1a. Explain any two methods of geophySical investigation in detail. (10 Marks)
A soil sampler has the following dimensions :
Inside diameter of cutting edge™ = 69mm S
Outside diameter of cutting edge
Inside diameter of sampling tube
Outside diameter of sampling tube
Compute: i) Inside clearance ii) Outside clea¥afice _ iii) Area ratio, (10 Marks)
. OR:
Explain any-two Site exploration techniques in detail. (10 Marks)
Vane sheat,tests were conducted in claylayer. The vane dimensions were 63.5mm (D) *
127mm(H). For the test at A, the torque required to cause failure was 0.0S1N-m. For the
clay, given : Liquid limit = 46%and plastic limit = 21%}Estimate the undrained cohesion
of clay for use in the design by Bjerrum’s 2. relationship: The Bjerrum’s and relationship is
Cocorectes) = ACy(ane shear res, ef
70.54 logio(PI%).% . (10 Marks)
Modul
What is RQD? When‘a drill of Im was cored in the rock, the, following rock core samples
were obtained ;8¢m, 20.lem, 18.2¢m,"5,2em, 15.1em, 74em, 6.8cm, 14.4cm and 4.Sem.
Find RQD and state its quality. (10 Marks)
Explain different types of soil samplefs. What are the qualities of good soil samples?
(10 Marks)
OR
a. A plate load was conducted using a plate of 075m x 0.75m on a uniform deposit of sand
and the following results were obtained.
Presslire | Settlement
0 0
30 15
100 2.0
200 4.0
300 75
400 12.5
300 20.0
600 40.0
Calculate the safe-bearing capacity by taking a factor of safety of 2.5. Also calculate the
settlement of a Square footing of size 2m x 2m at ultimate bearing capacity. (10 Marks)
b. Explain SPT ‘in brief and explain the corrections to be applied for observed SPT number in
the field, (10 Marks)10
oe
Module-3
18CGT12
How do you determine engineering properties of soil and their application using data
interpretation?
OR
(20 Marks)
Using data interpretation, briefly explain the procedure for site investigation report.
Module-4
Write a note on : )
i) Electro osmotic method
ii) Chemical osmotic method,
List the major benefits fromthe construction of vertical Sand drains.
» oR
Explain: : ~
i) Vibro-floatation technique EWIT-LIBRARY |
ii) Compaction’by explosives.
Explain the design and construction of sand drains.
y Modul
Deséfibe heating and cooling effects on soil .
Explain engineering benefits of bitumen stabilization
+ oR
Explain with a neat skéteh freezing and thawing-of soils.
Explain with a neat sketch working of grouting equipment and its techniques.
ete
20f2
(20 Marks)
(10 Marks)
(10 Marks)
(10 Marks)
(10 Marks)
(10 Marks)
(10 Marks)
(10 Marks)
(10 Marks)