Status of Activities April 28
Status of Activities April 28
Sir,
Attached herewith status of repair and maintenance activities for all properties.
Prepared by:
JOWEL DE LEON
Bldg. Administrator
Checked by:
REMARKS:
- PRESSURE DROP FROM 60 TO 42 within 20 minutes
- For possible leak tracing
LOCATION: PLARIDEL PROPERTY: NPIP 1
ACTIVITY: LEAK TRACING
REMARKS:
- FOR BREAKING OF GUTTER AND EXPOSING OF WATER LINE
- REQUEST OF EQUIPMENT c/o COLD STORAGE
- Manpower: Road Maint – Breaking / Leak Repair: Pipe Fitter c/o CS