Professional Documents
Culture Documents
TC1_Ezdihar (00000002)
TC1_Ezdihar (00000002)
PROCUREMENT DEPT.
GARRAF BASE CAMP (GBC), GARRAF OIL FIELD
QALAT SUKKAR DISTRICT, THI QAR PROVINCE,
REPUBLIC OF IRAQ
Reference to your proposal submitted to PETRONAS Carigali Iraq Holding B.V. (PCIHBV) for the above tender, please
clarify on our requirement as per ATTACHMENT 1 below. Please acknowledge the receipt of this technical clarification
as per the format in APPENDIX by email PCIHBV via Tender Secretariat email address:
tender_iraq05@petronas.com.my upon receipt of this clarification.
We wish to reiterate that failure to response in a clear and specific manner to each of the questions may result in the
rejection of your bid proposal.
Kindly submit via email to tender_iraq05@petronas.com.my ON OR BEFORE 15:00 HRS (IRAQ TIME; GMT+3),
31 December 2018 (Monday).
Method of Responses
1.1 Bidder shall complete the “TECHNICAL CLARIFICATION QUESTIONNAIRE” format shown below to
response to the clarification(s).
1.2 Bidder is encouraged to include supporting document(s) that will support their response on the clarification(s)
requested.
Please note that no reminder will be sent. Failure to submit the above requirement by the abovementioned date
shall be deemed non-responsive.
Regards,
TENDER SECRETARIAT_05
Page 1 of 4
Ezdihar Al-Garraf Company
GARRAF OIL FIELD, QALAT SUKKAR DISTRICT,
THI QAR PROVINCE, REPUBLIC OF IRAQ
Website:www.egciq.com
“STRICTLY CONFIDENTIAL”
We, Ezdihar Al-Garraf Company , hereby acknowledge receipt of Technical Clarification No. 1 for
the above tender.
We confirm that we will send our response by the date and time required in this technical clarification.
Signature : _______________________
Page 2 of 4
ATTACHMENT 2 - TECHNICAL CLARIFICATION
REFERENCE REFERENCE
No. PCIHBV REQUIREMENT / COMMENT BIDDER’S RESPONSE
DOCUMENT SECTION
11.0 EXCEPTIONS TO CONTRACT TERMS AND CONDITIONS
11.1 PCIHBV may provide BIDDER with soft copy of the relevant Bid
Documents.
Finding:
Bidder did not submit any propose changes/exception to Terms &
Conditions.
Requirement:
Bidder is required to confirm on compliance to PCIHBV’s Terms &
Conditions or submit (if any) propose changes/exception to Terms &
Conditions.
Page 4 of 4