (%)
e=2.5%
5+275

5+300

5+325

5+350

5+375

5+400

5+425

5+450

5+475

5+500

Chainage (Km)

REVISION DATE AMENDMENT \ ISSUE DESCRIPTION CLIENT CONSULTANT: RODIC CONSULTANTS PVT. LTD. Project CONSTRUCTION OF MISSING LINK FROM BIRHU TO LATHIANI INTO 4-LANE & PAVED SHOULDER
R0 Aug-22 2 Lane Standard 1, JAI SINGH MARG (FIRST FLOOR), YMCA CONFIGURATION FROM KM 35/550 (DESIGN CHAINAGE 0.000) TO 42/800 (DESIGN CHAINAGE 8.153) ON
DETAILED PROJECT REPORT
Ministry of Road Transport & Highways CULTURAL CENTRE BUILDING NH-503A INCLUDING CABLE STAYED BRIDGE (0.860 KM) ON BACK WATER OF GOVIND SAGAR RESERVOIR
R1 Feb-23 4 Lane Standard
Government of India NEW DELHI - 110001 (INDIA) AND ITS APPROACHES IN HIMACHAL PRADESH ON EPC MODE
R2 Nov-23 4 Lane Standard
(Ministry of Road Transport & Highways Transport Bhawan, 1, Parliament Street New In Association with
Designed: Scale PLAN & PROFILE (Link Road)
Drawn: H=:-1:2500 Drawing Title (Km.5+275 to Km.5+500)
Delhi-110001) Monarch Surveyors and Engineering
Consultants Pvt. Ltd.,
Checked: V=:-1:250
Approved:
Sheet size: A2 RC/1587/HO/HWB/RD/DWG/P&P/ 03 /R2
BIRHU
LATHIANI

Proposed ROW
TBM
Proposed Carriageway
Proposed Center Line
Slip/Link Road 1
Str. No. : 8/ 020
hainage: 7+
Proposed C N A --
pe : --
Existing Ty
e : --NA--
Existing Siz vert
Ty pe : Box Cul
: 6+
783 Proposed 3x 3. 0m
CH
ize : 1x
AT 30
top Proposed S ction
) 110 us S ew Constru
Ls(m
sed B HS) Proposal : N

CH.7+00
IP N
O : 23
150 S.T
.(m
)
210
Pr o p o (L
PETROL

PETROL

LEGEND
H
87 6 .(m
)
75.9
468
+950
Ch.6
) .4 L .T
R( m 64
8 g ) Proposed Center Line
( deg
)
1 6 8.8 2
D(d
e 7.00

CH
D c

CH.6+900
) .271 e%
=
Proposed Median
Lc(m 132
01 mph
Ts(
m) 40.6 5 0 k

.6+
:
(V) Proposed Carriageway Edge
m) ED

0
Es( S P E
IGN
DES TBM

800

ST 6887.55
Proposed Toe Line

CS 6857.55

TS 6967.71

SC 7
Proposed Right of Way

012.7
PROW PROW PROW PROW PROW PROW
PROW PRO Existing Right of Way

1
W W
O
PR
PR Proposed Box Culvert
OW
OW 65
+0
PR :7 0
CH .00
CH AT 45 3 Proposed Vehicular Underpass
.07

PR
Slip/Link Road
W ) 15

O
O PROW
.7+ (m

W
PR PROW
PROW PROW PROW PROW Ls m ) 3 8 0

MATCH LIN
Sli 100 .(
OW
PR p/L
in
:2
4 S.T )
PR
OW kR
oa
NO 10
0 .(m Proposed Vehicular Overpass
d 29 L.T g) 0
HIP .31 7.0

PR
CH

OW
) 5 5
9 (de

OW
PR 3 D
OW m
.6+ R(

PR
) .5 =
PR O
W (de
g 9 6
3 6 e % Toe Wall Toe Wall
8.7 ph
7 00 710
9.25
CS Dc
Lc
(m
)
)
10
32
.71
1
):
50
km
V

OW
m (

W
(

PRO
Ts ED Retaining Wall / Brest Wall

O
) PE

PR
PR

PR
(m
Es NS

W
SIG

OW
SC D E Gate Temporary/Permanents
6688

OW
.72

W
0 GPS
54 GP

PR

PROW
PRO
6+

PROW
:
ge
ina TS 6 ST 7154
6
ha rt 58.7 .25
Temporary Bench Mark

W
2
dC lve

PRO
W
e Cu n

PRO
os

PROW
edia
p x Religious Structures

Prop 180 (RH


Bo 3.0m on

PROW
Pro

Ch.7
e: x ti Proposed Road Level at Centerline (m)
yp : 1x3 truc
le M

T Existing Ground/Road Level at Proposed Centerline (m) Telephone Box T B

osed
ed ize n s

+
s o
po d S w C
ab

Str. No. 8/1 Transformer Points


Pro pose : Ne
Ground Level at Service road Right Side(m)
Mov

TRF

Bus )
l
Pro posa Ground Level at Service road left Side (m) Proposed Chainage: 7+020 Pylon
Pro Existing Type : --NA--

Stop
S
Existing Size : --NA-- Lamp Post
Proposed Type : Box Culvert Tree-T1,T2,T3,T4,T5,T6,
Proposed Size : 1x3x3.0m Tube Well Well
Tube Well, Well
Proposal : New Construction
Hand Pump
568 Kilometer Stone KM
STONE

OFC Pillar
566

Chainage=7070.000m
Petrol Pump

Chainage=6937.629m
564

Chainage=7041.154m
North Symbol

Level=557.430m
Chainage=6877.629m

Chainage=6981.154m
Railway Track

Level=556.131m

Level=555.892m
562

Level=555.381m
Existing Paved Road

Level=555.043m
Existing Unpaved Road
560
Telephone Line TP

558 High Tension Lines


Low Tension Line LT

556 Drain Canal


Invert Level
HFL Line
554 Water Pipe Line WPL

Building
552
PLAN
R - Radius of Curve
550
Dc - Degree of Curvature
Lc - Length of Circular Curve
548 Ts - Tangent Length
Es - Apex Distance
546 LS - Length of Spiral Curve

DATUM (m)= 544


S - Shift
- Deflection Angle
553.389 553.234 553.122 555.250

553.132 553.938 553.593 556.187

553.998 554.800 554.540 556.347

555.043 555.471 555.235 555.822

555.610 556.414 555.942 555.197

555.109 556.983 555.987 554.804

553.295 556.549 553.596 555.201

555.397 556.462 555.332 556.364

558.049 558.420 557.862 565.204


Proposed Road Level at V - Design Speed Km/Hr
e% - Superelevation
Centerline (m) PC - Point of Curvature
Existing Ground/Road Level at PT - Point of Tangent
HIP - Horizontal Intersection Point
Proposed Centerline (m) L - PROFILE
Ground Level at Service road G - Gradient %
Lv - Length of Vertical Curve
Left Side (m) L - Length of Grade(m)
K - Ratio Between vertical curve Length &
Ground Level at Service road Change of Gradient {Lc/(G2-G1)}
e - Superelevation (%)
Right Side (m) D - Straight Length of Horizontal Alignment
Lc - Length of Circular Curve
Proposed Vertical Alignment G K=7.66 L
Lv=60.00m Lv=60.00m
Schematic K=-8.00 L G
Lc=96.5m
Proposed Horizontal Alignment L D=80.2m Ls=45.0m R=100.0m
Schematic

Superelevation/Crossfall (%)
e=2.5%
7+064
6+875

6+900

6+925

6+950

6+975

7+000

7+025

7+050

Chainage (Km)

REVISION DATE AMENDMENT \ ISSUE DESCRIPTION CLIENT CONSULTANT: RODIC CONSULTANTS PVT. LTD. Project CONSTRUCTION OF MISSING LINK FROM BIRHU TO LATHIANI INTO 4-LANE & PAVED SHOULDER
R0 Aug-22 2 Lane Standard 1, JAI SINGH MARG (FIRST FLOOR), YMCA CONFIGURATION FROM KM 35/550 (DESIGN CHAINAGE 0.000) TO 42/800 (DESIGN CHAINAGE 8.153) ON
DETAILED PROJECT REPORT
Ministry of Road Transport & Highways CULTURAL CENTRE BUILDING NH-503A INCLUDING CABLE STAYED BRIDGE (0.860 KM) ON BACK WATER OF GOVIND SAGAR RESERVOIR
R1 Feb-23 4 Lane Standard
Government of India NEW DELHI - 110001 (INDIA) AND ITS APPROACHES IN HIMACHAL PRADESH ON EPC MODE
R2 Nov-23 4 Lane Standard
(Ministry of Road Transport & Highways Transport Bhawan, 1, Parliament Street New In Association with
Designed: Scale PLAN & PROFILE (Link Road)
Drawn: H=:-1:2500 Drawing Title (Km.6+875 to Km.7+050)
Delhi-110001) Monarch Surveyors and Engineering
Consultants Pvt. Ltd.,
Checked: V=:-1:250
Approved:
Sheet size: A2 RC/1587/HO/HWB/RD/DWG/P&P/ 04 /R2
BIRHU

PROW
+90
0 LATHIANI

PROW
H . 1

Proposed Bus Stop


C

Ch.1+840 (LHS)

PROW
PROW
Proposed ROW TS 1832.68
Proposed Carriageway

PROW
PROW
Proposed Center Line
Slip/Link Road
CH.1+800

PROW
ST 1792.01

PROW

PROW
CH
oad

CH.1+600
al R .1

PROW
LEGEND

CH.1+500
Loc +7
00 CS 17
47.01
Proposed Center Line

PROW
0+000
55
0+1
Proposed Median

WO
PR
Proposed Carriageway Edge

0+

OW
PROW PROW
PROW Proposed Toe Line

10
W

PR
PROW RO
PROW PROW PROW
PR P

0
OW OW
PR Proposed Right of Way
Str. No

W
PROW

O
PROW PROW . : 2/3
PROW PROW Existing Right of Way

PR
PROW PROW
Slip/Link Road Propo
Slip/Link Road
sed Ch
Existin ain Proposed Box Culvert
PR
OW g Type age: 1+640
Existin : --NA--
g Size
Propo :
PR
OW
sed Ty --NA-- Proposed Vehicular Underpass

SC 1
Slip/Link Road
Slip/Link Road
Propo pe
PROW
sed Siz : VUP

TS 1588.58
PROW PROW PROW PROW
PROW PROW e : 1x1

633.5
PROW Propo 2x5.5m Proposed Vehicular Overpass
sal : N
ew con
structi

8
on Toe Wall Toe Wall
Str. No. : 2/2
Proposed Chainage: 1+548
Existing Type : --NA-- Retaining Wall / Brest Wall
Existing Size : --NA-- Gate Temporary/Permanents
Proposed Type :Box Culvert
GPS GP
Proposed Size : 1x2x2.0m
Proposal : New Construction
Temporary Bench Mark
Religious Structures
Telephone Box T B

Transformer Points
TRF

Chainage=155.317m
Pylon

Level=543.888m
Lamp Post
Tree-T1,T2,T3,T4,T5,T6,
Tube Well Well
Tube Well, Well
Hand Pump
Kilometer Stone KM
STONE

OFC Pillar
Petrol Pump
North Symbol
Chainage=0.000m
Level=533.793m

Railway Track
Existing Paved Road
Existing Unpaved Road
Telephone Line TP

Level Datum =533.000 High Tension Lines


Low Tension Line LT
533.793

535.093

536.393

537.693

538.993

540.293

541.593

542.893

543.888
DESIGN LEVELS Drain Canal
Invert Level
HFL Line
Water Pipe Line WPL
533.747

533.662

534.173

534.088

534.026

537.482

542.047

543.563

544.003
GROUND LEVELS
Building
PLAN
R R R R R R - Radius of Curve
Horizontal L L L R R
L L L L L L L L L L L L Dc - Degree of Curvature
R L
L Lc - Length of Circular Curve
G=6.500
L=155.317m Ts - Tangent Length
155.317
0.000

Vertical Es - Apex Distance


LS - Length of Spiral Curve
S - Shift
Superelevation - Deflection Angle
V - Design Speed Km/Hr
e% - Superelevation
100.000

120.000

140.000

155.317
20.000

40.000

60.000

80.000

PC - Point of Curvature
0.000

Chainage
PT - Point of Tangent
HIP - Horizontal Intersection Point
L - PROFILE
G - Gradient %
Lv - Length of Vertical Curve
L - Length of Grade(m)
K - Ratio Between vertical curve Length &
Change of Gradient {Lc/(G2-G1)}
e - Superelevation (%)
D - Straight Length of Horizontal Alignment
Lc - Length of Circular Curve

REVISION DATE AMENDMENT \ ISSUE DESCRIPTION CLIENT CONSULTANT: RODIC CONSULTANTS PVT. LTD. Project CONSTRUCTION OF MISSING LINK FROM BIRHU TO LATHIANI INTO 4-LANE & PAVED SHOULDER
R0 Aug-22 2 Lane Standard 1, JAI SINGH MARG (FIRST FLOOR), YMCA CONFIGURATION FROM KM 35/550 (DESIGN CHAINAGE 0.000) TO 42/800 (DESIGN CHAINAGE 8.153) ON
DETAILED PROJECT REPORT
Ministry of Road Transport & Highways CULTURAL CENTRE BUILDING NH-503A INCLUDING CABLE STAYED BRIDGE (0.860 KM) ON BACK WATER OF GOVIND SAGAR RESERVOIR
R1 Feb-23 4 Lane Standard
Government of India NEW DELHI - 110001 (INDIA) AND ITS APPROACHES IN HIMACHAL PRADESH ON EPC MODE
R2 Nov-23 4 Lane Standard Designed:
(Ministry of Road Transport & Highways Transport Bhawan, 1, Parliament Street New In Association with Scale PLAN & PROFILE
Drawn: H=:-1:2500 Drawing Title (Local Road)
Delhi-110001) Monarch Surveyors and Engineering
Consultants Pvt. Ltd.,
Checked: V=:-1:250
Approved:
Sheet size: A2 RC/1587/HO/HWB/RD/DWG/P&P/ 05 /R2
Minor Junction
CH.0+200
XXXX
XXXX

XXXX
XXXX
W
O
PR

CH.0+000

PR

CH.0+100
W

OW
O

NH
PR

XX

RO P
PRO

W
PROW
PROW
50
PROW PROW
PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW m PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW
.0 m
12 .0
12
R= R=

Taper = 100m 4m
Taper=90m
PROW

4m
PROW
PROW

PROW PROW
PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW

50
NH
XX
Chainage=0.000m

Chainage=7.000m

Chainage=17.000m
Level=559.315m

Level=559.315m

Level=558.715m

Chainage=53.884m
Level=554.289m

Chainage=63.884m

Chainage=78.816m
Level=553.469m
Level Datum =551.000
559.315
559.315
559.261
559.099
558.829
558.475
558.115
557.755
557.395
557.035
556.675
556.315
555.955
555.595
555.235
554.875
554.515
554.160
553.859
553.627
553.469
553.331
CROSS ROAD FRL
559.120
559.005
558.973
558.873
557.777
557.151
556.785
556.220
555.844
555.577
555.292
555.111
554.857
554.417
554.111
553.986
553.859
553.721
553.584
553.487
553.379
553.260

CROSS ROAD EX.LVL


0.194
0.309
0.288
0.226
1.052
1.351
1.339
1.536
1.551
1.475
1.384
1.205
1.098
1.179
1.124
0.890
0.656
0.439
0.276
0.140
0.089
0.071

LEVEL DIFF.
10.000
13.000
16.000
19.000
22.000
25.000
28.000
31.000
34.000
37.000
40.000
43.000
46.000
49.000
52.000
55.000
58.000
61.000
63.884
67.000
4.000
7.000

Chainage

Profile 0+025LHS

REVISION DATE AMENDMENT \ ISSUE DESCRIPTION CLIENT CONSULTANT: RODIC CONSULTANTS PVT. LTD. Project CONSTRUCTION OF MISSING LINK FROM BIRHU TO LATHIANI INTO 4-LANE & PAVED SHOULDER CONFIGURATION FROM KM
R0 Aug.:- 2022 2-LANE STANDARD 1, JAI SINGH MARG (FIRST FLOOR), YMCA DETAILED PROJECT REPORT 35/550 (DESIGN CHAINAGE 0.000) TO 42/800 (DESIGN CHAINAGE 8.153) ON NH-503A INCLUDING CABLE STAYED BRIDGE
R1 Feb.:- 2023 4-LANE STANDARD Ministry of Road Transport & Highways CULTURAL CENTRE BUILDING (0.860 KM) ON BACK WATER OF GOVIND SAGAR RESERVOIR AND ITS APPROACHES IN HIMACHAL PRADESH ON EPC MODE”
R2 Nov.:- 2023 4-LANE STANDARD Government of India NEW DELHI - 110001 (INDIA)
Designed:
(Ministry of Road Transport & Highways Transport Bhawan, In JV with Scale Drawing Title MINOR JUNCTION
Drawn:
1, Parliament Street New Delhi-110001) Monarch Surveyors and Engineering N.T.S.
Checked:
Consultants Pvt. Ltd., Sheet size: A2 RC/1587/HO/HWB/RD/DWG/ 01/R2
Approved:
CH.1+300
CH.1+200
PROW
PROW
PROW
PROW
PROW
PROW
PROW

PROW
PROW

PROW
Taper=90
m
2.0m 2.0
m
R=1 R=1

PROW PROW PROW PROW


Taper=PROW
PROW
40m
PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW

4.m
4.m

PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW
PROW 4.m OW
PR
Taper=85 4.m

PR
m

O
W

PROW
PROW
Taper=90
m

PROW
PROW
XXXX

XXXX
PROW
PROW

XXXX
PROW
PROW
XXXX

PROW
PROW

PROW
PROW
Chainage=30.470m
Chainage=29.170m

Chainage=0.000m

Chainage=8.080m
Chainage=28.170m

Chainage=18.080m
Level=539.212m

Level=539.212m
Level=541.935m
Level=541.947m
Level=541.880m

Level=538.862m
Chainage=17.500m

Chainage=49.520m
Chainage=12.500m

Chainage=39.520m
Chainage=0.000m

Level=540.809m

Level=537.725m
Level=540.558m

Level=540.558m

Level=537.361m
Level Datum =539.000 Level Datum =536.000
540.558

540.558
540.558
540.809
541.060

541.880
541.947

539.212
539.212
539.199

538.862
538.728

538.027

537.361
537.330

537.725
537.793
CROSS ROAD FRL CROSS ROAD FRL
539.850
540.101
540.251
540.304
540.510
540.627
540.737
541.545
541.926
541.933

536.442
536.379
536.365
536.360
536.294
536.270
536.331
536.355

536.595
536.706
537.035
537.042
537.663
537.988
CROSS ROAD EX.LVL CROSS ROAD EX.LVL
0.709

0.308
0.254
0.299
0.433

0.136
0.013

2.711
2.842
2.834

2.570
2.448

1.673

0.704
0.654

0.061
0.074
LEVEL DIFF. LEVEL DIFF.
10.000
12.500
17.500
20.000

28.170
30.470

10.000

18.080
20.000

30.000

39.520
40.000

49.520
50.000
0.000

0.000
8.080
Chainage Chainage

Profile 1+275 LHS Profile1+300 RHS

REVISION DATE AMENDMENT \ ISSUE DESCRIPTION CLIENT CONSULTANT: RODIC CONSULTANTS PVT. LTD. Project CONSTRUCTION OF MISSING LINK FROM BIRHU TO LATHIANI INTO 4-LANE & PAVED SHOULDER CONFIGURATION FROM KM
R0 Aug.:- 2022 2-LANE STANDARD 1, JAI SINGH MARG (FIRST FLOOR), YMCA DETAILED PROJECT REPORT 35/550 (DESIGN CHAINAGE 0.000) TO 42/800 (DESIGN CHAINAGE 8.153) ON NH-503A INCLUDING CABLE STAYED BRIDGE
R1 Feb.:- 2023 4-LANE STANDARD Ministry of Road Transport & Highways CULTURAL CENTRE BUILDING (0.860 KM) ON BACK WATER OF GOVIND SAGAR RESERVOIR AND ITS APPROACHES IN HIMACHAL PRADESH ON EPC MODE”
R2 Nov.:- 2023 4-LANE STANDARD Government of India NEW DELHI - 110001 (INDIA)
Designed:
(Ministry of Road Transport & Highways Transport Bhawan, In JV with Scale Drawing Title MINOR JUNCTION
Drawn:
1, Parliament Street New Delhi-110001) Monarch Surveyors and Engineering N.T.S.
Checked:
Consultants Pvt. Ltd.,
Approved:
Sheet size: A2 RC/1587/HO/HWB/RD/DWG/ 02/R2
R2
R1
R0
REVISION
d
PROW

k Roa

PROW
in

DATE
PROW

Slip/L

Feb.:- 2023
Nov.:- 2023
Aug.:- 2022
PROW
+20 0
CH.2

PROW

PROW
PROW

PROW
Road
PROW

4-LANE STANDARD
4-LANE STANDARD
2-LANE STANDARD
PROW
Slip/Link
PROW

PROW

AMENDMENT \ ISSUE DESCRIPTION


PROW

PROW
Tap
er=3

Chainage
0m
PROW

PROW

CLIENT
LEVEL DIFF.
PROW

CROSS ROAD FRL


XX
PROW

CROSS ROAD EX.LVL


Level Datum =535.000
XX
Chainage=0.000m CH.2+100
0.000 0.000 535.875 Level=535.875m
PROW

536.002
PROW

10.000 -0.451 536.327 535.875 Chainage=10.000m


536.513 Level=535.875m
13.672 -0.557 535.956
PROW

536.636
PROW

537.134 Chainage=20.000m
20.000 -0.659 536.475 Level=536.475m
537.244
PROW

29.769 -0.216 537.863 537.647 Chainage=29.769m


PROW

31.278 -0.150 538.045 537.822 Level=537.647m


35.476 0.016 538.226 538.241
PROW

39.769 0.097 538.471 538.568 Chainage=39.769m


PROW

40.000 0.094 538.634 538.582 Level=538.568m


43.938 0.128 538.709 538.835
50.000 0.073 539.149 539.223

Profile2+100 LHS

Government of India
PROW

1, Parliament Street New Delhi-110001)


Slip/Link Road

PROW
PROW

Ministry of Road Transport & Highways


PROW

(Ministry of Road Transport & Highways Transport Bhawan,


PROW

PROW
PROW

PROW
PROW

CONSULTANT:
PROW
PROW

PROW
PROW

12m
XX
XX
PROW
PROW

0m
r=3

Chainage
PROW

pe

CH.2+400
PROW

Ta

LEVEL DIFF.
TBM

CROSS ROAD FRL

In JV with
PROW
PROW

XXXX

CROSS ROAD EX.LVL


Level Datum =540.000

Chainage=0.000m
0.000 0.787 544.879 Level=544.879m

Consultants Pvt. Ltd.,


543.645
PROW
PROW

543.456
10.000 1.910 542.970 544.879

NEW DELHI - 110001 (INDIA)


Chainage=10.500m
10.500 1.965 542.627 544.879 Level=544.879m

CULTURAL CENTRE BUILDING


15.500 2.304 542.376 544.679 Chainage=15.500m
PROW
PROW

Level=544.679m
20.000 2.406 541.913 544.319

Monarch Surveyors and Engineering


541.459
27.917 2.531 543.686
PROW
PROW

1, JAI SINGH MARG (FIRST FLOOR), YMCA


540.985

RODIC CONSULTANTS PVT. LTD.


31.020 2.514 540.924 543.438
540.685
37.787 2.310 542.896
540.455
PROW
PROW

40.000 2.264 542.719

Drawn:
43.181 2.126 540.339 542.465

Checked:
Designed:

Approved:
XXXX
oad

46.362 1.766 540.445 542.210


50.000 1.294 540.625 541.919
PROW
PROW

55.201 0.790 540.714 541.503 Chainage=56.074m XXXX


540.794 Level=541.434m
60.000 0.327 541.216
Slip/Link R

540.974
PROW
PROW

63.514 0.140 541.121 541.185


Profile 2+400 LHS 66.075 0.089 541.295 541.260 Chainage=66.074m
Level=541.260m
PROW
PROW

PROW
PROW

OW
OW

PR
PR

Scale
DETAILED PROJECT REPORT

N.T.S.
OW
OW

PR
PR

OW
OW
PR

PR
W

WO
P RO

PR

Project
W

XX
PRO

PRO

XX

Drawing Title
OW
PR

PROW
W

W
PRO

PRO

30m
PROW

PR
er=
Tap
OW
OW
PR m
PR 0.0
PROW

OW R=1
OW
PROW
Chainage

PR
4.m
OW
LEVEL DIFF.

PR
PROW

W
O

4m
CROSS ROAD FRL
PR

CROSS ROAD EX.LVL

Sheet size: A2 RC/1587/HO/HWB/RD/DWG/ 03/R2


Level Datum =533.000

Chainage=0.000m
PROW

m
0.0
0.000 0.048 535.397 R=3
535.345 Level=535.397m
W

8.000 0.116 535.281 535.397 Chainage=8.000m


Level=535.397m
PRO

10.000 0.126 535.263 535.389 600


PROW

CH.2+
17.391 0.033 535.198 535.232 Chainage=18.000m
W

W
O

Level=535.209m
PR

20.000 0.029 535.105 535.134


PRO

26.958 0.057 534.817 534.874 Chainage=26.958m


OW

Level=534.874m
PR

OW

30.000 0.038 534.633 534.728 Chainage=36.958m


PR

32.881 0.046 534.488 534.533 Chainage=39.426m


36.958 0.081 534.080 534.161 Chainage=40.426m
OW

40.000 0.063 533.784 533.838 Level=534.161m


PR

OW

40.426 0.060 533.724 533.785 Level=533.902m


MINOR JUNCTION
PR

45.697 0.000 533.096 533.096


W

Level=533.785m
O

Chainage=45.697m
PR

Profile 2+620 LHS

Level=533.096m
OW
PR
W
O
PR

OW
W

PR
O
PR

OW

XX
W

PR
O

XX
PR

X X
W

XX
O
W

PR
O
PR

W
O
PR
W
O
PR

35/550 (DESIGN CHAINAGE 0.000) TO 42/800 (DESIGN CHAINAGE 8.153) ON NH-503A INCLUDING CABLE STAYED BRIDGE
(0.860 KM) ON BACK WATER OF GOVIND SAGAR RESERVOIR AND ITS APPROACHES IN HIMACHAL PRADESH ON EPC MODE”
CONSTRUCTION OF MISSING LINK FROM BIRHU TO LATHIANI INTO 4-LANE & PAVED SHOULDER CONFIGURATION FROM KM

You might also like