TRAMO 6

CLASIFICACIÓN
Volumen
Progresiva Distancia Material Roca
Excavacion Roca Fija
Comun Ripeable
Km m m3 % % %
10+850.00 0.00
10+860.00 10.00 336.80 100%
10+870.00 10.00 338.30 100%
10+880.00 10.00 383.30 100%
10+890.00 10.00 367.15 20% 80%
10+900.00 10.00 315.50 20% 80%
10+910.00 10.00 285.35 20% 80%
10+920.00 10.00 290.40 20% 80%
10+930.00 10.00 325.45 20% 80%
10+940.00 10.00 384.85 20% 80%
10+950.00 10.00 389.50 20% 80%
10+960.00 10.00 354.30 20% 80%
10+970.00 10.00 328.60 20% 80%
10+980.00 10.00 307.30 20% 80%
10+990.00 10.00 314.95 20% 80%
11+000.00 10.00 307.75 20% 80%
11+010.00 10.00 213.30 100%
11+020.00 10.00 33.15 100%
11+030.00 10.00 - 100%
11+040.00 10.00 6.93 100%
11+050.00 10.00 111.35 100%
11+060.00 10.00 233.20 20% 80%
11+070.00 10.00 273.05 20% 80%
11+080.00 10.00 297.90 20% 80%
11+090.00 10.00 323.70 20% 80%
11+100.00 10.00 349.95 20% 80%
11+110.00 10.00 397.45 20% 80%
11+120.00 10.00 438.90 20% 80%
11+130.00 10.00 400.60 20% 80%
11+140.00 10.00 295.85 20% 80%
11+150.00 10.00 240.35 20% 80%
11+160.00 10.00 280.05 20% 80%
11+170.00 10.00 480.55 20% 80%
11+180.00 10.00 811.00 20% 80%
11+190.00 10.00 1,097.00 20% 80%
11+200.00 10.00 1,268.30 20% 80%
11+210.00 10.00 1,245.15 100%
11+220.00 10.00 1,109.45 100%
11+230.00 10.00 1,014.95 100%
11+240.00 10.00 883.85 100%
11+250.00 10.00 580.90 100%
11+260.00 10.00 210.95 100%
11+270.00 10.00 82.75 100%
11+280.00 10.00 207.70 100%
11+290.00 10.00 426.85 20% 80%
11+300.00 10.00 540.80 20% 80%
11+310.00 10.00 616.00 20% 80%
11+320.00 10.00 739.70 20% 80%
11+330.00 10.00 636.05 20% 80%
11+340.00 10.00 403.70 20% 80%
11+350.00 10.00 292.55 20% 80%
11+360.00 10.00 271.50 20% 80%
11+370.00 10.00 310.70 20% 80%
11+380.00 10.00 376.40 20% 80%
11+390.00 10.00 342.30 20% 80%
11+400.00 10.00 186.95 20% 80%
11+410.00 10.00 108.20 100%
11+420.00 10.00 225.70 100%
11+430.00 10.00 467.55 20% 80%
11+440.00 10.00 679.00 20% 80%
11+450.00 10.00 975.55 20% 80%
TRAMO 6
CLASIFICACIÓN
Volumen
Progresiva Distancia Material Roca
Excavacion Roca Fija
Comun Ripeable
Km m m3 % % %
11+460.00 10.00 1,291.50 20% 80%
11+470.00 10.00 1,320.20 20% 80%
11+480.00 10.00 952.25 20% 80%
11+490.00 10.00 619.40 20% 80%
11+500.00 10.00 625.35 20% 80%
11+510.00 10.00 585.10 20% 80%
11+520.00 10.00 440.25 100%
11+530.00 10.00 291.85 100%
11+540.00 10.00 231.45 100%
11+550.00 10.00 223.35 30% 70%
11+560.00 10.00 174.05 30% 70%
11+570.00 10.00 157.85 30% 70%
11+580.00 10.00 156.05 30% 70%
11+590.00 10.00 198.95 30% 70%
11+600.00 10.00 356.00 30% 70%
11+610.00 10.00 418.85 30% 70%
11+620.00 10.00 318.55 30% 70%
11+630.00 10.00 313.55 30% 70%
11+640.00 10.00 595.95 30% 70%
11+650.00 10.00 856.35 30% 70%
11+660.00 10.00 836.35 30% 70%
11+670.00 10.00 761.20 30% 70%
11+680.00 10.00 734.30 30% 70%
11+690.00 10.00 659.20 30% 70%
11+700.00 10.00 519.90 30% 70%
11+710.00 10.00 407.25 100%
11+720.00 10.00 452.00 100%
11+730.00 10.00 584.75 100%
11+740.00 10.00 593.85 50% 50%
11+750.00 10.00 506.50 50% 50%
11+760.00 10.00 443.15 50% 50%
11+770.00 10.00 389.65 50% 50%
11+780.00 10.00 339.45 50% 50%
11+790.00 10.00 362.30 50% 50%
11+800.00 10.00 406.55 50% 50%
11+810.00 10.00 437.35 50% 50%
11+820.00 10.00 437.00 100%
11+830.00 10.00 434.25 100%
11+840.00 10.00 411.70 100%
11+850.00 10.00 356.20 100%
11+860.00 10.00 285.45 100%
11+870.00 10.00 233.00 100%
11+880.00 10.00 259.45 10%
11+890.00 10.00 383.85 10%
11+900.00 10.00 632.55 10%
11+910.00 10.00 769.45 10%
11+920.00 10.00 570.35 10%
11+930.00 10.00 307.75 10%
11+940.00 10.00 252.65 10%
11+950.00 10.00 427.85 10%
11+960.00 10.00 770.85 10%
11+970.00 10.00 1,060.90 10%
11+980.00 10.00 987.95 10%
11+990.00 10.00 708.30 10%
12+000.00 10.00 490.75 10%
12+010.00 10.00 353.95 10% 90%
12+020.00 10.00 307.05 20% 80%
12+030.00 10.00 271.85 20% 80%
12+040.00 10.00 254.40 20% 80%
12+050.00 10.00 275.85 20% 80%
12+060.00 10.00 247.25 20% 80%
12+070.00 10.00 142.85 20% 80%
12+080.00 10.00 65.10 50% 50%
TRAMO 6
CLASIFICACIÓN
Volumen
Progresiva Distancia Material Roca
Excavacion Roca Fija
Comun Ripeable
Km m m3 % % %
12+090.00 10.00 59.10 50% 50%
12+100.00 10.00 173.45 50% 50%
12+110.00 10.00 392.65 50% 50%
12+120.00 10.00 600.55 100%
12+130.00 10.00 685.55 100%
12+140.00 10.00 552.40 100%
12+150.00 10.00 296.15 100%
12+160.00 10.00 127.80 100%
12+170.00 10.00 86.55 100%
12+180.00 10.00 112.10 100%
12+190.00 10.00 151.45 100%
12+200.00 10.00 162.60 100%
12+210.00 10.00 151.95 100%
12+220.00 10.00 177.10 100%
12+230.00 10.00 211.35 100%
12+240.00 10.00 220.10 100%
12+250.00 10.00 226.70 10% 90%
12+260.00 10.00 221.35 10% 90%
12+270.00 10.00 190.45 100%
12+280.00 10.00 167.40 100%
12+290.00 10.00 191.80 100%
12+300.00 10.00 293.50 100%
12+310.00 10.00 571.60 100%
12+320.00 10.00 730.65 100%
12+330.00 10.00 567.35 100%
12+340.00 10.00 303.90 100%
12+350.00 10.00 176.10 100%
12+360.00 10.00 225.40 100%
12+370.00 10.00 286.15 100%
12+380.00 10.00 298.05 20% 80%
12+390.00 10.00 263.10 20% 80%
12+400.00 10.00 244.65 20% 80%
12+410.00 10.00 269.00 20% 80%
12+420.00 10.00 321.10 20% 80%
12+430.00 10.00 382.50 20% 80%
12+440.00 10.00 421.85 20% 80%
12+450.00 10.00 416.45 20% 80%
12+460.00 10.00 396.70 20% 80%
12+470.00 10.00 370.15 20% 80%
12+480.00 10.00 328.85 20% 80%
12+490.00 10.00 284.70 100%
12+500.00 10.00 262.75 100%
12+510.00 10.00 220.85 100%
12+520.00 10.00 173.10 100%
12+530.00 10.00 186.90 100%
12+540.00 10.00 237.05 20% 80%
12+550.00 10.00 338.65 20% 80%
12+560.00 10.00 521.60 20% 80%
12+570.00 10.00 642.75 20% 80%
12+580.00 10.00 591.20 20% 80%
12+590.00 10.00 508.65 20% 80%
12+600.00 10.00 453.15 20% 80%
12+610.00 10.00 405.40 20% 80%
12+620.00 10.00 358.30 20% 80%
12+630.00 10.00 326.85 20% 80%
12+640.00 10.00 326.45 20% 80%
12+650.00 10.00 380.85 20% 80%
12+660.00 10.00 500.80 20% 80%
12+670.00 10.00 561.90 20% 80%
12+680.00 10.00 470.30 20% 80%
12+690.00 10.00 345.35 20% 80%
12+700.00 10.00 302.65 20% 80%
12+710.00 10.00 282.40 20% 80%
12+720.00 10.00 269.20 20% 80%
TRAMO 6
CLASIFICACIÓN
Volumen
Progresiva Distancia Material Roca
Excavacion Roca Fija
Comun Ripeable
Km m m3 % % %
12+730.00 10.00 348.35 20% 80%
12+740.00 10.00 458.55 20% 80%
12+750.00 10.00 398.00 20% 80%
12+760.00 10.00 265.20 20% 80%
12+770.00 10.00 236.40 20% 80%
12+780.00 10.00 289.95 20% 80%
12+790.00 10.00 336.65 20% 80%
12+800.00 10.00 325.95 20% 80%
12+810.00 10.00 332.30 20% 80%
12+820.00 10.00 400.30 10% 30% 60%
12+830.00 10.00 630.60 10% 30% 60%
12+840.00 10.00 1,077.40 10% 30% 60%
12+850.00 10.00 1,736.90 10% 30% 60%
12+860.00 10.00 2,548.30 10% 30% 60%
12+870.00 10.00 3,353.10 10% 30% 60%
12+880.00 10.00 3,933.15 10% 30% 60%
12+890.00 10.00 4,421.35 10% 30% 60%
12+900.00 10.00 5,123.85 10% 30% 60%
12+910.00 10.00 5,611.10
12+920.00 10.00 5,155.25
12+930.00 10.00 3,866.55
12+940.00 10.00 2,437.15
12+950.00 10.00 1,283.95
12+960.00 10.00 547.65
12+970.00 10.00 201.45
12+980.00 10.00 131.15
12+990.00 10.00 160.75
13+000.00 10.00 194.35
13+010.00 10.00 237.55
13+020.00 10.00 248.35
13+030.00 10.00 224.70
13+040.00 10.00 206.55
13+050.00 10.00 190.80
13+060.00 10.00 171.45
13+070.00 10.00 147.30
13+080.00 10.00 140.05
13+090.00 10.00 164.20
13+100.00 10.00 195.45
13+110.00 10.00 224.10
13+120.00 10.00 247.60
13+130.00 10.00 254.50
13+135.10 5.10 130.69
125,342.76