ICS: 91.040
Descriptors: construction, code of practice, works, demolition, buildings
© Copyright 2012
DEPARTMENT OF STANDARDS MALAYSIA
DEVELOPMENT OF MALAYSIAN STANDARDS
CONTENTS
Page
Foreword…. ............................................................................................................................... v
1 Scope............................................................................................................................ 1
3 Definitions ..................................................................................................................... 2
4 Planning ........................................................................................................................ 4
5 Precautionary measures............................................................................................. 11
Table 2 Design criteria for covered walkway and catch platform ........................................ 14
Table C1 Normal span depth ratio of reinforced concrete floor system, exceeding
which could be an indication of the existence of a pre-stressed system ............. 102
CONTENTS (continued)
Page
Figure 2 Typical section of steel catch platform and covered walkway ............................. 15
Figure 3 Typical plan and elevation of steel catch platform and covered walkway ........... 16
Figure 7 Details for securing external beams before dismantling (manual method).......... 44
Figure 10 Demolition of reinforced concrete wall separately from the cross beam
(manual method) .................................................................................................. 48
CONTENTS (concluded)
Page
Figure D1 Site plan and adjoining site conditions of building No. 1, ‘A’ street ................... 104
Figure D2 Typical floor plan and information of existing building No. 1, ‘A’ street ............. 108
Figure E1 Site plan and adjoining site conditions of building No. 7 at XX street ................ 123
Figure E2 Typical floor plan and information of existing building No. 7 at XX street.......... 126
Annex D Example of demolition plan and stability report for top down by manual
method ............................................................................................................... 103
Annex E Example of demolition plan and stability report for top down by
mechanical method ........................................................................................... 122
Committee representation
The Industry Standards Committee on Building and Civil Engineering (ISC D) under whose authority this Malaysian
Standard was developed, comprises representatives from the following organisations:
The Technical Committee on Construction Practices which developed this Malaysian Standard was managed by the
Construction Industry Development Board Malaysia in its capacity as an authorised Standards-Writing Organisation
and consists of representatives from the following organisations:
Co-opted members:
Jabatan Kerja Raya Malaysia (Cawangan Kejuruteraan Awam, Struktur dan Jambatan)
FOREWORD
This Malaysian Standard is the first revision of MS 282: Part 1, Code of practice for building
operations code - Part 1: Demolition.
This Malaysian Standard is based on the Code of practice for demolition of buildings,
published by Building Departments of Hong Kong in year 2004.
This Malaysian Standard cancels and replaces MS 282: Part 1:1975 and MS 2318:2010 (P).