BIAYA SURVEY PERENCANAAN

N0. URAIAN Tenaga Orang/Hari

A TENAGA AHLI
1 Surveyor 1 7
2 Asisten 1 7

B PENDUKUNG
1 Helpper 4 7

C PERALATAN
1 Alat Ukur 1 Set 1 7
2 Mobil Lapangan 1 7

D ATK DAN KELENGKAPAN


1 Patok STA 140 -
2 BM 8 -
3 Alat Tulis 1 -
4 Pilox/Cat 4 -
5 Foto Copy Format 70 -

E AKOMODASI DAN LAIN-LAIN


1 BBM 1 7
2 Biaya Makan 1 7
3 Penginapan 1 7
RENCANAAN

Harga Satuan Jumlah

Rp 1,200,000.00 Rp 8,400,000.00
Rp 900,000.00 Rp 6,300,000.00

Rp 45,000.00 Rp 1,260,000.00

Rp 350,000.00 Rp 2,450,000.00
Rp 350,000.00 Rp 2,450,000.00

Rp 1,000.00 Rp 140,000.00
Rp 50.00 Rp 400.00
Rp 20,000.00 Rp 20,000.00
Rp 12,500.00 Rp 50,000.00
Rp 200.00 Rp 14,000.00

Rp 150,000.00 Rp 1,050,000.00
Rp 90,000.00 Rp 630,000.00
Rp 100,000.00 Rp 700,000.00