You are on page 1of 3
FRANCO. PNTONETTE SANE A Bsa 3c Seatwork #5 Erample: the annua) raingell at stettion D and the average annva) Taingall at 10 surrounding stations are given below . Test Fhe Onsistency OF the record at ckation P anc cletermine the gear in Bhich % change _in Tegimc has occured. State haw you are going +o acuct the records fot the the Charge IN regime. Ectimete the mean _amual_ precipitation at spmennmnenneaeneuepeepeaeuenenaanuaunenanaauakhk station D. |e Ronval Rainrail Com) | Cvmilative Anrwal Baal Adyusted s1o.D | Ne. oF Msthol tum. josin: Abel Con sin-D Stn. D 993 | Gt-® te 73 Gl FF 1494 B78 ob 52-64 1945 46 ul 9% | 4v.2 5a 1993 43-2 BY lag | 69.4 £0 1999 | 47.9 84 g000 | 43.1 49 200) 49.3 bo aco2 | 50-3 oe 2003 | 1-5 4B 200g | 53.) bo 2005 50.4 St ame | 82s 96 07 | 67-4 bard gone | 1-4 \40 209 | 49.9 id gon | 573 as gu | 57-6 | 64-6 aw | 57-5 35 Stn D _|Ave-or tostn. Joumiosn Avel comor Sip | Adyusled «40D 60.8 24 1237S) | 1064.9 oat 993 49 aay | goo i889. 3¢.6 qo 1462.) | \\o3.2 a86 Ia 49% 29 150) .) dF 43.8. 5 56% 53 1453) | japae BEA | 5 35.0 27.7 13958 | \2aq 4 REL tS O44 %S-> | lool) | lage et f2-« 783 1704.2 | 14402 Sass. aoale 4) Ita7e | lagag 126 (Awe Bey 846.6} 544.4 Gh Re SlOpe 41-1943 to aonF Glope 4m 222417 - 0 ~loeze 2975 B-0 Slope 2* 2009 to go22 = 764-7 of j Slope 2, m= \ 184 =[OneR (2906 - 95-5 tation page LO

You might also like