METHOD OF STATEMENT DEMOLITION WORKS FOR EXISTING STRUCTURE AT LOT 1, KAJANG, SELANGOR (TOWER B) oi) Tel: 605-357 4100 Fax: 605-357 5100 aE DEMOLITION WORKS FOR EXISTING STRUCTURE AT LOT 1, KAJANG, SELANGOR ( TOWER B ) Revision: 02 NOTE: The Method Statement presented in this document may be subjected to futher modification and amendments, should the safety and personel, machinery and property are found to be compromised in any way whatsoever. Site conditions shall prevail and amendments may be made from time to time. All drawing & diagrams in thie document are for illustration purposes only. The layout and sequence of works may differ according to the progressive site condition. ©) [47 Central Geo Sdn. Bhd. um vibration and noise All plan is subject to be changed based on site condition and client requirement © 2019 Central Geo Sdn. Bhd. DEMOLITION WORKS FOR EXISTING STRUCTURE AT LOT 1, KAJANG, SELANGOR ( TOWER B ) Revision: 02 -TABLE OF CONTENTS CONTENT PAGE 1.0 Scope of Work 1.4. General Description 1 1.2. Description of Works 2 1.3. Plant, Machinery and Equipment 4 2.0 Demolition Methodology 34 Fen n of Demoltion Method wih Special Consideration for 6 2.2 Overall Demolition Methodology 7 2.3. Demolition Methodology for Cut and Lift Works 8 3.0 Demolition Procedure 3.1. Preparation Works 9 3.2 Demolition of Existing Structure 10 3.3 Demulilion Overview Sequences 9 3.4 — Demolition Method Sequences 12 3.5 Crane Parking Location and Swing Direction 8 8.6 Demolition Sequences “ 4.0 Safety, Health and Environmental Plan 41 Safety and Health Management Plan 20 4.2 Environmental Management Plan 23 5.0 Appondicos 5.1 Organization Chart 5.2 Netting Protection Details 5.3 Job Safety Analysis and Risk Assessment 5.4 Central Goo High Reach Demolition Sequences 5.5 Site Logistic Plan 5.6 Hybrid Method at Previous Site 5.7 Dust Control Methods © Central Geo Sdn. Bhd. [Minimum vibration and noi Al plan is subject to be changed based on site condition and client requirement © 2019 Central Geo Sdn, Bhd. DEMOLITION WORKS FOR EXISTING STRUCTURE AT LOT 1, KAJANG, SELANGOR ( TOWER B ) Revision: 02 1.0 SCOPE OF WORKS ©) 7 Central Geo Sdn. Bhd. um vibration and nots Al plan is subject to be changed based on site condition and client requirement © 2019 Central Geo Sdn, Bhd. DEMOLITION WORKS FOR EXISTING STRUCTURE AT LOT 1, KAJANG, SELANGOR ( TOWER B ) Regione Qa 4.0 SCOPE OF WORK 4.4 General Description The Method Statement for the above mentioned demolition works is based on the Conalition that the work is being carried near to MRT Station, commercial and residential area with sufficient working access and working platform. This site Is situated at Lot 1, Jalan Cheras , Mukim Kajang, Daerah Hulu Langat, Selangor. The site plan for the location of demolition works refer to Figure 1.4 We,with our experience staff and fleet of equipment together with our professional team of subcontractors and engineers will carry out and complete the work in the most professional manner and with outmost priority in regards to the safety aspects and minimal impact to the environment. « \QF7 conrat eo sah. ni ttt ‘Allan fs subject to be changed based on sls condion and Gant equreren 2079 Gentel Geo San Bhd L] DEMOLITION WORKS FOR EXISTING STRUCTURE AT LOT 1, KAJANG, SELANGOR ( TOWER B ) Revision: 02 1.2 Description of Works Our Scope of works are to demolished the abandon Office Complex (Tower A and Tower B). This method statement will focus on demalition work for Tower B only which is located within the 2nd reserve of MRT/ RPZ line. ‘The detail of the structure to be demolished refer Table 1.1 , Figure 1.2 and Figure 1.3. Table 1.1 : Structure to be Demolished Structure Detail a) Level: 12 Storey (b) Height: 54m Office Block , Tower B 1.3. Adjacent building: ‘Around this area (about 10m-100m) there are MRT Station Sungai Jernin, Carpark Building, Residential Area and KPJ Kajang Specialist Hospital . ©) Central Geo Sdn. Bhd. sum vibration and tse ‘Al plans subecto be changed based on sls condion and Gant equreren 02079 Gentel Geo San Bhd 2] DEMOLITION WORKS FOR EXISTING STRUCTURE AT LOT 1, KAJANG, SELANGOR ( TOWER B ) Revision: 02 Figure 1.2 : Structure to be Demolished GEO Ny QW Gentral Geo Sdn. Bhd. vara vibration and nai ‘Al plans subject be changed based on sls condion and Gant equrenen 2079 Gentel Geo San Bhd 3] (Lene wos 009 1woo 91025 nowsnbas op pus voupico ays uo poseayesuEw 2021 Eanes Le “PUG UPS 099 JenweD ‘ory ponsosou puz LUN 10} Weld ONS: Unb ———— 5 IAT o Sb Ido S&S VIA) - = rao ean (1 ¥SMOL) HOONVISS ‘ONY ae “+207 AV 3uNLOMLS DNUSIXS HOS S¥RIOM NOUTTONIG DEMOLITION WORKS FOR EXISTING STRUCTURE AT LOT 1, KAJANG, SELANGOR ( TOWER B ) Revision: 02 1.4 PlantMachinery & Equipment All plant and equipment we will be use for the mention demolition works are summarized below: Table 1.2 : Summarize of Plant & Equioment Description Purpose ‘Quantity Owned/Leased [crane 4. Crawler Crane To hoist the cutting structure to J2. Mobile Crane Jground fevel / 2 Unit Owned 13. "X1" High Reach Demolition | 10 crushed / hacked concrete i Machinery structure above than +/-15m ‘Unit owed 4. Super "x2" High Reach [To crushed / hacked concrete | 4 unig Tl Demolition Machinery structure less than +/-15m) Other's Machinery For processing works! To [5."X3" Demolition Machinery crushed / hacked concrete 4 Unit Owned structure [Transportation 6. Tipper Truck [To transport equipment to Variety | Owned site/debris offsite 17. Low Loader [To transport plant and equipment] Variety | Owned to site/oftsite [Others [8. Water Pump Jack [To spray the water during 3 Unit Owned |demolition works/minimize the ldust 19. Diamond Cutting Machine | Cutting existing structure 6 Unit Owned LY Central Geo Sdn. Bhd. Minimum vibration and noi ‘Al plans subject ob changed based on ole condion and Gant equrenen 02079 Gentel Geo San Bhd 51] DEMOLITION WORKS FOR EXISTING STRUCTURE AT LOT 1, KAJANG, SELANGOR ( TOWER B ) Revision: 02 2.0 DEMOLITION METHODOLOGY ©) Ly Central Geo Sdn. Bhd. um vibration and nots Al plan is subject to be changed based on site condition and client requirement © 2019 Central Geo Sdn, Bhd. DEMOLITION WORKS FOR EXISTING STRUCTURE AT LOT 1, KAJANG, SELANGOR ( TOWER B ) Revision: 02 24 SELECTION OF DEMOLITION METHOD WITH SPECIAL CONSIDERATION FOR ADJACENT MRT STATION Hybrid Method have been chosen due ta ils highest safety & environment requirement with minimum impact to public & environment. Hybrid Method is combination of 2 most advance demolition methods which have very minimum noise, vibration & dust impact to surrounding as mentioned in MS 2318:2012, Demolition Code of Practice in Malaysia. (Refer Appendix 5.6 : Hybrid Method at MRT Line 2 - Sentul Police Quarters Demolition) A s jana D 2 Diamond Cutting aa Low noise & low vibration, netting High Reach Demolition (Crushing) |Dust to be controlled by water spray & screen b) Conventional Hacking (Other Method not selected for Comparison Purpose) (Refer Appendix for Dust Control Method for Water Spray and Screen Netting) |Top Down Breaker (Hacking) High noise & vibration . Dust to be controlled by water spray & nettir methodology ©) [47 Central Geo Sdn. Bhd. Minimum vibration and nos ‘Allan fs subject to be changed based on ale condion and Gant equrenen 2019 Gentel Geo San Bhd 6] DEMOLITION WORKS FOR EXISTING STRUCTURE AT LOT 1, rieviefonetia KAJANG, SELANGOR ( TOWER B ) 22 OVERALL DEMOLITION METHODOLOGY Stat 7 ‘Survey - Surrounding Area/Adjacent Building - Site Access Machinery Parking Location - Building Structure Pre-Demolition Stage - Mobilization of Machinery - Setting up Diamond Cutting Machine and Crane installation of perimeter netting protection r Demolition Stage t (TOWER B) Demolish structure of Tower B by using combination Jmetnod ot Cut and Lit, and High Reach Demoition Method 1) Cut and Lift Method (from top of Tower B until Level 8) = Cul structure by using Diemond Cutting Machine and hoist the structure to ground level by using Crane. * Refer 2.2 for the detail methodology of cut & lift 2) High Reach Demolition Method ~ High Reach Demolition Machinery ("X1") demolish structure from Level 8 until Level 5, - High Reach Demolition Machinery (Super "X2) ‘demolish structure from Level 3a until ground ievel ("Last section/pay attached to carpark will be ‘separate before demolish) ¥ Site Clearing 7 Handover to Main contractor ¥ Finish ©) Central Geo Sdn. Bhd. Minimum vibration and noi ‘Allan fs subeco be changed based on se condion and Gant equreren 2079 Gentel Geo San Bhd 7] DEMOLITION WORKS FOR EXISTING STRUCTURE AT LOT 1, KAJANG, SELANGOR ( TOWER B ) Revision: 02 23 DEMOLITION METHODOLOGY FOR CUT AND LIFT WORKS, ‘Survey Structure Analysis Install Safety Netting — —_ Setting Up and Preparation for Machine Setting Up Crane Central Geo Sdn. All plan is subject to be changed based on site condition and client requirement © 2019 Central Geo Sdn. Bhi Marking the cutting sect ¢ Coring for hoisting purposes t iT a) wall plug track b) installation of blade hanging the cutting section Cutting the marked section [c) cut the marked section (control by remote) * During cutting works mobile crane would Removal Structure Diamond sawing & Lifting 1 (ST Cut Section Sorting Works All cut section would lifted down to ground level and crush into small pioces before transport off site + Disassembly Crane 1 Complete Cut and Lift Work —- eI DEMOLITION WORKS FOR EXISTING STRUCTURE AT LOT 1, KAJANG, SELANGOR ( TOWER B ) Revision: 02 3.0 DEMOLITION PROCEDURE ©) Ly Central Geo Sdn. Bhd. um vibration and nots Al plan is subject to be changed based on site condition and client requirement © 2019 Central Geo Sdn, Bhd. DEMOLITION WORKS FOR EXISTING STRUCTURE AT LOT 1, Revision: 02 KAJANG, SELANGOR ( TOWER B ) 3.0 DEMOLITION PROCEDURES 3.1. Preparation Works 3.1.1 General Prior to the demolition works, site personnel will ensure some important aspect ay @ @) (4) (6) ” ©) Obtained the permit/permission from relevant authorities before start demolition works. Verify the location of existing utilities which may affected during demolition works with the relevant authorities . The services which connected (9 building / facilities. will be disconnected prior to the works starting on site, Hoarding wil be install al the surrounding of the working area lo prevent outsiders from passing through / entering the demolition zone. The specification of the hoarding shall follow the requirements from authorities, Safety and warming signboard will be erected and placed at demolition area to inform public the imminent danger and as a precaution to them. On the aspects of traffic management , signage and billboard will be place at the barricade wall to inform the public of the work in progress. Flagman also will be stationed on site at all time to control the traffic flow of outgoing and incoming vehicles. Site survey will be conducted to inspect the condition of the building and surrounding area Prior to the work commences , the workers involved will be briefed by the supervisor / safety people on the scope of works and safety aspect of the works. The workers shall be complete with full PPE during works on site. Central Geo Sdn. Bhd. Minimum vibration and noi ‘Allan fs subectto be changed based on se condion and Gant equreren 02019 Gentel Geo San Bhd] DEMOLITION WORKS FOR EXISTING STRUCTURE AT LOT 1, KAJANG, SELANGOR ( TOWER B ) Revision: 02 32 — Demolition of Existing Structure 3.2.1 The existing structure shall be demolished according to Standard , Regulation , Orders and Guidiles as below: (a) Malaysian Standard for Demolition Works MS 2318 :2012. (b) The Factories and Machinery Act 1967, (c) Occupational Safety and Health act 1994 3.2.3. Pre-Demolition Works (@) _Priorto the demolition works, perimeter netting protection will be erected at working area for Tower B as a safely protection for workers during demolition works. The netting protection will follow the relevant acceptance standard, (Refer Appendix 5.2 for the Details of Perimeter Netting Protection) (6) Crane and Diamond cutting machine would be set up at the selected area cut and lifting works, (Refer 2.2 for the detail methodology for cut and lift work) 3.2.4 Demolished structure of abandon building (Tower B) m Reach nMetn (a) We would use cut and lift (Diamond Cutting Method) from top_of Tower B until Level 8) and high reach demolition method ( for Level 7 until Ground Level ). (b) After setting up machine and crane, we would doa marking works for the cutting section at Tower B. (©) Then, we will coring the selected cutting section for hoisting purpose (starting from top of Tower B ) and cut the section by using diamond cutting machine. During cutting works, crane would hanging the cutting section. (@) After finish cutting, crane will hoist the cutting section to ground level for processing works. (©) We would cut and lit (al of structure at top of Tower B until Level 8) follow by level accordingly unt finish. () The structure from level 8 until ground level at fist gridline near to MRT Station will be remained for use as additional protection barrier to MRT Station when we demolish the remaining structure ( from level 8 until ground level) by using high reach demolition method. (g) High reach demolition machinery ("X1") will crush the structure from Level 8 until Level 5. Then, another demolition machinery (Super "X2") will demolish structure from Level 3a until Ground Level (The sequences of works will follow by section area ( starting from area 1, then continue to area 2, 3 unti finish at area 4 by using same method ( (a) until (g)). Refer 3.6 for the detail demolition sequences ©) Central Geo Sdn. Bhd. Minimum vibration and noi ‘Allan fs subectto be changed based on se condion and Gan oquremnen 02019 Gentel Geo Sdn Bhd [Ete wes 0091 91025 nownnbas op pus voupice ays uo poseayosuaws 2021 Bales Le "WP 09 aD S83 Bh he) c= R-E} Teng wnidod MGIA NOTIVATTS seouarbog majaiong uonioweg _¢'¢ (1 ¥SMOL) HOONVISS ‘ONY ‘+401 LV 3uNLOMEILS ONUSHG BOs SOM NOLTIONSG 20 :uosnoy 5 Nowamnbas Wop pue Lownie ays uo posoayosUEND 2021 EAS SL I “pug ups 099 ren Ga ;powgow Bur ¥ Bumno puowea Suen wsiouled | Sy "powow Bunt» Busing puoweg Bufsn ysjioWwog ‘BTOROTOS FOR sooumbos ponaw vomiowog ye (1G ¥2MOL) NOONVTAS ‘ONY 20 1uonoy ‘+401 LV 3uNLOMEILS ONUSHG BOs SOM NOLTIONSG [Et] oe wos 009 1woo 91025 nownnbas op pus voupice ays uo poseayosuews 0021 Eanes Le “pues O90 eG oa (eouy ous) ‘our Kiesunag =~ — | sary Bupuom MBIA NVI uooa11q Sug pue uoner07 SuRLEE SUED STGON SC (1 ¥SMOL) HOONVISS ‘ONY ae “+207 AV 3uNLOMLS DNUSIXS HOS S¥RIOM NOUTTONIG DEMOLITION WORKS FOR EXISTING STRUCTURE AT LOT 1, KAJANG, SELANGOR ( TOWER B ) Revision: 02 3.6 DEMOLITION SEQUENCES © Y/_Central Geo Sdn. Bhd. wun vibration and noise Al plan is subject to be changed based on site condition and client requirement © 2019 Central Geo Sdn, Bhd. DEMOLITION WORKS FOR EXISTING STRUCTURE AT LOT 4, isviatanOa KAJANG, SELANGOR ( TOWER B ) 3.6.1. Demolition Sequences for Tower B LEGEND: (0 Area (0) Avea2 ‘Area 3 1 Areas (0 Area sa ors Crane Parking [Separation line at last section/bay lattached to carpark building © Central Geo Sdn. Bhd. [Minimum vibration and noise| All plan is subject to be changed based on site condition and client requirement © 2019 Central Geo Sdn. DEMOLITION WORKS FOR EXISTING STRUCTURE AT LOT 1, KAJANG, SELANGOR ( TOWER B ) Resatone ga: ion Sequences for Tower B (2a) Cut and lft structure at Area 1 & Area 5 [Area sa, remain lus - au (Final Cutting lafter demolish PODIUM CARPARK. Separation Ine at last section/bay attached to Icarpark building | Elevation View Area. TOWER B High Reach [Demolition |Crushing Ls - GL * Refer Step 3 © Central Geo Sdn. Bhd. imum vibration and noise ‘Allan fs subecto be changed based on se condion and Gant equreren 2079 Gentel Geo San Bha[B] DEMOLITION WORKS FOR EXISTING STRUCTURE AT LOT 1, KAJANG, SELANGOR ( TOWER B ) IRevisinn: 02 Demolition Sequences for Tower B (2b) Cut and lift structure at Area 2 & Area 5 TEs [i ee [i wes Area finish eu te [Area Sa, remain Ps Ep Separation Ine at last section/bay attached to Elevation View Area Tol High Reach [Demolition |Crushing Ls - GL * Refer Step 3 © Central Geo Sdn. All plan is subject to be changed based on site condition and client requirement © 2019 Central Geo Sdn. Bhd. DEMOLITION WORKS FOR EXISTING STRUCTURE AT LOT 1, KAJANG, SELANGOR ( TOWER B ) Revision: 02 \cos for Tower B areas ‘rea ‘rea finish Crane Parking GL (Final Cutting PODIUM CARPARK. Separation Ine at last section/bay attached to 4 Lcarpark bullding | [Area 5b,;emain is- Ge (Final Cutting latter demolish Elevation View larea 3) Areaa Area Sa& Sb 4 | FE F | = remain | High |Area 5b, Reach read (Final i Deraliti — rinat 2 (Cutting onvcrus ; treat See fares Se, || hing = loner”? et ASG sinor ; ldemotsh| > gig demotish | | = frees) Fy ) r t il Crane Crane. a © Central Geo Sdn. Bhd. ‘Allan fs subject to be changed based on sls condion and Gant oqureren 02079 Gentel Geo San Bha[ZZ] DEMOLITION WORKS FOR EXISTING STRUCTURE AT LOT 1, ievislons tia KAJANG, SELANGOR ( TOWER B ) Aree pany soa ie PODIUM CARPARK. Separation Ine at last section/bay attached to Icarpark building | Elevation View Area 3 High Reach Deraliti lon ,Crus hing Ike - oe Refer |stop 3 ©) Central Geo Sdn. Bhd. DEMOLITION WORKS FOR EXISTING STRUCTURE AT LOT 1, ievislons tia KAJANG, SELANGOR ( TOWER B ) 3.6.1. Demolition Sequences for Tower B Plan View TEGEND [EEE screen netting Aros HEDIS ee ater ten 2) vee (Rete step 2) ——__l lSeparation tine at last section/bay lattached to lcarpark building Elevation View a |Work Sequences: TOWER B (1) High Reach Demolition Machinery ("X1") will crushing the building ee } I (Above than 15m) round Level ! |(2) Then, High Reach Demolition Machinery ar z Gurereyea Elevation View demolish the remaining level unti finish (15m below) * The sequences (1) & (2) will follow the Area TOWER B (Area L until Area 4) Refer Step 1 and Step 2 ©) Central Geo Sdn. Bhd. imum vibration and noise| ‘Al plans subject to be changed based on se condion and Gant equreren 2019 Gontel Geo San Bha[ZS] DEMOLITION WORKS FOR EXISTING STRUCTURE AT LOT 1, KAJANG, SELANGOR ( TOWER B ) Revision: 02 4.0 SAFETY , HEALTH AND ENVIRONMENTAL MANAGEMENT PLAN ©) [47 Central Geo Sdn. Bhd. um vibration and noise Al plan is subject to be changed based on site condition and client requirement © 2019 Central Geo Sdn, Bhd. DEMOLITION WORKS FOR EXISTING STRUCTURE AT LOT 1, Revision: 02 KAJANG, SELANGOR ( TOWER B ) 40 ‘SAFETY, HEALTH AND ENVIRONMENTAL PLAN 44 ©) Central Geo Sdn. Bhd. Safety And Health Management Plan 4.1.4 Job Safety and Health Analysis / Hazard Identification Risk Assessment & Control The risk analysis shall be carriad at the site. The hazard in a particular activity and the control measure implementation shall be briefed to all worker during safety Induction session, tool box and JSA briefing. Information to Personnel (@) _ Site safety supervisor is required to conduct safety briefing and enforcement actions based on contro! procedure from risk assessment. (b) All workers and site personnel employed in the project site must have a valid CIDB Green Card, (©) __Allsite personnel must have a complete approved Personal Protective Equipment (PPE) and wear it all time during works at site, (@) The others safety during demolition works were emphasized as bel (1) Employee's Satety:- (2) Allemployees on-site will be required to have safety boots and safety helmet. (b) All employes will be briefed by our Site Supervisor on general safety issues e.g : location and use of first aid kit, fire extinguishers, emergency contacts etc. (©) Safety Induction to include emergency escape route and emergency meeting point. (2) Movement of heavy vehicles or machineries on and off site == (excavators, lorries & cranes) (@) Should there be any heavy vehicles and machineries on the move, flagmen will be stationed at designated spots to avoid any risk of collision . while maintaining the travelling speed of all vehicles on site. (b) Plastic cones, warning signs, etc. will be placed at designated locations if deemed reauired. (3) Physical demolition works by demolition machinery := (2) Flagmen & Spotters will be station at strategic locations of the site with a 2-way radio (walkie talkie) at all times and to inform all plant and machinery operators to temporary stop work should the need arise. (©) Should the integrity of the structure is found to be compromised or weakened , an immediate stop work order shall be issued. Our technical team shall go down onsite to inspect and evaluate the structure's status and to recommended alternative demolition ‘methods or additional protection’ strengthening should the need arise, prior to recommencement of work. Minimum vibration and noi ‘Allan fs subectto be changed based on se condion and Gan oquremnen 02019 Gentel Geo Sdn Bhd DEMOLITION WORKS FOR EXISTING STRUCTURE AT LOT 1, rieviefonetia KAJANG, SELANGOR ( TOWER B ) (4) Emergency resources Emergency Contact Number (as shown below), will be placed at a strategic location. EMERGENCY CONTACT NUMBER Contact Description Phone Number SED Project Manacer Ana Chek Chow) | 012-2138109 So) KPJ Kajang Specialist Hospital 03-8769 2999 @ Balai Bomba dan Penyelamat Kajang | 02.8736 1344 (a) Afirst aid kit wll be provided, while all workers will be made aware of the location and usage of Une first aid il () Walkie talkie to be provided to designated workers for communication efficiency in case on an emergency. Note: In case of any unforescen mishaps on-site, thre will be a standard procedure of contacting Site Supervisor, followed by informing the respected authorities. Central Geo Sdn. Bhd. 1um vibration and noise | ‘Allan fs subectto be changed based on se condion and Gant equreren 02079 Gentel Geo San Bha[Za] DEMOLITION WORKS FOR EXISTING STRUCTURE AT LOT 1, KAJANG, SELANGOR ( TOWER B ) Revision: 02 4.1.3 Proposed Emergency Response Plan PROPOSED EMERGENCY RESPONSE PLAN ’ - >, (accrpent / INCIDENT ) y ¥ /. ~\ / \ | Site Supervisor to Site Supervisor to. ecsses3) ia Sinan tk, check, first aid kit extend of injury, treat, available to treat injury and inform hospital") Inform client ) 4 \, | ¥ x y Site supervisor to report Stes a, | Todo a palce report, ‘| {_ tecliont Inform client ictim's farnily immedaitely ws Ne 7 7 a — (7 proceed to hospital) ( Balnsinwmatigation’e: ‘ MS 4 3 Y ~ site Supervisor to follow up | ~ A ©) Central Geo Sdn. Bhd. sum vibration and tse ‘Al plans subject to be changed based on sls condion and Gant oquveren 02019 Gentel Geo San Bha[Z2] DEMOLITION WORKS FOR EXISTING STRUCTURE AT LOT 1, KAJANG, SELANGOR ( TOWER B ) Revision: 02 42 Environmental Management Plan 4.2.1 Dust Control No Ae ivity! Source of Pollution Description/Control Measures 1 [Demolition / crushing of concrate [Erect hoarding perimeter and screen netting prior to structure the commencement of the demolition works. This is to prevent small stones and dust from flying onto the neighbouring property, passing vehicles and /or pedestrian [Dust emission will he controlled by the use of water spraying. [Each of High Reach Excavator with primary crusher will be accompanied with a water hose by the pump to minimize the dust particles. Traffic controls such as speed limits and traffic volume 2. |Intermal movement of construction |resiviction sill be enforced lu reduce dust emilled up vehicles. by vehicles. Regular spraying of water shall be carried oul on the temporary access and logistic roads at the site used by heavy vehicles to prevent dust generation. Transportation of construction materials and wastes to lbe confined to non-peak hours. Heavy vehicles entering and leaving the site will be covered at all times. Vehicle and machinery movement during the [construction work will be restricted to designated areas. 3 |Stockpile material [Stockpiles will be located as far away from public areas as possible. Where visible dust is coming from the stockpiles, the lused of water suppression or traps will be utilized Responsible Person a) Individual sub-contractors are responsible for activities and area under their control. b)_ Site Supervisor is responsible for compliance to the relevant rogulations and the: provisions of the planning approval. ©) Central Geo Sdn. Bhd. Minimum vibration and ns ‘Allan fs subject to be changed based on se condion and Gant oquverien 02079 Gentel Geo San Bha[Z3] DEMOLITION WORKS FOR EXISTING STRUCTURE AT LOT 1, KAJANG, SELANGOR ( TOWER B ) Revision: 02 4.2.2 Noise and Vibration Control No ‘Activity! Source of Eihition Description/Control Measures 1 [Demolition |An awareness program for demolition personnel on Inoise minimization will be incorporated into site !a) Concrete crushing induction training, b) Off-site transport of material [The Site Induction Training would be discussed the ltew following item (2) Allequipment will be maintained in good order. |b) Plant ‘and equipment will be used appropriately ce) Workers rust avoid dropping materials from height. id) Noisy activities will be planned, where possible, for parts of the day when they would have the lease impact. |e) Vibration will be minimized by Crushing Method where possible and around existing buildings. JAny activities during consruction stage which may |cause an increase of noise levels and vibration must lbe controlled to adhere to Schedule 5 of \("The Planning Guidelines for Environmental INoise Limit and Control"and Schedule 586, The [Planning Guidlines for Vibration Limits by DOE). (a) Noise and vibration will be continuously monitored during construction activities to Confirm compliance to DOE acceptance limits for construction activities in residential areas, Ib) Any construction works which contribute high level of noise should be confined to daytime hours and activities minimized during night time, weekends and public holidays. \(c) Hoarding shall be constructed around the project site to minimize noise dispersion to the external area. id) Movement of heavy vehicles shall be confined to daytime working hours and minimized during night time, weekends and public holidays. l(c) Overall noise levels arising from the movement of heavy vehicles shall be controlled by using routos that will cause minimum dieturbance in Vicinity of the. site. ©) Central Geo Sdn. Bhd. Minimum vibration and ns ‘Al plans subject to be changed based on se cordon and Gant equrerenl OZ0T9 Gentel Geo San Bha[za] DEMOLITION WORKS FOR EXISTING STRUCTURE AT LOT 1, KAJANG, SELANGOR ( TOWER B ) Revision: 02 4.2.2 Noise and Vibration Control (ont) No] Aativity! Source of Deserpton/Gontrol Measures 2 |Equipments and Machinery Noise generating equipment and machinery shall be inspected regurlarly and maintained in good working |conaition to reduce noise generation at source. |All noise generating equipment and machinery shall lbe shut down when not In use. Diesel generators sets to be low noise type enclosed in an acoustics enclosure and fitted with silencers at lexhaust and air intake, [Earth moving equipment to be of low noise emission type. Responsible Person a) Site Supervisor is responsible for activities and areas under their control and will identify and manage any activity that has the potential for noise emissions that cxoced the performance noise criteria b) The Site Supervisor is responsible for compliance to relevant regulations and the provisions of the Project Approval. ) The compliance noise monitoring at sensitive receiver will be conducted by representative noise consultant, ©) Central Geo Sdn. Bhd. Minimum vibration and ns ‘Allan fs subject to be changed based on se condion and Gant oqureren 2079 Gentel Geo San Bha[Z5] DEMOLITION WORKS FOR EXISTING STRUCTURE AT LOT 1, KAJANG, SELANGOR ( TOWER B ) Revision: 02 4.2.3 Waste Management Plan No Activity! Source of ecriutioniGonérel Moneuroe ioe Desoription/Control Me 1 [Construct instruction Waste: Construction waste (concrete, timber,metal etc) and spoil materials will be managed in acordance with3R (reduce, reuse and recycle) concept [Each waste container/bins will be properly labeled. Usable,recyclable or reusable materials will be segregrated, [Construction waste will be periodically collected and \disposcd at approved landfil Responsible Pers a) Individual sub-contractor are responsible for activities and areas under their control ) Site supervisor are responsible for ensuring sub-contractors comply with these provisions and for the daily monitoring of waste generation. ©) Site supervisor is responsible for compliance to the relevant regulations and the provisions of the planning approval. ©) Central Geo Sdn. Bhd. Minimum vibration and ns ‘Al plans subject be changed based on sls cordon and Gant oquremnen 02079 Gentel Geo Sdn Bhd DEMOLITION WORKS FOR EXISTING STRUCTURE AT LOT 1, KAJANG, SELANGOR ( TOWER B ) Revision: 02 4.2.4 Erosion and Sediment Management Plan No ‘Activity/ Source of Pollution 1 stockpiles soils may produce Area of bare surfave will be minimized Uuting runoff during rain events. Jdemolition and stabilized as soon as practicable. Dirt trom vehicles tyres may lead |Rainfall or groundwater that has collected in low lying Ito sedimentation of street lareas or excavation will be test according to stormwater system. guidelines. if water is suitable for reuse , it will be used for dust suppression where needed. Contaminated lwater will be disposed off sites at an appropriately licensed treatment facility or treated on site wherever feasible. Vehicles transportation which carry the idebris/stockpile material will be covered when leave the site to prevent dus/mud to public road. Wheel wash facilites will be used at demolition site lexit to remove mud and dust from vehicles and minimize material being transterred onto the public road or footpath. In the event of spillage, pilled material will be removed Jas soon as practicable within the working day of the spillage. [Appropriate drainage line feeding it will either be removed or capped off Responsible Person:- a) Individual sub-contractor are responsible for activities and areas under their control b) Site supervisor are responsible for ensuring sub-contractors comply with these provisions and for the daily monitoring of waste generation. ©) Site supervisor is responsible for compliance to the relevant regulations and the provisions of the planning approval. ©) Central Geo Sdn. Bhd. Minimum vibration and ns ‘Allan fs sued to be changed based on se condion and Gant equreTien 02079 Gontel Geo San Bha[Z7] DEMOLITION WORKS FOR EXISTING STRUCTURE AT LOT 1, KAJANG, SELANGOR ( TOWER B ) Revision: 02 5.0 Appendices Appendix 5.1: Organization Chart Appendix 5.2 : Appendix 5.3: Job Safety Analysis & Risk Assessment Appendix 5.4: Central Geo High Demolition Sequences Appendix 5.5: Site Logistic Plan Appendix 5.6: Hybrid Method at Previous Site Appendix §.7: Dust Control Methods © Y/_Central Geo Sdn. Bhd. wun vibration and noise Al plan is subject to be changed based on site condition and client requirement © 2019 Central Geo Sdn, Bhd. DEMOLITION WORKS FOR EXISTING STRUCTURE AT LOT 1, KAJANG, SELANGOR ( TOWER B ) Revision: 02 Appendix 5.1 Organization Chart ©) [47 Central Geo Sdn. Bhd. um vibration and noise Al plan is subject to be changed based on site condition and client requirement © 2019 Central Geo Sdn, Bhd. DEMOLITION WORKS FOR EXISTING STRUCTURE AT LOT 1, KAJANG, SELANGOR ( TOWER B ) Revision: 02 PROJECT ORGANISATION CHART 2019 ‘Project Manager ‘Ang Chek Chow Nurul izzati ‘Machinery & Site Supervisor Site Engineer reat Safety and Health Zukeri Mohamad / Nos bevel Loo Yau Soon Loo Kok Then AHS t y v High Reach. Diamond Cutting Crane Lifting Demolition Team Team Team ‘General Worker O Y/_Central Geo Sdn. Bhd. wun vibration and noise Al plan is subject to be changed based on site condition and client requirement © 2019 Central Geo Sdn, Bhd. DEMOLITION WORKS FOR EXISTING STRUCTURE AT LOT 1, KAJANG, SELANGOR ( TOWER B ) Revision: 02 Appendix 5.2 Netting Protection Details © Y/_Central Geo Sdn. Bhd. wun vibration and noise Al plan is subject to be changed based on site condition and client requirement © 2019 Central Geo Sdn, Bhd. ig wos 000 aueo 61029 Mounynbas wom pur Lao ays Uo pose euOND O82 oles UE IY “PUG UPS 099 JenweD ‘teieg vopperoig BumeN :Z5 xpLeddy ‘amen veRERETT Te ea wee a Bo ‘2454 wonrawod ystUy J8ye ABuIpIe Siete WIG n. NOLWWYOINIDNIGTING vonsaoud paunbes sds 40 wuawnuoU jeou04s} jepour 0731467) u ease ely (xoidde) weg x wet easy ous, NOLWWIdOANI TVuaNaD. uy unduin] ejeny ‘snuew ines sejer ae pares) $1 1s6uIpy pue 6uipjing sioyenb waidd Sunsr ove pays’ ase OANI 1WH3N39 JLIS NOLLTIONAG 039 TWHNDAS OHLIN GIYGAH (ef) WE TAMalt te UOT Ya OER EEE? ber (ey: [re] fee Moly] [SPU PMN fodUTs MU) Scaek-toM [SPE Je} eT) Iori TsEle) Cees) ENTER en ores COHLAW NOILMOWA3G HOV3Y HOIH: Z 9S GOHLIIN GIYSAH ONISN SADNIY¥I49y LIFOUd Qa ie) aa a lu = 2 a a SS ao oO = 2) =) n en S) 2 lu a wm ma rt 4 = 0 3 ie) a a MRT 2 - Demolition Work for Sentul Police Quarters (Ue s Mery] [ Sree nN SE eS oe es) 10000-1S7-SMLL-MONTLMOWdES = SINVIW 1NLNAS = — NVIWP LV SUALUVND WHGd ONILSIX 3HL ives vee enue myoa BuiNi een | | og peas] © ‘SM¥OM NOLLMOWAG YOd ANSWELVLS GOHLSW TaaRRanE oT moo NaS EE] —] Fu ANaWn90a [te ti ecorismeuttmonnanawease | | ere | ‘sum GNNODvaGNN ame | VAvrvuind - ©NVGwaS -HOTNE “OS atte “zy isin lava sovw arouse “oun many | al nu i pia ait, ee LF] (ef) WE TAMalt te UOT Ya OER EEE? ber (ey: [re] BLIMLNO 1@ Saqnores SJBENH 9I!]Od [NJUSS 410} YOM UOIWJOWAQ - Z LYIN (ef) WE TAMalt te UOT Ya OER EEE? ber (ey: [re] DEMOLITION WORKS FOR EXISTING STRUCTURE AT LOT 1, KAJANG, SELANGOR ( TOWER B ) Revision: 02 Appendix 5.7 Dust Control Methods © Y/_Central Geo Sdn. Bhd. wun vibration and noise Al plan is subject to be changed based on site condition and client requirement © 2019 Central Geo Sdn, Bhd. DEMOLITION WORKS FOR EXISTING STRUCTURE AT LOT 1, KAJANG, SELANGOR ( TOWER B ) Revision: 02 DUST CONTROL METHODS AT SITE 2) Dust control using manual water spray by workers. GEO Nyy \N_Central Geo Sdn. Bhd. All plan is subject to be changed based on site condition and client requirement © 2019 Central Geo Sdn. Bhd.

You might also like