A. Title of the Project .................................................................................................. 1.


B. Dates and Duration of the Internship .................................................................... 1.
C. Introduction/Background of the Internship .......................................................... 1.
D. Objective of the work ............................................................................................. 1.
E. Detailed Description of the task performed ........................................................... 2.
1. Introduction of the project .......................................................................................... 3.
1.1 Overview ................................................................................................................... 3.
1.2 Site location and after construction images ................................................................. 4.
2. Floor plan Details ........................................................................................................... 5.
3. Elevation Details ................................................................................................................
4. Foundation and temporary structures .......................................................................... 9.
4.1 Foundation.................................................................................................................. 9.
4.2 Temporary structures ................................................................................................ 10.
5. Data collection and details of experiments or analysis done ....................................... 11.
5.1 Cement ..................................................................................................................... 11.
5.2 Sand ......................................................................................................................... 14.
5.2 Aggregates ................................................................................................................ 22.
5.2 Water reducing mixtures ........................................................................................... 30.
5.2 Steel ......................................................................................................................... 31.
5.2 Concrete ................................................................................................................... 31.
5.2 Bricks and ACC ........................................................................................................ 32.
5.2 Machine and equipment ............................................................................................ 33.
6. Discussion of Results .................................................................................................... 34.
7. Conclusion .................................................................................................................... 35.
8. Learning outcome......................................................................................................... 35.
9. Certificate of Internship ............................................................................................... 37.
LIST OF FIGURES

Figure 1 : After construction images . ................................................................................... 4.


Figure 2 : Slide cross section ................................................................................................ 8.
Figure 3 : Cross Section of foundation.................................................................................. 9.
Figure 4 : Formwork and scaffolding .................................................................................. 10.
Figure 5 : Cement Used ...................................................................................................... 11.
Figure 6 : Sand ................................................................................................................... 14.
Figure 7 : Pycnometer ........................................................................................................ 16.
Figure 8 : Sieve .................................................................................................................. 16.
Figure 9 : Coarse Aggregate (10mm) .................................................................................. 22.
Figure 10 : Coarse Aggregate (20mm) ................................................................................ 22.
Figure 11 : Impact value apparatus .................................................................................... 26.
Figure 12 : AC machine...................................................................................................... 27.
Figure 13 : Compression testing machine ........................................................................... 27.
Figure 14 : EQR Fe500D.................................................................................................... 29.
Figure 15 : Masonry ........................................................................................................... 32.
Figure 16, 17 : ACC Blocks................................................................................................ 32.
Figure 17 : Batching Plant .................................................................................................. 33.
Figure 18 : Concrete piping ................................................................................................ 33.
Figure 19 : Steel bar bending machine ................................................................................ 33.
Figure 20 : Tower Crane ..................................................................................................... 33.
Figure 21 : Threaded Bars .................................................................................................. 33.
Figure 22 : Cube Casting process ....................................................................................... 36.
Figure 23 : Present construction stage structure .................................................................. 36.
LIST OF TABLES

Table 1,2,3,4,5,6,7 : Individual Floor spatial details .............................................................. 5.


Table 8 : Physical lab test results of cement ........................................................................ 12.
Table 9 : Chemical lab test results of cement ...................................................................... 13.
Table 10 : Sand sieve analysis results ................................................................................. 15.
Table 11 : Specific gravity of sand ...................................................................................... 17.
Table 12 : Bulking of sand test results ................................................................................ 19.
Table 13 : Silt content in fine sand test results .................................................................... 21.
Table 14 : Specific gravity of aggregates ............................................................................ 23.
Table 15 : AIV test results .................................................................................................. 26.
Table 16 : Combined gradation of 10 and 20 mm test results .............................................. 28.
Table 17 : ACV test results ................................................................................................. 29.
Table 18 : MIX design M30 ............................................................................................... 30.
Table 19 : MIX design M45 ............................................................................................... 30.
Table 20 : Cube test results ................................................................................................. 31.
Table 21 : Slump test results ............................................................................................... 31.