Professional Documents
Culture Documents
Rehab Lt3.gambar2.2
Rehab Lt3.gambar2.2
6000 3000
TANGGA 3
R. IRNA 1
+ 10.00
6000
TOILET
+9.95
JANITOR
+9.95
6000
TOILET
+9.95
R. IRNA 2
+ 10.00
6000
R. ISOLASI 1
+10.00
TOILET
+9.95
TOILET
+9.95
R. ISOLASI 2
+10.00
4000
SH
+9.50 STASI
PANTRY
PERAWAT 4
+10.00
+10.00
2.00
2000
R. PENYIMPANAN
ALAT, LINEN
& OBAT
+10.00
ADM
IRNA 4
TOILET +10.00
R. IRNA 3 R. IRNA 4
+9.95
+ 10.00 + 10.00
6000
R. KONSULTASI
TANGGA 2 +10.00
TOILET TOILET
+9.95
1000
+9.95
SELASAR
+ 10.00
2550
R.
6000
tr ADM
PENYIM- IRNA 3 STASI TOILET
PANAN +10.00 PERAWAT 3 +9.95
LIFT.2 ALAT, +10.00
R. IRNA 5
3450
LINEN
& OBAT + 10.00
SH
+10.00
R. +9.95
PENYIM-
PANAN
ALAT,
R. PANEL LINEN STASI
ADM
UTAMA & OBAT PERAWAT 2
IRNA 2
+10.00 +10.00 +10.00
+10.00
R. IRNA 6
MUSHOLLA
+ 10.00
6000
+10.10
TOILET
+9.95
TOILET
R.ANTARA R. URIN
R.SAMPLING
ramp TOILET
ADMIN
LIFT.1 +9.95
2800
A
R.LAB
7.57
R. IRNA 7
+ 10.00
Meja Beton
6000
TANGGA 1
3200
R.GANTI
R.DOKTER
8.89
TOILET
+9.95
R. IRNA 8
+ 10.00
+ 10.00
6000
TOILET
+9.95
SH
JANITOR TOILET
+9.95
+9.95 +9.95
C
B