NATIONAL LABOR AGREEMENT FOR THE.
DECOMMISSIONING, DECONTAMINATION AND
DEMOLITION OF NUCLEAR POWER GENERATION FACILITIES
Between
HOLTEC DECOMMISSIONING INTERNATIONAL, LLC (HDI)
And
LABORERS’ INTERNATIONAL UNION OF NORTH AMERICA
INTERNATIONAL UNION OF OPERATING ENGINEERS
INTERNATIONAL BROTHERHOOD OF ELECTRICAL WORKERS
UNITED BROTHERHOOD OF CARPENTERS and JOINERS OF
AMERICA
INTERNATIONAL ASSOCIATION OF BRIDGES, STRUCTURAL,
‘ORNAMENTAL AND REINFORCING IRON WORKERS‘This Agreement is entered into on January 31, 2022, and shal become effective on the
date that all parties become signatory. This Agreement is btween HD! (herein referred to 28
the "Contractor located at 1 Holtec Boulevard, Camden, Nu 08104 and those International
Unions listed hereinafter (herein refered to asthe "Unions" forthe purpose of
decommissioning, decontamination, demolition, and site restoration of Nuclear Power
Generation Sites located inthe United States of America (hereinafter refered to as the
Projects’). The scopes ofthese projects are defined inthis document in Article 1, Seton 6
“Tho Unions are composed of he following Itoratonal Unions
Laborers Intemational Union of Nora America
International Union of Operating Engineers
International rotherhood of Electrical Workers
United Brotherhood of Carpenters and Joiners ofAmerca
Intemational Association of ridges, Structural, Omamental and Reinforcing on Weer
COVENANTS
Whereas, the Contractor is engaged in the business of implementing and providing
technologioa and services related tothe decommissioning, dovontaminaion, demeition ond
site restoration of Nuclear Power Generation Stes and this work i of importance to the
Unions herein listed, and it being recognized there isan essential cfference in the
Conaltions require to perform this type of work, the Unions herein listed with the Contractor
‘ish to enter into the agreement for their mutual benefit covering work ofthis nature;
‘Whereas, the Unions have in ther memibership throughout the United States have
‘members competent and qualified to perform the work ofthe Contractor,
‘Whereas, the Contractor has employed members ofthe Unions and the Contractor
has a commitment andfor contract for work recognized by the Unions as being within the
{uisceton of said Unions;
‘Whereas, in order to ensure relative equty and uniform interpretation and applcatin,
the Unions wish to establish and administer tis Agreement in concert, each withthe othe, and
the Contractor,
Whereas the Contractor and the Unions desire to mutually stabilize wages hours and
Working conditions; and
Whereas, the Contractor andthe Unions agree thet, due to the particular nature ofthe
work covered by this Agreement, there shall be no lockout or strikes during the life ofthis
‘Agreement, and provisions must be made to achieve this end;Its, therefore, agreed by the undersigned Contractor and Unions in consideration ofthe
‘mutual promises and covenants contained herein thatthe National Agreement be made as
follows
ARTICLE |- PURPOSE AND SCOPE,
‘Seaton 4, This Agreements forthe joint use and benefit ofthe contracting partes, and
the provisions herein defied and set forth shal be construed as binding upon and effective in
determining the relations between the panies and/or subordinate sub-cvisions to set forth herein
the basic Agreement covering the rates of pay, hour of work, and conditions of employment to
be observed by the patie. The Unions and Contractr(s) agree to abide bythe terms and
coneitions contained inthis agreement with respect tothe administration af the agreement by all
pattos involved
‘Section 2. itis mutually understood thatthe folowing terms and consitons relating to
the employment of workers covered by this Agreement have been decided upon by means of
collective bargaining and thatthe follwing provisions wil be binding upon the Contractor and
the Unions during the term ofthis Agreement and any renewel thereafter. Itis futher agreed
{hat the employees working under this Agreement shall constitute a bargaining unt separate
and distinct rom all others. This Agreement covers al terms and conditions of employment for
decommissioning, decontamination, demoliion, and ste restoration of Nuclear Power
Generation Sites throughout te United Sates. In adlion, this Agreement does not incude
Construction, maintenance andlor the operation of any Nuclear Power Plan which may be
Covered under another Agreement.
Section 3. The Contractor will not be required to become signatory to any local area or
‘national collective bargaining agreement covering the work to be performed hereunder. This
agreement becomes the sole source of agreement between the Contractor and the union on
this work scope as defined in Arte 1, Section 5.
Section 4, In recognition ofthe special needs ofthese Projects and to maintain a
spirit of harmony, labor-management peace and stabilty during the term of tis Agreement, the
partes agree thatthe work will be done in a manner to secure optimum productivity ante
‘eliminate strikes, lockouts,stowdowns or interruptions or other disruptions of, interference with
‘or delay in the execution ofthe work covered by this Agreement. Similarly, the partes agree
that there wil be no work stoppages, slowdowns or other dsruption of the work covered by this
‘Agreement resulting fom employees working onthe Project ste together with, alongside o in
proximity to members of other unions not signatory to this Agreement
‘Section 5. The scope of this Agreements for ll work associated wth and required to
decommission, decontaminate, demolish, and restore Nuclear Power Generation sites located
In the United States of America to a predetermined end state.
‘This Agreement shal apply to all onsite construction work involved inthe performance of