You are on page 1of 1

RING BALK 15/20 4Ø10

20

15 15 15 15 10 10 10
Kolom 12/15 Ø6-15 SNI

Pas.Tembok Bata 1pc:6ps Sloof 15/20 4Ø12 SNI


Plesteran 1pc :6ps raban beton 1Pc : 3krl:5 Ps
urugan tanah

100
12 MT ±0.00

KOLOM STRUKTUR 12/15


Ø8-15 SNI

4Ø12 SNI
SLOOF 15/20

besi masuk kedalam pondasi 20 cm


20
30
Ø6-15 15 15 15 10 10 10
60
80 50-70

DETAIL PONDASI P3
SKALA 1 : 25
50
pas. Pondasi batu kali 1pc: 5ps

pas. Aanstamping T. 20 cm
15
pasir bawah pondasi T. 10 cm
10

30
KOLOM SLOOF BALOK LATEI RING BALOK BALOK TERAS KOLOM TERAS
TYPE DETAIL PEMBESIAN
10 / 15 15 / 20 10 / 15 10 / 15 15 / 20 25 / 25
70 SKALA 1 : 25

25 80
15 15
10 2.5 2.5 10 10 2.5 2.5 2.5 2.5

2.5 2.5 2.5 2.5 2.5 2.5


2.5 2.5
2.5

TAMPAK 2.5 2.5 2.5

15 20 15 15 20
25
2.5 2.5 2.5
2.5 2.5

2.5

TULANGAN 4 Ø12 4 Ø12 4 Ø12 4 Ø12 6 Ø12 8 Ø12

BEUGEL Ø8 -15 SNI Ø8 - 15 SNI Ø8 -15 SNI Ø8 - 15 SNI Ø8 -15 SNI Ø8 -15 SNI

You might also like