Construction Practices

& Equipment's
CVL 776

Col (Dr) Pawan Pandey


pvn@civil.iitd.ac.in

1
Batching plant
Batching plant
Batching plant
Batching plant
Transit Mixers
Conc Mix Design: IS 456 (2000)
 Fresh Concrete quality (Slump)
 Mass concrete & Light reinforced beam: 25-75 mm
 Pumped concrete: 100 to 150 mm
 Hardened Concrete: 28 days strength (fck) exhibited by > 95% cubes
 Considering standard distribution as per IS Code: fck=fm -1.65 σ
until 30 samples are tested and the actual value of s is calculated;
for M20-25, σ = 4; and for M25-M30, σ = 5
 w/c ratio and min cement from Table 4, 5, 6
95%
Pass sample because
strength more than fck
5% Failed
sample

fm
fck 1.65 σ