Vol
UFT NO.
Component Nome
in Assembly Ver: A
Co cin frome
Bat M35
Use tiff rl the rod
/
Co baton / x
Technica ements
+. Cobin lev hin 2mm after installation
2. Cobin wall verticdih in 2mm. flalness within tm +
3. Sur i adnt the color should according to the instructions
4, Cor frame cHom verticality thon 2mm otter instdlation ond the cor frome
diagonal mim +
5. Moke sure the
door sill level 2mm
Designed} Examined
Dae [Checked Hhopra
Remar| Fie NOMATIZ ELEVATOR COLTO
Type ali
Port/Nane Driving system-cor_platforin assembly
Cor coor sil
Sir
Bolt Mt2*30
—— Guice_shoe
Cor toe gurd
teone ball 423)
Cor platform diversion she
Boll M6*20
Technica, requirements
1 Connection between sil bracket and car platfarm should be fastened =
2 sill be instdle the sill bracket. ond make sure sill
alt connection for car platform diversior C
4.After the position adjustment of guide shoe wes finish
over 2mm
1 should be fastened. =
cod cor platform +
n shock-reducing
Reviewed!
Remert| Dae [Checked Hhopravec|3, Moke sure the flatness a
MATIZ ELEVATOR COLTD
Lit
Driving sy
ii-cor_wall_assembly
the sti
Frotk dl ~
nd car platform is
wall is less thon 2mm citer installation +
hon 2mm after installation =
Designed}
Remark
Fie NO
Signed
Oce [Checked
Reviewed!
HopraMATIZ ELE
OR COLTO
Model fila Lit FG0D0T
component Nowe Driving system-Cor frame assembly Page 4
\ Guide shoe
Bolt Mi0*20
Technical requirements
4, After the on site cor frawe instdlation wes fished. make sure the sHrdightness of vertcd bean and car flor is less fhan 2mm
2. Rod ecr side cor by bell
3. Fasten the bolt between ugper bean and verticd. bean
4. Agiust the guide shoes position and screw up the bolt,
Designed Reviewed
fernark
Signed Oce [CheckedTOR COLTO
voce Lit wATE-E00201
pret nae Driving @ top assembly A | Page 5
Bol M825 Side corto ball Mat
Bol M8*25,
kick ple
Bolt B25,
Qhedra connection port
\ Side cor fap
Technical requirements
4. Each connecti
2.After asse
jould make sure flainess less thon 2mm =
Designed Reviewed
Renal] Fie NO, Date [Checked Hhopravec|@ MATIZ ELEVATOR CO. LTD
Model Villa Lift NO: WT
MINT IZ Corponent Nene [Traction systew-asseably Terison: A | Page 6
Trt mie
“Traction mshine fro
Uachine ran strut angle steel,
chine frme hin frame
/ od welding parts
Technical requirements
Lachine frame strut angle steel in the drawing on site welding with
nachine frane lover terminal, re-paint atincorrosive paint after welding;
‘2Machine frane strut angle steel be fixed on the shaft wall through
expansion bolt (concrete structure), If it’s steel frame shaft, there
should be support beas, and it should be welded with support bean;
3 The machine fram and guide rial should be connected firmly. Adjust its
disance through the guide rail pad,make sure the top guide rail’ s
verticality less than 2m after the instal lation.
Designed
Remark! [File W_| Stanature| Date | Shecked@ MATIZ ELEVATOR CO. LTD
Model Villa Lift
MINT IZ “tan: sa:
aaa
Traction systerinsallatien asebly
rison:A | Page 7
/* Win machine
serene, na_/
Fatma, Sig we
Technical requirements
1. Traction device machine frame installed on the CTW
which locates on the position up ward 1600 of top
bin sachine installation mut M6
side rail
loor leveing,
pressed by the compression yard, and use strut angle steel to fix
on shaft wall
When install on site, each fixed bolt should be screwed up.
3, Install as the drawing, if there is on site welding, need to repaint
anticorrosive paint after the welding.
signed
fori
‘Remark [File NO. Signature| Date [hecked|
Trew@ MATIZ BLEVATOR CO. LTD
del Villa Lift WET
MINT IZ Corponent sane | Traction systen-vomponents Verison:h | Page 8
Nane: machine frane
Qty: according to packing list
Carton NO: #
Name : screw
Qty: according to packing 1ij
Carton NO: #
Carton NO: # S
Qty: according to packing list
Name: machine frame strut angle iran ~
Nane: machine frane fixed part Nane + guide compressopm yard
Qty: aezarding to packing list Qty: according to packing list
Carton NO. ,
4 pe ty
Hall door install shim
2 pe
landing
door hang fix panel 1 pc
YY
landing door hang fix panel
1 pc
WL
2 pe
4 0
pe °
per sill bracket hang fastene'
Standard parts
1) expansion b Dc
2) corss screw M4#12 pe
bolt M6*16,washer 6,gask:
4) bolt MB*25,nasher 8,gasket 8, &
Remark]
File NO.
Signature
Date | Designed
Date | Examine:
Approved
RemarkMATIZ ELEVATOR CO.LTD
Model
VILLA LIFT 10. WATIZ-ECO20T
MNT IZ
ponent Ware]
Tending door system=—parts Vers A [Page 28
Name: Right landing
Oty.see packing fist
Container NO:
Name: landing do
Qiy.see packing Is
Container NO:
ee packing list
Container NO
[swan Fie
door
guard
Upper sleeve
Sigae
ig
Name: Left landing door
Oy:
Con
Name: Side sleeve
Container NO:
Name: Standard parts
Container NO: #
Incl
i)
4
3}
see packing ist
tsiner NO.
Ee rater
1) Hal de pl pe
2) she iy
5) Fok Weipa MEter Bgaet 6, eth
y-see packing list
ides:
Expansion bl MI2S20_ Gp/doay,
sunk screw M5"D Spc /door,
bolt M3*20,nut MBrasher’8,gosket 8, 6pc/door
Datei Date
roe
emaMATIZ ELEVATOR COLTO
Assembly
Cor chor pre
Sdtaty light curtain] “
Technica requirements
4 Door panel to Cobin wall cis!
Door di
—
Cor coor pone
elity less thon 2mm,
Tents Fie Nt Sipdire
le
ileOLTD
LUFT
fi
Name Cor Door
Ligth Curtcin nstalation|
Cor doge_pael |}
Light_ curtain
N\
Washer 6
Cross Screw Mi*20
Rema} Fle Nd. Sindure (dle
= sire ak
lide
Checked
ens