You are on page 1of 1
(Referred to in Rule No. 5 WORK WISE DETAILS OF WORK COMPL 1, Name of Contractor 2, Name of Work Agreement No 4, Esti cost of work put to tender 3. Tender Amount 6. Date of starting the work 7. Dt. of completion of the work (As et contract agreement) 8. Actual Date of the completion of the work 9. Amount of work done up to 10. State whether the details as above given by the Contractor is correct, if hot state as to what is the correet information 11, State whether the contractor has executed the "Work in progress" satisfactorily as per speci- 12. Any other remarks FORM NO. 3 (A) By) D OR IN PROGRESS BY THE CONTRACTOR MCWAY MANAGE! ENTS LIMITED, Gandhinagar Consultancy Services for preparation of Detailed Project Report for Construction of Internal Roads and drains in 3.33 GW within 30 GW RE Park at GSECL. Plot allotted in Run of Kutch. B-1/90/2021-22 Rs. 88,37,500.00 Rs. 38,14,500.00 De. 17/02/2022 : Dt.02/04/2022 Dt, 25/08/2022 Rs 38,14.500.00 YES : "WORK IS SATISFACTORY COMPLETED " Preparation of Feasibility Report/Detailed Project Report, ‘Topographical Survey 6650 Hector Land, Lidar Survey, Preparation of Countour map, Pavement design of the new Greenfield Road, Hydraulic Design, GIS Mapping, Rainwater Distribution System, Design of the structure and renewable energy Infrastructure facility plan for the Various plot of GSECL in Rann of Kachehh, Approxitnate DPR project Cost is RS. 136.04 Cr, Cost of Drainage work : 74.27 Cr Length of Drainage ~ 62.6 Km [No of. Structure | NoofSpan | Length of Span : - — Structure _ 18 |___t 80 Box Culvert H 10.0 1 80 80 ‘Total Nos of Structure is 18 and each hi having length of structure is 28 Mis. (Including Total Mt Wall Length.) ABLE rae al Bhuj Pate 30 ft [24

You might also like