Jotun WB Mep - P-006-WMS - Pressure Test
Jotun WB Mep - P-006-WMS - Pressure Test
Statement
Document History :
1. Purpose
Tujuan
1) Establish safe and high-quality work processes and procedures to achieve the goal of “zero
accidents and zero quality complaints”
Menetapkan proses dan prosedur kerja yang aman dan berkualitas tinggi untuk mencapai
target “nol kecelakaan dan nol keluhan kualitas”
2) Easy to understand working procedure and work items for worker
Pekerja mudah memehami langkah-langkah pekerjaan
2. Scope
Ruang Lingkup
5. Reference
Referensi
1) Document
a) Element 15 HSEQ
Work Method Statement
PRESSURE TEST
2) Attachment
a) Job Safety Analysis
b) WI-039 ( Instruksi kerja pekejaan testing/ Pnumatic)
1) Tool’s
a) Compessor
Kompessor
b) Hydro pump
Pompa hydraulic
c) Pessure Gauge
Indicator tekanan
d) Valve
Keran
e) Hose
Selang
2) Material
a) Piping 304L (stainless steel )
1) QA & QC Manager
3) Site Manager
4) Engineer
5) Supervisor
Megevaluasi pekerjaan pada saat toll box meeting dan KY setiap hari
h) Sanctioning workers who perform work without following the rules
i) Memberikan Sanksi kepada pekerja yang melakukan pekerjaan diluar rencana
6) HSE
8) Signalman
a) Participate in TBM and KY and fill in the attendance list
Mengikuti TBM dan KY dan mengisi daftar hadir
b) Follow the safety and quality instructions and work rules contained in this work method
Mengikuti sesuai intruksi dan aturan kerja safety dan quality yang tertuang dalam
Metode kerja ini
c) Provide direction to heavy equipment operators (forklip & crane) according to the work
method that has been approved by the Consultant / Owner.
Memberikan arahan ke operator heavy equipment ( forklip & crane ) sesuai metode
kerja yang sudah disetujui Konsultan/ Owner
d) Maintain working tools and care ( lifting fear )
Menjaga alat kerja dan merawat ( lifting gear )
Work Method Statement
PRESSURE TEST
e) Take responsibility for work and stop work if unsafe conditions and behaviors are
observed.
Bertanggung jawab atas pekerjaan dan stop pekerjaan jika melihat kondisi dan
perilaku yang tidak aman
f) Perform house keeping in the work area
Melakukan house keeping di area kerjanya
9) Riger
a) Participate in TBM & KY and fill in the attendance list
Mengikuti TBM dan KY dan mengisi daftar hadir
b) Follow the safety and quality instructions and work rules contained in this work method
Mengikuti sesuai intruksi dan aturan kerja safety dan quality yang tertuang dalam
Metode kerja ini
c) Can coordinate with the team involved in this work
Dapat bekoordinasi dengan tim yang terlibat dalam pekerjaan ini
d) Follow the safety and quality instructions and work rules contained in this work method
Mengikuti sesuai intruksi dan aturan kerja safety dan quality yang tertuang dalam
Metode kerja ini
e) Maintain working tools and care ( lifting fear )
Menjaga alat kerja dan merawat ( lifting gear )
f) Perform house keeping in the work area
Melakukan house keeping di area kerjanya
10) Worker
8. Step of Works
Langkah kerja :
1. Workers, Supervisors and safety conduct TBM and KY before start to work
Pekerja, Supervisor dan safety melakukan TBM dan KY sebelum pekerjaan di mulai
2. Workers transfer materials for hard barricade and work tools to the work area use mapping
layout
Pekerja mentransfer material untuk barricade dan alat kerja di area kerja menggunakan
mapping layout
3. Prepare a work planning the form of methods and work permits etc.
Menyiapkan rencana kerja sebagai bentuk metode dan izin kerja.
4. Prepare Working area with install barricade
Work Method Statement
PRESSURE TEST
Attachment a) :
For high hazard classification of work or unprepared work method HYDROTEST JAM: 08.00 - 18.00
digunakan untuk pekerjaan yang termasuk High Hazard atau pekerjaan yang
PIC (Petugas yang melakukan pekerjaan) Supervisor: Site Manager : Approved by (Disetujui Oleh) : (Area Owner)
belum ada prosedur kerja
PERUSAHAAN/ CONTRACTOR
Fajar Ariffudin L
PLANT(lokasi) : Checked by (Diperiksa Oleh) : (HSE STAFF ) Acknowledge by (Diketahui oleh ): (SHE)
PT TAIYO SINAR
All area
Anung S
WORK DESCRIPTION (DESKRIPSI PEKERJAAN ):
PRESSURE TEST
HIGH HAZARD WORK berikut harus dilengkapi dengan Ijin Kerja (Permit To Work):
v WORK AT HEIGHT HIGH HAZARD ELECTRICAL WORK HAZARDOUS LINE BREAKING GROUND DISTURBANCE V GENERAL
HOT WORK CONFINED SPACE ENTRY CRITICAL LIFTING OPERATION DEMOLITION
write down the steps taken from start to finish the work potential to cause injury, harm or environmental write down the steps taken to prevent injury or environmental pollution
(tuliskan langkah-langkah yang dilakukan mulai dari awal sampai pollution(potensi menimbulkan cedera, bahaya atau (tuliskan langkah-langkah yang dilakukan untuk mencegah terjadinya cedera atau
menyelesaikan pekerjaan) pencemaran lingkungan) pencemaran lingkungan)
1.Prepare PTW and Tool box meeting a. TBM shall conduct prior operation.
pembuatan PTW dan tool box meeting 1. Failure Document. TBM agar dilakukan sebelum memulai operasional.
Kegagalan Dokumen b. Correct method shall be brief to the workers on TBM.
Correct method agar di briefingkan kepada pekerja di TBM.
a. Ensure the activity to be closely monitor by the supervisor.
Pastikan kegiatan di awasi oleh supervisor
2.Trip, falls, Miss communication, fatique, low consentration of
b. Communication device shall be use.
worker.
Gunakan alat komunikasi yang sesuai
Tergelincir, terjatuh, Miss komunikasi, kelelahan, konsentrasi
c. Worker to report to their Supervisor when unfit.
pekerja rendah
Jika kondisi kesehatan kurang Fit, agar segera melaporkan kepada supervisor.
d. ERT available and ready to perform when emergency event happened
ERT tersedia dan siap sedia melakukan evacuasi jika ada kejadian emergency.
2.Tool Preparation tool a.Ensure the material placement is not in the working acces area
Pesiapan alat kerja pastikan penempatan material tidak di akses jalan
Tools : barricade, scaffolding material,hose water 1.Stumble b.Make sure to walk on pedestrian access
alat kerja : baricade, material scaffolding, selang air tersandung pastikan berjalan di akses pejalan kaki
c.consentrate and focus during work
konsentrasi,fokus saat bekerja
a. Use proper tools
Gunakan alat yang proper
b. Electrical tools must be check before it used. Make sure already inspected by Electrical
Spv with update tagging.
Peralatan listrik harus diperiksa sebelum digunakan. Pastikan sudah diperiksa oleh
Electrical Spv dengan update tagging.
c. Correct method shall be practice
2. Struck againts, pinch point Metode penanganan yang tepat agar di briefingkan kepada pekerja.
Terbentur, terjepit
d. Correct method shall be brief to the workers on TBM.
Correct method agar di briefingkan kepada pekerja di TBM
e. Maintain communication and coordination at all time between involves
party/personnel.
Komunikasi harus selalu tetap dijaga antara semua personil yang terlibat.
f. Use PPE mandatory ( helmet, safety glases, hand gloves, safety shoes
Gunakan APD wajib ( helmet, kacamata safety, sarung tangan, sepatu safety )
3. Install scaffolding a. Manual lifting of loads exceeding 25 Kg must be avoided and it is required to use
Pemasangan scaffolding mechanical lifting aids
Pengangkatan secara manual pada Beban melebihi 25 Kg harus dihindari dan disyaratkan
untuk menggunakan alat bantu angkat angkut mekanis
f. Use PPE mandatory ( helmet, safety glases, hand gloves, safety shoes
Gunakan APD wajib ( helmet, kacamata safety, sarung tangan, sepatu safety )
6. hydrotest using hydro pump a. To be aware of pinch point, sharp edges, etc.
hridrotest menggunakan mesin pompa Perhatikan titik terjepit, sisi yang tajam, dll
Tools : hydro pump , hose etc b. Ensure proper access is provided .
alat kerja : mesin pompa, selang, dll Pastikan access sudah tersedia
c. Assess surrounding area.
1. Hand Injury. Periksa area sekitar.
Cidera tangan
d. Ensure appropriate PPE is used (including hand gloves) prior to work.
Pastikan pekerja memakai PPE yang sesuai
b. All open sides of the platform where someone might fall from a height of 2 meters
must be barricaded, with handrails, second handrails, and toe boards attached.
3. Fall from Scaffolding Semua sisi yg terbuka dari platform dimana seseorang berkemungnkinan jatuh dari
Terjatuh dari Scaffolding ketinggian 2 meter harus di barikade,dengan handrail,second handrail,dan di pasang toe
board.
c. Safety rope must be available when working at height as an additional safety if there is
no harness safety rope.
Tali lintasan pengaman harus tersedia saat bekerja diketinggian sebagai salah satu
tambahan penganman jika tidak terdapatnya penambatan tali pengaman harness.
d. Install barricades & Sign "Beware. Watch your step".
Install barricade & Sign "Hati-hati. Awas jatuh"
a.Ensure the material ( hose ) placement is not in the working acces area
pastikan penempatan material t( selang )idak di akses jalan
4.Stumble b.Make sure to walk on pedestrian access
tersandung pastikan berjalan di akses pejalan kaki
c.consentrate and focus during work
konsentrasi,fokus saat bekerja
a. Keep on safe distance
jaga jarak aman
b. Take coordination before open valve compresor
koordinasi sebelum buka valve kompresor
5. Hit by hose compresor c. one comand when open valve
kena selang compresor satu komando ketika buka valve
d. Correct method shall be brief to the workers on TBM.
Correct method agar di briefingkan kepada pekerja di TBM
e. Proper PPE shall be wear and fit correctly.
PPE yang tepat agar digunakan dengan benar
a. check condition power electrical with tespen
cek kondisi power listrik dengan tespen
h. if do conection electrical is carried out by certified workers who are still valid (K3
electrical)
jika adakoneksi listrik dilakukan oleh pekerja bersertifikat yang masih berlaku ( K3 listrik
)
i. Proper PPE shall be wear and fit correctly.
Proper PPE agar digunakan dan dipasang dengan tepat
1. Make sure the condition of the tube is firmly bonded using a chain
pastikan kondisi tabung terikat kuat menggunakan rantai
2. Struck by dust a. Proper PPE to be worn (safety glass, hand gloves, , Mask, etc).
Mata kelilipan debu Proper PPE agar dipakai (Safety glasess, hand glove, ear plugs, masker, dll)
a. organize it materials and tools into the tool box
3. Hand Injury rapikan material dan alat
Tangan terluka
b. Concentration
konsentrasi
Plant Division
Jun Sano Suryanto Dedi Kartiwa
P1 P2
1.Lakukanlah Line check sesuai dengan Gambar ISO 2.Persipakan material dan alat-alat hydrotest dan 3.Buat Chart Digram Hydrotest pressure dan spesifikasi
Metric dan pastikan semua part telah terpasanag, lalu pastikan tidak ada sambungna las atau flange yang pengujian sesuai persyaratan line tersebut, lalu buatlah
buatlah Diagram Schematic Line yang akan di test belum tersambung dengan baik. ijin kerja dan persetujuan dari pihak client dan owner.
a Perhatian !
4.Pasang Manifold dan Presssure gauge, lalu sambungkan 5.Lakukan Pressure secara perlahan hingga mencapai holding pressure,
kep semua mesin pompa pastikan sambungan telah kencang lalu perhatikan recorder dan semua pressure indicator.Pastikan tidak ada
dan kuat. Isilah pipa dengan air , lalu tutup semua valve. penururan tekanan akibat kebocoran sabungan.
Reference : Date Revision Item Revised Rev .No.
17-Dec-11 Initial release 0