(Referred to in Rule No. 5
WORK WISE DETAILS OF WORK COMPL
1, Name of Contractor
2, Name of Work
Agreement No
4, Esti cost of work put to tender
3. Tender Amount
6. Date of starting the work
7. Dt. of completion of the work (As
et contract agreement)
8. Actual Date of the completion of the
work
9. Amount of work done up to
10. State whether the details as above
given by the Contractor is correct, if
hot state as to what is the correet
information
11, State whether the contractor has
executed the "Work in progress"
satisfactorily as per speci-
12. Any other remarks
FORM NO. 3 (A)
By)
D OR IN PROGRESS BY THE CONTRACTOR
MCWAY MANAGE!
ENTS LIMITED, Gandhinagar
Consultancy Services for preparation of Detailed Project
Report for Construction of Internal Roads and drains in
3.33 GW within 30 GW RE Park at GSECL. Plot allotted
in Run of Kutch.
B-1/90/2021-22
Rs. 88,37,500.00
Rs. 38,14,500.00
De. 17/02/2022
: Dt.02/04/2022
Dt, 25/08/2022
Rs 38,14.500.00
YES
: "WORK IS SATISFACTORY COMPLETED "
Preparation of Feasibility Report/Detailed Project Report,
‘Topographical Survey 6650 Hector Land, Lidar Survey,
Preparation of Countour map, Pavement design of the
new Greenfield Road, Hydraulic Design, GIS Mapping,
Rainwater Distribution System, Design of the structure
and renewable energy Infrastructure facility plan for the
Various plot of GSECL in Rann of Kachehh,
Approxitnate DPR project Cost is RS. 136.04 Cr,
Cost of Drainage work : 74.27 Cr
Length of Drainage ~ 62.6 Km
[No of. Structure | NoofSpan | Length of Span :
- — Structure _
18 |___t 80 Box Culvert
H 10.0
1 80 80
‘Total Nos of Structure is 18 and each hi
having length of structure is 28 Mis. (Including Total Mt
Wall Length.)
ABLE rae al
Bhuj
Pate 30 ft [24