You are on page 1of 30
Vol UFT NO. Component Nome in Assembly Ver: A Co cin frome Bat M35 Use tiff rl the rod / Co baton / x Technica ements +. Cobin lev hin 2mm after installation 2. Cobin wall verticdih in 2mm. flalness within tm + 3. Sur i adnt the color should according to the instructions 4, Cor frame cHom verticality thon 2mm otter instdlation ond the cor frome diagonal mim + 5. Moke sure the door sill level 2mm Designed} Examined Dae [Checked Hhopra Remar| Fie NO MATIZ ELEVATOR COLTO Type ali Port/Nane Driving system-cor_platforin assembly Cor coor sil Sir Bolt Mt2*30 —— Guice_shoe Cor toe gurd teone ball 423) Cor platform diversion she Boll M6*20 Technica, requirements 1 Connection between sil bracket and car platfarm should be fastened = 2 sill be instdle the sill bracket. ond make sure sill alt connection for car platform diversior C 4.After the position adjustment of guide shoe wes finish over 2mm 1 should be fastened. = cod cor platform + n shock-reducing Reviewed! Remert| Dae [Checked Hhopravec| 3, Moke sure the flatness a MATIZ ELEVATOR COLTD Lit Driving sy ii-cor_wall_assembly the sti Frotk dl ~ nd car platform is wall is less thon 2mm citer installation + hon 2mm after installation = Designed} Remark Fie NO Signed Oce [Checked Reviewed! Hopra MATIZ ELE OR COLTO Model fila Lit FG0D0T component Nowe Driving system-Cor frame assembly Page 4 \ Guide shoe Bolt Mi0*20 Technical requirements 4, After the on site cor frawe instdlation wes fished. make sure the sHrdightness of vertcd bean and car flor is less fhan 2mm 2. Rod ecr side cor by bell 3. Fasten the bolt between ugper bean and verticd. bean 4. Agiust the guide shoes position and screw up the bolt, Designed Reviewed fernark Signed Oce [Checked TOR COLTO voce Lit wATE-E00201 pret nae Driving @ top assembly A | Page 5 Bol M825 Side corto ball Mat Bol M8*25, kick ple Bolt B25, Qhedra connection port \ Side cor fap Technical requirements 4. Each connecti 2.After asse jould make sure flainess less thon 2mm = Designed Reviewed Renal] Fie NO, Date [Checked Hhopravec| @ MATIZ ELEVATOR CO. LTD Model Villa Lift NO: WT MINT IZ Corponent Nene [Traction systew-asseably Terison: A | Page 6 Trt mie “Traction mshine fro Uachine ran strut angle steel, chine frme hin frame / od welding parts Technical requirements Lachine frame strut angle steel in the drawing on site welding with nachine frane lover terminal, re-paint atincorrosive paint after welding; ‘2Machine frane strut angle steel be fixed on the shaft wall through expansion bolt (concrete structure), If it’s steel frame shaft, there should be support beas, and it should be welded with support bean; 3 The machine fram and guide rial should be connected firmly. Adjust its disance through the guide rail pad,make sure the top guide rail’ s verticality less than 2m after the instal lation. Designed Remark! [File W_| Stanature| Date | Shecked @ MATIZ ELEVATOR CO. LTD Model Villa Lift MINT IZ “tan: sa: aaa Traction systerinsallatien asebly rison:A | Page 7 /* Win machine serene, na_/ Fatma, Sig we Technical requirements 1. Traction device machine frame installed on the CTW which locates on the position up ward 1600 of top bin sachine installation mut M6 side rail loor leveing, pressed by the compression yard, and use strut angle steel to fix on shaft wall When install on site, each fixed bolt should be screwed up. 3, Install as the drawing, if there is on site welding, need to repaint anticorrosive paint after the welding. signed fori ‘Remark [File NO. Signature| Date [hecked| Trew @ MATIZ BLEVATOR CO. LTD del Villa Lift WET MINT IZ Corponent sane | Traction systen-vomponents Verison:h | Page 8 Nane: machine frane Qty: according to packing list Carton NO: # Name : screw Qty: according to packing 1ij Carton NO: # Carton NO: # S Qty: according to packing list Name: machine frame strut angle iran ~ Nane: machine frane fixed part Nane + guide compressopm yard Qty: aezarding to packing list Qty: according to packing list Carton NO. , 4 pe ty Hall door install shim 2 pe landing door hang fix panel 1 pc YY landing door hang fix panel 1 pc WL 2 pe 4 0 pe ° per sill bracket hang fastene' Standard parts 1) expansion b Dc 2) corss screw M4#12 pe bolt M6*16,washer 6,gask: 4) bolt MB*25,nasher 8,gasket 8, & Remark] File NO. Signature Date | Designed Date | Examine: Approved Remark MATIZ ELEVATOR CO.LTD Model VILLA LIFT 10. WATIZ-ECO20T MNT IZ ponent Ware] Tending door system=—parts Vers A [Page 28 Name: Right landing Oty.see packing fist Container NO: Name: landing do Qiy.see packing Is Container NO: ee packing list Container NO [swan Fie door guard Upper sleeve Sigae ig Name: Left landing door Oy: Con Name: Side sleeve Container NO: Name: Standard parts Container NO: # Incl i) 4 3} see packing ist tsiner NO. Ee rater 1) Hal de pl pe 2) she iy 5) Fok Weipa MEter Bgaet 6, eth y-see packing list ides: Expansion bl MI2S20_ Gp/doay, sunk screw M5"D Spc /door, bolt M3*20,nut MBrasher’8,gosket 8, 6pc/door Datei Date roe ema MATIZ ELEVATOR COLTO Assembly Cor chor pre Sdtaty light curtain] “ Technica requirements 4 Door panel to Cobin wall cis! Door di — Cor coor pone elity less thon 2mm, Tents Fie Nt Sipdire le ile OLTD LUFT fi Name Cor Door Ligth Curtcin nstalation| Cor doge_pael |} Light_ curtain N\ Washer 6 Cross Screw Mi*20 Rema} Fle Nd. Sindure (dle = sire ak lide Checked ens

You might also like