INDEX OF ISOMETRIC DRAWING FOR ABOVEGROUND PIPING

NO. Latest NEW REV Status Issue ISO WBS LINE NO. R-Size R-Spec NO OF ISOMETRIC DRAWING ISSUE HISTORY REMARKS/HOLD ITEM
DEL/HOLD
Rev.No. Batch WBS SHEET REV.0 REV.1 REV.2 REV.3 REV.4
/Release
247 247 0 1 31 247 454 247 116 7 0 0 0
1 1 S004 EP26_A2 EP26_A2-BD-311-1302 8 A93A 2 01-Dec-21 17-Aug-22
2 0 S001 EP26_A2 EP26_A2-BFW-322-0101_A 10 D2A 2 01-Dec-21
3 0 S002 EP26_A2 EP26_A2-BFW-322-0101_B 10 D2A 1 15-Jun-22
4 2 S014 EP26_A2 EP26_A2-BFW-322-0101_C 8 D2A 2 01-Dec-21 17-Aug-22 01-Mar-23
5 0 S002 EP26_A2 EP26_A2-BFW-323-0107 2 D2A 1 15-Jun-22
6 0 S002 EP26_A2 EP26_A2-C-374-0306_A 4 A19A 1 15-Jun-22
7 1 S010 EP26_A2 EP26_A2-C-374-0306_B 2 A19A 2 01-Dec-21 09-Nov-22
8 1 S004 EP26_A2 EP26_A2-C-374-0307_A 6 A19A 1 01-Dec-21 17-Aug-22
9 0 S002 EP26_A2 EP26_A2-C-374-0307_B 6 A19A 1 15-Jun-22
10 0 S001 EP26_A2 EP26_A2-C-374-0310_A 4 A19A 2 01-Dec-21
11 0 S002 EP26_A2 EP26_A2-C-374-0310_B 4 A19A 1 15-Jun-22
12 0 S002 EP26_A2 EP26_A2-C-375-0201 3 A19A 1 15-Jun-22
13 1 S013 EP26_A2 EP26_A2-C-375-0208_A 3 A19A 2 01-Dec-21 07-Dec-22
14 0 S002 EP26_A2 EP26_A2-C-375-0208_B 3 A19A 1 15-Jun-22
15 1 S004 EP26_A2 EP26_A2-C-375-0208_C 3 A19A 2 01-Dec-21 17-Aug-22
16 0 S002 EP26_A2 EP26_A2-C-375-0211 3 A19A 1 15-Jun-22
17 0 S001 EP26_A2 EP26_A2-C-375-0212_A 3 A19A 2 01-Dec-21
18 0 S002 EP26_A2 EP26_A2-C-375-0212_B 3 A19A 1 15-Jun-22
19 1 S004 EP26_A2 EP26_A2-C-375-0212_C 3 A19A 1 01-Dec-21 17-Aug-22
20 0 S002 EP26_A2 EP26_A2-C-491-0401_A 3 A19A 2 15-Jun-22
21 0 S001 EP26_A2 EP26_A2-C-491-0401_B 3 A19A 1 01-Dec-21
22 0 S002 EP26_A2 EP26_A2-CRWS-491-0307 4 A1A 1 15-Jun-22
23 0 S001 EP26_A2 EP26_A2-CRWS-491-0312_A 10 A1A 2 01-Dec-21
24 0 S002 EP26_A2 EP26_A2-CRWS-491-0312_B 10 A1A 1 15-Jun-22
25 1 S004 EP26_A2 EP26_A2-CRWS-491-0312_C 10 A1A 2 01-Dec-21 17-Aug-22
26 0 S002 EP26_A2 EP26_A2-DM-321-0203 4 A3K 1 15-Jun-22
27 0 S001 EP26_A2 EP26_A2-DM-321-0204_A 8 A3K 2 01-Dec-21
28 0 S002 EP26_A2 EP26_A2-DM-321-0204_B 8 A3K 1 15-Jun-22
29 1 S004 EP26_A2 EP26_A2-DM-321-0204_C 4 A3K 2 01-Dec-21 17-Aug-22
30 1 S004 EP26_A2 EP26_A2-DM-321-0302 6 A3K 3 01-Dec-21 17-Aug-22
31 0 S002 EP26_A2 EP26_A2-DW-341-0329 6 J2A 1 15-Jun-22
32 0 S001 EP26_A2 EP26_A2-DW-341-0905_A 6 J2A 2 01-Dec-21
33 0 S002 EP26_A2 EP26_A2-DW-341-0905_B 6 J2A 1 15-Jun-22
34 0 S005 EP26_A2 EP26_A2-DW-341-0905_C 6 J2A 2 24-Aug-22
35 0 S002 EP26_A2 EP26_A2-ETW-491-0401_A 3 A48A 1 15-Jun-22
36 0 S004 EP26_A2 EP26_A2-ETW-491-0401_B 3 A48A 2 17-Aug-22

1 of 7
INDEX OF ISOMETRIC DRAWING FOR ABOVEGROUND PIPING
NO. Latest NEW REV Status Issue ISO WBS LINE NO. R-Size R-Spec NO OF ISOMETRIC DRAWING ISSUE HISTORY REMARKS/HOLD ITEM
DEL/HOLD
Rev.No. Batch WBS SHEET REV.0 REV.1 REV.2 REV.3 REV.4
/Release
37 1 S004 EP26_A2 EP26_A2-ETW-491-0703 10 A33Y 3 01-Dec-21 17-Aug-22
38 0 S001 EP26_A2 EP26_A2-FG-371-0104_A 16 A1A 2 01-Dec-21
39 0 S002 EP26_A2 EP26_A2-FG-371-0104_B 16 A1A 1 15-Jun-22
40 1 S004 EP26_A2 EP26_A2-FG-371-0104_C 16 A1A 3 01-Dec-21 17-Aug-22
41 0 S002 EP26_A2 EP26_A2-FG-371-0113 4 A1A 1 15-Jun-22

42 1 O S015 EP26_A2 EP26_A2-FL-322-0102 10 A4A 2 14-Sep-22 31-May-23


43 0 S007 EP26_A2 EP26_A2-FL-471-0215 52 A4A 2 14-Sep-22
44 1 S010 EP26_A2 EP26_A2-HP-322-0101_A 30 D2D 2 01-Dec-21 09-Nov-22
45 0 S002 EP26_A2 EP26_A2-HP-322-0101_B 30 D2D 1 15-Jun-22
46 1 S010 EP26_A2 EP26_A2-HP-322-0101_C 30 D2D 7 01-Dec-21 09-Nov-22
47 0 S002 EP26_A2 EP26_A2-HP-322-0208 14 D2D 1 15-Jun-22
48 1 S011 EP26_A2 EP26_A2-HP-322-02205 0.75 D2D 2 01-Dec-21 16-Nov-22
49 0 DEL S001 EP26_A2 EP26_A2-HP-322-02206 0.75 D2D 2 01-Dec-21
50 1 S011 EP26_A2 EP26_A2-HP-322-02207 0.75 D2D 2 01-Dec-21 16-Nov-22
51 1 S011 EP26_A2 EP26_A2-HP-322-02208 0.75 D2D 1 01-Dec-21 16-Nov-22
52 1 S011 EP26_A2 EP26_A2-HP-322-02209 0.75 D2D 2 01-Dec-21 16-Nov-22
53 0 DEL S001 EP26_A2 EP26_A2-HP-322-02210 0.75 D2D 2 01-Dec-21
54 0 DEL S001 EP26_A2 EP26_A2-HP-322-02211 0.75 D2D 2 01-Dec-21
55 1 S011 EP26_A2 EP26_A2-HP-322-02212 0.75 D2D 2 01-Dec-21 16-Nov-22
56 0 S001 EP26_A2 EP26_A2-IA-331-0101_A 8 A3A 2 01-Dec-21
57 0 S002 EP26_A2 EP26_A2-IA-331-0101_B 8 A3A 1 15-Jun-22
58 1 S004 EP26_A2 EP26_A2-IA-331-0101_C 8 A3A 1 01-Dec-21 17-Aug-22
59 0 S002 EP26_A2 EP26_A2-IA-331-0216 4 A3A 1 15-Jun-22
60 1 S006 EP26_A2 EP26_A2-LC-322-021104 0.75 A2A 1 01-Dec-21 07-Sep-22
61 1 S006 EP26_A2 EP26_A2-LC-322-021105 0.75 A2A 1 01-Dec-21 07-Sep-22
62 1 S006 EP26_A2 EP26_A2-LC-322-021106 0.75 A2A 1 01-Dec-21 07-Sep-22
63 0 DEL S001 EP26_A2 EP26_A2-LC-322-021107 0.75 A2A 1 01-Dec-21
64 0 DEL S001 EP26_A2 EP26_A2-LC-322-021108 0.75 A2A 1 01-Dec-21
65 0 DEL S001 EP26_A2 EP26_A2-LC-322-021109 0.75 A2A 1 01-Dec-21
66 0 DEL S001 EP26_A2 EP26_A2-LC-322-021110 0.75 A2A 1 01-Dec-21
67 0 S004 EP26_A2 EP26_A2-LC-322-021251 0.75 A2A 1 17-Aug-22
68 0 S004 EP26_A2 EP26_A2-LC-322-021252 0.75 A2A 1 17-Aug-22
69 0 S006 EP26_A2 EP26_A2-LC-322-021253 0.75 A2A 1 07-Sep-22
70 0 S006 EP26_A2 EP26_A2-LC-322-021254 0.75 A2A 1 07-Sep-22
71 1 S011 EP26_A2 EP26_A2-LC-322-02205 0.75 A2A 1 01-Dec-21 16-Nov-22
72 0 DEL S001 EP26_A2 EP26_A2-LC-322-02206 0.75 A2A 1 01-Dec-21
73 1 S011 EP26_A2 EP26_A2-LC-322-02207 0.75 A2A 1 01-Dec-21 16-Nov-22

2 of 7
INDEX OF ISOMETRIC DRAWING FOR ABOVEGROUND PIPING
NO. Latest NEW REV Status Issue ISO WBS LINE NO. R-Size R-Spec NO OF ISOMETRIC DRAWING ISSUE HISTORY REMARKS/HOLD ITEM
DEL/HOLD
Rev.No. Batch WBS SHEET REV.0 REV.1 REV.2 REV.3 REV.4
/Release
74 1 S011 EP26_A2 EP26_A2-LC-322-02208 0.75 A2A 1 01-Dec-21 16-Nov-22
75 1 S011 EP26_A2 EP26_A2-LC-322-02209 0.75 A2A 1 01-Dec-21 16-Nov-22
76 0 DEL S001 EP26_A2 EP26_A2-LC-322-02210 0.75 A2A 1 01-Dec-21
77 1 S006 EP26_A2 EP26_A2-LC-322-022105 1.5 A2A 1 01-Dec-21 07-Sep-22
78 1 S006 EP26_A2 EP26_A2-LC-322-022106 1.5 A2A 1 01-Dec-21 07-Sep-22
79 1 S006 EP26_A2 EP26_A2-LC-322-022107 1.5 A2A 1 01-Dec-21 07-Sep-22
80 1 S006 EP26_A2 EP26_A2-LC-322-022108 1.5 A2A 1 01-Dec-21 07-Sep-22
81 0 DEL S001 EP26_A2 EP26_A2-LC-322-022109 1.5 A2A 1 01-Dec-21
82 0 DEL S001 EP26_A2 EP26_A2-LC-322-02211 0.75 A2A 1 01-Dec-21
83 0 DEL S001 EP26_A2 EP26_A2-LC-322-022110 1.5 A2A 1 01-Dec-21
84 0 DEL S001 EP26_A2 EP26_A2-LC-322-022111 1.5 A2A 1 01-Dec-21
85 0 DEL S001 EP26_A2 EP26_A2-LC-322-022112 1.5 A2A 1 01-Dec-21
86 1 S011 EP26_A2 EP26_A2-LC-322-02212 0.75 A2A 1 01-Dec-21 16-Nov-22
87 0 S006 EP26_A2 EP26_A2-LC-322-022256 1.5 A2A 1 07-Sep-22
88 0 S006 EP26_A2 EP26_A2-LC-322-022257 1.5 A2A 1 07-Sep-22
89 0 S006 EP26_A2 EP26_A2-LC-322-022260 1.5 A2A 1 07-Sep-22
90 0 S006 EP26_A2 EP26_A2-LC-322-022261 1.5 A2A 1 07-Sep-22
91 1 S011 EP26_A2 EP26_A2-LC-322-02405 0.75 A2A 1 01-Dec-21 16-Nov-22
92 1 S011 EP26_A2 EP26_A2-LC-322-02406 0.75 A2A 1 01-Dec-21 16-Nov-22
93 1 S011 EP26_A2 EP26_A2-LC-322-02407 0.75 A2A 1 01-Dec-21 16-Nov-22
94 1 S011 EP26_A2 EP26_A2-LC-322-02408 0.75 A2A 1 01-Dec-21 16-Nov-22
95 1 S011 EP26_A2 EP26_A2-LC-322-02409 0.75 A2A 1 01-Dec-21 16-Nov-22
96 1 S011 EP26_A2 EP26_A2-LC-322-02410 0.75 A2A 1 01-Dec-21 16-Nov-22
97 1 S011 EP26_A2 EP26_A2-LC-322-02411 0.75 A2A 1 01-Dec-21 16-Nov-22
98 0 DEL S001 EP26_A2 EP26_A2-LC-322-02412 0.75 A2A 1 01-Dec-21
99 0 DEL S001 EP26_A2 EP26_A2-LC-322-02413 0.75 A2A 1 01-Dec-21
100 0 DEL S001 EP26_A2 EP26_A2-LC-322-02414 0.75 A2A 1 01-Dec-21
101 1 S011 EP26_A2 EP26_A2-LC-322-02706 0.75 A2A 1 01-Dec-21 16-Nov-22
102 1 S011 EP26_A2 EP26_A2-LC-322-02707 0.75 A2A 1 01-Dec-21 16-Nov-22
103 1 S011 EP26_A2 EP26_A2-LC-322-02708 0.75 A2A 1 01-Dec-21 16-Nov-22
104 1 S011 EP26_A2 EP26_A2-LC-322-02709 0.75 A2A 1 01-Dec-21 16-Nov-22
105 1 S011 EP26_A2 EP26_A2-LC-322-02710 0.75 A2A 1 01-Dec-21 16-Nov-22
106 1 S011 EP26_A2 EP26_A2-LC-322-02711 0.75 A2A 1 01-Dec-21 16-Nov-22
107 1 S011 EP26_A2 EP26_A2-LC-322-02712 0.75 A2A 1 01-Dec-21 16-Nov-22
108 0 DEL S001 EP26_A2 EP26_A2-LC-322-02713 0.75 A2A 1 01-Dec-21
109 0 DEL S001 EP26_A2 EP26_A2-LC-322-02714 0.75 A2A 1 01-Dec-21
110 0 DEL S001 EP26_A2 EP26_A2-LC-322-02715 0.75 A2A 1 01-Dec-21

3 of 7
INDEX OF ISOMETRIC DRAWING FOR ABOVEGROUND PIPING
NO. Latest NEW REV Status Issue ISO WBS LINE NO. R-Size R-Spec NO OF ISOMETRIC DRAWING ISSUE HISTORY REMARKS/HOLD ITEM
DEL/HOLD
Rev.No. Batch WBS SHEET REV.0 REV.1 REV.2 REV.3 REV.4
/Release
111 0 S001 EP26_A2 EP26_A2-LC-322-0312_A 10 A2A 2 01-Dec-21
112 0 S002 EP26_A2 EP26_A2-LC-322-0312_B 10 A2A 1 15-Jun-22
113 1 S004 EP26_A2 EP26_A2-LC-322-0312_C 10 A2A 4 01-Dec-21 17-Aug-22
114 0 S002 EP26_A2 EP26_A2-LC-322-0336 4 A2A 1 15-Jun-22
115 2 S011 EP26_A2 EP26_A2-LP-322-0101_A 36 A2A 3 01-Dec-21 09-Nov-22 16-Nov-22
116 0 S002 EP26_A2 EP26_A2-LP-322-0101_B 36 A2A 1 15-Jun-22
117 1 S010 EP26_A2 EP26_A2-LP-322-0101_C 36 A2A 10 01-Dec-21 09-Nov-22
118 1 S006 EP26_A2 EP26_A2-LP-322-021104 1.5 A2A 2 01-Dec-21 07-Sep-22
119 1 S006 EP26_A2 EP26_A2-LP-322-021105 1.5 A2A 2 01-Dec-21 07-Sep-22
120 1 S006 EP26_A2 EP26_A2-LP-322-021106 1.5 A2A 2 01-Dec-21 07-Sep-22
121 0 DEL S001 EP26_A2 EP26_A2-LP-322-021107 1.5 A2A 2 01-Dec-21
122 0 DEL S001 EP26_A2 EP26_A2-LP-322-021108 1.5 A2A 2 01-Dec-21
123 0 DEL S001 EP26_A2 EP26_A2-LP-322-021109 1.5 A2A 2 01-Dec-21
124 0 DEL S001 EP26_A2 EP26_A2-LP-322-021110 1.5 A2A 2 01-Dec-21
125 0 S004 EP26_A2 EP26_A2-LP-322-021251 1.5 A2A 2 17-Aug-22
126 0 S004 EP26_A2 EP26_A2-LP-322-021252 1.5 A2A 2 17-Aug-22
127 0 S006 EP26_A2 EP26_A2-LP-322-021253 1.5 A2A 2 07-Sep-22
128 0 S006 EP26_A2 EP26_A2-LP-322-021254 1.5 A2A 2 07-Sep-22
129 0 S002 EP26_A2 EP26_A2-LP-322-0213 16 A2A 1 15-Jun-22
130 1 S011 EP26_A2 EP26_A2-LP-322-02706 0.75 A2A 2 01-Dec-21 16-Nov-22
131 1 S011 EP26_A2 EP26_A2-LP-322-02707 0.75 A2A 1 01-Dec-21 16-Nov-22
132 1 S011 EP26_A2 EP26_A2-LP-322-02708 0.75 A2A 1 01-Dec-21 16-Nov-22
133 1 S011 EP26_A2 EP26_A2-LP-322-02709 0.75 A2A 1 01-Dec-21 16-Nov-22
134 1 S011 EP26_A2 EP26_A2-LP-322-02710 0.75 A2A 1 01-Dec-21 16-Nov-22
135 1 S011 EP26_A2 EP26_A2-LP-322-02711 0.75 A2A 2 01-Dec-21 16-Nov-22
136 1 S011 EP26_A2 EP26_A2-LP-322-02712 0.75 A2A 2 01-Dec-21 16-Nov-22
137 0 DEL S001 EP26_A2 EP26_A2-LP-322-02713 0.75 A2A 1 01-Dec-21
138 0 DEL S001 EP26_A2 EP26_A2-LP-322-02714 0.75 A2A 1 01-Dec-21
139 0 DEL S001 EP26_A2 EP26_A2-LP-322-02715 0.75 A2A 2 01-Dec-21
140 1 S014 EP26_A2 EP26_A2-MP-322-0101_A 36 B2A 2 01-Dec-21 01-Mar-23
141 0 S002 EP26_A2 EP26_A2-MP-322-0101_B 36 B2A 1 15-Jun-22
142 2 S013 EP26_A2 EP26_A2-MP-322-0101_C 30 B2A 8 01-Dec-21 09-Nov-22 07-Dec-22
143 0 S002 EP26_A2 EP26_A2-MP-322-0209 20 B2A 1 15-Jun-22
144 1 S011 EP26_A2 EP26_A2-MP-322-02405 0.75 B2A 2 01-Dec-21 16-Nov-22
145 1 S011 EP26_A2 EP26_A2-MP-322-02406 0.75 B2A 1 01-Dec-21 16-Nov-22
146 0 S001 EP26_A2 EP26_A2-MP-322-02407 0.75 B2A 2 01-Dec-21
147 1 S011 EP26_A2 EP26_A2-MP-322-02408 0.75 B2A 2 01-Dec-21 16-Nov-22

4 of 7
INDEX OF ISOMETRIC DRAWING FOR ABOVEGROUND PIPING
NO. Latest NEW REV Status Issue ISO WBS LINE NO. R-Size R-Spec NO OF ISOMETRIC DRAWING ISSUE HISTORY REMARKS/HOLD ITEM
DEL/HOLD
Rev.No. Batch WBS SHEET REV.0 REV.1 REV.2 REV.3 REV.4
/Release
148 0 S001 EP26_A2 EP26_A2-MP-322-02409 0.75 B2A 2 01-Dec-21
149 0 S001 EP26_A2 EP26_A2-MP-322-02410 0.75 B2A 2 01-Dec-21
150 0 S001 EP26_A2 EP26_A2-MP-322-02411 0.75 B2A 2 01-Dec-21
151 0 DEL S001 EP26_A2 EP26_A2-MP-322-02412 0.75 B2A 2 01-Dec-21
152 0 DEL S001 EP26_A2 EP26_A2-MP-322-02413 0.75 B2A 2 01-Dec-21
153 0 DEL S001 EP26_A2 EP26_A2-MP-322-02414 0.75 B2A 2 01-Dec-21
154 0 S001 EP26_A2 EP26_A2-N2-333-0204_A 10 A3A 2 01-Dec-21
155 0 S002 EP26_A2 EP26_A2-N2-333-0204_B 10 A3A 1 15-Jun-22
156 1 S004 EP26_A2 EP26_A2-N2-333-0204_C 8 A3A 1 01-Dec-21 17-Aug-22
157 0 S002 EP26_A2 EP26_A2-N2-333-0220 10 A3A 1 15-Jun-22
158 0 S001 EP26_A2 EP26_A2-OWS-491-0203_A 6 A1A 2 01-Dec-21
159 1 S009 EP26_A2 EP26_A2-OWS-491-0203_B 6 A1A 1 15-Jun-22 19-Oct-22
160 1 S004 EP26_A2 EP26_A2-OWS-491-0203_C 6 A1A 1 01-Dec-21 17-Aug-22
161 1 S009 EP26_A2 EP26_A2-OWS-491-0208 6 A1A 1 15-Jun-22 19-Oct-22
162 1 S003 EP26_A2 EP26_A2-P-301-0151 6 B1A 3 01-Dec-21 10-Aug-22
163 1 S003 EP26_A2 EP26_A2-P-301-0155 12 B9A 4 01-Dec-21 10-Aug-22
164 1 S003 EP26_A2 EP26_A2-P-301-0166 3 B19A 4 01-Dec-21 10-Aug-22
165 1 S003 EP26_A2 EP26_A2-P-301-0167 3 B16A 4 01-Dec-21 10-Aug-22
166 1 S003 EP26_A2 EP26_A2-P-301-0192 8 B1A 4 01-Dec-21 10-Aug-22
167 0 S002 EP26_A2 EP26_A2-P-301-0199_A 3 B48A 1 15-Jun-22
168 1 S004 EP26_A2 EP26_A2-P-301-0199_B 3 B48A 1 01-Dec-21 17-Aug-22
169 0 S003 EP26_A2 EP26_A2-P-301-0207 3 A1A 4 10-Aug-22
170 1 S003 EP26_A2 EP26_A2-P-301-0287 6 B1A 4 01-Dec-21 10-Aug-22
171 1 S013 EP26_A2 EP26_A2-P-301-0344_A 4 B1A 2 01-Dec-21 07-Dec-22
172 0 S007 EP26_A2 EP26_A2-P-301-0344_B 4 B1A 1 14-Sep-22
173 1 S004 EP26_A2 EP26_A2-P-301-0344_C 4 B1A 2 01-Dec-21 17-Aug-22
174 1 S003 EP26_A2 EP26_A2-P-301-0349 8 A1A 4 01-Dec-21 10-Aug-22
175 2 S014 EP26_A2 EP26_A2-P-301-0365 6 B1A 4 01-Dec-21 10-Aug-22 01-Mar-23
176 1 S003 EP26_A2 EP26_A2-P-301-0376 4 B5A 4 01-Dec-21 10-Aug-22
177 1 S003 EP26_A2 EP26_A2-P-301-0389 4 B1A 4 01-Dec-21 10-Aug-22
178 0 S007 EP26_A2 EP26_A2-P-301-0391 2 B1A 1 14-Sep-22
179 2 S013 EP26_A2 EP26_A2-P-301-0446 6 B48A 3 01-Dec-21 17-Aug-22 07-Dec-22
180 1 S004 EP26_A2 EP26_A2-P-301-0447 6 B1A 4 01-Dec-21 17-Aug-22
181 0 S001 EP26_A2 EP26_A2-P-301-0448_A 4 B1A 1 01-Dec-21
182 0 S002 EP26_A2 EP26_A2-P-301-0448_B 4 B1A 1 15-Jun-22
183 0 S001 EP26_A2 EP26_A2-P-301-0452_A 6 B4A 2 01-Dec-21
184 0 S002 EP26_A2 EP26_A2-P-301-0452_B 6 B4A 1 15-Jun-22

5 of 7
INDEX OF ISOMETRIC DRAWING FOR ABOVEGROUND PIPING
NO. Latest NEW REV Status Issue ISO WBS LINE NO. R-Size R-Spec NO OF ISOMETRIC DRAWING ISSUE HISTORY REMARKS/HOLD ITEM
DEL/HOLD
Rev.No. Batch WBS SHEET REV.0 REV.1 REV.2 REV.3 REV.4
/Release
185 1 S013 EP26_A2 EP26_A2-P-301-0466 2 B1A 3 14-Sep-22 07-Dec-22
186 0 S002 EP26_A2 EP26_A2-P-301-0467_A 3 B48A 1 15-Jun-22
187 1 S004 EP26_A2 EP26_A2-P-301-0467_B 3 B48A 1 01-Dec-21 17-Aug-22
188 1 S010 EP26_A2 EP26_A2-P-301-0470 4 A11N 3 21-Sep-22 09-Nov-22
189 0 S002 EP26_A2 EP26_A2-P-301-0480_A 8 B4A 1 15-Jun-22
190 1 S004 EP26_A2 EP26_A2-P-301-0480_B 8 B4A 1 01-Dec-21 17-Aug-22
191 0 S002 EP26_A2 EP26_A2-P-301-0488_A 10 B4A 1 15-Jun-22
192 1 S004 EP26_A2 EP26_A2-P-301-0488_B 10 B4A 2 01-Dec-21 17-Aug-22
193 0 S001 EP26_A2 EP26_A2-P-301-0492_A 8 B48A 2 01-Dec-21
194 0 S002 EP26_A2 EP26_A2-P-301-0492_B 8 B48A 1 15-Jun-22
195 0 S001 EP26_A2 EP26_A2-P-301-0493_A 6 B4A 2 01-Dec-21
196 0 S002 EP26_A2 EP26_A2-P-301-0493_B 6 B4A 1 15-Jun-22
197 0 S002 EP26_A2 EP26_A2-P-301-0495_A 8 B48A 1 15-Jun-22
198 1 S004 EP26_A2 EP26_A2-P-301-0495_B 8 B48A 2 01-Dec-21 17-Aug-22
199 0 S001 EP26_A2 EP26_A2-P-301-0496_A 6 B4A 2 01-Dec-21
200 0 S002 EP26_A2 EP26_A2-P-301-0496_B 6 B4A 1 15-Jun-22
201 1 S004 EP26_A2 EP26_A2-P-301-0665 6 B66A 4 01-Dec-21 17-Aug-22
202 1 S004 EP26_A2 EP26_A2-P-301-0667 4 A66A 4 01-Dec-21 17-Aug-22
203 1 S004 EP26_A2 EP26_A2-P-301-0668 10 A1A 4 01-Dec-21 17-Aug-22
204 1 S004 EP26_A2 EP26_A2-P-301-0670 10 A1A 5 01-Dec-21 17-Aug-22
205 0 S001 EP26_A2 EP26_A2-P-301-0759_A 6 A1A 2 01-Dec-21
206 1 S013 EP26_A2 EP26_A2-P-301-0759_B 6 A1A 1 15-Jun-22 07-Dec-22
207 1 S004 EP26_A2 EP26_A2-P-301-0759_C 6 A1A 3 01-Dec-21 17-Aug-22
208 1 S013 EP26_A2 EP26_A2-P-301-0779 3 A1A 1 15-Jun-22 07-Dec-22
209 1 S003 EP26_A2 EP26_A2-P-301-0842 12 A19A 4 01-Dec-21 10-Aug-22
210 2 S012 EP26_A2 EP26_A2-P-301-0851 12 A19A 4 01-Dec-21 10-Aug-22 23-Nov-22
211 2 S012 EP26_A2 EP26_A2-P-301-0853 12 A19A 4 01-Dec-21 10-Aug-22 23-Nov-22
212 0 S001 EP26_A2 EP26_A2-P-301-0856_A 18 B16A 2 01-Dec-21
213 0 S007 EP26_A2 EP26_A2-P-301-0856_B 18 B16A 1 14-Sep-22
214 0 S005 EP26_A2 EP26_A2-P-301-0856_C 18 B16A 3 24-Aug-22
215 0 S001 EP26_A2 EP26_A2-P-301-0859_A 16 B19A 2 01-Dec-21
216 0 S007 EP26_A2 EP26_A2-P-301-0859_B 16 B19A 1 14-Sep-22
217 1 S004 EP26_A2 EP26_A2-P-301-0859_C 16 B19A 3 01-Dec-21 17-Aug-22
218 0 S007 EP26_A2 EP26_A2-P-301-0865 4 B19A 1 14-Sep-22
219 1 S003 EP26_A2 EP26_A2-P-301-0872 6 A19A 3 01-Dec-21 10-Aug-22
220 1 S003 EP26_A2 EP26_A2-P-301-0876 8 A19A 3 01-Dec-21 10-Aug-22
221 0 S007 EP26_A2 EP26_A2-P-301-0896 4 B16A 1 14-Sep-22

6 of 7
INDEX OF ISOMETRIC DRAWING FOR ABOVEGROUND PIPING
NO. Latest NEW REV Status Issue ISO WBS LINE NO. R-Size R-Spec NO OF ISOMETRIC DRAWING ISSUE HISTORY REMARKS/HOLD ITEM
DEL/HOLD
Rev.No. Batch WBS SHEET REV.0 REV.1 REV.2 REV.3 REV.4
/Release
222 0 S002 EP26_A2 EP26_A2-P-301-0901_A 6 B4A 1 15-Jun-22
223 1 S004 EP26_A2 EP26_A2-P-301-0901_B 6 B4A 1 01-Dec-21 17-Aug-22
224 1 S003 EP26_A2 EP26_A2-P-301-0951_A 10 B5A 2 01-Dec-21 10-Aug-22
225 0 S002 EP26_A2 EP26_A2-P-301-0951_B 10 B5A 1 15-Jun-22
226 1 S003 EP26_A2 EP26_A2-P-301-0951_C 10 B5A 3 01-Dec-21 10-Aug-22
227 0 S002 EP26_A2 EP26_A2-P-301-0978 2 B5A 1 15-Jun-22
228 1 S003 EP26_A2 EP26_A2-P-301-0979 6 B1A 4 01-Dec-21 10-Aug-22
229 1 S004 EP26_A2 EP26_A2-P-301-0983 4 B1A 4 01-Dec-21 17-Aug-22
230 0 S001 EP26_A2 EP26_A2-P-301-0987_A 3 B5A 2 01-Dec-21
231 0 S002 EP26_A2 EP26_A2-P-301-0987_B 3 B5A 1 15-Jun-22
232 1 S003 EP26_A2 EP26_A2-P-301-1251 4 A67A 5 01-Dec-21 10-Aug-22
233 1 S003 EP26_A2 EP26_A2-P-301-1354 6 B1A 4 01-Dec-21 10-Aug-22
234 0 S004 EP26_A2 EP26_A2-P-301-1453 4 B9A 5 17-Aug-22
235 1 S003 EP26_A2 EP26_A2-P-301-1555 10 B66A 4 01-Dec-21 10-Aug-22
236 1 S003 EP26_A2 EP26_A2-P-491-0401 6 D9A 3 01-Dec-21 10-Aug-22
237 1 S004 EP26_A2 EP26_A2-P-491-0702 3 A1A 3 01-Dec-21 17-Aug-22
238 0 S001 EP26_A2 EP26_A2-PA-332-0106_A 8 A3A 2 01-Dec-21
239 0 S002 EP26_A2 EP26_A2-PA-332-0106_B 8 A3A 1 15-Jun-22
240 1 S004 EP26_A2 EP26_A2-PA-332-0106_C 8 A3A 1 01-Dec-21 17-Aug-22
241 0 S002 EP26_A2 EP26_A2-PA-332-0217 4 A3A 1 15-Jun-22
242 0 S001 EP26_A2 EP26_A2-SW-341-0216_A 20 A93A 2 01-Dec-21
243 0 S002 EP26_A2 EP26_A2-SW-341-0216_B 20 A93A 1 15-Jun-22
244 1 S004 EP26_A2 EP26_A2-SW-341-0216_C 20 A93A 3 01-Dec-21 17-Aug-22
245 0 DEL S001 EP26_A2 EP26_A2-SW-341-0216_E 20 A93A 1 01-Dec-21
246 0 S002 EP26_A2 EP26_A2-SW-341-0217 4 A93A 1 15-Jun-22
247 1 S004 EP26_A2 EP26_A2-WD-321-0101 4 A33Y 3 01-Dec-21 17-Aug-22

7 of 7
<SECURITY LEVEL2>

N MATERIAL LIST

PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
PIPE
1 1 APPTB0SBB 8" PIPE A106GR.B SMLS BE ASME B36.10M :S-STD 36.4 M
4
90° 2 APPTB0SAB 3/4" PIPE A106GR.B SMLS PE ASME B36.10M :S-160 0.2 M

CONT.ON FITTINGS
BD-311-1302 SHT 2 3 DHDTA0Q1R 8X3/4" HALF COUPLING A105 CL.6000 SW ASME B16.11 1

4 DEATB0S2Q 8" 90 DEG ELBOW A234GR.WPB SMLS BW ASME B16.9 4


:S-STD

FLANGES
5 CFATA0DBJ 3/4" FLANGE SW A105 CL.150 RF ASME B16.5 :S-160 1
<5
> S9 6 CDBTA0DBJ 3/4" BLIND FLANGE A105 CL.150 RF ASME B16.5 1
1
4027

G1-8
<6> 1

GASKETS
7 FFG121000DAFA 3/4" NON-ASBESTOS SHEET GASKET (G121) CL.150 FF 1
3.0 MM ASME B16.20

VALVES
E 1810360
25 N 1946462 8 51001 3/4" GATE VALVE CL.800 A105/HF SW BB,OS&Y BY 1
37 MFR/API 602/ASME B16.11 HANDWHEEL
8"NPS 7 90 EL +120049
00
PIPE SUPPORTS
9 G1 8" G1-8 3

4 6 PT| SIZE
S9

106
305 90° NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
EL +115609 G1-8
F5 G7 B10 BOLTS
10 EBEBB0A 1/2 " STUD BOLT(FULL THREADED)/HEX.NUT(HEAVY) 4
<4> 2 A193GR.B7/A194GR.2H ASME B18.2.1/ASME
B18.2.2 - 65 mm Length
68 8
STEM NORTH

235
79
39 CUT PIPE LENGTH
<3> 2
PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS
3 NO (MM) (IN) NO (MM) (IN)
8X3/4"NPS
<1> 4257 8 <2> 3417 8
50 <3> 100 3/4 <4> 100 3/4
0 <5> 25267 8 <6> 3417 8
4
90°
EL +119637
1

4027
<2> 1
<1> 1
4
90° S9
G1-8
35
00
45
62

8"NPS

CONT.ON
EP26_A1-BD-311-1302
E 1810360
N 1941400
EL +115610
Isometric File Name : EP26_A2-BD-311-1302
Iso Extraction Date : 2022-08-19 12:17:48

DESIGN TEMP. ºC 65.00 OPE. TEMP. ºC 45.00 PAINT SYSTEM T1 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 40.00 OPE. PRESS. kg/cm2g 4.00 PWHT N
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
1 17-08-2022 REVISED AS PER MARK1 PPK SP SS INS. CODE N TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm - TEST PRESS. kg/cm2g 15 CLIENT NAME


01/12/2021 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 1 PT or MT % 0 STRESS SYSTEM.NO 6405-EPCM25_26-CA-0024
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-491-PRS-PID-000-0004 GAD NO: EPCM26-6405-A1-PIP-ARG-AG-301A~C
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 8"-BD-311-1302-A93A PIPE SPEC :A93A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : BD-311-1302 AREA: EP26-A2 SHT. 1 OF 2 REV. 1
<SECURITY LEVEL2>

CONT.ON
N MATERIAL LIST
EP26_A3-BD-311-1302
E 1810360 PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
N 2083140
EL +123610 PIPE
305 1 APPTB0SBB 8" PIPE A106GR.B SMLS BE ASME B36.10M :S-STD 117.8 M

2 APPTB0SAB 3/4" PIPE A106GR.B SMLS PE ASME B36.10M :S-160 0.2 M

FITTINGS
4 3 DHDTA0Q1R 8X3/4" HALF COUPLING A105 CL.6000 SW ASME B16.11 1
8"NPS 90°
<4> 1 EL +123610 4 DEATB0S2Q 8" 90 DEG ELBOW A234GR.WPB SMLS BW ASME B16.9 2
S11 :S-STD
8000
G1TR1-0-850-8 FLANGES
WITH PAD.
5 CFATA0DBJ 3/4" FLANGE SW A105 CL.150 RF ASME B16.5 :S-160 1

6 CDBTA0DBJ 3/4" BLIND FLANGE A105 CL.150 RF ASME B16.5 1


6325

GASKETS
7 FFG121000DAFA 3/4" NON-ASBESTOS SHEET GASKET (G121) CL.150 FF 1
4 3.0 MM ASME B16.20
90°
1 VALVES
8 51001 3/4" GATE VALVE CL.800 A105/HF SW BB,OS&Y BY 1
MFR/API 602/ASME B16.11 HANDWHEEL
S9
PIPE SUPPORTS
G1-8
12 9 G1 8" G1-8 10
<3> 1 00
0 10 F1 8" F1-8 1
S9
12 11 G1TR1 8" G1TR1-0-850-8 1
G1-8 00
0 PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
S9
12 BOLTS
G1-8 00
0 12 EBEBB0A 1/2 " STUD BOLT(FULL THREADED)/HEX.NUT(HEAVY) 4
S9
A193GR.B7/A194GR.2H ASME B18.2.1/ASME
G1-8 B18.2.2 - 65 mm Length
12
00 11
0 04
S9 97 S10
G1-8 F1-8 CUT PIPE LENGTH
12
00 PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS
0 NO (MM) (IN) NO (MM) (IN)
S9
S9 <1> 100 3/4 <2> 100 3/4
G1-8 60 <3> 110387 8 <4> 7390 8
00 G1-8
60
00
1
12
00 S9
0
G1-8
S9 10
G1-8 10 3
0
S9 8X3/4"NPS
G1-8 195
11
50
0

562 8"NPS
SEE SHT
BD-311-1302 SHT 1

235
<1> 2
8 68
STEM SOUTH
106
<2> 2
F5 G7 B12
6
E 1810360
N 1972339
EL +115197
Isometric File Name : EP26_A2-BD-311-1302
Iso Extraction Date : 2022-08-19 12:17:48

DESIGN TEMP. ºC 65.00 OPE. TEMP. ºC 45.00 PAINT SYSTEM T1 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 40.00 OPE. PRESS. kg/cm2g 4.00 PWHT N
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
1 17-08-2022 REVISED AS PER MARK1 PPK SP SS INS. CODE N TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm - TEST PRESS. kg/cm2g 15 CLIENT NAME


01/12/2021 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 1 PT or MT % 0 STRESS SYSTEM.NO 6405-EPCM25_26-CA-0024
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-491-PRS-PID-000-0004 GAD NO: EPCM26-6405-A1-PIP-ARG-AG-301A~C
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 8"-BD-311-1302-A93A PIPE SPEC :A93A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : BD-311-1302 AREA: EP26-A2 SHT. 2 OF 2 REV. 1
<SECURITY LEVEL2>

N MATERIAL LIST

PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
PIPE
1 APPTB0SBBPG 10" PIPE A106GR.B SMLS BE ASME B36.10M IBR 32.1 M
:12.70mm
E 1805408 2 APPTB0SABPG 3/4" PIPE A106GR.B SMLS PE ASME B36.10M IBR :S-160 0.3 M
N 1969908
FITTINGS
EL +117911
3 DHDTA0Q1RPG 10X3/4" HALF COUPLING A105 CL.6000 SW ASME B16.11 IBR 1

6 4 DEATB0S2QPG 10" 90 DEG ELBOW A234GR.WPB SMLS BW ASME B16.9 2


F5 G10 B11 IBR :12.70mm

<5> 2 FLANGES
CONT.ON 5 CFATA0GBJPG 3/4" FLANGE SW A105 CL.600 RF ASME B16.5 IBR 1
EP26_A2-BFW-322-0101_B :S-160

122
E 1805408 6 CDBTA0GBJPG 3/4" BLIND FLANGE A105 CL.600 RF ASME B16.5 IBR 1
7
N 1976750 STEM NORTH VALVES
EL +112787
7 51002 3/4" GATE VALVE CL.800 A105/HF SW BB,OS&Y BY 2
MFR/API 602/ASME B16.11 HANDWHEEL IBR
4
90° 68
<4> 2 PIPE SUPPORTS
EL +117286
100 8 G1S2 10" G1S2-300-150-10 3
<3> 2
7
9 S2 10" S2-300-150-10 3
67 STEM NORTH
PT| SIZE
3 NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
10X3/4"NPS 20
08 GASKETS
581 S9
10"NPS 38 S2-300-150-10 10 FFG213ACDGBHA 3/4" SPIRAL WOUND GASKET (G213ACD) CL.600 RF 4.5 1
100
4500

50 MM ASME B16.20
<2> 1

45 S8
62 00 G1S2-300-150-10 BOLTS
61 162
11 EBEBB0A 5/8 " STUD BOLT(FULL THREADED)/HEX.NUT(HEAVY) 4
S9 A193GR.B7/A194GR.2H ASME B18.2.1/ASME
B18.2.2 - 90 mm Length
<1 S2-300-150-10
> 45
S8 1 00
G1S2-300-150-10 CUT PIPE LENGTH

PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS


NO (MM) (IN) NO (MM) (IN)
4 S8
90° 45 G1S2-300-150-10 <1> 5880 10 <2> 3738 10
22 00
21 <3> 100 3/4 <4> 100 3/4
6 <5> 100 3/4 <6> 22416 10

45
00

<6
>
1
10
"N
S9 PS
S2-300-150-10

CONT.ON
BFW-322-0101_A SHT 2
Isometric File Name : EP26_A2-BFW-322-0101_A
Iso Extraction Date : 2021-11-27 09:31:10

DESIGN TEMP. ºC 170.00 OPE. TEMP. ºC 160.00 PAINT SYSTEM T5 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 78.30 OPE. PRESS. kg/cm2g 61.00 PWHT N
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
INS. CODE IH TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm 60 TEST PRESS. kg/cm2 g 117.67 CLIENT NAME


01/12/2021 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 20 PT or MT % 0 STRESS SYSTEM.NO 6405-EPCM25_26-CA-0052
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-323-PRS-PID-000-0001 GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 10"-BFW-322-0101_A-D2A-IH PIPE SPEC :D2A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : BFW-322-0101_A AREA: EP26-A2 SHT. 1 OF 2 REV. 0
<SECURITY LEVEL2>

N MATERIAL LIST
381
PT| SIZE
SEE SHT NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
BFW-322-0101_A SHT 1
PIPE
1 APPTB0SBBPG 10" PIPE A106GR.B SMLS BE ASME B36.10M IBR 9.3 M
:12.70mm
2 APPTB0SABPG 3/4" PIPE A106GR.B SMLS PE ASME B36.10M IBR :S-160 0.3 M
4
90° FITTINGS
10"NPS 3 DHDTA0Q1RPG 10X3/4" HALF COUPLING A105 CL.6000 SW ASME B16.11 IBR 1

4 DEATB0S2QPG 10" 90 DEG ELBOW A234GR.WPB SMLS BW ASME B16.9 2


IBR :12.70mm

FLANGES
5 CFATA0GBJPG 3/4" FLANGE SW A105 CL.600 RF ASME B16.5 IBR 1
:S-160
6 CDBTA0GBJPG 3/4" BLIND FLANGE A105 CL.600 RF ASME B16.5 IBR 1

VALVES
7 51002 3/4" GATE VALVE CL.800 A105/HF SW BB,OS&Y BY 2
MFR/API 602/ASME B16.11 HANDWHEEL IBR

4500
PIPE SUPPORTS
<1> 1

8 F1S5 10" F1S5-500-150-G3-G3-10 1

PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
GASKETS
9 FFG213ACDGBHA 3/4" SPIRAL WOUND GASKET (G213ACD) CL.600 RF 4.5 1
MM ASME B16.20

BOLTS
10 EBEBB0A 5/8 " STUD BOLT(FULL THREADED)/HEX.NUT(HEAVY) 4
A193GR.B7/A194GR.2H ASME B18.2.1/ASME
B18.2.2 - 90 mm Length

CUT PIPE LENGTH

PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS


58 NO (MM) (IN) NO (MM) (IN)
4 1
90° <1> 3738 10 <2> 100 3/4
EL +112787 <3> 100 3/4 <4> 100 3/4
<5> 5530 10

3 162 S8
10X3/4"NPS F1S5-500-150-G3-G3-10

18
100

30
<2> 2
53
7 30
100 STEM NORTH
68
<3> 2 7
STEM NORTH <5
>
1
CONT.ON
68 EP26_A1-BFW-322-0101
F5 G9 B10 E 1805408
N 1941400
122

EL +112787
6
E 1805408
N 1946730 <4> 2
EL +112162
Isometric File Name : EP26_A2-BFW-322-0101_A
Iso Extraction Date : 2021-11-27 09:31:10

DESIGN TEMP. ºC 170.00 OPE. TEMP. ºC 160.00 PAINT SYSTEM T5 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 78.30 OPE. PRESS. kg/cm2g 61.00 PWHT N
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
INS. CODE IH TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm 60 TEST PRESS. kg/cm2 g 117.67 CLIENT NAME


01/12/2021 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 20 PT or MT % 0 STRESS SYSTEM.NO 6405-EPCM25_26-CA-0052
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-323-PRS-PID-000-0001 GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 10"-BFW-322-0101_A-D2A-IH PIPE SPEC :D2A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : BFW-322-0101_A AREA: EP26-A2 SHT. 2 OF 2 REV. 0
<SECURITY LEVEL2>

N MATERIAL LIST

PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
90° PIPE
2"NPS
1 APPTB0SBBPG 10" PIPE A106GR.B SMLS BE ASME B36.10M IBR 12.1 M
:12.70mm
2 APPTB0SBBPG 2" PIPE A106GR.B SMLS BE ASME B36.10M IBR :S-XS 1.2 M

FITTINGS
3 DRBTB0S2QPG 10X8" ECC REDUCER A234GR.WPB SMLS BW ASME B16.9 IBR 1
CONT.ON :12.70mm x S-XS
EP26_A2-BFW-323-0107 4 DSZTB0SBBPG 10X2" WELD BRANCH RPAD A106GR.B SMLS BE ASME 1

<1> 2
E 1805408 B36.10M IBR :12.70mm x S-XS
N 1982850 PIPE SUPPORTS
EL +114104
5 S2 10" S2-300-150-10 2

6 G1S2 10" G1S2-300-150-10 1

CUT PIPE LENGTH

PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS


CONT.ON NO (MM) (IN) NO (MM) (IN)
EP26_A2-BFW-322-0101_C

1318
178 E 1805408 <1> 1184 2 <2> 12054 10
N 1988982
EL +112760
S6
G1S2-300-150-10
<2
3 > S5
10X8"NPS 1 S2-300-150-10
27MM OFFSET 41
FLAT SIDE D 00

INSUL:
15
55/IH 50 INSUL:
INSUL: 59
54 45/IH
60/IH INSUL:
60/IH

4
10"X2"NPS

S5
S2-300-150-10
60
99

16
50

10
"N
PS
CONT.ON
EP26_A2-BFW-322-0101_A
E 1805408
N 1976750
EL +112787
Isometric File Name : EP26_A2-BFW-322-0101_B
Iso Extraction Date : 2022-06-17 16:00:23

DESIGN TEMP. ºC 170.00 OPE. TEMP. ºC 160.00 PAINT SYSTEM T5 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 78.30 OPE. PRESS. kg/cm2g 61.00 PWHT N
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
INS. CODE IH TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm 60 TEST PRESS. kg/cm2 g 117.67 CLIENT NAME


15/06/2022 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 20 PT or MT % 0 STRESS SYSTEM.NO 6405-EPCM25_26-CA-0052
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-323-PRS-PID-000-0001 GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 10"-BFW-322-0101_B-D2A-IH PIPE SPEC :D2A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : BFW-322-0101_B AREA: EP26-A2 SHT. 1 OF 1 REV. 0
<SECURITY LEVEL2>

N MATERIAL LIST

PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY

PIPE SUPPORTS
1 G1S2 8" G1S2-300-150-8 6

CONT.ON 2 S2 8" S2-300-150-8 6


BFW-322-0101_C SHT 2
3 F1S5 8" F1S5-500-150-8 1

S1
G1S2-300-150-8
6000
60
00

60 S1
00
8"NPS G1S2-300-150-8
S2 60
00
S2-300-150-8
S2
S1 S2-300-150-8
G1S2-300-150-8 60
00
S2
S2-300-150-8 60
00

60
00

60
00 2
S1 60
00 S3
G1S2-300-150-8 F1S5-500-150-8
S2 60
00 S1
S2-300-150-8 G1S2-300-150-8
60
S2 00
S2-300-150-8
60
00
10X8"NPS
27MM OFFSET
2 S2
S2-300-150-8
55
8"
18 FLAT SIDE D

NP
S1 S
G1S2-300-150-8
CONT.ON
EP26_A2-BFW-322-0101_B
E 1805408
N 1988982
EL +112760

INSUL:
55/IH
INSUL:
60/IH
Isometric File Name : EP26_A2-BFW-322-0101_C
Iso Extraction Date : 2023-03-02 09:59:31

DESIGN TEMP. ºC 170.00 OPE. TEMP. ºC 160.00 PAINT SYSTEM T5 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


2 01/03/2023 REVISED AS PER MARK2 PPK SP SS DESIGN PRESS kg/cm2 g 78.30 OPE. PRESS. kg/cm2g 61.00 PWHT N
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
1 17-08-2022 REVISED AS PER MARK1 PPK SP SS INS. CODE IH TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm 55 TEST PRESS. kg/cm2g 117.67 CLIENT NAME


01/12/2021 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 20 PT or MT % 0 STRESS SYSTEM.NO 6405-EPCM25_26-CA-0052
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-323-PRS-PID-000-0001 GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 8"-BFW-322-0101_C-D2A-IH PIPE SPEC :D2A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : BFW-322-0101_C AREA: EP26-A2 SHT. 1 OF 2 REV. 2
<SECURITY LEVEL2>

N MATERIAL LIST

PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
305
PIPE

8" 1 APPTB0SBBPG 8" PIPE A106GR.B SMLS BE ASME B36.10M IBR :S-XS 104.9 M
NP
S 2 APPTB0SABPG 3/4" PIPE A106GR.B SMLS PE ASME B36.10M IBR :S-160 0.4 M
CONT.ON FITTINGS
EP26_A3-BFW-322-0101
E 1805408 4 3 DHDTA0Q1RPG 8X3/4" HALF COUPLING A105 CL.6000 SW ASME B16.11 IBR 1
N 2086512 90°
4 DEATB0S2QPG 8" 90 DEG ELBOW A234GR.WPB SMLS BW ASME B16.9 2
EL +121259 EL +121259 IBR :S-XS

FLANGES
5 CFATA0GBJPG 3/4" FLANGE SW A105 CL.600 RF ASME B16.5 IBR 1
:S-160
<5> 1 6 CDBTA0GBJPG 3/4" BLIND FLANGE A105 CL.600 RF ASME B16.5 IBR 1

VALVES
7 51002 3/4" GATE VALVE CL.800 A105/HF SW BB,OS&Y BY 2
S10 MFR/API 602/ASME B16.11 HANDWHEEL IBR
8500
G1TR1-0-1000-8 PIPE SUPPORTS
WITH PAD.
8 S2 8" S2-300-150-8 2

9 G1S2 8" G1S2-300-150-8 1

10 G1TR1 8" G1TR1-0-1000-8 1

PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
GASKETS
3824

11 FFG213ACDGBHA 3/4" SPIRAL WOUND GASKET (G213ACD) CL.600 RF 4.5 1


MM ASME B16.20

4 BOLTS
90° 12 EBEBB0A 5/8 " STUD BOLT(FULL THREADED)/HEX.NUT(HEAVY) 4
A193GR.B7/A194GR.2H ASME B18.2.1/ASME
50 B18.2.2 - 90 mm Length
<4 5 3
> 8X3/4"NPS
1
EL +112760 CUT PIPE LENGTH
240

PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS


S8 NO (MM) (IN) NO (MM) (IN)
<1> 2 S2-300-150-8 <1> 105 3/4 <2> 110 3/4
58 <3> 105 3/4 <4> 96920 8
<5> 7890 8
110

7 50
00
STEM NORTH
96
72
<2> 2 0
58
S9
7 G1S2-300-150-8
127

60
STEM NORTH 00
<3> 2
F5 G11 B12
6 8"
NP
S
E 1805408 60
N 2085702 S8 00
EL +112162 S2-300-150-8

SEE SHT
BFW-322-0101_C SHT 1
Isometric File Name : EP26_A2-BFW-322-0101_C
Iso Extraction Date : 2023-03-02 09:59:31

DESIGN TEMP. ºC 170.00 OPE. TEMP. ºC 160.00 PAINT SYSTEM T5 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


2 01/03/2023 REVISED AS PER MARK2 PPK SP SS DESIGN PRESS kg/cm2 g 78.30 OPE. PRESS. kg/cm2g 61.00 PWHT N
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
1 17-08-2022 REVISED AS PER MARK1 PPK SP SS INS. CODE IH TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm 55 TEST PRESS. kg/cm2g 117.67 CLIENT NAME


01/12/2021 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 20 PT or MT % 0 STRESS SYSTEM.NO 6405-EPCM25_26-CA-0052
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-323-PRS-PID-000-0001 GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 8"-BFW-322-0101_C-D2A-IH PIPE SPEC :D2A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : BFW-322-0101_C AREA: EP26-A2 SHT. 2 OF 2 REV. 2
<SECURITY LEVEL2>

N MATERIAL LIST

PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
PIPE
1 APPTB0SBBPG 2" PIPE A106GR.B SMLS BE ASME B36.10M IBR :S-XS 3.4 M

2 APPTB0SABPG 3/4" PIPE A106GR.B SMLS PE ASME B36.10M IBR :S-160 0.3 M

FITTINGS
3 DHDTA0Q1RPG 2X3/4" HALF COUPLING A105 CL.6000 SW ASME B16.11 IBR 1
4 4 DEATB0S2QPG 2" 90 DEG ELBOW A234GR.WPB SMLS BW ASME B16.9 1
CONT.ON 90° IBR :S-XS
EP26_A2-BFW-322-0101_B EL +114180
E 1805408 FLANGES
N 1982850 5 CFATA0GBJPG 3/4" FLANGE SW A105 CL.600 RF ASME B16.5 IBR 1
EL +114104 :S-160
6 CDBTA0GBJPG 3/4" BLIND FLANGE A105 CL.600 RF ASME B16.5 IBR 1

VALVES
76
7 51002 3/4" GATE VALVE CL.800 A105/HF SW BB,OS&Y BY 2
MFR/API 602/ASME B16.11 HANDWHEEL IBR

PIPE SUPPORTS
2"NPS
8 S2 2" S2-150-150-2 1

E 1802500 PT| SIZE


N 1982850 8 NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
0
EL +114698 24 GASKETS
9 FFG213ACDGBHA 3/4" SPIRAL WOUND GASKET (G213ACD) CL.600 RF 4.5 1
6 S8 MM ASME B16.20

S2-150-150-2
122

BOLTS
10 EBEBB0A 5/8 " STUD BOLT(FULL THREADED)/HEX.NUT(HEAVY) 4
F5 G9 B10
A193GR.B7/A194GR.2H ASME B18.2.1/ASME
<3> 2 B18.2.2 - 90 mm Length
08
68 29
7
STEM EAST CUT PIPE LENGTH
100

PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS


<2> 2 NO (MM) (IN) NO (MM) (IN)
68
<1> 100 3/4 <2> 100 3/4
7 <3> 100 3/4 <4> 3332 2
STEM EAST
INSUL:
156

40/IH
<1> 2 INSUL:
45/IH
3
2X3/4"NPS
1
323-TP-91-001 >
<4

0
50

CONT.ON
EPCC-07-2"-BFW-323-9101-D2A-IH
E 1802000
N 1982850
EL +114180
Isometric File Name : EP26_A2-BFW-323-0107
Iso Extraction Date : 2022-06-17 16:02:19

DESIGN TEMP. ºC 170.00 OPE. TEMP. ºC 160.00 PAINT SYSTEM T5 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 78.30 OPE. PRESS. kg/cm2g 61.00 PWHT N
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
INS. CODE IH TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm 45 TEST PRESS. kg/cm2 g 117.67 CLIENT NAME


15/06/2022 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 20 PT or MT % 0 STRESS SYSTEM.NO 6405-EPCM25_26-CA-0052
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-323-PRS-PID-000-0001 GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 2"-BFW-323-0107-D2A-IH PIPE SPEC :D2A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : BFW-323-0107 AREA: EP26-A2 SHT. 1 OF 1 REV. 0
<SECURITY LEVEL2>

N MATERIAL LIST

E 1802500 PT| SIZE


N 1983550 7 NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
EL +117236 90°
PIPE
1 APPTB0SBB 4" PIPE A106GR.B SMLS BE ASME B36.10M :S-STD 4.1 M
9 F8 G10 B14
2 APPTB0SBB 2" PIPE A106GR.B SMLS BE ASME B36.10M :S-XS 1.1 M

3 APPTB0SAB 3/4" PIPE A106GR.B SMLS PE ASME B36.10M :S-160 0.3 M

<3> 3
FITTINGS

106
4 DTATB0S2Q 4X4" EQUAL TEE A234GR.WPB SMLS BW ASME B16.9 1
:S-STD x S-STD
1 5 DRBTB0S2Q 4X2" ECC REDUCER A234GR.WPB SMLS BW ASME B16.9 1
> :S-STD x S-XS
<4 6 DHDTA0Q1R 4X3/4" HALF COUPLING A105 CL.6000 SW ASME B16.11 1

7 DEATB0S2Q 4" 90 DEG ELBOW A234GR.WPB SMLS BW ASME B16.9 1


:S-STD

67 FLANGES
11 8 CFATA0DBJ 3/4" FLANGE SW A105 CL.150 RF ASME B16.5 :S-160 1
STEM EAST
S12 9 CDBTA0DBJ 3/4" BLIND FLANGE A105 CL.150 RF ASME B16.5 1
100 G1S2-300-150-4
05 GASKETS
<2> 3

30 10 FFG213ACADBHA 3/4" SPIRAL WOUND GASKET (G213ACA) CL.150 RF 4.5 1


MM ASME B16.20

68 VALVES
11
11 51092 3/4" GATE VALVE CL.800 A105/MONEL SW BB,OS&Y BY 2
STEM EAST
0 MFR/API 602/ASME B16.11 HANDWHEEL -
50
183

PIPE SUPPORTS
<1> 3

1000
12 G1S2 4" G1S2-300-150-4 1

13 G1S2 2" G1S2-150-150-2 1

<5> 1
6 PT| SIZE
4X3/4"NPS NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
374-TP-91-002
BOLTS
14 EBEBB0A 1/2 " STUD BOLT(FULL THREADED)/HEX.NUT(HEAVY) 4
A193GR.B7/A194GR.2H ASME B18.2.1/ASME
N PS 0 B18.2.2 - 65 mm Length
4" 50
S13
G1S2-150-150-2
CONT.ON CUT PIPE LENGTH
EPCC-07-4"-C-374-0117-A19A-IT
PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS
E 1802000 <6
> NO (MM) (IN) NO (MM) (IN)
N 1983550 2
EL +116707 <1> 100 3/4 <2> 100 3/4
<3> 100 3/4 <4> 3353 4
CONT.ON <5> 743 4 <6> 1043 2
EP26_A2-C-374-0306_B
E 1805505
N 1984800 64
3
EL +115680
102
10
43

4
4X4"NPS
EL +115707
5
4X2"NPS
27MM OFFSET
FLAT SIDE D CONT.ON
EP26_A2-C-374-0310_B
105 105 E 1805505
N 1983445
EL +115707
Isometric File Name : EP26_A2-C-374-0306_A
Iso Extraction Date : 2022-06-17 16:04:05

DESIGN TEMP. ºC 65.00 OPE. TEMP. ºC 45.00 PAINT SYSTEM T4 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 15.00 OPE. PRESS. kg/cm2g 3.30 PWHT Y
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
INS. CODE IT TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm 25 TEST PRESS. kg/cm2 g 22.50 CLIENT NAME


15/06/2022 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 5 PT or MT % 0 STRESS SYSTEM.NO NA
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-374-PRS-PID-000-0003 GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 4"-C-374-0306_A-A19A-IT PIPE SPEC :A19A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : C-374-0306_A AREA: EP26-A2 SHT. 1 OF 1 REV. 0
<SECURITY LEVEL2>

N MATERIAL LIST
76
PT| SIZE
2" NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
NP
S PIPE
1 APPTB0SBB 2" PIPE A106GR.B SMLS BE ASME B36.10M :S-XS 7.9 M
CONT.ON 2 APPTB0SAB 3/4" PIPE A106GR.B SMLS PE ASME B36.10M :S-160 0.3 M
EP26_A3-C-374-0306 4
E 1805505 90° FITTINGS
N 2082966 3 DHDTA0Q1R 2X3/4" HALF COUPLING A105 CL.6000 SW ASME B16.11 1
EL +123680
4 DEATB0S2Q 2" 90 DEG ELBOW A234GR.WPB SMLS BW ASME B16.9 2

1806
:S-XS

FLANGES

S10 5 CFATA0DBJ 3/4" FLANGE SW A105 CL.150 RF ASME B16.5 :S-160 1


G1TR1-0-800-2
6 CDBTA0DBJ 3/4" BLIND FLANGE A105 CL.150 RF ASME B16.5 1

GASKETS
7 FFG213ACADBHA 3/4" SPIRAL WOUND GASKET (G213ACA) CL.150 RF 4.5 1
MM ASME B16.20

8000
BOLTS
8 EBEBB0A 1/2 " STUD BOLT(FULL THREADED)/HEX.NUT(HEAVY) 4

4350
A193GR.B7/A194GR.2H ASME B18.2.1/ASME
B18.2.2 - 65 mm Length

VALVES
9 51092 3/4" GATE VALVE CL.800 A105/MONEL SW BB,OS&Y BY 2
MFR/API 602/ASME B16.11 HANDWHEEL -

PIPE SUPPORTS
1
10 G1TR1 2" G1TR1-0-800-2 2

11 S2 2" S2-150-150-2 1
S10
<1> 1

G1TR1-0-800-2 12 G1S2 2" G1S2-150-150-2 1

CUT PIPE LENGTH


25
4 0 S11 PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS
90° NO (MM) (IN) NO (MM) (IN)
S2-150-150-2
EL +115680 <1> 7848 2 <2> 100 3/4
<3> 100 3/4 <4> 100 3/4
3
2X3/4"NPS
1639
156

25 S12
<2> 2 00 G1S2-150-150-2

9 2"
STEM NORTH NP
S
68
<3> 2 9
100

STEM NORTH
CONT.ON
C-374-0306_B SHT 2
F5 G7 B8 67
106

6
E 1805505
N 2082640 <4> 2
EL +115178

1
Isometric File Name : EP26_A2-C-374-0306_B
Iso Extraction Date : 2022-11-11 13:49:52

DESIGN TEMP. ºC 65.00 OPE. TEMP. ºC 45.00 PAINT SYSTEM T2 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 15.00 OPE. PRESS. kg/cm2g 3.30 PWHT Y
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
1 09/11/2022 REVISED AS PER MARK1 PPK SP SS INS. CODE IT TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm 25 TEST PRESS. kg/cm2g 22.50 CLIENT NAME


01/12/2021 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 5 PT or MT % 0 STRESS SYSTEM.NO NA
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-374-PRS-PID-000-0003 GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 2"-C-374-0306_B-A19A-IT PIPE SPEC :A19A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : C-374-0306_B AREA: EP26-A2 SHT. 1 OF 2 REV. 1
<SECURITY LEVEL2>

N MATERIAL LIST

PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
PIPE
1 APPTB0SBB 2" PIPE A106GR.B SMLS BE ASME B36.10M :S-XS 98.1 M

PIPE SUPPORTS
2 S2 2" S2-150-150-2 8

1 3 G1S2 2" G1S2-150-150-2 6

4 F1S5 2" F1S5-500-150-2 1

SEE SHT
C-374-0306_B SHT 1 CUT PIPE LENGTH
2"NPS PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS
NO (MM) (IN) NO (MM) (IN)

S3 <1> 98013 2
G1S2-150-150-2
60 S2
00
S2-150-150-2
60 S2
00
S2-150-150-2
S2 60
S2-150-150-2 00

60
00

60 S3
00 G1S2-150-150-2
S3 60 97
G1S2-150-150-2 00 83 S2
9 S2-150-150-2
60 S2
00 S2-150-150-2

60
00
S2
S2-150-150-2
60
00

S3 60 S2
G1S2-150-150-2 00
S2-150-150-2
60
00

S4 60 S2
F1S5-500-150-2 00
S2-150-150-2
60
00
S3 60
G1S2-150-150-2 00
2"NPS
60
00
S3
G1S2-150-150-2 <1> 1
CONT.ON
EP26_A2-C-374-0306_A
E 1805505
N 1984800
EL +115680
Isometric File Name : EP26_A2-C-374-0306_B
Iso Extraction Date : 2022-11-11 13:49:52

DESIGN TEMP. ºC 65.00 OPE. TEMP. ºC 45.00 PAINT SYSTEM T2 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 15.00 OPE. PRESS. kg/cm2g 3.30 PWHT Y
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
1 09/11/2022 REVISED AS PER MARK1 PPK SP SS INS. CODE IT TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm 25 TEST PRESS. kg/cm2g 22.50 CLIENT NAME


01/12/2021 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 5 PT or MT % 0 STRESS SYSTEM.NO NA
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-374-PRS-PID-000-0003 GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 2"-C-374-0306_B-A19A-IT PIPE SPEC :A19A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : C-374-0306_B AREA: EP26-A2 SHT. 2 OF 2 REV. 1
<SECURITY LEVEL2>

N MATERIAL LIST

PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
CONT.ON PIPE
EP26_A3-C-374-0307 1 APPTB0SBB 6" PIPE A106GR.B SMLS BE ASME B36.10M :S-STD 105.4 M
E 1805950
N 2083090 2 APPTB0SAB 3/4" PIPE A106GR.B SMLS PE ASME B36.10M :S-160 0.3 M
EL +123584
FITTINGS
229
3 DHDTA0Q1R 6X3/4" HALF COUPLING A105 CL.6000 SW ASME B16.11 1

4 DEATB0S2Q 6" 90 DEG ELBOW A234GR.WPB SMLS BW ASME B16.9 2


:S-STD
4 S9
90° G1TR1-0-850-6 FLANGES
6"NPS
5 CFATA0DBJ 3/4" FLANGE SW A105 CL.150 RF ASME B16.5 :S-160 1
1677

8000

6 CDBTA0DBJ 3/4" BLIND FLANGE A105 CL.150 RF ASME B16.5 1

GASKETS
<1> 1

7 FFG213ACADBHA 3/4" SPIRAL WOUND GASKET (G213ACA) CL.150 RF 4.5 1


MM ASME B16.20

VALVES
8 51092 3/4" GATE VALVE CL.800 A105/MONEL SW BB,OS&Y BY 2
4 33 MFR/API 602/ASME B16.11 HANDWHEEL -
5 4025
90°
EL +115584 PIPE SUPPORTS
S10 9 G1TR1 6" G1TR1-0-850-6 1
3 S10
G1-6 G1-6
6X3/4"NPS 10 G1 6" G1-6 7
<2> 2
11 F1 6" F1-6 1
210 S10
8 12 G1-6 PT| SIZE
STEM NORTH 00 NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
0
<3> 2 68 1 BOLTS

100 12 EBEBB0A 1/2 " STUD BOLT(FULL THREADED)/HEX.NUT(HEAVY) 4


12 A193GR.B7/A194GR.2H ASME B18.2.1/ASME
00
0 B18.2.2 - 65 mm Length
67
<4> 2
8 12
F5 G7 B12 STEM NORTH 00 CUT PIPE LENGTH
0
106

S10 PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS


G1-6 97 NO (MM) (IN) NO (MM) (IN)
6 72
5
<1> 7542 6 <2> 100 3/4
E 1805950 12
00 <3> 100 3/4 <4> 100 3/4
N 2082525 0 <5> 97831 6
EL +115028
S10
G1-6
12 1
00
0
S11
F1-6
12
00
0
S10
G1-6
12
00
0
<5
>
1
S10
G1-6

CONT.ON
EP26_A2-C-374-0307_B
E 1805950
N 1984800
EL +115584
Isometric File Name : EP26_A2-C-374-0307_A
Iso Extraction Date : 2022-08-19 12:20:28

DESIGN TEMP. ºC 65.00 OPE. TEMP. ºC 45.00 PAINT SYSTEM T1 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 15.00 OPE. PRESS. kg/cm2g 3.30 PWHT Y
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
1 17-08-2022 REVISED AS PER MARK1 PPK SP SS INS. CODE N TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm - TEST PRESS. kg/cm2g 22.50 CLIENT NAME


01/12/2021 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 5 PT or MT % 0 STRESS SYSTEM.NO NA
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-374-PRS-PID-000-0003 GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 6"-C-374-0307_A-A19A PIPE SPEC :A19A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : C-374-0307_A AREA: EP26-A2 SHT. 1 OF 1 REV. 1
<SECURITY LEVEL2>

E 1802500 N MATERIAL LIST


N 1979385
EL +117140
PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
6
F5 G7 B10 PIPE
1 APPTB0SBB 6" PIPE A106GR.B SMLS BE ASME B36.10M :S-STD 9.5 M

<5> 2
2 APPTB0SAB 3/4" PIPE A106GR.B SMLS PE ASME B36.10M :S-160 0.3 M

FITTINGS

106
3 DHDTA0Q1R 6X3/4" HALF COUPLING A105 CL.6000 SW ASME B16.11 1

8 4 DEATB0S2Q 6" 90 DEG ELBOW A234GR.WPB SMLS BW ASME B16.9 2


STEM EAST :S-STD
67
FLANGES
5 CFATA0DBJ 3/4" FLANGE SW A105 CL.150 RF ASME B16.5 :S-160 1

<4> 2
6 CDBTA0DBJ 3/4" BLIND FLANGE A105 CL.150 RF ASME B16.5 1

100
4 GASKETS
90°
7 FFG213ACADBHA 3/4" SPIRAL WOUND GASKET (G213ACA) CL.150 RF 4.5 1
8 EL +116584 MM ASME B16.20
STEM EAST
68 VALVES
8 51092 3/4" GATE VALVE CL.800 A105/MONEL SW BB,OS&Y BY 2
MFR/API 602/ASME B16.11 HANDWHEEL -

<3> 2
50 PIPE SUPPORTS
29 9 G1 6" G1-6 2
S9
G1-6 PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY

210
BOLTS
10 EBEBB0A 1/2 " STUD BOLT(FULL THREADED)/HEX.NUT(HEAVY) 4
A193GR.B7/A194GR.2H ASME B18.2.1/ASME
50 B18.2.2 - 65 mm Length
34

374-TP-91-001
3 CUT PIPE LENGTH
1 6X3/4"NPS
> PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS
<6 NO (MM) (IN) NO (MM) (IN)
CONT.ON
0 <1> 5186 6 <2> 542 6
EPCC-07-6"-C-374-0206-A19A 50 <3> 100 3/4 <4> 100 3/4
E 1802000 <5> 100 3/4 <6> 3721 6
N 1979385
EL +116584

1000
CONT.ON
EP26_A2-C-374-0307_A
E 1805950

<2> 1
N 1984800
6" EL +115584
NP
S
40
0
S9
G1-6

54
15
<1
>
1

4
90°
Isometric File Name : EP26_A2-C-374-0307_B
Iso Extraction Date : 2022-06-17 16:06:00

DESIGN TEMP. ºC 65.00 OPE. TEMP. ºC 45.00 PAINT SYSTEM T1 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 15.00 OPE. PRESS. kg/cm2g 3.30 PWHT Y
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
INS. CODE N TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm - TEST PRESS. kg/cm2 g 22.50 CLIENT NAME


15/06/2022 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 5 PT or MT % 0 STRESS SYSTEM.NO NA
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-374-PRS-PID-000-0003 GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 6"-C-374-0307_B-A19A PIPE SPEC :A19A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : C-374-0307_B AREA: EP26-A2 SHT. 1 OF 1 REV. 0
<SECURITY LEVEL2>

N MATERIAL LIST

PT| SIZE
4 NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
90° 152
PIPE
EL +119707
1 APPTB0SBB 4" PIPE A106GR.B SMLS BE ASME B36.10M :S-STD 9.8 M

2 APPTB0SAB 3/4" PIPE A106GR.B SMLS PE ASME B36.10M :S-160 0.3 M

FITTINGS
4"NPS
CONT.ON 3 DHDTA0Q1R 4X3/4" HALF COUPLING A105 CL.6000 SW ASME B16.11 1
EP26_A2-C-374-0310_B
CONT.ON 4 DEATB0S2Q 4" 90 DEG ELBOW A234GR.WPB SMLS BW ASME B16.9 2
E 1805290
:S-STD
N 1978000 C-374-0310_A SHT 2
EL +115707 FLANGES
5 CFATA0DBJ 3/4" FLANGE SW A105 CL.150 RF ASME B16.5 :S-160 1

6 CDBTA0DBJ 3/4" BLIND FLANGE A105 CL.150 RF ASME B16.5 1

GASKETS
4"NPS 7 FFG213ACADBHA 3/4" SPIRAL WOUND GASKET (G213ACA) CL.150 RF 4.5 1
MM ASME B16.20

VALVES
8 51092 3/4" GATE VALVE CL.800 A105/MONEL SW BB,OS&Y BY 2
MFR/API 602/ASME B16.11 HANDWHEEL -

PIPE SUPPORTS

58 9 G1S2 4" G1S2-300-150-4 1

<5> 1
03
PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY

4000
50 BOLTS
99
10 EBEBB0A 1/2 " STUD BOLT(FULL THREADED)/HEX.NUT(HEAVY) 4
A193GR.B7/A194GR.2H ASME B18.2.1/ASME
B18.2.2 - 65 mm Length

CUT PIPE LENGTH

PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS


NO (MM) (IN) NO (MM) (IN)

<1> 100 3/4 <2> 100 3/4


<3> 100 3/4 <4> 6101 4
<5> 3696 4

45
0
<4
S9 >
3 1
G1S2-300-150-4 4X3/4"NPS

100
<1> 2 83

8
STEM SOUTH 4
68 90°
<2> 2

100
8
STEM SOUTH
F5 G7 B10 67
106
6
E 1805290
N 1972196 <3> 2
EL +115178
Isometric File Name : EP26_A2-C-374-0310_A
Iso Extraction Date : 2021-11-27 09:38:27

DESIGN TEMP. ºC 65.00 OPE. TEMP. ºC 45.00 PAINT SYSTEM T4 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 15.00 OPE. PRESS. kg/cm2g 3.30 PWHT Y
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
INS. CODE IT TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm 25 TEST PRESS. kg/cm2 g 22.50 CLIENT NAME


01/12/2021 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 5 PT or MT % 0 STRESS SYSTEM.NO NA
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-374-PRS-PID-000-0003 GAD NO: EPCM26-6405-A1-PIP-ARG-AG-301A~C
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 4"-C-374-0310_A-A19A-IT PIPE SPEC :A19A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : C-374-0310_A AREA: SHT. 1 OF 2 REV. 0
<SECURITY LEVEL2>

N MATERIAL LIST

SEE SHT PT| SIZE


C-374-0310_A SHT 1 NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
PIPE
S9
11 1 APPTB0SBB 4" PIPE A106GR.B SMLS BE ASME B36.10M :S-STD 33.6 M
94 S2-300-150-4
4" 2 APPTB0SAB 3/4" PIPE A106GR.B SMLS PE ASME B36.10M :S-160 0.3 M
NP 25
S 00 FITTINGS
S9 3 DHDTA0Q1R 4X3/4" HALF COUPLING A105 CL.6000 SW ASME B16.11 1
S2-300-150-4 E 1805290
45 N 1946554 4 DEATB0S2Q 4" 90 DEG ELBOW A234GR.WPB SMLS BW ASME B16.9 2
00 :S-STD
EL +120236
FLANGES

6 5 CFATA0DBJ 3/4" FLANGE SW A105 CL.150 RF ASME B16.5 :S-160 1


S10 S10 F5 G7 B12
45 6 CDBTA0DBJ 3/4" BLIND FLANGE A105 CL.150 RF ASME B16.5 1

<3> 2
G1S2-300-150-4 00 G1S2-300-150-4
GASKETS
7 FFG213ACADBHA 3/4" SPIRAL WOUND GASKET (G213ACA) CL.150 RF 4.5 1
MM ASME B16.20

106
45
00 VALVES
8 51092 3/4" GATE VALVE CL.800 A105/MONEL SW BB,OS&Y BY 2
25 8 MFR/API 602/ASME B16.11 HANDWHEEL -
04
0 STEM SOUTH
45 PIPE SUPPORTS
00
68 9 S2 4" S2-300-150-4 4
S9 <2> 2
25 10 G1S2 4" G1S2-300-150-4 3

100
S2-300-150-4 00
11 F1S5 4" F1S5-500-150-4 1
S10 8
67 STEM SOUTH PT| SIZE
G1S2-300-150-4 NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
BOLTS

100
S9 12 EBEBB0A 1/2 " STUD BOLT(FULL THREADED)/HEX.NUT(HEAVY) 4
S2-300-150-4 3 A193GR.B7/A194GR.2H ASME B18.2.1/ASME
<4 4X3/4"NPS B18.2.2 - 65 mm Length
>
<1> 2 83 1 4
90°
50 CUT PIPE LENGTH
0
PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS
NO (MM) (IN) NO (MM) (IN)

<1> 100 3/4 <2> 100 3/4


<3> 100 3/4 <4> 25388 4

<5> 1
<5> 3696 4 <6> 4502 4

4000
4
90°
EL +115707
11
54
S11
F1S5-500-150-4
<6
46 >
54 1
4"
NP
S

CONT.ON
EP26_A1-C-374-0310
E 1805290
N 1941400
EL +115707
Isometric File Name : EP26_A2-C-374-0310_A
Iso Extraction Date : 2021-11-27 09:38:27

DESIGN TEMP. ºC 65.00 OPE. TEMP. ºC 45.00 PAINT SYSTEM T4 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 15.00 OPE. PRESS. kg/cm2g 3.30 PWHT Y
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
INS. CODE IT TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm 25 TEST PRESS. kg/cm2 g 22.50 CLIENT NAME


01/12/2021 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 5 PT or MT % 0 STRESS SYSTEM.NO NA
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-374-PRS-PID-000-0003 GAD NO: EPCM26-6405-A1-PIP-ARG-AG-301A~C
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 4"-C-374-0310_A-A19A-IT PIPE SPEC :A19A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : C-374-0310_A AREA: SHT. 2 OF 2 REV. 0
<SECURITY LEVEL2>

N MATERIAL LIST

PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
PIPE
1 APPTB0SBB 4" PIPE A106GR.B SMLS BE ASME B36.10M :S-STD 5.3 M

FITTINGS
2 DEBTB0S2Q 4" 45 DEG ELBOW A234GR.WPB SMLS BW ASME B16.9 2
:S-STD

PIPE SUPPORTS
3 S2 4" S2-300-150-4 2

4"NPS CUT PIPE LENGTH

PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS


NO (MM) (IN) NO (MM) (IN)
4X4"NPS
20 <1> 2672 4 <2> 176 4
44 <3> 2430 4

S3
S2-300-150-4
27
36

<1
>
1 2
45°
CONT.ON
EP26_A2-C-374-0306_A
E 1805505
N 1983445 5
21
EL +115707

304
<2> 1
21
5

2
45°
24
94
20
93

<3
>
1
S3 4"
S2-300-150-4 NP
S

CONT.ON
EP26_A2-C-374-0310_A
E 1805290
N 1978000
EL +115707
Isometric File Name : EP26_A2-C-374-0310_B
Iso Extraction Date : 2022-06-17 16:07:44

DESIGN TEMP. ºC 65.00 OPE. TEMP. ºC 45.00 PAINT SYSTEM T4 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 15.00 OPE. PRESS. kg/cm2g 3.30 PWHT Y
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
INS. CODE IT TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm 25 TEST PRESS. kg/cm2 g 22.50 CLIENT NAME


15/06/2022 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 5 PT or MT % 0 STRESS SYSTEM.NO NA
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-374-PRS-PID-000-0003 GAD NO: EPCM26-6405-A1-PIP-ARG-AG-301A~C
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 4"-C-374-0310_B-A19A-IT PIPE SPEC :A19A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : C-374-0310_B AREA: EP26-A2 SHT. 1 OF 1 REV. 0
<SECURITY LEVEL2>

N MATERIAL LIST

PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
PIPE
1 APPTB0SBB 3" PIPE A106GR.B SMLS BE ASME B36.10M :S-STD 5.3 M

2 APPTB0SAB 3/4" PIPE A106GR.B SMLS PE ASME B36.10M :S-160 0.4 M

FITTINGS

4 3 DHDTA0Q1R 3X3/4" HALF COUPLING A105 CL.6000 SW ASME B16.11 1


90°
4 DEATB0S2Q 3" 90 DEG ELBOW A234GR.WPB SMLS BW ASME B16.9 1
EL +111344 :S-STD

FLANGES
5 CFATA0DBJ 3/4" FLANGE SW A105 CL.150 RF ASME B16.5 :S-160 1

6 CDBTA0DBJ 3/4" BLIND FLANGE A105 CL.150 RF ASME B16.5 1

GASKETS
7 FFG213ACADBHA 3/4" SPIRAL WOUND GASKET (G213ACA) CL.150 RF 4.5 1
MM ASME B16.20

VALVES
8 51092 3/4" GATE VALVE CL.800 A105/MONEL SW BB,OS&Y BY 2
MFR/API 602/ASME B16.11 HANDWHEEL -

1214
PIPE SUPPORTS
9 G1 3" G1-3 1
E 1802500 7 6
32

<1> 1
N 1983340 PT| SIZE
EL +111870 NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
BOLTS
6 10 EBEBB0A 1/2 " STUD BOLT(FULL THREADED)/HEX.NUT(HEAVY) 4
F5 G7 B10 A193GR.B7/A194GR.2H ASME B18.2.1/ASME
<4> 2 B18.2.2 - 65 mm Length

76 CONT.ON
37 EP26_A2-C-375-0212_B
116

CUT PIPE LENGTH


E 1806276
N 1983340 3X3"NPS PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS
8 EL +110130 NO (MM) (IN) NO (MM) (IN)
STEM EAST
<1> 1100 3 <2> 99 3/4
68 <3> 100 3/4 <4> 110 3/4
<3> 2 <5> 4162 3
100

<2> 2 3"NPS

68 S9
169 G1-3
8
STEM EAST 3
3X3/4"NPS
375-TP-91-001 1
>
<5
0
50
CONT.ON
EPCC-07-3"-C-375-9101-A19A
E 1802000
N 1983340
EL +111344
Isometric File Name : EP26_A2-C-375-0201
Iso Extraction Date : 2022-06-17 16:09:08

DESIGN TEMP. ºC 120.00 OPE. TEMP. ºC 45.00 PAINT SYSTEM T1 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 15.00 OPE. PRESS. kg/cm2g 5.00 PWHT Y
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
INS. CODE N TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm - TEST PRESS. kg/cm2 g 22.50 CLIENT NAME


15/06/2022 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 5 PT or MT % 0 STRESS SYSTEM.NO NA
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-375-PRS-PID-000-0002 GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 3"-C-375-0201-A19A PIPE SPEC :A19A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : C-375-0201 AREA: EP26-A2 SHT. 1 OF 1 REV. 0
<SECURITY LEVEL2>

N MATERIAL LIST

PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
PIPE
CONT.ON 1 APPTB0SBB 3" PIPE A106GR.B SMLS BE ASME B36.10M :S-STD 10.7 M
EP26_A2-C-375-0208_B
E 1805493 2 APPTB0SAB 3/4" PIPE A106GR.B SMLS PE ASME B36.10M :S-160 0.3 M
N 1978000 FITTINGS
EL +108044
3 DHDTA0Q1R 3X3/4" HALF COUPLING A105 CL.6000 SW ASME B16.11 1

4 DEATB0S2Q 3" 90 DEG ELBOW A234GR.WPB SMLS BW ASME B16.9 2


:S-STD

FLANGES
3"NPS 5 CFATA0DBJ 3/4" FLANGE SW A105 CL.150 RF ASME B16.5 :S-160 1

6 CDBTA0DBJ 3/4" BLIND FLANGE A105 CL.150 RF ASME B16.5 1

GASKETS
7 FFG213ACADBHA 3/4" SPIRAL WOUND GASKET (G213ACA) CL.150 RF 4.5 1
MM ASME B16.20

BOLTS
51
00 8 EBEBB0A 1/2 " STUD BOLT(FULL THREADED)/HEX.NUT(HEAVY) 4
87 S11 4 A193GR.B7/A194GR.2H ASME B18.2.1/ASME
12 F1-3 90° 114 B18.2.2 - 65 mm Length
EL +110044
VALVES
9 51092 3/4" GATE VALVE CL.800 A105/MONEL SW BB,OS&Y BY 2
MFR/API 602/ASME B16.11 HANDWHEEL -

PIPE SUPPORTS
3"NPS
10 G1 3" G1-3 1
CONT.ON 11 F1 3" F1-3 1
C-375-0208_A SHT 2

S10
CUT PIPE LENGTH

<5> 1
G1-3
PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS
NO (MM) (IN) NO (MM) (IN)

2000
<1> 100 3/4 <2> 100 3/4
<3> 100 3/4 <4> 8898 3
30 <5> 1772 3
0
<4
3 >
1
3X3/4"NPS

170
<1> 2

9
STEM SOUTH 4
68 90°
<2> 2
100
9
STEM SOUTH
F5 G7 B8 68

6 106
E 1805493
N 1969289 <3> 2
EL +107528
Isometric File Name : EP26_A2-C-375-0208_A

NOTES: REVISION FOR CORRECTION OF SYSTEM GENERATED MTO


Iso Extraction Date : 2022-12-07 10:36:25

DESIGN TEMP. ºC 120.00 OPE. TEMP. ºC 45.00 PAINT SYSTEM T1 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 15.00 OPE. PRESS. kg/cm2g 5.00 PWHT Y
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
1 07/12/2022 REVISED AS PER MARK1 PPK SP SS INS. CODE N TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm - TEST PRESS. kg/cm2g 22.5 CLIENT NAME


01/12/2021 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 5 PT or MT % 0 STRESS SYSTEM.NO NA
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-375-PRS-PID-000-0002 GAD NO: EPCM26-6405-A1-PIP-ARG-AG-302A~C
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 3"-C-375-0208_A-A19A PIPE SPEC :A19A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : C-375-0208_A AREA: EP26-A2 SHT. 1 OF 2 REV. 1
<SECURITY LEVEL2>

N MATERIAL LIST

SEE SHT PT| SIZE


NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
C-375-0208_A SHT 1
PIPE
1 APPTB0SBB 3" PIPE A106GR.B SMLS BE ASME B36.10M :S-STD 29.1 M
E 1805493 2 APPTB0SAB 3/4" PIPE A106GR.B SMLS PE ASME B36.10M :S-160 0.3 M
S10 N 1949312
97
4 G1-3 EL +110561 FITTINGS
3" 3 DHDTA0Q1R 3X3/4" HALF COUPLING A105 CL.6000 SW ASME B16.11 1
NP
S 6
4 DEATB0S2Q 3" 90 DEG ELBOW A234GR.WPB SMLS BW ASME B16.9 2
F5 G7 B8 :S-STD
67
50

<3> 2
FLANGES
5 CFATA0DBJ 3/4" FLANGE SW A105 CL.150 RF ASME B16.5 :S-160 1

S10 6 CDBTA0DBJ 3/4" BLIND FLANGE A105 CL.150 RF ASME B16.5 1

106
G1-3
9 GASKETS
STEM NORTH
7 FFG213ACADBHA 3/4" SPIRAL WOUND GASKET (G213ACA) CL.150 RF 4.5 1
MM ASME B16.20

11 BOLTS
25
0 8 EBEBB0A 1/2 " STUD BOLT(FULL THREADED)/HEX.NUT(HEAVY) 4
19 68 A193GR.B7/A194GR.2H ASME B18.2.1/ASME
56 B18.2.2 - 65 mm Length
3 <2> 2

100
VALVES

<1> 2 9 51092 3/4" GATE VALVE CL.800 A105/MONEL SW BB,OS&Y BY 2


MFR/API 602/ASME B16.11 HANDWHEEL -

68 PIPE SUPPORTS
10 G1 3" G1-3 3

170
11 F1 3" F1-3 1
9
S10 STEM NORTH
G1-3 4
<4 90° CUT PIPE LENGTH
>
3 1
PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS
3X3/4"NPS 50 NO (MM) (IN) NO (MM) (IN)
0
<1> 100 3/4 <2> 100 3/4
<3> 100 3/4 <4> 19949 3
<5> 1772 3 <6> 7298 3

<5> 1
2000
4
90°
EL +108044 CONT.ON
EP26_A1-C-375-0208
39 E 1805493
11 N 1941400
EL +108044
S11
F1-3
74
12 <6
>
1

3"
NP
S
Isometric File Name : EP26_A2-C-375-0208_A

NOTES: REVISION FOR CORRECTION OF SYSTEM GENERATED MTO


Iso Extraction Date : 2022-12-07 10:36:25

DESIGN TEMP. ºC 120.00 OPE. TEMP. ºC 45.00 PAINT SYSTEM T1 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 15.00 OPE. PRESS. kg/cm2g 5.00 PWHT Y
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
1 07/12/2022 REVISED AS PER MARK1 PPK SP SS INS. CODE N TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm - TEST PRESS. kg/cm2g 22.5 CLIENT NAME


01/12/2021 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 5 PT or MT % 0 STRESS SYSTEM.NO NA
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-375-PRS-PID-000-0002 GAD NO: EPCM26-6405-A1-PIP-ARG-AG-302A~C
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 3"-C-375-0208_A-A19A PIPE SPEC :A19A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : C-375-0208_A AREA: EP26-A2 SHT. 2 OF 2 REV. 1
<SECURITY LEVEL2>

N MATERIAL LIST

PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
PIPE
1 APPTB0SBB 3" PIPE A106GR.B SMLS BE ASME B36.10M :S-STD 6.7 M

FITTINGS
2 DTATB0S2Q 3X3" EQUAL TEE A234GR.WPB SMLS BW ASME B16.9 1
:S-STD x S-STD

PIPE SUPPORTS
CONT.ON
3 G1 3" G1-3 2
EP26_A2-C-375-0208_C
E 1805493
3" N 1984800
NP EL +108044 CUT PIPE LENGTH
S
40 S3 PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS
0
G1-3 NO (MM) (IN) NO (MM) (IN)

<1> 5339 3 <2> 1288 3

54
25
<1
>
1 2
3X3"NPS
CONT.ON 86
EP26_A2-C-375-0211
E 1805493
N 1979375 97
EL +108130 4

CONT.ON
S3 EP26_A2-C-375-0208_A
G1-3 E 1805493
N 1978000
<2 EL +108044
13 >
74 1
Isometric File Name : EP26_A2-C-375-0208_B
Iso Extraction Date : 2022-06-17 16:10:39

DESIGN TEMP. ºC 120.00 OPE. TEMP. ºC 45.00 PAINT SYSTEM T1 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 15.00 OPE. PRESS. kg/cm2g 5.00 PWHT Y
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
INS. CODE N TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm - TEST PRESS. kg/cm2 g 22.50 CLIENT NAME


15/06/2022 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 5 PT or MT % 0 STRESS SYSTEM.NO NA
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-375-PRS-PID-000-0002 GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 3"-C-375-0208_B-A19A PIPE SPEC :A19A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : C-375-0208_B AREA: EP26-A2 SHT. 1 OF 1 REV. 0
<SECURITY LEVEL2>

N MATERIAL LIST
114
PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
CONT.ON
PIPE
EP26_A3-C-375-0208
E 1805493 1 APPTB0SBB 3" PIPE A106GR.B SMLS BE ASME B36.10M :S-STD 67.2 M
N 2089802
4 EL +116544 2 APPTB0SAB 3/4" PIPE A106GR.B SMLS PE ASME B36.10M :S-160 0.3 M
90°

4015
3"NPS FITTINGS
3 DHDTA0Q1R 3X3/4" HALF COUPLING A105 CL.6000 SW ASME B16.11 1

4 DEATB0S2Q 3" 90 DEG ELBOW A234GR.WPB SMLS BW ASME B16.9 4


:S-STD
S10
G1TR1-180-800-3 FLANGES
8500

<1> 1

5 CFATA0DBJ 3/4" FLANGE SW A105 CL.150 RF ASME B16.5 :S-160 1

6 CDBTA0DBJ 3/4" BLIND FLANGE A105 CL.150 RF ASME B16.5 1

4 GASKETS
90° 7 FFG213ACADBHA 3/4" SPIRAL WOUND GASKET (G213ACA) CL.150 RF 4.5 1
EL +108044 MM ASME B16.20
1
BOLTS
26 8 EBEBB0A 1/2 " STUD BOLT(FULL THREADED)/HEX.NUT(HEAVY) 4
87
A193GR.B7/A194GR.2H ASME B18.2.1/ASME
B18.2.2 - 65 mm Length

85 VALVES
00
9 51092 3/4" GATE VALVE CL.800 A105/MONEL SW BB,OS&Y BY 2
S11 MFR/API 602/ASME B16.11 HANDWHEEL -
G1-3
PIPE SUPPORTS
12 57
00 86 10 G1TR1 3" G1TR1-180-800-3 1
S12 0 7
F1-3 11 G1 3" G1-3 5

12 F1 3" F1-3 1

S11 12
00 CUT PIPE LENGTH
G1-3 0
CONT.ON PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS
C-375-0208_C SHT 2 4 NO (MM) (IN) NO (MM) (IN)
90°
<1> 8272 3 <2> 100 3/4
S11 EL +109194
<3> 100 3/4 <4> 100 3/4
12 G1-3 <5> 57939 3 <6> 922 3
00
S11 0 114
G1-3 1150

90 3"NPS 1
30
00 0
S11
<5
G1-3 > <6> 1
1
3
3X3/4"NPS

170
4
<2> 2 90°
9
STEM NORTH
68
<3> 2
100
F5 G7 B8 9
STEM NORTH
68

6 106
E 1805493
N 2031820 <4> 2
EL +107528
Isometric File Name : EP26_A2-C-375-0208_C
Iso Extraction Date : 2022-08-19 12:21:36

DESIGN TEMP. ºC 120.00 OPE. TEMP. ºC 45.00 PAINT SYSTEM T1 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 15.00 OPE. PRESS. kg/cm2g 3.30 PWHT Y
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
1 17-08-2022 REVISED AS PER MARK1 PPK SP SS INS. CODE N TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm - TEST PRESS. kg/cm2g 22.50 CLIENT NAME


01/12/2021 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 5 PT or MT % 0 STRESS SYSTEM.NO NA
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-374-PRS-PID-000-0003 GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 3"-C-375-0208_C-A19A PIPE SPEC :A19A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : C-375-0208_C AREA: EP26-A2 SHT. 1 OF 2 REV. 1
<SECURITY LEVEL2>

E 1811500 N MATERIAL LIST


N 2029980
EL +109711 PT| SIZE
6 NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
F5 G7 B10 PIPE
<4> 2 1 APPTB0SBB 3" PIPE A106GR.B SMLS BE ASME B36.10M :S-STD 58.9 M
106 2 APPTB0SAB 3/4" PIPE A106GR.B SMLS PE ASME B36.10M :S-160 0.3 M
8
STEM NORTH FITTINGS
67
<3> 2
8 3 DHDTA0Q1R 3X3/4" HALF COUPLING A105 CL.6000 SW ASME B16.11 1
4 100 STEM NORTH
94 90° 4 DEATB0S2Q 3" 90 DEG ELBOW A234GR.WPB SMLS BW ASME B16.9 4
58 :S-STD
68
<2> 2 FLANGES
1 15 5 CFATA0DBJ 3/4" FLANGE SW A105 CL.150 RF ASME B16.5 :S-160 1
> 40 170
<1
N PS <5 6 CDBTA0DBJ 3/4" BLIND FLANGE A105 CL.150 RF ASME B16.5 1
3" > 4
50 1 90°
GASKETS
0
3 7 FFG213ACADBHA 3/4" SPIRAL WOUND GASKET (G213ACA) CL.150 RF 4.5 1
3X3/4"NPS MM ASME B16.20
SEE SHT 500
0
C-375-0208_C SHT 1 4 00 VALVES
MH2-F-650-1200-6 8 51092 3/4" GATE VALVE CL.800 A105/MONEL SW BB,OS&Y BY 2
MFR/API 602/ASME B16.11 HANDWHEEL -
<6> 1 08
60 PIPE SUPPORTS
1
9 G1 3" G1-3 4
4 MH2-A-550-1200-6
90° PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
BOLTS
<7> 1
10 EBEBB0A 1/2 " STUD BOLT(FULL THREADED)/HEX.NUT(HEAVY) 4
1150

A193GR.B7/A194GR.2H ASME B18.2.1/ASME


4 B18.2.2 - 65 mm Length
90° 19
EL +108044 80
S9
G1-3 CUT PIPE LENGTH
S9
G1-3 PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS
90 NO (MM) (IN) NO (MM) (IN)
00
<1> 5780 3 <2> 100 3/4
<3> 100 3/4 <4> 100 3/4
<5> 1812 3 <6> 5780 3
<7> 922 3 <8> 44566 3

S9
12 G1-3
00
0 1

44
68
0
12 S9
00
0 G1-3
CONT.ON
EP26_A2-C-375-0208_B
E 1805493
N 1984800
EL +108044
<8
>
1 3"NPS
Isometric File Name : EP26_A2-C-375-0208_C
Iso Extraction Date : 2022-08-19 12:21:36

DESIGN TEMP. ºC 120.00 OPE. TEMP. ºC 45.00 PAINT SYSTEM T1 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 15.00 OPE. PRESS. kg/cm2g 3.30 PWHT Y
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
1 17-08-2022 REVISED AS PER MARK1 PPK SP SS INS. CODE N TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm - TEST PRESS. kg/cm2g 22.50 CLIENT NAME


01/12/2021 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 5 PT or MT % 0 STRESS SYSTEM.NO NA
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-374-PRS-PID-000-0003 GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 3"-C-375-0208_C-A19A PIPE SPEC :A19A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : C-375-0208_C AREA: EP26-A2 SHT. 2 OF 2 REV. 1
<SECURITY LEVEL2>

N MATERIAL LIST

PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
PIPE
1 APPTB0SBB 3" PIPE A106GR.B SMLS BE ASME B36.10M :S-STD 4.4 M

2 APPTB0SAB 3/4" PIPE A106GR.B SMLS PE ASME B36.10M :S-160 0.3 M

FITTINGS

4 3 DHDTA0Q1R 3X3/4" HALF COUPLING A105 CL.6000 SW ASME B16.11 1


90°
4 DEATB0S2Q 3" 90 DEG ELBOW A234GR.WPB SMLS BW ASME B16.9 1
EL +109194 :S-STD

FLANGES
5 CFATA0DBJ 3/4" FLANGE SW A105 CL.150 RF ASME B16.5 :S-160 1

6 CDBTA0DBJ 3/4" BLIND FLANGE A105 CL.150 RF ASME B16.5 1

GASKETS
7 FFG213ACADBHA 3/4" SPIRAL WOUND GASKET (G213ACA) CL.150 RF 4.5 1
MM ASME B16.20

VALVES
8 51092 3/4" GATE VALVE CL.800 A105/MONEL SW BB,OS&Y BY 2
MFR/API 602/ASME B16.11 HANDWHEEL -

1064
E 1802500 PIPE SUPPORTS
3
N 1979375
2 49 9 G1 3" G1-3 1
EL +109708
PT| SIZE

<1> 1
6 NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
F5 G7 B10 BOLTS

<4> 2 10 EBEBB0A 1/2 " STUD BOLT(FULL THREADED)/HEX.NUT(HEAVY) 4


A193GR.B7/A194GR.2H ASME B18.2.1/ASME
105

B18.2.2 - 65 mm Length
8
93
STEM EAST 29
67 CONT.ON CUT PIPE LENGTH
S9
<3> 2 EP26_A2-C-375-0208_B
G1-3 E 1805493 PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS
N 1979375 3X3"NPS NO (MM) (IN) NO (MM) (IN)
98

8 EL +108130
STEM EAST <1> 950 3 <2> 100 3/4
68 <3> 98 3/4 <4> 99 3/4
<5> 3379 3
<2> 2

3"NPS
170

3
3X3/4"NPS
375-TP-91-002 1
>
<5
0
50
CONT.ON
EPCC-07-3"-C-375-9102-A19A
E 1802000
N 1979375
EL +109194
Isometric File Name : EP26_A2-C-375-0211
Iso Extraction Date : 2022-06-17 16:11:51

DESIGN TEMP. ºC 120.00 OPE. TEMP. ºC 45.00 PAINT SYSTEM T1 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 15.00 OPE. PRESS. kg/cm2g 5.00 PWHT Y
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
INS. CODE N TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm - TEST PRESS. kg/cm2 g 22.50 CLIENT NAME


15/06/2022 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 5 PT or MT % 0 STRESS SYSTEM.NO NA
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-375-PRS-PID-000-0002 GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 3"-C-375-0211-A19A PIPE SPEC :A19A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : C-375-0211 AREA: EP26-A2 SHT. 1 OF 1 REV. 0
<SECURITY LEVEL2>

N MATERIAL LIST

PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
PIPE
1 APPTB0SBB 3" PIPE A106GR.B SMLS BE ASME B36.10M :S-STD 30.0 M

2 APPTB0SAB 3/4" PIPE A106GR.B SMLS PE ASME B36.10M :S-160 0.3 M


E 1806276
N 1969162 FITTINGS
EL +112561 3 DHDTA0Q1R 3X3/4" HALF COUPLING A105 CL.6000 SW ASME B16.11 1

4 DEATB0S2Q 3" 90 DEG ELBOW A234GR.WPB SMLS BW ASME B16.9 2


6 :S-STD
F5 G7 B10
FLANGES
<5> 2
5 CFATA0DBJ 3/4" FLANGE SW A105 CL.150 RF ASME B16.5 :S-160 1

CONT.ON 6 CDBTA0DBJ 3/4" BLIND FLANGE A105 CL.150 RF ASME B16.5 1

106
EP26_A2-C-375-0212_B
8
E 1806276 STEM NORTH GASKETS
N 1976750 7 FFG213ACADBHA 3/4" SPIRAL WOUND GASKET (G213ACA) CL.150 RF 4.5 1
EL +110044 MM ASME B16.20
4 68 VALVES
90° <4> 2
EL +112044 8 51092 3/4" GATE VALVE CL.800 A105/MONEL SW BB,OS&Y BY 2
<3> 2 100 MFR/API 602/ASME B16.11 HANDWHEEL -
8
S9 STEM NORTH PIPE SUPPORTS
3"NPS 38 68
50 G1-3 9 G1 3" G1-3 4
100 1262
400 PT| SIZE
S9 NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
2000

70 G1-3
<2> 1

BOLTS
<1
71 > 10 EBEBB0A 1/2 " STUD BOLT(FULL THREADED)/HEX.NUT(HEAVY) 4
88 1 A193GR.B7/A194GR.2H ASME B18.2.1/ASME
B18.2.2 - 65 mm Length
90 S9
00
G1-3
CUT PIPE LENGTH

PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS


3 NO (MM) (IN) NO (MM) (IN)
4 3X3/4"NPS
90° <1> 7074 3 <2> 1772 3
<3> 100 3/4 <4> 100 3/4
<5> 100 3/4 <6> 21096 3
20
81
0
90
00 S9
G1-3

<6
>
3" 1
NP
S

CONT.ON
C-375-0212_A SHT 2
Isometric File Name : EP26_A2-C-375-0212_A
Iso Extraction Date : 2021-11-27 09:43:49

DESIGN TEMP. ºC 150.00 OPE. TEMP. ºC 45.00 PAINT SYSTEM T1 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 15.00 OPE. PRESS. kg/cm2g 5.00 PWHT Y
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
INS. CODE N TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm - TEST PRESS. kg/cm2 g 22.50 CLIENT NAME


01/12/2021 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 5 PT or MT % 0 STRESS SYSTEM.NO NA
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-375-PRS-PID-000-0002 GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 3"-C-375-0212_A-A19A PIPE SPEC :A19A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : C-375-0212_A AREA: EP26-A2 SHT. 1 OF 2 REV. 0
<SECURITY LEVEL2>

N MATERIAL LIST

114 PT| SIZE


NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
SEE SHT
C-375-0212_A SHT 1 PIPE
1 APPTB0SBB 3" PIPE A106GR.B SMLS BE ASME B36.10M :S-STD 8.5 M

2 APPTB0SAB 3/4" PIPE A106GR.B SMLS PE ASME B36.10M :S-160 0.3 M


4
90° FITTINGS
3 DHDTA0Q1R 3X3/4" HALF COUPLING A105 CL.6000 SW ASME B16.11 1
3"NPS
4 DEATB0S2Q 3" 90 DEG ELBOW A234GR.WPB SMLS BW ASME B16.9 2
:S-STD

FLANGES

2000
5 CFATA0DBJ 3/4" FLANGE SW A105 CL.150 RF ASME B16.5 :S-160 1

<1> 1
6 CDBTA0DBJ 3/4" BLIND FLANGE A105 CL.150 RF ASME B16.5 1

GASKETS
7 FFG213ACADBHA 3/4" SPIRAL WOUND GASKET (G213ACA) CL.150 RF 4.5 1
MM ASME B16.20

VALVES
8 51092 3/4" GATE VALVE CL.800 A105/MONEL SW BB,OS&Y BY 2
MFR/API 602/ASME B16.11 HANDWHEEL -
4 40
90° 0 PIPE SUPPORTS
EL +110044 9 F1 3" F1-3 1

PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
3 BOLTS
3X3/4"NPS 70 10 EBEBB0A 1/2 " STUD BOLT(FULL THREADED)/HEX.NUT(HEAVY) 4
A193GR.B7/A194GR.2H ASME B18.2.1/ASME
B18.2.2 - 65 mm Length

29
38
64 CUT PIPE LENGTH
38
PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS
NO (MM) (IN) NO (MM) (IN)
100

<1> 1772 3 <2> 100 3/4


<3> 100 3/4 <4> 100 3/4
<2> 2

<5 <5> 6724 3


>
S9 1
8 F1-3 CONT.ON
STEM NORTH EP26_A1-C-375-0212
E 1806276
N 1941400
EL +110044
68
<3> 2

100

8
STEM NORTH
68
<4> 2

106

F5 G7 B10

6
E 1806276
N 1947838
EL +109528
Isometric File Name : EP26_A2-C-375-0212_A
Iso Extraction Date : 2021-11-27 09:43:49

DESIGN TEMP. ºC 150.00 OPE. TEMP. ºC 45.00 PAINT SYSTEM T1 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 15.00 OPE. PRESS. kg/cm2g 5.00 PWHT Y
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
INS. CODE N TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm - TEST PRESS. kg/cm2 g 22.50 CLIENT NAME


01/12/2021 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 5 PT or MT % 0 STRESS SYSTEM.NO NA
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-375-PRS-PID-000-0002 GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 3"-C-375-0212_A-A19A PIPE SPEC :A19A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : C-375-0212_A AREA: EP26-A2 SHT. 2 OF 2 REV. 0
<SECURITY LEVEL2>

N MATERIAL LIST

PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
PIPE
1 APPTB0SBB 3" PIPE A106GR.B SMLS BE ASME B36.10M :S-STD 7.9 M

FITTINGS
2 DTATB0S2Q 3X3" EQUAL TEE A234GR.WPB SMLS BW ASME B16.9 1
:S-STD x S-STD

PIPE SUPPORTS

CONT.ON 3 G1 3" G1-3 1


EP26_A2-C-375-0212_C
E 1806276
3" N 1984800
NP CUT PIPE LENGTH
S EL +110044
PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS
40 NO (MM) (IN) NO (MM) (IN)
0
<1> 1374 3 <2> 6503 3

S3
G1-3

<1 2
> 3X3"NPS
14 1
CONT.ON 60
86
EP26_A2-C-375-0201
E 1806276
N 1983340
EL +110130

65 CONT.ON
89 EP26_A2-C-375-0212_A
<2 E 1806276
>
1 N 1976750
EL +110044
Isometric File Name : EP26_A2-C-375-0212_B
Iso Extraction Date : 2022-06-17 16:13:18

DESIGN TEMP. ºC 120.00 OPE. TEMP. ºC 45.00 PAINT SYSTEM T1 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 15.00 OPE. PRESS. kg/cm2g 5.00 PWHT Y
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
INS. CODE N TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm - TEST PRESS. kg/cm2 g 22.50 CLIENT NAME


15/06/2022 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 5 PT or MT % 0 STRESS SYSTEM.NO NA
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-375-PRS-PID-000-0002 GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 3"-C-375-0212_B-A19A PIPE SPEC :A19A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : C-375-0212_B AREA: EP26-A2 SHT. 1 OF 1 REV. 0
<SECURITY LEVEL2>

N MATERIAL LIST

PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
PIPE
1 APPTB0SBB 3" PIPE A106GR.B SMLS BE ASME B36.10M :S-STD 111.0 M

2 APPTB0SAB 3/4" PIPE A106GR.B SMLS PE ASME B36.10M :S-160 0.3 M


114
FITTINGS

CONT.ON 3 DHDTA0Q1R 3X3/4" HALF COUPLING A105 CL.6000 SW ASME B16.11 1


EP26_A3-C-375-0212 4 DEATB0S2Q 3" 90 DEG ELBOW A234GR.WPB SMLS BW ASME B16.9 2
E 1806276 :S-STD
4 N 2087729
90° EL +118544 FLANGES
3"NPS
5 CFATA0DBJ 3/4" FLANGE SW A105 CL.150 RF ASME B16.5 :S-160 1
8500
4014

6 CDBTA0DBJ 3/4" BLIND FLANGE A105 CL.150 RF ASME B16.5 1

GASKETS
S10 7 FFG213ACADBHA 3/4" SPIRAL WOUND GASKET (G213ACA) CL.150 RF 4.5 1
<1> 1

G1TR1-180-850-3 MM ASME B16.20

BOLTS
S11
8 EBEBB0A 1/2 " STUD BOLT(FULL THREADED)/HEX.NUT(HEAVY) 4
4 97 G1-3 A193GR.B7/A194GR.2H ASME B18.2.1/ASME
90° 5
B18.2.2 - 65 mm Length
EL +110044
S11
3 VALVES
3X3/4"NPS G1-3 1 9 51092 3/4" GATE VALVE CL.800 A105/MONEL SW BB,OS&Y BY 2
170

MFR/API 602/ASME B16.11 HANDWHEEL -

PIPE SUPPORTS
3140
11 10 G1TR1 3" G1TR1-180-850-3 1
00
0
<2> 2 11 G1 3" G1-3 8
9
STEM SOUTH 12 12 F1 3" F1-3 1
00
0
68 S11
<3> 2 G1-3 CUT PIPE LENGTH
12
100 00
9 0 PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS
STEM SOUTH S11 NO (MM) (IN) NO (MM) (IN)
F5 G7 B8 68 G1-3
12 10 <1> 8272 3 <2> 100 3/4
6 00 18 <3> 100 3/4 <4> 100 3/4
106 0 40 <5> 102701 3
S11
E 1806276
<4> 2 G1-3
N 2086640
EL +109528 12 1
00
0
S11
G1-3
12
00
0
S12
F1-3
12
00
0
S11
G1-3
12
00
0
S11
G1-3

<5> 1

CONT.ON
EP26_A2-C-375-0212_B
E 1806276
N 1984800
EL +110044
Isometric File Name : EP26_A2-C-375-0212_C
Iso Extraction Date : 2022-08-19 12:23:13

DESIGN TEMP. ºC 150.00 OPE. TEMP. ºC 45.00 PAINT SYSTEM T1 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 15.00 OPE. PRESS. kg/cm2g 5.00 PWHT Y
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
1 17-08-2022 REVISED AS PER MARK1 PPK SP SS INS. CODE N TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm - TEST PRESS. kg/cm2g 22.50 CLIENT NAME


01/12/2021 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 5 PT or MT % 0 STRESS SYSTEM.NO NA
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-375-PRS-PID-000-0002 GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 3"-C-375-0212_C-A19A PIPE SPEC :A19A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : C-375-0212_C AREA: EP26-A2 SHT. 1 OF 1 REV. 1
<SECURITY LEVEL2>

N MATERIAL LIST

PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
CONT.ON PIPE
C-491-0401_A SHT 2 1 APPTB0SBB 3" PIPE A106GR.B SMLS BE ASME B36.10M :S-STD 4.0 M

2 APPTB0SAB 3/4" PIPE A106GR.B SMLS PE ASME B36.10M :S-160 0.2 M

FITTINGS
3"NPS 3 DHDTA0Q1R 3X3/4" HALF COUPLING A105 CL.6000 SW ASME B16.11 1
51
4 DEATB0S2Q 3" 90 DEG ELBOW A234GR.WPB SMLS BW ASME B16.9 1
:S-STD
5 DEBTB0S2Q 3" 45 DEG ELBOW A234GR.WPB SMLS BW ASME B16.9 1
:S-STD
36
FLANGES
5 6 CFATA0DBJ 3/4" FLANGE SW A105 CL.150 RF ASME B16.5 :S-160 1
45°
EL +116189 7 CDBTA0DBJ 3/4" BLIND FLANGE A105 CL.150 RF ASME B16.5 1
36
GASKETS
644
<4> 1

8 FFG213ACADBHA 3/4" SPIRAL WOUND GASKET (G213ACA) CL.150 RF 4.5 1


MM ASME B16.20

VALVES
9 51092 3/4" GATE VALVE CL.800 A105/MONEL SW BB,OS&Y BY 1
MFR/API 602/ASME B16.11 HANDWHEEL -

PIPE SUPPORTS
10 G1 3" G1-3 1
26 PT| SIZE
4
4 <3 NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
90° >
1 BOLTS
11 EBEBB0A 1/2 " STUD BOLT(FULL THREADED)/HEX.NUT(HEAVY) 4
A193GR.B7/A194GR.2H ASME B18.2.1/ASME
170

B18.2.2 - 65 mm Length
<1> 2

CUT PIPE LENGTH

68 PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS


3 NO (MM) (IN) NO (MM) (IN)
3X3/4"NPS <1> 100 3/4 <2> 100 3/4
<3> 3450 3 <4> 479 3
106

9
STEM NORTH
33
E 1805505 00
N 1980050
<2> 2

EL +115196 S10
G1-3

F6 G8 B11
7

16
50

3"
NP
S

CONT.ON
EP26_A2-C-491-0401_B
E 1805505
N 1976750
EL +115544
Isometric File Name : EP26_A2-C-491-0401_A
Iso Extraction Date : 2022-06-17 16:14:25

DESIGN TEMP. ºC 65.00 OPE. TEMP. ºC 45.00 PAINT SYSTEM T1 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 10.00 OPE. PRESS. kg/cm2g 4.10 PWHT Y
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
INS. CODE N TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm - TEST PRESS. kg/cm2 g 15 CLIENT NAME


15/06/2022 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 5 PT or MT % 0 STRESS SYSTEM.NO NA
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-491-PRS-PID-000-0004 GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 3"-C-491-0401_A-A19A PIPE SPEC :A19A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : C-491-0401_A AREA: EP26-A2 SHT. 1 OF 2 REV. 0
<SECURITY LEVEL2>

N MATERIAL LIST

PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
PIPE
1 APPTB0SBB 3" PIPE A106GR.B SMLS BE ASME B36.10M :S-STD 3.8 M

2 APPTB0SAB 3/4" PIPE A106GR.B SMLS PE ASME B36.10M :S-160 0.2 M

FITTINGS
3 DHDTA0Q1R 3X3/4" HALF COUPLING A105 CL.6000 SW ASME B16.11 1
4 4 DEATB0S2Q 3" 90 DEG ELBOW A234GR.WPB SMLS BW ASME B16.9 1
90° :S-STD
EL +116544
FLANGES
5 CFATA0DBJ 3/4" FLANGE SW A105 CL.150 RF ASME B16.5 :S-160 1

6 CDBTA0DBJ 3/4" BLIND FLANGE A105 CL.150 RF ASME B16.5 1

GASKETS
7 FFG213ACADBHA 3/4" SPIRAL WOUND GASKET (G213ACA) CL.150 RF 4.5 1
MM ASME B16.20

45
<1

2
VALVES

3"
320

>
NP
8 51092 3/4" GATE VALVE CL.800 A105/MONEL SW BB,OS&Y BY 1

1
S
MFR/API 602/ASME B16.11 HANDWHEEL -

PIPE SUPPORTS
32
05 0 9 G1 3" G1-3 1
25
PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
E 1802500
N 1980670 BOLTS
EL +116893 10 EBEBB0A 1/2 " STUD BOLT(FULL THREADED)/HEX.NUT(HEAVY) 4
SEE SHT A193GR.B7/A194GR.2H ASME B18.2.1/ASME
6 C-491-0401_A SHT 1 B18.2.2 - 65 mm Length
F5 G7 B10
<3> 2 05
30
S9 CUT PIPE LENGTH
G1-3 PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS
106

NO (MM) (IN) NO (MM) (IN)

8 <1> 338 3 <2> 100 3/4


STEM EAST <3> 100 3/4 <4> 3391 3
<2> 2
68
170

3
3X3/4"NPS
491-TP-92-002 1
>
<4
0
50

CONT.ON
EPCC-07-3"-C-374-0401-A19A
E 1802000
N 1980670
EL +116544
Isometric File Name : EP26_A2-C-491-0401_A
Iso Extraction Date : 2022-06-17 16:14:25

DESIGN TEMP. ºC 65.00 OPE. TEMP. ºC 45.00 PAINT SYSTEM T1 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 10.00 OPE. PRESS. kg/cm2g 4.10 PWHT Y
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
INS. CODE N TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm - TEST PRESS. kg/cm2 g 15 CLIENT NAME


15/06/2022 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 5 PT or MT % 0 STRESS SYSTEM.NO NA
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-491-PRS-PID-000-0004 GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 3"-C-491-0401_A-A19A PIPE SPEC :A19A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : C-491-0401_A AREA: EP26-A2 SHT. 2 OF 2 REV. 0
<SECURITY LEVEL2>

N MATERIAL LIST

PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
PIPE
1 APPTB0SBB 3" PIPE A106GR.B SMLS BE ASME B36.10M :S-STD 42.5 M

2 APPTB0SAB 3/4" PIPE A106GR.B SMLS PE ASME B36.10M :S-160 0.2 M


CONT.ON
EP26_A2-C-491-0401_A FITTINGS
4 E 1805505 3 DHDTA0Q1R 3X3/4" HALF COUPLING A105 CL.6000 SW ASME B16.11 1
90° N 1976750
EL +119544 EL +115544 4 DEATB0S2Q 3" 90 DEG ELBOW A234GR.WPB SMLS BW ASME B16.9 4
:S-STD

38 FLANGES
46
5 CFATA0DBJ 3/4" FLANGE SW A105 CL.150 RF ASME B16.5 :S-160 1
S10 E 1805505
G1-3 N 1946554 6 CDBTA0DBJ 3/4" BLIND FLANGE A105 CL.150 RF ASME B16.5 1

4000
38 EL +119893
3"NPS 50 GASKETS

<2> 1
S10 7 FFG213ACADBHA 3/4" SPIRAL WOUND GASKET (G213ACA) CL.150 RF 4.5 1
90 G1-3 6 MM ASME B16.20
00 F5 G7 B11
50 VALVES
04 <1 <4> 2
> 4 8 51092 3/4" GATE VALVE CL.800 A105/MONEL SW BB,OS&Y BY 1
1 MFR/API 602/ASME B16.11 HANDWHEEL -
90°
S9 25 8 PIPE SUPPORTS

106
19
F1-3 2 STEM NORTH 9 F1 3" F1-3 2
90
00
10 G1 3" G1-3 3

PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
<3> 2 68 BOLTS
S10
11 EBEBB0A 1/2 " STUD BOLT(FULL THREADED)/HEX.NUT(HEAVY) 4

100
G1-3 A193GR.B7/A194GR.2H ASME B18.2.1/ASME
B18.2.2 - 65 mm Length
3 <5
3X3/4"NPS 70 > 4
1 90°
50 CUT PIPE LENGTH
0
PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS
NO (MM) (IN) NO (MM) (IN)

<1> 4890 3 <2> 3772 3


<3> 100 3/4 <4> 100 3/4
<5> 25464 3 <6> 3772 3

<6> 1
<7> 4540 3
CONT.ON

4000
EP26_A1-C-491-0401
E 1805505
N 1941400
4 EL +115544
90° 11
EL +115544 54
S9
F1-3
<7 3"NPS
46 >
54 1
Isometric File Name : EP26_A2-C-491-0401_B
Iso Extraction Date : 2021-11-27 09:47:17

DESIGN TEMP. ºC 65.00 OPE. TEMP. ºC 45.00 PAINT SYSTEM T1 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 10.00 OPE. PRESS. kg/cm2g 4.10 PWHT Y
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
INS. CODE N TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm - TEST PRESS. kg/cm2 g 15 CLIENT NAME


01/12/2021 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 5 PT or MT % 0 STRESS SYSTEM.NO NA
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-491-PRS-PID-000-0004 GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 3"-C-491-0401_B-A19A PIPE SPEC :A19A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : C-491-0401_B AREA: EP26-A2 SHT. 1 OF 1 REV. 0
<SECURITY LEVEL2>

N MATERIAL LIST

PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
PIPE
1 APPTB0SBB 4" PIPE A106GR.B SMLS BE ASME B36.10M :S-STD 7.9 M

2 APPTB0SAB 3/4" PIPE A106GR.B SMLS PE ASME B36.10M :S-160 0.2 M

FITTINGS
3 DHDTA0Q1R 4X3/4" HALF COUPLING A105 CL.6000 SW ASME B16.11 1

4 DEATB0S2Q 4" 90 DEG ELBOW A234GR.WPB SMLS BW ASME B16.9 1


4
:S-STD
CONT.ON 90°
EP26_A2-CRWS-491-0312_B EL +116557 FLANGES
E 1810000 5 CFATA0DBJ 3/4" FLANGE SW A105 CL.150 RF ASME B16.5 :S-160 1
N 1980470
EL +116405 6 CDBTA0DBJ 3/4" BLIND FLANGE A105 CL.150 RF ASME B16.5 1

GASKETS

0 152 7 FFG213ACDDBHA 3/4" SPIRAL WOUND GASKET (G213ACD) CL.150 RF 4.5 1


0 MM ASME B16.20
30
BOLTS
4"NPS 8 EBEBB0A 1/2 " STUD BOLT(FULL THREADED)/HEX.NUT(HEAVY) 4
A193GR.B7/A194GR.2H ASME B18.2.1/ASME
S10 B18.2.2 - 65 mm Length
MH2-F-800-1054-4
VALVES
9 51001 3/4" GATE VALVE CL.800 A105/HF SW BB,OS&Y BY 1
MFR/API 602/ASME B16.11 HANDWHEEL

PIPE SUPPORTS
10 MH2 4" MH2-F-800-1054-4 1

11 G1 4" G1-4 1

E 1802500
N 1980470 00
EL +116917 40 00
75 CUT PIPE LENGTH

6 PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS


F5 G7 B8 NO (MM) (IN) NO (MM) (IN)

<2> 2 <1> 100 3/4 <2> 100 3/4


<3> 7848 4

<1> 2
106

9
STEM EAST
66
183

491-TP-93-001 S11
3
4X3/4"NPS G1-4
1
3 >
<
0
50
CONT.ON
EPCC-07-4"-CRWS-491-9301-A1A
E 1802000
N 1980470
EL +116557
Isometric File Name : EP26_A2-CRWS-491-0307
Iso Extraction Date : 2022-06-17 16:16:14

DESIGN TEMP. ºC 65.00 OPE. TEMP. ºC 45.00 PAINT SYSTEM T1 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 10.00 OPE. PRESS. kg/cm2g 6.00 PWHT N
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
INS. CODE N TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm - TEST PRESS. kg/cm2 g 15 CLIENT NAME


15/06/2022 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 5 PT or MT % 0 STRESS SYSTEM.NO NA
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-491-PRS-PID-000-0003 GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 4"-CRWS-491-0307-A1A PIPE SPEC :A1A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : CRWS-491-0307 AREA: EP26-A2 SHT. 1 OF 1 REV. 0
<SECURITY LEVEL2>

N MATERIAL LIST

PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
PIPE
1 APPTB0SBB 10" PIPE A106GR.B SMLS BE ASME B36.10M :S-STD 32.9 M

2 APPTB0SAB 3/4" PIPE A106GR.B SMLS PE ASME B36.10M :S-160 0.2 M

E 1810000 FITTINGS
N 1971257
EL +120077 3 DHDTA0Q1R 10X3/4" HALF COUPLING A105 CL.6000 SW ASME B16.11 1

4 DEATB0S2Q 10" 90 DEG ELBOW A234GR.WPB SMLS BW ASME B16.9 2


:S-STD
6
F5 G7 B8 FLANGES
<4> 2 5 CFATA0DBJ 3/4" FLANGE SW A105 CL.150 RF ASME B16.5 :S-160 1

6 CDBTA0DBJ 3/4" BLIND FLANGE A105 CL.150 RF ASME B16.5 1

106
4 9 GASKETS
90° STEM NORTH
EL +119637 7 FFG213ACDDBHA 3/4" SPIRAL WOUND GASKET (G213ACD) CL.150 RF 4.5 1
<3> 2 MM ASME B16.20
3
68 BOLTS
10X3/4"NPS
8 EBEBB0A 1/2 " STUD BOLT(FULL THREADED)/HEX.NUT(HEAVY) 4
85 S11 A193GR.B7/A194GR.2H ASME B18.2.1/ASME
7
581 S0-10 B18.2.2 - 65 mm Length
100 25
4000

00 VALVES
10"NPS 38 S10 S11
50
<2> 1

9 51001 3/4" GATE VALVE CL.800 A105/HF SW BB,OS&Y BY 1


162 G1-10 S0-10 MFR/API 602/ASME B16.11 HANDWHEEL

49 45 PIPE SUPPORTS
12 00
10 G1 10" G1-10 4
S10
S10 G1-10 11 S0 10" S0-10 4

G1-10 45
4 00
90° CUT PIPE LENGTH
<1> 1 CONT.ON
EP26_A2-CRWS-491-0312_B PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS
E 1810000 S11 NO (MM) (IN) NO (MM) (IN)
N 1976750 S0-10
24 45 <1> 4531 10 <2> 3238 10
EL +115637 91 00
5 <3> 100 3/4 <4> 100 3/4
<5> 25115 10
S10
G1-10
45
00

25 S11
00
S0-10

<5> 1
10"NPS

CONT.ON
CRWS-491-0312_A SHT 2
Isometric File Name : EP26_A2-CRWS-491-0312_A
Iso Extraction Date : 2021-11-27 09:48:25

DESIGN TEMP. ºC 65.00 OPE. TEMP. ºC 45.00 PAINT SYSTEM T1 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 10.00 OPE. PRESS. kg/cm2g 6.00 PWHT N
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
INS. CODE N TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm - TEST PRESS. kg/cm2 g 15 CLIENT NAME


01/12/2021 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 5 PT or MT % 0 STRESS SYSTEM.NO NA
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-491-PRS-PID-000-0003 GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 10"-CRWS-491-0312_A-A1A PIPE SPEC :A1A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : CRWS-491-0312_A AREA: EP26-A2 SHT. 1 OF 2 REV. 0
<SECURITY LEVEL2>

N MATERIAL LIST
381
PT| SIZE
SEE SHT NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
CRWS-491-0312_A SHT 1 PIPE
1 APPTB0SBB 10" PIPE A106GR.B SMLS BE ASME B36.10M :S-STD 7.5 M

4 2 APPTB0SAB 3/4" PIPE A106GR.B SMLS PE ASME B36.10M :S-160 0.2 M


90°
FITTINGS

10"NPS 3 DHDTA0Q1R 10X3/4" HALF COUPLING A105 CL.6000 SW ASME B16.11 1

4 DEATB0S2Q 10" 90 DEG ELBOW A234GR.WPB SMLS BW ASME B16.9 2


:S-STD

FLANGES
5 CFATA0DBJ 3/4" FLANGE SW A105 CL.150 RF ASME B16.5 :S-160 1

6 CDBTA0DBJ 3/4" BLIND FLANGE A105 CL.150 RF ASME B16.5 1

GASKETS
7 FFG213ACDDBHA 3/4" SPIRAL WOUND GASKET (G213ACD) CL.150 RF 4.5 1
MM ASME B16.20

BOLTS

4000
8 EBEBB0A 1/2 " STUD BOLT(FULL THREADED)/HEX.NUT(HEAVY) 4
<1> 1

A193GR.B7/A194GR.2H ASME B18.2.1/ASME


B18.2.2 - 65 mm Length

VALVES
9 51001 3/4" GATE VALVE CL.800 A105/HF SW BB,OS&Y BY 1
MFR/API 602/ASME B16.11 HANDWHEEL

PIPE SUPPORTS
10 S0 10" S0-10 1

CUT PIPE LENGTH

PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS


NO (MM) (IN) NO (MM) (IN)

<1> 3238 10 <2> 100 3/4


<3> 100 3/4 <4> 4181 10
4
90°
EL +115637
14
00 S10
10
61 S0-10

3
10X3/4"NPS 162

31
100

62
<4
<2> 2 >
1
9
STEM SOUTH
68 CONT.ON
F5 G7 B8 EP26_A1-CRWS-491-0312
E 1810000
106

N 1941400
6 EL +115637
E 1810000
N 1944562 <3> 2
EL +115196
Isometric File Name : EP26_A2-CRWS-491-0312_A
Iso Extraction Date : 2021-11-27 09:48:25

DESIGN TEMP. ºC 65.00 OPE. TEMP. ºC 45.00 PAINT SYSTEM T1 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 10.00 OPE. PRESS. kg/cm2g 6.00 PWHT N
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
INS. CODE N TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm - TEST PRESS. kg/cm2 g 15 CLIENT NAME


01/12/2021 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 5 PT or MT % 0 STRESS SYSTEM.NO NA
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-491-PRS-PID-000-0003 GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 10"-CRWS-491-0312_A-A1A PIPE SPEC :A1A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : CRWS-491-0312_A AREA: EP26-A2 SHT. 2 OF 2 REV. 0
<SECURITY LEVEL2>

N MATERIAL LIST

PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
PIPE
1 APPTB0SBB 10" PIPE A106GR.B SMLS BE ASME B36.10M :S-STD 4.4 M

2 APPTB0SBB 4" PIPE A106GR.B SMLS BE ASME B36.10M :S-STD 0.7 M

PIPE SUPPORTS
3 S0 10" S0-10 1

4 G1 10" G1-10 1

CUT PIPE LENGTH


90°
4"NPS PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS
NO (MM) (IN) NO (MM) (IN)

<1> 645 4 <2> 4329 10

CONT.ON
CONT.ON <2 EP26_A2-CRWS-491-0307
EP26_A2-CRWS-491-0312_C > E 1810000
1

<1> 2
E 1810000 N 1980470
N 1984800 EL +116405
EL +115637
43
30

769
S4
G1-10
39
30

10X4"NPS 37
19

S3
S0-10

16
50

10
"N
PS

CONT.ON
EP26_A2-CRWS-491-0312_A
E 1810000
N 1976750
EL +115637
Isometric File Name : EP26_A2-CRWS-491-0312_B
Iso Extraction Date : 2022-06-17 16:17:40

DESIGN TEMP. ºC 65.00 OPE. TEMP. ºC 45.00 PAINT SYSTEM T1 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 10.00 OPE. PRESS. kg/cm2g 6.00 PWHT N
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
INS. CODE N TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm - TEST PRESS. kg/cm2 g 15 CLIENT NAME


15/06/2022 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 5 PT or MT % 0 STRESS SYSTEM.NO NA
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-491-PRS-PID-000-0003 GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 10"-CRWS-491-0312_B-A1A PIPE SPEC :A1A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : CRWS-491-0312_B AREA: EP26-A2 SHT. 1 OF 1 REV. 0
<SECURITY LEVEL2>

N MATERIAL LIST

PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
10 CONT.ON
"N 381 EP26_A3-CRWS-491-0302 PIPE
PS
E 1810000 1 APPTB0SBB 10" PIPE A106GR.B SMLS BE ASME B36.10M :S-STD 7.3 M
N 2083189
4 EL +123637 2 APPTB0SAB 3/4" PIPE A106GR.B SMLS PE ASME B36.10M :S-160 0.2 M
90°
FITTINGS
3 DHDTA0Q1R 10X3/4" HALF COUPLING A105 CL.6000 SW ASME B16.11 1

4 DEATB0S2Q 10" 90 DEG ELBOW A234GR.WPB SMLS BW ASME B16.9 2

1677
:S-STD

FLANGES
5 CFATA0DBJ 3/4" FLANGE SW A105 CL.150 RF ASME B16.5 :S-160 1

6 CDBTA0DBJ 3/4" BLIND FLANGE A105 CL.150 RF ASME B16.5 1

GASKETS
S10 7 FFG213ACDDBHA 3/4" SPIRAL WOUND GASKET (G213ACD) CL.150 RF 4.5 1
G1TR1-0-850-10 8000 MM ASME B16.20
WITH PAD.
BOLTS
8 EBEBB0A 1/2 " STUD BOLT(FULL THREADED)/HEX.NUT(HEAVY) 4
A193GR.B7/A194GR.2H ASME B18.2.1/ASME
B18.2.2 - 65 mm Length
<1> 1

VALVES
9 51001 3/4" GATE VALVE CL.800 A105/HF SW BB,OS&Y BY 1
MFR/API 602/ASME B16.11 HANDWHEEL

PIPE SUPPORTS
10 G1TR1 10" G1TR1-0-850-10 1

11 S0 10" S0-10 2

1 12 G1 10" G1-10 1

60
4 0 S11 CUT PIPE LENGTH
90° S0-10
EL +115637 PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS
NO (MM) (IN) NO (MM) (IN)
3
10X3/4"NPS <1> 7238 10 <2> 100 3/4
S12 <3> 100 3/4
1208 G1-10
262

25 1
00
<2> 2

9
STEM NORTH
68
F5 G7 B8
60
106

00
6
E 1810000
N 2082208 <3> 2
EL +115196 S11
S0-10 10
"N
PS

CONT.ON
CRWS-491-0312_C SHT 2
Isometric File Name : EP26_A2-CRWS-491-0312_C
Iso Extraction Date : 2022-08-19 12:24:21

DESIGN TEMP. ºC 65.00 OPE. TEMP. ºC 45.00 PAINT SYSTEM T1 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 10.00 OPE. PRESS. kg/cm2g 6.00 PWHT N
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
1 17-08-2022 REVISED AS PER MARK1 PPK SP SS INS. CODE N TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm - TEST PRESS. kg/cm2g 15 CLIENT NAME


01/12/2021 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 5 PT or MT % 0 STRESS SYSTEM.NO NA
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-491-PRS-PID-000-0003 GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 10"-CRWS-491-0312_C-A1A PIPE SPEC :A1A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : CRWS-491-0312_C AREA: EP26-A2 SHT. 1 OF 2 REV. 1
<SECURITY LEVEL2>

N MATERIAL LIST

PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
PIPE
1 APPTB0SBB 10" PIPE A106GR.B SMLS BE ASME B36.10M :S-STD 97.7 M

PIPE SUPPORTS
2 G1 10" G1-10 7

3 S0 10" S0-10 6

4 F1 10" F1-10 1

SEE SHT
CRWS-491-0312_C SHT 1 CUT PIPE LENGTH
10"NPS
PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS
S3 NO (MM) (IN) NO (MM) (IN)
S0-10
<1> 97627 10
S2
60 G1-10
00
S3 1
60 S0-10
00
S2
S2 60 G1-10
G1-10 00
S3
60 S0-10
00

60
00
1
97
60 40 S2
00 8
G1-10
S2
60 G1-10
00
S4
F1-10
60
00
S2
60 G1-10
00
S3
S3 60 S0-10
S0-10 00
S2
60 G1-10
00
S3
S0-10
60
00

60
00
10"NPS
60
00

<1> 1
CONT.ON
EP26_A2-CRWS-491-0312_B
E 1810000
N 1984800
EL +115637
Isometric File Name : EP26_A2-CRWS-491-0312_C
Iso Extraction Date : 2022-08-19 12:24:21

DESIGN TEMP. ºC 65.00 OPE. TEMP. ºC 45.00 PAINT SYSTEM T1 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 10.00 OPE. PRESS. kg/cm2g 6.00 PWHT N
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
1 17-08-2022 REVISED AS PER MARK1 PPK SP SS INS. CODE N TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm - TEST PRESS. kg/cm2g 15 CLIENT NAME


01/12/2021 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 5 PT or MT % 0 STRESS SYSTEM.NO NA
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-491-PRS-PID-000-0003 GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 10"-CRWS-491-0312_C-A1A PIPE SPEC :A1A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : CRWS-491-0312_C AREA: EP26-A2 SHT. 2 OF 2 REV. 1
<SECURITY LEVEL2>

N MATERIAL LIST

PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
PIPE
1 APPKB0SBD 4" PIPE A312GR.TP304 SMLS BE ASME B36.19M :S-10S 7.5 M

2 APPKB0SAD 3/4" PIPE A312GR.TP304 SMLS PE ASME B36.19M :S-80S 0.3 M

FITTINGS
3 DHDKA0P1R 4X3/4" HALF COUPLING A182GR.F304 CL.3000 SW ASME 1
B16.11
4 4 DEAKB0S2Q 4" 90 DEG ELBOW A403GR.WP304 SMLS BW ASME B16.9 1
90° :S-10S
EL +116557
CONT.ON FLANGES
EP26_A2-DM-321-0204_B 5 CFAKA0DBJ 3/4" FLANGE SW A182GR.F304 CL.150 RF ASME B16.5 1
E 1809640 :S-80S
N 1980050 6 CDBKA0DBJ 3/4" BLIND FLANGE A182GR.F304 CL.150 RF ASME B16.5 1
EL +116405
GASKETS

40 152 7 FFG121000DACA 3/4" NON-ASBESTOS SHEET GASKET (G121) CL.150 FF 1


26 4"NPS 2.0 MM ASME B16.20

VALVES
8 51045 3/4" GATE VALVE CL.800 A182GR.F304/HF SW BB,OS&Y 1
BY MFR/API 602/ASME B16.11 HANDWHEEL
S9
SH-4 PIPE SUPPORTS
9 Logical 4" SH-4 2

10 G1 4" G1-4 1

PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
BOLTS
11 EBEBB0A 1/2 " STUD BOLT(FULL THREADED)/HEX.NUT(HEAVY) 4
A193GR.B7/A194GR.2H ASME B18.2.1/ASME
E 1802500 00 MH2-F-800-1054-4
N 1980050 40 B18.2.2 - 65 mm Length
40
EL +116917 71
6 CUT PIPE LENGTH
F5 G7 B11
PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS
<2> 2
NO (MM) (IN) NO (MM) (IN)

<1> 99 3/4 <2> 102 3/4


S9 <3> 7488 4
108

SH-4
8
STEM EAST
68
<1> 2
182

321-TP-91-001
S10
1 G1-4
>
<3
3
500 4X3/4"NPS
CONT.ON
EPCC-07-4"-DM-321-9103-A3K
E 1802000
N 1980050
EL +116557
Isometric File Name : EP26_A2-DM-321-0203
Iso Extraction Date : 2022-06-17 16:18:57

DESIGN TEMP. ºC 75.00 OPE. TEMP. ºC 45.00 PAINT SYSTEM NA TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 11.00 OPE. PRESS. kg/cm2g 11.00 PWHT N
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
INS. CODE N TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm - TEST PRESS. kg/cm2 g 16.50 CLIENT NAME


15/06/2022 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 5 PT or MT % 0 STRESS SYSTEM.NO NA
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-321-PRS-PID-000-0002 GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 4"-DM-321-0203-A3K PIPE SPEC :A3K
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : DM-321-0203 AREA: EP26-A2 SHT. 1 OF 1 REV. 0
<SECURITY LEVEL2>

N MATERIAL LIST

PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
PIPE
1 APPKB0SBD 8" PIPE A312GR.TP304 SMLS BE ASME B36.19M :S-10S 33.3 M

2 APPKB0SAD 3/4" PIPE A312GR.TP304 SMLS PE ASME B36.19M :S-80S 0.2 M

E 1809640 FITTINGS
N 1971306
3 DHDKA0P1R 8X3/4" HALF COUPLING A182GR.F304 CL.3000 SW ASME 1
EL +120021 B16.11
4 DEAKB0S2Q 8" 90 DEG ELBOW A403GR.WP304 SMLS BW ASME B16.9 2
:S-10S
6
F5 G7 B11 FLANGES
<4> 2 5 CFAKA0DBJ 3/4" FLANGE SW A182GR.F304 CL.150 RF ASME B16.5 1
:S-80S
6 CDBKA0DBJ 3/4" BLIND FLANGE A182GR.F304 CL.150 RF ASME B16.5 1

106
4
90° 8 GASKETS
EL +119610 STEM NORTH 7 FFG121000DACA 3/4" NON-ASBESTOS SHEET GASKET (G121) CL.150 FF 1
<3> 2 2.0 MM ASME B16.20
3
8X3/4"NPS 68 VALVES
8 51045 3/4" GATE VALVE CL.800 A182GR.F304/HF SW BB,OS&Y 1
90 S9 BY MFR/API 602/ASME B16.11 HANDWHEEL
6
S9 505 SH-8
SH-8 PIPE SUPPORTS
100 25
4000

00 9 Logical 8" SH-8 8


8"NPS 38 S10 S9
50
<2> 1

135 G1-8 SH-8 10 G1 8" G1-8 4

49 45 PT| SIZE
39 <1> 1 00
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
S10 BOLTS
S9
G1-8
SH-8 11 EBEBB0A 1/2 " STUD BOLT(FULL THREADED)/HEX.NUT(HEAVY) 4
S10 45 A193GR.B7/A194GR.2H ASME B18.2.1/ASME
G1-8 4 00 B18.2.2 - 65 mm Length
90°
CONT.ON
EP26_A2-DM-321-0204_B S9 CUT PIPE LENGTH
E 1809640
S9 SH-8
N 1976750 25 45 PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS
EL +115610 SH-8 01 00 NO (MM) (IN) NO (MM) (IN)
3
<1> 4634 8 <2> 3390 8
S10 <3> 100 3/4 <4> 100 3/4
G1-8 <5> 25213 8

45
00

25 S9
00
SH-8

S9 <5> 1
SH-8 8"NPS

CONT.ON
DM-321-0204_A SHT 2
Isometric File Name : EP26_A2-DM-321-0204_A
Iso Extraction Date : 2021-11-27 09:51:44

DESIGN TEMP. ºC 75.00 OPE. TEMP. ºC 45.00 PAINT SYSTEM NA TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 11.00 OPE. PRESS. kg/cm2g 11.00 PWHT N
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
INS. CODE N TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm - TEST PRESS. kg/cm2 g 16.5 CLIENT NAME


01/12/2021 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 5 PT or MT % 0 STRESS SYSTEM.NO NA
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-321-PRS-PID-000-0002 GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 8"-DM-321-0204_A-A3K PIPE SPEC :A3K
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : DM-321-0204_A AREA: EP26-A2 SHT. 1 OF 2 REV. 0
<SECURITY LEVEL2>

N MATERIAL LIST

305 PT| SIZE


NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
SEE SHT
DM-321-0204_A SHT 1 PIPE
1 APPKB0SBD 8" PIPE A312GR.TP304 SMLS BE ASME B36.19M :S-10S 7.7 M

2 APPKB0SAD 3/4" PIPE A312GR.TP304 SMLS PE ASME B36.19M :S-80S 0.2 M


4
90° FITTINGS
3 DHDKA0P1R 8X3/4" HALF COUPLING A182GR.F304 CL.3000 SW ASME 1
8"NPS B16.11
4 DEAKB0S2Q 8" 90 DEG ELBOW A403GR.WP304 SMLS BW ASME B16.9 2
:S-10S

FLANGES
5 CFAKA0DBJ 3/4" FLANGE SW A182GR.F304 CL.150 RF ASME B16.5 1
:S-80S
6 CDBKA0DBJ 3/4" BLIND FLANGE A182GR.F304 CL.150 RF ASME B16.5 1

4000
<1> 1
GASKETS
7 FFG121000DACA 3/4" NON-ASBESTOS SHEET GASKET (G121) CL.150 FF 1
2.0 MM ASME B16.20

VALVES
8 51045 3/4" GATE VALVE CL.800 A182GR.F304/HF SW BB,OS&Y 1
BY MFR/API 602/ASME B16.11 HANDWHEEL

PIPE SUPPORTS
9 Logical 8" SH-8 1

10 G1 8" G1-8 1
4
90° PT| SIZE
EL +115610 NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
BOLTS
14 11 EBEBB0A 1/2 " STUD BOLT(FULL THREADED)/HEX.NUT(HEAVY) 4
10 00 S9 A193GR.B7/A194GR.2H ASME B18.2.1/ASME
88 SH-8 B18.2.2 - 65 mm Length

CUT PIPE LENGTH

PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS


NO (MM) (IN) NO (MM) (IN)
S10 3
G1-8 8X3/4"NPS 135 <1> 3390 8 <2> 100 3/4
31 <3> 100 3/4 <4> 4284 8
89
<4
>
1
CONT.ON
EP26_A1-DM-321-0204
E 1809640
N 1941400
EL +115610
100
<2> 2

8
STEM SOUTH
68
<3> 2

F5 G7 B11
106

6
E 1809640
N 1944589
EL +115198
Isometric File Name : EP26_A2-DM-321-0204_A
Iso Extraction Date : 2021-11-27 09:51:44

DESIGN TEMP. ºC 75.00 OPE. TEMP. ºC 45.00 PAINT SYSTEM NA TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 11.00 OPE. PRESS. kg/cm2g 11.00 PWHT N
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
INS. CODE N TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm - TEST PRESS. kg/cm2 g 16.5 CLIENT NAME


01/12/2021 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 5 PT or MT % 0 STRESS SYSTEM.NO NA
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-321-PRS-PID-000-0002 GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 8"-DM-321-0204_A-A3K PIPE SPEC :A3K
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : DM-321-0204_A AREA: EP26-A2 SHT. 2 OF 2 REV. 0
<SECURITY LEVEL2>

N MATERIAL LIST

PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
PIPE
1 APPKB0SBD 8" PIPE A312GR.TP304 SMLS BE ASME B36.19M :S-10S 5.3 M

2 APPKB0SBD 4" PIPE A312GR.TP304 SMLS BE ASME B36.19M :S-10S 3.3 M

FITTINGS
3 DRBKB0S2Q 8X4" ECC REDUCER A403GR.WP304 SMLS BW ASME B16.9 1
:S-10S x S-10S

PIPE SUPPORTS
CONT.ON
EP26_A2-DM-321-0204_C 4 Logical 8" SH-8 2
E 1809640
N 1984800 5 Logical 4" SH-4 1
EL +115557 6 G1 4" G1-4 1

S5
SH-4 CONT.ON
<3 CUT PIPE LENGTH
> 4"NPS EP26_A2-DM-321-0203
2 E 1809640 PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS
90° N 1980050 NO (MM) (IN) NO (MM) (IN)
EL +116405
<1> 702 4 <2> 5299 8
21
98 <3> 2598 4
152
S6
G1-4
25 3

<1> 2
98 8X4"NPS
52MM OFFSET
FLAT SIDE D

796
S4
<2 SH-8
>
1
13
51

20
00
8X4"NPS

S4
SH-8
16
50
CONT.ON
EP26_A2-DM-321-0204_A
32 E 1809640
99
N 1976750
EL +115610
8"
NP
S
Isometric File Name : EP26_A2-DM-321-0204_B
Iso Extraction Date : 2022-06-17 16:20:32

DESIGN TEMP. ºC 75.00 OPE. TEMP. ºC 45.00 PAINT SYSTEM NA TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 11.00 OPE. PRESS. kg/cm2g 11.00 PWHT N
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
INS. CODE N TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm - TEST PRESS. kg/cm2 g 16.5 CLIENT NAME


15/06/2022 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 5 PT or MT % 0 STRESS SYSTEM.NO NA
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-333-PRS-PID-000-0002 GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 8"-DM-321-0204_B-A3K PIPE SPEC :A3K
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : DM-321-0204_B AREA: EP26-A2 SHT. 1 OF 1 REV. 0
<SECURITY LEVEL2>

CONT.ON
N MATERIAL LIST
EP26_A3-DM-321-0204 152
E 1809640 PT| SIZE
N 2082987 4" NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
EL +123557 NP PIPE
S
1 APPKB0SBD 4" PIPE A312GR.TP304 SMLS BE ASME B36.19M :S-10S 7.7 M
4 2 APPKB0SAD 3/4" PIPE A312GR.TP304 SMLS PE ASME B36.19M :S-80S 0.2 M
90°
FITTINGS
3 DHDKA0P1R 4X3/4" HALF COUPLING A182GR.F304 CL.3000 SW ASME 1
B16.11
4 DEAKB0S2Q 4" 90 DEG ELBOW A403GR.WP304 SMLS BW ASME B16.9 2

1663
:S-10S

FLANGES
5 CFAKA0DBJ 3/4" FLANGE SW A182GR.F304 CL.150 RF ASME B16.5 1
:S-80S
6 CDBKA0DBJ 3/4" BLIND FLANGE A182GR.F304 CL.150 RF ASME B16.5 1

GASKETS
S9
8000
7 FFG121000DACA 3/4" NON-ASBESTOS SHEET GASKET (G121) CL.150 FF 1
G1TR1-0-850-4 2.0 MM ASME B16.20

VALVES
8 51045 3/4" GATE VALVE CL.800 A182GR.F304/HF SW BB,OS&Y 1
BY MFR/API 602/ASME B16.11 HANDWHEEL
<1> 1

PIPE SUPPORTS
9 G1TR1 4" G1TR1-0-850-4 1

10 Logical 4" SH-4 3

11 G1 4" G1-4 1

PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
BOLTS
12 EBEBB0A 1/2 " STUD BOLT(FULL THREADED)/HEX.NUT(HEAVY) 4
A193GR.B7/A194GR.2H ASME B18.2.1/ASME
35 B18.2.2 - 65 mm Length
4 2 S10
90° SH-4
EL +115557
3 CUT PIPE LENGTH
4X3/4"NPS
PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS
S10
NO (MM) (IN) NO (MM) (IN)
1483 SH-4
1 <1> 7696 4 <2> 100 3/4
<3> 100 3/4
183

25
<2> 2 00
1
S11
G1-4

F5 G7 B12 68

60
106

8 00
6 STEM NORTH

E 1809640
N 2082483 <3> 2
EL +115198 S10
SH-4 4"
NP
S

CONT.ON
DM-321-0204_C SHT 2
Isometric File Name : EP26_A2-DM-321-0204_C
Iso Extraction Date : 2022-08-19 12:25:33

DESIGN TEMP. ºC 65.00 OPE. TEMP. ºC 45.00 PAINT SYSTEM T1 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 11.00 OPE. PRESS. kg/cm2g 6.50 PWHT N
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
1 17-08-2022 REVISED AS PER MARK1 PPK SP SS INS. CODE N TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm - TEST PRESS. kg/cm2g 16.5 CLIENT NAME


01/12/2021 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 5 PT or MT % 0 STRESS SYSTEM.NO NA
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-333-PRS-PID-000-0002 GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 4"-DM-321-0204_C-A3K PIPE SPEC :A3K
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : DM-321-0204_C AREA: EP26-A2 SHT. 1 OF 2 REV. 1
<SECURITY LEVEL2>

N MATERIAL LIST

PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
PIPE
1 APPKB0SBD 4" PIPE A312GR.TP304 SMLS BE ASME B36.19M :S-10S 97.9 M

PIPE SUPPORTS
2 Logical 4" SH-4 13

3 G1 4" G1-4 6

4 F1 4" F1-K-4 1
SEE SHT
DM-321-0204_C SHT 1
CUT PIPE LENGTH
4"NPS
PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS
S3 S2 NO (MM) (IN) NO (MM) (IN)
G1-4 SH-4
<1> 97883 4
S2
60 SH-4
00
S2
SH-4 1
60
00
S2
S2 60 SH-4
SH-4 00
S2
60 SH-4
00

S3 60
G1-4 00 S3
97 G1-4
60 68 S2
00 3
SH-4 1
S3
G1-4 60
00
S2
60 SH-4
00
S2
S2 60 SH-4
SH-4 00
S2
60 SH-4
00
S3
S4 G1-4
60
F1-K-4 00
S2
60 SH-4
00

S3 60
G1-4 00
4"NPS
60
00
S2
SH-4
<1> 1
CONT.ON
EP26_A2-DM-321-0204_B
E 1809640
N 1984800
EL +115557
Isometric File Name : EP26_A2-DM-321-0204_C
Iso Extraction Date : 2022-08-19 12:25:33

DESIGN TEMP. ºC 65.00 OPE. TEMP. ºC 45.00 PAINT SYSTEM T1 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 11.00 OPE. PRESS. kg/cm2g 6.50 PWHT N
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
1 17-08-2022 REVISED AS PER MARK1 PPK SP SS INS. CODE N TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm - TEST PRESS. kg/cm2g 16.5 CLIENT NAME


01/12/2021 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 5 PT or MT % 0 STRESS SYSTEM.NO NA
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-333-PRS-PID-000-0002 GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 4"-DM-321-0204_C-A3K PIPE SPEC :A3K
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : DM-321-0204_C AREA: EP26-A2 SHT. 2 OF 2 REV. 1
<SECURITY LEVEL2>

N MATERIAL LIST

PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
CONT.ON
PIPE
EP26_A3-DM-321-0302
E 1807880 1 APPKB0SBD 6" PIPE A312GR.TP304 SMLS BE ASME B36.19M :S-10S 7.6 M
N 2083090
EL +123584 2 APPKB0SAD 3/4" PIPE A312GR.TP304 SMLS PE ASME B36.19M :S-80S 0.2 M

229 FITTINGS
3 DHDKA0P1R 6X3/4" HALF COUPLING A182GR.F304 CL.3000 SW ASME 1
B16.11
4 DEAKB0S2Q 6" 90 DEG ELBOW A403GR.WP304 SMLS BW ASME B16.9 2
4 :S-10S
90°
6"NPS FLANGES
5 CFAKA0DBJ 3/4" FLANGE SW A182GR.F304 CL.150 RF ASME B16.5 1
1677

:S-80S
6 CDBKA0DBJ 3/4" BLIND FLANGE A182GR.F304 CL.150 RF ASME B16.5 1
8000

GASKETS
S9 7 FFG121000DACA 3/4" NON-ASBESTOS SHEET GASKET (G121) CL.150 FF 1
G1TR1-0-800-6 2.0 MM ASME B16.20
<1> 1

VALVES
8 51045 3/4" GATE VALVE CL.800 A182GR.F304/HF SW BB,OS&Y 1
BY MFR/API 602/ASME B16.11 HANDWHEEL

PIPE SUPPORTS

50 9 G1TR1 6" G1TR1-0-800-6 1


4
90° 0
S10 10 Logical 6" SH-6 8
EL +115584
SH-6 11 G1 6" G1-6 4
3
6X3/4"NPS 1360 S10 PT| SIZE
SH-6 1
210

S10 NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY


SH-6 BOLTS
8 25
STEM NORTH 00 12 EBEBB0A 1/2 " STUD BOLT(FULL THREADED)/HEX.NUT(HEAVY) 4
A193GR.B7/A194GR.2H ASME B18.2.1/ASME
<2> 2 S10 B18.2.2 - 65 mm Length
60 SH-6
00

F5 G7 B12 CUT PIPE LENGTH


68
60 PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS
S11 00 NO (MM) (IN) NO (MM) (IN)
6 106 G1-6 S11 <1> 7542 6 <2> 100 3/4
E 1807880 G1-6 S11 <3> 100 3/4
N 2082361 <3> 2 60 G1-6
00
EL +115198
S10 1
SH-6
60
00
S10
SH-6 S11
60 G1-6
00
S10
SH-6
60
00
S10 6"
NP
SH-6 S

CONT.ON
DM-321-0302 SHT 2
Isometric File Name : EP26_A2-DM-321-0302
Iso Extraction Date : 2022-08-19 12:26:52

DESIGN TEMP. ºC 75.00 OPE. TEMP. ºC 45.00 PAINT SYSTEM NA TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 11.00 OPE. PRESS. kg/cm2g 11.00 PWHT N
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
1 17-08-2022 REVISED AS PER MARK1 PPK SP SS INS. CODE N TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm - TEST PRESS. kg/cm2g 16.5 CLIENT NAME


01/12/2021 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 5 PT or MT % 0 STRESS SYSTEM.NO NA
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-321-PRS-PID-000-0002 GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 6"-DM-321-0302-A3K PIPE SPEC :A3K
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : DM-321-0302 AREA: EP26-A2 SHT. 1 OF 3 REV. 1
<SECURITY LEVEL2>

N MATERIAL LIST

PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
PIPE
1 APPKB0SBD 6" PIPE A312GR.TP304 SMLS BE ASME B36.19M :S-10S 114.2 M

FITTINGS
2 DEAKB0S2Q 6" 90 DEG ELBOW A403GR.WP304 SMLS BW ASME B16.9 2
:S-10S

PIPE SUPPORTS
3 Logical 6" SH-6 11
SEE SHT
4 G1 6" G1-6 5
DM-321-0302 SHT 1
5 F1 6" F1-K-6 1

60
00 CUT PIPE LENGTH

6"NPS PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS


60 NO (MM) (IN) NO (MM) (IN)
00 S3 S3
SH-6 SH-6 <1> 110617 6 <2> 3542 6

S3 60
00
SH-6
S4 1
60
G1-6 00
S3
60 SH-6
00

60
00
S5 1
F1-K-6 S4
60 G1-6
11 00
S3 05
SH-6 75 S3
60 SH-6
00
S4 2
G1-6 90°
60 229
00 EL +119584
S3
SH-6 4100 S4
G1-6
S3
SH-6 60
00
6"NPS
55
00

<2> 1
S3

4000
SH-6
CONT.ON
S3 DM-321-0302 SHT 3
SH-6
S3
SH-6
S4
<1> 1 G1-6 2
90°
Isometric File Name : EP26_A2-DM-321-0302
Iso Extraction Date : 2022-08-19 12:26:52

DESIGN TEMP. ºC 75.00 OPE. TEMP. ºC 45.00 PAINT SYSTEM NA TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 11.00 OPE. PRESS. kg/cm2g 11.00 PWHT N
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
1 17-08-2022 REVISED AS PER MARK1 PPK SP SS INS. CODE N TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm - TEST PRESS. kg/cm2g 16.5 CLIENT NAME


01/12/2021 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 5 PT or MT % 0 STRESS SYSTEM.NO NA
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-321-PRS-PID-000-0002 GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 6"-DM-321-0302-A3K PIPE SPEC :A3K
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : DM-321-0302 AREA: EP26-A2 SHT. 2 OF 3 REV. 1
<SECURITY LEVEL2>

E 1807880 N MATERIAL LIST


N 1971286
EL +119970 PT| SIZE
6 NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
F5 G7 B11 PIPE
<2> 2 1 APPKB0SBD 6" PIPE A312GR.TP304 SMLS BE ASME B36.19M :S-10S 33.3 M

2 APPKB0SAD 3/4" PIPE A312GR.TP304 SMLS PE ASME B36.19M :S-80S 0.4 M


8

106
STEM NORTH FITTINGS
3 DHDKA0P1R 6X3/4" HALF COUPLING A182GR.F304 CL.3000 SW ASME 2
SEE SHT B16.11
DM-321-0302 SHT 2 4 DEAKB0S2Q 6" 90 DEG ELBOW A403GR.WP304 SMLS BW ASME B16.9 2
:S-10S
<1> 2 68
S9 FLANGES
88
6 SH-6 5 CFAKA0DBJ 3/4" FLANGE SW A182GR.F304 CL.150 RF ASME B16.5 2
:S-80S
6"NPS 25 6 CDBKA0DBJ 3/4" BLIND FLANGE A182GR.F304 CL.150 RF ASME B16.5 2
00
3 S9
6X3/4"NPS SH-6 GASKETS
210 45 7 FFG121000DACA 3/4" NON-ASBESTOS SHEET GASKET (G121) CL.150 FF 2
00
2.0 MM ASME B16.20
S10
S9 G1-6 VALVES
271 SH-6 45
00 8 51045 3/4" GATE VALVE CL.800 A182GR.F304/HF SW BB,OS&Y 2
BY MFR/API 602/ASME B16.11 HANDWHEEL
S10
G1-6 PIPE SUPPORTS
45
00 9 Logical 6" SH-6 8

10 G1 6" G1-6 3
45 1
00
25 PT| SIZE
S9 27 NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
2
SH-6 25 BOLTS
00 S9
S9 11 EBEBB0A 1/2 " STUD BOLT(FULL THREADED)/HEX.NUT(HEAVY) 8
SH-6 SH-6 A193GR.B7/A194GR.2H ASME B18.2.1/ASME
B18.2.2 - 65 mm Length
S10
G1-6 <3 4
> 90°
S9 1
CUT PIPE LENGTH
SH-6
PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS
NO (MM) (IN) NO (MM) (IN)

<1> 100 3/4 <2> 100 3/4

4000
<3> 25314 6 <4> 3542 6
<5> 100 3/4 <6> 100 3/4

<4> 1
<7> 4385 6

S9
4 35 SH-6 1
90° 5
EL +115584
3
6X3/4"NPS 759 42
59

210
<7 CONT.ON
>
1 EP26_A1-DM-321-0302
E 1807880
N 1941400
EL +115584
<5> 2

8
F5 G7 B11 STEM NORTH
106 68

6
E 1807880
N 1945659 <6> 2
EL +115198
Isometric File Name : EP26_A2-DM-321-0302
Iso Extraction Date : 2022-08-19 12:26:52

DESIGN TEMP. ºC 75.00 OPE. TEMP. ºC 45.00 PAINT SYSTEM NA TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 11.00 OPE. PRESS. kg/cm2g 11.00 PWHT N
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
1 17-08-2022 REVISED AS PER MARK1 PPK SP SS INS. CODE N TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm - TEST PRESS. kg/cm2g 16.5 CLIENT NAME


01/12/2021 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 5 PT or MT % 0 STRESS SYSTEM.NO NA
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-321-PRS-PID-000-0002 GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 6"-DM-321-0302-A3K PIPE SPEC :A3K
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : DM-321-0302 AREA: EP26-A2 SHT. 3 OF 3 REV. 1
<SECURITY LEVEL2>

N MATERIAL LIST

PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
PIPE
1 APPTB9SBB 6" PIPE A106GR.B/GALV. SMLS BE ASME B36.10M 4.7 M
:S-STD
2 APPTB9SEB 3/4" PIPE A106GR.B/GALV. SMLS TE ASME B36.10M 0.2 M
:S-160

FITTINGS
4
90° 3 DHDTA9P5R 6X3/4" HALF COUPLING A105/GALV. CL.3000 SCRD ASME 1
B16.11
EL +116734 4 DEATB9S2Q 6" 90 DEG ELBOW A234GR.WPB/GALV. SMLS BW ASME 1
B16.9 :S-STD

FLANGES
5 CFGTA9DAJ 3/4" FLANGE SCRD A105/GALV. CL.150 FF ASME B16.5 1

6 CDBTA9DAJ 3/4" BLIND FLANGE A105/GALV. CL.150 FF ASME B16.5 1

BOLTS
7 EBEBB9A 1/2 " STUD BOLT(FULL THREADED)/HEX.NUT(HEAVY) 4
A193GR.B7/A194GR.2H/GALV. ASME

857
B18.2.1/ASME B18.2.2 - 65 mm Length

VALVES

<1> 1
8 51080 3/4" GATE VALVE CL.2 IS-318GR.2 LEADED TIN 1
BRONZE/IS-318 LTB-2 SCRF SB,OS&Y IS:778
CL.2/IS:778 CL.2/ASME B16.11 HANDWHEEL
45
32 PIPE SUPPORTS
CONT.ON 9 G1S2 6" G1S2-300-150-6 1
EP26_A2-DW-341-0905_B
E 1802500 E 1806245 6X6"NPS PT| SIZE
N 1983250 N 1983250 NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
EL +117064 EL +115877 GASKETS
10 FFG111A00DBCD 3/4" RUBBER SHEET GASKET (G111A) CL.150 RF 2.0 MM 1
6
5 ASME B16.21
F5 G10 B7
3 74
<3> 2

6"NPS
CUT PIPE LENGTH
100

PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS


NO (MM) (IN) NO (MM) (IN)
8
STEM EAST <1> 628 6 <2> 100 3/4
31 <3> 100 3/4 <4> 4016 6
<2> 2

S9
197

G1S2-300-150-6

3
6X3/4"NPS
341-TP-92-001 1
>
<4

0
50
CONT.ON
EPCC-07-6"-DW-341-9202-J2A-IH
E 1802000
N 1983250
EL +116734
Isometric File Name : EP26_A2-DW-341-0329
Iso Extraction Date : 2022-06-17 16:21:55

DESIGN TEMP. ºC 65.00 OPE. TEMP. ºC 35.00 PAINT SYSTEM T4 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 7.00 OPE. PRESS. kg/cm2g 4.00 PWHT N
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
INS. CODE IH TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm 25 TEST PRESS. kg/cm2 g 10.50 CLIENT NAME


15/06/2022 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 1 PT or MT % 0 STRESS SYSTEM.NO NA
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-341-PRS-PID-000-0003 GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 6"-DW-341-0329-J2A-IH PIPE SPEC :J2A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : DW-341-0329 AREA: EP26-A2 SHT. 1 OF 1 REV. 0
<SECURITY LEVEL2>

N MATERIAL LIST

PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
PIPE
1 APPTB9SBB 6" PIPE A106GR.B/GALV. SMLS BE ASME B36.10M 33.7 M
:S-STD
2 APPTB9SEB 3/4" PIPE A106GR.B/GALV. SMLS TE ASME B36.10M 0.2 M
E 1806245 :S-160
N 1971382
FITTINGS
EL +120094
3 DHDTA9P5R 6X3/4" HALF COUPLING A105/GALV. CL.3000 SCRD ASME 1
B16.11
6 4 DEATB9S2Q 6" 90 DEG ELBOW A234GR.WPB/GALV. SMLS BW ASME 2
F5 G11 B7 B16.9 :S-STD
<4> 2 FLANGES
5 CFGTA9DAJ 3/4" FLANGE SCRD A105/GALV. CL.150 FF ASME B16.5 1

100
4 8 6 CDBTA9DAJ 3/4" BLIND FLANGE A105/GALV. CL.150 FF ASME B16.5 1
90° STEM NORTH
EL +119734 BOLTS
<3> 2 61
100 7 EBEBB9A 1/2 " STUD BOLT(FULL THREADED)/HEX.NUT(HEAVY) 4
A193GR.B7/A194GR.2H/GALV. ASME
B18.2.1/ASME B18.2.2 - 65 mm Length

98 S9 VALVES
2
6"NPS 429 S2-300-150-6 8 51080 3/4" GATE VALVE CL.2 IS-318GR.2 LEADED TIN 1
97 25 BRONZE/IS-318 LTB-2 SCRF SB,OS&Y IS:778
00
4000

CL.2/IS:778 CL.2/ASME B16.11 HANDWHEEL


S10
<2> 1

<1 G1S2-300-150-6 PIPE SUPPORTS


>
1 45 9 S2 6" S2-300-150-6 4
00 S9
S2-300-150-6 10 G1S2 6" G1S2-300-150-6 3
49 S10
39 PT| SIZE
4 3 G1S2-300-150-6
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
90° 6X3/4"NPS
45 GASKETS
00
CONT.ON 11 FFG111A00DBCD 3/4" RUBBER SHEET GASKET (G111A) CL.150 RF 2.0 MM 1
EP26_A2-DW-341-0905_B ASME B16.21
E 1806245
N 1976750 S9
EL +115734 S2-300-150-6
25 45 CUT PIPE LENGTH
16 00
4 PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS
NO (MM) (IN) NO (MM) (IN)
S10
G1S2-300-150-6 <1> 4710 6 <2> 3542 6
<3> 100 3/4 <4> 100 3/4
45 <5> 25364 6
00 S9
S2-300-150-6

25 <5> 1
00 6"NPS

CONT.ON
DW-341-0905_A SHT 2
Isometric File Name : EP26_A2-DW-341-0905_A
Iso Extraction Date : 2021-11-27 09:58:11

DESIGN TEMP. ºC 65.00 OPE. TEMP. ºC 35.00 PAINT SYSTEM T4 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 7.00 OPE. PRESS. kg/cm2g 4.00 PWHT N
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
INS. CODE IH TEST MEDIUM 10.50 ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm 25 TEST PRESS. kg/cm2 g WATER CLIENT NAME


01/12/2021 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 1 PT or MT % 0 STRESS SYSTEM.NO NA
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-341-PRS-PID-000-0003 GAD NO: EPCM26-6405-A2-PIP-ARG-AG-302A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 6"-DW-341-0905_A-J2A-IH PIPE SPEC :J2A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : DW-341-0905_A AREA: EP26-A2 SHT. 1 OF 2 REV. 0
<SECURITY LEVEL2>

N MATERIAL LIST
229
PT| SIZE
SEE SHT NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
DW-341-0905_A SHT 1
PIPE
1 APPTB9SBB 6" PIPE A106GR.B/GALV. SMLS BE ASME B36.10M 8.0 M
:S-STD
2 APPTB9SEB 3/4" PIPE A106GR.B/GALV. SMLS TE ASME B36.10M 0.2 M
4 :S-160
90°
6"NPS FITTINGS
3 DHDTA9P5R 6X3/4" HALF COUPLING A105/GALV. CL.3000 SCRD ASME 1
B16.11
4 DEATB9S2Q 6" 90 DEG ELBOW A234GR.WPB/GALV. SMLS BW ASME 2
B16.9 :S-STD

FLANGES
5 CFGTA9DAJ 3/4" FLANGE SCRD A105/GALV. CL.150 FF ASME B16.5 1

6 CDBTA9DAJ 3/4" BLIND FLANGE A105/GALV. CL.150 FF ASME B16.5 1

BOLTS
7 EBEBB9A 1/2 " STUD BOLT(FULL THREADED)/HEX.NUT(HEAVY) 4
A193GR.B7/A194GR.2H/GALV. ASME
B18.2.1/ASME B18.2.2 - 65 mm Length

4000
<1> 1
VALVES
8 51080 3/4" GATE VALVE CL.2 IS-318GR.2 LEADED TIN 1
BRONZE/IS-318 LTB-2 SCRF SB,OS&Y IS:778
CL.2/IS:778 CL.2/ASME B16.11 HANDWHEEL

PIPE SUPPORTS
9 S2 6" S2-300-150-6 1

PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
GASKETS
10 FFG111A00DBCD 3/4" RUBBER SHEET GASKET (G111A) CL.150 RF 2.0 MM 1
ASME B16.21

CUT PIPE LENGTH

PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS


NO (MM) (IN) NO (MM) (IN)
40
4 0
90° S9 <1> 3542 6 <2> 100 3/4
S2-300-150-6 <3> 100 3/4 <4> 4360 6
EL +115734
3
6X3/4"NPS 97
68
9
100

<2> 2 8
STEM NORTH 41
89

<4
<3> 2 61 >
1
F5 G10 B7 CONT.ON
100

EP26_A1-DW-341-0905
6 E 1806245
N 1941400
E 1806245 EL +115734
N 1945589
EL +115374
Isometric File Name : EP26_A2-DW-341-0905_A
Iso Extraction Date : 2021-11-27 09:58:11

DESIGN TEMP. ºC 65.00 OPE. TEMP. ºC 35.00 PAINT SYSTEM T4 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 7.00 OPE. PRESS. kg/cm2g 4.00 PWHT N
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
INS. CODE IH TEST MEDIUM 10.50 ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm 25 TEST PRESS. kg/cm2 g WATER CLIENT NAME


01/12/2021 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 1 PT or MT % 0 STRESS SYSTEM.NO NA
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-341-PRS-PID-000-0003 GAD NO: EPCM26-6405-A2-PIP-ARG-AG-302A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 6"-DW-341-0905_A-J2A-IH PIPE SPEC :J2A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : DW-341-0905_A AREA: EP26-A2 SHT. 2 OF 2 REV. 0
<SECURITY LEVEL2>

N MATERIAL LIST

PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
PIPE
1 APPTB9SBB 6" PIPE A106GR.B/GALV. SMLS BE ASME B36.10M 7.8 M
:S-STD

FITTINGS
2 DTATB9S2Q 6X6" EQUAL TEE A234GR.WPB/GALV. SMLS BW ASME B16.9 1
:S-STD x S-STD

PIPE SUPPORTS
3 G1S2 6" G1S2-300-150-6 1

6" 4 S2 6" S2-300-150-6 1


NP
S
40
0 CONT.ON CUT PIPE LENGTH
S3 EP26_A2-DW-341-0329
CONT.ON PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS
EP26_A2-DW-341-0905_C G1S2-300-150-6 E 1806245 NO (MM) (IN) NO (MM) (IN)
E 1806245 N 1983250
N 1984800 EL +115877 <1> 1407 6 <2> 6356 6
EL +115734 2
<1
> 6X6"NPS
1
15
50 143

48
49

S4
S2-300-150-6
64
99

CONT.ON
<2 EP26_A2-DW-341-0905_A
> E 1806245
1
N 1976750
EL +115734
Isometric File Name : EP26_A2-DW-341-0905_B
Iso Extraction Date : 2022-06-17 16:23:29

DESIGN TEMP. ºC 65.00 OPE. TEMP. ºC 35.00 PAINT SYSTEM T4 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 7.00 OPE. PRESS. kg/cm2g 4.00 PWHT N
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
INS. CODE IH TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm 25 TEST PRESS. kg/cm2 g 10.50 CLIENT NAME


15/06/2022 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 1 PT or MT % 0 STRESS SYSTEM.NO NA
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-341-PRS-PID-000-0003 GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 6"-DW-341-0905_B-J2A-IH PIPE SPEC :J2A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : DW-341-0905_B AREA: EP26-A2 SHT. 1 OF 1 REV. 0
<SECURITY LEVEL2>

N MATERIAL LIST
229
PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
6"
NP PIPE
S
1 APPTB9SBB 6" PIPE A106GR.B/GALV. SMLS BE ASME B36.10M 7.6 M
:S-STD
2 APPTB9SEB 3/4" PIPE A106GR.B/GALV. SMLS TE ASME B36.10M 0.2 M
CONT.ON :S-160
4
EP26_A3-DW-341-0905 90°
E 1806245 FITTINGS
N 2083065 3 DHDTA9P5R 6X3/4" HALF COUPLING A105/GALV. CL.3000 SCRD ASME 1
EL +123734 B16.11
4 DEATB9S2Q 6" 90 DEG ELBOW A234GR.WPB/GALV. SMLS BW ASME 2

1827
B16.9 :S-STD

FLANGES
5 CFGTA9DAJ 3/4" FLANGE SCRD A105/GALV. CL.150 FF ASME B16.5 1

6 CDBTA9DAJ 3/4" BLIND FLANGE A105/GALV. CL.150 FF ASME B16.5 1

BOLTS
S9 8000 7 EBEBB9A 1/2 " STUD BOLT(FULL THREADED)/HEX.NUT(HEAVY) 4
G1TR1-0-850-6 A193GR.B7/A194GR.2H/GALV. ASME
B18.2.1/ASME B18.2.2 - 65 mm Length

VALVES
8 51080 3/4" GATE VALVE CL.2 IS-318GR.2 LEADED TIN 1
BRONZE/IS-318 LTB-2 SCRF SB,OS&Y IS:778
<1> 1

CL.2/IS:778 CL.2/ASME B16.11 HANDWHEEL

PIPE SUPPORTS
9 G1TR1 6" G1TR1-0-850-6 1

10 S2 6" S2-300-150-6 2

11 G1S2 6" G1S2-300-150-6 1

PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
GASKETS
34 12 FFG111A00DBCD 3/4" RUBBER SHEET GASKET (G111A) CL.150 RF 2.0 MM 1
4 4 S10 ASME B16.21
90° S2-300-150-6
EL +115734
3 CUT PIPE LENGTH
6X3/4"NPS
S11 PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS
1491 G1S2-300-150-6 NO (MM) (IN) NO (MM) (IN)

<1> 7542 6 <2> 100 3/4


<3> 100 3/4
197

25
<2> 2 00
1
8
STEM NORTH 1
<3> 2 61

F5 G12 B7 60
00
100

6
E 1806245
N 2082491
EL +115374 6"
NP
S

S10
S2-300-150-6

CONT.ON
DW-341-0905_C SHT 2
Isometric File Name : EP26_A2-DW-341-0905_C
Iso Extraction Date : 2022-08-26 14:17:10

DESIGN TEMP. ºC 65.00 OPE. TEMP. ºC 35.00 PAINT SYSTEM T4 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 7.00 OPE. PRESS. kg/cm2g 4.00 PWHT N
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
INS. CODE IH TEST MEDIUM 10.50 ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm 25 TEST PRESS. kg/cm2g WATER CLIENT NAME


24-08-2022 APPROVED FOR CONSTRUCTION PPK SP SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 1 PT or MT % 0 STRESS SYSTEM.NO NA
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-341-PRS-PID-000-0003 GAD NO: EPCM26-6405-A2-PIP-ARG-AG-302A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 6"-DW-341-0905_C-J2A-IH PIPE SPEC :J2A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : DW-341-0905_C AREA: EP26-A2 SHT. 1 OF 2 REV. 0
<SECURITY LEVEL2>

N MATERIAL LIST

PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
PIPE
1 APPTB9SBB 6" PIPE A106GR.B/GALV. SMLS BE ASME B36.10M 97.9 M
:S-STD

PIPE SUPPORTS
2 G1S2 6" G1S2-300-150-6 6

3 S2 6" S2-300-150-6 7

4 F1S5 6" F1S5-500-150-6 1


SEE SHT
DW-341-0905_C SHT 1
6"NPS CUT PIPE LENGTH

S3 PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS


S2-300-150-6 NO (MM) (IN) NO (MM) (IN)

S2 <1> 97806 6
60 G1S2-300-150-6
00
S3 1
S2-300-150-6
60
00 S2
S2 G1S2-300-150-6
G1S2-300-150-6 60
00 S3
S2-300-150-6
60
00

60
00
97 S3
60 69
00 1 S2-300-150-6

60
00
S3
S2-300-150-6
60
00 S2
G1S2-300-150-6
S2 60
G1S2-300-150-6 00 S3
S2-300-150-6
60
00 S2
G1S2-300-150-6
S4 60
F1S5-500-150-6 00 S3
S2-300-150-6
60
00

60
00
6"NPS
60
00

<1> 1
CONT.ON
EP26_A2-DW-341-0905_B
E 1806245
N 1984800
EL +115734

1
Isometric File Name : EP26_A2-DW-341-0905_C
Iso Extraction Date : 2022-08-26 14:17:10

DESIGN TEMP. ºC 65.00 OPE. TEMP. ºC 35.00 PAINT SYSTEM T4 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 7.00 OPE. PRESS. kg/cm2g 4.00 PWHT N
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
INS. CODE IH TEST MEDIUM 10.50 ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm 25 TEST PRESS. kg/cm2g WATER CLIENT NAME


24-08-2022 APPROVED FOR CONSTRUCTION PPK SP SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 1 PT or MT % 0 STRESS SYSTEM.NO NA
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-341-PRS-PID-000-0003 GAD NO: EPCM26-6405-A2-PIP-ARG-AG-302A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 6"-DW-341-0905_C-J2A-IH PIPE SPEC :J2A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : DW-341-0905_C AREA: EP26-A2 SHT. 2 OF 2 REV. 0
<SECURITY LEVEL2>

N MATERIAL LIST

PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
PIPE
1 APPTB0SBBNA 3" PIPE A106GR.B SMLS BE ASME B36.10M NACE 8.6 M
:S-STD
2 APPTB0SABNA 3/4" PIPE A106GR.B SMLS PE ASME B36.10M NACE 0.2 M
:S-160

FITTINGS
4 3 DHDTA0Q1RNA 3X3/4" HALF COUPLING A105 CL.6000 SW ASME B16.11 1
E 1802500 90° NACE
N 1982970 EL +116694 4 DEATB0S2QNA 3" 90 DEG ELBOW A234GR.WPB SMLS BW ASME B16.9 2
EL +117043 NACE :S-STD

6 FLANGES
F5 G11 B12 5 CFATA0DBJNA 3/4" FLANGE SW A105 CL.150 RF ASME B16.5 NACE 1
:S-160
0 6 CDBTA0DBJNA 3/4" BLIND FLANGE A105 CL.150 RF ASME B16.5 NACE 1
5
11

<4> 2
VALVES
S8
7 51020 3/4" GATE VALVE CL.800 A105/316+HF SW BB,OS&Y BY 1
S2-300-150-3 MFR/API 602/ASME B16.11 HANDWHEEL NACE-

PIPE SUPPORTS
8 S2 3" S2-300-150-3 2

106
9 MH2 3" MH2-A-800-239-3 1

10 G1S2 3" G1S2-300-150-3 1


0
4 00 PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
GASKETS
11 FFG214ACNDBHA 3/4" SPIRAL WOUND GASKET (G214ACN) CL.150 RF 4.5 1
0
7 5 65 S9 MM ASME B16.20
STEM EAST MH2-A-800-239-3 BOLTS

1000
68
12 EBENF0A 1/2 " STUD BOLT(FULL THREADED)/HEX.NUT(HEAVY) 4
A193GR.B7M/A194GR.2HM ASME B18.2.1/ASME

<2> 1
B18.2.2 - 65 mm Length
<3> 2

S10
G1S2-300-150-3
170

CUT PIPE LENGTH


3"
NP PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS
S NO (MM) (IN) NO (MM) (IN)
3
3X3/4"NPS
<1> 1716 3 <2> 772 3
491-TP-92-001 1 40 <3> 100 3/4 <4> 100 3/4
> 0
<5> 6036 3
<5 CONT.ON S8
EP26_A2-ETW-491-0401_B S2-300-150-3
0 E 1808150
50
N 1984800
EL +115694 <1
18 >
30 1
CONT.ON
EPCC-07-3"-ETW-491-9201-A48A-IT
E 1802000
N 1982970
EL +116694

4
90°
Isometric File Name : EP26_A2-ETW-491-0401_A
Iso Extraction Date : 2022-06-17 16:24:47

DESIGN TEMP. ºC 70.00 OPE. TEMP. ºC 42.00 PAINT SYSTEM T4 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 13.10 OPE. PRESS. kg/cm2g 7.87 PWHT Y
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
INS. CODE IT TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm 25 TEST PRESS. kg/cm2 g 19.65 CLIENT NAME


15/06/2022 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 100 PT or MT % 0 STRESS SYSTEM.NO NA
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-491-PRS-PID-000-0004 GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 3"-ETW-491-0401_A-A48A-IT PIPE SPEC :A48A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : ETW-491-0401_A AREA: EP26-A2 SHT. 1 OF 1 REV. 0
<SECURITY LEVEL2>

N MATERIAL LIST
114
PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
3"
NP PIPE
S
1 APPTB0SBBNA 3" PIPE A106GR.B SMLS BE ASME B36.10M NACE 7.8 M
:S-STD
2 APPTB0SABNA 3/4" PIPE A106GR.B SMLS PE ASME B36.10M NACE 0.2 M
CONT.ON :S-160
EP26_A3-ETW-491-0401 4
90°
E 1808150 FITTINGS
N 2083014 3 DHDTA0Q1RNA 3X3/4" HALF COUPLING A105 CL.6000 SW ASME B16.11 1
EL +123694 NACE
4 DEATB0S2QNA 3" 90 DEG ELBOW A234GR.WPB SMLS BW ASME B16.9 2

1815
NACE :S-STD

FLANGES
5 CFATA0DBJNA 3/4" FLANGE SW A105 CL.150 RF ASME B16.5 NACE 1
:S-160
6 CDBTA0DBJNA 3/4" BLIND FLANGE A105 CL.150 RF ASME B16.5 NACE 1

VALVES
S8 8000 7 51020 3/4" GATE VALVE CL.800 A105/316+HF SW BB,OS&Y BY 1
G1TR1-0-750-3 MFR/API 602/ASME B16.11 HANDWHEEL NACE-

PIPE SUPPORTS
8 G1TR1 3" G1TR1-0-750-3 1

9 G1S2 3" G1S2-300-150-3 2


<1> 1

10 S2 3" S2-300-150-3 1

PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
GASKETS
11 FFG214ACNDBHA 3/4" SPIRAL WOUND GASKET (G214ACN) CL.150 RF 4.5 1
MM ASME B16.20

BOLTS
12 EBENF0A 1/2 " STUD BOLT(FULL THREADED)/HEX.NUT(HEAVY) 4
A193GR.B7M/A194GR.2HM ASME B18.2.1/ASME
35 B18.2.2 - 65 mm Length
4 0 S9
90° G1S2-300-150-3
EL +115694
CUT PIPE LENGTH

3 PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS


3X3/4"NPS S10 NO (MM) (IN) NO (MM) (IN)
S2-300-150-3
1550 <1> 7772 3 <2> 97 3/4
<3> 97 3/4
167

25
<2> 2 00

7
STEM NORTH
F5 G11 B12 68

60
103

00
6
E 1808150
N 2082550 <3> 2
EL +115352
3"
NP
S

S9
G1S2-300-150-3

CONT.ON
ETW-491-0401_B SHT 2
Isometric File Name : EP26_A2-ETW-491-0401_B
Iso Extraction Date : 2022-08-19 12:28:54

DESIGN TEMP. ºC 70.00 OPE. TEMP. ºC 42.00 PAINT SYSTEM T4 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 13.10 OPE. PRESS. kg/cm2g 7.87 PWHT Y
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
INS. CODE IT TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm 25 TEST PRESS. kg/cm2g 19.65 CLIENT NAME


17-08-2022 APPROVED FOR CONSTRUCTION PPK SP SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 100 PT or MT % 0 STRESS SYSTEM.NO NA
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-491-PRS-PID-000-0004 GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 3"-ETW-491-0401_B-A48A-IT PIPE SPEC :A48A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : ETW-491-0401_B AREA: EP26-A2 SHT. 1 OF 2 REV. 0
<SECURITY LEVEL2>

N MATERIAL LIST

PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
PIPE
1 APPTB0SBBNA 3" PIPE A106GR.B SMLS BE ASME B36.10M NACE 98.0 M
:S-STD

PIPE SUPPORTS
2 S2 3" S2-300-150-3 7

3 G1S2 3" G1S2-300-150-3 6

4 F1S5 3" F1S5-500-150-3 1

SEE SHT
ETW-491-0401_B SHT 1
CUT PIPE LENGTH

3"NPS S3 PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS


G1S2-300-150-3 NO (MM) (IN) NO (MM) (IN)

S2 <1> 97986 3
60 S2-300-150-3
00
S3
G1S2-300-150-3
60
00
S2
S2 S2-300-150-3
60
S2-300-150-3 00
S3
G1S2-300-150-3
60
00

60
00
97 S3
60 75
00 0 G1S2-300-150-3
S2
60 S2-300-150-3
00
S4
F1S5-500-150-3
60
00
S2
S2 S2-300-150-3
60
S2-300-150-3 00
S3
G1S2-300-150-3
60
00
S2
S2-300-150-3
60
00

60 S3
00
G1S2-300-150-3
60
00
3"NPS
60
00

<1> 1
CONT.ON
EP26_A2-ETW-491-0401_A
E 1808150
N 1984800
EL +115694
Isometric File Name : EP26_A2-ETW-491-0401_B
Iso Extraction Date : 2022-08-19 12:28:54

DESIGN TEMP. ºC 70.00 OPE. TEMP. ºC 42.00 PAINT SYSTEM T4 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 13.10 OPE. PRESS. kg/cm2g 7.87 PWHT Y
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
INS. CODE IT TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm 25 TEST PRESS. kg/cm2g 19.65 CLIENT NAME


17-08-2022 APPROVED FOR CONSTRUCTION PPK SP SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 100 PT or MT % 0 STRESS SYSTEM.NO NA
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-491-PRS-PID-000-0004 GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 3"-ETW-491-0401_B-A48A-IT PIPE SPEC :A48A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : ETW-491-0401_B AREA: EP26-A2 SHT. 2 OF 2 REV. 0
<SECURITY LEVEL2>

N MATERIAL LIST

PT| SIZE
CONT.ON NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
EP26_A3-ETW-491-0703 PIPE
E 1805823
1 APPZU1MBBIC 10" PIPE API5LGR.B PSL1 EFW BE ASME B36.10M IC 7.8 M
N 2086615 :S-STD
EL +121286 2 APPTB0SABIC 3/4" PIPE A106GR.B SMLS PE ASME B36.10M IC :S-160 0.4 M
381
FITTINGS
3 DHDTA0Q1RIC 10X3/4" HALF COUPLING A105 CL.6000 SW ASME B16.11 IC 1

4 4 DEATB0P2QIC 10" 90 DEG ELBOW A234GR.WPB WELD BW ASME B16.9 IC 2


90° :S-STD
10"NPS
FLANGES
5 CFATA0DBJIC 3/4" FLANGE SW A105 CL.150 RF ASME B16.5 IC :S-160 1
4677

6 CDBTA0DBJIC 3/4" BLIND FLANGE A105 CL.150 RF ASME B16.5 IC 1


8500

GASKETS
7 FFG121000DACA 3/4" NON-ASBESTOS SHEET GASKET (G121) CL.150 FF 1
2.0 MM ASME B16.20

BOLTS
<1> 1

S10 8 EBEBB0A 1/2 " STUD BOLT(FULL THREADED)/HEX.NUT(HEAVY) 4


G1TR1-0-1000-10 A193GR.B7/A194GR.2H ASME B18.2.1/ASME
WITH PAD. B18.2.2 - 65 mm Length

VALVES
55 9 51080 3/4" GATE VALVE CL.2 IS-318GR.2 LEADED TIN 2
4 0 BRONZE/IS-318 LTB-2 SCRF SB,OS&Y IS:778
90° 2184 CL.2/IS:778 CL.2/ASME B16.11 HANDWHEEL
EL +112786
PIPE SUPPORTS
3 S11
10 G1TR1 10" G1TR1-0-1000-10 1
10X3/4"NPS S2-300-150-10
<2> 2 11 S2 10" S2-300-150-10 4
280
S12 12 G1S2 10" G1S2-300-150-10 3
50 G1S2-300-150-10
0
9 32 0
STEM NORTH S11
S2-300-150-10 1 CUT PIPE LENGTH
S12
60 G1S2-300-150-10 PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS
00
136

NO (MM) (IN) NO (MM) (IN)


<3> 2 9
STEM NORTH <1> 7738 10 <2> 118 3/4
<3> 136 3/4 <4> 123 3/4
60
F5 G7 B8 00
31
1
6 130
60
E 1805823 00
N 2085684 <4> 2
S11
EL +112175
S2-300-150-10
S11
60 S2-300-150-10
00
S12
G1S2-300-150-10
60
00
10
"N
PS

CONT.ON
ETW-491-0703 SHT 2
Isometric File Name : EP26_A2-ETW-491-0703
Iso Extraction Date : 2022-08-19 12:30:05

DESIGN TEMP. ºC 65.00 OPE. TEMP. ºC 45.00 PAINT SYSTEM T1 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 15.00 OPE. PRESS. kg/cm2g 5.00 PWHT N
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
1 17-08-2022 REVISED AS PER MARK1 PPK SP SS INS. CODE N TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm - TEST PRESS. kg/cm2g 22.5 CLIENT NAME


01/12/2021 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 5 PT or MT % 0 STRESS SYSTEM.NO NA
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-491-PRS-PID-000-0004 GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 10"-ETW-491-0703-A33Y PIPE SPEC :A33Y
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : ETW-491-0703 AREA: EP26-A2 SHT. 1 OF 3 REV. 1
<SECURITY LEVEL2>

N MATERIAL LIST

PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
PIPE
1 APPZU1MBBIC 10" PIPE API5LGR.B PSL1 EFW BE ASME B36.10M IC 118.8 M
:S-STD

FITTINGS
2 DEATB0P2QIC 10" 90 DEG ELBOW A234GR.WPB WELD BW ASME B16.9 IC 2
:S-STD

PIPE SUPPORTS
SEE SHT 3 G1S2 10" G1S2-300-150-10 7
ETW-491-0703 SHT 1
4 S2 10" S2-300-150-10 5
S3
G1S2-300-150-10 5 F1S5 10" F1S5-500-150-10 1
60
00
CUT PIPE LENGTH
60
00 PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS
NO (MM) (IN) NO (MM) (IN)
60
00 S3 <1> 114983 10 <2> 3738 10

10"NPS G1S2-300-150-10
60
S4 00
6000
S2-300-150-10 1
S3
G1S2-300-150-10
60
00
S4
S2-300-150-10 60
00 1
S5
F1S5-500-150-10 11 60
51 00 S3
95
G1S2-300-150-10
S3 60
00
G1S2-300-150-10
60 2
00 4100 90° 10"NPS
S4
EL +117286 381
S2-300-150-10
<2> 1
S4 60
S2-300-150-10 00
S3 55
G1S2-300-150-10 00
S4

4500
S2-300-150-10
2
S3 90°
G1S2-300-150-10
<1> 1
CONT.ON
ETW-491-0703 SHT 3
Isometric File Name : EP26_A2-ETW-491-0703
Iso Extraction Date : 2022-08-19 12:30:05

DESIGN TEMP. ºC 65.00 OPE. TEMP. ºC 45.00 PAINT SYSTEM T1 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 15.00 OPE. PRESS. kg/cm2g 5.00 PWHT N
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
1 17-08-2022 REVISED AS PER MARK1 PPK SP SS INS. CODE N TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm - TEST PRESS. kg/cm2g 22.5 CLIENT NAME


01/12/2021 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 5 PT or MT % 0 STRESS SYSTEM.NO NA
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-491-PRS-PID-000-0004 GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 10"-ETW-491-0703-A33Y PIPE SPEC :A33Y
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : ETW-491-0703 AREA: EP26-A2 SHT. 2 OF 3 REV. 1
<SECURITY LEVEL2>

E 1805823 N MATERIAL LIST


N 1969908
EL +117898
PT| SIZE
6 NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
F5 G7 B8 PIPE
<3> 2 1 APPZU1MBBIC 10" PIPE API5LGR.B PSL1 EFW BE ASME B36.10M IC 31.7 M
:S-STD
130 2 APPTB0SABIC 3/4" PIPE A106GR.B SMLS PE ASME B36.10M IC :S-160 0.8 M
9
STEM SOUTH FITTINGS
31
<2> 2 3 DHDTA0Q1RIC 10X3/4" HALF COUPLING A105 CL.6000 SW ASME B16.11 IC 2

9 4 DEATB0P2QIC 10" 90 DEG ELBOW A234GR.WPB WELD BW ASME B16.9 IC 2


STEM SOUTH :S-STD

136
FLANGES

10"NPS 5 CFATA0DBJIC 3/4" FLANGE SW A105 CL.150 RF ASME B16.5 IC :S-160 2


SEE SHT
ETW-491-0703 SHT 2 6 CDBTA0DBJIC 3/4" BLIND FLANGE A105 CL.150 RF ASME B16.5 IC 2
31
<1> 2 GASKETS
281
7 FFG121000DACA 3/4" NON-ASBESTOS SHEET GASKET (G121) CL.150 FF 2
45 2.0 MM ASME B16.20
00
3 BOLTS
10X3/4"NPS 45 8 EBEBB0A 1/2 " STUD BOLT(FULL THREADED)/HEX.NUT(HEAVY) 8
200 00 A193GR.B7/A194GR.2H ASME B18.2.1/ASME
2008 B18.2.2 - 65 mm Length

S10 45
00 VALVES
S2-300-150-10 9 51080 3/4" GATE VALVE CL.2 IS-318GR.2 LEADED TIN 4
BRONZE/IS-318 LTB-2 SCRF SB,OS&Y IS:778
S11 45 CL.2/IS:778 CL.2/ASME B16.11 HANDWHEEL
00 S10
G1S2-300-150-10 22 S2-300-150-10 1
59 PIPE SUPPORTS
7
S10 10 S2 10" S2-300-150-10 3
4
S2-300-150-10 <4 90° 11 G1S2 10" G1S2-300-150-10 3
>
1
S11
G1S2-300-150-10
CUT PIPE LENGTH

PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS


NO (MM) (IN) NO (MM) (IN)

4500
<1> 119 3/4 <2> 136 3/4

<5> 1
<3> 123 3/4 <4> 22416 10
<5> 3738 10 <6> 118 3/4
<7> 136 3/4 <8> 123 3/4
<9> 5530 10
3
60 10X3/4"NPS
4 0 CONT.ON 1
90° 1811 EP26_A1-ETW-491-0703
EL +112787 E 1805823

280
53 N 1941400
11 EL +112787
<6> 2 <9
>
1

31 9
S11 STEM NORTH
G1S2-300-150-10
136 9
<7> 2
STEM NORTH

F5 G7 B8
31

6 130
E 1805823
N 1946711 <8> 2
EL +112175
Isometric File Name : EP26_A2-ETW-491-0703
Iso Extraction Date : 2022-08-19 12:30:05

DESIGN TEMP. ºC 65.00 OPE. TEMP. ºC 45.00 PAINT SYSTEM T1 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 15.00 OPE. PRESS. kg/cm2g 5.00 PWHT N
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
1 17-08-2022 REVISED AS PER MARK1 PPK SP SS INS. CODE N TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm - TEST PRESS. kg/cm2g 22.5 CLIENT NAME


01/12/2021 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 5 PT or MT % 0 STRESS SYSTEM.NO NA
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-491-PRS-PID-000-0004 GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 10"-ETW-491-0703-A33Y PIPE SPEC :A33Y
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : ETW-491-0703 AREA: EP26-A2 SHT. 3 OF 3 REV. 1
<SECURITY LEVEL2>

N MATERIAL LIST

PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
PIPE
1 APPTK0MBB 16" PIPE A672GR.B60CL.12 EFW BE ASME B36.10M 27.7 M
:S-STD
2 APPTB0SAB 3/4" PIPE A106GR.B SMLS PE ASME B36.10M :S-160 0.3 M

FITTINGS
E 1805001 3 DHDTA0Q1R 16X3/4" HALF COUPLING A105 CL.6000 SW ASME B16.11 1
N 1968886
EL +112911 4 DEATB0P2Q 16" 90 DEG ELBOW A234GR.WPB WELD BW ASME B16.9 2
:S-STD
CONT.ON FLANGES
EP26_A2-FG-371-0104_B 6
E 1805001 F5 G7 B8 5 CFATA0DBJ 3/4" FLANGE SW A105 CL.150 RF ASME B16.5 :S-160 1
N 1976750 <4> 2
6 CDBTA0DBJ 3/4" BLIND FLANGE A105 CL.150 RF ASME B16.5 1
EL +110353
106
4 9 GASKETS
90° STEM NORTH 7 FFG213ACDDBHA 3/4" SPIRAL WOUND GASKET (G213ACD) CL.150 RF 4.5 1
68
EL +112353 <3> 2 MM ASME B16.20

16"NPS 38 BOLTS
50

151
3 8 EBEBB0A 1/2 " STUD BOLT(FULL THREADED)/HEX.NUT(HEAVY) 4
2000 A193GR.B7/A194GR.2H ASME B18.2.1/ASME
16X3/4"NPS B18.2.2 - 65 mm Length
69 98
79 <1 5 S10
> VALVES
1 886 G1S2-300-150-16
9 51001 3/4" GATE VALVE CL.800 A105/HF SW BB,OS&Y BY 1
229 S11 MFR/API 602/ASME B16.11 HANDWHEEL
45
S10 00 S2-300-150-16
PIPE SUPPORTS
G1S2-300-150-16
<2> 1 S10
10 G1S2 16" G1S2-300-150-16 4

G1S2-300-150-16 11 S2 16" S2-300-150-16 2

4 45
00
90°
CUT PIPE LENGTH

PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS


S11 NO (MM) (IN) NO (MM) (IN)

20 45 S2-300-150-16 <1> 6369 16 <2> 780 16


24 00 <3> 151 3/4 <4> 100 3/4
7
<5> 20523 16

S10
45 G1S2-300-150-16
00
<5> 1
16"NPS

CONT.ON
FG-371-0104_A SHT 2
Isometric File Name : EP26_A2-FG-371-0104_A
Iso Extraction Date : 2021-11-27 10:04:40

DESIGN TEMP. ºC 75.00 OPE. TEMP. ºC 45.00 PAINT SYSTEM T5 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 7.00 OPE. PRESS. kg/cm2g 5.00 PWHT N
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
INS. CODE IT TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm 25 TEST PRESS. kg/cm2 g 10.68 CLIENT NAME


01/12/2021 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 5 PT or MT % 0 STRESS SYSTEM.NO 6405-EPCM25_26-CA-0035
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-371-PRS-PID-000-0001 GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 16"-FG-371-0104_A-A1A-IT PIPE SPEC :A1A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : FG-371-0104_A AREA: EP26-A2 SHT. 1 OF 2 REV. 0
<SECURITY LEVEL2>

N MATERIAL LIST

PT| SIZE
SEE SHT NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
FG-371-0104_A SHT 1 PIPE
1 APPTK0MBB 16" PIPE A672GR.B60CL.12 EFW BE ASME B36.10M 6.8 M
610 :S-STD
2 APPTB0SAB 3/4" PIPE A106GR.B SMLS PE ASME B36.10M :S-160 0.2 M

FITTINGS
3 DHDTA0Q1R 16X3/4" HALF COUPLING A105 CL.6000 SW ASME B16.11 1

4 DEATB0P2Q 16" 90 DEG ELBOW A234GR.WPB WELD BW ASME B16.9 2


:S-STD
4
90° FLANGES
16"NPS 5 CFATA0DBJ 3/4" FLANGE SW A105 CL.150 RF ASME B16.5 :S-160 1

6 CDBTA0DBJ 3/4" BLIND FLANGE A105 CL.150 RF ASME B16.5 1


2000

GASKETS
<1> 1

7 FFG213ACDDBHA 3/4" SPIRAL WOUND GASKET (G213ACD) CL.150 RF 4.5 1


MM ASME B16.20

BOLTS
8 EBEBB0A 1/2 " STUD BOLT(FULL THREADED)/HEX.NUT(HEAVY) 4
A193GR.B7/A194GR.2H ASME B18.2.1/ASME
B18.2.2 - 65 mm Length

4 88 VALVES
90° 6 9 51001 3/4" GATE VALVE CL.800 A105/HF SW BB,OS&Y BY 1
EL +110353 MFR/API 602/ASME B16.11 HANDWHEEL

PIPE SUPPORTS
10 S2 16" S2-300-150-16 1
3 229
16X3/4"NPS
<2> 2
CUT PIPE LENGTH

PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS


100 NO (MM) (IN) NO (MM) (IN)

67 22 <1> 780 16 <2> 100 3/4


42 <3> 100 3/4 <4> 6019 16

9
STEM NORTH
106
<3> 2

57
43

6
E 1805001 S10
N 1947143 S2-300-150-16
EL +109846
F5 G7 B8 <4
>
1

CONT.ON
EP26_A1-FG-371-0104
E 1805001
N 1941400
EL +110353
Isometric File Name : EP26_A2-FG-371-0104_A
Iso Extraction Date : 2021-11-27 10:04:40

DESIGN TEMP. ºC 75.00 OPE. TEMP. ºC 45.00 PAINT SYSTEM T5 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 7.00 OPE. PRESS. kg/cm2g 5.00 PWHT N
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
INS. CODE IT TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm 25 TEST PRESS. kg/cm2 g 10.68 CLIENT NAME


01/12/2021 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 5 PT or MT % 0 STRESS SYSTEM.NO 6405-EPCM25_26-CA-0035
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-371-PRS-PID-000-0001 GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 16"-FG-371-0104_A-A1A-IT PIPE SPEC :A1A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : FG-371-0104_A AREA: EP26-A2 SHT. 2 OF 2 REV. 0
<SECURITY LEVEL2>

N MATERIAL LIST

PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
PIPE
1 APPTK0MBB 16" PIPE A672GR.B60CL.12 EFW BE ASME B36.10M 8.1 M
:S-STD
2 APPTB0SBB 4" PIPE A106GR.B SMLS BE ASME B36.10M :S-STD 0.9 M

PIPE SUPPORTS
3 S2 16" S2-300-150-16 1
90°
4"NPS 4 G1S2 16" G1S2-300-150-G6-16 1

CUT PIPE LENGTH

PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS


NO (MM) (IN) NO (MM) (IN)
CONT.ON
EP26_A2-FG-371-0113 <1> 807 4 <2> 8050 16
E 1805001

<1> 2
N 1983775
EL +111355

1002
10
25
CONT.ON
EP26_A2-FG-371-0104_C
<2> 1 E 1805001
N 1984800
S4 EL +110353
G1S2-300-150-G6-16
62
5 16X4"NPS

70
24

S3
S2-300-150-16

16
50

16
"N
PS

CONT.ON
EP26_A2-FG-371-0104_A
E 1805001
N 1976750
EL +110353
Isometric File Name : EP26_A2-FG-371-0104_B
Iso Extraction Date : 2022-06-17 16:26:30

DESIGN TEMP. ºC 75.00 OPE. TEMP. ºC 40.00 PAINT SYSTEM T5 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 7.00 OPE. PRESS. kg/cm2g 5.00 PWHT N
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
INS. CODE IT TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm 25 TEST PRESS. kg/cm2 g 10.68 CLIENT NAME


15/06/2022 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 5 PT or MT % 0 STRESS SYSTEM.NO 6405-EPCM25_26-CA-0035
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-371-PRS-PID-000-0001 GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 16"-FG-371-0104_B-A1A-IT PIPE SPEC :A1A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : FG-371-0104_B AREA: EP26-A2 SHT. 1 OF 1 REV. 0
<SECURITY LEVEL2>

N MATERIAL LIST

PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
CONT.ON PIPE
EP26_A3-FG-371-0104
E 1805001 1 APPTK0MBB 16" PIPE A672GR.B60CL.12 EFW BE ASME B36.10M 53.5 M
N 2088650 :S-STD
2 APPTB0SAB 3/4" PIPE A106GR.B SMLS PE ASME B36.10M :S-160 0.2 M
EL +118853
610 FITTINGS
3 DHDTA0Q1R 16X3/4" HALF COUPLING A105 CL.6000 SW ASME B16.11 1

4 DEATB0P2Q 16" 90 DEG ELBOW A234GR.WPB WELD BW ASME B16.9 2


:S-STD
4
16"NPS FLANGES
90°
5 CFATA0DBJ 3/4" FLANGE SW A105 CL.150 RF ASME B16.5 :S-160 1
4202

6 CDBTA0DBJ 3/4" BLIND FLANGE A105 CL.150 RF ASME B16.5 1


8500

GASKETS
7 FFG213ACDDBHA 3/4" SPIRAL WOUND GASKET (G213ACD) CL.150 RF 4.5 1
MM ASME B16.20

BOLTS
<1> 1

S10
8 EBEBB0A 1/2 " STUD BOLT(FULL THREADED)/HEX.NUT(HEAVY) 4
G1TR1-180-1250-16 A193GR.B7/A194GR.2H ASME B18.2.1/ASME
WITH PAD. B18.2.2 - 65 mm Length
4
90° VALVES
EL +110353 16
01 S11 9 51001 3/4" GATE VALVE CL.800 A105/HF SW BB,OS&Y BY 1
10 G1S2-300-150-16 MFR/API 602/ASME B16.11 HANDWHEEL
40 2939 PIPE SUPPORTS
S12
3 10 G1TR1 16" G1TR1-180-1250-16 1
16X3/4"NPS S2-300-150-16
<2> 2 329 S13 11 G1S2 16" G1S2-300-150-16 4
F1S5-500-150-16
12 S2 16" S2-300-150-16 4
9 50 S12
STEM SOUTH 00 13 F1S5 16" F1S5-500-150-16 1
67 S2-300-150-16
<3> 2
F5 G7 B8 60 CUT PIPE LENGTH
00 S11
106

G1S2-300-150-16 PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS


NO (MM) (IN) NO (MM) (IN)
6 60 1
00 45 <1> 7280 16 <2> 100 3/4
E 1805001 22 <3> 100 3/4 <4> 46216 16
6
N 2086439
EL +109846 60
00 S11 1
G1S2-300-150-16

60
00

S12
S2-300-150-16 60
00 S11
G1S2-300-150-16

60
00

S12
S2-300-150-16

<4> 1
16"NPS
CONT.ON
FG-371-0104_C SHT 2
Isometric File Name : EP26_A2-FG-371-0104_C
Iso Extraction Date : 2022-08-19 12:32:08

DESIGN TEMP. ºC 75.00 OPE. TEMP. ºC 45.00 PAINT SYSTEM T5 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 7.00 OPE. PRESS. kg/cm2g 5.00 PWHT N
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
1 17-08-2022 REVISED AS PER MARK1 PPK SP SS INS. CODE IT TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm 25 TEST PRESS. kg/cm2g 10.68 CLIENT NAME


01/12/2021 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 5 PT or MT % 0 STRESS SYSTEM.NO 6405-EPCM25_26-CA-0035
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-371-PRS-PID-000-0001 GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 16"-FG-371-0104_C-A1A-IT PIPE SPEC :A1A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : FG-371-0104_C AREA: EP26-A2 SHT. 1 OF 3 REV. 1
<SECURITY LEVEL2>

N MATERIAL LIST

PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
PIPE
1 APPTK0MBB 16" PIPE A672GR.B60CL.12 EFW BE ASME B36.10M 20.0 M
:S-STD
2 APPTB0SAB 3/4" PIPE A106GR.B SMLS PE ASME B36.10M :S-160 0.2 M
E 1813166
N 2038785 FITTINGS
EL +112150 3 DHDTA0Q1R 16X3/4" HALF COUPLING A105 CL.6000 SW ASME B16.11 1

4 DEBTB0P2Q 16" 45 DEG ELBOW A234GR.WPB WELD BW ASME B16.9 1


7 :S-STD
F6 G8 B9 5 DEATB0P2Q 16" 90 DEG ELBOW A234GR.WPB WELD BW ASME B16.9 3
:S-STD
<4> 2
FLANGES
5

106
6 CFATA0DBJ 3/4" FLANGE SW A105 CL.150 RF ASME B16.5 :S-160 1
90° <3> 2 10
STEM SOUTH 7 CDBTA0DBJ 3/4" BLIND FLANGE A105 CL.150 RF ASME B16.5 1

GASKETS

57 8 FFG213ACDDBHA 3/4" SPIRAL WOUND GASKET (G213ACD) CL.150 RF 4.5 1


MM ASME B16.20
1
> BOLTS
<2 329
87 3 9 EBEBB0A 1/2 " STUD BOLT(FULL THREADED)/HEX.NUT(HEAVY) 4
5 A193GR.B7/A194GR.2H ASME B18.2.1/ASME
16X3/4"NPS B18.2.2 - 65 mm Length
65
81
<5 VALVES
>
1 10 51001 3/4" GATE VALVE CL.800 A105/HF SW BB,OS&Y BY 1
MFR/API 602/ASME B16.11 HANDWHEEL
S11
S2-300-150-16 54 PIPE SUPPORTS
45
00
40 5 11 S2 16" S2-300-150-16 4
90°
S11
S2-300-150-16 CUT PIPE LENGTH
SEE SHT
FG-371-0104_C SHT 1 PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS
S11 NO (MM) (IN) NO (MM) (IN)
99 S2-300-150-16
19 66
8 21 <1> 974 16 <2> 6945 16

1 83 5 <3> 100 3/4 <4> 100 3/4


1 90° 00 <5> 5100 16 <6> 6945 16
> EL +111653 40
<1
S11
S2-300-150-16 1
1300

16"NPS

4 55
45° 75
13 1
00 >
<6 S
254 " NP
16
CONT.ON
FG-371-0104_C SHT 3

1
Isometric File Name : EP26_A2-FG-371-0104_C
Iso Extraction Date : 2022-08-19 12:32:08

DESIGN TEMP. ºC 75.00 OPE. TEMP. ºC 45.00 PAINT SYSTEM T5 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 7.00 OPE. PRESS. kg/cm2g 5.00 PWHT N
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
1 17-08-2022 REVISED AS PER MARK1 PPK SP SS INS. CODE IT TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm 25 TEST PRESS. kg/cm2g 10.68 CLIENT NAME


01/12/2021 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 5 PT or MT % 0 STRESS SYSTEM.NO 6405-EPCM25_26-CA-0035
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-371-PRS-PID-000-0001 GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 16"-FG-371-0104_C-A1A-IT PIPE SPEC :A1A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : FG-371-0104_C AREA: EP26-A2 SHT. 2 OF 3 REV. 1
<SECURITY LEVEL2>

N MATERIAL LIST

PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
PIPE
1 APPTK0MBB 16" PIPE A672GR.B60CL.12 EFW BE ASME B36.10M 48.0 M
:S-STD
2 APPTB0SAB 3/4" PIPE A106GR.B SMLS PE ASME B36.10M :S-160 0.2 M

FITTINGS
3 DHDTA0Q1R 16X3/4" HALF COUPLING A105 CL.6000 SW ASME B16.11 1

4 DEATB0P2Q 16" 90 DEG ELBOW A234GR.WPB WELD BW ASME B16.9 1


SEE SHT :S-STD
16"NPS FG-371-0104_C SHT 2 5 DEBTB0P2Q 16" 45 DEG ELBOW A234GR.WPB WELD BW ASME B16.9 1
610 :S-STD

<1> 1 FLANGES
6 CFATA0DBJ 3/4" FLANGE SW A105 CL.150 RF ASME B16.5 :S-160 1
4
18

90° 7 CDBTA0DBJ 3/4" BLIND FLANGE A105 CL.150 RF ASME B16.5 1


38

GASKETS
1300

8 FFG213ACDDBHA 3/4" SPIRAL WOUND GASKET (G213ACD) CL.150 RF 4.5 1


MM ASME B16.20
S11
50 G1S2-300-150-16 BOLTS
8
1300 9 EBEBB0A 1/2 " STUD BOLT(FULL THREADED)/HEX.NUT(HEAVY) 4
5 A193GR.B7/A194GR.2H ASME B18.2.1/ASME
45° S12 B18.2.2 - 65 mm Length
EL +110353 S2-300-150-16
VALVES
3
16X3/4"NPS 10 51001 3/4" GATE VALVE CL.800 A105/HF SW BB,OS&Y BY 1
S11 MFR/API 602/ASME B16.11 HANDWHEEL
G1S2-300-150-16
1032 60 PIPE SUPPORTS
00
329

<2> 2 11 G1S2 16" G1S2-300-150-16 3

10 12 S2 16" S2-300-150-16 4
STEM NORTH 60
00
13 F1S5 16" F1S5-500-150-16 1
F6 G8 B9 57

7 60
106 00 CUT PIPE LENGTH
E 1805001 46
<3> 2 73 PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS
N 2031532 2 NO (MM) (IN) NO (MM) (IN)
EL +109856
S12 60
S2-300-150-16 00 1 <1> 974 16 <2> 100 3/4
<3> 100 3/4 <4> 46986 16
S11
G1S2-300-150-16
60
00 1

60
S12 00
S2-300-150-16
60
S13 00
<4
F1S5-500-150-16 >
1

S12
S2-300-150-16
CONT.ON
EP26_A2-FG-371-0104_B
E 1805001
N 1984800
EL +110353
Isometric File Name : EP26_A2-FG-371-0104_C
Iso Extraction Date : 2022-08-19 12:32:08

DESIGN TEMP. ºC 75.00 OPE. TEMP. ºC 45.00 PAINT SYSTEM T5 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 7.00 OPE. PRESS. kg/cm2g 5.00 PWHT N
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
1 17-08-2022 REVISED AS PER MARK1 PPK SP SS INS. CODE IT TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm 25 TEST PRESS. kg/cm2g 10.68 CLIENT NAME


01/12/2021 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 5 PT or MT % 0 STRESS SYSTEM.NO 6405-EPCM25_26-CA-0035
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-371-PRS-PID-000-0001 GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 16"-FG-371-0104_C-A1A-IT PIPE SPEC :A1A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : FG-371-0104_C AREA: EP26-A2 SHT. 3 OF 3 REV. 1
<SECURITY LEVEL2>

N MATERIAL LIST

PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
PIPE
1 APPTB0SBB 4" PIPE A106GR.B SMLS BE ASME B36.10M :S-STD 2.9 M

2 APPTB0SAB 3/4" PIPE A106GR.B SMLS PE ASME B36.10M :S-160 0.3 M

FITTINGS
3 DHDTA0Q1R 4X3/4" HALF COUPLING A105 CL.6000 SW ASME B16.11 1
4
4 DEATB0S2Q 4" 90 DEG ELBOW A234GR.WPB SMLS BW ASME B16.9 1
90° :S-STD
EL +111507
FLANGES
5 CFATA0DBJ 3/4" FLANGE SW A105 CL.150 RF ASME B16.5 :S-160 1

6 CDBTA0DBJ 3/4" BLIND FLANGE A105 CL.150 RF ASME B16.5 1

GASKETS
152
7 FFG213ACDDBHA 3/4" SPIRAL WOUND GASKET (G213ACD) CL.150 RF 4.5 1
MM ASME B16.20

4"NPS BOLTS
8 EBEBB0A 1/2 " STUD BOLT(FULL THREADED)/HEX.NUT(HEAVY) 4
A193GR.B7/A194GR.2H ASME B18.2.1/ASME
B18.2.2 - 65 mm Length
01 CONT.ON
20 EP26_A2-FG-371-0104_B VALVES
E 1805001
9 51001 3/4" GATE VALVE CL.800 A105/HF SW BB,OS&Y BY 1
N 1983775 MFR/API 602/ASME B16.11 HANDWHEEL
EL +111355
PIPE SUPPORTS
E 1802500 10 S2 4" S2-300-150-4 1
N 1983775
EL +111928
01
6 25 CUT PIPE LENGTH
F5 G7 B8
PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS
<2> 2 NO (MM) (IN) NO (MM) (IN)
117

<1> 150 3/4 <2> 111 3/4


9 <3> 2849 4
STEM EAST
65
<1> 2
233

S10
3
4X3/4"NPS S2-300-150-4
1
>
371-TP-91-001 <3

0
50

CONT.ON
EPCC-07-4"-FG-371-9101-A1A-IT
E 1802000
N 1983775
EL +111507
Isometric File Name : EP26_A2-FG-371-0113
Iso Extraction Date : 2022-06-17 16:27:40

DESIGN TEMP. ºC 75.00 OPE. TEMP. ºC 40.00 PAINT SYSTEM T5 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 7.00 OPE. PRESS. kg/cm2g 5.00 PWHT N
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
INS. CODE IT TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm 25 TEST PRESS. kg/cm2 g 10.50 CLIENT NAME


15/06/2022 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 5 PT or MT % 0 STRESS SYSTEM.NO VC
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-371-PRS-PID-000-0001 GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 4"-FG-371-0113-A1A-IT PIPE SPEC :A1A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : FG-371-0113 AREA: EP26-A2 SHT. 1 OF 1 REV. 0
<SECURITY LEVEL2>

N MATERIAL LIST

PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
PIPE
1 APPQK0SBB 10" PIPE A333GR.6 SMLS BE ASME B36.10M :S-STD 43.6 M

FITTINGS
2 DEAQB0S2Q 10" 90 DEG ELBOW A420GR.WPL6 SMLS BW ASME B16.9 3
:S-STD

PIPE SUPPORTS
3 S2 10" S2-300-302-10 1

4 S2 10" S2-300-153-10 1
CONT.ON 5 G1S2 10" G1S2-300-158-G0-10 1
FL-322-0102 SHT 2
6 S2 10" S2-300-167-10 1

7 G1S2 10" G1S2-300-176-G0-10 1

8 S2 10" S2-300-185-10 1
S10
MH2-A-828-473-10 9 G1S2 10" G1S2-300-194-G0-10 1
<4 1
>
10 1 10 MH2 10" MH2-A-828-473-10 1
"N
PS S9 11 S2 10" S2-300-150-10 1
G1S2-300-194-G0-10
S11
50 CUT PIPE LENGTH
S2-300-150-10 00
PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS
NO (MM) (IN) NO (MM) (IN)
45
00 <1> 3620 10 <2> 5525 10
33 <3> 1577 10 <4> 32832 10
21
2
S8 45
00 S6
S2-300-185-10
S2-300-167-10
S7
G1S2-300-176-G0-10
45
00 S4
S2-300-153-10
45 SLOPE 1:500 2
00 89.9°
S5 EL +119786
G1S2-300-158-G0-10 25 SLOPE 1:500
00
40 2
20 01 90°
00 87 EL +117436
62

2338
10"NPS

<3> 1
1 32
> 11
<2

2 SLOPE 1:500
89.9°
EL +117448 S3 <1> 1
S2-300-302-10
CONT.ON
EP26_A14-FL-322-0102
E 1812132
N 1941400
EL +117428
Isometric File Name : EP26_A2-FL-322-0102
Iso Extraction Date : 2023-06-05 15:55:37

DESIGN TEMP. ºC 330.00 OPE. TEMP. ºC 35.00 PAINT SYSTEM T1 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 3.50 OPE. PRESS. kg/cm2g 1.70 PWHT N
PROJECT NAME
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
1 31/05/2023 REVISED AS PER MARK1 PPK SP SS INS. CODE N TEST MEDIUM AIR ( BARAUNI, BIHAR STATE, INDIA )

0 14-09-2022 APPROVED FOR CONSTRUCTION PPK SP SS INS.THK mm - TEST PRESS. kg/cm2g 3.85 CLIENT NAME
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 5 PT or MT % 0 STRESS SYSTEM.NO 6405-EPCM25_26-CA-0041
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-471-PRS-PID-471-0002 GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 10"-FL-322-0102-A4A PIPE SPEC :A4A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : FL-322-0102 AREA: EP26-A2 SHT. 1 OF 2 REV. 1
<SECURITY LEVEL2>

N MATERIAL LIST
2
381 90.1° PT| SIZE
EL +123516 NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
PIPE
1 APPQK0SBB 10" PIPE A333GR.6 SMLS BE ASME B36.10M :S-STD 5.0 M

FITTINGS

0.1° 2 DEAQB0S2Q 10" 90 DEG ELBOW A420GR.WPL6 SMLS BW ASME B16.9 3


:S-STD

PIPE SUPPORTS
3 TR1 10" TR1-180-893-10 1

CUT PIPE LENGTH


64
24 PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS
NO (MM) (IN) NO (MM) (IN)

<1> 2902 10 <2> 2084 10

3
43
1:
2 O PE
89.9° SL
EL +123510

<1> 1
380 <2> 1

CONT.ON
EP26_A2-FL-471-0215
E 1803000
N 1979262 269
EL +123241

P S
"N
10

3663
269

S3
TR1-180-893-10
WITH PAD.

1307
2
89.9°
EL +119853
10"NPS

381
SEE SHT
FL-322-0102 SHT 1
Isometric File Name : EP26_A2-FL-322-0102
Iso Extraction Date : 2023-06-05 15:55:37

DESIGN TEMP. ºC 330.00 OPE. TEMP. ºC 35.00 PAINT SYSTEM T1 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 3.50 OPE. PRESS. kg/cm2g 1.70 PWHT N
PROJECT NAME
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
1 31/05/2023 REVISED AS PER MARK1 PPK SP SS INS. CODE N TEST MEDIUM AIR ( BARAUNI, BIHAR STATE, INDIA )

0 14-09-2022 APPROVED FOR CONSTRUCTION PPK SP SS INS.THK mm - TEST PRESS. kg/cm2g 3.85 CLIENT NAME
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 5 PT or MT % 0 STRESS SYSTEM.NO 6405-EPCM25_26-CA-0041
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-471-PRS-PID-471-0002 GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 10"-FL-322-0102-A4A PIPE SPEC :A4A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : FL-322-0102 AREA: EP26-A2 SHT. 2 OF 2 REV. 1
<SECURITY LEVEL2>

N MATERIAL LIST

PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
PIPE
1 APPQH1MBB 52" PIPE A671GR.CC60CL.32 EFW BE ASME B36.10M 63.5 M
:14.27mm
2 APPQK0SBB 10" PIPE A333GR.6 SMLS BE ASME B36.10M :S-STD 1.0 M

FITTINGS
3 DSZQH1MBB41 52X10" WELD BRANCH RPAD A106GR.B SMLS BE ASME 1
B36.10M 45 DEGREE :14.27mm x S-STD
4 DEAQB0P2N 52" 90 DEG ELBOW A420GR.WPL6 WELD BW MSS SP-75 1
S11 :14.27mm
S11-300-200-52 PIPE SUPPORTS
8000 5 S11 52" S11-300-325-52 1
CONT.ON
0 19 FL-471-0215 SHT 2 6 S11 52" S11-300-313-52 1
10 7 F1S15 52" F1S15-600-293-52 1
<3> 1
52"NPS 8 G1S11 52" G1S11-300-269-52 1

4 9 G1S11 52" G1S11-300-245-52 1


90° SLOPE 1:500
EL +121927 S10 10 G1S11 52" G1S11-300-221-52 1
SLOPE 1:500
G1S11-300-221-52 11 S11 52" S11-300-200-52 1
S9
12 G1S11-300-245-52
00
0 CUT PIPE LENGTH

PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS


NO (MM) (IN) NO (MM) (IN)
<2> 1 S8
12 <1> 912 10 <2> 55371 52
00 G1S11-300-269-52 <3> 8038 52
0

52 12
53 00
1 2 89.9°
CONT.ON
EP26_A2-FL-322-0102
E 1803000
N 1979262
EL +123241
10"NPS
10
09 10 S5
8 17 >
2
S11-300-325-52
S7 <1
F1S15-600-293-52 3931

1209
S6 48
S11-300-313-52 21

3 2752 SLOPE 1:500


52"X10"NPS
12
09

52"NPS
EL +122032
CONT.ON 471-TP-91-001
EPCC-07-52"-FL-471-9101-A4A
E 1803000
N 1975650
EL +122041
Isometric File Name : EP26_A2-FL-471-0215
Iso Extraction Date : 2022-09-15 14:20:13

DESIGN TEMP. ºC 330.00 OPE. TEMP. ºC 35.00 PAINT SYSTEM T1 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 3.50 OPE. PRESS. kg/cm2g 1.70 PWHT N
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
INS. CODE N TEST MEDIUM AIR ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm - TEST PRESS. kg/cm2g 3.85 CLIENT NAME


14-09-2022 APPROVED FOR CONSTRUCTION PPK SP SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 5 PT or MT % 0 STRESS SYSTEM.NO 6405-EPCM25_26-CA-0041
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-471-PRS-PID-000-0002 GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 52"-FL-471-0215-A4A PIPE SPEC :A4A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : FL-471-0215 AREA: EP26-A2 SHT. 1 OF 2 REV. 0
<SECURITY LEVEL2>

N MATERIAL LIST

PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
PIPE
1 APPQH1MBB 52" PIPE A671GR.CC60CL.32 EFW BE ASME B36.10M 54.0 M
:14.27mm

FITTINGS
2 DEAQB0P2N 52" 90 DEG ELBOW A420GR.WPL6 WELD BW MSS SP-75 4
:14.27mm

PIPE SUPPORTS
3 S11 52" S11-300-171-52 1

4 G1S11 52" G1S11-300-349-52 1

5 G1S11 52" G1S11-300-325-52 1

6 G1S11 52" G1S11-300-301-52 1

CONT.ON 7 F1S15 52" F1S15-600-289-52 1


EP26_A3-FL-471-0215 8 G1S11 52" G1S11-300-265-52 1
E 1801501
N 2086000
EL +121770
CUT PIPE LENGTH
SLOPE 1:500
84 PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS
<4 22 NO (MM) (IN) NO (MM) (IN)
>
1
<3> 1 <1> 3038 52 <2> 8036 52
21 21 45° <3> 35311 52 PLD BEND(1) <4> 7601 52
52"NPS EL +121793
S8 S7
59
G1S11-300-265-52 22 6 F1S15-600-289-52

2 59 36 2
45° 98 07 90°
7
EL +121787 EL +121889
1500 1500 SLOPE 1:500
12 S3 70
00 00
S6 0 S11-300-171-52 9
99
G1S11-300-301-52 11
SLOPE 1:500 <1> 1

12 00
00 >
1 40
S5 0 <2 SLOPE 1:500 2
G1S11-300-325-52 90°
SEE SHT EL +121903
25 FL-471-0215 SHT 1
00

S4
G1S11-300-349-52 2
90° 1981
EL +121865

52"NPS
Isometric File Name : EP26_A2-FL-471-0215
Iso Extraction Date : 2022-09-15 14:20:13

DESIGN TEMP. ºC 330.00 OPE. TEMP. ºC 35.00 PAINT SYSTEM T1 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 3.50 OPE. PRESS. kg/cm2g 1.70 PWHT N
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
INS. CODE N TEST MEDIUM AIR ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm - TEST PRESS. kg/cm2g 3.85 CLIENT NAME


14-09-2022 APPROVED FOR CONSTRUCTION PPK SP SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 5 PT or MT % 0 STRESS SYSTEM.NO 6405-EPCM25_26-CA-0041
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-471-PRS-PID-000-0002 GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 52"-FL-471-0215-A4A PIPE SPEC :A4A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : FL-471-0215 AREA: EP26-A2 SHT. 2 OF 2 REV. 0
<SECURITY LEVEL2>

N MATERIAL LIST
1143
PT| SIZE
CONT.ON NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
HP-322-0101_A SHT 2
PIPE
1 APPDN0MBBPG 30" PIPE A691GR.11/4CRCL.42 EFW BE ASME B36.10M 6.6 M
IBR :19.05mm
2 APPDB0SBBPG 3" PIPE A335GR.P11 SMLS BE ASME B36.10M IBR 0.5 M
:S-XS
5 3 APPDB0SABPG 3/4" PIPE A335GR.P11 SMLS PE ASME B36.10M IBR 0.2 M
90° :S-160
30"NPS EL +117631
FITTINGS
4 DSZDN0MBBPG 30X3" WELD BRANCH RPAD A691GR.11/4CRCL.42 EFW BE 1
ASME B36.10M IBR :19.05mm x S-XS
5 DEADE0P2QPG 30" 90 DEG ELBOW A234GR.WP11CL.1 WELD BW ASME 2

4500
B16.9 IBR :19.05mm

<4> 1
6 DHDDA0Q1RPG 3X3/4" HALF COUPLING A182GR.F11CL.2 CL.6000 SW ASME 1
B16.11 IBR
7 DJADE0S2QPG 3" CAP A234GR.WP11CL.1 SMLS BW ASME B16.9 IBR 1
:S-XS
8 DFEDA0Q1TPG 3/4" SOCKET OUTLET (FLAT) A182GR.F11CL.2 CL.6000 1
SW MSS SP-97 IBR

FLANGES
9 CFADA0GBJPG 3/4" FLANGE SW A182GR.F11CL.2 CL.600 RF ASME B16.5 1
IBR :S-160
10 CDBDA0GBJPG 3/4" BLIND FLANGE A182GR.F11CL.2 CL.600 RF ASME 1
B16.5 IBR

5 <3 GASKETS
90° >
1 11 FFG213ACDGBHA 3/4" SPIRAL WOUND GASKET (G213ACD) CL.600 RF 4.5 1
26 MM ASME B16.20
41
BOLTS
S13
D1S15-600-250-P-G30-30 12 EBECC0A 5/8 " STUD BOLT(FULL THREADED)/HEX.NUT(HEAVY) 4
A193GR.B16/A194GR.4 ASME B18.2.1/ASME
B18.2.2 - 90 mm Length
66
0 PIPE SUPPORTS
13 D1S15 30" D1S15-600-250-P-G30-30 1

INSUL: 28
185/IH 40 CUT PIPE LENGTH
INSUL: PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS
135/IH CONT.ON NO (MM) (IN) NO (MM) (IN)
EP26_A1-HP-322-0101
E 1808575 <1> 408 3 <2> 121 3/4
4 N 1941400 <3> 4339 30 <4> 2214 30
30"X3"NPS EL +113131
691

6 30"NPS
3X3/4"NPS
CONT.ON
EL +112440 EP26_A2-HP-322-02205
E 1808645
<1> 2 N 1944240
EL +112440

70
E 1808575 7 INSUL:
95

N 1944240 F9 G11 B12 100/IH


EL +112301 8 INSUL:
135/IH
INSUL: <2> 3
135/IH 10 3/4"NPS
INSUL:
100/IH 20
144
E 1808575
N 1944240
EL +112139
Isometric File Name : EP26_A2-HP-322-0101_A
Iso Extraction Date : 2022-11-11 13:51:00

DESIGN TEMP. ºC 450.00 OPE. TEMP. ºC 410.00 PAINT SYSTEM T6 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 44.00 OPE. PRESS. kg/cm2g 40.00 PWHT N
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
1 09/11/2022 REVISED AS PER MARK1 PPK SP SS INS. CODE IH TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm 185 TEST PRESS. kg/cm2g 80.87 CLIENT NAME


01/12/2021 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 20 PT or MT % 0 STRESS SYSTEM.NO 6405-EPCM25_26-CA-0045
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-322-PRS-PID-000-0002 GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 30"-HP-322-0101_A-D2D-IH PIPE SPEC :D2D
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : HP-322-0101_A AREA: EP26-A2 SHT. 1 OF 2 REV. 1
<SECURITY LEVEL2>

N MATERIAL LIST

PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
PIPE
1 APPDN0MBBPG 30" PIPE A691GR.11/4CRCL.42 EFW BE ASME B36.10M 28.7 M
IBR :19.05mm
2 APPDB0SABPG 3/4" PIPE A335GR.P11 SMLS PE ASME B36.10M IBR 0.5 M
:S-160

FITTINGS
3 DHDDA0Q1RPG 30X3/4" HALF COUPLING A182GR.F11CL.2 CL.6000 SW ASME 1
E 1808575 B16.11 IBR
N 1969516 4 DEADE0P2QPG 30" 90 DEG ELBOW A234GR.WP11CL.1 WELD BW ASME 2
EL +118620 <3> 2 B16.9 IBR :19.05mm

FLANGES
6 127
5 CFADA0GBJPG 3/4" FLANGE SW A182GR.F11CL.2 CL.600 RF ASME B16.5 1
IBR :S-160
58 6 CDBDA0GBJPG 3/4" BLIND FLANGE A182GR.F11CL.2 CL.600 RF ASME 1
B16.5 IBR
F5 G7 B8 9
110 STEM N 30.1 E GASKETS
4
90° <2> 2 7 FFG213ACDGBHA 3/4" SPIRAL WOUND GASKET (G213ACD) CL.600 RF 4.5 1
CONT.ON 58 MM ASME B16.20
EP26_A2-HP-322-0101_B
E 1808575 BOLTS
N 1976750 9 8 EBECC0A 5/8 " STUD BOLT(FULL THREADED)/HEX.NUT(HEAVY) 4
EL +113131 <1> 2 STEM N 30.1 E A193GR.B16/A194GR.4 ASME B18.2.1/ASME

632
B18.2.2 - 90 mm Length

<4 INSUL:
> 100/IH VALVES
1 INSUL: 9 51031 3/4" GATE VALVE CL.800 A182GR.F11CL.2/HF SW 2
30"NPS <6
4500

> 13 185/IH BB,OS&Y BY MFR/API 602/ASME B16.11


1 HANDWHEEL IBR
<5> 1

43
3
58 PIPE SUPPORTS
92 30X3/4"NPS
S10 10 S11 30" S11-300-250-P-30 3
S12 S11-300-250-P-30
F1S15-600-250-P-30 20 11 Special 30" GS-EP26-022 1
42
12 F1S15 30" F1S15-600-250-P-30 1
S11
90
02 GS-EP26-022
1 4 S10 CUT PIPE LENGTH
90° S11-300-250-P-30
EL +113131 PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS
NO (MM) (IN) NO (MM) (IN)

<1> 225 3/4 <2> 110 3/4


21 <3> 105 3/4 <4> 21691 30
49 <5> 2214 30 <6> 4749 30
1
89
99

18
30 76
"N
PS

S10
S11-300-250-P-30

SEE SHT
HP-322-0101_A SHT 1
Isometric File Name : EP26_A2-HP-322-0101_A
Iso Extraction Date : 2022-11-11 13:51:00

DESIGN TEMP. ºC 450.00 OPE. TEMP. ºC 410.00 PAINT SYSTEM T6 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 44.00 OPE. PRESS. kg/cm2g 40.00 PWHT N
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
1 09/11/2022 REVISED AS PER MARK1 PPK SP SS INS. CODE IH TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm 185 TEST PRESS. kg/cm2g 80.87 CLIENT NAME


01/12/2021 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 20 PT or MT % 0 STRESS SYSTEM.NO 6405-EPCM25_26-CA-0045
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-322-PRS-PID-000-0002 GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 30"-HP-322-0101_A-D2D-IH PIPE SPEC :D2D
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : HP-322-0101_A AREA: EP26-A2 SHT. 2 OF 2 REV. 1
<SECURITY LEVEL2>

N MATERIAL LIST

PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
PIPE
1 APPDN0MBBPG 30" PIPE A691GR.11/4CRCL.42 EFW BE ASME B36.10M 8.7 M
IBR :19.05mm
2 APPDB0SBBPG 14" PIPE A335GR.P11 SMLS BE ASME B36.10M IBR 0.4 M
:15.88mm
14"NPS
FITTINGS
CONT.ON
EP26_A2-HP-322-0208 3 DSZDN0MBBPG 30X14" WELD BRANCH RPAD A691GR.11/4CRCL.42 EFW BE 1
ASME B36.10M IBR :19.05mm x 15.88mm
CONT.ON E 1808575
90° N 1982375
EP26_A2-HP-322-0101_C PIPE SUPPORTS
E 1808575 EL +113845
N 1985352 4 S11 30" S11-300-250-P-30 2
EL +113131

<1> 2 CUT PIPE LENGTH


<2
> PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS
1 NO (MM) (IN) NO (MM) (IN)
S4
S11-300-250-P-30 <1> 377 14 <2> 8601 30

714
20
25

29 INSUL:
77
175/IH
30X20"NPS INSUL:
127MM OFFSET 185/IH
FLAT SIDE D
3
30"X14"NPS

S4
S11-300-250-P-30

56
24

16
50

30"NPS

CONT.ON
EP26_A2-HP-322-0101_A
E 1808575
N 1976750
EL +113131
Isometric File Name : EP26_A2-HP-322-0101_B
Iso Extraction Date : 2022-06-17 16:29:02

DESIGN TEMP. ºC 450.00 OPE. TEMP. ºC 410.00 PAINT SYSTEM T6 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 44.00 OPE. PRESS. kg/cm2g 40.00 PWHT N
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
INS. CODE IH TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm 185 TEST PRESS. kg/cm2 g 80.17 CLIENT NAME


15/06/2022 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 20 PT or MT % 0 STRESS SYSTEM.NO 6405-EPCM25_26-CA-0045
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-322-PRS-PID-000-0002 GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 30"-HP-322-0101_B-D2D-IH PIPE SPEC :D2D
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : HP-322-0101_B AREA: EP26-A2 SHT. 1 OF 1 REV. 0
<SECURITY LEVEL2>

N MATERIAL LIST

PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
PIPE
1 APPDB0SBBPG 12" PIPE A335GR.P11 SMLS BE ASME B36.10M IBR 12.0 M
:14.27mm
2 APPDB0SBBPG 3" PIPE A335GR.P11 SMLS BE ASME B36.10M IBR 0.5 M
:S-XS
3 APPDB0SABPG 3/4" PIPE A335GR.P11 SMLS PE ASME B36.10M IBR 0.2 M
:S-160

FITTINGS
4 DRBDE0P2QPG 30X20" ECC REDUCER A234GR.WP11CL.1 WELD BW ASME 1
B16.9 IBR :19.05mm x 17.48mm
5 DRBDE0P2QPG 20X12" ECC REDUCER A234GR.WP11CL.1 WELD BW ASME 1
B16.9 IBR :17.48mm x 14.27mm
7
6 DSZDB0SBBPG 12X3" WELD BRANCH RPAD A335GR.P11 SMLS BE ASME 1
90° B36.10M IBR :14.27mm x S-XS
S16 EL +114282 7 DEADE0S2QPG 12" 90 DEG ELBOW A234GR.WP11CL.1 SMLS BW ASME 3
S2-300-250-P-12 B16.9 IBR :14.27mm
6 8 DHDDA0Q1RPG 3X3/4" HALF COUPLING A182GR.F11CL.2 CL.6000 SW ASME 1
0
16 B16.11 IBR
9 DJADE0S2QPG 3" CAP A234GR.WP11CL.1 SMLS BW ASME B16.9 IBR 1
:S-XS
10 DFEDA0Q1TPG 3/4" SOCKET OUTLET (FLAT) A182GR.F11CL.2 CL.6000 1
SW MSS SP-97 IBR

<4> 1 FLANGES
68
39 11 CFADA0GBJPG 3/4" FLANGE SW A182GR.F11CL.2 CL.600 RF ASME B16.5 1
CONT.ON IBR :S-160
HP-322-0101_C SHT 2 EL +112912 12 CDBDA0GBJPG 3/4" BLIND FLANGE A182GR.F11CL.2 CL.600 RF ASME 1
S15 B16.5 IBR
S16 <3 G1S2-300-250-P-12
> 6
S2-300-250-P-12 1370 1 12"X3"NPS GASKETS
7 CONT.ON 13 FFG213ACDGBHA 3/4" SPIRAL WOUND GASKET (G213ACD) CL.600 RF 4.5 1
9 3 EP26_A2-HP-322-02212
79 90° 11 8 MM ASME B16.20
1 05 3X3/4"NPS E 1808575
>
<5 N 1990150 BOLTS
12"NPS EL +112450 14 EBECC0A 5/8 " STUD BOLT(FULL THREADED)/HEX.NUT(HEAVY) 4
INSUL: 20 A193GR.B16/A194GR.4 ASME B18.2.1/ASME
175/IH 31 508 CONT.ON B18.2.2 - 90 mm Length
INSUL: EP26_A2-HP-322-0101_B
135/IH 610 E 1808575 PIPE SUPPORTS

462
37 N 1985352 15 G1S2 12" G1S2-300-250-P-12 1
7 50 EL +113131
90° 16 S2 12" S2-300-250-P-12 2
30"NPS

457
EL +112450

<1> 2
CUT PIPE LENGTH

INSUL: 4
70 30X20"NPS PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS

95
E 1808575 100/IH NO (MM) (IN) NO (MM) (IN)
N 1990220 9 127MM OFFSET
EL +112311 INSUL: FLAT SIDE D <1> 401 3 <2> 121 3/4
175/IH <3> 4399 12 <4> 456 12
INSUL: 10 INSUL: <5> 7079 12
135/IH INSUL:
135/IH 185/IH E 1808575
19 12 5
INSUL: N 1990220 20X12"NPS
100/IH 144 EL +112150 92MM OFFSET
FLAT SIDE D
<2> 3 F11 G13 B14
3/4"NPS
Isometric File Name : EP26_A2-HP-322-0101_C
Iso Extraction Date : 2022-11-11 13:52:24

DESIGN TEMP. ºC 450.00 OPE. TEMP. ºC 410.00 PAINT SYSTEM T TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 44.00 OPE. PRESS. kg/cm2g 40.00 PWHT N
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
1 09/11/2022 REVISED AS PER MARK1 PPK SP SS INS. CODE IH TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm 185 TEST PRESS. kg/cm2g 80.17 CLIENT NAME


01/12/2021 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 20 PT or MT % 0 STRESS SYSTEM.NO 6405-EPCM25_26-CA-0045
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-322-PRS-PID-000-0002 GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 30"-HP-322-0101_C-D2D-IH PIPE SPEC :D2D
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : HP-322-0101_C AREA: EP26-A2 SHT. 1 OF 7 REV. 1
<SECURITY LEVEL2>

CONT.ON
N MATERIAL LIST
HP-322-0101_C SHT 3
PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
PIPE
12"NPS 1 APPDB0SBBPG 12" PIPE A335GR.P11 SMLS BE ASME B36.10M IBR 13.0 M
:14.27mm
S11 2 APPDB0SABPG 3/4" PIPE A335GR.P11 SMLS PE ASME B36.10M IBR 0.5 M
G1S2-300-250-P-12 :S-160

60 FITTINGS
00
3 DHDDA0Q1RPG 12X3/4" HALF COUPLING A182GR.F11CL.2 CL.6000 SW ASME 1
S11 S12
B16.11 IBR
4 DEADE0S2QPG 12" 90 DEG ELBOW A234GR.WP11CL.1 SMLS BW ASME 3
G1S2-300-250-P-12 D1S5-500-250-P-12 B16.9 IBR :14.27mm
60
00 FLANGES
5 CFADA0GBJPG 3/4" FLANGE SW A182GR.F11CL.2 CL.600 RF ASME B16.5 1
IBR :S-160
6 CDBDA0GBJPG 3/4" BLIND FLANGE A182GR.F11CL.2 CL.600 RF ASME 1
S11 B16.5 IBR

60 G1S2-300-250-P-12
GASKETS
00
7 FFG213ACDGBHA 3/4" SPIRAL WOUND GASKET (G213ACD) CL.600 RF 4.5 1
MM ASME B16.20

S10 BOLTS
S2-300-250-P-12 8 EBECC0A 5/8 " STUD BOLT(FULL THREADED)/HEX.NUT(HEAVY) 4
60 A193GR.B16/A194GR.4 ASME B18.2.1/ASME
00 B18.2.2 - 90 mm Length

S11 VALVES
G1S2-300-250-P-12 9 51031 3/4" GATE VALVE CL.800 A182GR.F11CL.2/HF SW 2
60 4 BB,OS&Y BY MFR/API 602/ASME B16.11
00 90° HANDWHEEL IBR

PIPE SUPPORTS
10 S2 12" S2-300-250-P-12 3

11 G1S2 12" G1S2-300-250-P-12 4

12 D1S5 12" D1S5-500-250-P-12 1


28 1
25 5>

1370
<
E 1800582
N 1996875 <6> 1 CUT PIPE LENGTH
S10 EL +115102
S2-300-250-P-12 PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS
NO (MM) (IN) NO (MM) (IN)
93
79
2418 <1> 275 3/4 <2> 110 3/4
<3> 105 3/4 <4> 5436 12
4 <5> 7079 12 <6> 456 12
<3> 2 90°
EL +112912
00 6 127
40
F5 G7 B8 58
9 9
STEM N 30.1 E 110 STEM N 30.1 E
4
90° <4 <2> 2
> 58
1
INSUL:
S10
100/IH

463
S2-300-250-P-12 INSUL:
80
0 175/IH
3
12 12X3/4"NPS
"N
PS
<1> 2

50
93

SEE SHT
HP-322-0101_C SHT 1
Isometric File Name : EP26_A2-HP-322-0101_C
Iso Extraction Date : 2022-11-11 13:52:24

DESIGN TEMP. ºC 450.00 OPE. TEMP. ºC 410.00 PAINT SYSTEM T TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 44.00 OPE. PRESS. kg/cm2g 40.00 PWHT N
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
1 09/11/2022 REVISED AS PER MARK1 PPK SP SS INS. CODE IH TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm 185 TEST PRESS. kg/cm2g 80.17 CLIENT NAME


01/12/2021 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 20 PT or MT % 0 STRESS SYSTEM.NO 6405-EPCM25_26-CA-0045
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-322-PRS-PID-000-0002 GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 30"-HP-322-0101_C-D2D-IH PIPE SPEC :D2D
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : HP-322-0101_C AREA: EP26-A2 SHT. 2 OF 7 REV. 1
<SECURITY LEVEL2>

N MATERIAL LIST

PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
PIPE
1 APPDB0SBBPG 12" PIPE A335GR.P11 SMLS BE ASME B36.10M IBR 42.3 M
:14.27mm
2 APPDB0SBBPG 3" PIPE A335GR.P11 SMLS BE ASME B36.10M IBR 0.5 M
:S-XS
3 APPDB0SABPG 3/4" PIPE A335GR.P11 SMLS PE ASME B36.10M IBR 0.2 M
:S-160

FITTINGS
4 DSZDB0SBBPG 12X3" WELD BRANCH RPAD A335GR.P11 SMLS BE ASME 1
5 B36.10M IBR :14.27mm x S-XS
90° 5 DEADE0S2QPG 12" 90 DEG ELBOW A234GR.WP11CL.1 SMLS BW ASME 3
EL +114282 B16.9 IBR :14.27mm
6 DHDDA0Q1RPG 3X3/4" HALF COUPLING A182GR.F11CL.2 CL.6000 SW ASME 1
B16.11 IBR
7 DJADE0S2QPG 3" CAP A234GR.WP11CL.1 SMLS BW ASME B16.9 IBR 1
75 :S-XS
S13 15 8 DFEDA0Q1TPG 3/4" SOCKET OUTLET (FLAT) A182GR.F11CL.2 CL.6000 1
SW MSS SP-97 IBR
S2-300-250-P-12
FLANGES

<4> 1
9 CFADA0GBJPG 3/4" FLANGE SW A182GR.F11CL.2 CL.600 RF ASME B16.5 1
IBR :S-160
SEE SHT 10 CDBDA0GBJPG 3/4" BLIND FLANGE A182GR.F11CL.2 CL.600 RF ASME 1
HP-322-0101_C SHT 2

1370
B16.5 IBR

5 85
9 GASKETS
90°
00 11 FFG213ACDGBHA 3/4" SPIRAL WOUND GASKET (G213ACD) CL.600 RF 4.5 1
40 <3 MM ASME B16.20
CONT.ON >
1 BOLTS
EP26_A2-HP-322-02207
E 1808645 34 12 EBECC0A 5/8 " STUD BOLT(FULL THREADED)/HEX.NUT(HEAVY) 4
79 A193GR.B16/A194GR.4 ASME B18.2.1/ASME
N 2032466 1
S13 EL +112450 12 B18.2.2 - 90 mm Length
S2-300-250-P-12 "N
PS
PIPE SUPPORTS
93 INSUL:
79 175/IH 13 S2 12" S2-300-250-P-12 2
INSUL:
135/IH
4
12"X3"NPS CUT PIPE LENGTH

461
1 PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS
CONT.ON 5> 6
HP-322-0101_C SHT 4 < 3X3/4"NPS
NO (MM) (IN) NO (MM) (IN)

12"NPS <1> 2
<1> 401 3 <2> 121 3/4
<3> 34736 12 <4> 456 12
EL +112450 <5> 7079 12
E 1808575
N 2032466 70
EL +112311
7 INSUL:

95
5
90° 100/IH
8 INSUL:
135/IH
INSUL: <2> 3
457 135/IH 3/4"NPS
19 10
INSUL:
100/IH 144

F9 G11 B12 E 1808575


N 2032466
EL +112150
Isometric File Name : EP26_A2-HP-322-0101_C
Iso Extraction Date : 2022-11-11 13:52:24

DESIGN TEMP. ºC 450.00 OPE. TEMP. ºC 410.00 PAINT SYSTEM T TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 44.00 OPE. PRESS. kg/cm2g 40.00 PWHT N
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
1 09/11/2022 REVISED AS PER MARK1 PPK SP SS INS. CODE IH TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm 185 TEST PRESS. kg/cm2g 80.17 CLIENT NAME


01/12/2021 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 20 PT or MT % 0 STRESS SYSTEM.NO 6405-EPCM25_26-CA-0045
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-322-PRS-PID-000-0002 GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 30"-HP-322-0101_C-D2D-IH PIPE SPEC :D2D
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : HP-322-0101_C AREA: EP26-A2 SHT. 3 OF 7 REV. 1
<SECURITY LEVEL2>

N MATERIAL LIST

PT| SIZE
4 NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
90°
PIPE
1 APPDB0SBBPG 12" PIPE A335GR.P11 SMLS BE ASME B36.10M IBR 13.0 M
:14.27mm
2 APPDB0SABPG 3/4" PIPE A335GR.P11 SMLS PE ASME B36.10M IBR 0.5 M
S10 :S-160
S2-300-250-P-12
FITTINGS
1 3 DHDDA0Q1RPG 12X3/4" HALF COUPLING A182GR.F11CL.2 CL.6000 SW ASME 1
>
<5 4 DEADE0S2QPG 12"
B16.11 IBR
90 DEG ELBOW A234GR.WP11CL.1 SMLS BW ASME 3
B16.9 IBR :14.27mm

1370
FLANGES

<6> 1
5 CFADA0GBJPG 3/4" FLANGE SW A182GR.F11CL.2 CL.600 RF ASME B16.5 1
IBR :S-160
6 CDBDA0GBJPG 3/4" BLIND FLANGE A182GR.F11CL.2 CL.600 RF ASME 1
B16.5 IBR
93
79 GASKETS
7 FFG213ACDGBHA 3/4" SPIRAL WOUND GASKET (G213ACD) CL.600 RF 4.5 1
MM ASME B16.20
S10 12"NPS
S2-300-250-P-12 00 CONT.ON BOLTS
40 HP-322-0101_C SHT 5 8 EBECC0A 5/8 " STUD BOLT(FULL THREADED)/HEX.NUT(HEAVY) 4
A193GR.B16/A194GR.4 ASME B18.2.1/ASME
4 B18.2.2 - 90 mm Length
2418 457 90°
E 1800582 EL +112912 VALVES
N 2038875 9 51031 3/4" GATE VALVE CL.800 A182GR.F11CL.2/HF SW 2
EL +115102 BB,OS&Y BY MFR/API 602/ASME B16.11
HANDWHEEL IBR
<3> 2
PIPE SUPPORTS
6 127 10 S2 12" S2-300-250-P-12 2
4
90°
F5 G7 B8 58
9 CUT PIPE LENGTH
9 110 STEM N
STEM N 30.1 E 30.1 E
PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS
<2> 2 NO (MM) (IN) NO (MM) (IN)
<4 58
> <1> 275 3/4 <2> 110 3/4
1
INSUL: <3> 105 3/4 <4> 5436 12
100/IH <5> 7079 12 <6> 456 12
463

80 INSUL:
0 175/IH
<1> 2

3
12X3/4"NPS

12
"N
PS

50
93

SEE SHT
HP-322-0101_C SHT 3
Isometric File Name : EP26_A2-HP-322-0101_C
Iso Extraction Date : 2022-11-11 13:52:24

DESIGN TEMP. ºC 450.00 OPE. TEMP. ºC 410.00 PAINT SYSTEM T TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 44.00 OPE. PRESS. kg/cm2g 40.00 PWHT N
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
1 09/11/2022 REVISED AS PER MARK1 PPK SP SS INS. CODE IH TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm 185 TEST PRESS. kg/cm2g 80.17 CLIENT NAME


01/12/2021 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 20 PT or MT % 0 STRESS SYSTEM.NO 6405-EPCM25_26-CA-0045
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-322-PRS-PID-000-0002 GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 30"-HP-322-0101_C-D2D-IH PIPE SPEC :D2D
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : HP-322-0101_C AREA: EP26-A2 SHT. 4 OF 7 REV. 1
<SECURITY LEVEL2>

N MATERIAL LIST

PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
PIPE
1 APPDB0SBBPG 12" PIPE A335GR.P11 SMLS BE ASME B36.10M IBR 29.2 M
:14.27mm
2 APPDB0SBBPG 3" PIPE A335GR.P11 SMLS BE ASME B36.10M IBR 0.5 M
:S-XS
3 APPDB0SABPG 3/4" PIPE A335GR.P11 SMLS PE ASME B36.10M IBR 0.2 M
:S-160
CONT.ON
HP-322-0101_C SHT 6 FITTINGS
4 DSZDB0SBBPG 12X3" WELD BRANCH RPAD A335GR.P11 SMLS BE ASME 1
B36.10M IBR :14.27mm x S-XS
5 DEADE0S2QPG 12" 90 DEG ELBOW A234GR.WP11CL.1 SMLS BW ASME 1
B16.9 IBR :14.27mm
<4> 1 CONT.ON 6 DHDDA0Q1RPG 3X3/4" HALF COUPLING A182GR.F11CL.2 CL.6000 SW ASME 1
12"NPS EP26_A2-HP-322-02208 B16.11 IBR
E 1808575 7 DJADE0S2QPG 3" CAP A234GR.WP11CL.1 SMLS BW ASME B16.9 IBR 1
:S-XS
N 2067745 8 DFEDA0Q1TPG 3/4" SOCKET OUTLET (FLAT) A182GR.F11CL.2 CL.6000 1
EL +112450 SW MSS SP-97 IBR
15
10 S13 FLANGES
913

G1S2-300-250-P-12 9 CFADA0GBJPG 3/4" FLANGE SW A182GR.F11CL.2 CL.600 RF ASME B16.5 1


<3 INSUL: IBR :S-160
> 100/IH 10 CDBDA0GBJPG 3/4" BLIND FLANGE A182GR.F11CL.2 CL.600 RF ASME 1
1 B16.5 IBR
5
90° GASKETS
11 FFG213ACDGBHA 3/4" SPIRAL WOUND GASKET (G213ACD) CL.600 RF 4.5 1
MM ASME B16.20
INSUL:
175/IH BOLTS
INSUL: S14
12 EBECC0A 5/8 " STUD BOLT(FULL THREADED)/HEX.NUT(HEAVY) 4
135/IH S2-300-250-P-12 A193GR.B16/A194GR.4 ASME B18.2.1/ASME
462

B18.2.2 - 90 mm Length
EL +112450 60
00 PIPE SUPPORTS
6 13 G1S2 12" G1S2-300-250-P-12 2
3X3/4"NPS 4
12"X3"NPS 14 S2 12" S2-300-250-P-12 2
<1> 2

70 27
E 1808575 68
7 INSUL: 3 S15 15 F1S5 12" F1S5-500-250-P-12 1
N 2067816
95

EL +112311 135/IH 60 F1S5-500-250-P-12


00
F9 G11 B12 8 CUT PIPE LENGTH

INSUL: <2> 3 PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS
135/IH 10 3/4"NPS NO (MM) (IN) NO (MM) (IN)
INSUL:
100/IH 20 60 <1> 401 3 <2> 121 3/4
144 00 <3> 28736 12 <4> 456 12
S13
E 1808575 G1S2-300-250-P-12
N 2067816
EL +112150

60
S14 00
S2-300-250-P-12 12
"N
PS

23
68

SEE SHT
HP-322-0101_C SHT 4
Isometric File Name : EP26_A2-HP-322-0101_C
Iso Extraction Date : 2022-11-11 13:52:24

DESIGN TEMP. ºC 450.00 OPE. TEMP. ºC 410.00 PAINT SYSTEM T TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 44.00 OPE. PRESS. kg/cm2g 40.00 PWHT N
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
1 09/11/2022 REVISED AS PER MARK1 PPK SP SS INS. CODE IH TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm 185 TEST PRESS. kg/cm2g 80.17 CLIENT NAME


01/12/2021 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 20 PT or MT % 0 STRESS SYSTEM.NO 6405-EPCM25_26-CA-0045
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-322-PRS-PID-000-0002 GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 30"-HP-322-0101_C-D2D-IH PIPE SPEC :D2D
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : HP-322-0101_C AREA: EP26-A2 SHT. 5 OF 7 REV. 1
<SECURITY LEVEL2>

N MATERIAL LIST

PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
PIPE
1 APPDB0SBBPG 12" PIPE A335GR.P11 SMLS BE ASME B36.10M IBR 20.1 M
:14.27mm
2 APPDB0SABPG 3/4" PIPE A335GR.P11 SMLS PE ASME B36.10M IBR 0.5 M
:S-160

FITTINGS

4 3 DHDDA0Q1RPG 12X3/4" HALF COUPLING A182GR.F11CL.2 CL.6000 SW ASME 1


90° B16.11 IBR
4 DEADE0S2QPG 12" 90 DEG ELBOW A234GR.WP11CL.1 SMLS BW ASME 5
B16.9 IBR :14.27mm

S10 FLANGES
S2-300-250-P-12
93 5 CFADA0GBJPG 3/4" FLANGE SW A182GR.F11CL.2 CL.600 RF ASME B16.5 1
79 IBR :S-160
6 CDBDA0GBJPG 3/4" BLIND FLANGE A182GR.F11CL.2 CL.600 RF ASME 1
1 B16.5 IBR
>
<6 GASKETS

1370
CONT.ON 7 FFG213ACDGBHA 3/4" SPIRAL WOUND GASKET (G213ACD) CL.600 RF 4.5 1
HP-322-0101_C SHT 7 MM ASME B16.20

<7> 1
E 1800582 BOLTS
N 2074875
8 EBECC0A 5/8 " STUD BOLT(FULL THREADED)/HEX.NUT(HEAVY) 4
EL +115102 A193GR.B16/A194GR.4 ASME B18.2.1/ASME
B18.2.2 - 90 mm Length
S10
S2-300-250-P-12 00
40 VALVES
2418 12"NPS 9 51031 3/4" GATE VALVE CL.800 A182GR.F11CL.2/HF SW 2
<4> 2
BB,OS&Y BY MFR/API 602/ASME B16.11
HANDWHEEL IBR
6 127
4 457 4 PIPE SUPPORTS
90° 90° 4 10 S2 12" S2-300-250-P-12 4
F5 G7 B8 58 90°
EL +112912
1575 EL +114282
9 9
STEM NORTH 110 STEM NORTH
CUT PIPE LENGTH
<5 <3> 2 57 PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS
>
1 S10 NO (MM) (IN) NO (MM) (IN)
INSUL:
100/IH S2-300-250-P-12
463

457 <1> 7079 12 <2> 275 3/4


80 INSUL: <3> 110 3/4 <4> 105 3/4
0 175/IH 12"NPS <5> 5436 12 <6> 7079 12
<7> 456 12
3
12X3/4"NPS 93
79
<2> 2 00
40
SEE SHT
HP-322-0101_C SHT 5
1
55 >
50 <1
S10
S2-300-250-P-12

4
90°
Isometric File Name : EP26_A2-HP-322-0101_C
Iso Extraction Date : 2022-11-11 13:52:24

DESIGN TEMP. ºC 450.00 OPE. TEMP. ºC 410.00 PAINT SYSTEM T TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 44.00 OPE. PRESS. kg/cm2g 40.00 PWHT N
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
1 09/11/2022 REVISED AS PER MARK1 PPK SP SS INS. CODE IH TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm 185 TEST PRESS. kg/cm2g 80.17 CLIENT NAME


01/12/2021 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 20 PT or MT % 0 STRESS SYSTEM.NO 6405-EPCM25_26-CA-0045
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-322-PRS-PID-000-0002 GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 30"-HP-322-0101_C-D2D-IH PIPE SPEC :D2D
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : HP-322-0101_C AREA: EP26-A2 SHT. 6 OF 7 REV. 1
<SECURITY LEVEL2>

N MATERIAL LIST
457
PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY

12"NPS PIPE
1 APPDB0SBBPG 12" PIPE A335GR.P11 SMLS BE ASME B36.10M IBR 17.2 M
:14.27mm
CONT.ON 5
2 APPDB0SBBPG 3" PIPE A335GR.P11 SMLS BE ASME B36.10M IBR 0.5 M
EP26_A3-HP-322-0101 90°
:S-XS
E 1808575 3 APPDB0SABPG 3/4" PIPE A335GR.P11 SMLS PE ASME B36.10M IBR 0.2 M
EL +121411 :S-160
N 2086637
EL +121411 FITTINGS
4 DSZDB0SBBPG 12X3" WELD BRANCH RPAD A335GR.P11 SMLS BE ASME 1
B36.10M IBR :14.27mm x S-XS
5 DEADE0S2QPG 12" 90 DEG ELBOW A234GR.WP11CL.1 SMLS BW ASME 2

<4> 1
B16.9 IBR :14.27mm
6 DHDDA0Q1RPG 3X3/4" HALF COUPLING A182GR.F11CL.2 CL.6000 SW ASME 1
B16.11 IBR
7 DJADE0S2QPG 3" CAP A234GR.WP11CL.1 SMLS BW ASME B16.9 IBR 1
:S-XS

8500
8 DFEDA0Q1TPG 3/4" SOCKET OUTLET (FLAT) A182GR.F11CL.2 CL.6000 1
S15 SW MSS SP-97 IBR
G1TR1-0-1000-12
WITH PAD. FLANGES
9 CFADA0GBJPG 3/4" FLANGE SW A182GR.F11CL.2 CL.600 RF ASME B16.5 1
IBR :S-160
10 CDBDA0GBJPG 3/4" BLIND FLANGE A182GR.F11CL.2 CL.600 RF ASME 1
B16.5 IBR

GASKETS
11 FFG213ACDGBHA 3/4" SPIRAL WOUND GASKET (G213ACD) CL.600 RF 4.5 1
MM ASME B16.20
3724

BOLTS
12 EBECC0A 5/8 " STUD BOLT(FULL THREADED)/HEX.NUT(HEAVY) 4
A193GR.B16/A194GR.4 ASME B18.2.1/ASME
B18.2.2 - 90 mm Length

PIPE SUPPORTS
13 G1S2 12" G1S2-300-250-P-12 1
21
<3 80 14 F1S5 12" F1S5-500-250-P-12 1
>
1 1
15 G1TR1 12" G1TR1-0-1000-12 1
5 4
90° 12"X3"NPS
S14 CUT PIPE LENGTH
F1S5-500-250-P-12
PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS
INSUL: NO (MM) (IN) NO (MM) (IN)
175/IH
INSUL: <1> 401 3 <2> 121 3/4
135/IH 78 S13 <3> 9591 12 <4> 7586 12
68
50 G1S2-300-250-P-12
6 00
462

3X3/4"NPS

EL +112450
12
<1> 2 "N
PS
23 SEE SHT
68
HP-322-0101_C SHT 6
70
CONT.ON
E 1808575 7 INSUL: EP26_A2-HP-322-02209
95

N 2084000 F9 G11 B12 100/IH E 1808645


EL +112311 8 INSUL: N 2084000
135/IH EL +112450
INSUL: <2> 3
135/IH 10 3/4"NPS
INSUL: 1
100/IH 19
144
E 1808575
N 2084000
EL +112150
Isometric File Name : EP26_A2-HP-322-0101_C
Iso Extraction Date : 2022-11-11 13:52:24

DESIGN TEMP. ºC 450.00 OPE. TEMP. ºC 410.00 PAINT SYSTEM T TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 44.00 OPE. PRESS. kg/cm2g 40.00 PWHT N
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
1 09/11/2022 REVISED AS PER MARK1 PPK SP SS INS. CODE IH TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm 185 TEST PRESS. kg/cm2g 80.17 CLIENT NAME


01/12/2021 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 20 PT or MT % 0 STRESS SYSTEM.NO 6405-EPCM25_26-CA-0045
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-322-PRS-PID-000-0002 GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 30"-HP-322-0101_C-D2D-IH PIPE SPEC :D2D
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : HP-322-0101_C AREA: EP26-A2 SHT. 7 OF 7 REV. 1
<SECURITY LEVEL2>

N MATERIAL LIST

PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
PIPE
1 APPDB0SBBPG 14" PIPE A335GR.P11 SMLS BE ASME B36.10M IBR 8.8 M
:15.88mm
2 APPDB0SABPG 3/4" PIPE A335GR.P11 SMLS PE ASME B36.10M IBR 0.4 M
:S-160
4 4
90° 90° FITTINGS
6
EL +114378
1 26 3 DHDDA0Q1RPG 14X3/4" HALF COUPLING A182GR.F11CL.2 CL.6000 SW ASME 1
B16.11 IBR
23 4 DEADE0S2QPG 14" 90 DEG ELBOW A234GR.WP11CL.1 SMLS BW ASME 3
00
B16.9 IBR :15.88mm

<2 FLANGES
533 >
1 5 CFADA0GBJPG 3/4" FLANGE SW A182GR.F11CL.2 CL.600 RF ASME B16.5 1
IBR :S-160
<1> 1 6 CDBDA0GBJPG 3/4" BLIND FLANGE A182GR.F11CL.2 CL.600 RF ASME 1
CONT.ON B16.5 IBR
14"NPS 4
EP26_A2-HP-322-0101_B 90° GASKETS
E 1808575
N 1982375 7 FFG213ACDGBHA 3/4" SPIRAL WOUND GASKET (G213ACD) CL.600 RF 4.5 1
EL +113845 MM ASME B16.20
S11
BOLTS
S2-300-200-P-14
8 EBECC0A 5/8 " STUD BOLT(FULL THREADED)/HEX.NUT(HEAVY) 4
A193GR.B16/A194GR.4 ASME B18.2.1/ASME
B18.2.2 - 90 mm Length

41
28 VALVES
9 51031 3/4" GATE VALVE CL.800 A182GR.F11CL.2/HF SW 2
BB,OS&Y BY MFR/API 602/ASME B16.11
HANDWHEEL IBR

PIPE SUPPORTS
E 1802500 10 MH2 14" MH2-F-1300-806-14 1
N 1980075
EL +115137 S10
11 S2 14" S2-300-200-P-14 2
<5> 2
MH2-F-1300-806-14
6 117 00
40 CUT PIPE LENGTH

F5 G7 B8 66 PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS


NO (MM) (IN) NO (MM) (IN)
9
STEM EAST 102 <1> 200 14 <2> 1234 14
<3> 200 3/4 <4> 102 3/4
<4> 2 <5> 95 3/4 <6> 7308 14
66
41
73
9
STEM EAST
<3> 2
403

3
14X3/4"NPS

INSUL: 1
100/IH >
INSUL: <6
175/IH S11
S2-300-200-P-14
0
50

322-TP-91-003
CONT.ON
EPCC-07-14"-HP-322-9101-D2D-IH
E 1802000
N 1980075
EL +114378
Isometric File Name : EP26_A2-HP-322-0208
Iso Extraction Date : 2022-06-17 16:30:14

DESIGN TEMP. ºC 450.00 OPE. TEMP. ºC 410.00 PAINT SYSTEM T6 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 44.00 OPE. PRESS. kg/cm2g 40.00 PWHT N
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
INS. CODE IH TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm 175 TEST PRESS. kg/cm2 g 93.86 CLIENT NAME


15/06/2022 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 20 PT or MT % 0 STRESS SYSTEM.NO 6405-EPCM25_26-CA-0045
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-322-PRS-PID-000-0002 GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 14"-HP-322-0208-D2D-IH PIPE SPEC :D2D
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : HP-322-0208 AREA: EP26-A2 SHT. 1 OF 1 REV. 0
<SECURITY LEVEL2>

N MATERIAL LIST

PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
PIPE
1 APPDB0SABPG 3/4" PIPE A335GR.P11 SMLS PE ASME B36.10M IBR 6.4 M
:S-160

FITTINGS
2 DECDA0Q1RPG 3/4" 90 DEG ELBOW A182GR.F11CL.2 CL.6000 SW ASME 4
B16.11 IBR

VALVES
3 51031 3/4" GATE VALVE CL.800 A182GR.F11CL.2/HF SW 2
BB,OS&Y BY MFR/API 602/ASME B16.11
HANDWHEEL IBR
CONT.ON
EP26_A2-HP-322-0101_A PIPE SUPPORTS
E 1808645 4 IH 3/4" IH-A-850-0.75 1
N 1944240
EL +112440 5 S2 3/4" S2-150-150-P-0.75 1

2
90°
CUT PIPE LENGTH
<5> 1
5 <1> 1 2
45 3/4"NPS S5 90° PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS
NO (MM) (IN) NO (MM) (IN)
S2-150-150-P-0.75
<1> 431 3/4 <2> 105 3/4
<2> 1 S4
129

<3> 108 3/4 <4> 336 3/4


IH-A-850-0.75 <5> 2131 3/4 <6> 3289 3/4
3
STEM EAST
58 79
<3> 1 21
3X3/4"NPS 108 3
STEM EAST 33
58 <6 37
>
1
<4> 1 1
1 90
360

2
90°
EL +111728
24
3/4"NPS

2
90°

CONT.ON
HP-322-02205 SHT 2
Isometric File Name : EP26_A2-HP-322-02205
Iso Extraction Date : 2022-11-17 11:02:10

DESIGN TEMP. ºC 450.00 OPE. TEMP. ºC 410.00 PAINT SYSTEM T6 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 44.00 OPE. PRESS. kg/cm2g 40.00 PWHT N
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
1 16/11/2022 REVISED AS PER MARK1 PPK SP SS INS. CODE IH TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm 100 TEST PRESS. kg/cm2g 80.17 CLIENT NAME


01/12/2021 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS 1 INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 20 PT or MT % 0 STRESS SYSTEM.NO NA
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-000-PRS-PID-000-0011 (2/7)GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS WELD WELD JOINT PIPE PIPE
LINE NO. : 3/4"-HP-322-02205-D2D-IH 1 PIPE SPEC :D2D
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : HP-322-02205 AREA: EP26-A2 SHT. 1 OF 2 REV. 1
<SECURITY LEVEL2>

N
SEE SHT MATERIAL LIST
HP-322-02205 SHT 1
PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
PIPE
1 APPDB0SABPG 3/4" PIPE A335GR.P11 SMLS PE ASME B36.10M IBR 12.1 M
3/4"NPS :S-160

FITTINGS

S3 2 DECDA0Q1RPG 3/4" 90 DEG ELBOW A182GR.F11CL.2 CL.6000 SW ASME 2


B16.11 IBR
DSC-150-150-P-0.75 138
270 DEG. PIPE SUPPORTS

38 3 DSC 3/4" DSC-150-150-P-0.75 1

4 IV 3/4" IV-A-700-0.75 4

5 G3S2 3/4" G3S2-150-150-P-0.75 3

S4 6 G1S2 3/4" G1S2-150-150-P-0.75 1


IV-A-700-0.75
7 Special 3/4" GS-EP26-014 1

3000
S5 MISC COMPONENTS
G3S2-150-150-P-0.75 8 SST-D2D 3/4 SPECIALITY ITEM - STEAM TRAP 1
270 DEG.

CUT PIPE LENGTH


S4
IV-A-700-0.75 PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS
NO (MM) (IN) NO (MM) (IN)

<1> 11366 3/4 <2> 309 3/4


<3> 394 3/4

3000
11390

S5
G3S2-150-150-P-0.75
270 DEG.

S4
IV-A-700-0.75
3000

S5
G3S2-150-150-P-0.75
270 DEG.

S4
IV-A-700-0.75 S6
G1S2-150-150-P-0.75
24
2 CLASS: D2D
<1> 1

90° INSUL: 100/IH


CLASS: A2A
24 333 INSUL: 25/IS
39
4
171

8
SST-D2D
<2> 1 3/4"NPS
2 CONT.ON
90° 167
EL +100313 EP26_A2-LC-322-02205
<3> 1 E 1811636
S7 N 1940315
GS-EP26-014
Isometric File Name : EP26_A2-HP-322-02205

EL +100313
Iso Extraction Date : 2022-11-17 11:02:10

DESIGN TEMP. ºC 450.00 OPE. TEMP. ºC 410.00 PAINT SYSTEM T6 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 44.00 OPE. PRESS. kg/cm2g 40.00 PWHT N
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
1 16/11/2022 REVISED AS PER MARK1 PPK SP SS INS. CODE IH TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm 100 TEST PRESS. kg/cm2g 80.17 CLIENT NAME


01/12/2021 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS 1
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 20 PT or MT % 0 STRESS SYSTEM.NO NA
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-000-PRS-PID-000-0011 (2/7)GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS WELD WELD JOINT PIPE PIPE
LINE NO. : 3/4"-HP-322-02205-D2D-IH 1 PIPE SPEC :D2D
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : HP-322-02205 AREA: EP26-A2 SHT. 2 OF 2 REV. 1
<SECURITY LEVEL2>

N MATERIAL LIST

PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
CONT.ON PIPE
HP-322-02206 SHT 2
1 APPDB0SABPG 3/4" PIPE A335GR.P11 SMLS PE ASME B36.10M IBR 6.6 M
:S-160

FITTINGS
2 DECDA0Q1RPG 3/4" 90 DEG ELBOW A182GR.F11CL.2 CL.6000 SW ASME 3
B16.11 IBR
S8
VALVES
<6 LH2-A-600-450-0.75
> 3 51031 3/4" GATE VALVE CL.800 A182GR.F11CL.2/HF SW 2
1 BB,OS&Y BY MFR/API 602/ASME B16.11
3/ HANDWHEEL IBR
4"
NP
S PIPE SUPPORTS
4 LH2 3/4" LH2-A-700-450-0.75 1

5 S2 3/4" S2-150-150-P-0.75 2
S5 6 G1S2 3/4" G1S2-150-150-P-0.75 1
S2-150-150-P-0.75
7 LH2 3/4" LH2-A-600-500-0.75 1
34
24 8 LH2 3/4" LH2-A-600-450-0.75 1
2658

CUT PIPE LENGTH

PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS


NO (MM) (IN) NO (MM) (IN)

<1> 321 3/4 <2> 102 3/4


<3> 102 3/4 <4> 374 3/4
<5> 2231 3/4 <6> 3400 3/4

2 2
90° 90°
S7
LH2-A-600-500-0.75
CONT.ON 1
>
EP26_A2-HP-322-0101_A <5
E 1808645 24
5
N 1974500 34
EL +112440 1 102
>
<1 PS
3X3/4"NPS N 66
4"
3/ 3
<2> 1 102 STEM EAST 0 S6
6
16 G1S2-150-150-P-0.75
<3> 1 55
66 22
3
STEM EAST
398
<4> 1

S4
LH2-A-700-450-0.75 S5
3 26 S2-150-150-P-0.75
2
90°
EL +111683

24
Isometric File Name : EP26_A2-HP-322-02206
Iso Extraction Date : 2021-11-27 10:18:04

DESIGN TEMP. ºC 450.00 OPE. TEMP. ºC 410.00 PAINT SYSTEM T6 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 44.00 OPE. PRESS. kg/cm2g 40.00 PWHT N
PROJECT NAME
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
1 9-11-2022 REVISED AS PER MARK1 ABJ PPK SS INS. CODE IH TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 01/12/2021 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS INS.THK mm 100 TEST PRESS. kg/cm2g 93.86 CLIENT NAME
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 20 PT or MT % 0 STRESS SYSTEM.NO NA
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-000-PRS-PID-000-0011 (2/7)GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 3/4"-HP-322-02206-D2D-IH PIPE SPEC :D2D
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : HP-322-02206 AREA: EP25-A2 SHT. 1 OF 2 REV. 01
<SECURITY LEVEL2>

N MATERIAL LIST
2 24
90° PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
PIPE
1 APPDB0SABPG 3/4" PIPE A335GR.P11 SMLS PE ASME B36.10M IBR 12.0 M
:S-160

FITTINGS
2 DECDA0Q1RPG 3/4" 90 DEG ELBOW A182GR.F11CL.2 CL.6000 SW ASME 3
3/4"NPS B16.11 IBR
713 SEE SHT
HP-322-02206 SHT 1 PIPE SUPPORTS
38 3 DSC 3/4" DSC-150-155-P-0.75 1

S4 4 IV 3/4" IV-A-650-0.75 2

S3 IV-A-650-0.75 5 IV 3/4" IV-A-450-0.75 2


DSC-150-155-P-0.75
270 DEG. 6 G3S2 3/4" G3S2-150-150-P-0.75 3

7 Special 3/4" GS-EP26-015 1

2970
S6 8 G1S2 3/4" G1S2-150-150-P-0.75 1
G3S2-150-150-P-0.75 MISC COMPONENTS
0 DEG.
9 SST-D2D 3/4 SPECIALITY ITEM - STEAM TRAP 1

CUT PIPE LENGTH


S5
IV-A-450-0.75 PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS
NO (MM) (IN) NO (MM) (IN)

<1> 11321 3/4 <2> 272 3/4


<3> 349 3/4

2295
11369

3/4"NPS
CONT.ON
EP26_A2-LC-322-02206
S5 E 1811589
IV-A-450-0.75 N 1978493
EL +100313
S6 CLASS: A2A
G3S2-150-150-P-0.75 INSUL: 25/IS
0 DEG. CLASS: D2D
2975

INSUL: 100/IH
171

37 140
3
S4
IV-A-650-0.75 9
SST-D2D
S6 <3> 1 S8
G3S2-150-150-P-0.75 S7 G1S2-150-150-P-0.75
<1> 1

270 DEG. GS-EP26-015 2


90°
1
>
<2
0
32

2
90°
EL +100313
Isometric File Name : EP26_A2-HP-322-02206
Iso Extraction Date : 2021-11-27 10:18:04

DESIGN TEMP. ºC 450.00 OPE. TEMP. ºC 410.00 PAINT SYSTEM T6 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 44.00 OPE. PRESS. kg/cm2g 40.00 PWHT N
PROJECT NAME
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
1 9-11-2022 REVISED AS PER MARK1 ABJ PPK SS INS. CODE IH TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 01/12/2021 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS INS.THK mm 100 TEST PRESS. kg/cm2g 93.86 CLIENT NAME
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 20 PT or MT % 0 STRESS SYSTEM.NO NA
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-000-PRS-PID-000-0011 (2/7)GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 3/4"-HP-322-02206-D2D-IH PIPE SPEC :D2D
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : HP-322-02206 AREA: EP25-A2 SHT. 2 OF 2 REV. 01
<SECURITY LEVEL2>

N MATERIAL LIST

PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
PIPE
1 APPDB0SABPG 3/4" PIPE A335GR.P11 SMLS PE ASME B36.10M IBR 4.6 M
:S-160

FITTINGS
2 DECDA0Q1RPG 3/4" 90 DEG ELBOW A182GR.F11CL.2 CL.6000 SW ASME 4
B16.11 IBR

VALVES
3 51031 3/4" GATE VALVE CL.800 A182GR.F11CL.2/HF SW 2
BB,OS&Y BY MFR/API 602/ASME B16.11
CONT.ON HANDWHEEL IBR
EP26_A2-HP-322-0101_C PIPE SUPPORTS
E 1808645
N 2032466 4 S2 3/4" S2-150-300-P-0.75 1
EL +112450 2
90°
CUT PIPE LENGTH
3
STEM SOUTH PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS
NO (MM) (IN) NO (MM) (IN)

<1> 1862 3/4 <2> 105 3/4


<3> 181 3/4 <4> 318 3/4
<2> 1

129
<5> 699 3/4 <6> 1414 3/4

3 S4
STEM SOUTH S2-150-300-P-0.75
86 58
18
1 <3> 1 2
> 90°
<1 PS

181
N
4"
3/ 8
57 74

<4> 1
14
<6 63
342

<5> 1 >
1
4 69
MH2-A-850-700-0.75

3X3/4"NPS
2
90°
EL +111683
24
3/4"NPS 2
90°

CONT.ON
HP-322-02207 SHT 2
Isometric File Name : EP26_A2-HP-322-02207
Iso Extraction Date : 2022-11-17 11:03:23

DESIGN TEMP. ºC 450.00 OPE. TEMP. ºC 410.00 PAINT SYSTEM T6 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 44.00 OPE. PRESS. kg/cm2g 40.00 PWHT N
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
1 16/11/2022 REVISED AS PER MARK1 PPK SP SS INS. CODE IH TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm 100 TEST PRESS. kg/cm2g 80.17 CLIENT NAME


01/12/2021 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS 1 INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 20 PT or MT % 0 STRESS SYSTEM.NO NA
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-000-PRS-PID-000-0011 (2/7)GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 3/4"-HP-322-02207-D2D-IH PIPE SPEC :D2D
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : HP-322-02207 AREA: EP26-A2 1 SHT. 1 OF 2 REV. 1
<SECURITY LEVEL2>

N
SEE SHT MATERIAL LIST
HP-322-02207 SHT 1
PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
PIPE
1 APPDB0SABPG 3/4" PIPE A335GR.P11 SMLS PE ASME B36.10M IBR 12.1 M
:S-160

FITTINGS

3/4"NPS
2 DECDA0Q1RPG 3/4" 90 DEG ELBOW A182GR.F11CL.2 CL.6000 SW ASME 2
B16.11 IBR

788
S3 PIPE SUPPORTS
DSC-150-150-P-0.75 3 DSC 3/4" DSC-150-150-P-0.75 1
270 DEG.
4 IV 3/4" IV-A-673-0.75 1
38
5 IV 3/4" IV-A-450-0.75 1

6 G3S2 3/4" G3S2-150-150-P-0.75 3

7 IV 3/4" IV-A-700-0.75 2
S4
IV-A-673-0.75 8 G1S2 3/4" G1S2-150-150-P-0.75 1

3000
9 Special 3/4" GS-EP26-016 1
S6
G3S2-150-150-P-0.75 MISC COMPONENTS
0 DEG. 10 SST-D2D 3/4 SPECIALITY ITEM - STEAM TRAP 1

S5 CUT PIPE LENGTH


IV-A-450-0.75
PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS
NO (MM) (IN) NO (MM) (IN)

<1> 11321 3/4 <2> 309 3/4


<3> 394 3/4
11345

3000 S6
G3S2-150-150-P-0.75
270 DEG.

S7
IV-A-700-0.75
3000

S7
IV-A-700-0.75
S6 S8
G3S2-150-150-P-0.75 24 G1S2-150-150-P-0.75
270 DEG. 2
90° CLASS: D2D
INSUL: 100/IH
<1> 1

3 CLASS: A2A
24 33 39 INSUL: 25/IS
4

171
10
<2> 1
SST-D2D
167 3/4"NPS
2
90° S9 CONT.ON
EL +100313 EP26_A2-LC-322-02207
GS-EP26-016 <3> 1 E 1811636
N 2030415
Isometric File Name : EP26_A2-HP-322-02207

EL +100313
Iso Extraction Date : 2022-11-17 11:03:23

DESIGN TEMP. ºC 450.00 OPE. TEMP. ºC 410.00 PAINT SYSTEM T6 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 44.00 OPE. PRESS. kg/cm2g 40.00 PWHT N
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
1 16/11/2022 REVISED AS PER MARK1 PPK SP SS INS. CODE IH TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm 100 TEST PRESS. kg/cm2g 80.17 CLIENT NAME


01/12/2021 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS 1 INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 20 PT or MT % 0 STRESS SYSTEM.NO NA
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-000-PRS-PID-000-0011 (2/7)GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 3/4"-HP-322-02207-D2D-IH 1 PIPE SPEC :D2D
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : HP-322-02207 AREA: EP26-A2 SHT. 2 OF 2 REV. 1
<SECURITY LEVEL2>

3X3/4"NPS <1> 1
N MATERIAL LIST
3/4"NPS
PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
2 PIPE
90°
1 APPDB0SABPG 3/4" PIPE A335GR.P11 SMLS PE ASME B36.10M IBR 16.1 M
74 :S-160
2
CONT.ON FITTINGS
EP26_A2-HP-322-0101_C
E 1808575 2 DECDA0Q1RPG 3/4" 90 DEG ELBOW A182GR.F11CL.2 CL.6000 SW ASME 5
<2> 1 B16.11 IBR
N 2067745

129
EL +112450 S4 VALVES
3
STEM EAST IH-A-667-0.75 3 51031 3/4" GATE VALVE CL.800 A182GR.F11CL.2/HF SW 2
58 BB,OS&Y BY MFR/API 602/ASME B16.11
<3> 1 <5> 1 2 HANDWHEEL IBR
90°
3 108 <4> 1 PIPE SUPPORTS
STEM EAST 01 4 IH 3/4" IH-A-667-0.75 1
58 24 S6
DSC-150-150-P-0.75 5 S2 3/4" S2-150-150-P-0.75 1

1556
0 DEG.
24 6 DSC 3/4" DSC-150-150-P-0.75 1

55
1

634
27 7 IV 3/4" IV-A-550-0.75 1
2
90° 8 IV 3/4" IV-A-700-0.75 2
38
EL +111464 24 9 G3S2 3/4" G3S2-150-150-P-0.75 2
S7
S5 10 G1S2 3/4" G1S2-150-150-P-0.75 1
IV-A-550-0.75
S2-150-150-P-0.75
11 Special 3/4" GS-EP26-017 1

1 1
MISC COMPONENTS

3000
S9 12 SST-D2D 3/4 SPECIALITY ITEM - STEAM TRAP 1
G3S2-150-150-P-0.75
270 DEG.
CUT PIPE LENGTH

PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS


NO (MM) (IN) NO (MM) (IN)
S8
IV-A-700-0.75 <1> 718 3/4 <2> 105 3/4
<3> 108 3/4 <4> 610 3/4
<5> 2731 3/4 <6> 11102 3/4
<7> 234 3/4 <8> 394 3/4

11126

3000
S9
G3S2-150-150-P-0.75
270 DEG.

S8
IV-A-700-0.75

S10
G1S2-150-150-P-0.75
<6> 1

2
90° CLASS: D2D
24 INSUL: 100/IH
CLASS: A2A
2 58 INSUL: 25/IS
24 39
4

171 CONT.ON
12 EP26_A2-LC-322-02208
SST-D2D E 1811636
<7> 1 N 2066415
EL +100313
2 167
90°
EL +100313 <8> 1
S11 3/4"NPS
GS-EP26-017
Isometric File Name : EP26_A2-HP-322-02208
Iso Extraction Date : 2022-11-18 14:02:40

DESIGN TEMP. ºC 450.00 OPE. TEMP. ºC 410.00 PAINT SYSTEM T6 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 44.00 OPE. PRESS. kg/cm2g 40.00 PWHT N
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
1 16/11/2022 REVISED AS PER MARK1 PPK SP SS INS. CODE IH TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm 100 TEST PRESS. kg/cm2g 80.17 CLIENT NAME


01/12/2021 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 20 PT or MT % 0 STRESS SYSTEM.NO NA
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-000-PRS-PID-000-0011 (2/7)GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 3/4"-HP-322-02208-D2D-IH PIPE SPEC :D2D
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : HP-322-02208 AREA: EP26-A2 SHT. 1 OF 1 REV. 1
<SECURITY LEVEL2>

N MATERIAL LIST

PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
PIPE
1 APPDB0SABPG 3/4" PIPE A335GR.P11 SMLS PE ASME B36.10M IBR 4.1 M
:S-160

FITTINGS
2 DECDA0Q1RPG 3/4" 90 DEG ELBOW A182GR.F11CL.2 CL.6000 SW ASME 4
B16.11 IBR

VALVES
3 51031 3/4" GATE VALVE CL.800 A182GR.F11CL.2/HF SW 2
BB,OS&Y BY MFR/API 602/ASME B16.11
HANDWHEEL IBR

PIPE SUPPORTS
4 LH2 3/4" LH2-A-500-350-0.75 1

5 G1S2 3/4" G1S2-150-150-P-0.75 1

2
90° CUT PIPE LENGTH

PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS


NO (MM) (IN) NO (MM) (IN)

1
46 1
<1> 437 3/4 <2> 105 3/4
CONT.ON <3> 106 3/4 <4> 393 3/4
1 HP-322-02209 SHT 2 <5> 1048 3/4 <6> 902 3/4
>
<1 P S <2> 1 <7> 1019 3/4
4 "N
3X3/4"NPS 3/ 3 2
129 STEM EAST 90°
58
<3> 1 50
0
106 3 S4
STEM EAST LH2-A-500-350-0.75
57
1
1 >
> <7 S
NP
<4> 1

<5 <6 "


> 3 /4
1
S5 95 43
9 6 0 10
417

10 G1S2-150-150-P-0.75

CONT.ON
EP26_A2-HP-322-0101_C
E 1808645
N 2084000 2
EL +112450 90°
2
90°
EL +111683
Isometric File Name : EP26_A2-HP-322-02209
Iso Extraction Date : 2022-11-17 11:05:34

DESIGN TEMP. ºC 450.00 OPE. TEMP. ºC 410.00 PAINT SYSTEM T6 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 44.00 OPE. PRESS. kg/cm2g 40.00 PWHT N
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
1 16/11/2022 REVISED AS PER MARK1 PPK SP SS INS. CODE IH TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm 100 TEST PRESS. kg/cm2g 80.17 CLIENT NAME


01/12/2021 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 20 PT or MT % 0 STRESS SYSTEM.NO NA
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-000-PRS-PID-000-0011 (2/7)GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 3/4"-HP-322-02209-D2D-IH 1 PIPE SPEC :D2D
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : HP-322-02209 AREA: EP26-A2 SHT. 1 OF 2 REV. 1
<SECURITY LEVEL2>

N MATERIAL LIST
25 2
90° PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
PIPE
1 APPDB0SABPG 3/4" PIPE A335GR.P11 SMLS PE ASME B36.10M IBR 12.0 M
:S-160
3/4"NPS FITTINGS
SEE SHT
HP-322-02209 SHT 1 2 DECDA0Q1RPG 3/4" 90 DEG ELBOW A182GR.F11CL.2 CL.6000 SW ASME 3

1811
B16.11 IBR

PIPE SUPPORTS
3 DSC 3/4" DSC-150-150-P-0.75 1
S3
DSC-150-150-P-0.75 4 IV 3/4" IV-A-450-0.75 3
180 DEG.
5 G3S2 3/4" G3S2-150-150-P-0.75 3

6 IV 3/4" IV-A-650-0.75 1
25 7 G1S2 3/4" G1S2-150-150-P-0.75 1

8 Special 3/4" GS-EP26-018 1

S4 MISC COMPONENTS
IV-A-450-0.75 9 SST-D2D 3/4 SPECIALITY ITEM - STEAM TRAP 1

2000
CUT PIPE LENGTH
S4
IV-A-450-0.75 PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS
NO (MM) (IN) NO (MM) (IN)
S5 <1> 11321 3/4 <2> 272 3/4
G3S2-150-150-P-0.75 <3> 349 3/4
180 DEG.

2000

S5 11369
G3S2-150-150-P-0.75
180 DEG. S4
IV-A-450-0.75 CLASS: A2A
INSUL: 25/IS
3/4"NPS CLASS: D2D
INSUL: 100/IH
9
3000

171
SST-D2D
CONT.ON
EP26_A2-LC-322-02209 138
1 E 1811589 37 1
3
N 2083594
EL +100313

<3> 1 S7
S6 G1S2-150-150-P-0.75
S8
IV-A-650-0.75
<1> 1

GS-EP26-018 2
90°
1
>
<2
0
32

2
90°
EL +100313 S5
G3S2-150-150-P-0.75
270 DEG.
Isometric File Name : EP26_A2-HP-322-02209
Iso Extraction Date : 2022-11-17 11:05:34

DESIGN TEMP. ºC 450.00 OPE. TEMP. ºC 410.00 PAINT SYSTEM T6 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 44.00 OPE. PRESS. kg/cm2g 40.00 PWHT N
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
1 16/11/2022 REVISED AS PER MARK1 PPK SP SS INS. CODE IH TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm 100 TEST PRESS. kg/cm2g 80.17 CLIENT NAME


01/12/2021 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 20 PT or MT % 0 STRESS SYSTEM.NO NA
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-000-PRS-PID-000-0011 (2/7)GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 3/4"-HP-322-02209-D2D-IH 1 PIPE SPEC :D2D
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : HP-322-02209 AREA: EP26-A2 SHT. 2 OF 2 REV. 1
<SECURITY LEVEL2>

N MATERIAL LIST

PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
PIPE
1 APPDB0SABPG 3/4" PIPE A335GR.P11 SMLS PE ASME B36.10M IBR 4.1 M
:S-160

FITTINGS
2 DECDA0Q1RPG 3/4" 90 DEG ELBOW A182GR.F11CL.2 CL.6000 SW ASME 3
B16.11 IBR

VALVES
3 51031 3/4" GATE VALVE CL.800 A182GR.F11CL.2/HF SW 2
BB,OS&Y BY MFR/API 602/ASME B16.11
HANDWHEEL IBR

PIPE SUPPORTS
4 S2 3/4" S2-150-150-P-0.75 2

5 IH 3/4" IH-A-700-0.75 1

6 LH2 3/4" LH2-A-600-350-0.75 1

2
90° CONT.ON CUT PIPE LENGTH
HP-322-02210 SHT 2
PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS
S6 NO (MM) (IN) NO (MM) (IN)
LH2-A-600-350-0.75
<1> 956 3/4 <2> 176 3/4
<3> 100 3/4 <4> 1248 3/4
S4 <5> 617 3/4 <6> 952 3/4
S2-150-150-P-0.75 1 <6> 1
4> 3/4"NPS
<
3X3/4"NPS CONT.ON

666
EP26_A2-HP-322-0101_C

<5> 1
E 1808575 0
N 2126480 30 7 2 97
6
EL +109450 3 12
STEM NORTH
<1 <3> 1
> S4
1 1
3/
4" <2> 1 72 S2-150-150-P-0.75
NP S5 2
S IH-A-700-0.75 90°
98 EL +108784
0
66

0
20
100
2 66
90° 3
STEM NORTH
Isometric File Name : EP26_A2-HP-322-02210
Iso Extraction Date : 2021-11-27 10:23:51

DESIGN TEMP. ºC 450.00 OPE. TEMP. ºC 410.00 PAINT SYSTEM T6 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 44.00 OPE. PRESS. kg/cm2g 40.00 PWHT N
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
INS. CODE IH TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm 100 TEST PRESS. kg/cm2 g 93.86 CLIENT NAME


01/12/2021 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 20 PT or MT % 0 STRESS SYSTEM.NO NA
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-000-PRS-PID-000-0011 (2/7)GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 3/4"-HP-322-02210-D2D-IH PIPE SPEC :D2D
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : HP-322-02210 AREA: EP25-A2 SHT. 1 OF 2 REV. 0
<SECURITY LEVEL2>

3/4"NPS
N MATERIAL LIST
24 2
90° PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
PIPE
1 APPDB0SABPG 3/4" PIPE A335GR.P11 SMLS PE ASME B36.10M IBR 9.2 M
:S-160

FITTINGS
SEE SHT
HP-322-02210 SHT 1 2 DECDA0Q1RPG 3/4" 90 DEG ELBOW A182GR.F11CL.2 CL.6000 SW ASME 3
B16.11 IBR

PIPE SUPPORTS
3 IV 3/4" IV-A-450-0.75 1

4 G3S2 3/4" G3S2-150-150-P-0.75 2

5 IV 3/4" IV-A-700-0.75 1

3938
6 Special 3/4" GS-EP26-019 1

7 G1S2 3/4" G1S2-150-150-P-0.75 1

MISC COMPONENTS
8 SST-D2D 3/4 SPECIALITY ITEM - STEAM TRAP 1

CUT PIPE LENGTH

PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS


NO (MM) (IN) NO (MM) (IN)

<1> 8423 3/4 <2> 309 3/4


<3> 390 3/4

S3
S4
IV-A-450-0.75
G3S2-150-150-P-0.75
180 DEG.
8471

3000

S4
G3S2-150-150-P-0.75
270 DEG.

S5
IV-A-700-0.75 S7
G1S2-150-150-P-0.75
24
2 CLASS: D2D
<1> 1

90° INSUL: 100/IH


CLASS: A2A
3
24 33 39 INSUL: 25/IS
0
171

8
<2> 1 SST-D2D
CONT.ON
164 EP26_A2-LC-322-02210
2 S6 E 1811636
90° GS-EP26-019 <3> 1 N 2124915
EL +100313 EL +100313
3/4"NPS
Isometric File Name : EP26_A2-HP-322-02210
Iso Extraction Date : 2021-11-27 10:23:51

DESIGN TEMP. ºC 450.00 OPE. TEMP. ºC 410.00 PAINT SYSTEM T6 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 44.00 OPE. PRESS. kg/cm2g 40.00 PWHT N
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
INS. CODE IH TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm 100 TEST PRESS. kg/cm2 g 93.86 CLIENT NAME


01/12/2021 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 20 PT or MT % 0 STRESS SYSTEM.NO NA
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-000-PRS-PID-000-0011 (2/7)GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 3/4"-HP-322-02210-D2D-IH PIPE SPEC :D2D
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : HP-322-02210 AREA: EP25-A2 SHT. 2 OF 2 REV. 0
<SECURITY LEVEL2>

N MATERIAL LIST

PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
PIPE
1 APPDB0SABPG 3/4" PIPE A335GR.P11 SMLS PE ASME B36.10M IBR 5.9 M
:S-160

FITTINGS
2 DECDA0Q1RPG 3/4" 90 DEG ELBOW A182GR.F11CL.2 CL.6000 SW ASME 4
B16.11 IBR

VALVES
3 51031 3/4" GATE VALVE CL.800 A182GR.F11CL.2/HF SW 2
BB,OS&Y BY MFR/API 602/ASME B16.11
HANDWHEEL IBR

PIPE SUPPORTS
4 S2 3/4" S2-150-150-P-0.75 1

3X3/4"NPS
CUT PIPE LENGTH
CONT.ON 2 PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS
EP26_A2-HP-322-0101_C 90° NO (MM) (IN) NO (MM) (IN)
E 1808575
N 2157948 <1> 327 3/4 <2> 101 3/4
35 2 EL +109450 <3> 100 3/4 <4> 593 3/4
<1> 1 1 90°
3/4"NPS MH2-A-600-650-0.75 <5> 2656 3/4 <6> 2045 3/4

3
STEM SOUTH 24 <2> 1

101

66 20
<3> 1 4 <5> 1 <6 93
2 70 >
3 1
100 S4
STEM SOUTH
S2-150-150-P-0.75
66
<4> 1

26
24
24
617

3/4"NPS

2
90°

2
90° CONT.ON
EL +108476 HP-322-02211 SHT 2
Isometric File Name : EP26_A2-HP-322-02211
Iso Extraction Date : 2021-11-27 10:25:17

DESIGN TEMP. ºC 450.00 OPE. TEMP. ºC 410.00 PAINT SYSTEM T6 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 44.00 OPE. PRESS. kg/cm2g 40.00 PWHT N
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
INS. CODE IH TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm 100 TEST PRESS. kg/cm2 g 93.86 CLIENT NAME


01/12/2021 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 20 PT or MT % 0 STRESS SYSTEM.NO NA
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-000-PRS-PID-000-0011 (2/7)GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 3/4"-HP-322-02211-D2D-IH PIPE SPEC :D2D
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : HP-322-02211 AREA: EP25-A2 SHT. 1 OF 2 REV. 0
<SECURITY LEVEL2>

N
SEE SHT MATERIAL LIST
HP-322-02211 SHT 1
PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
PIPE
1 APPDB0SABPG 3/4" PIPE A335GR.P11 SMLS PE ASME B36.10M IBR 8.9 M
3/4"NPS :S-160

FITTINGS
2 DECDA0Q1RPG 3/4" 90 DEG ELBOW A182GR.F11CL.2 CL.6000 SW ASME 2
B16.11 IBR

437
S3 PIPE SUPPORTS
DSC-150-150-P-0.75
3 DSC 3/4" DSC-150-150-P-0.75 1
270 DEG.
4 IV 3/4" IV-A-700-0.75 2
38
5 G3S2 3/4" G3S2-150-150-P-0.75 2

6 IV 3/4" IV-A-450-0.75 1

S4 7 G1S2 3/4" G1S2-150-150-P-0.75 1


IV-A-700-0.75 8 Special 3/4" GS-EP26-020 1

MISC COMPONENTS
9 SST-D2D 3/4 SPECIALITY ITEM - STEAM TRAP 1

3250
CUT PIPE LENGTH
S5 PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS
G3S2-150-150-P-0.75 NO (MM) (IN) NO (MM) (IN)
180 DEG.
<1> 8115 3/4 <2> 309 3/4
<3> 394 3/4

S6
8139

IV-A-450-0.75

3000

S4
IV-A-700-0.75

S5
G3S2-150-150-P-0.75
270 DEG. S7
24 G1S2-150-150-P-0.75
2
90° CLASS: D2D
<1> 1

INSUL: 100/IH
24 3 CLASS: A2A
33 39 INSUL: 25/IS
4

171

<2> 1 9
SST-D2D
168 3/4"NPS
2
90° S8 CONT.ON
EL +100313 GS-EP26-020 EP26_A2-LC-322-02211
<3> 1 E 1811636
N 2154915
Isometric File Name : EP26_A2-HP-322-02211

EL +100313
Iso Extraction Date : 2021-11-27 10:25:17

DESIGN TEMP. ºC 450.00 OPE. TEMP. ºC 410.00 PAINT SYSTEM T6 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 44.00 OPE. PRESS. kg/cm2g 40.00 PWHT N
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
INS. CODE IH TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm 100 TEST PRESS. kg/cm2 g 93.86 CLIENT NAME


01/12/2021 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 20 PT or MT % 0 STRESS SYSTEM.NO NA
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-000-PRS-PID-000-0011 (2/7)GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 3/4"-HP-322-02211-D2D-IH PIPE SPEC :D2D
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : HP-322-02211 AREA: EP25-A2 SHT. 2 OF 2 REV. 0
<SECURITY LEVEL2>

N MATERIAL LIST

PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
PIPE
1 APPDB0SABPG 3/4" PIPE A335GR.P11 SMLS PE ASME B36.10M IBR 4.6 M
:S-160

FITTINGS
2 DECDA0Q1RPG 3/4" 90 DEG ELBOW A182GR.F11CL.2 CL.6000 SW ASME 3
B16.11 IBR

VALVES
3 51031 3/4" GATE VALVE CL.800 A182GR.F11CL.2/HF SW 2
BB,OS&Y BY MFR/API 602/ASME B16.11
HANDWHEEL IBR
CONT.ON
PIPE SUPPORTS
EP26_A2-HP-322-0101_C
E 1808575 4 LH2 3/4" LH2-A-400-500-0.75 1
N 1990150
5 S2 3/4" S2-150-150-P-0.75 1
EL +112450
6 IH 3/4" IH-A-600-0.75 1
2 7 G1S2 3/4" G1S2-150-150-P-0.75 1
90°

<1 12 CUT PIPE LENGTH


>

6
3X3/4"NPS 49 S6

12
1 <5> 1
3/ IH-A-600-0.75 PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS
4" NO (MM) (IN) NO (MM) (IN)
NP
S

89
<1> 1225 3/4 <2> 105 3/4
2 <3> 108 3/4 <4> 330 3/4
90° <5> 2646 3/4 <6> 102 3/4
<6> 1
S4 3/4"NPS
LH2-A-400-500-0.75
129

89
95
26
<2> 1
58 CONT.ON
3 HP-322-02212 SHT 2
STEM EAST 108 26
21
<3> 1
58 S7
3 G1S2-150-150-P-0.75
STEM EAST
354
<4> 1

0
30
S5
S2-150-150-P-0.75
2
90°
EL +111743
Isometric File Name : EP26_A2-HP-322-02212
Iso Extraction Date : 2022-11-17 11:06:43

DESIGN TEMP. ºC 450.00 OPE. TEMP. ºC 410.00 PAINT SYSTEM T6 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 44.00 OPE. PRESS. kg/cm2g 40.00 PWHT N
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
1 16/11/2022 REVISED AS PER MARK1 PPK SP SS INS. CODE IH TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm 100 TEST PRESS. kg/cm2g 80.13 CLIENT NAME


01/12/2021 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 20 PT or MT % 0 STRESS SYSTEM.NO NA
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-000-PRS-PID-000-0011 (2/7)GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 3/4"-HP-322-02212-D2D-IH PIPE SPEC :D2D
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : HP-322-02212 AREA: EP26-A2 1 SHT. 1 OF 2 REV. 1
<SECURITY LEVEL2>

N MATERIAL LIST
3/4"NPS
PT| SIZE
2 NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
45° 15 SEE SHT
EL +111643 HP-322-02212 SHT 1 PIPE

16 1 APPDB0SABPG 3/4" PIPE A335GR.P11 SMLS PE ASME B36.10M IBR 12.0 M


:S-160

0.3° 11 FITTINGS
2 DEDDA0Q1RPG 3/4" 45 DEG ELBOW A182GR.F11CL.2 CL.6000 SW ASME 1
B16.11 IBR
11 3 DECDA0Q1RPG 3/4" 90 DEG ELBOW A182GR.F11CL.2 CL.6000 SW ASME 2
S4
B16.11 IBR
DSC-150-150-P-0.75

1756
180 DEG. PIPE SUPPORTS
4 DSC 3/4" DSC-150-150-P-0.75 1

5 IV 3/4" IV-A-450-0.75 1

1 6 IV 3/4" IV-A-700-0.75 2

25 7 G3S2 3/4" G3S2-150-150-P-0.75 2

8 G1S2 3/4" G1S2-150-150-P-0.75 1

9 Special 3/4" GS-EP26-053 1

S5 MISC COMPONENTS
IV-A-450-0.75 10 SST-D2D 3/4 SPECIALITY ITEM - STEAM TRAP 1

3000
S7
G3S2-150-150-P-0.75
270 DEG. CUT PIPE LENGTH

PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS


NO (MM) (IN) NO (MM) (IN)

<1> 11290 3/4 <2> 302 3/4


S6 <3> 390 3/4
11314 IV-A-700-0.75

3000

S7
G3S2-150-150-P-0.75
270 DEG.

S6
IV-A-700-0.75
<1> 1

S9
GS-EP26-053
CLASS: D2D
3 INSUL: 100/IH
90° CLASS: A2A
0 41 INSUL: 25/IS
35 5
171 CONT.ON
EP26_A2-LC-322-02212
E 1811619
18 N 1988415
8 EL +100313
3
90°
EL +100313 <2> 1
<3> 1
S8 3/4"NPS
10
G1S2-150-150-P-0.75
SST-D2D
Isometric File Name : EP26_A2-HP-322-02212
Iso Extraction Date : 2022-11-17 11:06:43

DESIGN TEMP. ºC 450.00 OPE. TEMP. ºC 410.00 PAINT SYSTEM T6 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 44.00 OPE. PRESS. kg/cm2g 40.00 PWHT N
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
1 16/11/2022 REVISED AS PER MARK1 PPK SP SS INS. CODE IH TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm 100 TEST PRESS. kg/cm2g 80.13 CLIENT NAME


01/12/2021 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 20 PT or MT % 0 STRESS SYSTEM.NO NA
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-000-PRS-PID-000-0011 (2/7)GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 3/4"-HP-322-02212-D2D-IH PIPE SPEC :D2D
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : HP-322-02212 AREA: EP26-A2 1 SHT. 2 OF 2 REV. 1
<SECURITY LEVEL2>

N MATERIAL LIST

PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
PIPE
1 APPTB0SBB 8" PIPE A106GR.B SMLS BE ASME B36.10M :S-STD 33.3 M

2 APPTB0SAB 3/4" PIPE A106GR.B SMLS PE ASME B36.10M :S-160 0.2 M

E 1807580 FITTINGS
N 1971306 3 DHDTA0Q1R 8X3/4" HALF COUPLING A105 CL.6000 SW ASME B16.11 1
EL +120021
4 DEATB0S2Q 8" 90 DEG ELBOW A234GR.WPB SMLS BW ASME B16.9 2
:S-STD
6
CONT.ON F5 G9 B10 FLANGES
EP26_A2-IA-331-0101_B
E 1807580 <4> 2 5 CFATA0DBJ 3/4" FLANGE SW A105 CL.150 RF ASME B16.5 :S-160 1
N 1976750 6 CDBTA0DBJ 3/4" BLIND FLANGE A105 CL.150 RF ASME B16.5 1
EL +115610

106
VALVES
<3> 2 7
STEM NORTH 7 51001 3/4" GATE VALVE CL.800 A105/HF SW BB,OS&Y BY 1
MFR/API 602/ASME B16.11 HANDWHEEL
68
PIPE SUPPORTS
4 100
90° 8 G1 8" G1-8 4
EL +119610
505 3 PT| SIZE
8X3/4"NPS NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
135 GASKETS
4000

3406
8"NPS 38 9 FFG121000DACA 3/4" NON-ASBESTOS SHEET GASKET (G121) CL.150 FF 1
<2> 1

50 2.0 MM ASME B16.20

BOLTS

49 S8 90 S8 10 EBEBB0A 1/2 " STUD BOLT(FULL THREADED)/HEX.NUT(HEAVY) 4


39 00 G1-8 A193GR.B7/A194GR.2H ASME B18.2.1/ASME
G1-8 B18.2.2 - 65 mm Length

S8 CUT PIPE LENGTH


G1-8
PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS
<1> 1 4 NO (MM) (IN) NO (MM) (IN)
90°
25
01 <1> 4634 8 <2> 3390 8
3 <3> 100 3/4 <4> 100 3/4
90 <5> 25213 8
00

S8
G1-8
<5
>
8" 1
NP
S

CONT.ON
IA-331-0101_A SHT 2
Isometric File Name : EP26_A2-IA-331-0101_A
Iso Extraction Date : 2021-11-27 10:28:09

DESIGN TEMP. ºC 65.00 OPE. TEMP. ºC 45.00 PAINT SYSTEM T1 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 13.00 OPE. PRESS. kg/cm2g 7.00 PWHT N
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
INS. CODE N TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm - TEST PRESS. kg/cm2 g 19.5 CLIENT NAME


01/12/2021 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 5 PT or MT % 0 STRESS SYSTEM.NO NC
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-331-PRS-PID-000-0002 GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 8"-IA-331-0101_A-A3A PIPE SPEC :A3A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : IA-331-0101_A AREA: EP26-A2 SHT. 1 OF 2 REV. 0
<SECURITY LEVEL2>

N MATERIAL LIST
305
PT| SIZE
SEE SHT NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
IA-331-0101_A SHT 1
PIPE
1 APPTB0SBB 8" PIPE A106GR.B SMLS BE ASME B36.10M :S-STD 7.7 M

4 2 APPTB0SAB 3/4" PIPE A106GR.B SMLS PE ASME B36.10M :S-160 0.2 M


90°
FITTINGS
8"NPS 3 DHDTA0Q1R 8X3/4" HALF COUPLING A105 CL.6000 SW ASME B16.11 1

4 DEATB0S2Q 8" 90 DEG ELBOW A234GR.WPB SMLS BW ASME B16.9 2


:S-STD

FLANGES
5 CFATA0DBJ 3/4" FLANGE SW A105 CL.150 RF ASME B16.5 :S-160 1

6 CDBTA0DBJ 3/4" BLIND FLANGE A105 CL.150 RF ASME B16.5 1

VALVES
7 51001 3/4" GATE VALVE CL.800 A105/HF SW BB,OS&Y BY 1
MFR/API 602/ASME B16.11 HANDWHEEL

4000
<1> 1 PIPE SUPPORTS
8 G1 8" G1-8 1

PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
GASKETS
9 FFG121000DACA 3/4" NON-ASBESTOS SHEET GASKET (G121) CL.150 FF 1
2.0 MM ASME B16.20

BOLTS
10 EBEBB0A 1/2 " STUD BOLT(FULL THREADED)/HEX.NUT(HEAVY) 4
A193GR.B7/A194GR.2H ASME B18.2.1/ASME
B18.2.2 - 65 mm Length

CUT PIPE LENGTH

PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS


NO (MM) (IN) NO (MM) (IN)

50 <1> 3390 8 <2> 100 3/4


4 0 <3> 100 3/4 <4> 4284 8
90° S8
EL +115610 G1-8

3
8X3/4"NPS 135
58
8
100

<2> 2 7 40
STEM NORTH 89

<4
>
68 1
F5 G9 B10
106

6
CONT.ON
E 1807580 EP26_A1-IA-331-0101
N 1945489 <3> 2 E 1807580
EL +115198 N 1941400
EL +115610
Isometric File Name : EP26_A2-IA-331-0101_A
Iso Extraction Date : 2021-11-27 10:28:09

DESIGN TEMP. ºC 65.00 OPE. TEMP. ºC 45.00 PAINT SYSTEM T1 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 13.00 OPE. PRESS. kg/cm2g 7.00 PWHT N
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
INS. CODE N TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm - TEST PRESS. kg/cm2 g 19.5 CLIENT NAME


01/12/2021 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 5 PT or MT % 0 STRESS SYSTEM.NO NC
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-331-PRS-PID-000-0002 GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 8"-IA-331-0101_A-A3A PIPE SPEC :A3A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : IA-331-0101_A AREA: EP26-A2 SHT. 2 OF 2 REV. 0
<SECURITY LEVEL2>

N MATERIAL LIST

PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
PIPE
1 APPTB0SBB 8" PIPE A106GR.B SMLS BE ASME B36.10M :S-STD 8.1 M

2 APPTB0SBB 4" PIPE A106GR.B SMLS BE ASME B36.10M :S-STD 0.8 M

PIPE SUPPORTS
3 G1 8" G1-8 1

CONT.ON CUT PIPE LENGTH


EP26_A2-IA-331-0101_C
E 1807580 PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS
N 1984800 NO (MM) (IN) NO (MM) (IN)
EL +115610
<1> 702 4 <2> 8050 8

<2
>
1

S3
G1-8
CONT.ON
49 4"NPS EP26_A2-IA-331-0216
60
E 1807580
90° N 1979840
EL +116405
45
60

<1> 2

796
8X4"NPS
30
89

8"
NP
S
CONT.ON
EP26_A2-IA-331-0101_A
E 1807580
N 1976750
EL +115610
Isometric File Name : EP26_A2-IA-331-0101_B
Iso Extraction Date : 2022-06-17 16:31:52

DESIGN TEMP. ºC 65.00 OPE. TEMP. ºC 45.00 PAINT SYSTEM T1 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 13.00 OPE. PRESS. kg/cm2g 7.00 PWHT N
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
INS. CODE N TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm - TEST PRESS. kg/cm2 g 19.5 CLIENT NAME


15/06/2022 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 5 PT or MT % 0 STRESS SYSTEM.NO NA
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-331-PRS-PID-000-0002 GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 8"-IA-331-0101_B-A3A PIPE SPEC :A3A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : IA-331-0101_B AREA: EP26-A2 SHT. 1 OF 1 REV. 0
<SECURITY LEVEL2>

N MATERIAL LIST

PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
PIPE
1 APPTB0SBB 8" PIPE A106GR.B SMLS BE ASME B36.10M :S-STD 2.4 M
CONT.ON
EP26_A3-IA-331-0101 2 APPTB0SBB 6" PIPE A106GR.B SMLS BE ASME B36.10M :S-STD 102.9 M
E 1807580
3 APPTB0SAB 3/4" PIPE A106GR.B SMLS PE ASME B36.10M :S-160 0.2 M
N 2083090
EL +123584 FITTINGS
229 4 DRBTB0S2Q 8X6" ECC REDUCER A234GR.WPB SMLS BW ASME B16.9 1
:S-STD x S-STD
5 DHDTA0Q1R 6X3/4" HALF COUPLING A105 CL.6000 SW ASME B16.11 1

6 DEATB0S2Q 6" 90 DEG ELBOW A234GR.WPB SMLS BW ASME B16.9 2


6 :S-STD
6"NPS 90°
<5> 2 EL +123584 FLANGES
8000

7 CFATA0DBJ 3/4" FLANGE SW A105 CL.150 RF ASME B16.5 :S-160 1

8 CDBTA0DBJ 3/4" BLIND FLANGE A105 CL.150 RF ASME B16.5 1

S12 VALVES
6323

G1TR1-0-800-6 9 51001 3/4" GATE VALVE CL.800 A105/HF SW BB,OS&Y BY 1


MFR/API 602/ASME B16.11 HANDWHEEL
6
90° PIPE SUPPORTS
<4 5
> 6X3/4"NPS 10 G1 6" G1-6 7
2 S10
EL +115584 G1-6 11 F1 6" F1-6 1
S10 39 12
G1-6 0 00 12 G1TR1 6" G1TR1-0-800-6 1
0 S10 1
210 G1-6 PT| SIZE
12 NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
00
0 S10 GASKETS

G1-6 13 FFG121000DACA 3/4" NON-ASBESTOS SHEET GASKET (G121) CL.150 FF 1


68 12 2.0 MM ASME B16.20
<2> 3 00
0 BOLTS
106
14 EBEBB0A 1/2 " STUD BOLT(FULL THREADED)/HEX.NUT(HEAVY) 4
<3> 3 A193GR.B7/A194GR.2H ASME B18.2.1/ASME
12 B18.2.2 - 65 mm Length
F7 G13 B14 00
8 0
E 1807580 9
STEM NORTH
N 2082471 CUT PIPE LENGTH
EL +115198 12
00
0 PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS
95 NO (MM) (IN) NO (MM) (IN)
12
7 12 <1> 2391 8 <2> 100 3/4
00
S10 0 <3> 100 3/4 <4> 95288 6
<5> 7542 6
G1-6
12
00 152 1
S11 0
F1-6 71
57 4
8X6"NPS
S10 25MM OFFSET
G1-6 FLAT SIDE D
<1> 1
S10 8"NPS
G1-6

23
91
CONT.ON
EP26_A2-IA-331-0101_B
E 1807580
N 1984800
EL +115610
Isometric File Name : EP26_A2-IA-331-0101_C
Iso Extraction Date : 2022-08-19 12:34:05

DESIGN TEMP. ºC 65.00 OPE. TEMP. ºC 45.00 PAINT SYSTEM T1 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 13.00 OPE. PRESS. kg/cm2g 7.00 PWHT N
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
1 17-08-2022 REVISED AS PER MARK1 PPK SP SS INS. CODE N TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm - TEST PRESS. kg/cm2g 19.5 CLIENT NAME


01/12/2021 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 5 PT or MT % 0 STRESS SYSTEM.NO NC
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-331-PRS-PID-000-0002 GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 8"-IA-331-0101_C-A3A PIPE SPEC :A3A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : IA-331-0101_C AREA: EP26-A2 SHT. 1 OF 1 REV. 1
<SECURITY LEVEL2>

N MATERIAL LIST

PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
PIPE
1 APPTB0SBB 4" PIPE A106GR.B SMLS BE ASME B36.10M :S-STD 5.5 M

2 APPTB0SAB 3/4" PIPE A106GR.B SMLS PE ASME B36.10M :S-160 0.3 M

FITTINGS
3 DHDTA0Q1R 4X3/4" HALF COUPLING A105 CL.6000 SW ASME B16.11 1

4 DEATB0S2Q 4" 90 DEG ELBOW A234GR.WPB SMLS BW ASME B16.9 1


4 :S-STD
90°
FLANGES
EL +116557
5 CFATA0DBJ 3/4" FLANGE SW A105 CL.150 RF ASME B16.5 :S-160 1

0 6 CDBTA0DBJ 3/4" BLIND FLANGE A105 CL.150 RF ASME B16.5 1


MH2-F-800-1054-4 58
VALVES
7 51001 3/4" GATE VALVE CL.800 A105/HF SW BB,OS&Y BY 1
152 MFR/API 602/ASME B16.11 HANDWHEEL

PIPE SUPPORTS
8 G1 4" G1-4 1
4"NPS
PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
CONT.ON GASKETS
EP26_A2-IA-331-0101_B 9 FFG121000DACA 3/4" NON-ASBESTOS SHEET GASKET (G121) CL.150 FF 1
E 1807580 2.0 MM ASME B16.20
N 1979840
00 EL +116405 BOLTS
40
10 EBEBB0A 1/2 " STUD BOLT(FULL THREADED)/HEX.NUT(HEAVY) 4
A193GR.B7/A194GR.2H ASME B18.2.1/ASME
E 1802500 B18.2.2 - 65 mm Length
N 1979840
EL +116917
80
6 50 CUT PIPE LENGTH
F5 G9 B10
PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS
<2> 2
NO (MM) (IN) NO (MM) (IN)

<1> 2 <1> 100 3/4 <2> 103 3/4


<3> 5428 4
109

7
STEM EAST
66
S8
331-TP-91-001
183

3 G1-4
4X3/4"NPS
1
>
<3
0
50
CONT.ON
EPCC-07-4"-IA-331-9102-A3A
E 1802000
N 1979840
EL +116557
Isometric File Name : EP26_A2-IA-331-0216
Iso Extraction Date : 2022-06-17 16:33:03

DESIGN TEMP. ºC 65.00 OPE. TEMP. ºC 45.00 PAINT SYSTEM T1 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 13.00 OPE. PRESS. kg/cm2g 7.00 PWHT N
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
INS. CODE N TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm - TEST PRESS. kg/cm2 g 19.50 CLIENT NAME


15/06/2022 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 5 PT or MT % 0 STRESS SYSTEM.NO NA
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-331-PRS-PID-000-0002 GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 4"-IA-331-0216-A3A PIPE SPEC :A3A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : IA-331-0216 AREA: EP26-A2 SHT. 1 OF 1 REV. 0
<SECURITY LEVEL2>

4
N MATERIAL LIST
90° 381
EL +117286 PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
PIPE
1 APPTB0SBBPG 10" PIPE A106GR.B SMLS BE ASME B36.10M IBR :S-STD 9.7 M

10"NPS 2 APPTB0SABPG 3/4" PIPE A106GR.B SMLS PE ASME B36.10M IBR :S-160 0.2 M

FITTINGS
CONT.ON
LC-322-0312_A SHT 2 3 DHDTA0Q1RPG 10X3/4" HALF COUPLING A105 CL.6000 SW ASME B16.11 IBR 1

4 DEATB0S2QPG 10" 90 DEG ELBOW A234GR.WPB SMLS BW ASME B16.9 2


IBR :S-STD

FLANGES
5 CFATA0DBJPG 3/4" FLANGE SW A105 CL.150 RF ASME B16.5 IBR 1
:S-160
6 CDBTA0DBJPG 3/4" BLIND FLANGE A105 CL.150 RF ASME B16.5 IBR 1

10"NPS GASKETS
7 FFG213ACADBHA 3/4" SPIRAL WOUND GASKET (G213ACA) CL.150 RF 4.5 1
MM ASME B16.20

VALVES
8 51002 3/4" GATE VALVE CL.800 A105/HF SW BB,OS&Y BY 1
MFR/API 602/ASME B16.11 HANDWHEEL IBR

PIPE SUPPORTS

<4> 1
56 9 G1S2 10" G1S2-300-150-10 1
38 61
50
PT| SIZE

4500
CONT.ON
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
EP26_A2-LC-322-0312_B
E 1804973 BOLTS
N 1976750 10 EBEBB0A 1/2 " STUD BOLT(FULL THREADED)/HEX.NUT(HEAVY) 4
EL +112787 A193GR.B7/A194GR.2H ASME B18.2.1/ASME
B18.2.2 - 65 mm Length

CUT PIPE LENGTH

PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS


NO (MM) (IN) NO (MM) (IN)

<1> 100 3/4 <2> 100 3/4


S9 <3> 5880 10 <4> 3738 10
G1S2-300-150-10

60
0
<3
>
3 1
10X3/4"NPS

162 4

100
90°
<1> 2
8
STEM SOUTH
68
F5 G7 B10

106
6
E 1804973
N 1971089 <2> 2
EL +112346
Isometric File Name : EP26_A2-LC-322-0312_A
Iso Extraction Date : 2021-11-27 11:06:56

DESIGN TEMP. ºC 320.00 OPE. TEMP. ºC 120.00 PAINT SYSTEM T4 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 7.00 OPE. PRESS. kg/cm2g 5.00 PWHT N
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
INS. CODE IH TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm 25 TEST PRESS. kg/cm2 g 11.80 CLIENT NAME


01/12/2021 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 10 PT or MT % 0 STRESS SYSTEM.NO 6405-EPCM25_26-CA-0053
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-371-PRS-PID-000-0001 GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 10"-LC-322-0312_A-A2A-IH PIPE SPEC :A2A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : LC-322-0312_A AREA: EP26-A2 SHT. 1 OF 2 REV. 0
<SECURITY LEVEL2>

N MATERIAL LIST

PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
SEE SHT
PIPE
LC-322-0312_A SHT 1 S9
1 APPTB0SBBPG 10" PIPE A106GR.B SMLS BE ASME B36.10M IBR :S-STD 31.7 M
S2-300-150-10
22 2 APPTB0SABPG 3/4" PIPE A106GR.B SMLS PE ASME B36.10M IBR :S-160 0.2 M
08
10 FITTINGS
"N
PS S10 3 DHDTA0Q1RPG 10X3/4" HALF COUPLING A105 CL.6000 SW ASME B16.11 IBR 1
45 G1S2-300-150-10
00 4 DEATB0S2QPG 10" 90 DEG ELBOW A234GR.WPB SMLS BW ASME B16.9 2
IBR :S-STD

FLANGES
5 CFATA0DBJPG 3/4" FLANGE SW A105 CL.150 RF ASME B16.5 IBR 1
:S-160
45 S9 6 CDBTA0DBJPG 3/4" BLIND FLANGE A105 CL.150 RF ASME B16.5 IBR 1
00 S2-300-150-10
GASKETS
E 1804973 7 FFG213ACADBHA 3/4" SPIRAL WOUND GASKET (G213ACA) CL.150 RF 4.5 1
N 1947861 MM ASME B16.20
EL +117727
VALVES
45
00 8 51002 3/4" GATE VALVE CL.800 A105/HF SW BB,OS&Y BY 1
6 MFR/API 602/ASME B16.11 HANDWHEEL IBR
22 F5 G7 B12
24
7 <2> 2 PIPE SUPPORTS
9 S2 10" S2-300-150-10 3
45
00

106
10 G1S2 10" G1S2-300-150-10 2
8
STEM NORTH 11 F1S5 10" F1S5-500-150-10 1

S10 PT| SIZE


G1S2-300-150-10 3 NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
67 10X3/4"NPS BOLTS
S9
S2-300-150-10 12 EBEBB0A 1/2 " STUD BOLT(FULL THREADED)/HEX.NUT(HEAVY) 4
100 A193GR.B7/A194GR.2H ASME B18.2.1/ASME
<3 B18.2.2 - 65 mm Length
> 4
<1> 2 1
90°
CUT PIPE LENGTH
162 55
0
PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS
NO (MM) (IN) NO (MM) (IN)

<1> 100 3/4 <2> 100 3/4


<3> 22416 10 <4> 3738 10
<5> 5530 10

<4> 1
4500
CONT.ON
EP26_A1-LC-322-0312
4 E 1804973
90° N 1941400
EL +112787 EL +112787
24
11

<5
S11 >
1
F1S5-500-150-10 59 10"NPS
11
Isometric File Name : EP26_A2-LC-322-0312_A
Iso Extraction Date : 2021-11-27 11:06:56

DESIGN TEMP. ºC 320.00 OPE. TEMP. ºC 120.00 PAINT SYSTEM T4 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 7.00 OPE. PRESS. kg/cm2g 5.00 PWHT N
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
INS. CODE IH TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm 25 TEST PRESS. kg/cm2 g 11.80 CLIENT NAME


01/12/2021 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 10 PT or MT % 0 STRESS SYSTEM.NO 6405-EPCM25_26-CA-0053
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-371-PRS-PID-000-0001 GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 10"-LC-322-0312_A-A2A-IH PIPE SPEC :A2A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : LC-322-0312_A AREA: EP26-A2 SHT. 2 OF 2 REV. 0
<SECURITY LEVEL2>

N MATERIAL LIST

PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
PIPE
1 APPTB0SBBPG 10" PIPE A106GR.B SMLS BE ASME B36.10M IBR :S-STD 8.1 M

2 APPTB0SBBPG 4" PIPE A106GR.B SMLS BE ASME B36.10M IBR :S-STD 1.2 M

PIPE SUPPORTS
3 S2 10" S2-300-150-10 1

4 G1S2 10" G1S2-300-150-10 1


CONT.ON
EP26_A2-LC-322-0312_C
E 1804973 CUT PIPE LENGTH
N 1984800
EL +112787 PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS
NO (MM) (IN) NO (MM) (IN)

<1> 1145 4 <2> 8050 10


90°
4"NPS

<2> 1
S4 CONT.ON
G1S2-300-150-10 EP26_A2-LC-322-0336
41 E 1804973
50 N 1980650

<1> 2
EL +114055

1269
37
50

10X4"NPS

38
99

S3
S2-300-150-10

16
50

10
"N
PS

CONT.ON
EP26_A2-LC-322-0312_A
E 1804973
N 1976750
EL +112787
Isometric File Name : EP26_A2-LC-322-0312_B
Iso Extraction Date : 2022-06-17 16:34:30

DESIGN TEMP. ºC 320.00 OPE. TEMP. ºC 120.00 PAINT SYSTEM T4 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 7.00 OPE. PRESS. kg/cm2g 5.00 PWHT N
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
INS. CODE IH TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm 25 TEST PRESS. kg/cm2 g 11.80 CLIENT NAME


15/06/2022 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 10 PT or MT % 0 STRESS SYSTEM.NO 6405-EPCM25_26-CA-0053
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-371-PRS-PID-000-0001 GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 10"-LC-322-0312_B-A2A-IH PIPE SPEC :A2A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : LC-322-0312_B AREA: EP26-A2 SHT. 1 OF 1 REV. 0
<SECURITY LEVEL2>

N MATERIAL LIST
E 1811648
N 1993580 PT| SIZE
EL +114493 NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
PIPE
1 APPTB0SBBPG 10" PIPE A106GR.B SMLS BE ASME B36.10M IBR :S-STD 4.1 M

8 2 APPTB0SBBPG 6" PIPE A106GR.B SMLS BE ASME B36.10M IBR :S-STD 13.3 M

106
3 APPTB0SABPG 3/4" PIPE A106GR.B SMLS PE ASME B36.10M IBR :S-160 0.2 M

6 F7 G9 B14 FITTINGS
90°
<6> 3 4 DRBTB0S2QPG 10X6" ECC REDUCER A234GR.WPB SMLS BW ASME B16.9 IBR 1
:S-STD x S-STD
6"NPS 68
<7 10 5 DHDTA0Q1RPG 6X3/4" HALF COUPLING A105 CL.6000 SW ASME B16.11 IBR 1
> STEM NORTH
2

210
6 DEATB0S2QPG 6" 90 DEG ELBOW A234GR.WPB SMLS BW ASME B16.9 4
CONT.ON IBR :S-STD
LC-322-0312_C SHT 2 <5> 3
FLANGES
22
40 5 7 CFATA0DBJPG 3/4" FLANGE SW A105 CL.150 RF ASME B16.5 IBR 1
6X3/4"NPS :S-160
229 8 CDBTA0DBJPG 3/4" BLIND FLANGE A105 CL.150 RF ASME B16.5 IBR 1

GASKETS
400 6 9 FFG213ACADBHA 3/4" SPIRAL WOUND GASKET (G213ACA) CL.150 RF 4.5 1
90° MM ASME B16.20

VALVES
S13 0 <4> 2
S2-300-150-6 4 00 10 51002 3/4" GATE VALVE CL.800 A105/HF SW BB,OS&Y BY 1
MFR/API 602/ASME B16.11 HANDWHEEL IBR
S13
6 S2-300-150-6 PIPE SUPPORTS

90° 11 S2 10" S2-300-150-10 1


7 5
EL +114104 66 12 G1S2 6" G1S2-300-150-6 1
7
2 02 13 S2 6" S2-300-150-6 2

PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
BOLTS
1 14 EBEBB0A 1/2 " STUD BOLT(FULL THREADED)/HEX.NUT(HEAVY) 4
1370

A193GR.B7/A194GR.2H ASME B18.2.1/ASME


B18.2.2 - 65 mm Length
<3> 2

CUT PIPE LENGTH


S12
G1S2-300-150-6 PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS
NO (MM) (IN) NO (MM) (IN)

<2 <1> 4004 10 <2> 3969 6


>
6 2 <3> 912 6 <4> 6217 6
90° 178 <5> 100 3/4 <6> 100 3/4
EL +112734 25 <7> 2182 6
18

41 <1> 1 1
98
S11
S2-300-150-10

37 CONT.ON
4 00 EP26_A2-LC-322-0312_B
10X6"NPS E 1804973
52MM OFFSET N 1984800
FLAT SIDE D EL +112787
40
04
10"NPS
Isometric File Name : EP26_A2-LC-322-0312_C
Iso Extraction Date : 2022-08-19 12:35:16

DESIGN TEMP. ºC 320.00 OPE. TEMP. ºC 120.00 PAINT SYSTEM T4 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 7.00 OPE. PRESS. kg/cm2g 5.00 PWHT N
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
1 17-08-2022 REVISED AS PER MARK1 PPK SP SS INS. CODE IH TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm 25 TEST PRESS. kg/cm2g 11.80 CLIENT NAME


01/12/2021 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 10 PT or MT % 0 STRESS SYSTEM.NO 6405-EPCM25_26-CA-0053
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-371-PRS-PID-000-0001 GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 10"-LC-322-0312_C-A2A-IH PIPE SPEC :A2A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : LC-322-0312_C AREA: EP26-A2 SHT. 1 OF 4 REV. 1
<SECURITY LEVEL2>

N MATERIAL LIST

PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
PIPE
1 APPTB0SBBPG 6" PIPE A106GR.B SMLS BE ASME B36.10M IBR :S-STD 82.1 M

2 APPTB0SABPG 3/4" PIPE A106GR.B SMLS PE ASME B36.10M IBR :S-160 0.2 M

FITTINGS
3 DHDTA0Q1RPG 6X3/4" HALF COUPLING A105 CL.6000 SW ASME B16.11 IBR 1
CONT.ON
LC-322-0312_C SHT 3 4 DEATB0S2QPG 6" 90 DEG ELBOW A234GR.WPB SMLS BW ASME B16.9 2
IBR :S-STD

FLANGES
5 CFATA0DBJPG 3/4" FLANGE SW A105 CL.150 RF ASME B16.5 IBR 1
S13 :S-160
G1S2-400-150-6 6 CDBTA0DBJPG 3/4" BLIND FLANGE A105 CL.150 RF ASME B16.5 IBR 1

GASKETS
S12
S2-400-150-6 7 FFG213ACADBHA 3/4" SPIRAL WOUND GASKET (G213ACA) CL.150 RF 4.5 1
MM ASME B16.20
<5> 1
VALVES
S13 S9 8 51002 3/4" GATE VALVE CL.800 A105/HF SW BB,OS&Y BY 1
G1S2-400-150-6 S2-300-150-6
60 SEE SHT MFR/API 602/ASME B16.11 HANDWHEEL IBR
00
LC-322-0312_C SHT 1 PIPE SUPPORTS
60 S11
3000 00 F1S5-500-150-6 9 S2 6" S2-300-150-6 6
60 10 G1S2 6" G1S2-300-150-6 6
00 419 6"NPS
74
60 73 4000 11 F1S5 6" F1S5-500-150-6 1
S10 00 1
G1S2-300-150-6 12 S2 6" S2-400-150-6 1
60 S10
S10 00 G1S2-300-150-6 13 G1S2 6" G1S2-400-150-6 2
G1S2-300-150-6
60 <1> 1
PT| SIZE
00 NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
S9 6000 4 6
S2-300-150-6 4 64 BOLTS
60 S10 S9 14 EBEBB0A 1/2 " STUD BOLT(FULL THREADED)/HEX.NUT(HEAVY) 4
S10 00 90°
G1S2-300-150-6 S2-300-150-6 A193GR.B7/A194GR.2H ASME B18.2.1/ASME
G1S2-300-150-6 6000 B18.2.2 - 65 mm Length
S9
S10
S2-300-150-6
G1S2-300-150-6 6000

<2> 1
CUT PIPE LENGTH
S9 60
00 PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS

1370
S2-300-150-6 40 NO (MM) (IN) NO (MM) (IN)
0
S9 <1> 6217 6 <2> 912 6
<3> 100 3/4 <4> 100 3/4
S2-300-150-6 <5> 74902 6
4
3000 90°
1280 EL +112734
<3> 2 1

210
3
6X3/4"NPS
8 68
STEM SOUTH
106
<4> 2
F5 G7 B14
6

E 1804973
N 1996220
EL +112346 1
Isometric File Name : EP26_A2-LC-322-0312_C
Iso Extraction Date : 2022-08-19 12:35:16

DESIGN TEMP. ºC 320.00 OPE. TEMP. ºC 120.00 PAINT SYSTEM T4 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 7.00 OPE. PRESS. kg/cm2g 5.00 PWHT N
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
1 17-08-2022 REVISED AS PER MARK1 PPK SP SS INS. CODE IH TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm 25 TEST PRESS. kg/cm2g 11.80 CLIENT NAME


01/12/2021 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 10 PT or MT % 0 STRESS SYSTEM.NO 6405-EPCM25_26-CA-0053
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-371-PRS-PID-000-0001 GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 10"-LC-322-0312_C-A2A-IH PIPE SPEC :A2A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : LC-322-0312_C AREA: EP26-A2 SHT. 2 OF 4 REV. 1
<SECURITY LEVEL2>

N MATERIAL LIST

PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
E 1811648 PIPE
N 2071555
EL +114493 1 APPTB0SBBPG 6" PIPE A106GR.B SMLS BE ASME B36.10M IBR :S-STD 15.6 M

2 APPTB0SABPG 3/4" PIPE A106GR.B SMLS PE ASME B36.10M IBR :S-160 0.2 M

4 FITTINGS
90° 6
S9 8 3 DHDTA0Q1RPG 6X3/4" HALF COUPLING A105 CL.6000 SW ASME B16.11 IBR 1

106
S2-300-150-6 64
4 DEATB0S2QPG 6" 90 DEG ELBOW A234GR.WPB SMLS BW ASME B16.9 4
F5 G7 B10
IBR :S-STD

<5 <4> 2
FLANGES
>
1 68 8 5 CFATA0DBJPG 3/4" FLANGE SW A105 CL.150 RF ASME B16.5 IBR 1
210 STEM NORTH :S-160
6 CDBTA0DBJPG 3/4" BLIND FLANGE A105 CL.150 RF ASME B16.5 IBR 1

22 GASKETS
65 <3> 2
00 7 FFG213ACADBHA 3/4" SPIRAL WOUND GASKET (G213ACA) CL.150 RF 4.5 1
40 3
MM ASME B16.20
6X3/4"NPS
VALVES
4
90° 8 51002 3/4" GATE VALVE CL.800 A105/HF SW BB,OS&Y BY 1
MFR/API 602/ASME B16.11 HANDWHEEL IBR
S9 375
S2-300-150-6 PIPE SUPPORTS
46 9 S2 6" S2-300-150-6 4
64
<2> 1 PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
BOLTS
S9
S2-300-150-6 10 EBEBB0A 1/2 " STUD BOLT(FULL THREADED)/HEX.NUT(HEAVY) 4
1 A193GR.B7/A194GR.2H ASME B18.2.1/ASME
> 00
<6 40 B18.2.2 - 65 mm Length

N PS
6" S9
S2-300-150-6 CUT PIPE LENGTH

5 PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS


7
66 NO (MM) (IN) NO (MM) (IN)

<1> 912 6 <2> 6217 6


<3> 100 3/4 <4> 100 3/4
CONT.ON <5> 2182 6 <6> 6217 6
LC-322-0312_C SHT 4
27
20
1

4
90° 1
EL +114104
1370

<1> 1

6"NPS

4
90°

229
SEE SHT
LC-322-0312_C SHT 2
Isometric File Name : EP26_A2-LC-322-0312_C
Iso Extraction Date : 2022-08-19 12:35:16

DESIGN TEMP. ºC 320.00 OPE. TEMP. ºC 120.00 PAINT SYSTEM T4 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 7.00 OPE. PRESS. kg/cm2g 5.00 PWHT N
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
1 17-08-2022 REVISED AS PER MARK1 PPK SP SS INS. CODE IH TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm 25 TEST PRESS. kg/cm2g 11.80 CLIENT NAME


01/12/2021 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 10 PT or MT % 0 STRESS SYSTEM.NO 6405-EPCM25_26-CA-0053
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-371-PRS-PID-000-0001 GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 10"-LC-322-0312_C-A2A-IH PIPE SPEC :A2A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : LC-322-0312_C AREA: EP26-A2 SHT. 3 OF 4 REV. 1
<SECURITY LEVEL2>

N MATERIAL LIST

PT| SIZE
229 NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
PIPE
1 APPTB0SBBPG 6" PIPE A106GR.B SMLS BE ASME B36.10M IBR :S-STD 21.0 M
6"NPS
2 APPTB0SABPG 3/4" PIPE A106GR.B SMLS PE ASME B36.10M IBR :S-160 0.2 M

FITTINGS
CONT.ON 4 3 DHDTA0Q1RPG 6X3/4" HALF COUPLING A105 CL.6000 SW ASME B16.11 IBR 1
EP26_A3-LC-322-0312 90°
E 1804973 EL +121234 4 DEATB0S2QPG 6" 90 DEG ELBOW A234GR.WPB SMLS BW ASME B16.9 4
N 2086553 IBR :S-STD
EL +121234
FLANGES
5 CFATA0DBJPG 3/4" FLANGE SW A105 CL.150 RF ASME B16.5 IBR 1
:S-160

<5> 1
6 CDBTA0DBJPG 3/4" BLIND FLANGE A105 CL.150 RF ASME B16.5 IBR 1

GASKETS
7 FFG213ACADBHA 3/4" SPIRAL WOUND GASKET (G213ACA) CL.150 RF 4.5 1
MM ASME B16.20

8500
VALVES
S12 8 51002 3/4" GATE VALVE CL.800 A105/HF SW BB,OS&Y BY 1
G1TR1-0-900-6 MFR/API 602/ASME B16.11 HANDWHEEL IBR

PIPE SUPPORTS
9 G1S2 6" G1S2-300-150-6 2

10 S2 6" S2-300-150-6 1

11 F1S5 6" F1S5-500-150-6 1


3823

1 12 G1TR1 6" G1TR1-0-900-6 1

PT| SIZE
4 NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
90° BOLTS
13 EBEBB0A 1/2 " STUD BOLT(FULL THREADED)/HEX.NUT(HEAVY) 4
A193GR.B7/A194GR.2H ASME B18.2.1/ASME
<4 B18.2.2 - 65 mm Length
>
1

CUT PIPE LENGTH

S11 6"NPS
12 PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS
F1S5-500-150-6 10 NO (MM) (IN) NO (MM) (IN)
4 4 SEE SHT
25 90° LC-322-0312_C SHT 3 <1> 912 6 <2> 100 3/4
00
<3> 100 3/4 <4> 12046 6
<5> 8042 6

25
00
S10 1
S2-300-150-6

<1> 1
229
S9 30

1370
G1S2-300-150-6 00 40
S9 0
G1S2-300-150-6

4
1280
210

90°
EL +112734

3
<2> 2 6X3/4"NPS
8 68
STEM SOUTH
106
<3> 2
F5 G7 B13
6
E 1804973
N 2074220
EL +112346
Isometric File Name : EP26_A2-LC-322-0312_C
Iso Extraction Date : 2022-08-19 12:35:16

DESIGN TEMP. ºC 320.00 OPE. TEMP. ºC 120.00 PAINT SYSTEM T4 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 7.00 OPE. PRESS. kg/cm2g 5.00 PWHT N
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
1 17-08-2022 REVISED AS PER MARK1 PPK SP SS INS. CODE IH TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm 25 TEST PRESS. kg/cm2g 11.80 CLIENT NAME


01/12/2021 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 10 PT or MT % 0 STRESS SYSTEM.NO 6405-EPCM25_26-CA-0053
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-371-PRS-PID-000-0001 GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 10"-LC-322-0312_C-A2A-IH PIPE SPEC :A2A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : LC-322-0312_C AREA: EP26-A2 SHT. 4 OF 4 REV. 1
<SECURITY LEVEL2>

N MATERIAL LIST

PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
PIPE
1 APPTB0SBBPG 4" PIPE A106GR.B SMLS BE ASME B36.10M IBR :S-STD 2.9 M

2 APPTB0SABPG 3/4" PIPE A106GR.B SMLS PE ASME B36.10M IBR :S-160 0.3 M

FITTINGS
3 DHDTA0Q1RPG 4X3/4" HALF COUPLING A105 CL.6000 SW ASME B16.11 IBR 1
4
4 DEATB0S2QPG 4" 90 DEG ELBOW A234GR.WPB SMLS BW ASME B16.9 1
90° IBR :S-STD
EL +114207
FLANGES
5 CFATA0DBJPG 3/4" FLANGE SW A105 CL.150 RF ASME B16.5 IBR 1
:S-160
6 CDBTA0DBJPG 3/4" BLIND FLANGE A105 CL.150 RF ASME B16.5 IBR 1

GASKETS
152
7 FFG213ACADBHA 3/4" SPIRAL WOUND GASKET (G213ACA) CL.150 RF 4.5 1
MM ASME B16.20

4"NPS VALVES
8 51002 3/4" GATE VALVE CL.800 A105/HF SW BB,OS&Y BY 1
MFR/API 602/ASME B16.11 HANDWHEEL IBR

73 CONT.ON PIPE SUPPORTS


19 EP26_A2-LC-322-0312_B
E 1804973 9 S2 4" S2-300-150-4 1
N 1980650 PT| SIZE
EL +114055 NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
BOLTS
E 1802500
N 1980650 10 EBEBB0A 1/2 " STUD BOLT(FULL THREADED)/HEX.NUT(HEAVY) 4
EL +114629 A193GR.B7/A194GR.2H ASME B18.2.1/ASME
B18.2.2 - 65 mm Length
73
6 24
F5 G7 B10
<2> 2 CUT PIPE LENGTH
116

PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS


8 NO (MM) (IN) NO (MM) (IN)
STEM EAST
<1> 150 3/4 <2> 110 3/4
68 <3> 2821 4
<1> 2
233

S9
3 S2-300-150-4
4X3/4"NPS
1
>
322-TP-92-001 <3

0
50

CONT.ON
EPCC-07-4"-LC-322-9101-A2A-IH
E 1802000
N 1980650
EL +114207
Isometric File Name : EP26_A2-LC-322-0336
Iso Extraction Date : 2022-06-17 16:35:39

DESIGN TEMP. ºC 320.00 OPE. TEMP. ºC 120.00 PAINT SYSTEM T4 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 7.00 OPE. PRESS. kg/cm2g 5.00 PWHT N
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
INS. CODE IH TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm 25 TEST PRESS. kg/cm2 g 11.80 CLIENT NAME


15/06/2022 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 10 PT or MT % 0 STRESS SYSTEM.NO 6405-EPCM25_26-CA-0053
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-322-PRS-PID-000-0003 GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 4"-LC-322-0336-A2A-IH PIPE SPEC :A2A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : LC-322-0336 AREA: EP26-A2 SHT. 1 OF 1 REV. 0
<SECURITY LEVEL2>

CONT.ON CLASS:
INSUL:
D2D
100/IH
N MATERIAL LIST
EP26_A2-HP-322-02205
E 1811636 COAT : UNDEFINED ?
PT| SIZE
N 1940315 CLASS: A2A
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
EL +100313 INSUL: 25/IS
COAT : UNDEFINED PIPE

SST-D2D 3/ 1 APPTB0SABPG 3/4" PIPE A106GR.B SMLS PE ASME B36.10M IBR :S-160 2.0 M
4" GS-EP26-014
NP FITTINGS
22 S
6 59 2 DECTA0Q1RPG 3/4" 90 DEG ELBOW A105 CL.6000 SW ASME B16.11 IBR 1
3 1
PIPE SUPPORTS
<1
> 3 G1S2 3/4" G1S2-150-150-0.75 1
1

S3 CUT PIPE LENGTH


G1S2-150-150-0.75
PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS
NO (MM) (IN) NO (MM) (IN)
2
90° <1> 568 3/4 <2> 1409 3/4

1433
3/4"NPS
<2> 1

14
TO ATM
1
E 1811636
N 1939722
EL +98867
Isometric File Name : EP26_A2-LC-322-02205
Iso Extraction Date : 2022-11-17 11:07:51

DESIGN TEMP. ºC 320.00 OPE. TEMP. ºC 250.00 PAINT SYSTEM T3 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 3.50 OPE. PRESS. kg/cm2g 0.00 PWHT N
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
1 16/11/2022 REVISED AS PER MARK1 PPK SP SS INS. CODE IS TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm 25 TEST PRESS. kg/cm2g 5.90 CLIENT NAME


01/12/2021 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 10 PT or MT % 0 STRESS SYSTEM.NO NA
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-000-PRS-PID-000-0011 (2/7)GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 3/4"-LC-322-02205-A2A-IS PIPE SPEC :A2A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : LC-322-02205 AREA: EP26-A2 SHT. 1 OF 1 REV. 1
<SECURITY LEVEL2>

N MATERIAL LIST
2
90° PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
PIPE
1 APPTB0SABPG 3/4" PIPE A106GR.B SMLS PE ASME B36.10M IBR :S-160 2.0 M

FITTINGS
S4
2 DECTA0Q1RPG 3/4" 90 DEG ELBOW A105 CL.6000 SW ASME B16.11 IBR 1
G1S2-150-150-0.75
<1
> 60 3 TO ATM 3/4" 1
1 7
PIPE SUPPORTS
CLASS: A2A 4 G1S2 3/4" G1S2-150-150-0.75 1
INSUL: 25/IS
3/ CLASS: D2D
4" INSUL: 100/IH
GS-EP26-015 NP CUT PIPE LENGTH
S
22 CONT.ON
0 EP26_A2-HP-322-02206 PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS
E 1811589 NO (MM) (IN) NO (MM) (IN)
N 1978493 <1> 583 3/4 <2> 1409 3/4
EL +100313
SST-D2D

1433

3/4"NPS
<2> 1

3
TO ATM

E 1811589
N 1979100
EL +98867
Isometric File Name : EP26_A2-LC-322-02206
Iso Extraction Date : 2021-11-27 10:37:44

DESIGN TEMP. ºC 320.00 OPE. TEMP. ºC 250.00 PAINT SYSTEM T3 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 3.50 OPE. PRESS. kg/cm2g 0.00 PWHT N
PROJECT NAME
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
1 9-11-2022 REVISED AS PER MARK1 ABJ PPK SS INS. CODE IS TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 01/12/2021 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS INS.THK mm 25 TEST PRESS. kg/cm2g 5.90 CLIENT NAME
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 10 PT or MT % 0 STRESS SYSTEM.NO NA
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-000-PRS-PID-000-0011 (2/7)GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 3/4"-LC-322-02206-A2A-IS PIPE SPEC :A2A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : LC-322-02206 AREA: EP26-A2 SHT. 1 OF 1 REV. 01
<SECURITY LEVEL2>

N
CLASS: D2D CLASS: A2A
MATERIAL LIST
INSUL: 100/IH INSUL: 25/IS PT| SIZE
COAT : UNDEFINED ? COAT : UNDEFINED NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
PIPE
GS-EP26-016
SST-D2D 1 APPTB0SABPG 3/4" PIPE A106GR.B SMLS PE ASME B36.10M IBR :S-160 2.0 M
CONT.ON
EP26_A2-HP-322-02207 FITTINGS
22
E 1811636 6 2 DECTA0Q1RPG 3/4" 90 DEG ELBOW A105 CL.6000 SW ASME B16.11 IBR 1
61 1
N 2030415 5
EL +100313 3/4"NPS PIPE SUPPORTS
<1
> 3 G1S2 3/4" G1S2-150-150-0.75 1
1

S3 CUT PIPE LENGTH


G1S2-150-150-0.75
PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS
NO (MM) (IN) NO (MM) (IN)
2
90° <1> 591 3/4 <2> 1409 3/4

1433
3/4"NPS
<2> 1

14
TO ATM
1
E 1811636
N 2029800
EL +98867
Isometric File Name : EP26_A2-LC-322-02207
Iso Extraction Date : 2022-11-17 11:08:24

DESIGN TEMP. ºC 320.00 OPE. TEMP. ºC 250.00 PAINT SYSTEM T3 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 3.50 OPE. PRESS. kg/cm2g 0.00 PWHT N
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
1 16/11/2022 REVISED AS PER MARK1 PPK SP SS INS. CODE IS TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm 25 TEST PRESS. kg/cm2g 5.90 CLIENT NAME


01/12/2021 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 10 PT or MT % 0 STRESS SYSTEM.NO NA
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-000-PRS-PID-000-0011 (2/7)GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 3/4"-LC-322-02207-A2A-IS PIPE SPEC :A2A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : LC-322-02207 AREA: EP26-A2 SHT. 1 OF 1 REV. 1
<SECURITY LEVEL2>

CONT.ON CLASS:
INSUL:
D2D
100/IH
N MATERIAL LIST
EP26_A2-HP-322-02208
E 1811636 COAT : UNDEFINED ?
PT| SIZE
N 2066415 CLASS: A2A
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
EL +100313 INSUL: 25/IS
COAT : UNDEFINED PIPE

SST-D2D 3/ 1 APPTB0SABPG 3/4" PIPE A106GR.B SMLS PE ASME B36.10M IBR :S-160 2.0 M
4" GS-EP26-017
NP FITTINGS
22 S
6 59 2 DECTA0Q1RPG 3/4" 90 DEG ELBOW A105 CL.6000 SW ASME B16.11 IBR 1
2 1
PIPE SUPPORTS
<1
> 3 G1S2 3/4" G1S2-150-150-0.75 1
1

S3 CUT PIPE LENGTH


G1S2-150-150-0.75
PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS
NO (MM) (IN) NO (MM) (IN)
2
90° <1> 568 3/4 <2> 1409 3/4

1433
3/4"NPS
<2> 1

14
TO ATM
1
E 1811636
N 2065822
EL +98867
Isometric File Name : EP26_A2-LC-322-02208
Iso Extraction Date : 2022-11-17 11:08:59

DESIGN TEMP. ºC 320.00 OPE. TEMP. ºC 250.00 PAINT SYSTEM T3 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 3.50 OPE. PRESS. kg/cm2g 0.00 PWHT N
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
1 16/11/2022 REVISED AS PER MARK1 PPK SP SS INS. CODE IS TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm 25 TEST PRESS. kg/cm2g 5.90 CLIENT NAME


01/12/2021 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 10 PT or MT % 0 STRESS SYSTEM.NO NA
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-000-PRS-PID-000-0011 (2/7)GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 3/4"-LC-322-02208-A2A-IS PIPE SPEC :A2A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : LC-322-02208 AREA: EP26-A2 SHT. 1 OF 1 REV. 1
<SECURITY LEVEL2>

N MATERIAL LIST
2
90° PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
PIPE
1 APPTB0SABPG 3/4" PIPE A106GR.B SMLS PE ASME B36.10M IBR :S-160 2.0 M

FITTINGS
S3
G1S2-150-150-0.75 2 DECTA0Q1RPG 3/4" 90 DEG ELBOW A105 CL.6000 SW ASME B16.11 IBR 1
<1 1
> 60 PIPE SUPPORTS
1 7
3 G1S2 3/4" G1S2-150-150-0.75 1
CLASS: A2A
INSUL: 25/IS
3/ CLASS: D2D CUT PIPE LENGTH
4" INSUL: 100/IH
GS-EP26-018 NP
S PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS
21 NO (MM) (IN) NO (MM) (IN)
7
CONT.ON <1> 583 3/4 <2> 1409 3/4
EP26_A2-HP-322-02209
E 1811589
N 2083594
SST-D2D EL +100313

1433

3/4"NPS
<2> 1

1
TO ATM
14
E 1811589
N 2084202
EL +98867
Isometric File Name : EP26_A2-LC-322-02209
Iso Extraction Date : 2022-11-17 11:09:36

DESIGN TEMP. ºC 320.00 OPE. TEMP. ºC 250.00 PAINT SYSTEM T3 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 3.50 OPE. PRESS. kg/cm2g 0.00 PWHT N
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
1 16/11/2022 REVISED AS PER MARK1 PPK SP SS INS. CODE IS TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm 25 TEST PRESS. kg/cm2g 5.90 CLIENT NAME


01/12/2021 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 10 PT or MT % 0 STRESS SYSTEM.NO NA
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-000-PRS-PID-000-0011 (2/7)GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 3/4"-LC-322-02209-A2A-IS PIPE SPEC :A2A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : LC-322-02209 AREA: EP26-A2 SHT. 1 OF 1 REV. 1
<SECURITY LEVEL2>

N
CLASS: D2D CLASS: A2A
MATERIAL LIST
INSUL: 100/IH INSUL: 25/IS PT| SIZE
COAT : UNDEFINED ? COAT : UNDEFINED NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
PIPE
GS-EP26-019
SST-D2D 1 APPTB0SABPG 3/4" PIPE A106GR.B SMLS PE ASME B36.10M IBR :S-160 2.0 M
3/
4"
CONT.ON NP FITTINGS
S
EP26_A2-HP-322-02210 2 DECTA0Q1RPG 3/4" 90 DEG ELBOW A105 CL.6000 SW ASME B16.11 IBR 1
E 1811636 61
226 5
N 2124915 PIPE SUPPORTS
EL +100313 <1 3 G1S2 3/4" G1S2-150-150-0.75 1
>
1
S3
G1S2-150-150-0.75 CUT PIPE LENGTH

PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS


NO (MM) (IN) NO (MM) (IN)
2
<1> 591 3/4 <2> 1409 3/4
90°

1433
3/4"NPS
<2> 1

TO ATM
E 1811636
N 2124300
EL +98867
Isometric File Name : EP26_A2-LC-322-02210
Iso Extraction Date : 2021-11-27 10:41:00

DESIGN TEMP. ºC 320.00 OPE. TEMP. ºC 250.00 PAINT SYSTEM T3 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 3.50 OPE. PRESS. kg/cm2g 0.00 PWHT N
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
INS. CODE IS TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm 25 TEST PRESS. kg/cm2 g 5.90 CLIENT NAME


01/12/2021 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 10 PT or MT % 0 STRESS SYSTEM.NO NA
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-000-PRS-PID-000-0011 (2/7)GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 3/4"-LC-322-02210-A2A-IS PIPE SPEC :A2A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : LC-322-02210 AREA: EP26-A2 SHT. 1 OF 1 REV. 0
<SECURITY LEVEL2>

CLASS: D2D
INSUL: 100/IH
N MATERIAL LIST
CLASS: A2A
PT| SIZE
INSUL: 25/IS NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
GS-EP26-020 PIPE

SST-D2D 1 APPTB0SABPG 3/4" PIPE A106GR.B SMLS PE ASME B36.10M IBR :S-160 2.0 M
3/
4"
NP FITTINGS
22 S
6 2 DECTA0Q1RPG 3/4" 90 DEG ELBOW A105 CL.6000 SW ASME B16.11 IBR 1
59
CONT.ON 2
EP26_A2-HP-322-02211 3 TO ATM 3/4" 1
E 1811636 <1
S4 > PIPE SUPPORTS
N 2154915 1
G1S2-150-150-0.75
EL +100313 4 G1S2 3/4" G1S2-150-150-0.75 1

CUT PIPE LENGTH

2 PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS


90° NO (MM) (IN) NO (MM) (IN)

<1> 568 3/4 <2> 1409 3/4

1433
3/4"NPS
<2> 1

3
TO ATM
E 1811636
N 2154322
EL +98867
Isometric File Name : EP26_A2-LC-322-02211
Iso Extraction Date : 2021-11-27 10:46:16

DESIGN TEMP. ºC 320.00 OPE. TEMP. ºC 250.00 PAINT SYSTEM T3 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 3.50 OPE. PRESS. kg/cm2g 0.00 PWHT N
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
INS. CODE IS TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm 25 TEST PRESS. kg/cm2 g 5.90 CLIENT NAME


01/12/2021 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 10 PT or MT % 0 STRESS SYSTEM.NO NA
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-000-PRS-PID-000-0011 (2/7)GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 3/4"-LC-322-02211-A2A-IS PIPE SPEC :A2A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : LC-322-02211 AREA: EP26-A2 SHT. 1 OF 1 REV. 0
<SECURITY LEVEL2>

CLASS:
INSUL:
D2D
100/IH
N MATERIAL LIST
CLASS: A2A
PT| SIZE
INSUL: 25/IS NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
PIPE
GS-EP26-053
SST-D2D 3/ 1 APPTB0SABPG 3/4" PIPE A106GR.B SMLS PE ASME B36.10M IBR :S-160 2.0 M
4"
NP FITTINGS
22 S
7 61 2 DECTA0Q1RPG 3/4" 90 DEG ELBOW A105 CL.6000 SW ASME B16.11 IBR 1
CONT.ON 5 1
EP26_A2-HP-322-02212 PIPE SUPPORTS
E 1811619 <1
S3 > 3 G1S2 3/4" G1S2-150-150-0.75 1
N 1988415 1
G1S2-150-150-0.75
EL +100313
CUT PIPE LENGTH

PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS


NO (MM) (IN) NO (MM) (IN)
2
90° <1> 591 3/4 <2> 1409 3/4

1433
3/4"NPS
<2> 1

14
TO ATM
1
E 1811619
N 1987800
EL +98867
Isometric File Name : EP26_A2-LC-322-02212
Iso Extraction Date : 2022-11-17 11:10:13

DESIGN TEMP. ºC 320.00 OPE. TEMP. ºC 250.00 PAINT SYSTEM T3 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 3.50 OPE. PRESS. kg/cm2g 0.00 PWHT N
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
1 16/11/2022 REVISED AS PER MARK1 PPK SP SS INS. CODE IS TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm 25 TEST PRESS. kg/cm2g 5.90 CLIENT NAME


01/12/2021 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 10 PT or MT % 0 STRESS SYSTEM.NO NA
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-000-PRS-PID-000-0011 (2/7)GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 3/4"-LC-322-02212-A2A-IS PIPE SPEC :A2A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : LC-322-02212 AREA: EP26-A2 SHT. 1 OF 1 REV. 1
<SECURITY LEVEL2>

N MATERIAL LIST
2
90° PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
PIPE
1 APPTB0SABPG 3/4" PIPE A106GR.B SMLS PE ASME B36.10M IBR :S-160 1.9 M

FITTINGS
2 DECTA0Q1RPG 3/4" 90 DEG ELBOW A105 CL.6000 SW ASME B16.11 IBR 1
CONT.ON 1
<1 PIPE SUPPORTS
> GS-EP26-028 EP26_A2-MP-322-02405
1 66 E 1811589 3 A2 3/4" A2-0.75 1
4 N 1949986
EL +100163
CUT PIPE LENGTH
CLASS: A2A
INSUL: 25/IS PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS
S3 3/ CLASS: B2A NO (MM) (IN) NO (MM) (IN)
A2-0.75 4" INSUL: 75/IH
NP
S <1> 640 3/4 <2> 1259 3/4
22
6

SST-B2A

1283

3/4"NPS
<2> 1

1
TO ATM
14
E 1811589
N 1950650
EL +98867
Isometric File Name : EP26_A2-LC-322-02405
Iso Extraction Date : 2022-11-17 11:10:47

DESIGN TEMP. ºC 320.00 OPE. TEMP. ºC 165.00 PAINT SYSTEM T2 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 3.50 OPE. PRESS. kg/cm2g 0.00 PWHT N
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
1 16/11/2022 REVISED AS PER MARK1 PPK SP SS INS. CODE IS TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm 25 TEST PRESS. kg/cm2g 5.9 CLIENT NAME


01/12/2021 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 10 PT or MT % 0 STRESS SYSTEM.NO NA
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-000-PRS-PID-000-0011(3/7) GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 3/4"-LC-322-02405-A2A-IS PIPE SPEC :A2A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : LC-322-02405 AREA: EP26-A2 SHT. 1 OF 1 REV. 1
<SECURITY LEVEL2>

N MATERIAL LIST
2
90° PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
PIPE
1 APPTB0SABPG 3/4" PIPE A106GR.B SMLS PE ASME B36.10M IBR :S-160 2.0 M

FITTINGS
2 DECTA0Q1RPG 3/4" 90 DEG ELBOW A105 CL.6000 SW ASME B16.11 IBR 1
1
PIPE SUPPORTS
<1
> GS-EP26-029 3 A2 3/4" A2-0.75 1
1 67
2

CUT PIPE LENGTH


CLASS: A2A
INSUL: 25/IS PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS
S3 3/ CLASS: B2A NO (MM) (IN) NO (MM) (IN)
A2-0.75 4" INSUL: 75/IH
NP <1> 648 3/4 <2> 1259 3/4
S
22
0
CONT.ON
EP26_A2-MP-322-02406
E 1811589
N 1972993
SST-B2A EL +100163

1283

3/4"NPS
<2> 1

1
TO ATM
14
E 1811589
N 1973664
EL +98867
Isometric File Name : EP26_A2-LC-322-02406
Iso Extraction Date : 2022-11-17 11:11:21

DESIGN TEMP. ºC 320.00 OPE. TEMP. ºC 165.00 PAINT SYSTEM T2 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 3.50 OPE. PRESS. kg/cm2g 0.00 PWHT N
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
1 16/11/2022 REVISED AS PER MARK1 PPK SP SS INS. CODE IS TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm 25 TEST PRESS. kg/cm2g 5.9 CLIENT NAME


01/12/2021 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 10 PT or MT % 0 STRESS SYSTEM.NO NA
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-000-PRS-PID-000-0011(3/7) GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 3/4"-LC-322-02406-A2A-IS PIPE SPEC :A2A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : LC-322-02406 AREA: EP26-A2 SHT. 1 OF 1 REV. 1
<SECURITY LEVEL2>

N MATERIAL LIST
2
90° PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
PIPE
1 APPTB0SABPG 3/4" PIPE A106GR.B SMLS PE ASME B36.10M IBR :S-160 1.9 M

FITTINGS
CONT.ON 2 DECTA0Q1RPG 3/4" 90 DEG ELBOW A105 CL.6000 SW ASME B16.11 IBR 1
GS-EP26-030 EP26_A2-MP-322-02407 1
<1 E 1811589 PIPE SUPPORTS
>
1 60 N 2000593
7 3 A2 3/4" A2-0.75 1
EL +100163
CLASS: A2A
INSUL: 25/IS CUT PIPE LENGTH
S3 3/ CLASS: B2A
A2-0.75 4" INSUL: 75/IH PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS
NP NO (MM) (IN) NO (MM) (IN)
S
22
0 <1> 583 3/4 <2> 1259 3/4

SST-B2A

1283

3/4"NPS
<2> 1

1
TO ATM
14
E 1811589
N 2001200
EL +98867
Isometric File Name : EP26_A2-LC-322-02407
Iso Extraction Date : 2022-11-17 11:11:54

DESIGN TEMP. ºC 320.00 OPE. TEMP. ºC 165.00 PAINT SYSTEM T2 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 3.50 OPE. PRESS. kg/cm2g 0.00 PWHT N
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
1 16/11/2022 REVISED AS PER MARK1 PPK SP SS INS. CODE IS TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm 25 TEST PRESS. kg/cm2g 5.9 CLIENT NAME


01/12/2021 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 10 PT or MT % 0 STRESS SYSTEM.NO NA
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-000-PRS-PID-000-0011(3/7) GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 3/4"-LC-322-02407-A2A-IS PIPE SPEC :A2A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : LC-322-02407 AREA: EP26-A2 SHT. 1 OF 1 REV. 1
<SECURITY LEVEL2>

N MATERIAL LIST
2
90° PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
PIPE
1 APPTB0SABPG 3/4" PIPE A106GR.B SMLS PE ASME B36.10M IBR :S-160 1.9 M

FITTINGS
CONT.ON 2 DECTA0Q1RPG 3/4" 90 DEG ELBOW A105 CL.6000 SW ASME B16.11 IBR 1
GS-EP26-031 EP26_A2-MP-322-02408 1
<1 E 1811589 PIPE SUPPORTS
>
1 60 N 2036593
7 3 A2 3/4" A2-0.75 1
EL +100163
CLASS: A2A
INSUL: 25/IS CUT PIPE LENGTH
S3 3/ CLASS: B2A
A2-0.75 4" INSUL: 75/IH PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS
NP NO (MM) (IN) NO (MM) (IN)
S
22
0 <1> 583 3/4 <2> 1259 3/4

SST-B2A

1283

3/4"NPS
<2> 1

1
TO ATM
14
E 1811589
N 2037200
EL +98867
Isometric File Name : EP26_A2-LC-322-02408
Iso Extraction Date : 2022-11-17 11:12:28

DESIGN TEMP. ºC 320.00 OPE. TEMP. ºC 165.00 PAINT SYSTEM T2 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 3.50 OPE. PRESS. kg/cm2g 0.00 PWHT N
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
1 16/11/2022 REVISED AS PER MARK1 PPK SP SS INS. CODE IS TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm 25 TEST PRESS. kg/cm2g 5.9 CLIENT NAME


01/12/2021 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 10 PT or MT % 0 STRESS SYSTEM.NO NA
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-000-PRS-PID-000-0011(3/7) GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 3/4"-LC-322-02408-A2A-IS PIPE SPEC :A2A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : LC-322-02408 AREA: EP26-A2 SHT. 1 OF 1 REV. 1
<SECURITY LEVEL2>

N MATERIAL LIST
2
90° PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
PIPE
1 APPTB0SABPG 3/4" PIPE A106GR.B SMLS PE ASME B36.10M IBR :S-160 1.9 M

FITTINGS
2 DECTA0Q1RPG 3/4" 90 DEG ELBOW A105 CL.6000 SW ASME B16.11 IBR 1
GS-EP26-032
1
<1 PIPE SUPPORTS
>
1 60
7 3 A2 3/4" A2-0.75 1

CLASS: A2A
INSUL: 25/IS CUT PIPE LENGTH
S3 3/ CLASS: B2A
A2-0.75 4" INSUL: 75/IH PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS
NP NO (MM) (IN) NO (MM) (IN)
S
22 CONT.ON
0 EP26_A2-MP-322-02409 <1> 583 3/4 <2> 1259 3/4

E 1811589
N 2042593
EL +100163
SST-B2A

1283

3/4"NPS
<2> 1

1
TO ATM
14
E 1811589
N 2043200
EL +98867
Isometric File Name : EP26_A2-LC-322-02409
Iso Extraction Date : 2022-11-17 11:13:02

DESIGN TEMP. ºC 320.00 OPE. TEMP. ºC 165.00 PAINT SYSTEM T2 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 3.50 OPE. PRESS. kg/cm2g 0.00 PWHT N
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
1 16/11/2022 REVISED AS PER MARK1 PPK SP SS INS. CODE IS TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm 25 TEST PRESS. kg/cm2g 5.9 CLIENT NAME


01/12/2021 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 10 PT or MT % 0 STRESS SYSTEM.NO NA
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-000-PRS-PID-000-0011(3/7) GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 3/4"-LC-322-02409-A2A-IS PIPE SPEC :A2A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : LC-322-02409 AREA: EP26-A2 SHT. 1 OF 1 REV. 1
<SECURITY LEVEL2>

N MATERIAL LIST
2
90° PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
PIPE
1 APPTB0SABPG 3/4" PIPE A106GR.B SMLS PE ASME B36.10M IBR :S-160 1.9 M

FITTINGS
2 DECTA0Q1RPG 3/4" 90 DEG ELBOW A105 CL.6000 SW ASME B16.11 IBR 1
GS-EP26-033
1
<1 PIPE SUPPORTS
>
1 60
7 3 A2 3/4" A2-0.75 1

CLASS: A2A
INSUL: 25/IS CUT PIPE LENGTH
S3 3/ CLASS: B2A
A2-0.75 4" INSUL: 75/IH PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS
NP NO (MM) (IN) NO (MM) (IN)
S
22 CONT.ON
0 EP26_A2-MP-322-02410 <1> 583 3/4 <2> 1259 3/4

E 1811589
N 2072593
EL +100163
SST-B2A

1283

3/4"NPS
<2> 1

TO ATM
14
E 1811589
N 2073200
EL +98867
Isometric File Name : EP26_A2-LC-322-02410
Iso Extraction Date : 2022-11-17 11:13:35

DESIGN TEMP. ºC 320.00 OPE. TEMP. ºC 165.00 PAINT SYSTEM T2 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 3.50 OPE. PRESS. kg/cm2g 0.00 PWHT N
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
1 16/11/2022 REVISED AS PER MARK1 PPK SP SS INS. CODE IS TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm 25 TEST PRESS. kg/cm2g 5.9 CLIENT NAME


01/12/2021 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 10 PT or MT % 0 STRESS SYSTEM.NO NA
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-000-PRS-PID-000-0011(3/7) GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 3/4"-LC-322-02410-A2A-IS PIPE SPEC :A2A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : LC-322-02410 AREA: EP26-A2 SHT. 1 OF 1 REV. 1
<SECURITY LEVEL2>

N MATERIAL LIST
2
90° PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
PIPE
1 APPTB0SABPG 3/4" PIPE A106GR.B SMLS PE ASME B36.10M IBR :S-160 1.9 M

FITTINGS
2 DECTA0Q1RPG 3/4" 90 DEG ELBOW A105 CL.6000 SW ASME B16.11 IBR 1
GS-EP26-034
1
<1 PIPE SUPPORTS
>
1 60
7 3 A2 3/4" A2-0.75 1

CLASS: A2A
INSUL: 25/IS CUT PIPE LENGTH
S3 3/ CLASS: B2A
A2-0.75 4" INSUL: 75/IH PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS
NP NO (MM) (IN) NO (MM) (IN)
S
22 CONT.ON
0 EP26_A2-MP-322-02411 <1> 583 3/4 <2> 1259 3/4

E 1811589
N 2078593
EL +100163
SST-B2A

1283

3/4"NPS
<2> 1

1
TO ATM
14
E 1811589
N 2079200
EL +98867
Isometric File Name : EP26_A2-LC-322-02411
Iso Extraction Date : 2022-11-17 11:14:09

DESIGN TEMP. ºC 320.00 OPE. TEMP. ºC 165.00 PAINT SYSTEM T2 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 3.50 OPE. PRESS. kg/cm2g 0.00 PWHT N
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
1 16/11/2022 REVISED AS PER MARK1 PPK SP SS INS. CODE IS TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm 25 TEST PRESS. kg/cm2g 5.9 CLIENT NAME


01/12/2021 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 10 PT or MT % 0 STRESS SYSTEM.NO NA
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-000-PRS-PID-000-0011(3/7) GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 3/4"-LC-322-02411-A2A-IS PIPE SPEC :A2A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : LC-322-02411 AREA: EP26-A2 SHT. 1 OF 1 REV. 1
<SECURITY LEVEL2>

N MATERIAL LIST
2
90° PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
PIPE
1 APPTB0SABPG 3/4" PIPE A106GR.B SMLS PE ASME B36.10M IBR :S-160 1.9 M

FITTINGS
2 DECTA0Q1RPG 3/4" 90 DEG ELBOW A105 CL.6000 SW ASME B16.11 IBR 1

<1 GS-EP26-035 3 TO ATM 3/4" 1


>
1 60
7 PIPE SUPPORTS
4 A2 3/4" A2-0.75 1
CLASS: A2A
INSUL: 25/IS
S4 3/ CLASS: B2A CUT PIPE LENGTH
A2-0.75 4" INSUL: 75/IH
NP
S PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS
21 NO (MM) (IN) NO (MM) (IN)
9
CONT.ON <1> 583 3/4 <2> 1259 3/4
EP26_A2-MP-322-02412
E 1811589
N 2116593
SST-B2A EL +100163

1283

3/4"NPS
<2> 1

3
TO ATM

E 1811589
N 2117200
EL +98867
Isometric File Name : EP26_A2-LC-322-02412
Iso Extraction Date : 2021-11-27 10:56:21

DESIGN TEMP. ºC 320.00 OPE. TEMP. ºC 165.00 PAINT SYSTEM T2 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 3.50 OPE. PRESS. kg/cm2g 0.00 PWHT N
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
INS. CODE IS TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm 25 TEST PRESS. kg/cm2 g 5.9 CLIENT NAME


01/12/2021 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 10 PT or MT % 0 STRESS SYSTEM.NO NA
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-000-PRS-PID-000-0011(3/7) GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 3/4"-LC-322-02412-A2A-IS PIPE SPEC :A2A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : LC-322-02412 AREA: EP26-A2 SHT. 1 OF 1 REV. 0
<SECURITY LEVEL2>

N MATERIAL LIST
2
90° PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
PIPE
1 APPTB0SABPG 3/4" PIPE A106GR.B SMLS PE ASME B36.10M IBR :S-160 1.9 M

FITTINGS

CONT.ON 2 DECTA0Q1RPG 3/4" 90 DEG ELBOW A105 CL.6000 SW ASME B16.11 IBR 1

<1 GS-EP26-036 EP26_A2-MP-322-02413


3 TO ATM 3/4" 1
> E 1811589
1 61 N 2137093
0 PIPE SUPPORTS
EL +100163
4 A2 3/4" A2-0.75 1
CLASS: A2A
INSUL: 25/IS
S4 3/ CLASS: B2A CUT PIPE LENGTH
A2-0.75 4" INSUL: 75/IH
NP
S PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS
21 NO (MM) (IN) NO (MM) (IN)
9
<1> 586 3/4 <2> 1259 3/4

SST-B2A

1283

3/4"NPS
<2> 1

3
TO ATM

E 1811589
N 2137703
EL +98867
Isometric File Name : EP26_A2-LC-322-02413
Iso Extraction Date : 2021-11-27 10:57:10

DESIGN TEMP. ºC 320.00 OPE. TEMP. ºC 165.00 PAINT SYSTEM T2 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 3.50 OPE. PRESS. kg/cm2g 0.00 PWHT N
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
INS. CODE IS TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm 25 TEST PRESS. kg/cm2 g 5.9 CLIENT NAME


01/12/2021 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 10 PT or MT % 0 STRESS SYSTEM.NO NA
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-000-PRS-PID-000-0011(3/7) GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 3/4"-LC-322-02413-A2A-IS PIPE SPEC :A2A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : LC-322-02413 AREA: EP26-A2 SHT. 1 OF 1 REV. 0
<SECURITY LEVEL2>

N MATERIAL LIST
2
90° PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
PIPE
1 APPTB0SABPG 3/4" PIPE A106GR.B SMLS PE ASME B36.10M IBR :S-160 1.9 M

FITTINGS

CONT.ON 2 DECTA0Q1RPG 3/4" 90 DEG ELBOW A105 CL.6000 SW ASME B16.11 IBR 1

<1 GS-EP26-037 EP26_A2-MP-322-02414 3 TO ATM 3/4" 1


> E 1811589
1 61 N 2163385
5 PIPE SUPPORTS
EL +100163
4 A2 3/4" A2-0.75 1
CLASS: A2A
INSUL: 25/IS
S4 3/ CLASS: B2A CUT PIPE LENGTH
A2-0.75 4" INSUL: 75/IH
NP
S PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS
22 NO (MM) (IN) NO (MM) (IN)
6
<1> 590 3/4 <2> 1259 3/4

SST-B2A

1283

3/4"NPS
<2> 1

3
TO ATM

E 1811589
N 2164000
EL +98867
Isometric File Name : EP26_A2-LC-322-02414
Iso Extraction Date : 2021-11-27 10:57:57

DESIGN TEMP. ºC 320.00 OPE. TEMP. ºC 165.00 PAINT SYSTEM T2 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 3.50 OPE. PRESS. kg/cm2g 0.00 PWHT N
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
INS. CODE IS TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm 25 TEST PRESS. kg/cm2 g 5.9 CLIENT NAME


01/12/2021 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 10 PT or MT % 0 STRESS SYSTEM.NO NA
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-000-PRS-PID-000-0011(3/7) GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 3/4"-LC-322-02414-A2A-IS PIPE SPEC :A2A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : LC-322-02414 AREA: EP26-A2 SHT. 1 OF 1 REV. 0
<SECURITY LEVEL2>

INSUL: N
40/IH MATERIAL LIST
INSUL:
PT| SIZE
25/IS NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
GS-EP26-043 PIPE

SST-A2A 1 APPTB0SABPG 3/4" PIPE A106GR.B SMLS PE ASME B36.10M IBR :S-160 1.9 M
3/
4"
NP 1 FITTINGS
22 S
CONT.ON 0 2 DECTA0Q1RPG 3/4" 90 DEG ELBOW A105 CL.6000 SW ASME B16.11 IBR 1
EP26_A2-LP-322-02706 65
1
E 1803589 1 PIPE SUPPORTS
N 1972815 3 A2 3/4" A2-0.75 1
EL +100163 <1
>
1
S3 CUT PIPE LENGTH
A2-0.75
PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS
NO (MM) (IN) NO (MM) (IN)

<1> 627 3/4 <2> 1259 3/4


2
90°

1283
3/4"NPS
<2> 1

14
TO ATM
1
E 1803589
N 1972164
EL +98867
Isometric File Name : EP26_A2-LC-322-02706
Iso Extraction Date : 2022-11-17 11:14:43

DESIGN TEMP. ºC 320.00 OPE. TEMP. ºC 165.00 PAINT SYSTEM T2 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 3.50 OPE. PRESS. kg/cm2g 0.00 PWHT N
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
1 16/11/2022 REVISED AS PER MARK1 PPK SP SS INS. CODE IS TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm 25 TEST PRESS. kg/cm2g 5.9 CLIENT NAME


01/12/2021 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 10 PT or MT % 0 STRESS SYSTEM.NO NA
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-000-PRS-PID-000-0011(4/7) GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 3/4"-LC-322-02706-A2A-IS PIPE SPEC :A2A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : LC-322-02706 AREA: EP26-A2 SHT. 1 OF 1 REV. 1
<SECURITY LEVEL2>

INSUL:
75/IH
N MATERIAL LIST
INSUL:
PT| SIZE
25/IS NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
GS-EP26-044 PIPE

SST-A2A 1 APPTB0SABPG 3/4" PIPE A106GR.B SMLS PE ASME B36.10M IBR :S-160 1.9 M
3/
4"
NP FITTINGS
CONT.ON 22 S
0 2 DECTA0Q1RPG 3/4" 90 DEG ELBOW A105 CL.6000 SW ASME B16.11 IBR 1
EP26_A2-LP-322-02707 61 1
E 1802411 5 PIPE SUPPORTS
N 1988415 <1 3 A2 3/4" A2-0.75 1
EL +100163 >
1
S3 CUT PIPE LENGTH
A2-0.75
PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS
NO (MM) (IN) NO (MM) (IN)

2 <1> 591 3/4 <2> 1259 3/4


90°

1283
3/4"NPS
<2> 1

14
TO ATM
1
E 1802411
N 1987800
EL +98867
Isometric File Name : EP26_A2-LC-322-02707
Iso Extraction Date : 2022-11-17 11:15:17

DESIGN TEMP. ºC 320.00 OPE. TEMP. ºC 165.00 PAINT SYSTEM T2 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 3.50 OPE. PRESS. kg/cm2g 0.00 PWHT N
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
1 16/11/2022 REVISED AS PER MARK1 PPK SP SS INS. CODE IS TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm 25 TEST PRESS. kg/cm2g 5.9 CLIENT NAME


01/12/2021 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 10 PT or MT % 0 STRESS SYSTEM.NO NA
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-000-PRS-PID-000-0011(4/7) GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 3/4"-LC-322-02707-A2A-IS PIPE SPEC :A2A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : LC-322-02707 AREA: EP26-A2 SHT. 1 OF 1 REV. 1
<SECURITY LEVEL2>

N MATERIAL LIST
2
90° PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
PIPE
1 APPTB0SABPG 3/4" PIPE A106GR.B SMLS PE ASME B36.10M IBR :S-160 1.9 M

FITTINGS
2 DECTA0Q1RPG 3/4" 90 DEG ELBOW A105 CL.6000 SW ASME B16.11 IBR 1
1
<1 GS-EP26-045 PIPE SUPPORTS
>
1 61 3 A2 3/4" A2-0.75 1
5

INSUL:
25/IS CUT PIPE LENGTH
S3 3/ INSUL:
4" PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS
A2-0.75 NP 75/IH NO (MM) (IN) NO (MM) (IN)
S
22 <1> 591 3/4 <2> 1259 3/4
1
CONT.ON
EP26_A2-LP-322-02708
E 1802411
N 2000585
SST-A2A EL +100163

1283

3/4"NPS
<2> 1

1
TO ATM
14
E 1802411
N 2001200
EL +98867
Isometric File Name : EP26_A2-LC-322-02708
Iso Extraction Date : 2022-11-17 11:15:50

DESIGN TEMP. ºC 320.00 OPE. TEMP. ºC 165.00 PAINT SYSTEM T2 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 3.50 OPE. PRESS. kg/cm2g 0.00 PWHT N
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
1 16/11/2022 REVISED AS PER MARK1 PPK SP SS INS. CODE IS TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm 25 TEST PRESS. kg/cm2g 5.9 CLIENT NAME


01/12/2021 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 10 PT or MT % 0 STRESS SYSTEM.NO NA
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-000-PRS-PID-000-0011(4/7) GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 3/4"-LC-322-02708-A2A-IS PIPE SPEC :A2A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : LC-322-02708 AREA: EP26-A2 SHT. 1 OF 1 REV. 1
<SECURITY LEVEL2>

INSUL:
75/IH
N MATERIAL LIST
INSUL:
PT| SIZE
25/IS NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
GS-EP26-046 PIPE

SST-A2A 1 APPTB0SABPG 3/4" PIPE A106GR.B SMLS PE ASME B36.10M IBR :S-160 1.9 M
3/
4"
NP FITTINGS
CONT.ON 22 S
0 2 DECTA0Q1RPG 3/4" 90 DEG ELBOW A105 CL.6000 SW ASME B16.11 IBR 1
EP26_A2-LP-322-02709 61 1
E 1802411 5 PIPE SUPPORTS
N 2030415 <1 3 A2 3/4" A2-0.75 1
EL +100163 >
1
S3 CUT PIPE LENGTH
A2-0.75
PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS
NO (MM) (IN) NO (MM) (IN)

2 <1> 591 3/4 <2> 1259 3/4


90°

1283
3/4"NPS
<2> 1

14
TO ATM
1
E 1802411
N 2029800
EL +98867
Isometric File Name : EP26_A2-LC-322-02709
Iso Extraction Date : 2022-11-17 11:16:23

DESIGN TEMP. ºC 320.00 OPE. TEMP. ºC 165.00 PAINT SYSTEM T2 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 3.50 OPE. PRESS. kg/cm2g 0.00 PWHT N
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
1 16/11/2022 REVISED AS PER MARK1 PPK SP SS INS. CODE IS TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm 25 TEST PRESS. kg/cm2g 5.9 CLIENT NAME


01/12/2021 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 10 PT or MT % 0 STRESS SYSTEM.NO NA
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-000-PRS-PID-000-0011(4/7) GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 3/4"-LC-322-02709-A2A-IS PIPE SPEC :A2A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : LC-322-02709 AREA: EP26-A2 SHT. 1 OF 1 REV. 1
<SECURITY LEVEL2>

N MATERIAL LIST
2
90° PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
PIPE
1 APPTB0SABPG 3/4" PIPE A106GR.B SMLS PE ASME B36.10M IBR :S-160 1.9 M

FITTINGS
2 DECTA0Q1RPG 3/4" 90 DEG ELBOW A105 CL.6000 SW ASME B16.11 IBR 1
1
<1 GS-EP26-047 PIPE SUPPORTS
>
1 61 3 A2 3/4" A2-0.75 1
4

INSUL:
25/IS CUT PIPE LENGTH
S3 3/ INSUL:
4" PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS
A2-0.75 NP 75/IH NO (MM) (IN) NO (MM) (IN)
S
22 <1> 590 3/4 <2> 1259 3/4
0
CONT.ON
EP26_A2-LP-322-02710
E 1803567
N 2042586
SST-A2A EL +100163

1283

3/4"NPS
<2> 1

1
TO ATM
14
E 1803567
N 2043200
EL +98867
Isometric File Name : EP26_A2-LC-322-02710
Iso Extraction Date : 2022-11-17 11:16:56

DESIGN TEMP. ºC 320.00 OPE. TEMP. ºC 165.00 PAINT SYSTEM T2 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 3.50 OPE. PRESS. kg/cm2g 0.00 PWHT N
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
1 16/11/2022 REVISED AS PER MARK1 PPK SP SS INS. CODE IS TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm 25 TEST PRESS. kg/cm2g 5.9 CLIENT NAME


01/12/2021 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 10 PT or MT % 0 STRESS SYSTEM.NO NA
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-000-PRS-PID-000-0011(4/7) GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 3/4"-LC-322-02710-A2A-IS PIPE SPEC :A2A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : LC-322-02710 AREA: EP26-A2 SHT. 1 OF 1 REV. 1
<SECURITY LEVEL2>

INSUL:
75/IH
N MATERIAL LIST
INSUL:
PT| SIZE
25/IS NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY

S3 PIPE

SST-A2A 3/ A2-0.75 1 APPTB0SABPG 3/4" PIPE A106GR.B SMLS PE ASME B36.10M IBR :S-160 2.0 M
4"
NP FITTINGS
S
CONT.ON 22 2 DECTA0Q1RPG 3/4" 90 DEG ELBOW A105 CL.6000 SW ASME B16.11 IBR 1
0 1
EP26_A2-LP-322-02711 61
E 1802411 5 PIPE SUPPORTS
N 2066415 <1 3 A2 3/4" A2-0.75 1
EL +100163 >
GS-EP26-048 1

CUT PIPE LENGTH

PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS


NO (MM) (IN) NO (MM) (IN)
2 <1> 590 3/4 <2> 1339 3/4
90°

1363
3/4"NPS
<2> 1

14
TO ATM
1
E 1802411
N 2065800
EL +98787
Isometric File Name : EP26_A2-LC-322-02711
Iso Extraction Date : 2022-11-17 11:17:31

DESIGN TEMP. ºC 320.00 OPE. TEMP. ºC 165.00 PAINT SYSTEM T2 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 3.50 OPE. PRESS. kg/cm2g 0.00 PWHT N
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
1 16/11/2022 REVISED AS PER MARK1 PPK SP SS INS. CODE IS TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm 25 TEST PRESS. kg/cm2g 5.9 CLIENT NAME


01/12/2021 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 10 PT or MT % 0 STRESS SYSTEM.NO NA
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-000-PRS-PID-000-0011(4/7) GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 3/4"-LC-322-02711-A2A-IS PIPE SPEC :A2A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : LC-322-02711 AREA: EP26-A2 SHT. 1 OF 1 REV. 1
<SECURITY LEVEL2>

N MATERIAL LIST
2
90° PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
PIPE
1 APPTB0SABPG 3/4" PIPE A106GR.B SMLS PE ASME B36.10M IBR :S-160 1.9 M

FITTINGS
2 DECTA0Q1RPG 3/4" 90 DEG ELBOW A105 CL.6000 SW ASME B16.11 IBR 1
1
<1 GS-EP26-049 PIPE SUPPORTS
>
1 61 3 A2 3/4" A2-0.75 1
5

INSUL:
25/IS CUT PIPE LENGTH
S3 3/ INSUL:
4" PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS
A2-0.75 NP 75/IH NO (MM) (IN) NO (MM) (IN)
S
22 <1> 590 3/4 <2> 1259 3/4
0
CONT.ON
EP26_A2-LP-322-02712
E 1803595
N 2078586
SST-A2A EL +100163

1283

3/4"NPS
<2> 1

1
TO ATM
14
E 1803595
N 2079200
EL +98867
Isometric File Name : EP26_A2-LC-322-02712
Iso Extraction Date : 2022-11-17 11:18:05

DESIGN TEMP. ºC 320.00 OPE. TEMP. ºC 165.00 PAINT SYSTEM T2 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 3.50 OPE. PRESS. kg/cm2g 0.00 PWHT N
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
1 16/11/2022 REVISED AS PER MARK1 PPK SP SS INS. CODE IS TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm 25 TEST PRESS. kg/cm2g 5.9 CLIENT NAME


01/12/2021 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 10 PT or MT % 0 STRESS SYSTEM.NO NA
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-000-PRS-PID-000-0011(4/7) GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 3/4"-LC-322-02712-A2A-IS PIPE SPEC :A2A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : LC-322-02712 AREA: EP26-A2 SHT. 1 OF 1 REV. 1
<SECURITY LEVEL2>

INSUL:
75/IH
N MATERIAL LIST
INSUL:
PT| SIZE
25/IS
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
GS-EP26-050 PIPE

SST-A2A 1 APPTB0SABPG 3/4" PIPE A106GR.B SMLS PE ASME B36.10M IBR :S-160 1.9 M
3/
4"
NP FITTINGS
CONT.ON 22 S
0 2 DECTA0Q1RPG 3/4" 90 DEG ELBOW A105 CL.6000 SW ASME B16.11 IBR 1
EP26_A2-LP-322-02713 61
E 1802411 5 3 TO ATM 3/4" 1
N 2124915
<1 PIPE SUPPORTS
EL +100163 >
1 4 A2 3/4" A2-0.75 1

S4
A2-0.75
CUT PIPE LENGTH

PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS


NO (MM) (IN) NO (MM) (IN)
2
90° <1> 591 3/4 <2> 1259 3/4

1283
3/4"NPS
<2> 1

3
TO ATM
E 1802411
N 2124300
EL +98867
Isometric File Name : EP26_A2-LC-322-02713
Iso Extraction Date : 2021-11-27 11:04:32

DESIGN TEMP. ºC 320.00 OPE. TEMP. ºC 165.00 PAINT SYSTEM T2 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 3.50 OPE. PRESS. kg/cm2g 0.00 PWHT N
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
INS. CODE IS TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm 25 TEST PRESS. kg/cm2 g 5.9 CLIENT NAME


01/12/2021 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 10 PT or MT % 0 STRESS SYSTEM.NO NA
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-000-PRS-PID-000-0011(4/7) GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 3/4"-LC-322-02713-A2A-IS PIPE SPEC :A2A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : LC-322-02713 AREA: EP26-A2 SHT. 1 OF 1 REV. 0
<SECURITY LEVEL2>

N MATERIAL LIST
2
90° PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
PIPE
1 APPTB0SABPG 3/4" PIPE A106GR.B SMLS PE ASME B36.10M IBR :S-160 1.9 M

FITTINGS

CONT.ON 2 DECTA0Q1RPG 3/4" 90 DEG ELBOW A105 CL.6000 SW ASME B16.11 IBR 1

<1 GS-EP26-051 EP26_A2-LP-322-02714


3 TO ATM 3/4" 1
> E 1802411
1 61 N 2137085
5 PIPE SUPPORTS
EL +100163
4 A2 3/4" A2-0.75 1
INSUL:
25/IS
S4 3/ INSUL: CUT PIPE LENGTH
A2-0.75 4" 75/IH
NP
S PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS
22 NO (MM) (IN) NO (MM) (IN)
0
<1> 590 3/4 <2> 1259 3/4

SST-A2A

1283

3/4"NPS
<2> 1

3
TO ATM

E 1802411
N 2137700
EL +98867
Isometric File Name : EP26_A2-LC-322-02714
Iso Extraction Date : 2021-11-27 11:05:20

DESIGN TEMP. ºC 320.00 OPE. TEMP. ºC 165.00 PAINT SYSTEM T2 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 3.50 OPE. PRESS. kg/cm2g 0.00 PWHT N
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
INS. CODE IS TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm 25 TEST PRESS. kg/cm2 g 5.9 CLIENT NAME


01/12/2021 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 10 PT or MT % 0 STRESS SYSTEM.NO NA
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-000-PRS-PID-000-0011(4/7) GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 3/4"-LC-322-02714-A2A-IS PIPE SPEC :A2A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : LC-322-02714 AREA: EP26-A2 SHT. 1 OF 1 REV. 0
<SECURITY LEVEL2>

N MATERIAL LIST
2
90° PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
PIPE
1 APPTB0SABPG 3/4" PIPE A106GR.B SMLS PE ASME B36.10M IBR :S-160 1.9 M

FITTINGS

CONT.ON 2 DECTA0Q1RPG 3/4" 90 DEG ELBOW A105 CL.6000 SW ASME B16.11 IBR 1

<1 GS-EP26-052 EP26_A2-LP-322-02715


3 TO ATM 3/4" 1
> E 1799411
1 61 N 2163385
5 PIPE SUPPORTS
EL +100163
4 A2 3/4" A2-0.75 1
INSUL:
25/IS
S4 3/ INSUL: CUT PIPE LENGTH
A2-0.75 4" 75/IH
NP
S PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS
22 NO (MM) (IN) NO (MM) (IN)
0
<1> 590 3/4 <2> 1259 3/4

SST-A2A

1283

3/4"NPS
<2> 1

3
TO ATM

E 1799411
N 2164000
EL +98867
Isometric File Name : EP26_A2-LC-322-02715
Iso Extraction Date : 2021-11-27 11:06:07

DESIGN TEMP. ºC 320.00 OPE. TEMP. ºC 165.00 PAINT SYSTEM T2 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 3.50 OPE. PRESS. kg/cm2g 0.00 PWHT N
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
INS. CODE IS TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm 25 TEST PRESS. kg/cm2 g 5.9 CLIENT NAME


01/12/2021 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 10 PT or MT % 0 STRESS SYSTEM.NO NA
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-000-PRS-PID-000-0011(4/7) GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 3/4"-LC-322-02715-A2A-IS PIPE SPEC :A2A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : LC-322-02715 AREA: EP26-A2 SHT. 1 OF 1 REV. 0
<SECURITY LEVEL2>

INSUL:
75/IH
N MATERIAL LIST
ASSEMBLY UP TO STEAM TRAP BY MANIFOLD VENDOR
SST-A2A INSUL:
25/IS PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
PIPE
1 APPTB0SABPG 3/4" PIPE A106GR.B SMLS PE ASME B36.10M IBR :S-160 0.7 M

FITTINGS
CONT.ON 2 DECTA0Q1RPG 3/4" 90 DEG ELBOW A105 CL.6000 SW ASME B16.11 IBR 1
EP26_A2-LP-322-021104
E 1802000 <1 26
N 1968110 > 4
1 CUT PIPE LENGTH
EL +99317 3/
4"
NP PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS
S
NO (MM) (IN) NO (MM) (IN)

<1> 240 3/4 <2> 413 3/4

2
90° 1.

437
1.

3/4"NPS
<2> 1

13
TO NEAREST SS/GRADE

E 1802000
N 1967846
Isometric File Name : EP26_A2-LC-322-021104

EL +98867
Iso Extraction Date : 2022-09-08 12:29:58

DESIGN TEMP. ºC 320.00 OPE. TEMP. ºC 165.00 PAINT SYSTEM T2 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 3.50 OPE. PRESS. kg/cm2g 0.00 PWHT N
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
1 07-09-2022 REVISED AS PER MARK1 PPK SP SS INS. CODE IS TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm 25 TEST PRESS. kg/cm2g 5.9 CLIENT NAME


01/12/2021 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 10 PT or MT % 0 STRESS SYSTEM.NO NA
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-000-PRS-PID-000-0011(5/7) GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 3/4"-LC-322-021104-A2A-IS PIPE SPEC :A2A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : LC-322-021104 AREA: EP26-A2 SHT. 1 OF 1 REV. 1
<SECURITY LEVEL2>

INSUL:
75/IH
N MATERIAL LIST
ASSEMBLY UP TO STEAM TRAP BY MANIFOLD VENDOR
SST-A2A INSUL:
25/IS PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
PIPE
1 APPTB0SABPG 3/4" PIPE A106GR.B SMLS PE ASME B36.10M IBR :S-160 0.7 M

FITTINGS
CONT.ON 2 DECTA0Q1RPG 3/4" 90 DEG ELBOW A105 CL.6000 SW ASME B16.11 IBR 1
EP26_A2-LP-322-021105
E 1802000 <1 26
N 1969710 > 4
1 CUT PIPE LENGTH
EL +99317 3/
4"
NP PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS
S
NO (MM) (IN) NO (MM) (IN)

<1> 240 3/4 <2> 413 3/4

2 1.
90°

437
1.

3/4"NPS
<2> 1

13
TO NEAREST SS/GRADE

E 1802000
N 1969446
Isometric File Name : EP26_A2-LC-322-021105

EL +98867
Iso Extraction Date : 2022-09-08 12:30:33

DESIGN TEMP. ºC 320.00 OPE. TEMP. ºC 165.00 PAINT SYSTEM T2 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 3.50 OPE. PRESS. kg/cm2g 0.00 PWHT N
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
1 07-09-2022 REVISED AS PER MARK1 PPK SP SS INS. CODE IS TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm 25 TEST PRESS. kg/cm2g 5.9 CLIENT NAME


01/12/2021 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 10 PT or MT % 0 STRESS SYSTEM.NO NA
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-000-PRS-PID-000-0011(5/7) GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 3/4"-LC-322-021105-A2A-IS PIPE SPEC :A2A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : LC-322-021105 AREA: EP26-A2 SHT. 1 OF 1 REV. 1
<SECURITY LEVEL2>

INSUL:
75/IH
N MATERIAL LIST
ASSEMBLY UP TO STEAM TRAP BY MANIFOLD VENDOR
SST-A2A INSUL:
25/IS PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
PIPE
1 APPTB0SABPG 3/4" PIPE A106GR.B SMLS PE ASME B36.10M IBR :S-160 0.7 M

FITTINGS
CONT.ON 2 DECTA0Q1RPG 3/4" 90 DEG ELBOW A105 CL.6000 SW ASME B16.11 IBR 1
EP26_A2-LP-322-021106
E 1802000 <1 26
N 1971310 > 4
1 CUT PIPE LENGTH
EL +99317 3/
4"
NP PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS
S
NO (MM) (IN) NO (MM) (IN)

<1> 240 3/4 <2> 413 3/4

1.
2
90°

1.

437
3/4"NPS
<2> 1

13
TO NEAREST SS/GRADE

E 1802000
N 1971046
Isometric File Name : EP26_A2-LC-322-021106

EL +98867
Iso Extraction Date : 2022-09-08 12:31:05

DESIGN TEMP. ºC 320.00 OPE. TEMP. ºC 165.00 PAINT SYSTEM T2 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 3.50 OPE. PRESS. kg/cm2g 0.00 PWHT N
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
1 07-09-2022 REVISED AS PER MARK1 PPK SP SS INS. CODE IS TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm 25 TEST PRESS. kg/cm2g 5.9 CLIENT NAME


01/12/2021 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 10 PT or MT % 0 STRESS SYSTEM.NO NA
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-000-PRS-PID-000-0011(5/7) GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 3/4"-LC-322-021106-A2A-IS PIPE SPEC :A2A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : LC-322-021106 AREA: EP26-A2 SHT. 1 OF 1 REV. 1
<SECURITY LEVEL2>

N MATERIAL LIST

PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
2
PIPE
90°
1 APPTB0SABPG 3/4" PIPE A106GR.B SMLS PE ASME B36.10M IBR :S-160 0.5 M

FITTINGS
2 DECTA0Q1RPG 3/4" 90 DEG ELBOW A105 CL.6000 SW ASME B16.11 IBR 1

CUT PIPE LENGTH

PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS


NO (MM) (IN) NO (MM) (IN)
ASSEMBLY UP TO STEAM TRAP BY MANIFOLD VENDOR
<1 SST-A2A <1> 240 3/4 <2> 200 3/4
>
1

26
4

3/
4"
NP
S
INSUL:
3/4"NPS

25/IS
<2> 1

INSUL:
224

75/IH

CONT.ON
EP26_A2-LP-322-021107
E 1809800
N 2110990
EL +99104

TO ATM

E 1809800
N 2111254
EL +98867
Isometric File Name : EP26_A2-LC-322-021107
Iso Extraction Date : 2022-09-08 12:31:05

DESIGN TEMP. ºC 320.00 OPE. TEMP. ºC 165.00 PAINT SYSTEM T2 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 3.50 OPE. PRESS. kg/cm2g 0.00 PWHT N
PROJECT NAME
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
1 07-09-2022 REVISED AS PER MARK1 PPK SP SS INS. CODE IS TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 01/12/2021 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS INS.THK mm 25 TEST PRESS. kg/cm2g 5.9 CLIENT NAME
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 10 PT or MT % 0 STRESS SYSTEM.NO NA
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-000-PRS-PID-000-0011(5/7) GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 3/4"-LC-322-021107-A2A-IS PIPE SPEC :A2A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : LC-322-021107 AREA: EP26-A2 SHT. 1 OF 1 REV. 01
<SECURITY LEVEL2>

INSUL:
75/IH
N MATERIAL LIST
INSUL:
PT| SIZE
25/IS
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
ASSEMBLY UP TO STEAM TRAP BY MANIFOLD VENDOR PIPE
SST-A2A
1 APPTB0SABPG 3/4" PIPE A106GR.B SMLS PE ASME B36.10M IBR :S-160 0.5 M

FITTINGS
CONT.ON 2 DECTA0Q1RPG 3/4" 90 DEG ELBOW A105 CL.6000 SW ASME B16.11 IBR 1
EP26_A2-LP-322-021108
E 1812200 3/
4"
N 2110009 NP
S CUT PIPE LENGTH
EL +99104
PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS
NO (MM) (IN) NO (MM) (IN)
26
4 <1> 240 3/4 <2> 200 3/4

<1
>
1

2
90°

224
3/4"NPS
<2> 1

TO ATM
E 1812200
N 2109746
EL +98867
Isometric File Name : EP26_A2-LC-322-021108
Iso Extraction Date : 2022-09-08 12:31:05

DESIGN TEMP. ºC 320.00 OPE. TEMP. ºC 165.00 PAINT SYSTEM T2 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 3.50 OPE. PRESS. kg/cm2g 0.00 PWHT N
PROJECT NAME
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
1 07-09-2022 REVISED AS PER MARK1 PPK SP SS INS. CODE IS TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 01/12/2021 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS INS.THK mm 25 TEST PRESS. kg/cm2g 5.9 CLIENT NAME
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 10 PT or MT % 0 STRESS SYSTEM.NO NA
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-000-PRS-PID-000-0011(5/7) GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 3/4"-LC-322-021108-A2A-IS PIPE SPEC :A2A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : LC-322-021108 AREA: EP26-A2 SHT. 1 OF 1 REV. 01
<SECURITY LEVEL2>

N MATERIAL LIST

PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
2
PIPE
90°
1 APPTB0SABPG 3/4" PIPE A106GR.B SMLS PE ASME B36.10M IBR :S-160 0.5 M

FITTINGS
2 DECTA0Q1RPG 3/4" 90 DEG ELBOW A105 CL.6000 SW ASME B16.11 IBR 1

CUT PIPE LENGTH

PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS


NO (MM) (IN) NO (MM) (IN)
ASSEMBLY UP TO STEAM TRAP BY MANIFOLD VENDOR
<1 SST-A2A <1> 240 3/4 <2> 200 3/4
>
1

26
4

3/
4"
NP
S
INSUL:
3/4"NPS

25/IS
<2> 1

INSUL:
224

75/IH

CONT.ON
EP26_A2-LP-322-021109
E 1804200
N 2110990
EL +99104

TO ATM

E 1804200
N 2111254
EL +98867
Isometric File Name : EP26_A2-LC-322-021109
Iso Extraction Date : 2022-09-08 12:31:05

DESIGN TEMP. ºC 320.00 OPE. TEMP. ºC 165.00 PAINT SYSTEM T2 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 3.50 OPE. PRESS. kg/cm2g 0.00 PWHT N
PROJECT NAME
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
1 07-09-2022 REVISED AS PER MARK1 PPK SP SS INS. CODE IS TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 01/12/2021 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS INS.THK mm 25 TEST PRESS. kg/cm2g 5.9 CLIENT NAME
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 10 PT or MT % 0 STRESS SYSTEM.NO NA
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-000-PRS-PID-000-0011(5/7) GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 3/4"-LC-322-021109-A2A-IS PIPE SPEC :A2A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : LC-322-021109 AREA: EP26-A2 SHT. 1 OF 1 REV. 01
<SECURITY LEVEL2>

INSUL:
75/IH
N MATERIAL LIST
INSUL:
PT| SIZE
25/IS
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
PIPE
1 APPTB0SABPG 3/4" PIPE A106GR.B SMLS PE ASME B36.10M IBR :S-160 0.5 M

FITTINGS
2 DECTA0Q1RPG 3/4" 90 DEG ELBOW A105 CL.6000 SW ASME B16.11 IBR 1
CONT.ON
3/ EP26_A2-LP-322-021110
4"
NP E 1801800
S CUT PIPE LENGTH
N 2110009
EL +99104
PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS
NO (MM) (IN) NO (MM) (IN)
26
4 <1> 240 3/4 <2> 200 3/4

ASSEMBLY UP TO STEAM TRAP BY MANIFOLD VENDOR <1


SST-A2A >
1

2
90°

224
3/4"NPS
<2> 1

TO ATM
E 1801800
N 2109746
EL +98867
Isometric File Name : EP26_A2-LC-322-021110
Iso Extraction Date : 2022-09-08 12:31:05

DESIGN TEMP. ºC 320.00 OPE. TEMP. ºC 165.00 PAINT SYSTEM T2 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 3.50 OPE. PRESS. kg/cm2g 0.00 PWHT N
PROJECT NAME
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
1 07-09-2022 REVISED AS PER MARK1 PPK SP SS INS. CODE IS TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 01/12/2021 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS INS.THK mm 25 TEST PRESS. kg/cm2g 5.9 CLIENT NAME
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 10 PT or MT % 0 STRESS SYSTEM.NO NA
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-000-PRS-PID-000-0011(5/7) GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 3/4"-LC-322-021110-A2A-IS PIPE SPEC :A2A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : LC-322-021110 AREA: EP26-A2 SHT. 1 OF 1 REV. 01
<SECURITY LEVEL2>

INSUL:
75/IH
N MATERIAL LIST
ASSEMBLY UP TO STEAM TRAP BY MANIFOLD VENDOR
SST-A2A INSUL:
PT| SIZE
25/IS
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
PIPE
1 APPTB0SABPG 3/4" PIPE A106GR.B SMLS PE ASME B36.10M IBR :S-160 0.7 M

FITTINGS
CONT.ON 2 DECTA0Q1RPG 3/4" 90 DEG ELBOW A105 CL.6000 SW ASME B16.11 IBR 1
EP26_A2-LP-322-021251
E 1802100 <1 26
N 2011310 > 2
1
EL +99317 3/ CUT PIPE LENGTH
4"
NP PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS
S
NO (MM) (IN) NO (MM) (IN)

<1> 238 3/4 <2> 413 3/4

2
90°

437
3/4"NPS
<2> 1

13
TO ATM

E 1802100
N 2011048
Isometric File Name : EP26_A2-LC-322-021251

EL +98867
Iso Extraction Date : 2022-08-19 15:12:01

DESIGN TEMP. ºC 320.00 OPE. TEMP. ºC 165.00 PAINT SYSTEM T2 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 3.50 OPE. PRESS. kg/cm2g 0.00 PWHT N
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
INS. CODE IS TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm 25 TEST PRESS. kg/cm2g 5.9 CLIENT NAME


17-08-2022 APPROVED FOR CONSTRUCTION PPK SP SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 10 PT or MT % 0 STRESS SYSTEM.NO NA
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-000-PRS-PID-000-0011 (5 OfGAD
7) NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 3/4"-LC-322-021251-A2A-IS PIPE SPEC :A2A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : LC-322-021251 AREA: EP26-A2 SHT. 1 OF 1 REV. 0
<SECURITY LEVEL2>

INSUL:
75/IH ?
N MATERIAL LIST
INSUL:
PT| SIZE
25/IS
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
PIPE
1 APPTB0SABPG 3/4" PIPE A106GR.B SMLS PE ASME B36.10M IBR :S-160 0.7 M

FITTINGS
ASSEMBLY UP TO STEAM TRAP BY MANIFOLD VENDOR 2 DECTA0Q1RPG 3/4" 90 DEG ELBOW A105 CL.6000 SW ASME B16.11 IBR 1
SST-A2A
<1 26
> 2
1
3/ CUT PIPE LENGTH
4"
NP PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS
S
NO (MM) (IN) NO (MM) (IN)

<1> 238 3/4 <2> 413 3/4

2
90°

437
CONT.ON
EP26_A2-LP-322-021252
E 1802100
N 2009710
EL +99317

3/4"NPS
<2> 1

13
TO ATM

E 1802100
N 2009448
Isometric File Name : EP26_A2-LC-322-021252

EL +98867
Iso Extraction Date : 2022-08-19 15:12:36

DESIGN TEMP. ºC 320.00 OPE. TEMP. ºC 165.00 PAINT SYSTEM T2 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 3.50 OPE. PRESS. kg/cm2g 0.00 PWHT N
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
INS. CODE IS TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm 25 TEST PRESS. kg/cm2g 5.9 CLIENT NAME


17-08-2022 APPROVED FOR CONSTRUCTION PPK SP SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 10 PT or MT % 0 STRESS SYSTEM.NO NA
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-000-PRS-PID-000-0011 (5 OfGAD
7) NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 3/4"-LC-322-021252-A2A-IS PIPE SPEC :A2A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : LC-322-021252 AREA: EP26-A2 SHT. 1 OF 1 REV. 0
<SECURITY LEVEL2>

INSUL:
75/IH
N MATERIAL LIST
INSUL:
PT| SIZE
25/IS
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
PIPE
1 APPTB0SABPG 3/4" PIPE A106GR.B SMLS PE ASME B36.10M IBR :S-160 0.7 M

FITTINGS
ASSEMBLY UP TO STEAM TRAP BY MANIFOLD VENDOR 2 DECTA0Q1RPG 3/4" 90 DEG ELBOW A105 CL.6000 SW ASME B16.11 IBR 1
SST-A2A
<1 26
> 2
1
3/ CUT PIPE LENGTH
4"
NP PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS
S
NO (MM) (IN) NO (MM) (IN)

<1> 238 3/4 <2> 413 3/4

2
90°

437
CONT.ON
EP26_A2-LP-322-021253
E 1802100
N 2080010
EL +99317

3/4"NPS
<2> 1

13
TO NEAREST SS/GRADE

E 1802100
N 2079748
Isometric File Name : EP26_A2-LC-322-021253

EL +98867
Iso Extraction Date : 2022-09-08 12:31:37

DESIGN TEMP. ºC 320.00 OPE. TEMP. ºC 165.00 PAINT SYSTEM T2 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 3.50 OPE. PRESS. kg/cm2g 0.00 PWHT N
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
INS. CODE IS TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm 25 TEST PRESS. kg/cm2g 5.9 CLIENT NAME


07-09-2022 APPROVED FOR CONSTRUCTION PPK SP SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 10 PT or MT % 0 STRESS SYSTEM.NO NA
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-000-PRS-PID-000-0011 (5 OfGAD
7) NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 3/4"-LC-322-021253-A2A-IS PIPE SPEC :A2A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : LC-322-021253 AREA: EP26-A2 SHT. 1 OF 1 REV. 0
<SECURITY LEVEL2>

INSUL:
75/IH
N MATERIAL LIST
INSUL:
PT| SIZE
25/IS
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
PIPE
1 APPTB0SABPG 3/4" PIPE A106GR.B SMLS PE ASME B36.10M IBR :S-160 0.7 M

FITTINGS
ASSEMBLY UP TO STEAM TRAP BY MANIFOLD VENDOR 2 DECTA0Q1RPG 3/4" 90 DEG ELBOW A105 CL.6000 SW ASME B16.11 IBR 1
SST-A2A
<1 26
> 2
1
3/ CUT PIPE LENGTH
4"
NP PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS
S
NO (MM) (IN) NO (MM) (IN)

<1> 238 3/4 <2> 413 3/4

2
90°

437
CONT.ON
EP26_A2-LP-322-021254
E 1802100
N 2078710
EL +99317

3/4"NPS
<2> 1

13
TO NEAREST SS/GRADE

E 1802100
N 2078448
Isometric File Name : EP26_A2-LC-322-021254

EL +98867
Iso Extraction Date : 2022-09-08 12:32:08

DESIGN TEMP. ºC 320.00 OPE. TEMP. ºC 165.00 PAINT SYSTEM T2 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 3.50 OPE. PRESS. kg/cm2g 0.00 PWHT N
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
INS. CODE IS TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm 25 TEST PRESS. kg/cm2g 5.9 CLIENT NAME


07-09-2022 APPROVED FOR CONSTRUCTION PPK SP SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 10 PT or MT % 0 STRESS SYSTEM.NO NA
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-000-PRS-PID-000-0011 (5 OfGAD
7) NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 3/4"-LC-322-021254-A2A-IS PIPE SPEC :A2A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : LC-322-021254 AREA: EP26-A2 SHT. 1 OF 1 REV. 0
<SECURITY LEVEL2>

N MATERIAL LIST

PT| SIZE
E 1802100 NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
N 2008900
EL +100491 PIPE

3/4"NPS
1 APPTB0SABPG 1.1/2" PIPE A106GR.B SMLS PE ASME B36.10M IBR :S-XS 1.4 M

FITTINGS

138
1.1/2X3/4"NPS 2 CRL-8 1.1/2" SPECIALITY ITEM - CONDENSATE RETURN MANIFOLD 1

3 DECTA0P1RPG 1.1/2" 90 DEG ELBOW A105 CL.3000 SW ASME B16.11 IBR 2


AS-EP26-665
16
CUT PIPE LENGTH
505 2
CRL-PR16-105 PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS
CRL-8 NO (MM) (IN) NO (MM) (IN)

<1> 313 1.1/2 <2> 433 1.1/2

<1> 1
<3> 566 1.1/2

347
1.
3
90°
EL +99480

50
<2 0
>
1

1.

3
90°

600
1.1/2"NPS
<3> 1

24
TO NEAREST SS/GRADE

E 1802100
N 2008400
Isometric File Name : EP26_A2-LC-322-022105

EL +98856
Iso Extraction Date : 2022-09-08 13:12:43

DESIGN TEMP. ºC 320.00 OPE. TEMP. ºC 165.00 PAINT SYSTEM T2 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 3.50 OPE. PRESS. kg/cm2g 0.00 PWHT N
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
1 07-09-2022 REVISED AS PER MARK1 PPK SP SS INS. CODE IS TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm 25 TEST PRESS. kg/cm2g 5.9 CLIENT NAME


01/12/2021 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 10 PT or MT % 0 STRESS SYSTEM.NO NA
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-000-PRS-PID-000-0011 (7/7)GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 1-1/2"-LC-322-022105-A2A-IS PIPE SPEC :A2A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : LC-322-022105 AREA: EP26-A2 SHT. 1 OF 1 REV. 1
<SECURITY LEVEL2>

N MATERIAL LIST

PT| SIZE
E 1802100 NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
N 2007600
EL +100491 PIPE

3/4"NPS
1 APPTB0SABPG 1.1/2" PIPE A106GR.B SMLS PE ASME B36.10M IBR :S-XS 1.4 M

FITTINGS

138
1.1/2X3/4"NPS 2 CRL-8 1.1/2" SPECIALITY ITEM - CONDENSATE RETURN MANIFOLD 1

3 DECTA0P1RPG 1.1/2" 90 DEG ELBOW A105 CL.3000 SW ASME B16.11 IBR 2


AS-EP26-665
16
CUT PIPE LENGTH
505 2
CRL-PR16-106 PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS
CRL-8 NO (MM) (IN) NO (MM) (IN)

<1> 313 1.1/2 <2> 433 1.1/2

<1> 1
<3> 566 1.1/2

347
1.
3
90°
EL +99480

50
<2 0
>
1

3
90°

1.

600
1.1/2"NPS
<3> 1

24
TO NEAREST SS/GRADE

E 1802100
N 2007100
Isometric File Name : EP26_A2-LC-322-022106

EL +98856
Iso Extraction Date : 2022-09-08 13:13:28

DESIGN TEMP. ºC 320.00 OPE. TEMP. ºC 165.00 PAINT SYSTEM T2 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 3.50 OPE. PRESS. kg/cm2g 0.00 PWHT N
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
1 07-09-2022 REVISED AS PER MARK1 PPK SP SS INS. CODE IS TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm 25 TEST PRESS. kg/cm2g 5.9 CLIENT NAME


01/12/2021 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 10 PT or MT % 0 STRESS SYSTEM.NO NA
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-000-PRS-PID-000-0011 (7/7)GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 1-1/2"-LC-322-022106-A2A-IS PIPE SPEC :A2A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : LC-322-022106 AREA: EP26-A2 SHT. 1 OF 1 REV. 1
<SECURITY LEVEL2>

N MATERIAL LIST

PT| SIZE
E 1802100 NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
N 2082900
EL +100491 PIPE

3/4"NPS
1 APPTB0SABPG 1.1/2" PIPE A106GR.B SMLS PE ASME B36.10M IBR :S-XS 1.4 M

FITTINGS

138
1.1/2X3/4"NPS 2 CRL-8 1.1/2" SPECIALITY ITEM - CONDENSATE RETURN MANIFOLD 1

3 DECTA0P1RPG 1.1/2" 90 DEG ELBOW A105 CL.3000 SW ASME B16.11 IBR 2


AS-EP26-666
16
CUT PIPE LENGTH
505 2
CRL-PR16-107 PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS
CRL-8 NO (MM) (IN) NO (MM) (IN)

<1> 313 1.1/2 <2> 433 1.1/2

<1> 1
<3> 566 1.1/2

347
1.
3
90°
EL +99480

50
<2 0
>
1

3
1.
90°

600
1.1/2"NPS
<3> 1

24
TO NEAREST SS/GRADE

E 1802100
N 2082400
Isometric File Name : EP26_A2-LC-322-022107

EL +98856
Iso Extraction Date : 2022-09-08 13:14:10

DESIGN TEMP. ºC 320.00 OPE. TEMP. ºC 165.00 PAINT SYSTEM T2 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 3.50 OPE. PRESS. kg/cm2g 0.00 PWHT N
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
1 07-09-2022 REVISED AS PER MARK1 PPK SP SS INS. CODE IS TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm 25 TEST PRESS. kg/cm2g 5.9 CLIENT NAME


01/12/2021 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 10 PT or MT % 0 STRESS SYSTEM.NO NA
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-000-PRS-PID-000-0011 (7/7)GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 1-1/2"-LC-322-022107-A2A-IS PIPE SPEC :A2A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : LC-322-022107 AREA: EP26-A2 SHT. 1 OF 1 REV. 1
<SECURITY LEVEL2>

N MATERIAL LIST

PT| SIZE
E 1802100 NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
N 2081700
EL +100491 PIPE

3/4"NPS
1 APPTB0SABPG 1.1/2" PIPE A106GR.B SMLS PE ASME B36.10M IBR :S-XS 1.4 M

FITTINGS

138
1.1/2X3/4"NPS 2 CRL-8 1.1/2" SPECIALITY ITEM - CONDENSATE RETURN MANIFOLD 1

3 DECTA0P1RPG 1.1/2" 90 DEG ELBOW A105 CL.3000 SW ASME B16.11 IBR 2


AS-EP26-666
16
CUT PIPE LENGTH
505 2
CRL-PR16-108 PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS
CRL-8 NO (MM) (IN) NO (MM) (IN)

<1> 313 1.1/2 <2> 433 1.1/2

<1> 1
<3> 566 1.1/2

347
1.
3
90°
EL +99480

50
<2 0
>
1

3
90°

1.

600
1.1/2"NPS
<3> 1

24
TO NEAREST SS/GRADE

E 1802100
N 2081200
Isometric File Name : EP26_A2-LC-322-022108

EL +98856
Iso Extraction Date : 2022-09-08 13:14:52

DESIGN TEMP. ºC 320.00 OPE. TEMP. ºC 165.00 PAINT SYSTEM T2 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 3.50 OPE. PRESS. kg/cm2g 0.00 PWHT N
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
1 07-09-2022 REVISED AS PER MARK1 PPK SP SS INS. CODE IS TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm 25 TEST PRESS. kg/cm2g 5.9 CLIENT NAME


01/12/2021 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 10 PT or MT % 0 STRESS SYSTEM.NO NA
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-000-PRS-PID-000-0011 (7/7)GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 1-1/2"-LC-322-022108-A2A-IS PIPE SPEC :A2A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : LC-322-022108 AREA: EP26-A2 SHT. 1 OF 1 REV. 1
<SECURITY LEVEL2>

E 1798800
N 2155000 2 N MATERIAL LIST
EL +100199 CRL-PR16-109
CRL-8 PT| SIZE
505 NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
PIPE
S5 16 1 APPTB0SABPG 3/4" PIPE A106GR.B SMLS PE ASME B36.10M IBR :S-160 0.5 M
AS-EP26-759
FITTINGS
2 CRL-8 1.1/2" SPECIALITY ITEM - STEAM SUPPLY MANIFOLD 1
1.1/2X3/4"NPS

113
FLANGES

3/4"NPS
3 CFATA0DBJPG 3/4" FLANGE SW A105 CL.150 RF ASME B16.5 IBR 1
:S-160

GASKETS
4 FFG213ACADBHA 3/4" SPIRAL WOUND GASKET (G213ACA) CL.150 RF 4.5 1
68 MM ASME B16.20
STEM WEST
PIPE SUPPORTS
DRAIN ASSEMBLY UPTO FLANGE BY MANIFOLD VENDOR.
5 Special 1.1/2" AS-EP26-759 1

85
PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
BOLTS
6 EBEBB0A 1/2 " STUD BOLT(FULL THREADED)/HEX.NUT(HEAVY) 4
A193GR.B7/A194GR.2H ASME B18.2.1/ASME
B18.2.2 - 65 mm Length
F3 G4 B6

CUT PIPE LENGTH

PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS


NO (MM) (IN) NO (MM) (IN)

<1> 498 3/4

504
<1> 1

TO ATM
E 1798800
N 2155000
EL +98867
Isometric File Name : EP26_A2-LC-322-022109
Iso Extraction Date : 2022-09-08 12:31:05

DESIGN TEMP. ºC 320.00 OPE. TEMP. ºC 165.00 PAINT SYSTEM T2 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 3.50 OPE. PRESS. kg/cm2g 0.00 PWHT N
PROJECT NAME
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
1 07-09-2022 REVISED AS PER MARK1 PPK SP SS INS. CODE IS TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 01/12/2021 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS INS.THK mm 25 TEST PRESS. kg/cm2g 5.9 CLIENT NAME
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 10 PT or MT % 0 STRESS SYSTEM.NO NA
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-000-PRS-PID-000-0011 (7/7)GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 1-1/2"-LC-322-022109-A2A-IS PIPE SPEC :A2A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : LC-322-022109 AREA: EP26-A2 SHT. 1 OF 1 REV. 01
<SECURITY LEVEL2>

E 1800000
N 2156200 2 N MATERIAL LIST
CRL-PR16-110
EL +100449 CRL-12 PT| SIZE
S5 755 NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
AS-EP26-760 PIPE
16 1 APPTB0SABPG 3/4" PIPE A106GR.B SMLS PE ASME B36.10M IBR :S-160 0.5 M

1.1/2X3/4"NPS FITTINGS
2 CRL-12 1.1/2" SPECIALITY ITEM - STEAM SUPPLY MANIFOLD 1

113
FLANGES

3/4"NPS
3 CFATA0DBJPG 3/4" FLANGE SW A105 CL.150 RF ASME B16.5 IBR 1
:S-160

GASKETS
4 FFG213ACADBHA 3/4" SPIRAL WOUND GASKET (G213ACA) CL.150 RF 4.5 1
68 MM ASME B16.20

PIPE SUPPORTS
5 Special 1.1/2" AS-EP26-760 1
STEM NORTH
DRAIN ASSEMBLY UPTO FLANGE BY MANIFOLD VENDOR.

85
PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
BOLTS
6 EBEBB0A 1/2 " STUD BOLT(FULL THREADED)/HEX.NUT(HEAVY) 4
A193GR.B7/A194GR.2H ASME B18.2.1/ASME
B18.2.2 - 65 mm Length
F3 G4 B6

CUT PIPE LENGTH

PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS


NO (MM) (IN) NO (MM) (IN)

<1> 498 3/4

504
<1> 1

TO ATM
E 1800000
N 2156200
EL +98867
Isometric File Name : EP26_A2-LC-322-022110
Iso Extraction Date : 2022-09-08 12:31:05

DESIGN TEMP. ºC 320.00 OPE. TEMP. ºC 165.00 PAINT SYSTEM T2 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 3.50 OPE. PRESS. kg/cm2g 0.00 PWHT N
PROJECT NAME
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
1 07-09-2022 REVISED AS PER MARK1 PPK SP SS INS. CODE IS TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 01/12/2021 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS INS.THK mm 25 TEST PRESS. kg/cm2g 5.9 CLIENT NAME
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 10 PT or MT % 0 STRESS SYSTEM.NO NA
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-000-PRS-PID-000-0011 (7/7)GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 1-1/2"-LC-322-022110-A2A-IS PIPE SPEC :A2A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : LC-322-022110 AREA: EP26-A2 SHT. 1 OF 1 REV. 01
<SECURITY LEVEL2>

E 1801200
N 2155000 2 N MATERIAL LIST
EL +100199 CRL-PR16-111
CRL-8 PT| SIZE
505 NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
PIPE
S5 16 1 APPTB0SABPG 3/4" PIPE A106GR.B SMLS PE ASME B36.10M IBR :S-160 0.5 M
AS-EP26-761
FITTINGS
2 CRL-8 1.1/2" SPECIALITY ITEM - STEAM SUPPLY MANIFOLD 1
1.1/2X3/4"NPS

113
FLANGES

3/4"NPS
3 CFATA0DBJPG 3/4" FLANGE SW A105 CL.150 RF ASME B16.5 IBR 1
:S-160

GASKETS
4 FFG213ACADBHA 3/4" SPIRAL WOUND GASKET (G213ACA) CL.150 RF 4.5 1
68 MM ASME B16.20
STEM EAST
PIPE SUPPORTS
DRAIN ASSEMBLY UPTO FLANGE BY MANIFOLD VENDOR.
5 Special 1.1/2" AS-EP26-761 1

85
PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
BOLTS
6 EBEBB0A 1/2 " STUD BOLT(FULL THREADED)/HEX.NUT(HEAVY) 4
A193GR.B7/A194GR.2H ASME B18.2.1/ASME
B18.2.2 - 65 mm Length
F3 G4 B6

CUT PIPE LENGTH

PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS


NO (MM) (IN) NO (MM) (IN)

<1> 498 3/4

504
<1> 1

TO ATM
E 1801200
N 2155000
EL +98867
Isometric File Name : EP26_A2-LC-322-022111
Iso Extraction Date : 2022-09-08 12:31:05

DESIGN TEMP. ºC 320.00 OPE. TEMP. ºC 165.00 PAINT SYSTEM T2 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 3.50 OPE. PRESS. kg/cm2g 0.00 PWHT N
PROJECT NAME
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
1 07-09-2022 REVISED AS PER MARK1 PPK SP SS INS. CODE IS TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 01/12/2021 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS INS.THK mm 25 TEST PRESS. kg/cm2g 5.9 CLIENT NAME
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 10 PT or MT % 0 STRESS SYSTEM.NO NA
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-000-PRS-PID-000-0011 (7/7)GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 1-1/2"-LC-322-022111-A2A-IS PIPE SPEC :A2A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : LC-322-022111 AREA: EP26-A2 SHT. 1 OF 1 REV. 01
<SECURITY LEVEL2>

E 1809800
N 2155000 2 N MATERIAL LIST
EL +100449 CRL-PR16-112
CRL-12 PT| SIZE
755 NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
PIPE
S5 16 1 APPTB0SABPG 3/4" PIPE A106GR.B SMLS PE ASME B36.10M IBR :S-160 0.5 M
AS-EP26-762
FITTINGS
2 CRL-12 1.1/2" SPECIALITY ITEM - STEAM SUPPLY MANIFOLD 1
1.1/2X3/4"NPS

113
FLANGES

3/4"NPS
3 CFATA0DBJPG 3/4" FLANGE SW A105 CL.150 RF ASME B16.5 IBR 1
:S-160

GASKETS
4 FFG213ACADBHA 3/4" SPIRAL WOUND GASKET (G213ACA) CL.150 RF 4.5 1
68 MM ASME B16.20
STEM WEST
PIPE SUPPORTS
DRAIN ASSEMBLY UPTO FLANGE BY MANIFOLD VENDOR.
5 Special 1.1/2" AS-EP26-762 1

85
PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
BOLTS
6 EBEBB0A 1/2 " STUD BOLT(FULL THREADED)/HEX.NUT(HEAVY) 4
A193GR.B7/A194GR.2H ASME B18.2.1/ASME
B18.2.2 - 65 mm Length
F3 G4 B6

CUT PIPE LENGTH

PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS


NO (MM) (IN) NO (MM) (IN)

<1> 498 3/4

504
<1> 1

TO ATM
E 1809800
N 2155000
EL +98867
Isometric File Name : EP26_A2-LC-322-022112
Iso Extraction Date : 2022-09-08 12:31:05

DESIGN TEMP. ºC 320.00 OPE. TEMP. ºC 165.00 PAINT SYSTEM T2 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 3.50 OPE. PRESS. kg/cm2g 0.00 PWHT N
PROJECT NAME
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
1 07-09-2022 REVISED AS PER MARK1 PPK SP SS INS. CODE IS TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 01/12/2021 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS INS.THK mm 25 TEST PRESS. kg/cm2g 5.9 CLIENT NAME
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 10 PT or MT % 0 STRESS SYSTEM.NO NA
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-000-PRS-PID-000-0011 (7/7)GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 1-1/2"-LC-322-022112-A2A-IS PIPE SPEC :A2A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : LC-322-022112 AREA: EP26-A2 SHT. 1 OF 1 REV. 01
<SECURITY LEVEL2>

N MATERIAL LIST

PT| SIZE
E 1802100 NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
N 2043550
EL +100491 PIPE

3/4"NPS
1 APPTB0SABPG 1.1/2" PIPE A106GR.B SMLS PE ASME B36.10M IBR :S-XS 1.4 M

FITTINGS

138
1.1/2X3/4"NPS 2 CRL-8 1.1/2" SPECIALITY ITEM - CONDENSATE RETURN MANIFOLD 1

3 DECTA0P1RPG 1.1/2" 90 DEG ELBOW A105 CL.3000 SW ASME B16.11 IBR 2


AS-EP26-903
16
CUT PIPE LENGTH
505 2
CRL-PR16-105A PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS
CRL-8 NO (MM) (IN) NO (MM) (IN)

<1> 313 1.1/2 <2> 433 1.1/2

<1> 1
<3> 566 1.1/2

347
3
90°
EL +99480

50
<2 0
>
1

3
90°

600
1.1/2"NPS
<3> 1

24
TO NEAREST SS/GRADE

E 1802100
N 2043050
Isometric File Name : EP26_A2-LC-322-022256

EL +98856
Iso Extraction Date : 2022-09-08 12:32:38

DESIGN TEMP. ºC 320.00 OPE. TEMP. ºC 165.00 PAINT SYSTEM T2 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 3.50 OPE. PRESS. kg/cm2g 0.00 PWHT N
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
INS. CODE IS TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm 25 TEST PRESS. kg/cm2g 5.9 CLIENT NAME


07-09-2022 APPROVED FOR CONSTRUCTION PPK SP SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 10 PT or MT % 0 STRESS SYSTEM.NO NA
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-000-PRS-PID-000-0011 (7/7)GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 1-1/2"-LC-322-022256-A2A-IS PIPE SPEC :A2A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : LC-322-022256 AREA: EP26-A2 SHT. 1 OF 1 REV. 0
<SECURITY LEVEL2>

N MATERIAL LIST

PT| SIZE
E 1802100 NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
N 2044850
EL +100491 PIPE

3/4"NPS
1 APPTB0SABPG 1.1/2" PIPE A106GR.B SMLS PE ASME B36.10M IBR :S-XS 1.4 M

FITTINGS

138
1.1/2X3/4"NPS 2 CRL-8 1.1/2" SPECIALITY ITEM - CONDENSATE RETURN MANIFOLD 1

3 DECTA0P1RPG 1.1/2" 90 DEG ELBOW A105 CL.3000 SW ASME B16.11 IBR 2


AS-EP26-903
16
CUT PIPE LENGTH
505 2
CRL-PR16-106A PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS
CRL-8 NO (MM) (IN) NO (MM) (IN)

<1> 313 1.1/2 <2> 433 1.1/2

<1> 1
<3> 566 1.1/2

347
3
90°
EL +99480

50
<2 0
>
1

3
90°

600
1.1/2"NPS
<3> 1

24
TO NEAREST SS/GRADE

E 1802100
N 2044350
Isometric File Name : EP26_A2-LC-322-022257

EL +98856
Iso Extraction Date : 2022-09-08 12:33:19

DESIGN TEMP. ºC 320.00 OPE. TEMP. ºC 165.00 PAINT SYSTEM T2 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 3.50 OPE. PRESS. kg/cm2g 0.00 PWHT N
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
INS. CODE IS TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm 25 TEST PRESS. kg/cm2g 5.9 CLIENT NAME


07-09-2022 APPROVED FOR CONSTRUCTION PPK SP SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 10 PT or MT % 0 STRESS SYSTEM.NO NA
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-000-PRS-PID-000-0011 (7/7)GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 1-1/2"-LC-322-022257-A2A-IS PIPE SPEC :A2A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : LC-322-022257 AREA: EP26-A2 SHT. 1 OF 1 REV. 0
<SECURITY LEVEL2>

N MATERIAL LIST

PT| SIZE
E 1802100 NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
N 2046150
EL +100491 PIPE

3/4"NPS
1 APPTB0SABPG 1.1/2" PIPE A106GR.B SMLS PE ASME B36.10M IBR :S-XS 1.4 M

FITTINGS

138
1.1/2X3/4"NPS 2 CRL-8 1.1/2" SPECIALITY ITEM - CONDENSATE RETURN MANIFOLD 1

3 DECTA0P1RPG 1.1/2" 90 DEG ELBOW A105 CL.3000 SW ASME B16.11 IBR 2


AS-EP26-903
16
CUT PIPE LENGTH
505 2
CRL-PR16-107A PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS
CRL-8 NO (MM) (IN) NO (MM) (IN)

<1> 313 1.1/2 <2> 433 1.1/2

<1> 1
<3> 566 1.1/2

347
3
90°
EL +99480

50
<2 0
>
1

3
90°

600
1.1/2"NPS
<3> 1

24
TO NEAREST SS/GRADE

E 1802100
N 2045650
Isometric File Name : EP26_A2-LC-322-022260

EL +98856
Iso Extraction Date : 2022-09-08 12:34:00

DESIGN TEMP. ºC 320.00 OPE. TEMP. ºC 165.00 PAINT SYSTEM T2 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 3.50 OPE. PRESS. kg/cm2g 0.00 PWHT N
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
INS. CODE IS TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm 25 TEST PRESS. kg/cm2g 5.9 CLIENT NAME


07-09-2022 APPROVED FOR CONSTRUCTION PPK SP SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 10 PT or MT % 0 STRESS SYSTEM.NO NA
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-000-PRS-PID-000-0011 (7/7)GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 1-1/2"-LC-322-022260-A2A-IS PIPE SPEC :A2A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : LC-322-022260 AREA: EP26-A2 SHT. 1 OF 1 REV. 0
<SECURITY LEVEL2>

N MATERIAL LIST

PT| SIZE
E 1802100 NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
N 2047450
EL +100491 PIPE

3/4"NPS
1 APPTB0SABPG 1.1/2" PIPE A106GR.B SMLS PE ASME B36.10M IBR :S-XS 1.4 M

FITTINGS

138
1.1/2X3/4"NPS 2 CRL-8 1.1/2" SPECIALITY ITEM - CONDENSATE RETURN MANIFOLD 1

3 DECTA0P1RPG 1.1/2" 90 DEG ELBOW A105 CL.3000 SW ASME B16.11 IBR 2


S4
16 AS-EP26-903 PIPE SUPPORTS
4 Special 1.1/2" AS-EP26-903 1
505
2
CRL-PR16-108A
CUT PIPE LENGTH
CRL-8
PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS

<1> 1
NO (MM) (IN) NO (MM) (IN)

<1> 313 1.1/2 <2> 433 1.1/2


<3> 566 1.1/2

347
3
90°
EL +99480

50
<2 0
>
1

3
90°

600
1.1/2"NPS
<3> 1

24
TO NEAREST SS/GRADE

E 1802100
N 2046950
Isometric File Name : EP26_A2-LC-322-022261

EL +98856
Iso Extraction Date : 2022-09-08 12:34:41

DESIGN TEMP. ºC 320.00 OPE. TEMP. ºC 165.00 PAINT SYSTEM T2 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 3.50 OPE. PRESS. kg/cm2g 0.00 PWHT N
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
INS. CODE IS TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm 25 TEST PRESS. kg/cm2g 5.9 CLIENT NAME


07-09-2022 APPROVED FOR CONSTRUCTION PPK SP SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 10 PT or MT % 0 STRESS SYSTEM.NO NA
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-000-PRS-PID-000-0011 (7/7)GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 1-1/2"-LC-322-022261-A2A-IS PIPE SPEC :A2A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : LC-322-022261 AREA: EP26-A2 SHT. 1 OF 1 REV. 0
<SECURITY LEVEL2>

1
MATERIAL LIST
CONT.ON
EP26_A2-LP-322-0101_B PT| SIZE
E 1804068 NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
N 1976750 DTL-MPR16-501 PIPE
EL +113157 1 APPTK0MBBPG 36" PIPE A672GR.B60CL.12 EFW BE ASME B36.10M IBR 6.3 M
E 1804068 1 2 APPTB0SABPG 3/4"
:S-STD
PIPE A106GR.B SMLS PE ASME B36.10M IBR :S-160 0.6 M
N 1976250
EL +114011
DTL-MPR16-502 FITTINGS
3 DSZTK0MBBPG 36X3" WELD BRANCH RPAD A672GR.B60CL.12 EFW BE ASME 1
E 1804068 B36.10M IBR :S-STD x S-STD
N 1975750
1
7 4 DHDTA0P1RPG 36X1.1/2" HALF COUPLING A105 CL.3000 SW ASME B16.11 IBR 1
STEM WEST 14 EL +114011
5 DHDTA0Q1RPG 36X3/4" HALF COUPLING A105 CL.6000 SW ASME B16.11 IBR 2
57 7
STEM WEST 6 DEATB0P2QPG 36" 90 DEG ELBOW A234GR.WPB WELD BW ASME B16.9 1
<1> 2 IBR :S-STD
14
CONT.ON VALVES
36"NPS
LP-322-0101_A SHT 3
783
57
1
7 51002 3/4" GATE VALVE CL.800 A105/HF SW BB,OS&Y BY 2
MFR/API 602/ASME B16.11 HANDWHEEL IBR
50
0 <2> 2 PIPE SUPPORTS
8 F1S15 36" F1S15-600-200-G10-G0-36 1

783
1
5 50
36X3/4"NPS 0 CUT PIPE LENGTH

PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS


NO (MM) (IN) NO (MM) (IN)
5
36X3/4"NPS <1> 300 3/4 <2> 300 3/4
<3> 4499 36 <4> 1756 36
12 3
25
36"X3"NPS CONT.ON
EP26_A2-LP-322-021106
E 1804068
N 1973270
EL +113648
INSUL:
130/IH

36"NPS
491

3128
<4> 1
INSUL:
100/IH INSUL:
12 85/IH
3"NPS

55 INSUL:
130/IH

37
0
4
36X1.1/2"NPS

<3
>
1
S8 23
91
F1S15-600-200-G10-G0-36
CONT.ON
LP-322-0101_A SHT 2

6
90°
Isometric File Name : EP26_A2-LP-322-0101_A
Iso Extraction Date : 2022-11-17 11:18:42

DESIGN TEMP. ºC 320.00 OPE. TEMP. ºC 320.00 PAINT SYSTEM T6 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 7.00 OPE. PRESS. kg/cm2g 5.00 PWHT N
PROJECT NAME
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
1 16/11/2022 REVISED AS PER MARK1 PPK SP SS INS. CODE IH TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 01/12/2021 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS INS.THK mm 130 TEST PRESS. kg/cm2g 12.88 CLIENT NAME
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 10 PT or MT % 0 STRESS SYSTEM.NO 6405-EPCM25_26-CA-0047
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-322-PRS-PID-000-0002 GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 36"-LP-322-0101_A-A2A-IH PIPE SPEC :A2A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : LP-322-0101_A AREA: EP26-A2 SHT. 1 OF 3 REV. 2
<SECURITY LEVEL2>

SEE SHT N MATERIAL LIST


LP-322-0101_A SHT 1
PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
PIPE
1 APPTB0SBBPG 3" PIPE A106GR.B SMLS BE ASME B36.10M IBR :S-STD 0.4 M

2 APPTB0SABPG 3/4" PIPE A106GR.B SMLS PE ASME B36.10M IBR :S-160 0.2 M

FITTINGS
3 DHDTA0Q1RPG 3X3/4" HALF COUPLING A105 CL.6000 SW ASME B16.11 IBR 1

4 DJATB0S2QPG 3" CAP A234GR.WPB SMLS BW ASME B16.9 IBR :S-STD 1

5 DFETA0Q1TPG 3/4" SOCKET OUTLET (FLAT) A105 CL.6000 SW MSS 1


SP-97 IBR

FLANGES
6 CFATA0DBJPG 3/4" FLANGE SW A105 CL.150 RF ASME B16.5 IBR 1

3"NPS
:S-160
7 CDBTA0DBJPG 3/4" BLIND FLANGE A105 CL.150 RF ASME B16.5 IBR 1

GASKETS
8 FFG213ACADBHA 3/4" SPIRAL WOUND GASKET (G213ACA) CL.150 RF 4.5 1
MM ASME B16.20

PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY

712
BOLTS
9 EBEBB0A 1/2 " STUD BOLT(FULL THREADED)/HEX.NUT(HEAVY) 4
A193GR.B7/A194GR.2H ASME B18.2.1/ASME
B18.2.2 - 65 mm Length

CUT PIPE LENGTH

PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS


NO (MM) (IN) NO (MM) (IN)

<1> 352 3 <2> 137 3/4

INSUL:
100/IH
INSUL:
40/IH
70

EL +112445
3
3X3/4"NPS
CONT.ON
EP26_A2-LP-322-02706
E 1803998
95

N 1974525
EL +112445
<1> 1

INSUL:
100/IH
INSUL:
E 1804068 4 75/IH
N 1974525 19
EL +112306 144
5
<2> 2
3/4"NPS
F6 G8 B9
7

E 1804068
N 1974525
Isometric File Name : EP26_A2-LP-322-0101_A

EL +112145
Iso Extraction Date : 2022-11-17 11:18:42

DESIGN TEMP. ºC 320.00 OPE. TEMP. ºC 320.00 PAINT SYSTEM T6 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 7.00 OPE. PRESS. kg/cm2g 5.00 PWHT N
PROJECT NAME
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
1 16/11/2022 REVISED AS PER MARK1 PPK SP SS INS. CODE IH TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 01/12/2021 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS INS.THK mm 130 TEST PRESS. kg/cm2g 12.88 CLIENT NAME
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 10 PT or MT % 0 STRESS SYSTEM.NO 6405-EPCM25_26-CA-0047
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-322-PRS-PID-000-0002 GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 36"-LP-322-0101_A-A2A-IH PIPE SPEC :A2A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : LP-322-0101_A AREA: EP26-A2 SHT. 2 OF 3 REV. 2
<SECURITY LEVEL2>

3
N MATERIAL LIST
90°
EL +117657 PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
36"NPS
PIPE
1 APPTK0MBBPG 36" PIPE A672GR.B60CL.12 EFW BE ASME B36.10M IBR 27.2 M
:S-STD
SEE SHT
LP-322-0101_A SHT 1 FITTINGS
INSUL:
491 85/IH 2 DHDTA0P1RPG 36X1.1/2" HALF COUPLING A105 CL.3000 SW ASME B16.11 IBR 2
INSUL:
130/IH 3 DEATB0P2QPG 36" 90 DEG ELBOW A234GR.WPB WELD BW ASME B16.9 3
23 IBR :S-STD
1372 29 491
PIPE SUPPORTS
INSUL:
85/IH 4 S11 36" S11-300-200-36 2
2
36X1.1/2"NPS INSUL: 5 G1S11 36" G1S11-300-200-36 1
130/IH
37 6 F1S15 36" F1S15-600-200-36 1
28 0
0
CONT.ON S4
EP26_A2-LP-322-021104 2 S11-300-200-36 CUT PIPE LENGTH
E 1804068 36X1.1/2"NPS
N 1968550 90 PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS
EL +118147 00
S5 NO (MM) (IN) NO (MM) (IN)
CONT.ON G1S11-300-200-36
EP26_A2-LP-322-021105 <1> 21275 36 <2> 1756 36
E 1804068 <3> 4089 36
N 1968270
EL +118147

90
00
21
41
0 S4
S11-300-200-36

<1 3
>
1 90°

450 0

<2> 1

4500
3 1960
90°
EL +113157

54 <3 3
61 >
1
36"NPS

S6
F1S15-600-200-36

CONT.ON
EP26_A1-LP-322-0101
E 1804065
N 1941400
EL +113157
Isometric File Name : EP26_A2-LP-322-0101_A
Iso Extraction Date : 2022-11-17 11:18:42

DESIGN TEMP. ºC 320.00 OPE. TEMP. ºC 320.00 PAINT SYSTEM T6 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 7.00 OPE. PRESS. kg/cm2g 5.00 PWHT N
PROJECT NAME
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
1 16/11/2022 REVISED AS PER MARK1 PPK SP SS INS. CODE IH TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 01/12/2021 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS INS.THK mm 130 TEST PRESS. kg/cm2g 12.88 CLIENT NAME
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 10 PT or MT % 0 STRESS SYSTEM.NO 6405-EPCM25_26-CA-0047
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-322-PRS-PID-000-0002 GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 36"-LP-322-0101_A-A2A-IH PIPE SPEC :A2A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : LP-322-0101_A AREA: EP26-A2 SHT. 3 OF 3 REV. 2
<SECURITY LEVEL2>

N MATERIAL LIST

PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
PIPE
1 APPTK0MBBPG 36" PIPE A672GR.B60CL.12 EFW BE ASME B36.10M IBR 8.7 M
:S-STD
2 APPTK0MBBPG 16" PIPE A672GR.B60CL.12 EFW BE ASME B36.10M IBR 0.3 M
:S-STD

FITTINGS
3 DSZTK0MBBPG 36X16" WELD BRANCH RPAD A672GR.B60CL.12 EFW BE ASME 1
CONT.ON B36.10M IBR :S-STD x S-STD
EP26_A2-LP-322-0101_C
E 1804068 PIPE SUPPORTS
N 1985352 4 S11 36" S11-300-200-36 2
EL +113157

<2 CUT PIPE LENGTH


>
1 S4 PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS
NO (MM) (IN) NO (MM) (IN)
S11-300-200-36
<1> 226 16 <2> 8601 36

36X30"NPS
76MM OFFSET 16"NPS CONT.ON
51
FLAT SIDE D 50 90° EP26_A2-LP-322-0213
E 1804068
N 1979250
61 EL +113793
02

<1> 2

636
3
36"X16"NPS
S4
S11-300-200-36
16
50

24
99 36"NPS

CONT.ON
EP26_A2-LP-322-0101_A
E 1804068
N 1976750
EL +113157
Isometric File Name : EP26_A2-LP-322-0101_B
Iso Extraction Date : 2022-06-17 16:36:59

DESIGN TEMP. ºC 320.00 OPE. TEMP. ºC 320.00 PAINT SYSTEM T6 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 7.00 OPE. PRESS. kg/cm2g 5.00 PWHT N
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
INS. CODE IH TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm 130 TEST PRESS. kg/cm2 g 12.88 CLIENT NAME


15/06/2022 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 10 PT or MT % 0 STRESS SYSTEM.NO 6405-EPCM25_26-CA-0047
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-322-PRS-PID-000-0002 GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 36"-LP-322-0101_B-A2A-IH PIPE SPEC :A2A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : LP-322-0101_B AREA: EP26-A2 SHT. 1 OF 1 REV. 0
<SECURITY LEVEL2>

N MATERIAL LIST

PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY

CONT.ON PIPE
LP-322-0101_C SHT 2 1 APPTK0MBBPG 20" PIPE A672GR.B60CL.12 EFW BE ASME B36.10M IBR 9.7 M
:S-STD
2 APPTB0SBBPG 3" PIPE A106GR.B SMLS BE ASME B36.10M IBR :S-STD 0.4 M

3 APPTB0SABPG 3/4" PIPE A106GR.B SMLS PE ASME B36.10M IBR :S-160 0.2 M

<5> 1 FITTINGS
20"NPS 4 DRBTB0P2QPG 36X30" ECC REDUCER A234GR.WPB WELD BW ASME B16.9 IBR 1
03 :S-STD x 9.53mm
S16 63 S16 5 DRBTB0P2QPG 30X20" ECC REDUCER A234GR.WPB WELD BW ASME B16.9 IBR 1
S2-300-200-20 00 S2-300-200-20 :9.53mm x S-STD
40 6 DSZTK0MBBPG 20X3" WELD BRANCH RPAD A672GR.B60CL.12 EFW BE ASME 1
B36.10M IBR :S-STD x S-STD
7 DEATB0P2QPG 20" 90 DEG ELBOW A234GR.WPB WELD BW ASME B16.9 1
8 IBR :S-STD
45° 8 DEBTB0P2QPG 20" 45 DEG ELBOW A234GR.WPB WELD BW ASME B16.9 1
EL +114324 IBR :S-STD
9 DHDTA0Q1RPG 3X3/4" HALF COUPLING A105 CL.6000 SW ASME B16.11 IBR 1
2
1 56 10 DJATB0S2QPG 3" CAP A234GR.WPB SMLS BW ASME B16.9 IBR :S-STD 1

11 DFETA0Q1TPG 3/4" SOCKET OUTLET (FLAT) A105 CL.6000 SW MSS 1


SP-97 IBR

37
19

1370
FLANGES

>
12 CFATA0DBJPG 3/4" FLANGE SW A105 CL.150 RF ASME B16.5 IBR 1
<4 13 CDBTA0DBJPG 3/4"
:S-160
BLIND FLANGE A105 CL.150 RF ASME B16.5 IBR 1

70 GASKETS
13 14 FFG213ACADBHA 3/4" SPIRAL WOUND GASKET (G213ACA) CL.150 RF 4.5 1
7 MM ASME B16.20
90° <3
>
1 EL +112954 PIPE SUPPORTS
15 G1S2 20" G1S2-300-200-G20-20 1
10 6
S15 88 20"X3"NPS 16 S2 20" S2-300-200-20 2
G1S2-300-200-G20-20
19 610 PT| SIZE
INSUL: 29 CONT.ON NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
130/IH 610 EP26_A2-LP-322-0101_B BOLTS
INSUL: E 1804068 17 EBEBB0A 1/2 " STUD BOLT(FULL THREADED)/HEX.NUT(HEAVY) 4
100/IH N 1985352
509

24 A193GR.B7/A194GR.2H ASME B18.2.1/ASME


84 EL +113157 B18.2.2 - 65 mm Length
INSUL: INSUL:
75/IH 70 100/IH 36"NPS

CUT PIPE LENGTH


EL +112445
4
PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS
36X30"NPS NO (MM) (IN) NO (MM) (IN)
CONT.ON 76MM OFFSET
EP26_A2-LP-322-02707 FLAT SIDE D <1> 354 3 <2> 137 3/4
E 1803998 9 <3> 2811 20 <4> 857 20
N 1989056 3X3/4"NPS 5 <5> 5985 20
<1> 2

EL +112445 30X20"NPS
127MM OFFSET
95

FLAT SIDE D
10
E 1804068
N 1989056
EL +112306 11

INSUL: <2> 3
100/IH 3/4"NPS
20
INSUL:
F12 G14 B17
144

75/IH
13

E 1804068
N 1989056
EL +112145
Isometric File Name : EP26_A2-LP-322-0101_C

1
Iso Extraction Date : 2022-11-11 13:58:00

DESIGN TEMP. ºC 320.00 OPE. TEMP. ºC 320.00 PAINT SYSTEM T6 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 7.00 OPE. PRESS. kg/cm2g 5.00 PWHT N
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
1 09/11/2022 REVISED AS PER MARK1 PPK SP SS INS. CODE IH TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm 130 TEST PRESS. kg/cm2g 12.88 CLIENT NAME


01/12/2021 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 10 PT or MT % 0 STRESS SYSTEM.NO 6405-EPCM25_26-CA-0047
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-322-PRS-PID-000-0002 GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 36"-LP-322-0101_C-A2A-IH PIPE SPEC :A2A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : LP-322-0101_C AREA: EP26-A2 SHT. 1 OF 10 REV. 1
<SECURITY LEVEL2>

N MATERIAL LIST

PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
PIPE
1 APPTK0MBBPG 20" PIPE A672GR.B60CL.12 EFW BE ASME B36.10M IBR 14.1 M
:S-STD
2 APPTB0SABPG 3/4" PIPE A106GR.B SMLS PE ASME B36.10M IBR :S-160 0.3 M

FITTINGS
3 DHDTA0Q1RPG 20X3/4" HALF COUPLING A105 CL.6000 SW ASME B16.11 IBR 1

4 DEATB0P2QPG 20" 90 DEG ELBOW A234GR.WPB WELD BW ASME B16.9 3


IBR :S-STD
5 DEBTB0P2QPG 20" 45 DEG ELBOW A234GR.WPB WELD BW ASME B16.9 1
IBR :S-STD

FLANGES
6 CFATA0DBJPG 3/4" FLANGE SW A105 CL.150 RF ASME B16.5 IBR 1
:S-160
7 CDBTA0DBJPG 3/4" BLIND FLANGE A105 CL.150 RF ASME B16.5 IBR 1

GASKETS
4 8 FFG213ACADBHA 3/4" SPIRAL WOUND GASKET (G213ACA) CL.150 RF 4.5 1
90° E 1812502 F6 G8 B11 MM ASME B16.20
N 1994500
EL +114913 9 VALVES
7 111 STEM NORTH 9 51002 3/4" GATE VALVE CL.800 A105/HF SW BB,OS&Y BY 1
MFR/API 602/ASME B16.11 HANDWHEEL IBR
2 <3 <2> 2 58
0 > PIPE SUPPORTS
15 1
65 INSUL: 10 S2 20" S2-300-200-20 2
70 43 75/IH

415
56 INSUL: PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
S10 130/IH
BOLTS
S2-300-200-20 <1> 2 3
00 20X3/4"NPS
11 EBEBB0A 1/2 " STUD BOLT(FULL THREADED)/HEX.NUT(HEAVY) 4
CONT.ON 40 A193GR.B7/A194GR.2H ASME B18.2.1/ASME
B18.2.2 - 65 mm Length
LP-322-0101_C SHT 3
5
45° 1
4 >
< 43 CUT PIPE LENGTH
56
PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS
S10 4 NO (MM) (IN) NO (MM) (IN)
S2-300-200-20 90°
<1> 135 3/4 <2> 105 3/4
37

<3> 7188 20 <4> 5985 20


20"NPS
19

<5> 857 20
1

1370

SEE SHT
>
<5

LP-322-0101_C SHT 1

70
13 762

20"NPS 4
90°
EL +112954
762
Isometric File Name : EP26_A2-LP-322-0101_C

1
Iso Extraction Date : 2022-11-11 13:58:00

DESIGN TEMP. ºC 320.00 OPE. TEMP. ºC 320.00 PAINT SYSTEM T6 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 7.00 OPE. PRESS. kg/cm2g 5.00 PWHT N
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
1 09/11/2022 REVISED AS PER MARK1 PPK SP SS INS. CODE IH TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm 130 TEST PRESS. kg/cm2g 12.88 CLIENT NAME


01/12/2021 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 10 PT or MT % 0 STRESS SYSTEM.NO 6405-EPCM25_26-CA-0047
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-322-PRS-PID-000-0002 GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 36"-LP-322-0101_C-A2A-IH PIPE SPEC :A2A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : LP-322-0101_C AREA: EP26-A2 SHT. 2 OF 10 REV. 1
<SECURITY LEVEL2>

CONT.ON
N MATERIAL LIST
CONT.ON
LP-322-0101_C SHT 4 EP26_A2-LP-322-021252
PT| SIZE
E 1804068 NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
N 2012100 PIPE
EL +113242
1 APPTB0SBBPG 3" PIPE A106GR.B SMLS BE ASME B36.10M IBR :S-STD 0.4 M
CONT.ON
4 EP26_A2-LP-322-021251 2 APPTB0SABPG 3/4" PIPE A106GR.B SMLS PE ASME B36.10M IBR :S-160 0.2 M
20 20X1.1/2"NPS E 1804068
"N N 2011700 FITTINGS
PS EL +113242 3 DSZTK0MBBPG 20X3" WELD BRANCH RPAD A672GR.B60CL.12 EFW BE ASME 1
288 B36.10M IBR :S-STD x S-STD 1
INSUL: 4 DHDTA0P1RPG 20X1.1/2" HALF COUPLING A105 CL.3000 SW ASME B16.11 IBR 2
85/IH
INSUL: 1 5 DHDTA0Q1RPG 3X3/4" HALF COUPLING A105 CL.6000 SW ASME B16.11 IBR 1
INSUL: 130/IH
6 DJATB0S2QPG 3" CAP A234GR.WPB SMLS BW ASME B16.9 IBR :S-STD 1
85/IH
INSUL: 40 288 7 DFETA0Q1TPG 3/4" SOCKET OUTLET (FLAT) A105 CL.6000 SW MSS 1
130/IH 0 SP-97 IBR
4
20X1.1/2"NPS FLANGES
S12
8 CFATA0DBJPG 3/4" FLANGE SW A105 CL.150 RF ASME B16.5 IBR 1
S2-300-200-20 :S-160
9 CDBTA0DBJPG 3/4" BLIND FLANGE A105 CL.150 RF ASME B16.5 IBR 1

GASKETS
10 FFG213ACADBHA 3/4" SPIRAL WOUND GASKET (G213ACA) CL.150 RF 4.5 1
MM ASME B16.20

PIPE SUPPORTS
11 G1S2 20" G1S2-300-200-20 1

60 12 S2 20" S2-300-200-20 1
00
11 PT| SIZE
63 NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
9
BOLTS
SEE SHT 13 EBEBB0A 1/2 " STUD BOLT(FULL THREADED)/HEX.NUT(HEAVY) 4
LP-322-0101_C SHT 2 A193GR.B7/A194GR.2H ASME B18.2.1/ASME
B18.2.2 - 65 mm Length

43 INSUL:
9 CUT PIPE LENGTH
100/IH
PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS
NO (MM) (IN) NO (MM) (IN)
S11 20 <1> 354 3 <2> 137 3/4
G1S2-300-200-20 "N
PS
INSUL:
130/IH 44
INSUL: 4
100/IH

509
3
INSUL: 20"X3"NPS
75/IH 70
EL +112445
CONT.ON
EP26_A2-LP-322-02708
E 1803998
N 2000062
EL +112445

<1> 1
5
3X3/4"NPS

95
6
E 1804068
N 2000062
EL +112306 7

INSUL: <2> 2
100/IH 3/4"NPS
20
INSUL:
F8 G10 B13

144
75/IH
9

E 1804068
N 2000062
Isometric File Name : EP26_A2-LP-322-0101_C

1 EL +112145
Iso Extraction Date : 2022-11-11 13:58:00

DESIGN TEMP. ºC 320.00 OPE. TEMP. ºC 320.00 PAINT SYSTEM T6 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 7.00 OPE. PRESS. kg/cm2g 5.00 PWHT N
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
1 09/11/2022 REVISED AS PER MARK1 PPK SP SS INS. CODE IH TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm 130 TEST PRESS. kg/cm2g 12.88 CLIENT NAME


01/12/2021 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 10 PT or MT % 0 STRESS SYSTEM.NO 6405-EPCM25_26-CA-0047
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-322-PRS-PID-000-0002 GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 36"-LP-322-0101_C-A2A-IH PIPE SPEC :A2A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : LP-322-0101_C AREA: EP26-A2 SHT. 3 OF 10 REV. 1
<SECURITY LEVEL2>

N MATERIAL LIST

PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
PIPE
1 APPTK0MBBPG 20" PIPE A672GR.B60CL.12 EFW BE ASME B36.10M IBR 31.8 M
:S-STD 1
2 APPTB0SBBPG 3" PIPE A106GR.B SMLS BE ASME B36.10M IBR :S-STD 0.4 M

3 APPTB0SABPG 3/4" PIPE A106GR.B SMLS PE ASME B36.10M IBR :S-160 0.5 M

FITTINGS
4 DSZTK0MBBPG 20X3" WELD BRANCH RPAD A672GR.B60CL.12 EFW BE ASME 1 1
CONT.ON B36.10M IBR :S-STD x S-STD
LP-322-0101_C SHT 5 1 5 DHDTA0Q1RPG 20X3/4" HALF COUPLING A105 CL.6000 SW ASME B16.11 IBR 1

6 DHDTA0Q1RPG 3X3/4" HALF COUPLING A105 CL.6000 SW ASME B16.11 IBR 1


4 DTL-MPR16-503
20"X3"NPS 7 DJATB0S2QPG 3" CAP A234GR.WPB SMLS BW ASME B16.9 IBR :S-STD 1
14 E 1804068
8 DFETA0Q1TPG 3/4" SOCKET OUTLET (FLAT) A105 CL.6000 SW MSS 1
32 N 2030000
SP-97 IBR
6 57 EL +113605
<4 12 FLANGES
> STEM WEST 9 CFATA0DBJPG 3/4" FLANGE SW A105 CL.150 RF ASME B16.5 IBR 1
INSUL: 1 10 :S-160
100/IH 55 <1> 3 S15 10 CDBTA0DBJPG 3/4" BLIND FLANGE A105 CL.150 RF ASME B16.5 IBR 1
G1S2-300-200-20
GASKETS
INSUL: 580 11 FFG213ACADBHA 3/4" SPIRAL WOUND GASKET (G213ACA) CL.150 RF 4.5 1
130/IH MM ASME B16.20
INSUL: 5
20X3/4"NPS VALVES
1
100/IH
12 51002 3/4" GATE VALVE CL.800 A105/HF SW BB,OS&Y BY 1
INSUL: 70 MFR/API 602/ASME B16.11 HANDWHEEL IBR
75/IH 509 500
PIPE SUPPORTS
6 13 S2 20" S2-300-200-20 2
CONT.ON 3X3/4"NPS
EP26_A2-LP-322-02709 14 F1S5 20" F1S5-500-200-20 1
E 1803998 E 1804068
<2> 2

N 2031056 EL +112445
N 2031056 15 G1S2 20" G1S2-300-200-20 1
EL +112306 S13
95

EL +112445
7 PT| SIZE
S2-300-200-20 17 NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
90
<3> 3 0 BOLTS
3/4"NPS 8
F9 G11 B16 16 EBEBB0A 1/2 " STUD BOLT(FULL THREADED)/HEX.NUT(HEAVY) 4
60 A193GR.B7/A194GR.2H ASME B18.2.1/ASME
INSUL: 00 B18.2.2 - 65 mm Length
100/IH 10
INSUL:
75/IH 20
144 CUT PIPE LENGTH

E 1804068 PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS


N 2031056 NO (MM) (IN) NO (MM) (IN)
EL +112145
S14 <1> 300 3/4 <2> 354 3
60
F1S5-500-200-20 00 <3> 137 3/4 <4> 31764 20

S13
S2-300-200-20
40
0
20"NPS

SEE SHT
LP-322-0101_C SHT 3
Isometric File Name : EP26_A2-LP-322-0101_C

1
Iso Extraction Date : 2022-11-11 13:58:00

DESIGN TEMP. ºC 320.00 OPE. TEMP. ºC 320.00 PAINT SYSTEM T6 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 7.00 OPE. PRESS. kg/cm2g 5.00 PWHT N
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
1 09/11/2022 REVISED AS PER MARK1 PPK SP SS INS. CODE IH TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm 130 TEST PRESS. kg/cm2g 12.88 CLIENT NAME


01/12/2021 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 10 PT or MT % 0 STRESS SYSTEM.NO 6405-EPCM25_26-CA-0047
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-322-PRS-PID-000-0002 GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 36"-LP-322-0101_C-A2A-IH PIPE SPEC :A2A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : LP-322-0101_C AREA: EP26-A2 SHT. 4 OF 10 REV. 1
<SECURITY LEVEL2>

N MATERIAL LIST

PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
PIPE
1 APPTK0MBBPG 20" PIPE A672GR.B60CL.12 EFW BE ASME B36.10M IBR 20.1 M
:S-STD
4 2 APPTB0SABPG 3/4" PIPE A106GR.B SMLS PE ASME B36.10M IBR :S-160 0.3 M
90° E 1812502 FITTINGS
N 2036500
EL +114962 <4> 2 3 DHDTA0Q1RPG 20X3/4" HALF COUPLING A105 CL.6000 SW ASME B16.11 IBR 1

4 DEATB0P2QPG 20" 90 DEG ELBOW A234GR.WPB WELD BW ASME B16.9 3


9
7 111 STEM NORTH IBR :S-STD
02 5 DEBTB0P2QPG 20" 45 DEG ELBOW A234GR.WPB WELD BW ASME B16.9 2
15 <5 F6 G8 B11 IBR :S-STD
> 58
1 <3> 2 FLANGES
43 INSUL: 6 CFATA0DBJPG 3/4" FLANGE SW A105 CL.150 RF ASME B16.5 IBR 1
56 75/IH

465
:S-160
65 S10 INSUL:
70 S2-300-200-20 130/IH
7 CDBTA0DBJPG 3/4" BLIND FLANGE A105 CL.150 RF ASME B16.5 IBR 1

00 GASKETS
40 3 8 FFG213ACADBHA 3/4" SPIRAL WOUND GASKET (G213ACA) CL.150 RF 4.5 1
20X3/4"NPS MM ASME B16.20

VALVES
9 51002 3/4" GATE VALVE CL.800 A105/HF SW BB,OS&Y BY 1
1 MFR/API 602/ASME B16.11 HANDWHEEL IBR
5 >
45° <6 43
56 PIPE SUPPORTS
318 10 S2 20" S2-300-200-20 4
S10
20"NPS S2-300-200-20 PT| SIZE
4
90° NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
225 BOLTS
11 EBEBB0A 1/2 " STUD BOLT(FULL THREADED)/HEX.NUT(HEAVY) 4
A193GR.B7/A194GR.2H ASME B18.2.1/ASME
1 B18.2.2 - 65 mm Length
>
<2
225
CUT PIPE LENGTH
CONT.ON S10
5 PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS
LP-322-0101_C SHT 6 6
70 S2-300-200-20 NO (MM) (IN) NO (MM) (IN)

00
40 <1> 857 20 <2> 5985 20
<3> 185 3/4 <4> 105 3/4
<5> 7188 20 <6> 5985 20

5 63
45° 15 S10
EL +114324 S2-300-200-20
37
19

1370
>
<1

70
13
4
90°
20"NPS

SEE SHT
762 LP-322-0101_C SHT 4
Isometric File Name : EP26_A2-LP-322-0101_C

1
Iso Extraction Date : 2022-11-11 13:58:00

DESIGN TEMP. ºC 320.00 OPE. TEMP. ºC 320.00 PAINT SYSTEM T6 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 7.00 OPE. PRESS. kg/cm2g 5.00 PWHT N
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
1 09/11/2022 REVISED AS PER MARK1 PPK SP SS INS. CODE IH TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm 130 TEST PRESS. kg/cm2g 12.88 CLIENT NAME


01/12/2021 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 10 PT or MT % 0 STRESS SYSTEM.NO 6405-EPCM25_26-CA-0047
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-322-PRS-PID-000-0002 GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 36"-LP-322-0101_C-A2A-IH PIPE SPEC :A2A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : LP-322-0101_C AREA: EP26-A2 SHT. 5 OF 10 REV. 1
<SECURITY LEVEL2>

CONT.ON
N MATERIAL LIST
LP-322-0101_C SHT 7
PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
PIPE
1 APPTK0MBBPG 20" PIPE A672GR.B60CL.12 EFW BE ASME B36.10M IBR 0.9 M
:S-STD
2 APPTB0SBBPG 3" PIPE A106GR.B SMLS BE ASME B36.10M IBR :S-STD 0.4 M

3 APPTB0SABPG 3/4" PIPE A106GR.B SMLS PE ASME B36.10M IBR :S-160 0.2 M

FITTINGS
4 DSZTK0MBBPG 20X3" WELD BRANCH RPAD A672GR.B60CL.12 EFW BE ASME 1
B36.10M IBR :S-STD x S-STD
20"NPS 5 DEATB0P2QPG 20" 90 DEG ELBOW A234GR.WPB WELD BW ASME B16.9 1
IBR :S-STD
S12 60 6 DHDTA0Q1RPG 3X3/4" HALF COUPLING A105 CL.6000 SW ASME B16.11 IBR 1
G1S2-300-200-20 00
7 DJATB0S2QPG 3" CAP A234GR.WPB SMLS BW ASME B16.9 IBR :S-STD 1

8 DFETA0Q1TPG 3/4" SOCKET OUTLET (FLAT) A105 CL.6000 SW MSS 1


SP-97 IBR

FLANGES

S13 9 CFATA0DBJPG 3/4" FLANGE SW A105 CL.150 RF ASME B16.5 IBR 1


60 :S-160
S2-300-200-20 00 10 CDBTA0DBJPG 3/4" BLIND FLANGE A105 CL.150 RF ASME B16.5 IBR 1

GASKETS
11 FFG213ACADBHA 3/4" SPIRAL WOUND GASKET (G213ACA) CL.150 RF 4.5 1
MM ASME B16.20

PIPE SUPPORTS
60 12 G1S2 20" G1S2-300-200-20 2
S14 00
F1S5-500-200-20 13 S2 20" S2-300-200-20 2
SEE SHT
5 LP-322-0101_C SHT 5 14 F1S5 20" F1S5-500-200-20 1
90°
EL +112954 PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
60
S13 00 BOLTS
S2-300-200-20 15 EBEBB0A 1/2 " STUD BOLT(FULL THREADED)/HEX.NUT(HEAVY) 4
A193GR.B7/A194GR.2H ASME B18.2.1/ASME
12 B18.2.2 - 65 mm Length
01 <1> 1
S12 20"NPS
44 1619
G1S2-300-200-20 3
CUT PIPE LENGTH

INSUL: 1145 PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS
130/IH NO (MM) (IN) NO (MM) (IN)
INSUL: <1> 857 20 <2> 354 3
100/IH <3> 137 3/4
1145

509
INSUL: 4
100/IH 20"X3"NPS
INSUL:
75/IH
70

CONT.ON EL +112445
EP26_A2-LP-322-02710
E 1803998
N 2042057
EL +112445 6

<2> 2
3X3/4"NPS

95
7
E 1804068
N 2042057
EL +112306 8

INSUL: F9 G11 B15


100/IH 19 10
INSUL:
75/IH 144
<3> 3
3/4"NPS E 1804068
N 2042057
EL +112145
Isometric File Name : EP26_A2-LP-322-0101_C

1
Iso Extraction Date : 2022-11-11 13:58:00

DESIGN TEMP. ºC 320.00 OPE. TEMP. ºC 320.00 PAINT SYSTEM T6 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 7.00 OPE. PRESS. kg/cm2g 5.00 PWHT N
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
1 09/11/2022 REVISED AS PER MARK1 PPK SP SS INS. CODE IH TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm 130 TEST PRESS. kg/cm2g 12.88 CLIENT NAME


01/12/2021 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 10 PT or MT % 0 STRESS SYSTEM.NO 6405-EPCM25_26-CA-0047
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-322-PRS-PID-000-0002 GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 36"-LP-322-0101_C-A2A-IH PIPE SPEC :A2A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : LP-322-0101_C AREA: EP26-A2 SHT. 6 OF 10 REV. 1
<SECURITY LEVEL2>

N MATERIAL LIST
762
PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY

CONT.ON PIPE
LP-322-0101_C SHT 8 20"NPS 1 APPTK0MBBPG 20" PIPE A672GR.B60CL.12 EFW BE ASME B36.10M IBR 32.7 M
:S-STD
2 APPTB0SBBPG 3" PIPE A106GR.B SMLS BE ASME B36.10M IBR :S-STD 0.4 M
5
90° 3 APPTB0SABPG 3/4" PIPE A106GR.B SMLS PE ASME B36.10M IBR :S-160 0.2 M
1 FITTINGS
>
<5 4 DSZTK0MBBPG 20X3" WELD BRANCH RPAD A672GR.B60CL.12 EFW BE ASME 1
B36.10M IBR :S-STD x S-STD
5 DEATB0P2QPG 20" 90 DEG ELBOW A234GR.WPB WELD BW ASME B16.9 2
S13 IBR :S-STD
6 DEBTB0P2QPG 20" 45 DEG ELBOW A234GR.WPB WELD BW ASME B16.9 1
S2-300-200-20 IBR :S-STD
7 DHDTA0Q1RPG 3X3/4" HALF COUPLING A105 CL.6000 SW ASME B16.11 IBR 1

64 8 DJATB0S2QPG 3" CAP A234GR.WPB SMLS BW ASME B16.9 IBR :S-STD 1


70
9 DFETA0Q1TPG 3/4" SOCKET OUTLET (FLAT) A105 CL.6000 SW MSS 1
0 0 SP-97 IBR
40
FLANGES
10 CFATA0DBJPG 3/4" FLANGE SW A105 CL.150 RF ASME B16.5 IBR 1
:S-160
11 CDBTA0DBJPG 3/4" BLIND FLANGE A105 CL.150 RF ASME B16.5 IBR 1

GASKETS
12 FFG213ACADBHA 3/4" SPIRAL WOUND GASKET (G213ACA) CL.150 RF 4.5 1
MM ASME B16.20

6 62 S13
15 PIPE SUPPORTS
45° S2-300-200-20 13 S2 20" S2-300-200-20 2
EL +114324
PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
38

BOLTS
19

1370

14 EBEBB0A 1/2 " STUD BOLT(FULL THREADED)/HEX.NUT(HEAVY) 4


>
<4

A193GR.B7/A194GR.2H ASME B18.2.1/ASME


B18.2.2 - 65 mm Length

1370 CUT PIPE LENGTH


10
<3 88 PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS
5 > NO (MM) (IN) NO (MM) (IN)
90° 1
<1> 354 3 <2> 137 3/4
20 24 <3> 25764 20 <4> 858 20
"N 99 <5> 5984 20
PS 9
INSUL:
130/IH
INSUL: SEE SHT
INSUL: 100/IH LP-322-0101_C SHT 6
509

100/IH 4
INSUL: 20"X3"NPS
75/IH
70

CONT.ON EL +112445
EP26_A2-LP-322-02711
E 1803998
N 2067056
EL +112445
<1> 2

7
3X3/4"NPS
95

E 1804068 8
N 2067056
EL +112306 9

INSUL: <2> 3
100/IH 19 11 3/4"NPS
INSUL:
75/IH 144
E 1804068
F10 G12 B14 N 2067056
EL +112145
Isometric File Name : EP26_A2-LP-322-0101_C

1
Iso Extraction Date : 2022-11-11 13:58:00

DESIGN TEMP. ºC 320.00 OPE. TEMP. ºC 320.00 PAINT SYSTEM T6 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 7.00 OPE. PRESS. kg/cm2g 5.00 PWHT N
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
1 09/11/2022 REVISED AS PER MARK1 PPK SP SS INS. CODE IH TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm 130 TEST PRESS. kg/cm2g 12.88 CLIENT NAME


01/12/2021 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 10 PT or MT % 0 STRESS SYSTEM.NO 6405-EPCM25_26-CA-0047
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-322-PRS-PID-000-0002 GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 36"-LP-322-0101_C-A2A-IH PIPE SPEC :A2A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : LP-322-0101_C AREA: EP26-A2 SHT. 7 OF 10 REV. 1
<SECURITY LEVEL2>

N MATERIAL LIST

PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
PIPE
1 APPTK0MBBPG 20" PIPE A672GR.B60CL.12 EFW BE ASME B36.10M IBR 14.1 M
:S-STD
2 APPTB0SABPG 3/4" PIPE A106GR.B SMLS PE ASME B36.10M IBR :S-160 0.3 M

FITTINGS
3 DHDTA0Q1RPG 20X3/4" HALF COUPLING A105 CL.6000 SW ASME B16.11 IBR 1

4 DEATB0P2QPG 20" 90 DEG ELBOW A234GR.WPB WELD BW ASME B16.9 2


IBR :S-STD
5 DEBTB0P2QPG 20" 45 DEG ELBOW A234GR.WPB WELD BW ASME B16.9 1
IBR :S-STD

FLANGES
6 CFATA0DBJPG 3/4" FLANGE SW A105 CL.150 RF ASME B16.5 IBR 1
:S-160
7 CDBTA0DBJPG 3/4" BLIND FLANGE A105 CL.150 RF ASME B16.5 IBR 1

GASKETS
E 1812502
4 N 2072500 8 FFG213ACADBHA 3/4" SPIRAL WOUND GASKET (G213ACA) CL.150 RF 4.5 1
90° EL +114963 <2> 2 MM ASME B16.20

9 VALVES
7 111 STEM EAST 9 51002 3/4" GATE VALVE CL.800 A105/HF SW BB,OS&Y BY 1
MFR/API 602/ASME B16.11 HANDWHEEL IBR
F6 G8 B11 57
<3
02 > PIPE SUPPORTS
15 1
64 INSUL: 10 S2 20" S2-300-200-20 2
70 75/IH

465
INSUL: PT| SIZE
43 NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
56 130/IH
S10 BOLTS
S2-300-200-20 3
00 20X3/4"NPS
11 EBEBB0A 1/2 " STUD BOLT(FULL THREADED)/HEX.NUT(HEAVY) 4
CONT.ON 40 A193GR.B7/A194GR.2H ASME B18.2.1/ASME
LP-322-0101_C SHT 9 <1> 2 B18.2.2 - 65 mm Length
20
5 "N
45° 1 PS
>
<4 CUT PIPE LENGTH
35
94 PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS
S10 NO (MM) (IN) NO (MM) (IN)
S2-300-200-20
<1> 185 3/4 <2> 105 3/4
38

<3> 7188 20 <4> 5984 20


19

1370

<5> 858 20
>
<5

SEE SHT
LP-322-0101_C SHT 7
70
13

20"NPS 4
90°
EL +112954
762
Isometric File Name : EP26_A2-LP-322-0101_C

1
Iso Extraction Date : 2022-11-11 13:58:00

DESIGN TEMP. ºC 320.00 OPE. TEMP. ºC 320.00 PAINT SYSTEM T6 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 7.00 OPE. PRESS. kg/cm2g 5.00 PWHT N
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
1 09/11/2022 REVISED AS PER MARK1 PPK SP SS INS. CODE IH TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm 130 TEST PRESS. kg/cm2g 12.88 CLIENT NAME


01/12/2021 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 10 PT or MT % 0 STRESS SYSTEM.NO 6405-EPCM25_26-CA-0047
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-322-PRS-PID-000-0002 GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 36"-LP-322-0101_C-A2A-IH PIPE SPEC :A2A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : LP-322-0101_C AREA: EP26-A2 SHT. 8 OF 10 REV. 1
<SECURITY LEVEL2>

N MATERIAL LIST

PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY

CONT.ON PIPE
LP-322-0101_C SHT 10 1 APPTB0SBBPG 3" PIPE A106GR.B SMLS BE ASME B36.10M IBR :S-STD 0.4 M

2 APPTB0SABPG 3/4" PIPE A106GR.B SMLS PE ASME B36.10M IBR :S-160 0.2 M

20 FITTINGS
"N
PS 3 DSZTK0MBBPG 20X3" WELD BRANCH RPAD A672GR.B60CL.12 EFW BE ASME 1
B36.10M IBR :S-STD x S-STD
4 DHDTA0Q1RPG 3X3/4" HALF COUPLING A105 CL.6000 SW ASME B16.11 IBR 1

5 DJATB0S2QPG 3" CAP A234GR.WPB SMLS BW ASME B16.9 IBR :S-STD 1


S10
G1S2-300-200-20 6 DFETA0Q1TPG 3/4" SOCKET OUTLET (FLAT) A105 CL.6000 SW MSS 1
SP-97 IBR

FLANGES
7 CFATA0DBJPG 3/4" FLANGE SW A105 CL.150 RF ASME B16.5 IBR 1
:S-160
44 8 CDBTA0DBJPG 3/4" BLIND FLANGE A105 CL.150 RF ASME B16.5 IBR 1
3
GASKETS
9 FFG213ACADBHA 3/4" SPIRAL WOUND GASKET (G213ACA) CL.150 RF 4.5 1
MM ASME B16.20

PIPE SUPPORTS
43
INSUL: 9 10 G1S2 20" G1S2-300-200-20 1
130/IH
INSUL: 20 PT| SIZE
"N NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
100/IH PS
BOLTS
11 EBEBB0A 1/2 " STUD BOLT(FULL THREADED)/HEX.NUT(HEAVY) 4
3 A193GR.B7/A194GR.2H ASME B18.2.1/ASME
20"X3"NPS B18.2.2 - 65 mm Length

CUT PIPE LENGTH

PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS

509
NO (MM) (IN) NO (MM) (IN)

SEE SHT <1> 354 3 <2> 137 3/4


LP-322-0101_C SHT 8

INSUL:
100/IH CONT.ON
EP26_A2-LP-322-02712
INSUL: E 1803998
75/IH N 2078057
70 EL +112445

EL +112445

4
3X3/4"NPS
<1> 1
95

E 1804068
N 2078057 5
EL +112306

INSUL: F7 G9 B11
100/IH 19 8
INSUL:
75/IH 144
<2> 2 E 1804068
3/4"NPS N 2078057
EL +112145
Isometric File Name : EP26_A2-LP-322-0101_C

1
Iso Extraction Date : 2022-11-11 13:58:00

DESIGN TEMP. ºC 320.00 OPE. TEMP. ºC 320.00 PAINT SYSTEM T6 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 7.00 OPE. PRESS. kg/cm2g 5.00 PWHT N
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
1 09/11/2022 REVISED AS PER MARK1 PPK SP SS INS. CODE IH TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm 130 TEST PRESS. kg/cm2g 12.88 CLIENT NAME


01/12/2021 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 10 PT or MT % 0 STRESS SYSTEM.NO 6405-EPCM25_26-CA-0047
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-322-PRS-PID-000-0002 GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 36"-LP-322-0101_C-A2A-IH PIPE SPEC :A2A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : LP-322-0101_C AREA: EP26-A2 SHT. 9 OF 10 REV. 1
<SECURITY LEVEL2>

N MATERIAL LIST

762 PT| SIZE


NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
PIPE
1 APPTK0MBBPG 20" PIPE A672GR.B60CL.12 EFW BE ASME B36.10M IBR 14.5 M
1 20"NPS :S-STD
1
2 APPTB0SABPG 3/4" PIPE A106GR.B SMLS PE ASME B36.10M IBR :S-160 0.3 M

CONT.ON 5
FITTINGS
EP26_A3-LP-322-0101 90° 3 DHDTA0P1RPG 20X1.1/2" HALF COUPLING A105 CL.3000 SW ASME B16.11 IBR 2
E 1804068 1
EL +121454
N 2086666 4 DHDTA0Q1RPG 20X3/4" HALF COUPLING A105 CL.6000 SW ASME B16.11 IBR 1
EL +121454
5 DEATB0P2QPG 20" 90 DEG ELBOW A234GR.WPB WELD BW ASME B16.9 2
IBR :S-STD

VALVES
6 51002 3/4" GATE VALVE CL.800 A105/HF SW BB,OS&Y BY 1 1
MFR/API 602/ASME B16.11 HANDWHEEL IBR

8500
PIPE SUPPORTS

<3> 1
7 F1S5 20" F1S5-500-200-20 1

1
CUT PIPE LENGTH

PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS


NO (MM) (IN) NO (MM) (IN)

1 <1> 300 3/4 <2> 7524 20


<3> 6976 20

E 1804068
N 2079800
EL +113605
S7
<2 F1S5-500-200-20
5 > 6
90° 1 DTL-MPR16-504 STEM WEST

37
00
13
61 58
04
580 <1> 2
288

4 INSUL:
20X3/4"NPS 85/IH
INSUL:
130/IH
50 288
0
INSUL:
3 85/IH
20X1.1/2"NPS INSUL:
130/IH
CONT.ON 40
0 20"NPS SEE SHT
EP26_A2-LP-322-021254 LP-322-0101_C SHT 9
E 1804068
N 2079300 3
EL +113242 20X1.1/2"NPS
84 CONT.ON
3
EP26_A2-LP-322-021253
E 1804068
N 2078900
EL +113242
Isometric File Name : EP26_A2-LP-322-0101_C

1
Iso Extraction Date : 2022-11-11 13:58:00

DESIGN TEMP. ºC 320.00 OPE. TEMP. ºC 320.00 PAINT SYSTEM T6 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 7.00 OPE. PRESS. kg/cm2g 5.00 PWHT N
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
1 09/11/2022 REVISED AS PER MARK1 PPK SP SS INS. CODE IH TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm 130 TEST PRESS. kg/cm2g 12.88 CLIENT NAME


01/12/2021 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 10 PT or MT % 0 STRESS SYSTEM.NO 6405-EPCM25_26-CA-0047
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-322-PRS-PID-000-0002 GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 36"-LP-322-0101_C-A2A-IH PIPE SPEC :A2A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : LP-322-0101_C AREA: EP26-A2 SHT. 10OF 10 REV. 1
<SECURITY LEVEL2>

N MATERIAL LIST

PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
PIPE
1 APPTK0MBBPG 16" PIPE A672GR.B60CL.12 EFW BE ASME B36.10M IBR 1.5 M
:S-STD
2 APPTB0SABPG 3/4" PIPE A106GR.B SMLS PE ASME B36.10M IBR :S-160 0.4 M
4
90° FITTINGS
EL +114403 3 DHDTA0Q1RPG 16X3/4" HALF COUPLING A105 CL.6000 SW ASME B16.11 IBR 1
E 1802500 4 DEATB0P2QPG 16" 90 DEG ELBOW A234GR.WPB WELD BW ASME B16.9 1
N 1979250 IBR :S-STD
EL +115021
CONT.ON FLANGES
EP26_A2-LP-322-0101_B
6 E 1804068 610 5 CFATA0DBJPG 3/4" FLANGE SW A105 CL.150 RF ASME B16.5 IBR 1
8 :S-160
N 1979250 1 06 6 CDBTA0DBJPG 3/4" BLIND FLANGE A105 CL.150 RF ASME B16.5 IBR 1

116
EL +113793

<2> 2
GASKETS
F5 G7 B10
16"NPS 7 FFG213ACADBHA 3/4" SPIRAL WOUND GASKET (G213ACA) CL.150 RF 4.5 1
S9 MM ASME B16.20
S2-300-200-16
68 VALVES
8
8 51002 3/4" GATE VALVE CL.800 A105/HF SW BB,OS&Y BY 1
STEM EAST MFR/API 602/ASME B16.11 HANDWHEEL IBR

PIPE SUPPORTS
9 S2 16" S2-300-200-16 1

<1> 2
68 PT| SIZE
15 NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY

429
BOLTS
10 EBEBB0A 1/2 " STUD BOLT(FULL THREADED)/HEX.NUT(HEAVY) 4
A193GR.B7/A194GR.2H ASME B18.2.1/ASME
B18.2.2 - 65 mm Length
3 INSUL:
16X3/4"NPS 75/IH
INSUL: CUT PIPE LENGTH
130/IH
PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS
CONT.ON NO (MM) (IN) NO (MM) (IN)
EPCC-07-16"-LP-322-9101-A2A-IH
E 1802000 <1> 200 3/4 <2> 110 3/4
N 1979250 <3> 1458 16
EL +114403

1
>
<3

0
50

322-TP-91-001
Isometric File Name : EP26_A2-LP-322-0213
Iso Extraction Date : 2022-06-17 16:38:03

DESIGN TEMP. ºC 320.00 OPE. TEMP. ºC 320.00 PAINT SYSTEM T6 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 7.00 OPE. PRESS. kg/cm2g 5.00 PWHT N
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
INS. CODE IH TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm 130 TEST PRESS. kg/cm2 g 12.88 CLIENT NAME


15/06/2022 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 10 PT or MT % 0 STRESS SYSTEM.NO 6405-EPCM25_26-CA-0047
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-322-PRS-PID-000-0002 GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 16"-LP-322-0213-A2A-IH PIPE SPEC :A2A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : LP-322-0213 AREA: EP26-A2 SHT. 1 OF 1 REV. 0
<SECURITY LEVEL2>

N MATERIAL LIST

PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
PIPE
1 APPTB0SABPG 3/4" PIPE A106GR.B SMLS PE ASME B36.10M IBR :S-160 3.9 M
3X3/4"NPS
5 82 1
> CONT.ON FITTINGS
2 <1 PS EP26_A2-LP-322-0101_A 2 DECTA0Q1RPG 3/4" 90 DEG ELBOW A105 CL.6000 SW ASME B16.11 IBR 4
90° " N E 1803998
3 /4 N 1974525 VALVES
EL +112445 3 51002 3/4" GATE VALVE CL.800 A105/HF SW BB,OS&Y BY 1
MFR/API 602/ASME B16.11 HANDWHEEL IBR

155
PIPE SUPPORTS
4 LH2 3/4" LH2-A-400-350-0.75 1
<2> 1
58
3 CUT PIPE LENGTH
STEM NORTH
PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS
NO (MM) (IN) NO (MM) (IN)

<1> 558 3/4 <2> 131 3/4

502

<3> 1
<3> 478 3/4 <4> 1087 3/4
<5> 1566 3/4

2
90°
EL +111730

1 7
42
36
11

1
>
<4 S4
LH2-A-400-350-0.75
24

2
90°

<5 15
> 91
1

24
3/4"NPS

2
90°

CONT.ON
LP-322-02706 SHT 2
Isometric File Name : EP26_A2-LP-322-02706
Iso Extraction Date : 2022-11-17 11:20:09

DESIGN TEMP. ºC 320.00 OPE. TEMP. ºC 320.00 PAINT SYSTEM T6 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 7.00 OPE. PRESS. kg/cm2g 5.00 PWHT N
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
1 16/11/2022 REVISED AS PER MARK1 PPK SP SS INS. CODE IH TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm 40 TEST PRESS. kg/cm2g 11.80 CLIENT NAME


01/12/2021 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 10 PT or MT % 0 STRESS SYSTEM.NO NA
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-000-PRS-PID-000-0011 (4/7)GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 3/4"-LP-322-02706-A2A-IH PIPE SPEC :A2A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : LP-322-02706 AREA: EP26-A2 SHT. 1 OF 2 REV. 1
<SECURITY LEVEL2>

N
SEE SHT MATERIAL LIST
LP-322-02706 SHT 1
PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
PIPE
1 APPTB0SABPG 3/4" PIPE A106GR.B SMLS PE ASME B36.10M IBR :S-160 13.5 M

FITTINGS
2 DECTA0Q1RPG 3/4" 90 DEG ELBOW A105 CL.6000 SW ASME B16.11 IBR 3

3/4"NPS
PIPE SUPPORTS
1
3 DSA 3/4" DSA-0.75 1

896
S3 4 G2 3/4" G2-0.75 3
DSA-0.75 5 Special 3/4" GS-EP26-043 1
360 DEG.
50
MISC COMPONENTS
6 SST-A2A 3/4 SPECIALITY ITEM - STEAM TRAP 1

IV-A-814-1.5 CUT PIPE LENGTH

PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS


NO (MM) (IN) NO (MM) (IN)

3500
<1> 11518 3/4 <2> 381 3/4
<3> 1261 3/4 <4> 330 3/4

S4
G2-0.75

11542
IV-A-814-1.5

4500
INSUL:
40/IH
2 INSUL:
1 90° 25/IS

09 35
<3> 1 13 5
S4
2 171 G2-0.75
90° 6 IV-A-814-1.5
SST-A2A
CONT.ON
134 EP26_A2-LC-322-02706
S5 E 1803589
GS-EP26-043 <4> 1 N 1972815
<1> 1

<2 EL +100163
> 3/4"NPS
S4 1
G2-0.75

43
0

2
90°
EL +100163
Isometric File Name : EP26_A2-LP-322-02706
Iso Extraction Date : 2022-11-17 11:20:09

DESIGN TEMP. ºC 320.00 OPE. TEMP. ºC 320.00 PAINT SYSTEM T6 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 7.00 OPE. PRESS. kg/cm2g 5.00 PWHT N
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
1 16/11/2022 REVISED AS PER MARK1 PPK SP SS INS. CODE IH TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm 40 TEST PRESS. kg/cm2g 11.80 CLIENT NAME


01/12/2021 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 10 PT or MT % 0 STRESS SYSTEM.NO NA
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-000-PRS-PID-000-0011 (4/7)GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 3/4"-LP-322-02706-A2A-IH PIPE SPEC :A2A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : LP-322-02706 AREA: EP26-A2 SHT. 2 OF 2 REV. 1
<SECURITY LEVEL2>

CONT.ON
EP26_A2-LP-322-0101_C
N MATERIAL LIST
<1> 1
3/4"NPS E 1803998
N 1989056 PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
EL +112445
4 43 PIPE
1 APPTB0SABPG 3/4" PIPE A106GR.B SMLS PE ASME B36.10M IBR :S-160 14.1 M

FITTINGS
2
90° 3X3/4"NPS 2 DECTA0Q1RPG 3/4" 90 DEG ELBOW A105 CL.6000 SW ASME B16.11 IBR 5

155
<2> 1 VALVES
3 51002 3/4" GATE VALVE CL.800 A105/HF SW BB,OS&Y BY 1
MFR/API 602/ASME B16.11 HANDWHEEL IBR
3
S4 STEM NORTH PIPE SUPPORTS
LH2-A-300-250-0.75 58
<3> 1
4 LH2 3/4" LH2-A-300-250-0.75 1
1

299
5 DSA 3/4" DSA-0.75 1
2 4
90° 55 6 IV 3/4" IV-A-500-0.75 3

7 G2 3/4" G2-0.75 4

8 86 8 IV 3/4" IV-A-700-0.75 1
2
90°

2065
9 Special 3/4" GS-EP26-044 1
EL +111933
MISC COMPONENTS
<4> 1 10 SST-A2A 3/4 SPECIALITY ITEM - STEAM TRAP 1

1
22 S5 CUT PIPE LENGTH
DSA-0.75
180 DEG.

2000
PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS
NO (MM) (IN) NO (MM) (IN)
S6
IV-A-500-0.75 <1> 419 3/4 <2> 131 3/4
S7 <3> 275 3/4 <4> 837 3/4
G2-0.75 <5> 11722 3/4 <6> 209 3/4
S6 <7> 446 3/4
IV-A-500-0.75

2000

11770
S7
3000

G2-0.75
S8
IV-A-700-0.75 S6
IV-A-500-0.75
S7
G2-0.75
<5> 1 2
90°
S7 EL +100163
G2-0.75
<6> 1

7
S9 2 25
90° <7> 1
GS-EP26-044
10
SST-A2A
24 3/4"NPS

225 CONT.ON
EP26_A2-LC-322-02707
446 E 1802411
171 N 1988415
INSUL: EL +100163
75/IH
INSUL:
25/IS
Isometric File Name : EP26_A2-LP-322-02707
Iso Extraction Date : 2022-11-17 11:21:15

DESIGN TEMP. ºC 320.00 OPE. TEMP. ºC 320.00 PAINT SYSTEM T6 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 7.00 OPE. PRESS. kg/cm2g 5.00 PWHT N
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
1 16/11/2022 REVISED AS PER MARK1 PPK SP SS INS. CODE IH TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm 75 TEST PRESS. kg/cm2g 11.80 CLIENT NAME


01/12/2021 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 10 PT or MT % 0 STRESS SYSTEM.NO NA
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-000-PRS-PID-000-0011 (4/7)GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 3/4"-LP-322-02707-A2A-IH PIPE SPEC :A2A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : LP-322-02707 AREA: EP26-A2 SHT. 1 OF 1 REV. 1
<SECURITY LEVEL2>

CONT.ON N
EP26_A2-LP-322-0101_C MATERIAL LIST
E 1803998
PT| SIZE
N 2000062
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
EL +112445
4 16 PIPE
1 APPTB0SABPG 3/4" PIPE A106GR.B SMLS PE ASME B36.10M IBR :S-160 14.0 M

2 3X3/4"NPS FITTINGS

90° <1> 1
2 DECTA0Q1RPG 3/4" 90 DEG ELBOW A105 CL.6000 SW ASME B16.11 IBR 5

3/4"NPS

155
<2> 1 VALVES
3 51002 3/4" GATE VALVE CL.800 A105/HF SW BB,OS&Y BY 1
MFR/API 602/ASME B16.11 HANDWHEEL IBR
3
STEM SOUTH 58 PIPE SUPPORTS
S4 <3> 1 4 IH 3/4" IH-A-600-0.75 1
IH-A-600-0.75 1

434
5 DSA 3/4" DSA-0.75 1
2 81
90° 5 6 IV 3/4" IV-A-450-0.75 3

7 G2 3/4" G2-0.75 4

4 2 8 IV 3/4" IV-A-600-0.75 1
86 90°
EL +111798 9 Special 3/4" GS-EP26-045 1

1926
MISC COMPONENTS
10 SST-A2A 3/4 SPECIALITY ITEM - STEAM TRAP 1
<4> 1

1 CUT PIPE LENGTH


25 S5
DSA-0.75 PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS
NO (MM) (IN) NO (MM) (IN)
0 DEG.

2000
S6 <1> 392 3/4 <2> 131 3/4
<3> 410 3/4 <4> 816 3/4
IV-A-450-0.75 <5> 11586 3/4 <6> 257 3/4
<7> 328 3/4
S7
G2-0.75 S6
IV-A-450-0.75

2000

11634
S6
IV-A-450-0.75
S7
G2-0.75
3000

S8
IV-A-600-0.75

S7
S7 G2-0.75
<5> 1

G2-0.75
2
<7> 1 90°
3/4"NPS EL +100163
<6> 1
13 2
3
90°
CONT.ON 10
EP26_A2-LC-322-02708 SST-A2A
E 1802411 35
2 5
N 2000585 30
EL +100163
INSUL:
25/IS 171
INSUL:
S9
75/IH
GS-EP26-045
Isometric File Name : EP26_A2-LP-322-02708
Iso Extraction Date : 2022-11-17 11:22:19

DESIGN TEMP. ºC 320.00 OPE. TEMP. ºC 320.00 PAINT SYSTEM T6 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 7.00 OPE. PRESS. kg/cm2g 5.00 PWHT N
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
1 16/11/2022 REVISED AS PER MARK1 PPK SP SS INS. CODE IH TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm 75 TEST PRESS. kg/cm2g 11.80 CLIENT NAME


01/12/2021 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 10 PT or MT % 0 STRESS SYSTEM.NO NA
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-000-PRS-PID-000-0011 (4/7)GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 3/4"-LP-322-02708-A2A-IH PIPE SPEC :A2A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : LP-322-02708 AREA: EP26-A2 SHT. 1 OF 1 REV. 1
<SECURITY LEVEL2>

CONT.ON
EP26_A2-LP-322-0101_C
N MATERIAL LIST
E 1803998
N 2031056 PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
EL +112445
4 43 PIPE
1 APPTB0SABPG 3/4" PIPE A106GR.B SMLS PE ASME B36.10M IBR :S-160 14.1 M
3X3/4"NPS
FITTINGS
2 <1> 1
90° 3/4"NPS 2 DECTA0Q1RPG 3/4" 90 DEG ELBOW A105 CL.6000 SW ASME B16.11 IBR 5

155
<2> 1 VALVES
STEM NORTH
3 51002 3/4" GATE VALVE CL.800 A105/HF SW BB,OS&Y BY 1
MFR/API 602/ASME B16.11 HANDWHEEL IBR
S4 PIPE SUPPORTS
58
IH-A-700-0.75 <3> 1 4 IH 3/4" IH-A-700-0.75 1
1

499
5 DSA 3/4" DSA-0.75 1
2 4
90° 55 6 IV 3/4" IV-A-450-0.75 3

7 G2 3/4" G2-0.75 4
8
83 8 IV 3/4" IV-A-700-0.75 1

1865
9 Special 3/4" GS-EP26-046 1
2
90° MISC COMPONENTS
<4> 1
EL +111733 10 SST-A2A 3/4 SPECIALITY ITEM - STEAM TRAP 1

22 S5 1
CUT PIPE LENGTH
DSA-0.75
180 DEG.

2000
PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS
S6 NO (MM) (IN) NO (MM) (IN)
IV-A-450-0.75 <1> 419 3/4 <2> 131 3/4
S7
<3> 475 3/4 <4> 789 3/4
G2-0.75
S6 <5> 11522 3/4 <6> 257 3/4
<7> 446 3/4
IV-A-450-0.75

2000

11570
S7
3000

G2-0.75
S8
IV-A-700-0.75 S6
IV-A-450-0.75
S7
G2-0.75
<5> 1 2
<6> 1 90°
EL +100163
5
30

S7
G2-0.75
S9 2
90° <7> 1
GS-EP26-046 10
SST-A2A
24 3/4"NPS

225 CONT.ON
EP26_A2-LC-322-02709
446 E 1802411
171 N 2030415
INSUL: EL +100163
75/IH
INSUL:
25/IS
Isometric File Name : EP26_A2-LP-322-02709
Iso Extraction Date : 2022-11-17 11:23:21

DESIGN TEMP. ºC 320.00 OPE. TEMP. ºC 320.00 PAINT SYSTEM T6 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 7.00 OPE. PRESS. kg/cm2g 5.00 PWHT N
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
1 16/11/2022 REVISED AS PER MARK1 PPK SP SS INS. CODE IH TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm 75 TEST PRESS. kg/cm2g 11.80 CLIENT NAME


01/12/2021 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 10 PT or MT % 0 STRESS SYSTEM.NO NA
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-000-PRS-PID-000-0011 (4/7)GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 3/4"-LP-322-02709-A2A-IH PIPE SPEC :A2A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : LP-322-02709 AREA: EP26-A2 SHT. 1 OF 1 REV. 1
<SECURITY LEVEL2>

CONT.ON N MATERIAL LIST


EP26_A2-LP-322-0101_C
E 1803998
PT| SIZE
N 2042057 NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
EL +112445
6 PIPE
63
1 APPTB0SABPG 3/4" PIPE A106GR.B SMLS PE ASME B36.10M IBR :S-160 14.5 M

3X3/4"NPS FITTINGS
2 2 DECTA0Q1RPG 3/4" 90 DEG ELBOW A105 CL.6000 SW ASME B16.11 IBR 5
90° <1> 1
3/4"NPS
VALVES

155
<2> 1
3 51002 3/4" GATE VALVE CL.800 A105/HF SW BB,OS&Y BY 1
MFR/API 602/ASME B16.11 HANDWHEEL IBR
3
STEM SOUTH PIPE SUPPORTS
58 4 IH 3/4" IH-A-600-0.75 1
<3> 1
S4 1
5 DSA 3/4" DSA-0.75 1

410
IH-A-600-0.75
6 IV 3/4" IV-A-450-0.75 3
5
64 7 G2 3/4" G2-0.75 4
2
36 8 IV 3/4" IV-A-600-0.75 1

9 Special 3/4" GS-EP26-047 1


2
90° <4> 1 2
MISC COMPONENTS
90°
S5 EL +111822 10 SST-A2A 3/4 SPECIALITY ITEM - STEAM TRAP 1
DSA-0.75

1950
0 DEG.
CUT PIPE LENGTH
1
PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS
NO (MM) (IN) NO (MM) (IN)
S6
IV-A-450-0.75 25 <1> 611 3/4 <2> 131 3/4
<3> 386 3/4 <4> 597 3/4
<5> 11610 3/4 <6> 802 3/4
<7> 334 3/4

2000
S6
IV-A-450-0.75
INSUL:
75/IH
11659

S7
G2-0.75
2000

INSUL: 171 CONT.ON


S7 25/IS EP26_A2-LC-322-02710
G2-0.75 E 1803567
10 N 2042586
S6 SST-A2A EL +100163
IV-A-450-0.75 35 137
8
3000

S7
<7> 1 S9
G2-0.75
GS-EP26-047
S7
S8 G2-0.75 2
<5> 1

IV-A-600-0.75 90°
1
>
3/4"NPS <6
0
85

2
90°
EL +100163
Isometric File Name : EP26_A2-LP-322-02710
Iso Extraction Date : 2022-11-17 11:24:23

DESIGN TEMP. ºC 320.00 OPE. TEMP. ºC 320.00 PAINT SYSTEM T6 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 7.00 OPE. PRESS. kg/cm2g 5.00 PWHT N
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
1 16/11/2022 REVISED AS PER MARK1 PPK SP SS INS. CODE IH TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm 75 TEST PRESS. kg/cm2g 11.80 CLIENT NAME


01/12/2021 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 10 PT or MT % 0 STRESS SYSTEM.NO NA
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-000-PRS-PID-000-0011 (4/7)GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 3/4"-LP-322-02710-A2A-IH PIPE SPEC :A2A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : LP-322-02710 AREA: EP26-A2 SHT. 1 OF 1 REV. 1
<SECURITY LEVEL2>

N MATERIAL LIST

PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
PIPE
1 APPTB0SABPG 3/4" PIPE A106GR.B SMLS PE ASME B36.10M IBR :S-160 1.9 M
3X3/4"NPS
FITTINGS
3 CONT.ON
44 1 EP26_A2-LP-322-0101_C 2 DECTA0Q1RPG 3/4" 90 DEG ELBOW A105 CL.6000 SW ASME B16.11 IBR 3
>
<1 S E 1803998
" NP N 2067056 VALVES
3 /4 EL +112445 3 51002 3/4" GATE VALVE CL.800 A105/HF SW BB,OS&Y BY 1
MFR/API 602/ASME B16.11 HANDWHEEL IBR

PIPE SUPPORTS
4 IH 3/4" IH-A-700-0.75 1
2
90°

CUT PIPE LENGTH

155
<2> 1 PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS
3 NO (MM) (IN) NO (MM) (IN)
STEM NORTH
<1> 419 3/4 <2> 131 3/4
<3> 425 3/4 <4> 837 3/4

58

<3> 1

449
2
90°
EL +111783

4
55
8 86

1
>
<4
S4
IH-A-700-0.75

24
2 3/4"NPS
90°

CONT.ON
LP-322-02711 SHT 2
Isometric File Name : EP26_A2-LP-322-02711
Iso Extraction Date : 2022-11-17 11:25:25

DESIGN TEMP. ºC 320.00 OPE. TEMP. ºC 320.00 PAINT SYSTEM T6 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 7.00 OPE. PRESS. kg/cm2g 5.00 PWHT N
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
1 16/11/2022 REVISED AS PER MARK1 PPK SP SS INS. CODE IH TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm 75 TEST PRESS. kg/cm2g 11.80 CLIENT NAME


01/12/2021 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 10 PT or MT % 0 STRESS SYSTEM.NO NA
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-000-PRS-PID-000-0011 (4/7)GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 3/4"-LP-322-02711-A2A-IH PIPE SPEC :A2A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : LP-322-02711 AREA: EP26-A2 SHT. 1 OF 2 REV. 1
<SECURITY LEVEL2>

SEE SHT
LP-322-02711 SHT 1
N MATERIAL LIST

PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
PIPE
1 APPTB0SABPG 3/4" PIPE A106GR.B SMLS PE ASME B36.10M IBR :S-160 12.3 M

FITTINGS

1891
3/4"NPS
2 DECTA0Q1RPG 3/4" 90 DEG ELBOW A105 CL.6000 SW ASME B16.11 IBR 2

PIPE SUPPORTS
3 DSA 3/4" DSA-0.75 1
1
4 IV 3/4" IV-A-500-0.75 3
22 S3
DSA-0.75
1 5 G2 3/4" G2-0.75 4
180 DEG. 6 IV 3/4" IV-A-750-0.75 1

2000
S4 7 Special 3/4" GS-EP26-048 1
IV-A-500-0.75
MISC COMPONENTS
8 SST-A2A 3/4 SPECIALITY ITEM - STEAM TRAP 1

51 S5
G2-0.75 CUT PIPE LENGTH
S4
PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS
IV-A-500-0.75 NO (MM) (IN) NO (MM) (IN)

<1> 11572 3/4 <2> 209 3/4

1949
<3> 446 3/4

11596
S4
IV-A-500-0.75 S5
G2-0.75

3000

S5 S6
G2-0.75 IV-A-750-0.75
<1> 1

2
90°
<2> 1 S5 EL +100163
G2-0.75
CONT.ON
2 EP26_A2-LC-322-02711
90° 7 E 1802411
25 N 2066415
<3> 1 EL +100163

8
24 SST-A2A
3/4"NPS

225 S7
GS-EP26-048
446
171
INSUL:
75/IH
INSUL:
25/IS
Isometric File Name : EP26_A2-LP-322-02711
Iso Extraction Date : 2022-11-17 11:25:25

DESIGN TEMP. ºC 320.00 OPE. TEMP. ºC 320.00 PAINT SYSTEM T6 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 7.00 OPE. PRESS. kg/cm2g 5.00 PWHT N
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
1 16/11/2022 REVISED AS PER MARK1 PPK SP SS INS. CODE IH TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm 75 TEST PRESS. kg/cm2g 11.80 CLIENT NAME


01/12/2021 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 10 PT or MT % 0 STRESS SYSTEM.NO NA
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-000-PRS-PID-000-0011 (4/7)GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 3/4"-LP-322-02711-A2A-IH PIPE SPEC :A2A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : LP-322-02711 AREA: EP26-A2 SHT. 2 OF 2 REV. 1
<SECURITY LEVEL2>

CONT.ON N
EP26_A2-LP-322-0101_C MATERIAL LIST
E 1803998
PT| SIZE
N 2078057
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
EL +112445
6 PIPE
66
1 APPTB0SABPG 3/4" PIPE A106GR.B SMLS PE ASME B36.10M IBR :S-160 12.0 M

3X3/4"NPS FITTINGS
2 <1> 1 2 DECTA0Q1RPG 3/4" 90 DEG ELBOW A105 CL.6000 SW ASME B16.11 IBR 3
90° 3/4"NPS
VALVES

155
<2> 1 3 51002 3/4" GATE VALVE CL.800 A105/HF SW BB,OS&Y BY 1
MFR/API 602/ASME B16.11 HANDWHEEL IBR
3 PIPE SUPPORTS
STEM SOUTH
58 4 IH 3/4" IH-A-600-0.75 1
<3> 1
S4 5 DSA 3/4" DSA-0.75 1
1

327
IH-A-600-0.75
6 IV 3/4" IV-A-500-0.75 3

6 63 7 G2 3/4" G2-0.75 3

3 32 8 IV 3/4" IV-A-600-0.75 1

2 2
90° <4> 1 CUT PIPE LENGTH
90°
S5 EL +111905 PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS
NO (MM) (IN) NO (MM) (IN)
DSA-0.75

2085
0 DEG. <1> 641 3/4 <2> 131 3/4
<3> 303 3/4 <4> 615 3/4
<5> 10237 3/4
1

25

S7
G2-0.75

2000
S6
IV-A-500-0.75
10261

S6
1949

IV-A-500-0.75
S6
IV-A-500-0.75

S7
G2-0.75

S8
3000

IV-A-600-0.75

<5> 1
3/4"NPS

S7
G2-0.75

CONT.ON
LP-322-02712 SHT 2
Isometric File Name : EP26_A2-LP-322-02712
Iso Extraction Date : 2022-11-17 11:26:27

DESIGN TEMP. ºC 320.00 OPE. TEMP. ºC 320.00 PAINT SYSTEM T6 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 7.00 OPE. PRESS. kg/cm2g 5.00 PWHT N
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
1 16/11/2022 REVISED AS PER MARK1 PPK SP SS INS. CODE IH TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm 75 TEST PRESS. kg/cm2g 11.80 CLIENT NAME


01/12/2021 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 10 PT or MT % 0 STRESS SYSTEM.NO NA
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-000-PRS-PID-000-0011 (4/7)GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 3/4"-LP-322-02712-A2A-IH PIPE SPEC :A2A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : LP-322-02712 AREA: EP26-A2 SHT. 1 OF 2 REV. 1
<SECURITY LEVEL2>

N MATERIAL LIST

2 PT| SIZE
90° NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
PIPE
1 APPTB0SABPG 3/4" PIPE A106GR.B SMLS PE ASME B36.10M IBR :S-160 2.7 M

FITTINGS
2 DECTA0Q1RPG 3/4" 90 DEG ELBOW A105 CL.6000 SW ASME B16.11 IBR 3

PIPE SUPPORTS
3 IH 3/4" IH-A-582-0.75 1

4 G2 3/4" G2-0.75 1
6 1
92 <1
> 5 Special 3/4" GS-EP26-049 1

MISC COMPONENTS
SEE SHT 6 SST-A2A 3/4 SPECIALITY ITEM - STEAM TRAP 1
LP-322-02712 SHT 1

CUT PIPE LENGTH

PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS


NO (MM) (IN) NO (MM) (IN)

24 S3 <1> 878 3/4 <2> 1409 3/4

3 31 IH-A-582-0.75 <3> 334 3/4

3/4"NPS
2
90°
EL +101621

1457
<2> 1
1

3/4"NPS
6
CONT.ON SST-A2A
EP26_A2-LC-322-02712
E 1803595
N 2078586
EL +100163 <3 S5
>
171 1 GS-EP26-049
INSUL:
25/IS 35
INSUL: 8
75/IH S4
G2-0.75 13
7

2
90°
EL +100163
Isometric File Name : EP26_A2-LP-322-02712
Iso Extraction Date : 2022-11-17 11:26:27

DESIGN TEMP. ºC 320.00 OPE. TEMP. ºC 320.00 PAINT SYSTEM T6 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 7.00 OPE. PRESS. kg/cm2g 5.00 PWHT N
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
1 16/11/2022 REVISED AS PER MARK1 PPK SP SS INS. CODE IH TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm 75 TEST PRESS. kg/cm2g 11.80 CLIENT NAME


01/12/2021 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 10 PT or MT % 0 STRESS SYSTEM.NO NA
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-000-PRS-PID-000-0011 (4/7)GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 3/4"-LP-322-02712-A2A-IH PIPE SPEC :A2A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : LP-322-02712 AREA: EP26-A2 SHT. 2 OF 2 REV. 1
<SECURITY LEVEL2>

CONT.ON N MATERIAL LIST


EP26_A2-LP-322-0101_C
E 1803998
PT| SIZE
N 2125556 NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
EL +109445
1
58 PIPE
1 APPTB0SABPG 3/4" PIPE A106GR.B SMLS PE ASME B36.10M IBR :S-160 11.1 M

3X3/4"NPS FITTINGS
2
2 DECTA0Q1RPG 3/4" 90 DEG ELBOW A105 CL.6000 SW ASME B16.11 IBR 5
90° <1> 1
3/4"NPS VALVES

150
<2> 1
3 51002 3/4" GATE VALVE CL.800 A105/HF SW BB,OS&Y BY 1
MFR/API 602/ASME B16.11 HANDWHEEL IBR
3
S4 STEM NORTH PIPE SUPPORTS
68
IH-A-700-0.75 <3> 1 4 IH 3/4" IH-A-700-0.75 1

323
5 G2 3/4" G2-0.75 5
2 17
90° 4 6 IV 3/4" IV-A-450-0.75 3

7 IV 3/4" IV-A-700-0.75 1

0 2 8 Special 3/4" GS-EP26-050 1


70 90°
EL +108904 MISC COMPONENTS

2057
9 SST-A2A 3/4 SPECIALITY ITEM - STEAM TRAP 1

<4> 1
CUT PIPE LENGTH

S5 PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS


G2-0.75 NO (MM) (IN) NO (MM) (IN)
S6

2000
IV-A-450-0.75 <1> 557 3/4 <2> 126 3/4
<3> 299 3/4 <4> 652 3/4
<5> 8692 3/4 <6> 257 3/4
<7> 446 3/4
S5
G2-0.75
S6
IV-A-450-0.75
2000

S5 8741
G2-0.75
S6
2000

IV-A-450-0.75
S7
IV-A-700-0.75

S5 <5> 1 2
G2-0.75 90°
EL +100163
<6> 1

S8 S5
GS-EP26-050 5 G2-0.75
30
<7> 1 9
2 SST-A2A
90° 24 3/4"NPS

CONT.ON
226 EP26_A2-LC-322-02713
E 1802411
446 N 2124915
171 EL +100163
INSUL:
75/IH
INSUL:
25/IS
Isometric File Name : EP26_A2-LP-322-02713
Iso Extraction Date : 2021-11-27 11:46:23

DESIGN TEMP. ºC 320.00 OPE. TEMP. ºC 320.00 PAINT SYSTEM T2 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 3.50 OPE. PRESS. kg/cm2g 0.00 PWHT N
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
INS. CODE IH TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm 75 TEST PRESS. kg/cm2 g 5.90 CLIENT NAME


01/12/2021 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 10 PT or MT % 0 STRESS SYSTEM.NO NA
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-000-PRS-PID-000-0011 (4/7)GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 3/4"-LP-322-02713-A2A-IH PIPE SPEC :A2A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : LP-322-02713 AREA: EP26-A2 SHT. 1 OF 1 REV. 0
<SECURITY LEVEL2>

CONT.ON N
EP26_A2-LP-322-0101_C MATERIAL LIST
E 1803998
PT| SIZE
N 2136562 NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
EL +109445
1 PIPE
58
1 APPTB0SABPG 3/4" PIPE A106GR.B SMLS PE ASME B36.10M IBR :S-160 11.0 M
3X3/4"NPS
FITTINGS
2 <1> 1
3/4"NPS 2 DECTA0Q1RPG 3/4" 90 DEG ELBOW A105 CL.6000 SW ASME B16.11 IBR 5
90°
<2> 1 24 VALVES
3 51002 3/4" GATE VALVE CL.800 A105/HF SW BB,OS&Y BY 1
126 MFR/API 602/ASME B16.11 HANDWHEEL IBR
3
STEM SOUTH PIPE SUPPORTS
S4 68
4 IH 3/4" IH-A-600-0.75 1
IH-A-600-0.75 <3> 1
5 G2 3/4" G2-0.75 5

483
2 7 6 IV 3/4" IV-A-450-0.75 3
90° 41
7 IV 3/4" IV-A-600-0.75 1

8 Special 3/4" GS-EP26-051 1


0
70 MISC COMPONENTS
9 SST-A2A 3/4 SPECIALITY ITEM - STEAM TRAP 1
2

1898
90°
<4> 1 EL +108745
CUT PIPE LENGTH

PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS


NO (MM) (IN) NO (MM) (IN)
S5
<1> 557 3/4 <2> 126 3/4
G2-0.75 S6 <3> 459 3/4 <4> 652 3/4
IV-A-450-0.75 <5> 8533 3/4 <6> 257 3/4

2000
<7> 328 3/4

S5
G2-0.75 S6
IV-A-450-0.75

2000

S5 8581
G2-0.75
S6
IV-A-450-0.75
2000

S5
G2-0.75 S5 S7
<7> 1 G2-0.75 IV-A-600-0.75

<5> 1
3/4"NPS
13
2
CONT.ON
EP26_A2-LC-322-02714
E 1802411 9
N 2137085 SST-A2A 2
EL +100163 35 90°
2 3 05 <6> 1 EL +100163
INSUL:
25/IS 171
INSUL:
S8
75/IH
GS-EP26-051
2
90°
Isometric File Name : EP26_A2-LP-322-02714
Iso Extraction Date : 2021-11-27 11:47:55

DESIGN TEMP. ºC 320.00 OPE. TEMP. ºC 320.00 PAINT SYSTEM T2 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 3.50 OPE. PRESS. kg/cm2g 0.00 PWHT N
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
INS. CODE IH TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm 75 TEST PRESS. kg/cm2 g 5.90 CLIENT NAME


01/12/2021 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 10 PT or MT % 0 STRESS SYSTEM.NO NA
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-000-PRS-PID-000-0011 (4/7)GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 3/4"-LP-322-02714-A2A-IH PIPE SPEC :A2A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : LP-322-02714 AREA: EP26-A2 SHT. 1 OF 1 REV. 0
<SECURITY LEVEL2>

N MATERIAL LIST

PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
PIPE
1 APPTB0SABPG 3/4" PIPE A106GR.B SMLS PE ASME B36.10M IBR :S-160 9.8 M

FITTINGS
2 DECTA0Q1RPG 3/4" 90 DEG ELBOW A105 CL.6000 SW ASME B16.11 IBR 3

VALVES
3 51002 3/4" GATE VALVE CL.800 A105/HF SW BB,OS&Y BY 1
MFR/API 602/ASME B16.11 HANDWHEEL IBR

CONT.ON PIPE SUPPORTS


EP26_A2-LP-322-0101_C 4 IH 3/4" IH-A-650-0.75 2
E 1803998
N 2158032 5 G2 3/4" G2-0.75 2
EL +109445 200
6 LH2 3/4" LH2-A-350-300-0.75 1
68
7 LH2 3/4" LH2-A-350-450-0.75 1
3X3/4"NPS
<1> 1
3/4"NPS CUT PIPE LENGTH
2 3
86 STEM SOUTH
PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS
S4 NO (MM) (IN) NO (MM) (IN)
CONT.ON 67
LP-322-02715 SHT 2
IH-A-650-0.75 31 <1> 200 3/4 <2> 3143 3/4
<3> 820 3/4 <4> 846 3/4
S4 <5> 4782 3/4
05
20 IH-A-650-0.75

S5 S5
<5 G2-0.75 2 G2-0.75
> 90°
1
3/ <2> 1
4"
NP
S

<3> 1

868
25
00
S7 48
06
LH2-A-350-450-0.75 <4> 1

2 2
56 90°
EL +108577
4
89
2
90° S6
LH2-A-350-300-0.75
Isometric File Name : EP26_A2-LP-322-02715
Iso Extraction Date : 2021-11-27 11:49:23

DESIGN TEMP. ºC 320.00 OPE. TEMP. ºC 320.00 PAINT SYSTEM T2 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 3.50 OPE. PRESS. kg/cm2g 0.00 PWHT N
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
INS. CODE IH TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm 75 TEST PRESS. kg/cm2 g 5.90 CLIENT NAME


01/12/2021 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 10 PT or MT % 0 STRESS SYSTEM.NO NA
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-000-PRS-PID-000-0011 (4/7)GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 3/4"-LP-322-02715-A2A-IH PIPE SPEC :A2A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : LP-322-02715 AREA: EP26-A2 SHT. 1 OF 2 REV. 0
<SECURITY LEVEL2>

N MATERIAL LIST
2 24
90° PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
PIPE
1 APPTB0SABPG 3/4" PIPE A106GR.B SMLS PE ASME B36.10M IBR :S-160 9.0 M
3/4"NPS

260
FITTINGS
SEE SHT 2 DECTA0Q1RPG 3/4" 90 DEG ELBOW A105 CL.6000 SW ASME B16.11 IBR 3
LP-322-02715 SHT 1
PIPE SUPPORTS
38 S3 3 DSA 3/4" DSA-0.75 1
DSA-0.75
90 DEG. 4 IV 3/4" IV-A-600-0.75 2

5 G2 3/4" G2-0.75 3

6 IV 3/4" IV-A-500-0.75 1
S4
IV-A-600-0.75 7 Special 3/4" GS-EP26-052 1

MISC COMPONENTS

3575
8 SST-A2A 3/4 SPECIALITY ITEM - STEAM TRAP 1

CUT PIPE LENGTH

PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS


NO (MM) (IN) NO (MM) (IN)

<1> 8366 3/4 <2> 209 3/4


<3> 328 3/4

S5
G2-0.75

S6

8414
IV-A-500-0.75

3000

S4
S5 IV-A-600-0.75
G2-0.75
<1> 1

S5
G2-0.75
<3> 1

3/4"NPS <2> 1
13
CONT.ON 2
EP26_A2-LC-322-02715
E 1799411
N 2163385 8
EL +100163 SST-A2A 35 7
171 2 25
INSUL: 2
25/IS 2 90°
INSUL: 90° EL +100163
75/IH
S7
GS-EP26-052
Isometric File Name : EP26_A2-LP-322-02715
Iso Extraction Date : 2021-11-27 11:49:23

DESIGN TEMP. ºC 320.00 OPE. TEMP. ºC 320.00 PAINT SYSTEM T2 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 3.50 OPE. PRESS. kg/cm2g 0.00 PWHT N
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
INS. CODE IH TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm 75 TEST PRESS. kg/cm2 g 5.90 CLIENT NAME


01/12/2021 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 10 PT or MT % 0 STRESS SYSTEM.NO NA
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-000-PRS-PID-000-0011 (4/7)GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 3/4"-LP-322-02715-A2A-IH PIPE SPEC :A2A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : LP-322-02715 AREA: EP26-A2 SHT. 2 OF 2 REV. 0
<SECURITY LEVEL2>

CONT.ON
N MATERIAL LIST
EP26_A2-LP-322-0101_A 2
E 1804068 90° PT| SIZE
N 1968550 EL +118524 NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
EL +118147 PIPE
3 1 APPTB0SABPG 1.1/2" PIPE A106GR.B SMLS PE ASME B36.10M IBR :S-XS 19.5 M
S4
133 61
IH-A-809-1.5 FITTINGS
<1> 1
1.1/2"NPS 2 DECTA0P1RPG 1.1/2" 90 DEG ELBOW A105 CL.3000 SW ASME B16.11 IBR 3
<3> 1 22
13 VALVES

377
3 53002 1.1/2" CHECK VALVE CL.800 A105/HF SW BC,LIFT BY 1
MFR/API 602/ASME B16.11 IBR
3
PIPE SUPPORTS
2
90° 322 <2> 1 4 IH 1.1/2" IH-A-809-1.5 1
65
0
36X1.1/2"NPS 5 DSA 1.1/2" DSA-1.5 1

6 IV 1.1/2" IV-A-814-1.5 1

7 G2 1.1/2" G2-1.5 4
2
<4> 1 90°

715
CUT PIPE LENGTH
S5
PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS
DSA-1.5 NO (MM) (IN) NO (MM) (IN)
180 DEG.
50 <1> 343 1.1/2 <2> 579 1.1/2
<3> 1288 1.1/2 <4> 583 1.1/2
<5> 16633 1.1/2
S6
IV-A-814-1.5

3500
IV-A-814-1.5 1.

S7
G2-1.5 1.
3500

16666
S7
G2-1.5
IV-A-814-1.5
3500

IV-A-814-1.5 S7
G2-1.5
4500

IV-A-814-1.5
<5> 1
1.1/2"NPS
S7
G2-1.5

CONT.ON
LP-322-021104 SHT 2
Isometric File Name : EP26_A2-LP-322-021104
Iso Extraction Date : 2022-09-08 12:35:24

DESIGN TEMP. ºC 320.00 OPE. TEMP. ºC 320.00 PAINT SYSTEM T6 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 7.00 OPE. PRESS. kg/cm2g 5.00 PWHT N
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
1 07-09-2022 REVISED AS PER MARK1 PPK SP SS INS. CODE IH TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm 85 TEST PRESS. kg/cm2g 11.80 CLIENT NAME


01/12/2021 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 10 PT or MT % 0 STRESS SYSTEM.NO NA
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-000-PRS-PID-000-0011(5/7) GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 1-1/2"-LP-322-021104-A2A-IH PIPE SPEC :A2A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : LP-322-021104 AREA: EP26-A2 SHT. 1 OF 2 REV. 1
<SECURITY LEVEL2>

N MATERIAL LIST

PT| SIZE
2 NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
90° PIPE
1 APPTB0SABPG 1.1/2" PIPE A106GR.B SMLS PE ASME B36.10M IBR :S-XS 1.7 M

FITTINGS
2 DECTA0P1RPG 1.1/2" 90 DEG ELBOW A105 CL.3000 SW ASME B16.11 IBR 2

3 SSL-12 1.1/2" SPECIALITY ITEM - STEAM SUPPLY MANIFOLD 1


70
0 PIPE SUPPORTS
4 Special 1.1/2" AS-EP26-504 1
<1 SEE SHT
>
1 LP-322-021104 SHT 1
CUT PIPE LENGTH

PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS


NO (MM) (IN) NO (MM) (IN)
33 <1> 633 1.1/2 <2> 987 1.1/2

1.1/2"NPS
2
90° 1.
EL +101824

1020

1.
<2> 1

3
SSL-PR16-104
SSL-12

S4
AS-EP26-504
1453
1.1/2X3/4"NPS
33
90°
EL +99317 12
3 ASSEMBLY UP TO STEAM TRAP BY MANIFOLD VENDOR
SST-A2A
16 78 3/4"NPS
INSUL: 99
85/IH
INSUL:
75/IH
171
INSUL:
75/IH
INSUL: CONT.ON
25/IS EP26_A2-LC-322-021104
E 1802000
N 1968110
EL +99317
Isometric File Name : EP26_A2-LP-322-021104
Iso Extraction Date : 2022-09-08 12:35:24

DESIGN TEMP. ºC 320.00 OPE. TEMP. ºC 320.00 PAINT SYSTEM T6 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 7.00 OPE. PRESS. kg/cm2g 5.00 PWHT N
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
1 07-09-2022 REVISED AS PER MARK1 PPK SP SS INS. CODE IH TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm 85 TEST PRESS. kg/cm2g 11.80 CLIENT NAME


01/12/2021 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 10 PT or MT % 0 STRESS SYSTEM.NO NA
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-000-PRS-PID-000-0011(5/7) GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 1-1/2"-LP-322-021104-A2A-IH PIPE SPEC :A2A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : LP-322-021104 AREA: EP26-A2 SHT. 2 OF 2 REV. 1
<SECURITY LEVEL2>

N MATERIAL LIST
CONT.ON 2
EP26_A2-LP-322-0101_A PT| SIZE
90° NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
E 1804068 EL +118524
N 1968270 PIPE
EL +118147 3 1 APPTB0SABPG 1.1/2" PIPE A106GR.B SMLS PE ASME B36.10M IBR :S-XS 18.9 M
61
133
FITTINGS
<1> 1
1.1/2"NPS 2 DECTA0P1RPG 1.1/2" 90 DEG ELBOW A105 CL.3000 SW ASME B16.11 IBR 3
<3> 1 15
10 VALVES

377
3 53002 1.1/2" CHECK VALVE CL.800 A105/HF SW BC,LIFT BY 1
MFR/API 602/ASME B16.11 IBR
2 3
PIPE SUPPORTS
90°
322 <2> 1 4 DSA 1.1/2" DSA-1.5 1
37
IH-A-809-1.5? 0
36X1.1/2"NPS 5 IV 1.1/2" IV-A-814-1.5 4

6 G2 1.1/2" G2-1.5 4

2
<4> 1 90° CUT PIPE LENGTH

715
PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS
S4 NO (MM) (IN) NO (MM) (IN)
DSA-1.5
<1> 343 1.1/2 <2> 579 1.1/2
180 DEG. <3> 982 1.1/2 <4> 303 1.1/2
50
<5> 16633 1.1/2

1.
IV-A-814-1.5

3500
S5
IV-A-814-1.5

S6
G2-1.5

3500

16666
S6 1.
G2-1.5
S5
IV-A-814-1.5
3500

S5
IV-A-814-1.5 S6
G2-1.5
4500

S5
IV-A-814-1.5

<5> 1
1.1/2"NPS
S6
G2-1.5

CONT.ON
LP-322-021105 SHT 2
Isometric File Name : EP26_A2-LP-322-021105
Iso Extraction Date : 2022-09-08 12:36:26

DESIGN TEMP. ºC 320.00 OPE. TEMP. ºC 320.00 PAINT SYSTEM T6 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 7.00 OPE. PRESS. kg/cm2g 5.00 PWHT N
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
1 07-09-2022 REVISED AS PER MARK1 PPK SP SS INS. CODE IH TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm 85 TEST PRESS. kg/cm2g 11.80 CLIENT NAME


01/12/2021 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 10 PT or MT % 0 STRESS SYSTEM.NO NA
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-000-PRS-PID-000-0011(5/7) GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 1-1/2"-LP-322-021105-A2A-IH PIPE SPEC :A2A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : LP-322-021105 AREA: EP26-A2 SHT. 1 OF 2 REV. 1
<SECURITY LEVEL2>

N MATERIAL LIST

PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
PIPE
1 APPTB0SABPG 1.1/2" PIPE A106GR.B SMLS PE ASME B36.10M IBR :S-XS 3.6 M

FITTINGS
2 DECTA0P1RPG 1.1/2" 90 DEG ELBOW A105 CL.3000 SW ASME B16.11 IBR 2

434 3 DEDTA0P1RPG 1.1/2" 45 DEG ELBOW A105 CL.3000 SW ASME B16.11 IBR 1

2 4 SSL-8 1.1/2" SPECIALITY ITEM - STEAM SUPPLY MANIFOLD 1


90° 3
<2> 1 45°

CUT PIPE LENGTH

PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS


NO (MM) (IN) NO (MM) (IN)
30 7
7 30 <1> 1938 1.1/2 <2> 378 1.1/2
<3> 1237 1.1/2

1.
<1
>
1
19
93
SEE SHT
LP-322-021105 SHT 1
<3> 1
1270

33

1.1/2"NPS

2
4 90°
SSL-PR16-105 EL +101824
SSL-8

AS-EP26-504
1203

33
90° 12 1.1/2X3/4"NPS
EL +99317 3
ASSEMBLY UP TO STEAM TRAP BY MANIFOLD VENDOR
SST-A2A
16
INSUL: 99
85/IH 78 CONT.ON
INSUL: EP26_A2-LC-322-021105
171 E 1802000
75/IH
N 1969710
INSUL: 3/4"NPS EL +99317
75/IH 1.
INSUL:
25/IS
Isometric File Name : EP26_A2-LP-322-021105
Iso Extraction Date : 2022-09-08 12:36:26

DESIGN TEMP. ºC 320.00 OPE. TEMP. ºC 320.00 PAINT SYSTEM T6 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 7.00 OPE. PRESS. kg/cm2g 5.00 PWHT N
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
1 07-09-2022 REVISED AS PER MARK1 PPK SP SS INS. CODE IH TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm 85 TEST PRESS. kg/cm2g 11.80 CLIENT NAME


01/12/2021 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 10 PT or MT % 0 STRESS SYSTEM.NO NA
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-000-PRS-PID-000-0011(5/7) GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 1-1/2"-LP-322-021105-A2A-IH PIPE SPEC :A2A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : LP-322-021105 AREA: EP26-A2 SHT. 2 OF 2 REV. 1
<SECURITY LEVEL2>

N MATERIAL LIST
2 PT| SIZE
90° NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
EL +114024
132 PIPE

2 34 1 APPTB0SABPG 1.1/2" PIPE A106GR.B SMLS PE ASME B36.10M IBR :S-XS 14.7 M

<1> 1 FITTINGS
1.1/2"NPS 2 DECTA0P1RPG 1.1/2" 90 DEG ELBOW A105 CL.3000 SW ASME B16.11 IBR 3
01
17 CONT.ON VALVES
EP26_A2-LP-322-0101_A

376
1 3 53002 1.1/2" CHECK VALVE CL.800 A105/HF SW BC,LIFT BY 1
3> 3 E 1804068 MFR/API 602/ASME B16.11 IBR
< N 1973270
2 <2> 1 EL +113648 PIPE SUPPORTS
90° 37 4 DSA 1.1/2" DSA-1.5 1
0
5 IV 1.1/2" IV-A-814-1.5 4
36X1.1/2"NPS
6 G2 1.1/2" G2-1.5 3

2
<4> 1 90°
CUT PIPE LENGTH

715
S4 PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS
DSA-1.5 NO (MM) (IN) NO (MM) (IN)
360 DEG.
<1> 343 1.1/2 <2> 200 1.1/2
<3> 1668 1.1/2 <4> 303 1.1/2
50 <5> 12133 1.1/2

S5
IV-A-814-1.5 1.

2500
S5
IV-A-814-1.5

S6 1.
G2-1.5

12166
3500

S5
IV-A-814-1.5 S6
G2-1.5
4500

S5
IV-A-814-1.5

<5> 1
1.1/2"NPS
S6
G2-1.5

CONT.ON
LP-322-021106 SHT 2
Isometric File Name : EP26_A2-LP-322-021106
Iso Extraction Date : 2022-09-08 12:37:35

DESIGN TEMP. ºC 320.00 OPE. TEMP. ºC 320.00 PAINT SYSTEM T6 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 7.00 OPE. PRESS. kg/cm2g 5.00 PWHT N
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
1 07-09-2022 REVISED AS PER MARK1 PPK SP SS INS. CODE IH TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm 85 TEST PRESS. kg/cm2g 11.80 CLIENT NAME


01/12/2021 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 10 PT or MT % 0 STRESS SYSTEM.NO NA
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-000-PRS-PID-000-0011(5/7) GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 1-1/2"-LP-322-021106-A2A-IH PIPE SPEC :A2A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : LP-322-021106 AREA: EP26-A2 SHT. 1 OF 2 REV. 1
<SECURITY LEVEL2>

SEE SHT
LP-322-021106 SHT 1
N MATERIAL LIST

PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
PIPE
1 APPTB0SABPG 1.1/2" PIPE A106GR.B SMLS PE ASME B36.10M IBR :S-XS 2.3 M
1.1/2"NPS FITTINGS
2 DECTA0P1RPG 1.1/2" 90 DEG ELBOW A105 CL.3000 SW ASME B16.11 IBR 2
33
3 SSL-8 1.1/2" SPECIALITY ITEM - STEAM SUPPLY MANIFOLD 1
2
90°
EL +101824
<1 11 CUT PIPE LENGTH
> 00
1 PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS
NO (MM) (IN) NO (MM) (IN)

<1> 1033 1.1/2 <2> 1237 1.1/2

2
90°

ASSEMBLY UP TO STEAM TRAP BY MANIFOLD VENDOR


SST-A2A

1270

<2> 1

3
SSL-PR16-106
SSL-8

AS-EP26-504
1203 1.1/2X3/4"NPS
34
90° 12
EL +99317 3

16 3/4"NPS
INSUL:
78
85/IH CONT.ON
INSUL: 99 171 EP26_A2-LC-322-021106
75/IH E 1802000
INSUL: N 1971310
75/IH EL +99317
INSUL:
25/IS
Isometric File Name : EP26_A2-LP-322-021106
Iso Extraction Date : 2022-09-08 12:37:35

DESIGN TEMP. ºC 320.00 OPE. TEMP. ºC 320.00 PAINT SYSTEM T6 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 7.00 OPE. PRESS. kg/cm2g 5.00 PWHT N
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
1 07-09-2022 REVISED AS PER MARK1 PPK SP SS INS. CODE IH TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm 85 TEST PRESS. kg/cm2g 11.80 CLIENT NAME


01/12/2021 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 10 PT or MT % 0 STRESS SYSTEM.NO NA
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-000-PRS-PID-000-0011(5/7) GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 1-1/2"-LP-322-021106-A2A-IH PIPE SPEC :A2A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : LP-322-021106 AREA: EP26-A2 SHT. 2 OF 2 REV. 1
<SECURITY LEVEL2>

N MATERIAL LIST

PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
2 PIPE
90°
1 APPTB0SABPG 1.1/2" PIPE A106GR.B SMLS PE ASME B36.10M IBR :S-XS 29.0 M
S5
FITTINGS
TV-A-350-500-1.5
2 DECTA0P1RPG 1.1/2" 90 DEG ELBOW A105 CL.3000 SW ASME B16.11 IBR 4

26 VALVES
0 3 53002 1.1/2" CHECK VALVE CL.800 A105/HF SW BC,LIFT BY 1
1000 MFR/API 602/ASME B16.11 IBR
<4
>
1 PIPE SUPPORTS
S6 4 IH 1.1/2" IH-A-600-1.5 1

3000
G2-1.5
5 TV 1.1/2" TV-A-350-500-1.5 5

6 G2 1.1/2" G2-1.5 5
<3> 1 2
90°
S5
TV-A-350-500-1.5 S6 97 CUT PIPE LENGTH
G2-1.5 67
PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS
133 3 S4 NO (MM) (IN) NO (MM) (IN)

15 IH-A-600-1.5
4 61 <1>
<3>
449
6763
1.1/2
1.1/2
<2>
<4>
651
193
1.1/2
1.1/2

6000
68 <5> 20876 1.1/2
2
90°
EL +122224
<2> 1
CONT.ON
<1> 1 EP26_A2-LP-322-0101_C

483
1.1/2"NPS E 1804068
N 2110100
S5 EL +121741
TV-A-350-500-1.5 S6
20943

G2-1.5
20X1.1/2"NPS
6000

S5
TV-A-350-500-1.5

S6
G2-1.5
4000

S5
TV-A-350-500-1.5

S6
G2-1.5
2
90° <5> 1
EL +101281
1.1/2"NPS

CONT.ON
LP-322-021107 SHT 2

34
Isometric File Name : EP26_A2-LP-322-021107
Iso Extraction Date : 2022-09-08 12:31:05

DESIGN TEMP. ºC 320.00 OPE. TEMP. ºC 320.00 PAINT SYSTEM T6 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 7.00 OPE. PRESS. kg/cm2g 5.00 PWHT N
PROJECT NAME
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
1 07-09-2022 REVISED AS PER MARK1 PPK SP SS INS. CODE IH TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 01/12/2021 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS INS.THK mm 85 TEST PRESS. kg/cm2g 11.80 CLIENT NAME
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 10 PT or MT % 0 STRESS SYSTEM.NO NA
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-000-PRS-PID-000-0011(5/7) GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 1-1/2"-LP-322-021107-A2A-IH PIPE SPEC :A2A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : LP-322-021107 AREA: EP26-A2 SHT. 1 OF 2 REV. 01
<SECURITY LEVEL2>

N MATERIAL LIST

PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
PIPE
1 APPTB0SABPG 1.1/2" PIPE A106GR.B SMLS PE ASME B36.10M IBR :S-XS 3.2 M

FITTINGS
2 DECTA0P1RPG 1.1/2" 90 DEG ELBOW A105 CL.3000 SW ASME B16.11 IBR 3

SEE SHT 18 3 SSL-8 1.1/2" SPECIALITY ITEM - STEAM SUPPLY MANIFOLD 1


LP-322-021107 SHT 1 4
PIPE SUPPORTS
4 IH 1.1/2" IH-A-550-1.5 1
2
90° 5 Special 1.1/2" AS-EP26-507 1
<1> 1
1.1/2"NPS
CUT PIPE LENGTH

S4 PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS


IH-A-550-1.5 NO (MM) (IN) NO (MM) (IN)

1 <1> 150 1.1/2 <2> 1814 1.1/2


68 <3> 290 1.1/2 <4> 907 1.1/2

2
90°

1
>
<2
35
7

<3 81
> 18
1

2
90°
941

CONT.ON
EP26_A2-LC-322-021107
E 1809800
N 2110990
<4> 1

EL +99104
3/4"NPS 1.1/2X3/4"NPS
1203
3
34 SSL-PR16-107
INSUL: 171 99 SSL-8
25/IS
INSUL:
75/IH 78 S5
INSUL:
AS-EP26-507
75/IH
12
15 3
90°
INSUL: EL +99104
85/IH ASSEMBLY UP TO STEAM TRAP BY MANIFOLD VENDOR
SST-A2A
Isometric File Name : EP26_A2-LP-322-021107
Iso Extraction Date : 2022-09-08 12:31:05

DESIGN TEMP. ºC 320.00 OPE. TEMP. ºC 320.00 PAINT SYSTEM T6 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 7.00 OPE. PRESS. kg/cm2g 5.00 PWHT N
PROJECT NAME
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
1 07-09-2022 REVISED AS PER MARK1 PPK SP SS INS. CODE IH TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 01/12/2021 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS INS.THK mm 85 TEST PRESS. kg/cm2g 11.80 CLIENT NAME
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 10 PT or MT % 0 STRESS SYSTEM.NO NA
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-000-PRS-PID-000-0011(5/7) GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 1-1/2"-LP-322-021107-A2A-IH PIPE SPEC :A2A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : LP-322-021107 AREA: EP26-A2 SHT. 2 OF 2 REV. 01
<SECURITY LEVEL2>

N MATERIAL LIST
2
PT| SIZE
90°
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
S4 PIPE
IH-A-600-1.5
1 APPTB0SABPG 1.1/2" PIPE A106GR.B SMLS PE ASME B36.10M IBR :S-XS 29.0 M

FITTINGS
26
0 2 DECTA0P1RPG 1.1/2" 90 DEG ELBOW A105 CL.3000 SW ASME B16.11 IBR 3
9 7
67 VALVES
3 53002 1.1/2" CHECK VALVE CL.800 A105/HF SW BC,LIFT BY 1
133 <3> 1 MFR/API 602/ASME B16.11 IBR
2
90° PIPE SUPPORTS

1000
4 IH 1.1/2" IH-A-600-1.5 1
4 15 <4> 1
2 68 61 TV-A-350-500-1.5
5 G2 1.1/2" G2-1.5 5
90°
EL +122224
CUT PIPE LENGTH
S5

483
3 G2-1.5 PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS

3000
NO (MM) (IN) NO (MM) (IN)
<2> 1
TV-A-350-500-1.5 <1> 449 1.1/2 <2> 651 1.1/2
<3> 6763 1.1/2 <4> 193 1.1/2
<5> 20876 1.1/2
20X1.1/2"NPS S5
<1> 1 G2-1.5
1.1/2"NPS
CONT.ON
EP26_A2-LP-322-0101_C
E 1804068
N 2110900
EL +121741

6000

20909
TV-A-350-500-1.5

S5
G2-1.5

6000
S5
G2-1.5

TV-A-350-500-1.5
4000

TV-A-350-500-1.5
<5> 1
1.1/2"NPS
S5
G2-1.5

CONT.ON
LP-322-021108 SHT 2
Isometric File Name : EP26_A2-LP-322-021108
Iso Extraction Date : 2022-09-08 12:31:05

DESIGN TEMP. ºC 320.00 OPE. TEMP. ºC 320.00 PAINT SYSTEM T6 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 7.00 OPE. PRESS. kg/cm2g 5.00 PWHT N
PROJECT NAME
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
1 07-09-2022 REVISED AS PER MARK1 PPK SP SS INS. CODE IH TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 01/12/2021 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS INS.THK mm 85 TEST PRESS. kg/cm2g 11.80 CLIENT NAME
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 10 PT or MT % 0 STRESS SYSTEM.NO NA
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-000-PRS-PID-000-0011(5/7) GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 1-1/2"-LP-322-021108-A2A-IH PIPE SPEC :A2A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : LP-322-021108 AREA: EP26-A2 SHT. 1 OF 2 REV. 01
<SECURITY LEVEL2>

N MATERIAL LIST

PT| SIZE
2 NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
SEE SHT
LP-322-021108 SHT 1 90° PIPE
1 APPTB0SABPG 1.1/2" PIPE A106GR.B SMLS PE ASME B36.10M IBR :S-XS 1.2 M
537
FITTINGS
2 DECTA0P1RPG 1.1/2" 90 DEG ELBOW A105 CL.3000 SW ASME B16.11 IBR 2
<1> 1
3 SSL-12 1.1/2" SPECIALITY ITEM - STEAM SUPPLY MANIFOLD 1

1.1/2"NPS PIPE SUPPORTS


4 Special 1.1/2" AS-EP26-508 1
34
2
90° 9
EL +101281 51 CUT PIPE LENGTH

14 PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS


0 NO (MM) (IN) NO (MM) (IN)

<1> 470 1.1/2 <2> 657 1.1/2

691

<2> 1
ASSEMBLY UP TO STEAM TRAP BY MANIFOLD VENDOR
SST-A2A
3
SSL-PR16-108
SSL-12

S4
AS-EP26-508
1453

34
90°
EL +99104 12
3

1.1/2X3/4"NPS 16 78
INSUL:
85/IH 3/4"NPS
INSUL: 99
75/IH

171
INSUL:
75/IH
INSUL: CONT.ON
25/IS EP26_A2-LC-322-021108
E 1812200
N 2110009
EL +99104
Isometric File Name : EP26_A2-LP-322-021108
Iso Extraction Date : 2022-09-08 12:31:05

DESIGN TEMP. ºC 320.00 OPE. TEMP. ºC 320.00 PAINT SYSTEM T6 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 7.00 OPE. PRESS. kg/cm2g 5.00 PWHT N
PROJECT NAME
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
1 07-09-2022 REVISED AS PER MARK1 PPK SP SS INS. CODE IH TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 01/12/2021 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS INS.THK mm 85 TEST PRESS. kg/cm2g 11.80 CLIENT NAME
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 10 PT or MT % 0 STRESS SYSTEM.NO NA
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-000-PRS-PID-000-0011(5/7) GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 1-1/2"-LP-322-021108-A2A-IH PIPE SPEC :A2A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : LP-322-021108 AREA: EP26-A2 SHT. 2 OF 2 REV. 01
<SECURITY LEVEL2>

<2> 1
2 N MATERIAL LIST
90°
3 EL +110773
PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY

2 280 <1> 1 PIPE


90° S4 1.1/2"NPS 1 APPTB0SABPG 1.1/2" PIPE A106GR.B SMLS PE ASME B36.10M IBR :S-XS 10.5 M
IH-A-650-1.5
CONT.ON

531
5 FITTINGS
<4> 1 65 EP26_A2-LP-322-0101_C
E 1804068 2 DECTA0P1RPG 1.1/2" 90 DEG ELBOW A105 CL.3000 SW ASME B16.11 IBR 6
1
< 3> N 2116000
VALVES
EL +110242
3 53002 1.1/2" CHECK VALVE CL.800 A105/HF SW BC,LIFT BY 1
MFR/API 602/ASME B16.11 IBR
2
36 91 20X1.1/2"NPS
0 133 PIPE SUPPORTS
1000
2 4 IH 1.1/2" IH-A-650-1.5 1
90°
5 G2 1.1/2" G2-1.5 3
S5
G2-1.5
TV-A-1000-500-1.5 CUT PIPE LENGTH

PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS


NO (MM) (IN) NO (MM) (IN)

3000
<1> 498 1.1/2 <2> 621 1.1/2
<3> 879 1.1/2 <4> 293 1.1/2
<5> 7674 1.1/2 <6> 299 1.1/2
<7> 213 1.1/2

TV-A-1000-500-1.5

S5
7741

G2-1.5
3000

TV-A-1000-500-1.5

S5
G2-1.5
<5> 1

<6> 1
366
2
90°

2 34
90° 23 <7> 1
6
EL +103032 1.1/2"NPS
280

246
33 CONT.ON
LP-322-021109 SHT 2
2
90°
EL +102752
Isometric File Name : EP26_A2-LP-322-021109
Iso Extraction Date : 2022-09-08 12:31:05

DESIGN TEMP. ºC 320.00 OPE. TEMP. ºC 320.00 PAINT SYSTEM T6 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 7.00 OPE. PRESS. kg/cm2g 5.00 PWHT N
PROJECT NAME
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
1 07-09-2022 REVISED AS PER MARK1 PPK SP SS INS. CODE IH TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 01/12/2021 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS INS.THK mm 85 TEST PRESS. kg/cm2g 11.80 CLIENT NAME
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 10 PT or MT % 0 STRESS SYSTEM.NO NA
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-000-PRS-PID-000-0011(5/7) GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 1-1/2"-LP-322-021109-A2A-IH PIPE SPEC :A2A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : LP-322-021109 AREA: EP26-A2 SHT. 1 OF 2 REV. 01
<SECURITY LEVEL2>

N MATERIAL LIST

PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
PIPE
1 APPTB0SABPG 1.1/2" PIPE A106GR.B SMLS PE ASME B36.10M IBR :S-XS 9.1 M
SEE SHT
LP-322-021109 SHT 1 FITTINGS

191 2 DECTA0P1RPG 1.1/2" 90 DEG ELBOW A105 CL.3000 SW ASME B16.11 IBR 3

3 DEDTA0P1RPG 1.1/2" 45 DEG ELBOW A105 CL.3000 SW ASME B16.11 IBR 1

S5 4 SSL-8 1.1/2" SPECIALITY ITEM - STEAM SUPPLY MANIFOLD 1


IH-A-800-1.5 PIPE SUPPORTS
5 IH 1.1/2" IH-A-800-1.5 2

18 6 G2 1.1/2" G2-1.5 2
00 S6
G2-1.5 7 IH 1.1/2" IH-A-600-1.5 1
1.1/2"NPS 8 Special 1.1/2" AS-EP26-509 1

CUT PIPE LENGTH

PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS


51 NO (MM) (IN) NO (MM) (IN)
S5 91 30
00
IH-A-800-1.5 <1> 5157 1.1/2 <2> 1403 1.1/2
<3> 1097 1.1/2 <4> 510 1.1/2
S6 <5> 907 1.1/2
G2-1.5

2
90°
CONT.ON
IH-A-900-1.5 EP26_A2-LC-322-021109
E 1804200
N 2110990
EL +99104 2
<1> 1 S7 90°
IH-A-600-1.5 566

3 <4> 1

<2> 1
45°
52
11

1470
1
>
<3
40 0
0 40

941
3/4"NPS
2 2 S8
90° 35 4
EL +101281 AS-EP26-509 SSL-PR16-109

<5> 1
SSL-8
ASSEMBLY UP TO STEAM TRAP BY MANIFOLD VENDOR
SST-A2A 1203
171 33
INSUL:
25/IS
INSUL: 78 12 90°
75/IH 99 3 EL +99104
INSUL:
75/IH 1.1/2X3/4"NPS
16
INSUL:
85/IH
Isometric File Name : EP26_A2-LP-322-021109
Iso Extraction Date : 2022-09-08 12:31:05

DESIGN TEMP. ºC 320.00 OPE. TEMP. ºC 320.00 PAINT SYSTEM T6 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 7.00 OPE. PRESS. kg/cm2g 5.00 PWHT N
PROJECT NAME
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
1 07-09-2022 REVISED AS PER MARK1 PPK SP SS INS. CODE IH TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 01/12/2021 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS INS.THK mm 85 TEST PRESS. kg/cm2g 11.80 CLIENT NAME
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 10 PT or MT % 0 STRESS SYSTEM.NO NA
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-000-PRS-PID-000-0011(5/7) GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 1-1/2"-LP-322-021109-A2A-IH PIPE SPEC :A2A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : LP-322-021109 AREA: EP26-A2 SHT. 2 OF 2 REV. 01
<SECURITY LEVEL2>

N
CONT.ON MATERIAL LIST
EP26_A2-LP-322-0101_C
PT| SIZE
E 1804068 2 NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
N 2117000 90°
EL +110242 EL +110773 PIPE
5 1 APPTB0SABPG 1.1/2" PIPE A106GR.B SMLS PE ASME B36.10M IBR :S-XS 10.3 M
S4 65
IH-A-650-1.5? 133 FITTINGS
2 DECTA0P1RPG 1.1/2" 90 DEG ELBOW A105 CL.3000 SW ASME B16.11 IBR 4

<3> 1 2
91 VALVES

531 3 53002 1.1/2" CHECK VALVE CL.800 A105/HF SW BC,LIFT BY 1


MFR/API 602/ASME B16.11 IBR
3
<1> 1 PIPE SUPPORTS
2 1.1/2"NPS
90° 280 <2> 1 4 IH 1.1/2" IH-A-650-1.5 1
36
0
5 G2 1.1/2" G2-1.5 3
20X1.1/2"NPS
6 TV 1.1/2" TV-A-1000-500-1.5 3

<4> 1 2

1000
CUT PIPE LENGTH
90°
PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS
NO (MM) (IN) NO (MM) (IN)

S5 <1> 498 1.1/2 <2> 621 1.1/2


G2-1.5 S6 <3> 879 1.1/2 <4> 293 1.1/2
TV-A-1000-500-1.5 <5> 7954 1.1/2

3000
S6
TV-A-1000-500-1.5

S5
G2-1.5
8021

3000

S6
TV-A-1000-500-1.5

S5
G2-1.5
<5> 1

2 1.1/2"NPS
90°
EL +102752

CONT.ON
LP-322-021110 SHT 2

34
Isometric File Name : EP26_A2-LP-322-021110
Iso Extraction Date : 2022-09-08 12:31:05

DESIGN TEMP. ºC 320.00 OPE. TEMP. ºC 320.00 PAINT SYSTEM T6 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 7.00 OPE. PRESS. kg/cm2g 5.00 PWHT N
PROJECT NAME
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
1 07-09-2022 REVISED AS PER MARK1 PPK SP SS INS. CODE IH TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 01/12/2021 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS INS.THK mm 85 TEST PRESS. kg/cm2g 11.80 CLIENT NAME
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 10 PT or MT % 0 STRESS SYSTEM.NO NA
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-000-PRS-PID-000-0011(5/7) GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 1-1/2"-LP-322-021110-A2A-IH PIPE SPEC :A2A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : LP-322-021110 AREA: EP26-A2 SHT. 1 OF 2 REV. 01
<SECURITY LEVEL2>

N MATERIAL LIST
1.1/2"NPS
PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
SEE SHT
LP-322-021110 SHT 1 PIPE
1 APPTB0SABPG 1.1/2" PIPE A106GR.B SMLS PE ASME B36.10M IBR :S-XS 8.7 M

FITTINGS
70 2 DECTA0P1RPG 1.1/2" 90 DEG ELBOW A105 CL.3000 SW ASME B16.11 IBR 3
7
IH-A-800-1.5
3 SSL-12 1.1/2" SPECIALITY ITEM - STEAM SUPPLY MANIFOLD 1

PIPE SUPPORTS
18 4 G2 1.1/2" G2-1.5 2
00
IH-A-800-1.5 61 5 IH 1.1/2" IH-A-900-1.5 1
07
ASSEMBLY UP TO STEAM TRAP BY MANIFOLD VENDOR 6 Special 1.1/2" AS-EP26-510 1
SST-A2A
S4 CUT PIPE LENGTH
S4 30 G2-1.5
G2-1.5 00
PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS
NO (MM) (IN) NO (MM) (IN)

<1 <1> 6073 1.1/2 <2> 1403 1.1/2


> <3> 500 1.1/2 <4> 657 1.1/2
1

S5 2
IH-A-900-1.5 90°

1470
<2> 1
2
90°
<3> 1 EL +101281

2
90°
8
56

3
691

<4> 1 SSL-PR16-110
SSL-12

S6
AS-EP26-510
1453

33
90° 1.1/2X3/4"NPS
12
EL +99104 3
3/4"NPS
16
INSUL:
85/IH 78
99
INSUL: 171
75/IH
INSUL:
75/IH CONT.ON
INSUL: EP26_A2-LC-322-021110
25/IS E 1801800
N 2110009
Isometric File Name : EP26_A2-LP-322-021110

EL +99104
Iso Extraction Date : 2022-09-08 12:31:05

DESIGN TEMP. ºC 320.00 OPE. TEMP. ºC 320.00 PAINT SYSTEM T6 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 7.00 OPE. PRESS. kg/cm2g 5.00 PWHT N
PROJECT NAME
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
1 07-09-2022 REVISED AS PER MARK1 PPK SP SS INS. CODE IH TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 01/12/2021 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS INS.THK mm 85 TEST PRESS. kg/cm2g 11.80 CLIENT NAME
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 10 PT or MT % 0 STRESS SYSTEM.NO NA
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-000-PRS-PID-000-0011(5/7) GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 1-1/2"-LP-322-021110-A2A-IH PIPE SPEC :A2A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : LP-322-021110 AREA: EP26-A2 SHT. 2 OF 2 REV. 01
<SECURITY LEVEL2>

2
90°
N MATERIAL LIST
<2> 1 EL +114024
PT| SIZE
2 3 NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
90° S4 <1> 1 PIPE
1
IH-A-953-1.5? 70 1.1/2"NPS 1 APPTB0SABPG 1.1/2" PIPE A106GR.B SMLS PE ASME B36.10M IBR :S-XS 15.7 M
<4> 1
4
23 FITTINGS

782
1 2 DECTA0P1RPG 1.1/2" 90 DEG ELBOW A105 CL.3000 SW ASME B16.11 IBR 3
>
<3 VALVES
CONT.ON
1 132 EP26_A2-LP-322-0101_C 3 53002 1.1/2" CHECK VALVE CL.800 A105/HF SW BC,LIFT BY 1
0 E 1804068
80
0 16 MFR/API 602/ASME B16.11 IBR
N 2011700
EL +113242 PIPE SUPPORTS
1974 20X1.1/2"NPS
2 4 IH 1.1/2" IH-A-953-1.5 1
90°
5 DSA 1.1/2" DSA-1.5 1

50 6 G2 1.1/2" G2-1.5 3
S5
DSA-1.5
360 DEG. CUT PIPE LENGTH
IV-A-764-1.5 PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS
NO (MM) (IN) NO (MM) (IN)

3000
<1> 749 1.1/2 <2> 200 1.1/2
<3> 1568 1.1/2 <4> 733 1.1/2
IV-A-764-1.5 <5> 12433 1.1/2

S6
G2-1.5
12466

3000

S6
G2-1.5 IV-A-764-1.5
3000

IV-A-764-1.5

S6
G2-1.5

<5> 1
1.1/2"NPS

CONT.ON
LP-322-021251 SHT 2
Isometric File Name : EP26_A2-LP-322-021251
Iso Extraction Date : 2022-08-19 15:13:14

DESIGN TEMP. ºC 320.00 OPE. TEMP. ºC 320.00 PAINT SYSTEM T6 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 7.00 OPE. PRESS. kg/cm2g 5.00 PWHT N
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
INS. CODE IH TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm 85 TEST PRESS. kg/cm2g 11.80 CLIENT NAME


17-08-2022 APPROVED FOR CONSTRUCTION PPK SP SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 10 PT or MT % 0 STRESS SYSTEM.NO NA
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-000-PRS-PID-000-0011 (5 OfGAD
7) NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 1-1/2"-LP-322-021251-A2A-IH PIPE SPEC :A2A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : LP-322-021251 AREA: EP26-A2 SHT. 1 OF 2 REV. 0
<SECURITY LEVEL2>

SEE SHT
LP-322-021251 SHT 1
N MATERIAL LIST

PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
PIPE
1 APPTB0SABPG 1.1/2" PIPE A106GR.B SMLS PE ASME B36.10M IBR :S-XS 1.6 M

1.1/2"NPS FITTINGS
2 DECTA0P1RPG 1.1/2" 90 DEG ELBOW A105 CL.3000 SW ASME B16.11 IBR 2
34
3 SSL-8 1.1/2" SPECIALITY ITEM - STEAM SUPPLY MANIFOLD 1
2
90° PIPE SUPPORTS
EL +101524 70 4 Special 1.1/2" AS-EP26-665 1
<1 0
>
1
CUT PIPE LENGTH

PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS


NO (MM) (IN) NO (MM) (IN)

<1> 633 1.1/2 <2> 937 1.1/2

2
90°

<2> 1
970
ASSEMBLY UP TO STEAM TRAP BY MANIFOLD VENDOR
SST-A2A

3
SSL-PR16-105A
SSL-8

S4
1203 AS-EP26-665
1.1/2X3/4"NPS
34

12
90° 3
EL +99317
16
84
INSUL:
85/IH INSUL: 3/4"NPS
75/IH 93

171
INSUL:
75/IH CONT.ON
INSUL: EP26_A2-LC-322-021251
25/IS E 1802100
N 2011310
Isometric File Name : EP26_A2-LP-322-021251

EL +99317
Iso Extraction Date : 2022-08-19 15:13:14

DESIGN TEMP. ºC 320.00 OPE. TEMP. ºC 320.00 PAINT SYSTEM T6 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 7.00 OPE. PRESS. kg/cm2g 5.00 PWHT N
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
INS. CODE IH TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm 85 TEST PRESS. kg/cm2g 11.80 CLIENT NAME


17-08-2022 APPROVED FOR CONSTRUCTION PPK SP SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 10 PT or MT % 0 STRESS SYSTEM.NO NA
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-000-PRS-PID-000-0011 (5 OfGAD
7) NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 1-1/2"-LP-322-021251-A2A-IH PIPE SPEC :A2A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : LP-322-021251 AREA: EP26-A2 SHT. 2 OF 2 REV. 0
<SECURITY LEVEL2>

<2> 1
2
N MATERIAL LIST
3 90°
EL +114024 PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
2
90° 1 <1> 1 PIPE
IH-A-953-1.5 70 1.1/2"NPS 1 APPTB0SABPG 1.1/2" PIPE A106GR.B SMLS PE ASME B36.10M IBR :S-XS 15.1 M
<4> 1 4 CONT.ON
23 FITTINGS

782
<3> 1 EP26_A2-LP-322-0101_C
2 DECTA0P1RPG 1.1/2" 90 DEG ELBOW A105 CL.3000 SW ASME B16.11 IBR 3
E 1804068
N 2012100 VALVES
EL +113242
51 3 53002 1.1/2" CHECK VALVE CL.800 A105/HF SW BC,LIFT BY 1
40
0 13 MFR/API 602/ASME B16.11 IBR
132
20X1.1/2"NPS PIPE SUPPORTS
1974 2
90° 4 DSA 1.1/2" DSA-1.5 1

5 IV 1.1/2" IV-A-764-1.5 4

50 6 G2 1.1/2" G2-1.5 3

S4
DSA-1.5 S5
360 DEG. IV-A-764-1.5 CUT PIPE LENGTH

PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS


NO (MM) (IN) NO (MM) (IN)

3000
<1> 749 1.1/2 <2> 200 1.1/2
S5 <3> 1318 1.1/2 <4> 333 1.1/2
IV-A-764-1.5 <5> 12433 1.1/2

S6
G2-1.5
12466

3000

S6
G2-1.5 S5
IV-A-764-1.5
3000

S5
IV-A-764-1.5

S6
G2-1.5

<5> 1
1.1/2"NPS

CONT.ON
LP-322-021252 SHT 2
Isometric File Name : EP26_A2-LP-322-021252
Iso Extraction Date : 2022-08-19 15:14:25

DESIGN TEMP. ºC 320.00 OPE. TEMP. ºC 320.00 PAINT SYSTEM T6 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 7.00 OPE. PRESS. kg/cm2g 5.00 PWHT N
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
INS. CODE IH TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm 85 TEST PRESS. kg/cm2g 11.80 CLIENT NAME


17-08-2022 APPROVED FOR CONSTRUCTION PPK SP SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 10 PT or MT % 0 STRESS SYSTEM.NO NA
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-000-PRS-PID-000-0011 (5 OfGAD
7) NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 1-1/2"-LP-322-021252-A2A-IH PIPE SPEC :A2A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : LP-322-021252 AREA: EP26-A2 SHT. 1 OF 2 REV. 0
<SECURITY LEVEL2>

SEE SHT
LP-322-021252 SHT 1
N MATERIAL LIST

PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
PIPE
1 APPTB0SABPG 1.1/2" PIPE A106GR.B SMLS PE ASME B36.10M IBR :S-XS 3.3 M

1.1/2"NPS FITTINGS
2 DECTA0P1RPG 1.1/2" 90 DEG ELBOW A105 CL.3000 SW ASME B16.11 IBR 2
34
3 DEDTA0P1RPG 1.1/2" 45 DEG ELBOW A105 CL.3000 SW ASME B16.11 IBR 1

2 4 SSL-8 1.1/2" SPECIALITY ITEM - STEAM SUPPLY MANIFOLD 1


90°
EL +101524

20 CUT PIPE LENGTH


<1 50
> PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS
1 NO (MM) (IN) NO (MM) (IN)

<1> 1994 1.1/2 <2> 298 1.1/2


<3> 937 1.1/2

0 3
25 45°

3 54
< 2> 1
25
0

2
90°

<3> 1
970
4
SSL-PR16-106A
SSL-8

AS-EP26-665
1203 1.1/2X3/4"NPS
34
12 CONT.ON
90° 3
EL +99317 EP26_A2-LC-322-021252
16 84 E 1802100
N 2009710
INSUL: EL +99317
85/IH INSUL: 93
75/IH
ASSEMBLY UP TO STEAM TRAP BY MANIFOLD VENDOR 3/4"NPS
SST-A2A
171
INSUL:
75/IH
INSUL:
25/IS
Isometric File Name : EP26_A2-LP-322-021252
Iso Extraction Date : 2022-08-19 15:14:25

DESIGN TEMP. ºC 320.00 OPE. TEMP. ºC 320.00 PAINT SYSTEM T6 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 7.00 OPE. PRESS. kg/cm2g 5.00 PWHT N
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
INS. CODE IH TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm 85 TEST PRESS. kg/cm2g 11.80 CLIENT NAME


17-08-2022 APPROVED FOR CONSTRUCTION PPK SP SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 10 PT or MT % 0 STRESS SYSTEM.NO NA
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-000-PRS-PID-000-0011 (5 OfGAD
7) NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 1-1/2"-LP-322-021252-A2A-IH PIPE SPEC :A2A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : LP-322-021252 AREA: EP26-A2 SHT. 2 OF 2 REV. 0
<SECURITY LEVEL2>

N MATERIAL LIST

PT| SIZE
2 NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
90°
132 EL +114024 PIPE

2 34 1 APPTB0SABPG 1.1/2" PIPE A106GR.B SMLS PE ASME B36.10M IBR :S-XS 15.0 M

FITTINGS
<1> 1 2 DECTA0P1RPG 1.1/2" 90 DEG ELBOW A105 CL.3000 SW ASME B16.11 IBR 3
S4 1.1/2"NPS
IH-A-952-1.5 51
13 VALVES
CONT.ON 3 53002 1.1/2" CHECK VALVE CL.800 A105/HF SW BC,LIFT BY 1

782
3 EP26_A2-LP-322-0101_C MFR/API 602/ASME B16.11 IBR
<3> 1 E 1804068
1 N 2078900 PIPE SUPPORTS
2 70 20X1.1/2"NPS
90° EL +113242 4 IH 1.1/2" IH-A-952-1.5 1
40 <2> 1
0 5 DSA 1.1/2" DSA-1.5 1

6 IV 1.1/2" IV-A-714-1.5 4

7 G2 1.1/2" G2-1.5 3
2
<4> 1 90°
CUT PIPE LENGTH

1974
PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS
NO (MM) (IN) NO (MM) (IN)

S5 <1> 749 1.1/2 <2> 200 1.1/2


DSA-1.5 <3> 1318 1.1/2 <4> 333 1.1/2
0 DEG. <5> 12333 1.1/2

50

S6
IV-A-714-1.5

3000
S7
G2-1.5

12366
S6
IV-A-714-1.5
3000

S6
IV-A-714-1.5 S7
G2-1.5
3000

S6 <5> 1
IV-A-714-1.5 1.1/2"NPS

S7
G2-1.5

CONT.ON
LP-322-021253 SHT 2
Isometric File Name : EP26_A2-LP-322-021253
Iso Extraction Date : 2022-09-08 12:54:04

DESIGN TEMP. ºC 320.00 OPE. TEMP. ºC 320.00 PAINT SYSTEM T6 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 7.00 OPE. PRESS. kg/cm2g 5.00 PWHT N
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
INS. CODE IH TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm 85 TEST PRESS. kg/cm2g 11.80 CLIENT NAME


07-09-2022 APPROVED FOR CONSTRUCTION PPK SP SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 10 PT or MT % 0 STRESS SYSTEM.NO NA
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-000-PRS-PID-000-0011 (5 OfGAD
7) NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 1-1/2"-LP-322-021253-A2A-IH PIPE SPEC :A2A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : LP-322-021253 AREA: EP26-A2 SHT. 1 OF 2 REV. 0
<SECURITY LEVEL2>

N MATERIAL LIST

PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
PIPE
1 APPTB0SABPG 1.1/2" PIPE A106GR.B SMLS PE ASME B36.10M IBR :S-XS 3.1 M

FITTINGS
2 DECTA0P1RPG 1.1/2" 90 DEG ELBOW A105 CL.3000 SW ASME B16.11 IBR 2
2 354 3 DEDTA0P1RPG 1.1/2" 45 DEG ELBOW A105 CL.3000 SW ASME B16.11 IBR 1
90°
3 4 SSL-8 1.1/2" SPECIALITY ITEM - STEAM SUPPLY MANIFOLD 1
<2> 1 45°
PIPE SUPPORTS
5 Special 1.1/2" AS-EP26-666 1

25 0 CUT PIPE LENGTH


0 25
PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS
NO (MM) (IN) NO (MM) (IN)

<1> 1694 1.1/2 <2> 298 1.1/2


<3> 1037 1.1/2

<1
>
1
17
50
SEE SHT
<3> 1
1070

LP-322-021253 SHT 1

34

1.1/2"NPS

4 2
SSL-PR16-107A 90°
SSL-8 EL +101624

S5
1203 AS-EP26-666
34 1.1/2X3/4"NPS

12 ASSEMBLY UP TO STEAM TRAP BY MANIFOLD VENDOR


90° 3
EL +99317 16 SST-A2A
84 CONT.ON
EP26_A2-LC-322-021253
INSUL: INSUL: E 1802100
85/IH 93 N 2080010
75/IH
EL +99317

171
INSUL:
75/IH
INSUL: 3/4"NPS
25/IS
Isometric File Name : EP26_A2-LP-322-021253
Iso Extraction Date : 2022-09-08 12:54:04

DESIGN TEMP. ºC 320.00 OPE. TEMP. ºC 320.00 PAINT SYSTEM T6 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 7.00 OPE. PRESS. kg/cm2g 5.00 PWHT N
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
INS. CODE IH TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm 85 TEST PRESS. kg/cm2g 11.80 CLIENT NAME


07-09-2022 APPROVED FOR CONSTRUCTION PPK SP SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 10 PT or MT % 0 STRESS SYSTEM.NO NA
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-000-PRS-PID-000-0011 (5 OfGAD
7) NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 1-1/2"-LP-322-021253-A2A-IH PIPE SPEC :A2A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : LP-322-021253 AREA: EP26-A2 SHT. 2 OF 2 REV. 0
<SECURITY LEVEL2>

N MATERIAL LIST

PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
132 PIPE
2
2 34 <2> 1 90° 1 APPTB0SABPG 1.1/2" PIPE A106GR.B SMLS PE ASME B36.10M IBR :S-XS 15.6 M
EL +114024
FITTINGS
<3> 1 <1> 1 2 DECTA0P1RPG 1.1/2" 90 DEG ELBOW A105 CL.3000 SW ASME B16.11 IBR 3
1.1/2"NPS
01
16 VALVES
CONT.ON 3 53002 1.1/2" CHECK VALVE CL.800 A105/HF SW BC,LIFT BY 1

782
EP26_A2-LP-322-0101_C MFR/API 602/ASME B16.11 IBR
3 E 1804068
2 N 2079300 PIPE SUPPORTS
90° 701
EL +113242 4 DSA 1.1/2" DSA-1.5 1
80 20X1.1/2"NPS
0 5 G2 1.1/2" G2-1.5 3
IH-A-952-1.5?

CUT PIPE LENGTH

2 PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS


<4> 1 90° NO (MM) (IN) NO (MM) (IN)

<1> 749 1.1/2 <2> 200 1.1/2


<3> 1568 1.1/2 <4> 733 1.1/2

1974
<5> 12333 1.1/2

S4
DSA-1.5
0 DEG.
50

IV-A-714-1.5

3000
IV-A-714-1.5

12366
S5
G2-1.5
3000

IV-A-714-1.5 S5
G2-1.5
3000

IV-A-714-1.5

<5> 1
S5 1.1/2"NPS
G2-1.5

CONT.ON
LP-322-021254 SHT 2
Isometric File Name : EP26_A2-LP-322-021254
Iso Extraction Date : 2022-09-08 12:55:05

DESIGN TEMP. ºC 320.00 OPE. TEMP. ºC 320.00 PAINT SYSTEM T6 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 7.00 OPE. PRESS. kg/cm2g 5.00 PWHT N
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
INS. CODE IH TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm 85 TEST PRESS. kg/cm2g 11.80 CLIENT NAME


07-09-2022 APPROVED FOR CONSTRUCTION PPK SP SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 10 PT or MT % 0 STRESS SYSTEM.NO NA
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-000-PRS-PID-000-0011 (5 OfGAD
7) NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 1-1/2"-LP-322-021254-A2A-IH PIPE SPEC :A2A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : LP-322-021254 AREA: EP26-A2 SHT. 1 OF 2 REV. 0
<SECURITY LEVEL2>

N MATERIAL LIST

PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
2
PIPE
90°
1 APPTB0SABPG 1.1/2" PIPE A106GR.B SMLS PE ASME B36.10M IBR :S-XS 1.7 M

FITTINGS
2 DECTA0P1RPG 1.1/2" 90 DEG ELBOW A105 CL.3000 SW ASME B16.11 IBR 2

3 SSL-8 1.1/2" SPECIALITY ITEM - STEAM SUPPLY MANIFOLD 1

70
0
CUT PIPE LENGTH
<1 SEE SHT
> PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS
1 LP-322-021254 SHT 1 NO (MM) (IN) NO (MM) (IN)

<1> 633 1.1/2 <2> 1037 1.1/2

34

1.1/2"NPS
2
90°
EL +101624

<2> 1
1070

3
SSL-PR16-108A
SSL-8

AS-EP26-666
1203
1.1/2X3/4"NPS
34

12
90° 3 CONT.ON
EL +99317 EP26_A2-LC-322-021254
16 E 1802100
84
N 2078710
INSUL: EL +99317
85/IH INSUL:
75/IH 93
3/4"NPS

171
INSUL:
75/IH ASSEMBLY UP TO STEAM TRAP BY MANIFOLD VENDOR
INSUL: SST-A2A
25/IS
Isometric File Name : EP26_A2-LP-322-021254
Iso Extraction Date : 2022-09-08 12:55:05

DESIGN TEMP. ºC 320.00 OPE. TEMP. ºC 320.00 PAINT SYSTEM T6 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 7.00 OPE. PRESS. kg/cm2g 5.00 PWHT N
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
INS. CODE IH TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm 85 TEST PRESS. kg/cm2g 11.80 CLIENT NAME


07-09-2022 APPROVED FOR CONSTRUCTION PPK SP SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 10 PT or MT % 0 STRESS SYSTEM.NO NA
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-000-PRS-PID-000-0011 (5 OfGAD
7) NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 1-1/2"-LP-322-021254-A2A-IH PIPE SPEC :A2A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : LP-322-021254 AREA: EP26-A2 SHT. 2 OF 2 REV. 0
<SECURITY LEVEL2>

N MATERIAL LIST
CONT.ON
EP26_A2-MP-322-0101_B PT| SIZE
E 1809885 NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
N 1976750 PIPE
EL +113157
1 APPTK0MBBPG 36" PIPE A672GR.B60CL.12 EFW BE ASME B36.10M IBR 6.4 M
:17.48mm
2 APPTB0SBBPG 3" PIPE A106GR.B SMLS BE ASME B36.10M IBR :S-STD 0.4 M

3 APPTB0SABPG 3/4" PIPE A106GR.B SMLS PE ASME B36.10M IBR :S-160 0.2 M
5 FITTINGS
90° 1372
36"NPS 4 DSZTK0MBBPG 36X3" WELD BRANCH RPAD A672GR.B60CL.12 EFW BE ASME 1
EL +117657
B36.10M IBR :17.48mm x S-STD
5 DEATB0P2QPG 36" 90 DEG ELBOW A234GR.WPB WELD BW ASME B16.9 2
IBR :17.48mm
6 DHDTA0Q1RPG 3X3/4" HALF COUPLING A105 CL.6000 SW ASME B16.11 IBR 1

36"NPS 7 DJATB0S2QPG 3" CAP A234GR.WPB SMLS BW ASME B16.9 IBR :S-STD 1

8 DFETA0Q1TPG 3/4" SOCKET OUTLET (FLAT) A105 CL.6000 SW MSS 1


CONT.ON SP-97 IBR
MP-322-0101_A SHT 2
FLANGES
43
77 9 CFATA0EBJPG 3/4" FLANGE SW A105 CL.300 RF ASME B16.5 IBR 1
:S-160
38 10 CDBTA0EBJPG 3/4" BLIND FLANGE A105 CL.300 RF ASME B16.5 IBR 1
50
PIPE SUPPORTS
11 D1S15 36" D1S15-600-200-36 1

PT| SIZE

<4> 1
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
GASKETS

4500
12 FFG213ACAEBHA 3/4" SPIRAL WOUND GASKET (G213ACA) CL.300 RF 4.5 1
MM ASME B16.20

BOLTS
13 EBEBB0A 5/8 " STUD BOLT(FULL THREADED)/HEX.NUT(HEAVY) 4
A193GR.B7/A194GR.2H ASME B18.2.1/ASME
S11 B18.2.2 - 80 mm Length
D1S15-600-200-36
DS MEMBER HEIGHT TO BE ADJUSTED TO AVOID
CLASH WITH CIVIL BRACKING MEMBER AT SITE CONT.ON 15 CUT PIPE LENGTH
EP26_A2-MP-322-02406 44
E 1809955 PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS
N 1972374 <3
> NO (MM) (IN) NO (MM) (IN)
EL +112445 1
<1> 352 3 <2> 127 3/4
INSUL: <3> 4549 36 <4> 1756 36
130/IH
INSUL:
100/IH
6
4 3X3/4"NPS

712
36"X3"NPS
5
E 1809885 90°
N 1972374 <1> 2
EL +112306
EL +112445
70
7
INSUL:

95
F9 G12 B13
8 75/IH
INSUL:
INSUL: <2> 3 100/IH
100/IH 10 3/4"NPS
INSUL:
75/IH 19
144
E 1809885
N 1972374
EL +112145
Isometric File Name : EP26_A2-MP-322-0101_A
Iso Extraction Date : 2023-03-02 10:00:34

DESIGN TEMP. ºC 350.00 OPE. TEMP. ºC 330.00 PAINT SYSTEM T6 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 17.00 OPE. PRESS. kg/cm2g 12.00 PWHT N
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
1 01/03/2023 REVISED AS PER MARK1 PPK SP SS INS. CODE IH TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm 130 TEST PRESS. kg/cm2g 32.53 CLIENT NAME


01/12/2021 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 10 PT or MT % 0 STRESS SYSTEM.NO 6405-EPCM25_26-CA-0046
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-322-PRS-PID-000-0002 GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 36"-MP-322-0101_A-B2A-IH PIPE SPEC :B2A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : MP-322-0101_A AREA: EP26-A2 SHT. 1 OF 2 REV. 1
<SECURITY LEVEL2>

E 1809885 F10 G16 B17 N MATERIAL LIST


N 1969258
EL +118676 PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
PIPE
11 121
1 APPTK0MBBPG 36" PIPE A672GR.B60CL.12 EFW BE ASME B36.10M IBR 27.1 M
:17.48mm
58 2 APPTB0SBBPG 3" PIPE A106GR.B SMLS BE ASME B36.10M IBR :S-STD 0.4 M
<3> 3
12
3 APPTB0SABPG 3/4" PIPE A106GR.B SMLS PE ASME B36.10M IBR :S-160 0.6 M
110 STEM NORTH
<2> 3 FITTINGS
58 4 DSZTK0MBBPG 36X3" WELD BRANCH RPAD A672GR.B60CL.12 EFW BE ASME 1
B36.10M IBR :17.48mm x S-STD
5 DHDTA0Q1RPG 36X3/4" HALF COUPLING A105 CL.6000 SW ASME B16.11 IBR 1

12 6 DEATB0P2QPG 36" 90 DEG ELBOW A234GR.WPB WELD BW ASME B16.9 2


<1> 3 STEM NORTH IBR :17.48mm
SEE SHT

668
7 DHDTA0Q1RPG 3X3/4" HALF COUPLING A105 CL.6000 SW ASME B16.11 IBR 1
MP-322-0101_A SHT 1 INSUL:
36 75/IH 8 DJATB0S2QPG 3" CAP A234GR.WPB SMLS BW ASME B16.9 IBR :S-STD 1
"N INSUL:
PS
130/IH 9 DFETA0Q1TPG 3/4" SOCKET OUTLET (FLAT) A105 CL.6000 SW MSS 1
5 SP-97 IBR
36X3/4"NPS 1357
20 S13 FLANGES
0 S11-300-200-36 10 CFATA0EBJPG 3/4" FLANGE SW A105 CL.300 RF ASME B16.5 IBR 2
90 :S-160
00 11 CDBTA0EBJPG 3/4" BLIND FLANGE A105 CL.300 RF ASME B16.5 IBR 2
S14
GS-EP26-023 VALVES
12 51002 3/4" GATE VALVE CL.800 A105/HF SW BB,OS&Y BY 2
MFR/API 602/ASME B16.11 HANDWHEEL IBR
90 PIPE SUPPORTS
00
22 13 S11 36" S11-300-200-36 3
S13
39
7 S11-300-200-36 14 Special 36" GS-EP26-023 1

S13 15 F1S15 36" F1S15-600-200-36 1


<4> 1
S11-300-200-36 PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
GASKETS
6 16 FFG213ACAEBHA 3/4" SPIRAL WOUND GASKET (G213ACA) CL.300 RF 4.5 2
90° MM ASME B16.20
<5> 1
1 BOLTS

4500
17 EBEBB0A 5/8 " STUD BOLT(FULL THREADED)/HEX.NUT(HEAVY) 8
26 A193GR.B7/A194GR.2H ASME B18.2.1/ASME
10 S15 B18.2.2 - 80 mm Length
F1S15-600-200-36

6 19 28 CONT.ON CUT PIPE LENGTH


90° 60 51 EP26_A1-MP-322-0101
EL +113157 E 1809885 PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS
4 <8 N 1941400 NO (MM) (IN) NO (MM) (IN)
> EL +113157
36"X3"NPS 1
<1> 185 3/4 <2> 110 3/4
<3> 105 3/4 <4> 21225 36
INSUL: <5> 1756 36 <6> 352 3
130/IH <7> 127 3/4 <8> 4089 36
7 INSUL:
3X3/4"NPS 100/IH CONT.ON

712
EL +112445 EP26_A2-MP-322-02405
E 1809955
N 1944250
<6> 2 EL +112445

70
E 1809885 8 INSUL:
95

N 1944250
EL +112306 75/IH
9 INSUL:
100/IH
INSUL: <7> 3
100/IH 11 3/4"NPS
19
INSUL:
75/IH 144
F10 G16 B17 E 1809885
N 1944250
Isometric File Name : EP26_A2-MP-322-0101_A

EL +112145
Iso Extraction Date : 2023-03-02 10:00:34

DESIGN TEMP. ºC 350.00 OPE. TEMP. ºC 330.00 PAINT SYSTEM T6 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 17.00 OPE. PRESS. kg/cm2g 12.00 PWHT N
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
1 01/03/2023 REVISED AS PER MARK1 PPK SP SS INS. CODE IH TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm 130 TEST PRESS. kg/cm2g 32.53 CLIENT NAME


01/12/2021 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 10 PT or MT % 0 STRESS SYSTEM.NO 6405-EPCM25_26-CA-0046
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-322-PRS-PID-000-0002 GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 36"-MP-322-0101_A-B2A-IH PIPE SPEC :B2A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : MP-322-0101_A AREA: EP26-A2 SHT. 2 OF 2 REV. 1
<SECURITY LEVEL2>

N MATERIAL LIST

PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
PIPE
1 APPTK0MBBPG 36" PIPE A672GR.B60CL.12 EFW BE ASME B36.10M IBR 8.7 M
:17.48mm
2 APPTK0MBBPG 20" PIPE A672GR.B60CL.12 EFW BE ASME B36.10M IBR 0.3 M
:12.70mm
CONT.ON
FITTINGS
EP26_A2-MP-322-0101_C
E 1809885 3 DSZTK0MBBPG 36X20" WELD BRANCH RPAD A672GR.B60CL.12 EFW BE ASME 1
N 1985352 B36.10M IBR :17.48mm x 12.70mm
EL +113157
PIPE SUPPORTS
S4 4 S11 36" S11-300-200-36 2
S11-300-200-36
<2
>
1
CUT PIPE LENGTH

PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS


NO (MM) (IN) NO (MM) (IN)

<1> 255 20 <2> 8601 36

36X30"NPS
76MM OFFSET 51
FLAT SIDE D 00 90°
CONT.ON
EP26_A2-MP-322-0209
20"NPS E 1809885
60 N 1979301
51
EL +113792

<1> 2
635
S4
3
36"X20"NPS S11-300-200-36

16
50

25
50
36"NPS

CONT.ON
EP26_A2-MP-322-0101_A
E 1809885
N 1976750
EL +113157
Isometric File Name : EP26_A2-MP-322-0101_B
Iso Extraction Date : 2022-06-17 16:39:18

DESIGN TEMP. ºC 350.00 OPE. TEMP. ºC 330.00 PAINT SYSTEM T6 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


DESIGN PRESS kg/cm2 g 17.00 OPE. PRESS. kg/cm2g 12.00 PWHT N
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
INS. CODE IH TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm 130 TEST PRESS. kg/cm2 g 32.53 CLIENT NAME


15/06/2022 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 10 PT or MT % 0 STRESS SYSTEM.NO 6405-EPCM25_26-CA-0046
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-322-PRS-PID-000-0002 GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 36"-MP-322-0101_B-B2A-IH PIPE SPEC :B2A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : MP-322-0101_B AREA: EP26-A2 SHT. 1 OF 1 REV. 0
<SECURITY LEVEL2>

N MATERIAL LIST

PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
PIPE
1 APPTK0MBBPG 30" PIPE A672GR.B60CL.12 EFW BE ASME B36.10M IBR 18.3 M
:15.88mm
2 APPTB0SABPG 3/4" PIPE A106GR.B SMLS PE ASME B36.10M IBR :S-160 0.4 M

FITTINGS
3 DRBTB0P2QPG 36X30" ECC REDUCER A234GR.WPB WELD BW ASME B16.9 IBR 1
:17.48mm x 15.88mm
4 DHDTA0Q1RPG 30X3/4" HALF COUPLING A105 CL.6000 SW ASME B16.11 IBR 1

5 DEATB0P2QPG 30" 90 DEG ELBOW A234GR.WPB WELD BW ASME B16.9 3


IBR :15.88mm
6 DEBTB0P2QPG 30" 45 DEG ELBOW A234GR.WPB WELD BW ASME B16.9 1
IBR :15.88mm

FLANGES
7 CFATA0EBJPG 3/4" FLANGE SW A105 CL.300 RF ASME B16.5 IBR 1
:S-160
8 CDBTA0EBJPG 3/4" BLIND FLANGE A105 CL.300 RF ASME B16.5 IBR 1
CONT.ON
MP-322-0101_C SHT 2 VALVES
9 51002 3/4" GATE VALVE CL.800 A105/HF SW BB,OS&Y BY 2
MFR/API 602/ASME B16.11 HANDWHEEL IBR
S11
E 1801557 PIPE SUPPORTS
S11-300-200-30 N 1995325 10 G1S11 30" G1S11-300-200-G10-30 1
S11 EL +115344
88
S11-300-200-30 64 F7 G12 B13
11 S11 30" S11-300-200-30 4

PT| SIZE
1443 NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
8 121 6
45° GASKETS
00 <6> 2 57 EL +114451 12 FFG213ACAEBHA 3/4" SPIRAL WOUND GASKET (G213ACA) CL.300 RF 4.5 1
5 40 MM ASME B16.20
90° <8> 1 9 1370
30"NPS 110 STEM NORTH BOLTS
193
<5> 2 S11 7 13 EBEBB0A 5/8 " STUD BOLT(FULL THREADED)/HEX.NUT(HEAVY) 4
<7 58 A193GR.B7/A194GR.2H ASME B18.2.1/ASME
S11-300-200-30 5
> B18.2.2 - 80 mm Length
9 1 INSUL: <2> 1 90°
5 8 EL +113081
STEM NORTH 75/IH 69
542

13 INSUL:
CUT PIPE LENGTH
00 130/IH <1
>
1 PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS
25 CONT.ON NO (MM) (IN) NO (MM) (IN)
39 610 EP26_A2-MP-322-0101_B
0
00 37 E 1809885 <1> 5271 30 <2> 324 30
<4> 2 40 1 N 1985352 <3> 5345 30 <4> 135 3/4
64 EL +113157 <5> 110 3/4 <6> 105 3/4
4 1515 14
29 <7> 1964 30 <8> 5345 30
30X3/4"NPS 50 36"NPS
<3> 1 S11
S10
S11-300-200-30
G1S11-300-200-G10-30
5
90° 3
36X30"NPS
76MM OFFSET
FLAT SIDE D
Isometric File Name : EP26_A2-MP-322-0101_C

NOTES: REVISION FOR CORRECTION OF SYSTEM GENERATED MTO


Iso Extraction Date : 2022-12-07 10:38:27

DESIGN TEMP. ºC 350.00 OPE. TEMP. ºC 330.00 PAINT SYSTEM T6 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


2 07/12/2022 REVISED AS PER MARK2 PPK SP SS DESIGN PRESS kg/cm2 g 17.00 OPE. PRESS. kg/cm2g 12.00 PWHT N
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
1 09/11/2022 REVISED AS PER MARK1 PPK SP SS INS. CODE IH TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm 130 TEST PRESS. kg/cm2g 32.53 CLIENT NAME


01/12/2021 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 10 PT or MT % 0 STRESS SYSTEM.NO 6405-EPCM25_26-CA-0046
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-322-PRS-PID-000-0002 GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 30"-MP-322-0101_C-B2A-IH PIPE SPEC :B2A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : MP-322-0101_C AREA: EP26-A2 SHT. 1 OF 8 REV. 2
<SECURITY LEVEL2>

N MATERIAL LIST

PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
PIPE
1 APPTK0MBBPG 30" PIPE A672GR.B60CL.12 EFW BE ASME B36.10M IBR 0.4 M
:15.88mm
2 APPTB0SBBPG 3" PIPE A106GR.B SMLS BE ASME B36.10M IBR :S-STD 0.4 M
CONT.ON
MP-322-0101_C SHT 3 3 APPTB0SABPG 3/4" PIPE A106GR.B SMLS PE ASME B36.10M IBR :S-160 0.2 M

FITTINGS
4 DSZTK0MBBPG 30X3" WELD BRANCH RPAD A672GR.B60CL.12 EFW BE ASME 1
B36.10M IBR :15.88mm x S-STD
5 DEBTB0P2QPG 30" 45 DEG ELBOW A234GR.WPB WELD BW ASME B16.9 1
IBR :15.88mm
30 6 DEATB0P2QPG 30" 90 DEG ELBOW A234GR.WPB WELD BW ASME B16.9 1
"N
PS IBR :15.88mm
7 DHDTA0Q1RPG 3X3/4" HALF COUPLING A105 CL.6000 SW ASME B16.11 IBR 1

8 DJATB0S2QPG 3" CAP A234GR.WPB SMLS BW ASME B16.9 IBR :S-STD 1

9 DFETA0Q1TPG 3/4" SOCKET OUTLET (FLAT) A105 CL.6000 SW MSS 1


SP-97 IBR
60
00 FLANGES
S13
10 CFATA0EBJPG 3/4" FLANGE SW A105 CL.300 RF ASME B16.5 IBR 1
S11-300-200-30 :S-160
11 CDBTA0EBJPG 3/4" BLIND FLANGE A105 CL.300 RF ASME B16.5 IBR 1

60 PIPE SUPPORTS
00
S14 12 G1S11 30" G1S11-300-200-30 1
F1S15-600-200-30
13 S11 30" S11-300-200-30 3

14 F1S15 30" F1S15-600-200-30 1


60
00
S13 PT| SIZE
S11-300-200-30 NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
GASKETS
15 FFG213ACAEBHA 3/4" SPIRAL WOUND GASKET (G213ACA) CL.300 RF 4.5 1
60 MM ASME B16.20
00
S13
4 BOLTS
S11-300-200-30
30"X3"NPS 16 EBEBB0A 5/8 " STUD BOLT(FULL THREADED)/HEX.NUT(HEAVY) 4
23 A193GR.B7/A194GR.2H ASME B18.2.1/ASME
S12 6
29 90° B18.2.2 - 80 mm Length
G1S11-300-200-30
EL +113081
INSUL: 15
130/IH 46 INSUL: CUT PIPE LENGTH
INSUL: 100/IH
100/IH PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS
NO (MM) (IN) NO (MM) (IN)

CONT.ON <1> 324 30 <2> 353 3

636
EP26_A2-MP-322-02407 EL +112445 <3> 127 3/4
E 1809955 7
N 1998171 3X3/4"NPS 193 7
EL +112445 470
<2> 2
5
E 1809885 45° <1> 1
N 1998171
EL +112306 70
8 30"NPS
95

<3> 3 9

1370
3/4"NPS
INSUL: 70
13
100/IH 20 11
INSUL:
75/IH 144
E 1809885 INSUL:
F10 G15 B16 N 1998171 75/IH
EL +112145
SEE SHT
MP-322-0101_C SHT 1
Isometric File Name : EP26_A2-MP-322-0101_C

NOTES: REVISION FOR CORRECTION OF SYSTEM GENERATED MTO


Iso Extraction Date : 2022-12-07 10:38:27

DESIGN TEMP. ºC 350.00 OPE. TEMP. ºC 330.00 PAINT SYSTEM T6 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


2 07/12/2022 REVISED AS PER MARK2 PPK SP SS DESIGN PRESS kg/cm2 g 17.00 OPE. PRESS. kg/cm2g 12.00 PWHT N
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
1 09/11/2022 REVISED AS PER MARK1 PPK SP SS INS. CODE IH TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm 130 TEST PRESS. kg/cm2g 32.53 CLIENT NAME


01/12/2021 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 10 PT or MT % 0 STRESS SYSTEM.NO 6405-EPCM25_26-CA-0046
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-322-PRS-PID-000-0002 GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 30"-MP-322-0101_C-B2A-IH PIPE SPEC :B2A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : MP-322-0101_C AREA: EP26-A2 SHT. 2 OF 8 REV. 2
<SECURITY LEVEL2>

N MATERIAL LIST

PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
PIPE
1 APPTK0MBBPG 30" PIPE A672GR.B60CL.12 EFW BE ASME B36.10M IBR 41.2 M
:15.88mm
2 APPTB0SBBPG 3" PIPE A106GR.B SMLS BE ASME B36.10M IBR :S-STD 0.4 M

3 APPTB0SABPG 3/4" PIPE A106GR.B SMLS PE ASME B36.10M IBR :S-160 0.2 M

FITTINGS
4 DSZTK0MBBPG 30X3" WELD BRANCH RPAD A672GR.B60CL.12 EFW BE ASME 1
B36.10M IBR :15.88mm x S-STD
6 5 DEATB0P2QPG 30" 90 DEG ELBOW A234GR.WPB WELD BW ASME B16.9 2
45° IBR :15.88mm
EL +114451 6 DEBTB0P2QPG 30" 45 DEG ELBOW A234GR.WPB WELD BW ASME B16.9 1
IBR :15.88mm
7 DHDTA0Q1RPG 3X3/4" HALF COUPLING A105 CL.6000 SW ASME B16.11 IBR 1

8 DJATB0S2QPG 3" CAP A234GR.WPB SMLS BW ASME B16.9 IBR :S-STD 1


<4> 1
9 DFETA0Q1TPG 3/4" SOCKET OUTLET (FLAT) A105 CL.6000 SW MSS 1
193 SP-97 IBR
7 5
S13 90° FLANGES
S11-300-200-30 10 CFATA0EBJPG 3/4" FLANGE SW A105 CL.300 RF ASME B16.5 IBR 1
15 :S-160
46 11 CDBTA0EBJPG 3/4" BLIND FLANGE A105 CL.300 RF ASME B16.5 IBR 1

58 5 <3 PIPE SUPPORTS


69 15
1 > 12 G1S11 30" G1S11-300-200-30 1
CONT.ON 1
MP-322-0101_C SHT 4 13 S11 30" S11-300-200-30 2
0
S13 1 37 4 PT| SIZE
S11-300-200-30 1370 30"X3"NPS S12 NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
G1S11-300-200-30
1143 00 INSUL: GASKETS
40 130/IH 34
65 14 FFG213ACAEBHA 3/4" SPIRAL WOUND GASKET (G213ACA) CL.300 RF 4.5 1
INSUL: 8 MM ASME B16.20
100/IH
7 BOLTS
3X3/4"NPS
15 EBEBB0A 5/8 " STUD BOLT(FULL THREADED)/HEX.NUT(HEAVY) 4

636
30 A193GR.B7/A194GR.2H ASME B18.2.1/ASME
EL +112445 "N
PS B18.2.2 - 80 mm Length
5
30"NPS 90° <1> 2
<5> 1 E 1809885 60
00 CUT PIPE LENGTH
N 2032829
EL +112306 70 PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS
NO (MM) (IN) NO (MM) (IN)
8
INSUL:

95
F10 G14 B15 75/IH <1> 353 3 <2> 127 3/4
9 INSUL: <3> 35464 30 <4> 324 30
<5> 5345 30
100/IH
INSUL: <2> 3
100/IH 11 3/4"NPS
INSUL:
75/IH 20 E 1809885
144 N 2032829
EL +112145
CONT.ON
EP26_A2-MP-322-02408
E 1809955
N 2032829
EL +112445
SEE SHT
MP-322-0101_C SHT 2
Isometric File Name : EP26_A2-MP-322-0101_C

NOTES: REVISION FOR CORRECTION OF SYSTEM GENERATED MTO


Iso Extraction Date : 2022-12-07 10:38:27

DESIGN TEMP. ºC 350.00 OPE. TEMP. ºC 330.00 PAINT SYSTEM T6 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


2 07/12/2022 REVISED AS PER MARK2 PPK SP SS DESIGN PRESS kg/cm2 g 17.00 OPE. PRESS. kg/cm2g 12.00 PWHT N
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
1 09/11/2022 REVISED AS PER MARK1 PPK SP SS INS. CODE IH TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm 130 TEST PRESS. kg/cm2g 32.53 CLIENT NAME


01/12/2021 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 10 PT or MT % 0 STRESS SYSTEM.NO 6405-EPCM25_26-CA-0046
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-322-PRS-PID-000-0002 GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 30"-MP-322-0101_C-B2A-IH PIPE SPEC :B2A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : MP-322-0101_C AREA: EP26-A2 SHT. 3 OF 8 REV. 2
<SECURITY LEVEL2>

N MATERIAL LIST

PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
PIPE
1 APPTK0MBBPG 30" PIPE A672GR.B60CL.12 EFW BE ASME B36.10M IBR 7.7 M
:15.88mm
2 APPTB0SABPG 3/4" PIPE A106GR.B SMLS PE ASME B36.10M IBR :S-160 0.4 M
CONT.ON 1143 FITTINGS
MP-322-0101_C SHT 5
3 DHDTA0Q1RPG 30X3/4" HALF COUPLING A105 CL.6000 SW ASME B16.11 IBR 1

4 DEATB0P2QPG 30" 90 DEG ELBOW A234GR.WPB WELD BW ASME B16.9 2


193 7 IBR :15.88mm
5 5 DEBTB0P2QPG 30" 45 DEG ELBOW A234GR.WPB WELD BW ASME B16.9 1
45° IBR :15.88mm
30"NPS
<6> 1
FLANGES
4 6 CFATA0EBJPG 3/4" FLANGE SW A105 CL.300 RF ASME B16.5 IBR 1
90° :S-160
1 EL +113081 7 CDBTA0EBJPG 3/4" BLIND FLANGE A105 CL.300 RF ASME B16.5 IBR 1

< 5>

1370
VALVES
70 8 51002 3/4" GATE VALVE CL.800 A105/HF SW BB,OS&Y BY 2
13 MFR/API 602/ASME B16.11 HANDWHEEL IBR

PIPE SUPPORTS
9 S11 30" S11-300-200-30 2

PT| SIZE
S9 NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
4000
58 S11-300-200-30 GASKETS
69
10 FFG213ACAEBHA 3/4" SPIRAL WOUND GASKET (G213ACA) CL.300 RF 4.5 1
MM ASME B16.20

BOLTS
11 EBEBB0A 5/8 " STUD BOLT(FULL THREADED)/HEX.NUT(HEAVY) 4
A193GR.B7/A194GR.2H ASME B18.2.1/ASME
B18.2.2 - 80 mm Length

S9
S11-300-200-30 E 1801557 CUT PIPE LENGTH
N 2036500
EL +115394 PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS
F6 G10 B11 NO (MM) (IN) NO (MM) (IN)

1443 <1> 185 3/4 <2> 110 3/4


<3> 105 3/4 <4> 1964 30
7 121 <5> 5345 30 <6> 324 30

58
4 <3> 2
90° 8
110 STEM NORTH
<2> 2
58
<4
> INSUL:
1
75/IH
592

INSUL:
8 130/IH
STEM NORTH 21
25

<1> 2
30
"N
PS

98
3 1
30X3/4"NPS

SEE SHT
MP-322-0101_C SHT 3
Isometric File Name : EP26_A2-MP-322-0101_C

NOTES: REVISION FOR CORRECTION OF SYSTEM GENERATED MTO


Iso Extraction Date : 2022-12-07 10:38:27

DESIGN TEMP. ºC 350.00 OPE. TEMP. ºC 330.00 PAINT SYSTEM T6 TOYO ENGINEERING INDIA PRIVATE TEIL JOB NO. ACCOUNT CLIENT ORDER NO.

LIMITED, MUMBAI, INDIA 6405


2 07/12/2022 REVISED AS PER MARK2 PPK SP SS DESIGN PRESS kg/cm2 g 17.00 OPE. PRESS. kg/cm2g 12.00 PWHT N
BARAUNI REFINERY BR-9 CAPACITY EXPANSION PROJECT
PROJECT NAME
1 09/11/2022 REVISED AS PER MARK1 PPK SP SS INS. CODE IH TEST MEDIUM WATER ( BARAUNI, BIHAR STATE, INDIA )

0 INS.THK mm 130 TEST PRESS. kg/cm2g 32.53 CLIENT NAME


01/12/2021 APPROVED FOR CONSTRUCTION ABJ PPK SM/SS
INDIAN OIL CORPORATION LIMITED
REV. DATE DESCRIPTION DWN CHK APP RT % 10 PT or MT % 0 STRESS SYSTEM.NO 6405-EPCM25_26-CA-0046
NOTES: (1) NOTES FOR ISOMETRICS DRAWING SEE DOC.NO.IBCE-6373-C00-PIP-SPC-000-0010 (6) UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN MM P&ID NO: IBCE-6373-322-PRS-PID-000-0002 GAD NO: EPCM26-6405-A2-PIP-ARG-AG-303A~D
SHOP SOCKET SCREWED INSULATED TRACED
(2) PIPE SUPPORT STANDARD IBCE-6373-C00-PIP-STD-000-0001 (7) CONSTRUCTION CONTRACTOR TO TAKE PRECAUTIONARY ACTION WELD WELD JOINT PIPE PIPE
(3) FW (FIELD WELD) AND SPOOL LENGTH TO ALLOW FOR SITE FIT-UP IS RESPONSIBILITY OF FABRICATOR. WHEREVER CROSS WELD EXISTS LINE NO. : 30"-MP-322-0101_C-B2A-IH PIPE SPEC :B2A
(4) PIPE SIZE OF 1.1/2 AND SMALLER TO BE SITE RUN AND ALL GIVEN DIMENSIONS TO BE CHECKED AND ADJUSTED AT FIELD.
(5) STUB END SCHEDULE SHOULD MATCH WITH PIPE SCHEDULE. ISO DWG NO. : MP-322-0101_C AREA: EP26-A2 SHT. 4 OF 8 REV. 2
<SECURITY LEVEL2>

CONT.ON
N MATERIAL LIST
MP-322-0101_C SHT 6
PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
PIPE
1 APPTB0SBBPG 3" PIPE A106GR.B SMLS BE ASME B36.10M IBR :S-STD 0.4 M

2 APPTB0SABPG 3/4" PIPE A106GR.B SMLS PE ASME B36.10M IBR :S-160 0.2 M

FITTINGS
30
"N 3 DSZTK0MBBPG 30X3" WELD BRANCH RPAD A672GR.B60CL.12 EFW BE ASME 1
PS B36.10M IBR :15.88mm x S-STD
4 DHDTA0Q1RPG 3X3/4" HALF COUPLING A105 CL.6000 SW ASME B16.11 IBR 1

5 DJATB0S2QPG 3" CAP A234GR.WPB SMLS BW ASME B16.9 IBR :S-STD 1


S9
G1S11-300-200-30 6 DFETA0Q1TPG 3/4" SOCKET OUTLET (FLAT) A105 CL.6000 SW MSS 1
60
00 SP-97 IBR

FLANGES
7 CFATA0EBJPG 3/4" FLANGE SW A105 CL.300 RF ASME B16.5 IBR 1
:S-160
8 CDBTA0EBJPG 3/4" BLIND FLANGE A105 CL.300 RF ASME B16.5 IBR 1

PIPE SUPPORTS
S10 60
00 9 G1S11 30" G1S11-300-200-30 2
S11-300-200-30
10 S11 30" S11-300-200-30 2

11 F1S15 30" F1S15-600-200-30 1

PT| SIZE
NO ITEM CODE (INS) MATERIAL DESCRIPTION QTY
S11 60
00 GASKETS
F1S15-600-200-30 12 FFG213ACAEBHA 3/4" SPIRAL WOUND GASKET (G213ACA) CL.300 RF 4.5 1
MM ASME B16.20

BOLTS
13 EBEBB0A 5/8 " STUD BOLT(FULL THREADED)/HEX.NUT(HEAVY) 4
3 A193GR.B7/A194GR.2H ASME B18.2.1/ASME
S10 30"X3"NPS
60 B18.2.2 - 80 mm Length
S11-300-200-30 00

S9 CUT PIPE LENGTH


40
G1S11-300-200-30 2 PIECE LENGTH NPD REMARKS PIECE LENGTH NPD REMARKS
23 30
NO (MM) (IN) NO (MM) (IN)
SEE SHT 29 "N
MP-322-0101_C SHT 4 PS <1> 353 3 <2> 127 3/4

INSUL:
130/IH
INSUL:
100/IH
CONT.ON
EP26_A2-MP-322-02409
E 1809955

636
N 2040171
EL +112445
4
3X3/4"NPS
<1> 1
EL +112445
E 1809885
N 2040171
EL +112306 70
5
INSUL:

95
75/IH
6
INSUL:
INSUL: <2> 2 100/IH
100/IH 3/4"NPS
INSUL: 19 F7 G12 B13

144
75/IH
8

E 1809885
N 2040171
Isometric File Name : EP26_A2-MP-322-0101_C

EL +112145
NOTES: REVISION FOR CORRECTION OF SYSTEM GENERATED MTO