Business Systems Planning (BSP) is a
structured approach to help an organization
establish an information systems plan that

en
can satisfy its near- and long-terminforma-
tion needs. This guide offers assistance to
BSP study teams by explaining the approach

w and presenting guidelines for conducting a


BSP study. It can also be used for general
reference on the subject of planning for

z information systems.
The guide covers BSP principles, concepts,
and study overview, then devotes a chapter

en
to each of the major activities of a BSP study,
and includes a fmal chapter to acquaint the
reader with follow-on projects.

::l
m
Second Edition (October 1978)
A form for readers' comments has been provided at the back of this publication. If
the form has been removed, address comments to IBM Corporation, Technical
Publications, Dept. 824, 1133 Westchester Avenue, White Plains, New York 10604.
IBM may use or distribute any of the information you supply in any way it believes
appropriate without incurring any obligation whatever.

© Copyright International Business Machines Corporation 1975, 1978


Preface principles, concepts, methodology overview, methodol-
ogy details, and finally the alternati~ and the refer-
ence material in the appendices. The iIttroduction is
Business Systems Planning (BSP) is a structured ap- for those persons who may have heard of BSP but do
proach to assist a business in establishing an informa- not know its purpose or origin. Chapter I presents the
tion systems plan to satisfy its near- and long-term concepts that form the basis for the methodology, so
information needs. The primary purpose of this guide that the reader can understand the basic principles
is to assist BSP study team members by explaining the without becoming embroiled in the detail of how BSP is
approach and presenting specific guidelines for con- done. Even persons with some orientation or training
ducting a BSP study. The guide may also be used for in the subject may wish to read the introduction and
general reference on the subject of planning for Chapter I to strengthen their understanding.
information systems. The reader does not need a Chapter 2 provides an overview of all the activi-
knowledge of computers to understand the concepts ties in a BSP study so that the reader will be prepared
and to apply the methodology. for the details in the following chapters.
Experience has shown that BSP can be applied to Chapter 3 deals with getting the proper executive
all the public sector and all industries in the private commitment before starting a BSP study.
sector, because the requirements for developing Chapter 4 discusses the activities that take place
information systems are similar regardless of the before the BSP team starts its concentrated study. It
business served or the products and services provided. also outlines the considerations that must be made in
F or the sake of simplicity, throughout this manual the the management of the study.
term business is used for the organization entity being Chapters 5-15 cover the details of the methodolo-
studied, regardless of its size or purpose, and whether gy, culminating in the writing of the final report and
private or public. the making of recommendations to the business
Before initiating a BSP study, the personnel executives. Since each step of the methodology can
involved should consider taking the appropriate prohably be done a number of ways, a single, cohesive
BSP-related courses. Information on the educational methodology is outlined and alternatives, where
offerings is available through local IBM branch offices. appropriate, are included at the end of each chapter or
Because IBM cannot control the manner in which in the appendices. For continuity from step to step, all
this methodology is applied, it takes no responsibility examples are based on the same business, a medium-
for the results. Hundreds of studies have been com- size manufacturing firm, except those in the appendic-
pleted successfully using this approach; this guide es, which are based on various industries and the
represents as much of that experience as it is feasible to public sector.
include. Chapter 16 gives an introduction to the follow-on
This guide is organized so that readers already projects so that an action plan for them may be devel-
familiar with BSP can go directly to the material they oped during the BSP study.
require, while others may progress serially through
Contents

Introduction Chapter 6. Defining Business Processes 24


The Changing Environment Prerequisites to Defining Processes 24
From Operation to Management Control The Product and Resource Life Cycle 24
A Justified Approach I Basic Steps in Defining Processes 24
Origin of IBM's Business Systems Planning Function 2 Planning and Control Processes 25
Objectives and Potential Benefits of BSP 2 Define the Processes of Strategic
Objectives 2 Planning and Management Control 25
Potential Benefits 3 Product/Service Processes 26
Identify the Product/Service of the Organization 26
Chapter t. BSP Concepts 4 Identify the Processes in Each Stage of the
'Life Cycle of the Product/Service 26
Chapter 2. Overview of the BSP Study Approach 10 Write a Description of Each Process 26
Perspective '10 Supporting Resource Processes 28
Major Activities 11 Describe the Supporting Resources 28
Gaining Commitment 12 Identify the Processes in Each Stage of
Preparing for the Study 12 the Life Cycle of Each of the Supporting Resources 28
Conducting the Kickoff Meeting 12 Consolidation and Analysis 29
Defining Business Processes 12 Group the Processes 29
Defining Data Classes 12 Chart the Process Groups and Complete Descriptions 29
Analyzing Business/Systems Relationships 13 Relate the Business Processes to the Organization 29
Determining the Executive Perspective 13 Identify Processes Key to Business Success 30
Assessing Business Problems 13 Outputs and Their Uses 30
Defining Information Architecture 13 Expansions and Variations in Approach 30
Determining Architectural Priorities 13 Diversity in Business, Product, or Service 30
Reviewing Information Systems Management (ISM) 13 Outside Assistance 30
Developing Recommendations and Action Plan 13 Alternate Methods in Identifying Business Processes 32
Reporting Results 13 Generic Process Model 32

Chapter 3. Gaining the Commitment 15 Chapter 7. Defining Data Classes 33


Establishing the Study Scope 15 Business Entity Approach 33
Setting Study Objectives 16 Business Process Approach 35
Developing Business Reasons for the Study 16 Cross-Referencing and Regrouping 35
Resourcing the Study Team 16 Data Class to Process Analysis 36
Characteristics 16
Organization and Responsibilities 16 Chapter 8. Analyzing Business/Systems Relationships 37
Considerations for Full-Time or Part-Time Study 17 Understanding l/S Support of Processes 37
Manpower Requirements 17 Identifying Usage of Current Data 41
Selection of Team Leader 17 Summary 41
Sponsor's Letter 17
Chapter 9. Determining the Executive Perspective 42
Chapter 4. Preparing for the Study 18 Confirming the List of Executives to be Interviewed 42
Briefing the Study Team 18 Reviewing the Interview Schedule 42
Gathering Data 18 Preparing Questions for Interviews 42
Educating the Team 19 Determining Team Member Interview Roles and
Developing the Study Work Plan 19 Interviewee Characteristics 43
Establishing a BSP Study Control File 21 Conducting Interviews 44
Defining the Structure of the Final Study Preparing Interview Summaries 44
Report and Ancillary Output 21
Creating Executive Interview List and Schedule 21 Chapter to. Assessing Business Problems and Benefits 45
Briefing Interviewees 21 Step I: Summarize Interview Data 45
Obtaining and Equipping Control Room 22 Step 2: Classify Interview Data 45
Arranging for Administrative Support 22 Step 3: Relate Data to Processes 47
Reviewing with Executive Sponsor 22 Summary 47

Chapter 5. Conducting the Kickoff Meeting 23 Chapter t 1. Defining Information Architecture 49


Sponsor's Opening 23 Developing the Architecture Diagram 49
Review of Study Work Plan 23 Data Flow 53
Business Review 23 Subsystem Identification 57
Information Systems Review 23 Analyzing for Prerequisites 57
Architecture Use 57
Chapter 12. Determining Architecture Priorities 58 Appendix I. ISM Processes 92
Determine Selection Criteria 58
Apply Criteria and List Systems 58 Appendix J. Potential Topics for BSP Study Report 94
List Prerequisites 58
Document Recommended System 58 Glossary 96
Expansions and Variations 59

Chapter 13. Reviewing Information Systems Management 60


Purpose of ISM in the BSP Study 60
ISM as Part of the BSP Study 60
ISM Inputs 60
Flow of Activities in the ISM Module 60
Compiling the I/S Objectives 60 Figures
Ensuring ISM Supports Architectural Priorities 62
Problem Analysis 62
Rearrange I/S Support Problems by Type 62 I. Translation of business strategy to I/S strategy 4
Extract ISM Problems from I/S Review 62 2. Characteristics of planning and control levels 5
Consolidating and Prioritizing ISM Changes 62 3. Top-down analysis with bottom-up implementation 7
Developing Recommendations and Action Plan 63 4. General I/S planning approach 8
ISM Outputs of a BSP Study 63
5. Information architecture example 9
Chapter 14. Developing Recommendations and Action Plan 64 6. Relationship of BSP to I/S projects 10
7. Flow of the BSP study II
Chapter 15. Reporting Results 65 8. BSP organizational business unit options 15
Report Outline 65 9. Sample study team organization 17
Report Preparation 65
10. BSP study control points 19
Presentation Medium 65
Executive Presentation 65 II. Work plan for the BSP study 20
12. Definition of business processes 25
Chapter 16. Overview of Follow-on Activities 66 13. Example of the flow ofa product/service through a business
Perspective on Follow-on Activities 66 14. Sample list of processes by process group 29
Relation of BSP Study to Follow-on Activities 66
Preparation for Follow-on Activities 66 15. Organization/process matrix 31
Orientation of Teams 66 16. Business process network 32
Information Systems Management 67 17. Information life-cycle 33
ISM in Perspective 67 18. Data class/business entity matrix 34
Information Systems as a Business 67 19. Input-process-output examples 35
Information Architecture 68
20. Data class by process, showing data creation and usage 36
Architecture Refinement 68
Current Systems Examination 69 21. Organization/process matrix, with current systems support
Data Base 69 shown 38
Distributed Information Systems 69. 22. System/organization matrix 39
Developing the First System 72 23. System/process matrix 40
Technical Factors 72
24. System/data file matrix 41
Effective Communication 72
Priorities and Conflicts 72 25. Data reduction steps 45
26. Interview analysis and data reduction worksheet 46
Appendix A. Sample Executive Announcement Letter 74 27. Problem/process matrix, showing the number of times the
problems were stated 48
Appendix B. Sample Interview Confirmation Letter 75
28. Data class by process, showing data creation and usage 50
Appendix C. Examples of Process Groups and 29. Data classes arranged by creating process 5 I
Processes by Industry 76 30. Process/data class groupings 52
31. Data flow determination 53
Appendix D. Examples of Planning and Control Processes 81 32. Data flow 54
33. Information architecture 55
Appendix E. Sample Descriptions of Processes 83
34. Graphic rearrangement of information architecture 56
Appendix F. Examples of Business/Systems Relationship 35. Prerequisite subsystem analysis 57
Matrices 86 36. Sample subsystem ranking 59
37. Flow ofISM in a BSP study 61
Appendix G. Sample List of Wall Charts for Control Room 89
38. Data base system 70
Appendix H. Risk - Potential Benefit Analysis 90 39. Distributed information requirements analysis 71
Introduction

The Changing Environment A Justified Approach


The rapidly changing environment and the constant In an article entitled "Blueprint for MIS," * Dr. Wil-
need for businesses to adjust quickly to it make it liam Zani states, "Traditionally, management informa-
necessary for executive management to have up-to-date tion systems have not really been designed at all. They
information avaiiable at all times, so that through have been spun off as by-products while improving
meaningful analyses and resource allocation tradeoffs existing systems within a company. No tool has proved
they can manage their businesses more effectively. so disappointing in use. I trace this disappointment to
With organization-wide availability of information, the fact that most management information systems
strategies can be improved, decisions made more have been developed in the "bottom-up" fashion - an
soundly, and operations performed more efficiently. effective system, under normal conditions, can only be
born of a carefully planned, rational design that looks
From Operation to Management Control down from the top, the natural vantage point of the
Data processing is in transition. Until comparatively managers who will use it."
recently, most businesses considered it a service In most instances the current operational systems
function and used it to support single-operation units have been justified and have been performing effec-
or locations. In the last two decades applications have tively for their specific intent, even though their
been developed independently, with very little regard maintenance and interfaces may have become unman-
for the support they could give other functions and for ageable. An information system plan should allow a
the information they could supply for management modular approach to implementation, providing
control. Functional autonomy has been the rule. This confidence that each module will fit and function
has resulted in fractionalized and redundant data files properly in an integrated network and will interface
and in the inaccessibility of data from the many properly with the present operating systems until they
operational applications installed in the various too can be included in that network. The plan should
functions. also allow for better decisions concerning the efficient
Today, however, businesses are recognizing data and effective commitment of information systems
more and more as a resource that is as important as development resources. With such a plan, the required
personnel, cash, facilities, or materials. They see the information can be more readily obtained.
need to consolidate the key data files and make Business Systems Planning (BSP) is geared to help
information available not just to individual functions provide such a plan through:
or departments but throughout the business, in order • A top-down approach to (1) getting people commit-
, for management to gain a business-wide view and be ted and involved (starting with top management and
able to make multifunctional decisions. working down through the organization) and
Many companies have recognized the need for (2) studying the business (working from the overall
company-wide information systems but have been to the detail level)
unable to develop them for one or more of the follow- • A bottom-up approach to implementation
ing reasons: • Use of a structured methodology proven in hun-
• Failing to obtain executive commitment and dreds of studies
involvement • The translation of business objectives into informa-
• Establishing objectives and strategies that were not tion requirements
in line with their overall business objectives The effectiveness of the BSP methodology can be
• Attempting to implement information systems attributed to two components:
without first understanding the business from • The fundamental principles and concepts - the
general management's viewpoint unvarying ideas and logic that form the basis for
• Setting out to implement totally new company-wide BSP, including the standards upon which the proce-
information systems rather than a comprehensive dures are based
plan evolving from current systems
• failing to put in place-those information systems
management functions required to adequately
manage the information systems resources

*Harvard Business Review, November/December, 1970

1
• The sequenced activities, techniques, disciplines, lished a set of information system strategies covering
time,outputs, planning, team composition, etc., five major areas:
established to fill a particular organization's need 1. Fixed data responsibility
and situation (although consistent with BSP's basic 2. Single source and parallel distribution of data
principles and concepts, the pr6cedures are flexible 3. Central control and planning of information systems
and vary with the particular environment) 4. Organizational independence of data
5. Resource sharing of data, equipment, and
Origin of IBM's Business Systems communications
Planning Function With the knowledge of what was being done with
Learning from its own mistakes and those of other data processing, and the direction established through
companies that attempted to implement large informa- the set of strategies, the department defined a network
tion systems in the 1960s, IBM realized that a disci- . of information systems and assigned responsibilities for
plined approach was required, using proven principles the development of the systems. These systems ad-
and methodologies. In 1966 a business-wide Informa- dressed the operational, functional, and general
tion Systems Control and Planning Department was management needs for information.
established at IBM'S Data Processing Group headquar- As the definition and design efforts for the business-
ters. The Data Processing Group was a total business wide network of information systems got under way in
unit comprising the engineering, manufacturing, the late 1960s, many of IBM's customers showed
marketing, and service divisions responsible for all of interest in learning how they might better manage their
IBM'S domestic data processing business. information system resources. In an effort to assist
Until the Control and Planning Department was these interested customers, IBM established the Busi-
established, IBM had little overall direction in the ness Systems Planning (BSP) program in 1970.
internal use of computers. In fact, little coordination To conduct the program, the nucleus of the control
took place between divisions; most data processing and planning department that developed the internal
activities were confined to locations and units within information systems plan was transferred to the Data
divisions. Consequently, each manufacturing plant Processing Division headquarters. This group proceed-
and marketing region developed and operated its own ed to document proven methodologies and institute a
system. Although the individual systems carried out training program to educate regional and branch office
similar functions, they differed in design and perfor- personnel and customers in the approach. Executive
mance; they could not be used interchangeably and briefings and seminars were established to show
could not communicate with each other. The result customer executives the potential benefits of the
was a redundancy of data and excessive use of th~ data approach and the reasons why their involvement was
processing resources required to develop and maintain vital to successful implementation of information
such systems. Even with this large expenditure of systems.
resources by each division, the systems were mainly The methods used in developing this information
satisfying the local department needs of the business, systems plan and the lessons learned have since been
rather than doing an overall data processing job. used by many IBM customers. Application of BSP
When steps were taken to improve the data processing methodology has helped them to formulate their
within a division (for example, development of a information system plans and control mechanisms and
consoli,dated order entry system within the marketing to improve their use of information and data process-
division), little serious attention was given to an ing resources. Studies using the BSP methodology and
effective interface of that system with inputs from guidelines have been conducted successfully by profit
engineering and outputs to manufacturing. The and nonprofit organizations, of varying size, in many
business was not getting the return on investment from industries.
data processing that it could have because the informa-
tion needs of the business, and particularly those of the O~ctives and Potential Benefits of
generalll)anager responsible for the business, were not B -
being accommodated. With a reasonable amount of planning and control, the
The first effort of the Control and Planning Depart- user of this BSP approach should be able to attain its
ment was to inventory and profile the systems existing- objectives and realize its potential benefits.
within the business and the plans for the future. At the
same time, recognizing that the data processing effort Objectives
must be directed toward satisfying business needs and The first and most important objective of BSP is to
not solely toward individual functions and depart- provide an information systems plan that supports the
ments, the Control -and Planning Department estab- business's short- and long-term information needs and
2
is integral with the business plan. There are other Potential Benefits
objectives that help to justify and clarify the approach: Application of the approach and methodology con-
1. Provide a formal, objective method for management tained in this planning guide offers many potential
to establish information systems priorities without benefits to three management groups:
regard to provincial interests. To executive management:
2. Provide for the development of systems that have a • An evaluation of the effectiveness of current infor-
long life, protecting the systems investment, because mation systems
these systems are based upon the business processes • A defined, logical approach to aid in solving man-
that are generally unaffected by organizational agement control problems from a business
. changes. perspective
3. Provide that the data processing resources are • An assessment of future information system needs
managed for the most efficient and effective support based on business-related impacts and priorities
of the business goals. • A planned approach that will allow an early return
4. Increase executive confidence that high-return, on the company's information systems investment
major information systems will be produced. • Information systems that are relatively independent
5. Improve relationships between the information of organization structure
systems department and users by providing for • Confidence that information system direction and
systems that are responsive to user requirements and adequate management attention exist to implement
priorities. the proposed systems
6. Identify data as a corporate resource that should be To functional and operational management:
planned, managed, and controlled in order to be • A defined, logical approach to aid in solving man-
used effectively by everyone. agement control and operational control problems
The illustration below shows the overall flow of BSP • Consistent data to be used and shared by all users
and relates the BSP study to the activities that follow. • Top management involvement to establish organiza-
This relationship is expanded upon in Chapter 16, with tional objectives and direction, as well as agreed-
an explanation of the foll()w-on activities. upon system priorities
Step Output • Systems that are management and user oriented
rather than data processing oriented
Analysis To information systems management:
Evaluation of BSP Scope of study
• Top management communication and awareness
• . Agreed-upon system priorities
• A better long-range planning base for data process-
ing resources and funding
Objectives • Personnel
I
better trained and more experienced in
Executive
commitment
Team leader planning data processing to respond to business
Study team
needs
The plan that results from a BSP study should not be
considered unchangeable; it simply represents the best
Education
thinking at a certain point in time. The real value of
Preparation for the BSP approach is that it offers the opportunity to
Work plan
BSP study
Business facts (1) create an environment and an initial plan of action
that can enable a business to react to future changes in
priorities and 'direction without radical disruptions in
Business requirements
systems design, and (2) define an information system
BSP study Information architecture function to continue the planning process.
Architectural priorities
liS management
Action plan

Information architecture
Follow-on
First system(s)
projects lIS management
Data management
lIS planning

3
Chapter 1. BSP Concepts

Business Systems Planning is most often thought of as be done as a part of the BSP methodology. In either
a structured approach or methodology. This meth- event, a recognition of this basic need by senior
odology, however, is based upon some fundamental management is critical, for only with that recognition
concepts, a good understanding of which can give the will their commitment and involvement be great
BSP study team members: enough to guarantee a meaningful BSP study.
I. A better appreciation of the ';;why's" of the
methodology An lIS Strategy Should Address the Needs of All ",.•'
2. Improved confidence in applying variations to meet Levels of Management Within the Business
specific situations This requirement has several implications relative to
3. A better background with which to communicate liS structure. First, it is important to recognize the
the objectives and eventual recommendations to varying characteristics of information as needed by
senior management different activities and management levels. Typically,
The premise for conducting a BSP study is that there lower levels need considerable detail, volume, and
exists witb.in the organization a need for significantly frequency, higher levels need summaries, "exception"
improved ]computer-based information systems (liS) reporting, and inquiries, and still higher levels need
and a need for an overall strategy to attain them. BSP is cross-functional summaries, special requests, "what if'
concerned with how these information systems should analyses, "external" requirements, etc. It would be
be structured, integrated, and implemented over the impractical to construct a single system to accommo-
long term. The basic concepts of BSP can be· related to date all activities or management levels, and it would
the long-term objectives for liS in an organization. be erroneous to associate anyone type of information
requirement solely with one management level.
An lIS Must Support the Goals and Objectives of the Clearly, there is need to establish some reasonable
Business framework upon which the liS can be defined.
This most basic concept underlies the "top down" First, the emphasis in liS should be in support of
philosophy of the methodology as well as several of the management decision making. This is in contrast to
specific steps, such as executive interviews·and system more traditional bookkeeping or recordkeeping
priorities. functions. Business decisions are made for various
Since information systems can be an integral part of purposes, but most can be associated with either
a business and be critical to its overall effectiveness, planning or control. Planning, of course, is the estab-
and because they will continue to represent major lishment of various missions, objectives, and policies,
investments of time and money, it is essential that they and it occurs at all levels. Good information is vital to
support the organization's true business needs and the establishment of good plans. Control decisions, on
directly influence its objectives. BSP, then, can be the other hand, are made in order to guide an activity
thought of as a vehicle or process to translate business toward some implicit or defined (by the plan) objec-
strategy into liS strategy (see Figure I). tive. The liS can provide the measurements of the
current or actual condition to the decision maker . We
thus complete a planning, measurement and control
Business BSP I/S Strategy cycle with liS potentially an integral part. Since
Strategy planning and control are the keys to decision making, a
Mission I/S Objectives framework for liS based upon these activities can be
Goals and I/S Strategic ... I/S Policies utilized. It has been proposed, * and well accepted
objectives Planning Process ... Information
Strategies Architecture today, that three distinct but concurrent planning and
control levels exist in any organization:
Strategic planning, the process of deciding on
objectives of the organization, on the resources used
to attain these objectives, and on the policies that
Figure 1. Translation of business strategy to liS strategy are to govern the acquisition, use, and disposition of
resources
Obviously, it is important that an organization be
willing and able to express its long-term goals and
objectives. For some organizations, this can be done Planning and Control Systems: A Frame-
*Anthony, R.N.
principally through the business plan. For others, work for Analysis, Harvard Business School, Division of
where a business plan is not available or current, it can Research, 1965.

4
Management control, the process by which managers An liS Should Provide Consistency of Information
assure that resources are obtained and used effi- Throughout the Organization
ciently in the accomplishment of the organization's The keyword in this objective is consistency. The
objectives implication is that information derived from more
Operational control, the process of assuring that traditional data processing applications is not necessar-
specific tasks are carried out effectively and ily consistent, particularly when applied to new
efficiently business problems (decision areas) of broader scope.
Further characteristics of these areas are outlined in The problems in data consistency normally arise as a
Figure 2. An advantage of this framework is that it result of a historical evolution of computer usage that
does not restrict planning and control activity to any traditionally occurs. Isolated and independent applica-
particular industry, function, or management level. A tion areas are selected and mechanized, typically to
conclusion at this point is that an ljS could convenient- reduce operational costs. The'data files are defined as
ly address itself to anyone of the above three planning necessary to support the specific needs of each applica-
and control levels. tion without regard to one another or to future applica-
Resource management is also key to this philosophy tions. The data itself is converted from manual files
and represents a major vehicle for US definition. The located and maintained by the using organization.
specific resources to be managed vary in nature and As computer applications are added, new data files
relative importance from one organization to the next. are usually required since the data requirements for
Examples of traditional resources to be managed are different applications are rarely the same. These are
people, facilities, materials and money. Their require- usually created from spinoffs of existing mechanized
ments are based upon the needs to support the prime files plus any additional data that may be required
mission area of the organization, e.g., its products or from the using area. Summary-type reports for higher
services. Because an organization's product or service management levels are the result of sorting and merg-
area has all the attributes of a resource, i.e., a life cycle ing various existing data files together to create new
of activities and decision points, and yet drives the ones. Rarely is any existing data file of the form or
other resources, it is referred to as the "key resource." content required to provide newly requested informa-
Each resource, including the key resource, is managed tion of any magnitude. Thus new data files are born.
through planning and control decisions of the three Data redundancies and file update requirements
levels previously discussed. Resource management has multiply. The continual cry from management that "I
the desired characteristic of cutting across organiza- know the data that I need is somewhere in data proc-
tional boundaries - vertically across management essing, but I can't get at it" may be basically true from
levels and horizontally across functional lines. Thus a their point of view. The data may be there, but not
framework based on resources as well as planning and necessarily defined as needed, of adequate summary
control levels can be established, and an US architec- level or sequence, or of proper time period or currency.
ture can be applied within this framework.

Planning and Control Level


Decision Strategic Management Operational
Characteristic Planning Control Control

Management General management General management Functional management


. involvement Functional management Functional management Operational management
Operational management

Time Long range Vear-to-year Day-to-day


horizon (1-10+ years) Monthly Weekly

Degree of Unstructu red and More structured, Highly structured,


structure irregular; each problem cyclic, largely· repetitious
different repeating

Data Summaries, estimates, dif- Summaries, definable, need Detail, operational, defin-
requirements ficult to pre-define, much for unanticipated forms, able, internally generated
external to business largely internal

Resource Establishment of policies Allocation of the resource Efficient use of the


management pertaining to the resource resource

Figure 2. Characteristics of planning and control levels

5
Data, then, exists in most organizations in varying and should be managed accordingly. It should be
form, definition, and time. The form may be uncaptured potentially available to and shared by the total business
raw data, mechanized data files, detailed DP reports, unit on a consistent basis. It should not be controlled
summarized DP reports, business documents, or by a limited organizational segment but by a central
knowledge in someone's head. The definition of any coordinator, much like other corporate resources, such
given data can have as many variations, and thus as cash and personnel. The management function
inconsistencies, as there are users of that data. For would include formulating policies and procedures for
example, "salary" to the payroll department may mean consistent definition, sourcing, technical implementa-
an employee's actual monthly pay, to the project tion, use, and security of the data.
manager an annual figure plus burden to be charged to
a customer, to the department manager a budget line An lIS Should Be Able to Live Through Organization-
item representing total expense for all reporting al and Management Change
employees. In addition, a time inconsistency is very Many data processing systems and applications are set
likely to exist between what may otherwise be compa- up to provide the information needs of a specific
rable data. Data may be captured by such varying department or other organizational entity. Others are
methods as the mail, telephone, data terminals, or built solely on the specific output report requirements
satellites. It may be "batched" over varying lengths of of a particular manager. Both types can become
time by the user or by OP before processing, or it may immediately obsolete upon a reoganization or manage-
be entered "online" as each transactiorl occurs, directly ment change. A new manager may have his own ideas
from its source. Data may be processed daily, weekly, as to what information is needed to run the depart-
or monthly on a predetermined schedule, or it may be ment. While this kind of change is inevitable, it can be
incapable of being processed until a series of prior expensive from a data processing standpoint. The data
computer runs are completed (e.g., the month-end processing system, however, should in no way inhibit
closing). The output itself may be mailed or it could be management flexibility in a dynamic enterprise. Thus,
immediately available as the result of an online the liS must anticipate and be capable of living through
inquiry. Finally, the report may be up to the second, as the long-term organizational and management changes
when reading from a terminal, or it may have lain in a of a business with minimum impact if the expected
desk for three weeks after last month's processing. The return on investments is to be realized.
combinations of time deviations between data capture, This objective cannot be realized without the proper
data processing activity, and actual data usage are support vehicle for liS, and this vehicle must be
many. independent of the various components of the organi-
With all these potential data inconsistencies, it is no zational structure. The BSP vehicle is the business
wonder that reports frequently don't "match" between process, that is, a basic activity and decision area
using departments and managers. This becomes a irrespective of any reporting hierarchy or specific
problem most often during interdepartmental decision- management responsibility. A logical set of these
making or at higher reporting levels where consolida- processes can be defined for any type of business and
tion of multifunction activities is important. Attempts will undergo minimum change as long as the product
to provide better data consistency usually result in or service area of the business remains basically the
"resystematizing" or "consolidating" existing applica- same.
tions into larger ones with broader problem scope and One example of a business process is purchasing. A
data definitions. This may yield a satisfactory system particular business might define this as "the process by
within the defined scope, but again, as still broader which raw materials are acquired from vendors." There
problems are addressed, there will undoubtedly be data mayor may not be a separate organizational unit to·'
inconsistencies between the larger systems. Resystem- accomplish this process, or indeed there may be
atizing at this scope may be extremely expensive and several. Inherent within this process are the various
difficult to justify, let alone accomplish. Comments activities and decisions necessary to accomplish the
prevail such as "our systems cannot talk to one process.
another." Defining the organization's business processes is one
What has been described is the classical "bottom of the most important parts of the BSP methodology,
up" evolution of data processing systems. In. order to and the method for doing so is tied directly to the
begin to address the data consistency problem, a previously discussed l/S framework, that is, one based
different philosophy must be adopted relative to data on resoOrces and planning and control levels. With
management. This is commonly referred to as this in mind it is convenient to define an organization's
managing data as a resource. This concept suggests that business processes in association with each of its
data is of considerable overall value to an organization defined resources. Emphasis in· BSP is normally placed

6
upon those processes necessary to manage the key
resource. Each resource of a business can be thought of Business
objectives
as having a "life cycle" made up of several stages. A
product life cycle, for example, has four stages: re-
quirements, ,acquisition, stewardship, and retirement.
The time spread of the life cycle can vary greatly with Business Business
the particular product area but is of no consequence in processes objectives
this approach. Business processes can be identified to
describe the major activities performed and decisions
made by the business in the course of managing the
t
resource throughout its life cycle. These can normally Business Business
organization processes
be organized into a process hierarchy, and this is done
without regard to organizational involvement or
responsibility. ~ .. T
The above approach results in process definitions Data
Information
processing
that encompass the three planning and control levels applications systems
previously discussed - namely, strategic planning,
management control, and operational control. Using a
product resource as the example again, the decision to
t
pursue a particular product area would be "strategic Data Data
files bases
planning," the planning and control decisions relative
to product volumes or advertising expenditures would
be "management control," and the decisions in areas of t
engineering control, manufacturing efficiency, etc., Data
would be "operational control." By using this approach classes
for all the resources it is possible to define all the
business processes that take place within any organiza- ~--- Planning ----I~~II--- Design and ----t~~1
tional segment. This may be tempered by practicality implementation
in the actual BSP as there may be little I/S support. Figure 3" Top-down analysis with bottom-up it:nplementation
interest for some of the resources.

The liS Strategy Should Be Implemented By Subsys-


tem Within a Total Information Architecture The BSP methodology, although consisting of
There are several implications and concepts associated considerably more steps and detail than shown in
with this statement. The first is that a totall/s to Figure 4, is consistent with this philosophy. St~p I of
support the entire business unit's needs is too big to Figure 4, defining the business objectives, is intended
build in any single project. However, because of the to ensure agreement among all executive levels as to
many problems associated with a "bottom up" evolu- where the business is going, so that the liS strategy can
tion ofsystems (data inconsistencies, non-integrated be in direct support. Step 2, defining the business
system designs, expensive resystematizing, priority processes, establishes the prime long-term basis for I/S
difficulties, etc.), it is very important that long-range support in the business. Step 3, defining the data
goals and objectives for I/S be established. The basic classes, can be done on the basis of the processes to be
concept, then, is top-down liS planning with bottom-up supported. A data class, as the name implies, is a
implementation (Figure 3). major category of data needed to support one or more
With this concept the long-range I/S goals and business processes. For example, customer informa-
objectives are identified through a top-down planning tion is a data class needed in several process areas, such
process (the BSP approach). The identified systems as order entry, billing, and distribution. This step
are then implemented in a modular building-block results in a definition of all the data to be managed a&-3"-
fashion\ over time while remaining consistent with the resource across the business unit. Step 4, defining the
organization's business priorities, available funds, and information architecture, becomes a statement of the
other shorter-term considerations. This philosophy can long-term liS objective. This is normally in the form of
be likened to the detail design and construction of a a group of interrelated liS areas and the associated data
large office building, which would be unthinkable to be managed. From the information architecture the
without an architect's approved drawing of the finished individual modules can be identified, prioritized, and
product. built as scheduled by the liS plan ..

7
Step 1 Step 2 systems can draw on these data bases as well as new
Define the Define the ones that they will create and maintain.
business
objectives
.
...... business
processes
I--- Most of the identified I/S areas will normally be in
support of processes that are operational in nature. .
That is, the decision areas inherent in the processes WIll
Step 3 Step 4 relate to the "operational control" level of planning
Define the and control. Thus these I/S's are sometimes referred to
~
Define the --..
... information as operational control systems. The ma~aged data is
data classes architecture also at an operational level and is typified by much
detail and quantity. A management control system, on
Figure 4. General I/S planning approach the other hand (Figure 5), is in support of a
"management control" category of processes. Its
A significant piece of the BSP methodology is the
managed data would typically b~ summariz~tions of
formulation of a recommended information architec-
the internally generated operational data (dotted lines
ture. The intent is to develop an implementation
strategy that can be built in modules and yet provide
in the figure) plusany other data (competitive data, for
example) as necessary to'support the processes. By
justifiable return to the business at each step. These
having "business plan" data in the data base, the .
modules or implementable pieces are generally referred executive could effect control decisions by companng
to as information systems (I/S). Each could be thought
actual versus plan tor his area of responsibility.
of as the depository or management point'for a particu- In summary, there are a number of basic concepts
lar set of the data classes. As the data classes are
and philosophies relative to information systems upon
implemented (assumed through d~ta base technology),
which the BSP methodology is based. The methodology
it is possible to provide the information needs for itself should be considered flexible in nature. That is,
various business processes. Each I/S then normally certain steps and techniques could be altered in order
becomes associated with one or more business process- to adapt to specific situations without detriment to the
es and one or more data classes (see Figure 5). The
final outcome. However, these basic concepts them-
implementation strategy should obviously be in tune
selves should be considered inviolate. They, in effect,
with the business needs. An identified I/S is responsi-
are BSP.
ble for the collection and maintenance of its data bases
for the entire business. Other, or later implemented,

8
Product Planning

Distribution Manufacturing

,, Management Control
/
/

/
Marketing
/

Administration

Figure 5. Information architecture example

9
Chapter 2. Overview of the BSP Study Approach

The keys to success in planning, developing, and undertaken and implemented over time. In addition to
implementing an information architecture that effec- information systems projects, there is also a continuing
tively supports the business goals are: set of projects covering information architecture and
• Top-down planning with bottom-up implementation information systems management (ISM). Identification
• Managing data as a corporate resource of overall business requirements is not reiterative
• Orientation around business processes unless a major change occurs within the business unit
• Use of a proven, comprehensive methodology that would change the basic business processes.
Chapter I examined the first three at some length. BSP is a methodology for identifying the business
This chapter gives an overview of a proven methodolo- requirements. If an entire business were not included
gy for the BSP study which will be delineated in more in the BSP study, but only a component such as one
detail in the following chapters. profit center, additional BSP studies would be appropri-
ate for other business components.
Perspective In the past, and in many businesses today, projects
Since BSP is part of an overall cycle for providing the are defined to address a functional area of the business
business with required information, it should be put without regard to the total requirements of the business
into perspective. As Figure 6 shows, there is a major unit. BSP can provide overall direction for the total
juncture between identification of overall business business before projects are undertaken and therefore
requirements and the six project phases for implement- avoid the fractionalization of data and inconsistencies
ing an IjS. Requirements are identified for a total of systems.
business unit and then separated into projects that are

Information Architecture Projects

Project 1 (highest priority)

I I I I I
II III IV V VI

Project 2

II III IIV V VI

Project 3
Overall Business
II III IV V VI
Requirements
(SSP)
Project 4

III IV V VI

Project n
II III I IV V VI

Information Systems Management Projects

--------------------------------------------time--------------~ljl~------------------------~~
Project Phases (Optional)
I. Requirements definition "I. I nternal design V. System test
II. External design IV. Program development VI. Installation and maintenance

Figure 6. Relationship of BSP to liS projects

10
The top-down, bottom-up aspects of the BSP study ~aining the I.
are reflected in the following: ~mmitment-.J

Business
objectives
Business
objectives I
r
Preparing
for the
I
LstUdY ~

Business Business
Conducting
processes processes
the kickoff
meeting

Organi-
Defining
zation business
processes

Data
processing Information
support systems

Data Data Analyzing


files classes businessl
system
re1ationships

Data

Determining
the executive
perspective'
The study progresses from the very broad world in
which the business exists down to the data required to
run the business. The data is categorized into data Assessing business
classes that lead to the definition of information problems and
benefits
systems to support the business processes and business
objectives. The study starts with a collection of facts
about the business that are usually available in docu-
mented form throughout the organization. These facts
are organized, abstracted, and analyzed by the study
team and enhanced by the top executive, who explains
the business and adds those points usually not docu-
mented. The study progresses to an identification of
the major activities and decision processes in the
business and then each of the executives is asked to
validate and enlarge upon the facts that have been
gathered and analyzed. The analysis ends with the
consolidation and comparison of the facts from all
Developing recom-
sources. From this understanding the study follows the mendations and
normal path of findings and conclusions, recommenda- action plan
tions, action plan, and executive presentation for
concurrence and support.

Major Activities
As Figure 7 indicates, there are two major activities
that precede a BSP study and eleven in the study itself. Figure 7. Flow of the BSP study

11
While these activities may be carried out in varying charted, and ready for the kickoff period. This activity
degrees, none can be I omitted. Figure 7 shows these should end with a review by the BSP study sponsor.
activities and their most logical arrangement. When
one becomes fairly familiar with the BSP approach, Conducting the Kickoff Meeting
however, he can, as appropriate, do part of a given The BSP study itself and the full-time participation of
activity and delay the balance. The remainder of this the team members starts with the kickoff meeting,
chapter is a brief commentary on these major activities. which consists of three presentations. First, the
executive sponsor reiterates the objectives, expected
Gaining Commitment outputs, and perspective of the study with relation to
A BSP study should not be started unless a top execu- other company activities and objectives.
tive sponsor and some other executives are committed The next presentation is concerned with the main
to being involved in it. The study must reflect their purpose of the kickoff, which is to provide that each
view of the business, and the success of the study team member is conversant with the information that
depends upon their providing the business understand- has been gathered and to discuss those facts that are
ing and information requirements to the team. Most of not part of the information supplied. To accomplish
the input will come ,directly or indirectly from these this the team leader "walks through" the business facts
executives. that have been gathered and makes subjective com-
Since approval of study recommendations commits ments and additions on facts that cannot be readily
th~ company for several years to a certain direction in documented - politics and sensitive issues, and changes
the use of its data processing resources, it is important planned and in process~ He should also cover the
at the outset to get agreement on the scope and objec- decision process, how the organization functions, key
tives of the study and on its expected deliverables, so as people, major problems, the user's view of DP support,
to minimize future misunderstandings. and the image of the DP department.
The most important action following commitment The third presentation is made by the information
regards selection of the team leader, an executive who systems director or one of his managers, who gives the
will work full time in the study and direct team activi- team a view of data processing analogous to what was
ties. He sees that contact with other executives is on presented for the business. He should also cover
the proper level and that input from them is interpreted project status and project control, history of major data
correctly. A letter from the sponsor to a,ll participating processing projects started in the last two years, major
executives sets the tone and signifies commitment. current activities, planned changes, and major
problems.
Preparing for the Study These three presentations, added to the facts that
Considerable saving of time, avoidance of frustation, have been gathered and made readily available to the
and higher quality of output can be gained by proper team, should give the team an overall understanding of
study preparation. All executive participants and the the business and the present and planned data process-
team need to know what will be done, why, and what is ing support.
expected of them. Proper education and orientation
will provide the best input from the executives and the Defining Business Processes
best use of it by the team. No other activity during the study can be quite as
Interviewees are selected as soon as possible so as to overwhelming or as important as the identifying of the
allow for their orientation, scheduling of interviews, business processes. Since these processes form the
and the providing of information to the study team. basis for executive interviews, the information architec-
F or maximum efficiency on the part of the team in ture, problem analysis, data class identification, and
working together full time during the study, informa- various follow-on activities, everyone on the team must
tion on the company and on data processing support is acquire an understa~ding of all the processes, and they
gathered before the study kickoff. can do so by assisting full time in their identification
A control room is established so that the team may and in the. writing of their descriptions. The major
work together, display relevant material on the walls, output from this step will be a list of all the processes, a
and conduct interviews. description of each, and the identification of those that
The major output should be a study control book are key to the success of the business.
containing: a study work plan; a schedule of interviews
and a schedule of checkpoint reviews with the sponsor; Defining Data Classes
an outline of the final report from the BSP study; and The defining of data classes is the grouping of data into
business and information systems data, analyzed and logically related categories. This classification, and its

12
mbsequent modification during the follow-on projects, show clearly that better information will help to solve
helps the business develop data bases over time with a the problems.
minimum of redundancy and in a manner that allows One of the last activities in assessing the business
systems to be added without a major revision to the problems is to divide them into those which are
data bases. Since data must be recognized as a corpo- information systems support problems and those which
rate resource, it deserves the attention recommended are non liS problems. The non liS problems will be
here. delineated and given to the executive sponsor to follow
When the data classes have been identified, they are up on while the information systems support problems
related to the business processes in orqer to define the continue to be addressed in the 8SP study and by the
information architecture, and they are related to follow-on activities.
present files to assist in the development of a migration
plan. Defining Information Architecture-
This activity represents a major movement from an
Analyzing Business/Systems Relationships examination of the present to a synthesis of the future.
The main purpose of this activity is to show how data It is here that we sketch future information systems and
processing currently supports the business in order to their accompanying data.
develop recommendations for future action. The Systems may be viewed as the automated portions of
currently existing organizations, business processes, processes. Data bases are the computerized part of the
information systems (applications), and data files are total inventory of data in the business. Information
analyzed to identify voids and redundafiCies, help architecture brings order and structure to the systems
clarify responsibilities, and further the understanding and the data they create and use. Once it is structured,
of the business processes. it allows for step-by-step development to migrate from
The main analysis tool is the matrix, and various the applications of today to the information systems of
matrices are developed using combinations of the four the future.
elements. The key matrix for the executive interviews Because this task involves drawing a blueprint for
is the organization/process matrix, and its intercepts the future, it deserves the attention of the whole team.
denote the decision makers, major and millor organiza-
tional responsibility for a process, and current data Determining Architectural Priorities
processing support. Since a total information architecture cannot be
This activity will not only prepare the team for developed and implemented at one time, the team must
discussion with executives but will also help them establish priorities for the development of the systems
determine requirements for information support. and data bases. By deciding which of the data bases
should be designed and implemented first, the team
Determining the Executive Perspective establishes which subsystems will be defined during the
This activity is an integral part of the top-down follow-on project. This allows an early·implementation
approach. Its purpose is to validate the work done by for a "pay-as-you-go" foundation and helps establish
the team, determine the objectives, problems, and credibility for the balance of the output from the BSP
information needs (}.nd their value, and gain executive study.
rapport and involvement. The executive interviews Prioritization is accomplished by developing a list of
provide the business understanding necessary for projects from the subsystems of the information
information systems planning. architecture, then establishing a set of criteria and
The major output consists of notes from the inter- rating the prospective projects against them. The
views, an update of the control room charts, and a new analysis of the business problems is a major contributor
or improv~d rapport between the executive and the 8SP to this process.
study team.
Reviewing Information Systems Management
Assessing Business Problems (ISM)
Some of the business problems were supplied as input The purpose of ISM is to eventually establish a con-
,during the fact-gathering step. These were expanded trolled environment in which the information architec-
upon and complemented by the knowledge of the team ture can be developed, implemented, and operated
and finally validated, explained, and added to in the efficiently and effectively. The information systems
executive interview. The problems must now be functions are examined during the BSP study to identify
analyzed and related to the business processes so as to ( I) any changes that could be made immediately to
give guidance to the setting of project priorities and to enhance success in the follow-on projects, (2) changes

13
that are necessary to properly manage and implement and sized before start dates can be put on the follow-on
the high-priority information architecture projects, and projects, so that management can give the direction
(3) major activities that will become projects in the necessary to move immediately into those preparatory
follow-on to the BSP study. Fulfillment of this step is activities.
vital to the successful support of the business by the
data processing function. Reporting Results
The major inputs are the information systems The purpose of the final report and executive presenta-
support problems from the executive interviews, the tion is to obtain executive management commitment
ISM problems as identified by the liS director, and the and involvement for implementing recommendations
technologies and skill requirements of the first system from the BSP study. The format of the report was
or systems. Additions and/or changes to the present agreed upon before the study was started, but may
information systems functions that are required for have to be modified slightly now, on the basis of the
planning, developing, and implementing are then study results. Various parts of the report should be
identified and put in priority sequence. This forms the written during the BSP study and finalized at this time.
basis for the development of an action plan for ISM The report should be prepared as follows:
which feeds into the action plan and report from the I. It should include an executive summary.
BSP study. 2. The supporting detail, such as descriptions of the
business processes, should be contained in
Developing Recommendations and Action Plan appendices.
The purpose of the action plan is to assist management 3. It should be possible to extract highly confidential or
in its decisions regarding the recommended follow-on sensitive material easily and still have the balance of
projects. The follow-on projects will come from the the report usable by all people participating in the
architectural priorities and from the information follow-on activities.
systems management recommendations. Each of the The report provides the basis for the executive
projects will have been defined as a result of the presentation and the distribution of the final results to
activities in those two areas. The action plan brings those people designated by the sponsor. After the
these together to identify specific resources, schedules, executive presentation, which is normally given by the
and interactions of the projects. team leader, all other relevant material that is not a
Another major part of the action plan should be the part of the report should be indexed and filed for ready
identification of the steps preparatory to starting each availability in follow-on projects.
of the follow-on activities. These must be examined

14
Chapter 3. Gaining the Commitment

The success of a Business Systems Planning study • Invite the executive to an executive information
depends heavily upon the commitment of the business session conducted at an IBM Customer Executive
to complete all the relevant activities and heed the Education center
recommendations of the study team. The steps de- The IBM representative can help set up any of these
scribed in this chapter should be completed and an activities.
assessment made of the commitment of all participants,
before the final decision is made to move into the Establishing the Study Scope
resource dependent activities. Certain situations and Normally the executive sponsoring the study (called
environments will be considered unsuitable for a BSP the executive sponsor) will select the scope of the
study at this stage. If such is the case, the team should organization to be studied. This business unit must be
be prepared to postpone BSP until the situation be- defined so that all participants can recognize the
comes more suitable. boundaries within which their activities will be
In some organizations there may be a problem in concentrated.
obtaining access to executive management to explain In general, the selected segment sliould extend to the
the objectives and expected results of a BSP study. If upper levels of the organization, include more than one
so, the following actions should be considered: major function, and be of significant importance to the
• Arrange an executive visit to another business that organization in that it contributes a major portion of
has successfully completed a BSP study the revenues, profits and/or services.
• Invite a senior IBM executive to discuss information Businesses whose activities are participated in by
systems planning with the appropriate executive in multiple functional units tend to gain more from a BSP
your organization study than those that are more simply structured.
• Conduct an executive briefing session specifically Most companies performing a BSP study choose a
for yo~r executives major operating division, a group of divisions, or the
• Conduct an executive planning session - a service entire organization (see Figure 8, options 1-3 respec-
offered by IBM tively). In each case it should be possible to define

I- Chief
executive
officer
-- -----,
I
I I
I r---I------
General
management
I ------ _ _ _ _ ---1I
I Product/
service
group
11I
I
r _I I I
I Product/ I
I
service
division II
II I
I I I I I
Functional
management
{II Product/
service
function
I
I Option·' Major operating division
_ _ _ _ _ _ _ _ _ _ JI
II
IL Option ~r~ ~n_s_
I OPti~Entire organization __ __ _-.J
Figure 8. BSP organizational business unit options

15
boundaries for the study scope, including the measure- Current participants should present this report to an
ments for assessing effectiveness. executiv~ of the organization and gain agreement on all
issues. Assuming that the report recommends proceed-
Setting Study Objectives ing with BSP, the meeting should result in a commit-
Study objectives should now be defined. Good objec- ment to:
tives will'be capable of being stated clearly and con- • Appoint a study team leader
cisely. They will have criteria that can be applied to • Resource the study team as appropriate
measure the degree to which they have been met. In • Have open communication of future plans and
addition, they will be applicabl~ to the specific require- current data among all team members
ments of the organization to be studied. Finally, they • W rite a study announcement letter to executives of
will be capable of being satisfied by the BSP study team the organization of the form shown in Appendix A.
working within the defined study scope.
Specifically, a study team's objectives may be to: Resoufcing the Study Team
• Provide a formal, objective method for management
to establish information systems priorities without Characteristics
regard for provincial interests Since the study team is responsible for determining the
• Provide for the development of information systems information needs of the entire business and recom-
that have a long life, protecting the systems mending the nature of its data processing operations
investment for years to come, the selection of team members is
• Provide that the data processing resources are very important.
managed for the most efficient and effective support The people chosen should:
of the business goals • Have several years' experience within the organiza-
• Increase executive confidence that high-return tion, a sound knowledge of their own area, and an
information systems will be produced appreciation of the rest of the business
• Improve relationship between the information • Be able to understand and deal analytically with
systems department and the users by providing problems
systems responsive to the users' requirements and • Be willing to commit to conclusions and recommen-
priorities dations that will have a far-reaching effect on the
• Identify data as a corporate resource that should be organization
planned, managed, and controlled, in order to be • Be perceived by other management within the
used effectively by everyone organization as competent and responsible business-
men whose opinions will carry considerable weight
Developing Business Reasons fOf the In short, the best people for the study team are those
Study who are already in high demand and difficult to make
There are several factors that may make a given ayailable.
business more difficult to do a BSP study for than
others: Organization and Responsibilities
• Major reorganization or transformation of control A possible organization structure for the study team is
taking place depicted by Figure 9. While minor variations are
• Geographical diversity, necessitating significant possible, the following fundamental responsibilities
travel time need to be assigned:
• Well over 20 executives who must be interviewed • Executive Sponsor
• Multiple independent sub-organizations with - Visibly endorse and support the study effort.
autonomous decision making processes and with - Review progress and findings during the study.
unique lines of products/services serving diverse - Receive the final report and make the approval
markets decision.
These factors should be reflected in a brief report • TeamLeader
(two or three pages) containing: - See that the study is successfully completed.
• Statement of the study scope - Provide overall direction, make key business
• Study objectives judgments, and act as liaison with other execu-
• Positive contributions of a BSP study tives of the organization.
• Obstacles to successful completion - Direct the study effort on a day-to-day basis and
• Recommendation either to proceed with BSP or organize a~l necessary administration for the
postpone it team.

16
• Team Members Manpower Requirements
- Participate in at least some, if not all, interviews. If the intent and methodology of BSP are reasonably
- Analyze the data collected and executive perspec- followed, and the study team is full time, the resources
tives expressed during the study. required should fall within the following limits:
- Draw conclusions and perform report writing • Number of team members 4-7
tasks. • Number of weeks 6-8
• Team Secretary These wide variations can be explained by signifi-
- Do typing, filing and general secretarial services. cant variations in organizational types and sizes, as
well as study objectives.

Selection of Team Leader


The success of the study depends largely on the person
selected by the executive sponsor to lead the team. The
team leader will be knowledgeable in business matters
and have a broad perspective of the business. With
first-hand knowledge of how the various departments
of the business interact, and where detailed informa-
tion about the operation of the business can be ob-
tained, the leader can save the team valuable time.
Activities of the team leader include:
• Conducting the study team orientation session
• Conducting a kickoff meeting for team members at
the outset of the formal activities of the BSP study
• Setting and confirming executive session schedules
• Managing the logistics of the study, including
Sample study· team organization day-to-dayadministration
Figure 9. Sample study team organization • Providing guidance and business perspective
• Providing resource material
• Maintaining the schedule
Considerations for Full- Time or Part- Time
• Presenting the study report to management at the
Study
completion of the study
To compound the problem of team selection, a BSP
.study is intensive in nature, and is best performed on a
full-time basis. While part-time studies may appear to
Sponsor's Letter
The team leader is now in a position to compose a
be easier to resource and may be successful, they are
study announcement letter to be signed by the chief
often characterized by deadline and continuity prob-
executive officer and distributed to the executives who
lems. Before embarking on a part-time study, assur-
control the major functions within the scope of the
ance should be gained that:
study. The letters should cover:
• The team will be very well managed. That is, the
time, effort and skills required to tightly control the • Objectives of the program
work schedule must be available and committed. • Potential value to the organization
• Need for functional executives to be involved
• Momentum will not be lost as a result of inactivity
• Need for candor and cooperation of executives
during the study.
A sample announcement letter is included in
• Astute use will be made of the administrative
Appendix A.
support available to effectively utilize the time when
the team is not in session to prepare and type drafts,
update charts, etc. One full-time member may be
helpful.

17
Chapter 4. Preparing for the Study

Using the criteria established in Chapter 3, potential Gathering Data


team members are identified. Final selection is nor- To provide a basis of information the team should
mally performed by the team leader and the executive establish a reference library of both business and
sponsor. The information systems representative on information systems documentation. Data of value
the study team will provide continuity for the activities will be of two types:
that will follow the BSP study. Each team member
must be thoroughly briefed on the magnitude and General Business
importance of the study and on the executive sponsor • Environment
commitment to BSP. External- economic, customers, technology,
A preparation plan will be prepared by the team competition, government, suppliers
leader with assistance from IBM personnel. The major Internal - corporate policies, practices, constraints
tasks are: • Industry position and industry trends
• Briefing the study team • Planning process and calendar
• Gathering data on the business and information • Business plan - goals, objectives, strategy, resources,
systems schedules, financial
• Educating team members • Organization charts - position, names, numbers of
• Developing the study work plan people, and expected changes
• Defining the study report and ancillary output • Key decision makers
• Creating an executive interview list and schedule • Major business measurements and control
• Briefing participating executives • Major studies, task forces, committees during the
• Obtaining a suitable control room previous three years
• Arranging for administrative support • Major problem areas
• . Reviewing with executive sponsor • Products and markets
These tasks, many of which can be performed • Geographic distribution
concurrently, are described in the remainder of this • Financial statistics .!:"

chapter. I. Sizing statistics (vendors, employees, orders, cus-


tomers, shipments, purchase orders, etc.)
Briefing the Study Team • Project initiation and funding process
The team leader, assisted by experienced IBM people,
should hold a half- to full-day orientation session to Information Systems
brief the study team on such topics as: • liS plan - goals, objectives, strategies, resources,
• Overview of BSP. This can include development of schedules, finances
the BSP concept, study methods used, output that • Policies and practices
may be expected, and references to results obtained • Organization charts
in other BSP studies. • Planning process
• Review of activities to date. The team leader • Major studies, task forces, committees during
presents the scope of the study, states its objectives, previous three years
and leads a discussion of the business reasons for • Geographical distribution (equipment, t~rminals,
conducting the BSP studies at this time. communication facilities)
• Study preparation plan and schedule. Generally the • Software environment
team leader will have prepared a draft plan and • Project initiation and funding process
schedule. After this has been presented, the team, • Systems justification requirements
operating as a working committee, should critically • Standards/guidelines
review the plan. • History of major projects started in the last two
The leader should also discuss with team members years
the allocation of the preparation activities. As a work • Present and planned systems and data bases
group, the team shpuld divide the activities among • Major information systems problems
themselves. In gen~ral, distribution of the workload • Sizing statistics (number of programs, jobs per
among the various team members depends on how period, users, files, data elements, and turnover)
much time they can devote and how closely the tasks
relate to their respective functions.

18
Educating the Team Gantt chart similar to that shown in Figure 11. This
To enable a smooth, coordinated entry to the BSP plan is developed under the control of the team leader,
study, the team members should understand the and agreed upon by the team members.
principles of the BSP methodology. Some understand-
ing of the method of implementation, plus a review of
the nature of the output that can be expected, will also ~aining the I
be of advantage to the team members. ~mmitment---l
The team leader, working with IBM personnel,
should establish an education plan for the team.
Formal IBM education is c:fvailable and the local IBM
r
, - - Preparing I
for the
office can supply details. LstU?y -.J
It is recommended that all team members should
attend1he same education session.
Conducting
the kickoff
Developing the Study Work Plan meeting
Intensive study activity requires appropriate planning
and assignment of tasks. A work plan will document
Defining
all the known tasks and indicate major resource I
business
allocation required to complete the study. The team, processes
working under the guidance of the team leader, should
develop a study work plan in keeping with the scope
and objectives previously established.
There are some study control points that should be
scheduled in the work plan (e.g., see Figure 10). The
team should consider whether additional control points
Analyzing
should be established in each particular study. business/
When the activity and project control checkpoints system
relationships
have been establishe~,.they should be combined into a
single action plan. This plan can be represented on a o
Determining
Control the executive
Point Participants Activities perspective

Study team Review study to date,


documentation standards,
and team understanding of AsseSSing business
results. Confirm resource problems and
allocations for the next stage. potential benefits

Executive Results to date. Update the


sponsor study plan. Review the execu-
tive interview objectives.

Executive Report on both qualitative


sponsor and quantitative results of architecture
the executive interviews.
Present and validate the
assessment of business
problems and benefits.
Update the study plan.
/@) Study team Team agreement on all major
issues. Review all supporting
documentation to be completed.
Confirm resource allocation. DeveJopin'g recom-
Update the plan. mendations and
action plan
® Executive Review all major findings and
sponsor recommendations. Demonstrate
an understanding of the business
and its requirements. Gain
executive sponsor's agreement
that the team is qualified to
present the recommendations.

Figure 10. BSP study control points

19
Preparing for Docu-
Study Execution
the BSP Study* men-
(based on full time)
Task tation

2 weeks 1 week 1 week


Week 1 Week 2 Week 3 Week 4 Week 5 Week 6
before before after

Determine scope,
select team and
leader, and edu-
catf! ---- ~

Hold executive
orientation .
Prepare for study

Conduct kickoff
meeting I-
Define processes
-
Define data classes
-~
Analyze business
system relationships
--.
Conduct interviews* *
~--- to-

Assess business problems


and benefits
--- --.
Define information
architecture
- ,
Determine architectural
priorities
- ~

Review ISM

Develop recommendations
-- r--.
and action plan
-~
Report results
--- -- ~--- - ----
'Preparation time is variable and not full dme.
**Time varies from 6 to 12 days for 10 to 20 interviews
I Legend:

---
Control point;
Variable time; ___ Task;
_ _ _ Parallel activity

Figure 11. Work plan for the BSP study

20
Establishing a BSP Study Control File production planning, director of marketing operations.
The control file should be established to contain all The tentative executive list and schedule should be
material pertaining to the study. Because of the nature prepared by the team leader. Some other names may
and number of the documents involved, they should be be added to the list during the study as the team gains
stored in a lockable filing cabinet. Suggested contents knowledge of the company's processes. When creating
include: the schedule, the team leader should consider all
• Key correspondence factors that may inhibit the full participation of the
• Statements of objectives and scope executives - vacation, important business meetings, '
• Project plan public holidays, etc.
• Schedules The list of proposed executive participants should be
• Data gathered during preparation reviewed and approved by the executive sponsor.
• Documentation of completed analyses Additions or deletions should be made and the support
• Executive interview notes of the executive sponsor reemphasized.
• Executive interview summaries To enable the executives to prepare for the inter-
• Project control review meeting notes view, an invitation letter should be sent at least one
• Recommendations week before the interview. The letter should also
• Report and presentation confirm the time and place for the interview. Refer-
ence to the study announcement letter previously
signed by the chief executive officer should emphasize
DefiniJ!g the Structure of the Final the importance of executive participation in the study
Study Report and Ancillary Output· (see Appendix B). Either within the body of the
The outline (and table of contents) should be estab-
invitation letter or as an attachment, a list of topics for
lished as early as possible. Team members should be
discussion during the interview should be included.
assigned specific responsibility for sections of the
Both the executive and the team members should use
report. During the study period, it is the assigned
this topical outline to make the discussions more
member's duty to coordinate and deliver their section.
fruitful. Possible topics include:
A typical Study Report will contain the following
• Responsibilities
topics:
• Objectives and plans to achieve required results
• Executive summary
• Business problems and value of solving them
• Purpose, scope and objectives
• Opportunities for improvement
• Method of study • Major measurements and controls
• Business perspective
• Identification of the key business areas
• liS perspective
• Anticipated changes (products, organization, etc.)
• Findings and conclusions
• Evaluation of current l/S support
• Recommendations
• Requirements for future l/S support
• Action plan for follow-on projects
• Value of the required l/S support
• Appendices as required
Because of the nature of a BSP study, documentation
created during the study may prove valuable to func-
Briefing Interviewees
The selected executives should attend a briefing session
tions within the business. While the data and analyses
prior to the commencement of the executive perspec-
are current, the team should endeavor to publish these
tive segment of the BSP study. During this preparation
documents as ancillary output to the formal report.
phase, the executive briefing session should be pre-
pared, presenters selected and exhibits prepared, so
Creating Executive Interview List and that the session may be delivered at the appropriate
Schedufe time during the study activities.
A preliminary list of executives to be interviewed Major topics which should be included in the
should be prepared as early as possible. The executives briefing are:
selected will normally be within the top three levels of • Executive level overview of BSP
the company and be responsible for the major func- • Study scope
tions included within the study scope statement. • Objectives of the study
Executives with cross-company responsibilities should • Business reasons for conducting the study
also be considered. Since the need is for a perspective • Review of the expected output
rather than specific detailed information, the ideal • Executive involvement - why, and what is expected
candidate is the senior executive with discrete function- of the executive
al responsibility, e.g., director of finance, manager of • Schedule for executive interviews

21
Obtaining and Equipping Control Arranging for Administrative Support
Room Typing and general· administrative support will be
Effectiveness of the BSP study depends on having a required by the study team. This support should be
workroom assigned for its duration. This room is used estimated and organized before the major study
both as the work location for the team and for execu- activities are undertaken. Administrative activities will
tive discussion session away from the executive's office. be concentrated toward the latter part of the study and
This approach has proved very effective in,allowing will include executive discussion summaries, work
executives to review charts and diagrams on display plans, status reports, results of analyses, charts, final
and to concentrate on discussions without interruption. report, confirmation of interviews, and general secre-
The study room should be: tarial support.
• Located away from traffic and noise
• Large enough to accommodate the study team plus Reviewing with Executive Sponsor
one or two other people Completion of the study preparation is indicated by a
• Equipped with a large table, blackboard, flipchart successful review meeting with the executive sponsor.
stand, and lockable storage or filing cabinet Any issues that may have arisen during the preparation
• Able to accommodate the posting of charts on the should have been resolved by this time.
walls Items to be reviewed with executive sponsor are:
• Securable to protect sensitive information • General results of the preparation
• Equipped with a telephone only if the telephone can • Study work plan
be disconnected during executive interviews • Definition of the study output
• Approval process
• Executive selection and discussion schedule
• Letter of invitation to be sent to selected executives
Everything is now prepared for the start of the BSP
study. Experience has shown that if all the items
discussed in Chapters 3 and 4 have been completed, the
study results should be of high qu·ality.

22
Chapter 5. Conducting the Kickoff Meeting

Conducting the kickoff meeting is the first major the business - ca~h, people, facilities, materials, and
activity in the formal execution of a BSP study. This, products/ services.
and the next five major activities (see Chapters 6-10) Some of the material presented will be continually
are all aimed at understanding the business require- focused upon throughout the study. This selected
ments and data processing support as it exists today as information should be posted in the control room. The
well as business requirements for the future. Since this team leader may also elect to distribute hard-copy
understanding is vital to the success of the study, all handouts to each team member for their own personal
these activities must be carried out conscientiously. review and/or research. In any case, all presentation
material, including detail backup, should remain in the
Sponsor's Opening control room for continued reference. Much of it will
The kickoff meeting should be attended by all study be placed in the Study Control File.
team members. The executive sponsor opens the
meeting, emphasizes the business reasons for initiating Information Systems Review
the study, and explains the significance of this high- The director of liS, or the team member representing
priority program to the company. The sponsor may liS, should present, in summary form, the material
also reiterate the objectives and scope of the study and gathered during study preparation. This will enable
expected output, and offer personal commitment and the study team to understand how liS is currently
support in the interest of seeing a successful completion supporting the business and planning to support it in
to the study. the future.
The major projects installed or being developed
Review of Study Work Plan should be discussed with the study team. The discus-
The study team leader reviews the work plan and the sion should include whether these projects have met or
Gantt chart or calendar developed during the study will meet their objectives.
preparation phase. The work plan is used as a point of Another area that should be discussed is how data
departure for discussing and finalizing: processing interfaces with its users, the responsibility it
• Major events, major outputs, and schedules has in the development and justification of applica-
• Individual assignments tions, and·who has responsibility for data within the
• Project control company.
This review can also serve as an opportunity to A Copy of the presentation should be made available
discuss administrative details, such as secretarial to the study team members, as it will help them later in
support, handling of phone messages, working hours, the study - especially during the interviewing and
office security, expense charge numbers, etc. when the team members are developing their conclu-
sions and recommendations.
Business Review The following is an outline for presentation of the
The team leader should be prepared to present, in liS function:
summary form, the business related information • Mission and objectives
gathered during the study preparation phase. This • History and background of data processing
information may be new to most team members and • Organizations
should serve to broaden the business perspective of the • Overview of major application systems installed and
team as a whole. planned
Presentation emphasis should be given to business • Relationship with users
goals, objectives and strategies; business problems; • Project approval process
organizations; geography; environment; and to infor- • Key problems and challenges
mation relative to understanding the major resources of

23
Chapter 6. Defining Business Processes
A four-stage life cycle of the product/service and of
each of the supporting resources is used to logically
For purposes of the BSP study, business processes are- identify and group the processes. The life cycle
defined as groups of logically related decisions and normally used is:
activities required to manage the resources of the • Stage 1 - Requirements, planning, measurement
business. They are studied and identified without and control
regard to the organization responsible for them. The • Stage 2 - Acquisition or implementation
reason for defining the processes is that doing so will • Stage 3 - Stewardship
provide or lead to: • Stage 4 - Retirement or disposition
• Information systems with a large degree of inde- The following paragraphs refer to these stages as
pendence from organization changes requirements, acquisition, stewardship, and retirement.
• A comprehensive understanding of how the business A description of each of the life cycle stages follows:
accomplishes its overall missions and objectives I. Requirements - activities that dete:t;mine how much
• A basis for separating the strategic planning and of the product or resource is required, the plan for
management control processes from operational getting it, and measurement and control against the
control pro~esses plan.
• A basis for defining required informatipn architec- 2. Acquisition - activities performed to develop a
ture, de!ermining its scope, defining it so as to make product or service or to get the resources that are
it modular, and setting priorities for its development going to be used in its development. In manufactur-
• A basis for defining key data requirements ing this would include procurement and fabrication;
Lists of processes, along with some sample descrip- in personnel, the hiring or transfer of people; in
tions from both the public andprivate sectors,may be education, the development of a curriculum and the
found in the appendices. enrollment of students.
3. Stewardship - activities to form, refine, modify or
Prerequisites to Defining Processes maintain the supporting resources and to store or
The following points ar~ particularly relevant to track the product/service. In the insurance industry
success: this could be policy maintenance, premium notices
• All members must be present and participate and dividend statements; in the distribution industry
throughout the exercise and there should be general it could include inventory control and warehousing.
agreement on the expected outputs before the 4. Retirement - those activities and decisions that
exercise begil}s. terminate the responsibility of an organization for a
• Note-takers should be designated right from the product or service or signal the end use of a re-
beginning so that decisions and definitions of source. This might include the selling of space on an
processes will not be forgotten or misunderstood airline, the discharge or retiring of an employee, the
later. scrapping or selling of a capital asset, or the removal
• Information gathered before the start of the BSP of a service by a government agency.
must describe and size the products and resources, The life cycle serves as a vehicle for structured,
and clearly state or provide a flow diagram of the logical, comprehensive identification of the processes
strategic planning and management control proce- by the team.
dures and schedules.
• The team must understand the concept of resources Basic Steps in Defining Processes
and their life cycle. An overview of process identification is provided by
Figure 12, which shows the three main sources for the
The Product and Resource Life Cycle identification of the business processes: planning and
The manager's job is to manage the resources within control; product/service; and supporting resources.
his realm of responsibilities to most efficiently and Taking the latter two through their life cycle provides a
effectively support the goals of the total business. By definition of their respective business processes.
identifying the decision processes that he goes through Because strategic planning and some of management
and the activities that he performs in managing the control are not.solely product or resource oriented,
resources, it is possible to gain a comprehensive they must be considered as a separate source to provide
understanding of all the business processes involved. that all processes of the business are identified.
The products/services may be defined as key resources
and occupy a major role in defining the business
processes.

24
Planning Productl Supporting After the product and each of the supporting
and Service Resources
Control Processes Processes
resources have been taken through their respective life
Processes
cycles and the processes identified and subsequently
Review strategic
Identify
grouped, it is no longer necessary to retain the
planning and Describe
productl supporting process/stage relationship for process defining, but it
management
service resources will be helpful later in identifying data classes. Since


control procedures
the life cycle is an artificial means for directing the
~ .~ team's thinking, very little time should be spent in
Identify deciding in which stage a given activity appears. The
planning Identify Identify recording of the activity is more important than its
and control processes processes position.
processes
The measurement and control processes identified
~ under the requirements stage will contain both man-
agement control and operational control activities. If
Flow the processes associated with strategic planning and
diagram
processes
management control are identified first, it will sharpen
the distinction between management control and
operational control and reduce some of the redundancy
l in the management control processes. The following
Write descriptions of steps correspond to the flow presented
description
of each in Figure 12.
process
Planning and Control Processes
~
..
r-
Group the
processes
~
....
Define the Processes of Strategic Planning and
Management Control
With the preparatory work that was done in collecting
the information on planning and possible samples of
~ the organization~s plans, it should not be difficult to
identify the processes involved. They will normally be
Chart process
groups and grouped into strategic planning and management
complete control. Strategic planning may be referred to as the
descriptions
long-range plan, the seven-year plan, or the develop-
~ ment plan. Management control may be referred to as
the operating plan, the management plan, the resource
Relate
processes plan, and sometimes the contract plan. In some
to companies the budget may serve as a major tool for
organization management planning and control. Examples of

+ planning and control processes are shown in the


following table. Further examples are contained in
Appendix D.
Identify
key
processes
Strategic Planning Management Control

:1 Economic forecasting
Organization planning
Market/product forecasting
Working capital planning
Confirm, add, Policy development Staff level planning
delete in Divestiture/acquisition Operational planning
interviews
Analysis
Assumptions management Budgeting
Goals development Measurement and review
Figure 12. Definition of business processes
Product line modeling

25
F or a detailed discussion of the theory of strategic process, logic, theory, or other diversions.
planning and management control the reader may wish The following example might result from perform-
to refer to Robert N. Anthony's book entitled ing this analysis with a manufacturer of electrical and
"Planning and Control Systems: A Framework for electronic components.
Analysis."
Requirements Acquisition Stewardship Retirement

Product/Service Processes Marketing Engineering design Inventory Selling


planning and development control

Identify the Product/Service of the Organization Marketing Product Receiving Order


F or purposes of this exercise it is assumed that there is research specifications servicing
one major product group or that the products are
Forecasting Engineering Quality control Shipping
managed through similar business processes. In the records
case of the public sector and some service organizations
it will help to go back to the goals to best specify the Pricing Production Packing and Fleet man-
. scheduling storing agement
product or service. For example, one might think that
the product of a health insurance organization would Material Production
be its policies, but an examination of its goals might requ i rements operations
show the products to be (I) service to the subscriber Capacity Purchasing
and (2) payment to the provider. In like manner, an planning
examination of the goals might keep one from assum-
ing that the curriculum is the major product of a
university.
Make a General Flowchart of the Product/Service
If there are two or more groups or families of
Processes
products and services, they are discussed under
A flowchart of the product/service processes (see
"Expansions and Variations" at the end of this chapter.
Figure 13) serves several purposes:
I. It helps in providing that all the processes have been
Identify the Processes in Each Stage of the Life Cycle
identified.
of the Product/Service
2. It helps in determining if the team really under-
The general approach in identifying the processes is to
stands the business processes associated with the
start with the requirements stage and work through the
product/service.
succeeding stages. Care should be exercised in getting
3. It serves as a model for the subsequent definition of
consistency in the level of the processes identified in the information architecture.
each of the stages. Although there is no prescribed
4. It helps in identifying the processes involved in
number of processes appearing in each of the stages,
managing the supporting resources.
most studies result in only 20-60 processes for the
There should be a box on the flowchart for each of
whole business. The team should tend to identify more
the processes. If other boxes seem to be required, the
processes than necessary, with the idea of grouping
definition of the processes should be reexamined. The
them later as necessary.
flowchart will result from the identification of the
With the total team working together it is sometimes
above processes and is not intended to show the
helpful to label each of four charts with the four stages
strategic planning and management control processes.
and to complete them simultaneously "as each process is
brought into discussion. This eliminates the develop- Write a Description of Each Process
ment of notes for the inclusion of certain items in other A member of the team should have been making notes
stages as they are worked upon. There is no secret on the decisions and activities associated with each of
formula for this identifying of business processes, so the processes as they were defined by the group.
one should not be surprised if the first attempt results Although this is a laborious task, it is absolutely
in many more processes than are needed and also a mandatory if the process descriptions are going to
great inconsistency in the levels. Do not let this deter reflect the knowledge of the team and the amount of
you; it will be corrected during the grouping of time that has been spent in defining them. The note-
processes. taking job can be rotated through the team and.not be
It is very important that every team member partici- a burden on anyone individual. The descriptions may
pate at all times, since business processes are the basis be either in list form or verbal.
for practically everything that follows in the BSP study. - Completing these descriptions before moving into
Getting started is far more important than any theoreti- the next step will help bring out the similarities and
cal discussions on the definition of a process group or a differences between these processes and those subse-
26
Marketing

Market Sales Order


research administration servicing

Materials
Management

Scheduling
Information Material
Production control requ i rements
Capacity tomer
planning

Engineering

Business
Management
plan

-------------------------------------------------------time----------------------------------------------------------------------~~

Figure 13. Example of the flow ofa product/service through a


business
quently identified. One of the advantages of rotating While the use of only these four resources should be
the note-taking among the different members is that adequate, the inclusion of some ancillary resources
the task of further defining the processes can now be might make it easier for the team to get a comprehen-
assigned to most of the team members so that it may be . sive list of processes. Selection can be made from the
accomplished before a description of the supporting following list:
resources is started. The final revision of these descrip- • Marketplace (general public, potential customers,
tions will probably be included in the appendix to the and customers)
final report upon completion of the BSP study. • Vendors
The following are examples of process descriptions • Documented knowledge (designs, specifications, text
(further descriptions may be found in Appendix E): material, procedures, patents)
Production planning - the activity of planning for and • Company image (in the stock market, to the general
coordinating materials, men and machines in order to public, customers, vendors, employees)
produce the finished products needed to meet forecast- A thorough examination of the activities and
ed requirements decisions associated with these resources should result
• Capacities and capabilities planning - the process of in the identification of the rest of the operational
balancing production need with ability control processes in which the business engages and
• Scheduling - the scheduling of labor and'material which were not brought out in the product/services
needs to meet production and shipping require- processes.
ments. Also, the scheduling and balancing of the The team should review the facts on resources that
product mix were gathered and prepared during the preparation for
• Material requirements - the calculation of raw the BSP study. Before starting to identify the processes,
material needs to meet a schedule, recognizing it is well to place a chart on the wall with a short
optimum inventory levels, economic order quanti- description or list of the components of the resource
ties, substitutions, etc. being considered.
• Costing - establishing of standard raw material costs
and product costs on the basis of these and other Identify the Processes in Each Stage of the Life Cycle
manufacturing and administrative cost factors of Each of the Supporting Resources
Purchasing - the activities of acquiring materials, The resources are taken one at a time through the four
machinery and supplies of specified quality on a timely stages in the same manner as the product/service. The
basis at the best price following chart is an example of the processes that
• Supplier evaluation and selection - the searching for, might be associated with the resources.
evaluation of, and selection of suppliers who meet
requirements for materials, packaging, machinery,
Life Cycle Stages
equipment and delivery at competitive prices
Resource R equ irements Acquisition Stewardship Retirement
(includes internal search)
• Order placement and follow-up - the actual placing Money Financial Capital Portfolio Accounts
planning acquisition management payable
of purchase orders with approved suppliers for Cost control Receivables Banking
quantities of raw materials as specified (may include General
accounting
raw material routing) by production planning,
equipment acquisitions approved by management, Personnel Manpower Recruiting Compensation Termination
planning Transfers and benefits Retirement
etc. (includes release of customer-purchased Salary Career
materials) administration development
• Receipts and inspection - the receiving or returning Material Requirements Purchasing Inventory Order
of purchased materials, machinery, and supplies, generation Receiving control control
Movements
verifying quantity and quality, and documenting the
activities Facilities Capital Equipment Machine Equipment
equipment purchase maintenance disposition
planning Buildings Furnitu~ and
Supporting Resource Processes management fixtures

Describe the Supporting Resources


A resource is best described as that which a business
consumes or uses in meeting its goals. There are four
basic resources that we deal with: "
• Materials • Facilities
• Money • Personnel

28
Consolidation and Analysis Chart the Process Groups and Complete Descriptions
Each process group and its processes should be listed
Group the Processes on a chart and displayed for the whole team to view.
The processes have been identified from the three The team should agree on the placement of each
sources: strategic planning and management control; process under the process group, as well as the name of
major product/service; and supporting resources. The each, and should have a good understanding of all of
grouping should take place along the following lines: them. The list should be divided among the team
• Reduce inconsistencies in level. In the above members and the writing of the descriptions should be
examples of the processes, the process of manufac- completed in line with the regrouping. It is a good idea
turing and the process of accounts payable appear at to have the descriptions typed so that each team may
the same level. This should be corrected. have them for quick reference during subsequent
• Combine the processes where commonalities occur. activities such as executive interviewing. It is also
As an example, purchasing may have been identi- advisable to save the charts for subsequent activities.
fied as a process in the acquisition stage, not only for
the product but also for materials and for facilities. Relate the Business Processes to the Organization
Assuming the processes are similar, these should be Once the business processes are agreed upon and
combined into one process. As the processes were described, they can be related to the organizational
grouped during the requirements stage, there may structure of the business to help the study team identify
have appeared processes entitled manpower loading, any additional people that should be interviewed and
develop workflow plan, and schedule supply materi- to further clarify their understanding of the business
als. These three might be grouped with the manage- processes. Some teams may wish to complete this
ment control process of operational planning. matrix before completing the process descriptions.
A workable maximum is 60 processes. There will Relating the organization to the processes also helps
normally be 4-12 process groups. Some will be associ- the team determine the information needed from the
ated with the resources from which they were derived. interviews, such as verification of executive involve-
ment in the processes.
To relate the business processes to the organization-
Marketing Facilities Management
al structure of the business, the team develops an
Planning Workflow layout
Research Maintenance organization/process matrix. Essentially, this is a
Forecasting Equipment performance graphic representation of one aspect of the manage-
Sales Operations Administration
ment system of the organization because it illustrates
Territory management General accounting who makes the decision in each of the processes.
Selling Cost planning The organization/process matrix is one of several
Administration Budget accounting
Order servicing matrices developed as part of the BSP methodology.
Matrices are used because they provide a convenient
Engineering Finance
method to analyze relationships. They also provide a
Design and development Financial planning
Product specification maintenance Capital acquisition concise way to cQnvey findings to management.
Information control Funds management To prepare the organization/process matrix, the
Production Human Resources study team uses the business processes already identi-
Scheduling Personnel planning fied. Using their knowledge and perspective of the
Capacity planning Recru iti ng/development business and the organization charts from the study
Material requirements Compensation
Operations preparation phase, the team members identify the
organizational entities involved in the processes.
Materials Management Management
Since the BSP study is intended to provide a broad
Purchasing Business planning
Receiving Organization analysis overview of the business, not every organizational
I nventory control Review and control
Shipping Risk management
entity is identified. Furthermore, common similar
organizations can sometimes be represented as one
organizational unit. For example, 100 sales offices may
Figure 14. Sample list of processes by process group
be listed as a single unit. Where feasible, plants and
laboratories should also be groupt:d into units. One-
The product/service may result in two or more groups,
and planning will account fo( one or two groups.
Figure 14 is an example of grouping. Other examples
are shown in Appendix C.

29
unit representation is also generally appropriate when Outputs and Their Uses
organizations of different scopes are doing the same The output to be expected from defining the business
job. For example, a financial planning organization processes consists of:
may have three departments, each focusing on separate 1. A list of process groups and their processes
divisions. The mission of all three is still financial 2. A typed description of each of the processes
planning, and they can be represented by one organiza- 3. A list of the processes key to the success of the
tional unit Figure 15 illustrates the organization/ business or designated as such on the charts of
process matrix. process groups and processes
Once the processes and organizational entities are 4. Product/services flowchart
arranged on the matrix, the study team completes the 5. Team understanding of how the whole business
matrix by indicating the degree to which each organi- operates and is managed and controlled
zational entity is involved in the processes. The As mentioned earlier, business processes serve as the
following symbols are used in Figure 15 to indicate the base for most of the activities that follow. The ultimate
degree of involvement: use ipf the business processes is to identify opportunities
~ Major responsibility and decision maker and requirements for the use of information systems to
~ Major involvement in the process support the business. That is also one of the basic goals
IZI Some involvement in the process of the BSP study.
When making this notation on the matrix, leave The team members should at all times keep in mind
room for the posting of systems numbers, as explained that they probably will not all be working on the
in Chapter 8. follow-on projects after the BSP study. The study
Such indicators do not describe the actual responsi- should be regarded as an independent operation and
bilities of each of the organizational units but serve the processes defined in such a way that any experi-
only as a guide to assigned responsibility for and enced person can read the output and understand the
involvement in a process. Some businesses have found work that was done in the study. The follow-on
this matrix to be valuable after the study as an index to projects will start with the output from the study and
a management system manual, in which they develop further define the processes, the problems associated
responsibility and activity statements for each of the with each of them, and the information requirements.
organization/process intersects.
The organization/process matrix helps the study Expansions and Variations in Approach
team validate the list of individuals to be interviewed Although following the above procedure should result
and determine the questions to be asked of the individ- in well-defined processes and supporting material,
uals responsible for the processes. To authenticate the other considerations and variations are worth mention-
matrix, each person interviewed by the team should be '. ing. The more salient of these are covered in the
asked to confirm or correct the portion of the matrix remainder of this chapter.
showing his responsibility or involvement.
The organization/process matrix sometimes will Diversity in Business, Product, or Service
show overlapping responsibility and decision-making If the various divisions or parts of the company or the
authority for a process or a lack of decision-making product/services are too diversified to have common
responsibility for a process where it normally would be processes, a grouping will be necessary before process
appropriate. Such potential problem areas are clarified identification is begun. When all the processes are
later during the executive interviews. identified, it is still highly advantageous to look for
processes that might have common information
Identify Processes Key to Business. Success requirements.
This step will later aid in selecting the area of the
business to be studied in more detail (architecture Outside Assistance
priority), sizing the importance of the problems Even though the team members were selected with the
identified, and identifying items to be stressed in the aim of having their combined knowledge cover the
executive interviews. The strategic planning and entire business unit, there may be voids in that cover-
management control processes will be some of the age. If so, the team should get outside help where
outstanding processes. One method of doing this necessary for a thorough understanding of the process-
identification is to rank the objectives in order of their es. Care should be taken, however, to limit the time of
importance and then determine which of the processes any outsider invited in and to keep that person\ at the
are most critical in reaching each objective. The level at which the team has been· working on other
process/organization matrix will also contribute to this processes.
selection.

30
Sales Materials Facilities Admini- Human
PROCESS Marketing Engineering Production Finance Management
Operations Management Management stration Resources

11/
u
C
III
C
~
C
...c '; ...c
...c 11/
E
:E
C II
cGI
- GI
u
c GI
E
.!!!
GI
E
GI
a.
0 '.,
0
III
]
c aI
c
E
g ...;:,
III

E 'Sc
aI aI
C aI
,5·
C
,g 1:GI aI
C
a.
0 aI
c
'">
ii
c
gc ...C
aI "i
~ 0 'cc ! 0
0
't
.~
c E 'cc "i
> 'cc cr: GI
III
c
C aI
c ~ (J '; C > ;:, ;:, 'iii GI C 0
E
0
c 'uIII GI
a.. 0 aI C
'; II GI
u
aI
c ~ -! 'u
'; '1:1 a. C
,g aI
III
a: a: Ii VI
c c
aI <3 !l 3c
C cr:8
c
'cC 8u III
a: IT
U
aI
!II a: C
"a.
0
a: ,2
ic
II
fc
c
]
s:. 'iIII ~ ,i Jj c en ,5
~
0
aI
c ~ aI
~ II GI cr: :!u cr: :E 1c ,5 i II
aI
C
'cc
u

I u
,~
aI

C
'E Ii
III
C
aI
b;:, III
E
-;
is:. 'u
ii
.
'i !
'iii
III
s:. ';
'iii
0
C
c
:; ~
'a,
a.
C
E
a. ;c III
a: ~
aI c !'a, '"
'a
.
51
,t:
;:,
I ~
8. c 'c .;I .JI-
e !~ ! ~ 'S c
K E 'w S.
'1:1 U
! III
! •
.:> ii ~ :E
'~ GI U '1:1
"0 a. 'iI
a: <3 .B 0 a: a:
;:, ;:,
ORGANIZATION III
a:: III
a: 0
u. ~ ;i :i 0 C a.. eX a III
:E 0
;:,
a..
III
a: w
IT III
CI <3 III u:: II
(J u. l.
GI

President [)( X lX / X [X lX X V V V V lX ~ ~ X ~ l;.( ~ X LX. r><


Vice President of Finance LX lX D< V / X C>< ./V [X LX: lX ~ ;«.. X [X LX X rx l5<: :><: rx
X rx ex X [X
Controller
Personnel Director
Vice President of Sales
rx IX /
X ¥ r¥ ~ ¥ r:. X C>< lX X C><
[7 V V V V V

lX
[X LX X X 1;-:;' ~ X

[X X
;« ... X
1/r7 C7 / 1/
Order Control Manager V 1/V / V
Electronic Sales Manager X [X[X X ex: r>< 7 / X
Electrical Sales Manager X C>< ex X rx [)( V V X
Vice President of Engineering
Vice President of Production
Plant Operations Director
Production Planning Director
Facilities Manager
X X 1/
/ /' [X
/ /
X
[X
c;.::: [)( X
7 1//
[)<:: ~ 7
IX
X
X X
ex:: rx 7 :><: rx: ex: ~ X X .:
....
~

~ ex. ~ [X X X X :;.:: X X
[>( X rx lX
[X X
C>< X
[X[XLX
..
.x ex ~ ex: ~ ;.
X
X ":.:' ~
~ ~X
~~
[X X

1/
V

rx
Materials Control Manager [X 1/V 1/V ~ IX IX IX IX ex: IX ex:
Purchasing Manager lX IX LX: ex: [7 V IX IX ~ ~ ~ IX C>< IX
Division Lawyer c:-:: rx [X [5( rx
Planning Director lX V V [7 L>< V ex r.:- -.: :. r." LX: ~ I'i( [5(
X Major responsibility and decision maker X Major involvement in the process , / Some involvement in the process

Figure 15. Organization/proces~ matrix


Alternate Methods in Identifying Business 3. Requirements includes processes associated with
~ocesses ' determining and defining the products or services of
Predefined checklists of processes maybe used for the the business. These processes normally involve the
business being studied. rhese may be found in the marketplace and other environmental factors ..
a,ppendix, otherBSP studies, trade publications,or IBM 4. Administration includes processes associated with the
jndustry publications such as the Consumer Based overall accountability of the business. These nor-
Information System (CBIS) or the Communications mally involve reporting activities within the organi-
Oriented Productipn Information Control System zation, such as those directly associated with admin-
(COPICS). If this method is used, care should beexer- istration as well as those associated with finance,
cised.so that the'Rro~esses are well understood by all human resources, and facilities management.
the team members and do indeed represent the activi- 5. Management includes processes that tie together the
ties and decisions of the business being studied. other four aspects of the business. This aspect
encompasses the planning, control, and measure-
Generic ~ocess Model ment activities of the business.
An alternate approach in identifying business processes
is to use a simple model of the business such as shown
Marketplace/Environment
in Figure 16.
The model may be expanded to fit the business. For
instance, "demand" may become "merchandising" and Require-
~-""I ments ~--
"selling," while "supply" might break into "product
development" and "manufacturing." The following
further explains the model:
I. Supply includes processes associated with producing
the product and obtaining the resources necessary to c
provide the products or services of the business. u
S
These processes normally relate to external interfac- T Manage-
es such as suppliers or vendors. o Demand
ment
Supply
M
2. Demand includes processes associated with making E
the product or service available and relates directly R
S
to external interfaces such as customers or clients.

~_~Adminis- ~_......
tration

Figure 16. Business process matrix

32
Chapter 7. Defining Data Classes

A data class is a category of logically related informa-


tion. Examples of a data class would be customer,
vendor, product, order, inventory, etc. Since the
purpose of information systems planning is to aid in
Planning
data /
/
Requirements
,,
managing the data resource, the data must be identi-
/
/ I....... Statistical> ,
fied. Defining the data classes is one approach to summary
identifying the data to be managed. It also provides I data

valuable assistance in reducing the possibility that data


bases developed for early systems projects will require
Acquisition I Disposition

I
major rework to support later systems projects. Once
the processes that support the business have been , I /
/
defined, the next step is to identify the data created,
controlled, and used by those processes. As an aid to
analysis, the data supporting the processes is grouped
data "
Transaction ,
,
Stewardship
/
/Transaction
data

into data classes.


Two approaches to identifying data class candidates Inventory data
are presented here, one based on relating data to
business entities, the other on relating it to business Figure 17. Information life-cycle
processes. It is suggested that the two approaches both
be used and that their results be cross-referenced to personnel, etc. Entities.usually include, but are not
arrive at a final list of 30 to 60 data classes. Data limited to, the resources around which the business
sharing is then illustrated by relating the data classes to processes were defined.
the processes that create and use them. Since a data class may contain data relevant to a
part of a business entity, an entire business entity, or a
Business Entity Approach group of related business entities, the first step in this
The first approach to identifying data classes is to approach is to identify and list the business entities. A
examine categories or types of data maintained by a minimum starting list can be made by referring to the
business. If the life cycle of resources, previously resources around which processes were defined. This
discussed, is represented as in Figure 17, the types of list can then be expanded with any other significant
data related to each stage of the life cycle can be entities of the business that have data related to them.
defined. Seven to fifteen entities are usually identified.
Planning data, which represents objectives or Next, to identify the data classes related to those
expectations, supports requirements activities. entities, a matrix is used, with the entities listed hori-
Inventory data, which maintains the resource status, zontally and the major types of data classes listed
supports stewardship activities. Transaction data effects vertically. Six types of data class will cover most
changes to the inventory data caused by acquisition or enterprises'requirements. In Figure 18 the six types
disposition activities. At periodic intervals, summary are Plans/Models, Statistical/Summary, Inventory,
data is extracted from the inventory data to provide and Transaction. Each entity is examined and the
feedback on how well requirements have been met. If appropriate data names filled in for each data class
each business entity is examined for each of these types type under the entity. Inventory data types are usually
of data, a set of data classes can be identified. easiest to identify first, as these are the "master file"
Entities are simply things an organization or enter- kinds of information. Transactions that affect the
prise is concerned about and therefore keeps informa- inventory data can next be identified, followed by the
tion about, such as customers, products, materials, summary and ,planning types of data.

33
BUSINESS
,
ENTITIES

DATA
CLASS
TYPES
Product Customer Facilities Material Vendor
'( Cash Personnel

Plansl
Models
Product
plans
Sales
territory

Market
plans
Facility
plans

Capacity
plans
Material
requirements

Production
schedule
) Budget Personnel
plans

Statistica II

(
Product Sales Work in Open Vendor
Summary demand history process requirements performance

Equipment
utilization

Inventory Product Customer Facilities Raw Material Vendor

. Finished Machine Cost


goods load

Parts
master
Routings Bills of
material
1/

~
Transaction Order Shipment Purchase Material
order receipt

Figure 18. Data class/business entity matrix

34
Business Process Approach Marketing

~
The second approach to identifying data classes uses Customer
Sales
Product . Planning
the previously dermed business processes - specifically, • analysis
Sales territory
what data is created and/or used by each process. This
approach involves constructing a series of input-
process-output diagrams, one for each of the 20 to 60 Facilities
Management
processes identified in the business process definition

~
(see Figure 19). Facilities
Workflow ~ Workflow
Product
layout analysis
Routings
Cross-Referencing and Regrouping
By cross-analyzing Figures 18.and 19 and regrouping
on the basis of commonalities or inconsistencies in Finance

~
level, it is possible to compile a manageable list of 30 to Financial
~ Profitability
60 data classes. Customer Analysis
analysis
Product

Engineering
Product Product Routings
Engineering changes specification
Bills of
Parts master maintenance
material

Materials
Management
Raw material
inventory ..
~
Purchasing
.. Purchase
... order
Vendor
~
Order

Sales
Operations

Product
Custome r
Jo.

::
~
Order
servicing
... Order
Custome r request ...

Production
Product
Open requirements Scheduling Production
Bills of material schedule
Facilities

Human
Resources

Employee
...... Personnel
Planning
.. Government
... reports

Figure 19. Input-process-output examples

35
Data Class to Process Analysis
The data classes should then be placed on a matrix
opposite the business processes, and the letters C and U
should be entered to indicate which processes Create
the data and which Use it. Figure 20 shows this plot,
with the processes arranged in the life cycle sequence
of the key resource. As this matrix shows how data is
shared by the processes, it will be used later to develop
the information architecture.

~
DATA CLASS S
c ~
Sc II
c4D
i6 =
.5
~
III
§a- E
'j
. a- ii
·c =
.5
.,. S !
.; 1
a-
4D
a- t; a E IE ! "80
4D

f
·c i6 m
i.,. 'uc ·sC
t:L
.1 ia- 4D

PROCESS
E
i
a-
4D
0
"a
c
:I

.
"a
c
.;: '0 II
E
.
~
m
"!. .. . .5
~ ~
. c
C

..
:cU
ii (Ji l.
'E 0
:I
0 a- C E
4D
c C a-
'u 4D
~ ~
:I ii t:L
(J 0 A. II: II: it W en ii: is: I&. 0 :E
Business planning U U C
Organization analysis
U
Review and control
U U
Financial planning
U U C U
Capital acquisition
C
Research
U V
Forecasting U U U
V
Design and development
U C \J ~
Product specification maintenance lJ U C C
Purchasing C U
Receiving \.) U
Inventory control Co C. U
Workflow layout \) C
\J
Scheduling \J V C u U
Capacity planning U U Co
\J \.J
Material requirements
U lJ U C
Operations C U U \J
Territory management C U U
Selling U U U C
Sales Administration \) l)
Order servicing U 'C V
Shipping U U U
General accounting U U U U
Cost planning U U C.
Budget accounting U U U U U
Personnel planning Co U
Recruiting/development U
Compensation U U

Figure 20. Data class by process,· showing data creation and usage

36
Chapter 8. Analyzing Business/Systems Relationships

Up to now, the team has been developing a new during the executive interviews. Used in combination,
perspective of the business - learning to look at the these matrices are very helpful in providing the team
business in terms of business processes and the data with a broad overview of current systems and data
classes necessary to perform them. Now the team must usage.
develop a firm understanding of how data processing
currently supports the business, in order to develop Understanding I/S Support of
recommendations for future action. This section Processes
describes the use of data gathered and presented as In order to obtain a business-wide picture of existing
part of the liS review as well as the organization, and planned data ,processing support, the study team
process, and data class information to develop perspec- may opt to annotate the organization/process matrix
tives on: with current systems support (Figure 21). The nota-
• liS support of processes. The organization/process 1
tions on this matl;-ix identify which organizations
matrix developed in Chapter 6 is annotated to involved in the p~ocesses are receiving application
indicate which current systems support the business support. This enables the study team,to identify:
processes. • Processes receiving no current systems support
• Usage of current data. A system/data file matrix is • Processes receiving systems support in some organi-
developed to identify the data files currently in use zational units, but not all
or planned for use by existing systems. • Possible redundant systems
(A system here is an application or grouping of To create the notations, the team assigns a number
several applications.) to each of the current systems, then posts this number
Each of these matrices is described in more detail in to the appropriate intersections on the organization/
the following pages. Although the matrices provide an process matrix. This may be facilitated by first creat-
overview of the current and planned data processing ing a system/organization matrix (Figure 22) or a
support of the business, they cannot indicate the extent system/process matrix (Figure 23).
of support needed or the value of this support to each
of the processes. Such information is obtained later

37
\
\
Sales Operations Production
PROCESS
~

'"c
o
:;:;
e
&
ORGANIZATION
\
o
\

President
\
.~

VP of Finance
\
\

Controller
\
~
Personnel
Director
\
{

VP of Sales
\
(

Order Control
Manager
\
Co
Electronic
Sales Manager
\
~

Electrical
Sales Manager
\
{

VP of Engineering
\
, \
VPof
Production )
~
Plant Operations
Director
\
{

Production Plan-
ning Director
\
~
Facilities
Manager
\
~
Materials Control
Manager
1
\
Purchasing
Manager
\
l
Division
Lawyer
\
f
Planning
Director

x x
\
\

Major responsibility
and decision maker
Major involvement
in the process
/ Some involvement
in the process

Figure 21. Organization/process matrix, with current systems


support shown

38
ORGANI- = .. c
...0
. =.. If..
"5 0
ZATION ,
III
u
c III iC
"
u
:I
0
b
~ fc
III
c I QI
m III
III
"m '8 f Q
u:: -; C
= III

-... e...
III C C
en c A: is ::E
....0 ...0
III
....W0
C
i ..> ...0
Ic "0....c
III
III
::E
::E ::E ....0 c VI "2
...c ~
0
I I ...c ...c 0
C
III
III
C QI
-;
~
III
c it
. QI
Q QI en -; III "! III 0 ::E ~

. 1..
QI
""0
~
"!a.. e Qj
""0
"j
c U
en ""0
"j
""0
"!a.. III
C
0
::E CJ
=
c
III
..I Q
=
..e ~.. e-
0 "2
..
VI
c
III
""0
c
c G: ..
CJ
A: 0
"
u
~
I
~
"j c
0 C
"2
"i ::E...
0 :I ~
"j QI III
QI QI "iii
u C ~ u ""0 it it
QI QI C
III 2 "; c
0
SYSTEM A: :> CJ
QI
a.. :> 0 iii iii "S!!
>
"S!!
> it a.. u.
III :I
a.. Q
III
it
Customer Order Entry '/p ~ ~ ~ 'I, ~ ~ c;.-
Customer Order Control C C C C C G C, C C C
Invoicing C C
Engineering Control p
Finished Goods Inventory C C C C C C C C C
Bills of Material C C C C C
Parts Inventory C C C C C C C
Purchase Order Control % c~ ~ ~ ~ ~ %>
Routings C C C C
Shop Floor Control C C C C
Capacity Planning 1> p P P P P P
General Ledger 11 p
Expense C C
Product Costing ~ ~ ~ ~ 51:1» Cb ~ o/P ,/p % 5'P
Operating Statements C C C
Accounts Receivable C
Accounts Payable C C C P
Asset Accounting C C C C
Marketing Analysis C C C C C
Payroll C
C Current P Planned C/P Current and Planned

Figure 22. System/organization matrix

39
Sales Materials Facilities Admini. Human
Marketing "'Engineering Productio,", Finance Management
Operatlo'ns Management Management tration Resources
PROCESS :: r
'+l
c c
2 1c ::I
0
i 0
(J
8
4(

... j a ."a C
"i"E >C

...c c •0EDo
C
tl
~
c
';•
, ..
C C III
•E Do 0
ec C
•E
III
E CII

i
CII C
,S
"CII
0
'i
> J'¥ 0
CII
C
'2 f e... ';
0
>
~
't
...C
:s
'5 r
'S ~ •E 'S 'i
CII
CII
C C C
•E
1\1
C
C
0 C
'u Q• (J c ';
a-
C
0
1\1
..J
• :.c 0 CII
'C
::I C
'iii
'; •r ~ 0
C
1\1
'2 4( C
C
0
(J
c c: "0 'j
1\1 .~ 0 C
a:•
C .!!
CII
C ~ I! 'E "a Do 0
C
,~
1\1
c: 2 CII
U
~
Co)
C
8
4( 'S 8 Q.
f c: 'j0
1\1
i1\1 f
..
(I)
~
1\1
> C '~ C CII C 'i C
e "i
~ 1;; 1\1 Ql 4( C

·i
Ql 0
CII 1\1
:; ~ 'iii C cCII C :i ~
Ic
~ iL: 1\1 '~
C ~ (I) b E iII c: ; ·cC 1\1
'S c E 'u1\1 ';
E '; & I
I u..~ ic3
CII
:s 1\1 $ ~
'1
Co)
'2 'ji 'S
:E 'E ~ i ... Z! '; Q.

SYSTEM
C
III
c: a:
·E·;
ID
~ i ~
l!
0 Q
CII
'i e :s
Q.
~ .c:
~
Do
c3 ~
Ql

0
e::I ¥
Q. a:
Ql
>
.E
Do
:c
(I)
~
~
3:
C
';
~
';
a-
w
c
ID
CI
! -gm'.
u
lSI C
III
c
ii:
i::I
u..
~

¥
a:
E
0
u
'iii
::I
m
~
0
'j
a:
.:Jt
a:•
Customer Order Entry ~ c,.p c~ ~ ~ ~
Customer Order Control ,C C C C C
Invoicing , C C
Engineering Control p
Finished Goods Inventory C C C C C
Bills of Material C C C C C
Parts Inventory C C C
Purchase Order Control ~ ~ ~ ~
Routings C C C
Shop Floor Control C C C C
Capacity Planning P p
. General Ledger P p
Expense C C
Product Costing ~ ~ ~ ~
Operating Statements C C C C
Accounts Receivable C C
Accounts Payable o. r c C
Asset Accounting C C C'
Marketing Analysis C C C C
Payroll "C C C
C Current P Planned C/P Current and Planned

Figure 2J. System/process matrix


Identifying Usage of Current Data Summary
The team needs to understand what data is currently Some teams find it convenient to use various matrices
automated and where, that is, which systems utilize as communications/presentation tools. Different
which portions of the data. The next matrix developed combinations of two or more (those that share common
by the study team, the system/data file matrix (Figure axes) may be so used.
24), provides this understanding. The systems annotat- These charts and matrices provide an overview of
ed in Figure 21 form the vertical axis of this matrix, the current and presently planned data processing
while the data files, grouped by similarity, form the support of the business. Such information should be
horizontal. An X is placed in each appropriate box to obtained from the executive interviews regarding
show which data files support which systems. problems with current data processing support and
This matrix sheds more light on how much data is additional needs for information. These charts,
shared by various systems. This, in tum, helps point together with the executive interviews, help the study
out the need for a data base approach to provide team determine those areas where emphasis should be
consistency of data. The information gathered here applied in developing and enhancing appropriate
will also be useful later in developing implementation information systems.
priorities. Appendix F contains examples of matrices from
other industries.

~ ...~c
0

DATA FILE ...


0
CD
...c
1/1
C
CD
> .:> CD

~CD .: 1/1
Ii E
~

...u
...
IV
:!1
:;
1ii
~CD
...
"80
~
I
.
~
0
eE
U
2
I:L
!
·s0-
~
IV
0
..J
SYSTEM
CD
E & IV IV
"2 CD ii
'uc =
c .: I CD
a: CD
~
0 ::I
c '0 :!1 :!1 .c ~ I-
'cc ~
c
:.c
0
1ii CD
"E
~
cCD ~
.~

::I :! 16 t: ~
1/1
'c a. I IV
c
~

0 'uIV
C
CD
M
::I
> 2 0
a: iii IV IV
a: E ii IV C.
0 0 I:L 0 I:L ir: w en ir: i!i: 3: u.. 0 :!1
Customer Order Entry
X X [X [X X X X
Customer Order Control
X X t>< X X X X X X :x:
Invoicing
X X rx X rx
Engineering Control
X X X X X X C>< X
Finished Goods Inventory
X X [X [>(
[>( ~ [X
Bills of Material
:X X X X X lX ~
[X l2( r.x [X X
Parts Inventory lX [X X X [X 3<: ex
Purchase Order Control
ex rx rx: ~ rx: [)(
rx-
Routings
~ [X r>< [X LX: ~ CK l>S: C><
Shop Floor Control [X [>( X X [>( [X ex: ~
[X ~
D<
Capacity Planning lX lX X X [X X X D< C>< LX K
General Ledger [X ~ ~ [2( LX rx D< lX
Expense e><: ex:
Product Costing
lX [X [X [X ex [X D< t><
Operating Statements D< !X C>< lX
Accounts Receivable
lX LX [X C>< lX
Accounts Payable ex lX lX
Asset Accounting IX IX D<
Marketing Analysis
lX lX lX ex:: ex
Payroll
D<
Figure 24. System/data file matrix

41
Chapter·9. Determining the Executive Perspective

Interviewing and interview analysis consume more Sometimes it is difficult to assign final responsibility
time during the study than any other activity because for a process to one specific organizational entity.
the executive interviews are the primary source of Several organizations may reach a decision together.
information for determining the business problem and In some cases it is necessary to interview certain
management's need for support in overcoming their managers for political reasons; if they don't have an
problem and/or supporting new opportunities. opportunity to participate in the study, they may
The interviews are not intended to gather data on oppose any recommendations that result from it. It
the specific details and exact form of the information may also be advisable to interview a particular execu-
required by the interviewees. tive simply because other executives of the same level
Specifically, the purpose of the interviews is to: will be interviewed. This decision normally is made by
• Validate the data gathered, analyzed, and docu- the executive sponsor.
mented in matrices and charts
• . Determine the information needed by individual Reviewing the Interview Schedule
executives as well as their problems and priorities When the list of executives to be interviewed has been
• Gain executive rapport and involvement updated and confirmed, the study team confirms the
• Determine management values and quantify interview schedule. Interview preparation time should
benefits to be derived by modifying or adding always be allowed. Experience indicates that an
applications. effective interview requires two tofour hours, exclud-
The tasks that have to be accomplished in order to ing preparation. Therefore, only two interviews should
conduct the interviews are: be scheduled for a given day. Normally, 10 to 20
• Confirm the list of executives to be interviewed that interviews are conducted during the study, although
was developed during study preparation this number varies greatly with the size and require-
• Review the interview schedule to be certain it is ments of the business.
practical, and confirm it with the interviewees It is recommended that higher executives be inter-
• Organize wall charts in control room viewed last. For one thing, interviewers' techniques
• Review the questions that apply to all interviewees, and procedures improve with practice, and the team
and develop individualized questions for certain should be working at its best before interviewing top
executives, as appropriate managers. Second, any suspicions or doubts the team
• Determine the role of study team members for each may have about information obtained from the first
interview and the characteristics of individual executives interviewed can be resolved by formulating
interviewees specific questions for top management.
• Conduct the interview itself
• Prepare a summary of each interview to be ap- Preparing Questions for Interviews
proved by the interviewee Before the interviews are conducted, the study team
This chapter is devoted to a discussion of these prepares a list of general questions that apply to all
tasks. interviewees. The team also may prepare specific
questions for certain executives, as needed. The
Confirming the List of Executives To following general questions, while furnished only as a
Be Interviewed . guide, usually apply to all interviewees:
During BSP study preparation the team identified the 1. Briefly, what is your area of responsibility?
executives that should be interviewed. The team most 2. What are its basic objectives?
likely selected managers no more than two levels below 3. What are the three greatest problems you have
the president. Now, aided by the organization/process met in achieving these objectives within the last
matrix, the team can confirm its earlier list of inter- year?
viewees and identify any other executives that should 4. What has prevented your solving them?
be included. 5. .What is needed to solve them?
Two questions can be answered using this approach: 6. What value (in man-hours saved, dollars saved, or
• What organizations are involved in each of the programs enhanced) would better information
processes? have in these areas?
• Within those organizations, who must be inter- 7. In what other ar~as of your responsibility could
viewed to determine the problems, objectives, and the greatest improvements be realized, given the
requirements? needed information support?

42
'8. What would be the value of these improvements in • Question 15. The questions on anticipated changes
man-hours saved, dollars saved, or programs are important because major information systems
enhanced? development cycles can take from two to five years
9. How would you rate your, information support to complete. Recommendations for information
with respect to adequacy; validity, timeliness, systems development could be impacted by plans to
consistency, cost, and volume? centralize, decentralize, change the organization,
10. What is the most useful information you receive? introduce new products, etc.
11. How are you measured? • Question 16. The questions regarding expectations
12. How do you measure your subordinates? for the BSP study may help the study team ascertain
13. What other kinds of measurement are you expect- how likely management is to accept and implement
ed to make? the study recommendations.
14. What kinds of decisions are you expected to • Question 17. Additional thoughts and comments
make? make an appropriate way to terminate the interview.
15. What major changes are anticipated in your area
in the next year? Three years? Determining Team MemberTnterview
16. What do you expect to result from this study? Roles and Interviewee Characteristics
What does it mean to you and to the business? One of the tasks that must be performed when prepar-
17. Do you have any additional thoughts or com- ing for interviewing is to assign roles for team members
ments? to play during the interviews. The.re are several factors
The interviewer must understand the purpose of the to consider when making these assignments.
general questions in order to be sure that the needed The interview team is drawn solely from study team
information is elicited. If an interviewee's response members and may include IBM representatives. Re-
does not provide the information desired, it may mean gardless of the number of people on the study team,
that the question should be worded differently. Let's there are usually no more than four active team
examine the purposes of the general questions and members present at any particular interview.
kinds of responses needed: A given team member need not play the same role
• Questions 1-2. The interviewer asks the executives in each interview. Furthermore, some members ate-----
what their responsibilities are because conclusions usually assigned to more than one role in an interview.
drawn from the organization chart may not be The following roles should be filled:
correct. Also, the objectives that executives set for • An individual to present the study objectives and
themselves in performing their functions may have a approach to the interview~e. This person may have
large bearing on their information needs. another role in the interview as well.
• Questions 3-6. When asking about problems, the • An interviewer.
team should be sure that the executives do not • A backup interviewer to listen carefully to the
indicate only their last problems. Sometimes people proceedings to make sure that all questions are
overlook more serious problems that occurred asked' and that all answers are understood. The
months before. backup interviewer asks any additional questions
• Questions 7-9. The information satisfaction and necessary.
needs questions should focus on the additional costs • Someone to take notes during the interview and
that may be incurred from inaccurate and untimely have them organized, typed, and presented to the
information. The value of any additional informa- interviewee afterwards for approval.
tiondesired should also be determined. • A supplementary note-taker if the situation requires.
• Question 10. The team must determine where the Sometimes the interviewee is a member of a depart-
current information support is adequate so that ment in which a team member serves. Because of the
these benefits are retained. possible sensitivity of some of the information, it may
• Questions 11-13. The questions concerning meas- not be advisable for that team member to be an
urement are intended to disclose how the effective- interviewer during that session. Perhaps the individual
ness of resource allocation and use is measured. A should not even be present. Similarly, if there are any
major factor in business success is efficient use of personality clashes between an interviewee and a
resources. particular team member, that team member should
• Question 14. The question on what decisions are probably not be presented at the session.
made is intended to disclose whether executives In determining who will serve in what roles, consid-
receive adequate information on which to base eration should be given to individual abilities. Some
them. people are better speakers than others; some are fast

43
and accurate note-takers. The interviewer for any • Have the interviewee express a potential benefit as a
session should be chosen for knowledge of the area of percentage.
the business to be investigated and for ability to • Have the interviewee express a potential benefit in
achieve rapport with the interviewee. terms of a range - for ,example, a saving of $200,000
Before each interview session, the study team should to $400,000. .
meet to discuss various matters that are specific to that • If the interviewee\gives an exceptionally high value
interview. The responsibility of individual team that might not be acceptable to other managers,
members during the interview has already been suggest using 50 percent of that figure. ...., --' ...
covered. The study team should also review: • In a particular operational area, cite-a weii~known
• Background of the interviewee industry average.
• Responsibilities of the interviewee • Determine the company's present position in the
• Process in which the interviewee is involved industry and ask what it would be worth to be in a
• Data processing support provided to the stronger position.
interviewee's area of responsibility • Employ in-depth logical questioning. If the value of
• Specific questions to ask the interviewee, which may a particular benefit cannot be quantified by the
be based on prior interviews with other executives interviewee, try to break down the various costs of
not having the benefit.
Conducting Interviews • Determine the objectives against which the execu-
The best location for interviews is the study control tive is measured and what it would be worth to
room, where interruptions are least likely and where achieve those objectives.
the matrices and charts can be displayed on the walls • Determine what the company is currently spending,
for reference. If the control room is close to executive what the forecasts are, and how these spending
offices, it should be convenient for the interviewees. levels would be affected if a certain capability were
The following sequence of activities will normally available.
transpire after the interviewee arrives and has been The interviewer must be sensitive to the responses of
ibtroduced to the interview team: the executive in order to probe more deeply into any
• The interviewee should be walked through the wall subject area when appropriate. Team members should
charts by the interviewer and he should be asked to be attentive to the executive's tone of voice and facial
validate the data on the charts. There should be expressions, which are often a key to underlying
agreement between the interviewee and the study feelings.
team on the business process definitions and their
relation to the organizational entities, particularly Preparing Interview Summaries
within the interviewees area of the business. Make The study team should keep current with the documen-
changes to the wall charts if necessary. (See Appen- tation of the interviews. Immediately after the inter-
dix G.) view has been concluded, the two study team members
• The interviewee is seated so that he can see the wall who were taking notes during the interview should pull
charts during the interview. This should make the the notes together and have them summarized and
interviewee more comfortable and thus enhance typed.
support. Summaries should be formatted so that problem
• All the general questions and any specific questions statements and key points appear in separate para-
previously formulated are asked. Many questions graphs. Each problem statement and key point can
are likely to arise in the course of the interview and then be easily extracted for later analytical work. The
these are also asked. summaries are reviewed by the team leader, then
As indicated before, the interviewer often needs to presented to the interviewee for approval. The inter-
ask more questions than were prepared. It is impossi- viewees should approve and return them to the study
ble to predict all the possible responses that an execu- team within two days after the interview so that all
tive might offer. From statements made during the team members can keep informed. Copies should be
interview, new questions are bound to arise. Further- given to all the team members and one copy filed as the
more, questions often must be formulated or restated official study team document.
during the interview to elicit the exact information In addition, any changes resulting from the inter-
needed. This is particularly true when trying to secure view should be posted to the wall charts to keep them
value statements that can be quantified, especially as accurate as possible.
when discussing intangibles. As the interview summaries' are returned, the study
Following are some techniques that can be used to team members can begin to assess the business prob-
prompt an interviewee to express values quantifiably: lems and/or opportunities (see Chapter 10).

44
Chapter 10. Assessing Business Problems and
Benefits

The reduction and use of data obtained during the BSP ed by each end-effect may then be quantified as far as
interview process is extremely important. This chapter possible, and the relative contributions of root causes to
presenls a structured and proven procedure to organize that loss may be assessed.
interview data and provide a useful format for later use Figure 26 illustrates the worksheet to be used in this
in determining information architecture and priorities. step. The team, as a unit, then considers the individual
Figure 25 presents a logical flowchart of the data analyses and drafts a composite list of problems,
reduction procedure and is keyed to the te~t by step solutions and values. The team must take care to select
number. only stated problems and not implied problems. If the
team decides that an implied problem is of a magni-
tude and importance that it should be further clarified,
communication with the interviewee on a formal or
informal basis should be undertaken in order to
establish the specifics and/or magnitude of the
"implied problem." If the communication establishes
additional significant data not in the original notes, it l'

Problems,
Solutions must be added as an addendum to the validated
. Step 1
& Values original notes with reference to the follow-on commu-
nications. A copy of the addendum must be forwarded
to the interviewee for his validation.
Step 2 The entire composite list should now be typed with
1/5 I/S
Problems, Needs & values Non·I/S
double spacing between entries. Each entry must be
Solutions & values Where no system Problems To code-connected to the original interviewee. Assigning
For existing system Exists executive
sponsor a number or letter or combination of same to each
interviewee allows his identity code to be attached to
each entry, while maintaining confidentiality.
Step 3

Step 2: Classify Interview Data


U sing the interview notes and worksheets, the team
now examines each line entry and establishes whether
To information architecture it is in the category of:
and priorities 1. l/S problems/solutions and values (existing systems)
Figure 25. Data reduction steps 2. liS needs and values (no system exists)
3. Non-l/s problems
Step 1: Summarize Interview Data Sometimes a problem will have both an organiza-
The team selects out of each set of interview notes tional solution and an l/S solution .. Example: "There
(1) the problems, (2) solutions (if given), (3) value is a need for better marketing research information."
statements - tangible or intangible - if given, (4) the This may require that a research group be established
processes impacted, and (5) the processes causing the to gather information and an information system be
problems. developed to store and manipulate the information. At
Problems as stated by the businessman may be the end of step 2, the line entries extracted from the
"perceived problems" (that is, perceived from the interview process should be in the three categories
impact they make on a particular process) or they may named above.
be actual root-cause problems. "Perceived problems" It is critical at this point that the "non-lis problems"
are necessarily the starting point for problem assess- be logically grouped, stripped of all identity, and very
ment in BSP. A perceived problem is something a carefully handled. It is notthe,missi,dn of the BSP study
businessman sees as a problem. It may turn out to be a team to solve the non-l/S problems. However, the
real problem, an incomplete version of a real problem, information obtai~ed in the interview processes, which
or just a symptom of one. relates to these problems, is important .~nd should be
In order to assess problems objectively, therefore, properly presented to the appropriate Individual
perceived problems must first be traced back to root (usually the spdll:sor}for his consideration and a,ppro-
causes and forward to end-effects. The loss represent- priate action.
45
Interviewee: Mr. H.R.Zimmer, Vice President of Production

Team Member: Mel Aksarben Date: August 24, 1978

Major Problem Problem Solution Value Statement Information Process/G roup Process/G roup
System Needs Impacted Causing

Lack of effective Mechanized pro- Improve profit; Production Production Production


production planning duction planning improve customer planning
impairs profit- relations; improve
ability s~rvice of supply

Increasing account- Better information I ncrease value from Cost system Finance Finance
ability of board of outside directors
directors; demand
for financial and
manageme,nt
auditing

Lack of "what if" Mechanized online Improve profit; better Co~t system Finance Administration
capability on cost cost sheet capa- customer relations
sheets bility

Inability to look at Financial modeling Raise profit; curtail Planning simula- Finance/management Management
enough alternatives ("what if" capa- losses; improve growth tion
in business planning bility)

Lack of ability to Better information Retain good people; Skills inventory Human Resources Human Resources
identify and pro- on p~rsonnel re- improve morale system
mote qualified sources
people

Lack of expertise in More marketing Satisfy customers Marketing Human Resources


marketing impairs awareness and more
growth and profits people with market-
ing expertise

Loss of ability to Description of work Manage people prop- Order status Human Resources Sales Operations
effectively transfer to be done in each erly; improve quality
people; low produc- area of work; increase pro-
tivity. Long training ductivity
Poor customer re- Better sales analysis I mprove customer Order status Marketing Sales Operations
lations; loss of and productive relations
profit; excessive planning; better
inventory buyer reports

Poor customer re- Better sales analysis I mprove customer Production Marketing Production
lations; loss of and productive plan- relations planning
profit; excessive ning; better buyer
inventory reports

Poor customer Better sales analysis I mprove customer Sales analysis Marketing Marketing
relations; loss of and productive plan- relations
profit; excessive in- ning; better buyer
ventory reports

Smaller, more Order trend Control cost better Territory analysis Sales Operations Sales Operations
frequent orders; lead analysis/costs
times too critical;
higher cost of
handling orders

Figure 26. Interview analysis and data reduction worksheet

46
Step 3: Relate Data to Processes
All of those interview entries which were grouped as liS
problems/solutions or liS needs and values should now
be cut from the worksheet. Example:

K-2
Lack of effective Mechanized pro- Improve profit; Production Production Production
production planning duction planning improve customer planning
impairs profit- relations; improve
ability service of supply

N ext a ~ipchart page should be created for each validated interview notes or even the original hand-
business process group and its processes. These should written notes to firmly establish the topic area and
be arranged around the control room at a level handy background that triggered the interview comment
to "post" to. Team members then take each of the (entry). The need for mobility of the item entries
prepared interview entries and stick them onto the quickly becomes obvious during this fine-tuning step.
flipchart for the business process that causes the
problem. If possible, the entry should be placed within Summary
the process most appropriate. It is possible to group the interview data entries in
Don't worry about being too precise on the first several ways. They may be related to the causing
"posting." Additional teamwork is required to finalize processes or the impacted processes using matrices as
the procedures. illustrated in Figure 27 or in other summary formats as
When all entries have been "posted," the team appropriate. This data will provide valuable perspec-
concentrates on one business process at a time to tive as the team develops recommendations on infor-
ensure that all entries have been posted to the right mation architecture and systems priorities. "
process. It is normal to have to go back to the original

47
PROCESS GROUP
...c
CII
E
CII
~

.. ..
III C)
C
0
1\1
c
C
0 e
:s ...c
" 1\1 " 0
t!
C)
c E t!
C)
c CII
"E 0
"~
III III ~ f CII
E
"; C-
0
CII
CII
:s ~CII
CII
;g "c CII
Co)
c
c
1\1
CII
C)

~
1\1 C;
~
c
"S!
c
"CI
0
...
III "u1\1 "e"CI 1\1
C
E
:s
1\1
C
1\1
PROBLEM :E en w .t :E LL « u:: l: :E

Market/Customer Selectivity 2 2 2
Quality of Forecasting .3 4
Order Entry Log :3 /
Product Line Profitability I I
Market Share Deterioration :3 2
Product Development Support 4- I /
External Reporting Requirements I I
Control of Orders 4 :3 6 2
Facility Planning I J 2
I nventory Level Consistency 5 5
Purchasing Control b 2
Control of Production Costs 2 5
Labor and Machine Utilization 5 t

Plan':ferformance Measurements 5
Shop Manpower Utilization 2
Asset Performance /
Variance Analysis 2 I
Working Capital Management 2
Manpower,. Development I
Jqb Des~ri~tions 3
Total 9 9 8 32 7 2 II 7 4 9
Figure 27" Problem/proce~s matrix, showing the number of times
the problems were stated

48
Chapter 11.; Defining Information Architecture

Having acquired an understanding of the business Developing the Architecture Diagram


processes and the data required to support them, the Begin with the process/data class matrix where the
team should continue its analysis by determining how process axis is in life cycle sequence based upon the
the data will be managed to support the processes. The key resource, as in Figure 28. Next, arrange the data
data classes that have been identified can be logically axis by taking all data classes created b); the first
grouped into data bases. Information systems then process and grouping them to the left, or origin of the
become the vehicles used to insert data into and extract matrix. Group all data classes created by the second
it from data bases, and formulate useful management process next to those created by the first process and
information to support the business processes. continue this grouping until all data classes are cov-
ered. Figure 29 shows the result, with all "creates"
Business
process grouped diagonally from the matrix origin to the
opposite corner.
Information
system
Although the next step is somewhat a matter of
judgment, the object is to group the processes and data
~ into major systems areas. This can be accomplished by

~
looking at the process groups and the data created by
them, then boxing in these groupings as in Figure 30.
Where a process group creates no data, the box is
In order to identify the information systems and arbitrary. The boxes represent logical subsystem
su bsystems areas to be developed, an information groupings with responsibility for creating and main-
architecture is defined, using a diagram that shows the taining specific related classes of data.
relationship of data to systems and the processes
supported by each. The architecture diagram, then, is
the blueprint that outlines for each system area (1) the
data created, controlled and used, (2) the relationship
of system to system, and (3) the systems that support a
given process. The architecture diagram allows us to
take into consideration the data requirements of later
subsystems at the time of developing earlier subsystems
in order to maximize sharing of data.
First, the architecture is developed by evolving
through several iterations of a process/data class
matrix. pata flow is then added to the architecture,
followed by subsystem identification and analysis of
subsystems for prerequisites.

49
DATA CLASS .. .
~
0
cCD
S
>
tJ
cCD
> c

.
ii
.t: . .5
.! .:
CD
> .
>
I
8.a. E
.;f
"a

CD
E . . .. .a. c
aIII
E
CD
i aIII "a0
III
CD
CD
~
.~ 1i
a 'uc
as
c .: I .
i
III
.2
CD

PROCESS i CD
0
"a
c
.
U
::::J
"a '0
i
E
.
tJ
E
~
0
as
c a.E
III '2 .
~ ~
'uIII
c
c
:cu
• -e ::::J CD III C CD
0 c a.
~
::::J CD 0 «I ii III III
CJ 0 .> Q. a: ~ (J
III
Q. a: ii: w en iL ;: II. 0 :E
Business planning U U C
Organization analysis l>
. Review and control
U U
Financial planning U U C U
Capital acquisition C
Research U \J
Forecasting U U V \J
Design and development U C u C.
Product specification maintenance lJ U C (!
"

Purchasing C U
Receiving \J U
Inventory control Ie c. U
Workflow layout lJ lJ C
Scheduling \J V C u U
Capacity planning \) U U LJ C
Material requirements U lJ U C
Operations C U u U
Territory management C U \J
Selling U U U ~
Sales Administration U U
Order servicing U C V
Shipping U U U
General accounting U U U U
Cost plar;tning U U C
Budget accounting U U U U U
Personnel planning C. U
Recru iting/development U
Compensation U U

Figure 28. Data class by process, showing data creation and usage

50
DATA CLASS
~
0. ..
cQ) ~
0 II
cQ)
> cQ)
.. .= Iu
.. CD
~
!IV ~ .=
. ~
>
.
0
"a
IV
E
.;! ..
~
0

PROCESS
en
c
·cc
]
u
c
IV
u
~
"a
i
E
~IV
E
'0 0
1
CD
IV
E
~
0
en
II
~
·uIV
a.
.:
.:tit
0
.!2
Q)
c
:cu
~
c
t!L
c
.;;
~
~
E
0
~
..
aE
Q)

II
.
Q) ..8
I
~
-a
IV .: 0
a: Q) IV .5 IV
CD
a. 0 ~ ii
"a
E
A: u. A. iii > IX: u. u. 3: :E 0 IX: CJ U) 0 (,J w
Business planning C U U
Organization analysis U
Review and control U U
Financial planning C U U U
Capital acquisition C
Research V \)
Forecasting U U U U
Design and development C C U U
Product specification maintenance U C C U
Purchasing C U
Receiving U U
Inventory control C C U
Workflow layout U C U
Scheduling U U U C V
Capacity planning U U C u \J
Material requirements U U u C
Operations U lJ U C
Territory management U C. U
Selling U \) UC
Sales administration U U
Order servicing U U C
Shipping U U U
General accounting U U U U
Cost planning U U C
Budget accounting U U U U U
Personnel planning U Q
Recruiting/development U
Compensation LJ U

Figure 29. Data classes arranged by creating process

51
DATA CLASS ..
~
0
c
CD g
>
II
c
>
.: c.
e CD

.... ..
CD
~CD .:> Co)
E >

..
~CD
"C
0
.;f! 0
t ..
CD ftI
Q. .2
en :3 ftI III
"C 0' !II ai ·E CD

....0E 0 ..
.:
..
Xl CD
c
..8
CD
·cC c
Co)
::I E ftI
E
0
0
en ~
c
:ECo)
~
.-
.c E
0
: >
0
PROCESS .¥ c
ftI
ftI
.:
"C
0
III
t:ftI "
c ~
.~
·uftI 0 ftI
CD
a. ?a III
III
CD
ii
CD
"C
Q.
E
~
::I
Ci: u.. ct 0.. iii
ftI
Cl: u.. u.. ~ ::iE 0 Cl: (J (I) 0 (J w
Business planning C l> U
Organization analysis \)
Review and control U U
Financial planning C U u U
Capital acquisition C
Research U U
Forecasti ng U U U U
Design and development C C U U
Product specification maintenance U C C U
Purchasing C U
Receiving U U
l'1ventory control C C U
Workflow layout
U C U
Scheduling U U \) C. LJ
Capacity planning U \) C. u U
Material requ i rements U U U C
Operations U U U C
Territory management U C U
Selling V U C. U
Sales administration U U
Order servicing U U C
Shipping \J \) U
General accounting U U U U
Cost planning U \J C
Budget accounting U U U \J U
Personnel planning U (\
Recruiting/development \)
Compensation U
-
\)

Figure 30. Process/data class groupings

52
Data Flow flow from the second to the third system. The second
'Where the U falls outside a system box, a means to system uses "Customer" data created by the fourth
represent data flow from one system area to another is system, so an arrow indkates this data flow. Figure 32
desirable. This flow is represented by arrows in Figure shows all data flow from'system to system represented
31. The third system down uses "Product" data by one-way arrows. This figure will be used later for
created by the second system. The arrow shows data su bsystem identification.

>-
DATA CLASS ...0c >-
Q)
> Sc. J!l
cQ)
.: ~
.. ~ ]
Q)
>
.:
Q)
u -a
E
~
>-
C)
c iii
'y
...u
...en ...
Q)

III
Q)

III
E ~III
en
-a
0
en
Q)
0
Co
.:
III
2
Q)
':;
CT ~
.. .~
Q)
Q)
Q)

'cc c :s E ....0 0 E 0
~
c ~ c
.;; E ~ >-
PROCESS III
.:
-a en
~
-a
c ~
C)
'y
~

0
:cu cQ) :s ...
0 en
Q) t
-a
...en 0
Q.
.~
III 0 en
III 0 :s iii E
~ u.. ct III
Q. iii ~
III
a: u..
III
u. s: ~
Q.
0 a: u en 0 U
0
w
Business planning C U U
Organization analysis
U
Review and control U U
Financial planning C U u U
Capital acquisition C
Research U U
....... u
Forecasti ng U U :(~
Design and development C C. U \
Product specification maintenance U C C c:.J
Purchasing
<
e U
Receiving U U
Inventory control C. e. U
Workflow layout Id)) ....
r' c U
Scheduling U U U C. lJ
Capacity planning U \) e. u U
Material requirements \) U U C
Operations U U U C
Territory management U C U
Selling U U C. U
Sales administration U U
Order servicing U U C
Shipping l> V U
General accounting U U IV U
Cost planning U U C
Budget accounting U U \J u U
Personnel planning U ('
Recruiting/development \J
Compensation U
'n. -
\)

Figure 31. Data flow determination

53
~

>
DATA CLASS g >
cQ)
>
g :l
c
cQ) :g
.: Q)

.... ~ >
.:
Q)
u E >
g
~
"C
~ ...
Q)
en
0
a. C\l
.E .;~ ...
Cl iij ...u en
C\l
C\l
E ....0 ~ "C en 0- & ·E Q)
c
'cc 'uc E ....0
C\l 0
0
Q)
.: Q)
c ~ c
Q)

E ~
Q)
>
PROCESS
~
"C
E Cl ~ .::I. :cu cQ) .;;
2en en ~ ...en 0
C\l
C\l
.:u.
"C
0 t: c 3:
.~ 'uC\l 0 ~ Q)
"C
Q.
a:: Q: C\l
0.. iii ~
C\l
a: u. u. ~
C\l
:2:
Q.
0
0
a: u
~ iij
CI) c5
0
u E
w
Business planning C \) u u u u U
Organ ization analysis
U .......
Review and control U U
Financial planning C U u u
. Capital acquisition C
Research
U ~
Forecasti ng l \,) .... I}
V
Design and development I": ....
C C U .... I U
Product specification maintenance U C C U
Purchasing
C \~
Receiving U U ........
Inventory control
.... C C. U
Workflow layout
I~ C U
Scheduling I~ U U C. V ~-
Capacity planning ,U U C. u U
Material requ irements \~ U U C
Operations U U U C
Territory management ,J r• ...
C U
Selling ) ... U C. U
Sales administration U U
Order servici ng
II
...... U C
Shipping \J ~~ U
General accounting \. U IU I ..
--.,. \
..
Cost planning

Budget accounting \ '"


U
." \ ..
\T C
\J \~

Personnel planning l. (\
Recru i ting/development ..... \J
Compensation

Figure 32. Data flow .


U
-
\)

54
With data creation and use indicated by the boxes
and arrows, the Cs and Us may be eliminated and
names applied to the major systems areas (Figure 33).
While Figure 33 represents the completed information
architecture, a final rearrangement of axes and use of
two-way arrows allows preparation of a simplified
graphic of the architecture. Figure 34 shows such a
graphic with the same systems. Such illustrations have
proved useful in management communications regard-
ing the information architecture.

DATA CLASS .. ..
~
0
c
QI
~
0 ~
c
> c
.: QI
Iu QI

~
.. ......
E

= iij
.. ~
QI

XI
QI
III
~ .:
..
QI
>
III
'"CI
e
a.
'"CI
III
.E .;f! ~
~
0
-E QI
E !l .: ! ...&c QI QI

·c ·uc
..
0 QI
:
..
C III
u E 0 c E >
E ~
:;, 0 0
PROCESS c '"CI
~III
0 '"CI = ·u .:it :cU C 0
!l
~
Q.
III
III
.: a:
0 C
CD"
3:
III .~ III
o.
;;: III
QI
a.
:;,
0
III
:;, iij
QI
'"CI III
0 E
ii: U. Q. iii > a: u. u. ~ 0 a: (J (I) c5 (J w
Business planning
Organization analysis .....
Man- I"'""
Review and control age-
Financial planning ment

Capital acquisition
Research
Forecasting ~

~
~ Requ irements .....
Design and development ~

.....
Product specification maintenance
Purchasing
Receiving ...
.....
Inventory control
Workflow layout Manufacturing
....
Scheduling .....
~
Capacity planning
Material requirements
Operations
Territory management
Selling I ......
Sales administration
Order servicing
... Sales

Shipping
General accounting
Cost planning
'---!.
....
Budget accounting Administration .,s. !"'""

Personnel planning
Recruiting/development
......

--
",

Compensation Personnel-

Figure 33. Information architecture

55
PROCESS.
3c
,
ftII
C

C
~
'; ~
c :E
~
c ~ C III i JI
CD
E
c
0
8-
0
'+l ec at
c at
c
'iii
>
iii ec at c at
c
E
a.
c
I
CD
aI
ftII
c
!
~
'i
l
ftII
u
~
~

0
'+l
c
::s
'+l
c
::s
c
'cc
at
c
c(
~

0
c
'cc
0
'+l
'iii 'cc
0

1 c
'0
:=c
~

~
at
c
'cC ';!
III
'u CJ aI CJ '; >
ftII 'c ,~ Q
! c
0
8 c 0 c ftII ftII
e 0 0 ftII
it i
III
it
.
ftII CJ ...I
:E
's c: C
at ~
c en 0
c( 'cc 8 it
0
'+l
~
c it B' at
'+l
IJc at at
a: III
c
.. ~ ~ ,S
'~ c( c( 'i c C at
~ iIII iii
..
CD at J: ftII ftII c 0
"S ~ !
~ ftII IA c

'.
en c u ~ ftII
'uC
,~
at c(
'aa. u
E iii a: t:at N
~ "Ii c '+l CD
:~ Sc
~ II CD
'E :cen
ftII

II u.!0
C
,S!
II
::s
~
e .:.2 c
~
1;; ~ 'iii
CD
C '~
ftII
~
CD
'; ftII
c
~

'a ~iii
'2U a.
E
J:
e::s B CD
>
i 'j
iJ: a. i f
CD
a.
DATA CLASS
...
CD 'i
en
"Ii
en 0 a: Q a.
CD
C!J
0
CJ
::s
/XI
::s
/XI 0
CD
a: u:: ftII
CJ a.
CD
a:
0
CJ a.
CD
a: .: i u
en
III
CJ
III
:E 0

Customer
Order Sales
....
Sales Territory
~
..
Planning
4~
- Management .......
Financial .....
j ~
I .,
Work in Process
Open Requirements
Machine Load
Facilities Manufactu ring

Vendor
Raw Material Inventory
Finished Goods Inventory
~Ir

f
j ~
Product
Bills of Material 4 Requirements ........
Parts Master

Employee
..
..- Personnel
1,
Cost
..... Administration ........

Figure 34. Graphic rearrangement of information architecture


Subsystem Identification PREREQUISITE
The first cut at identifying subsystems is again an SUBSYSTEM
arbitrary classification. Using the architecture devel-
opment diagram such as Figure 30, define each C as a
'"
'iii
>
i&
c
.!iP
K:
"a
..
c
.2
.1
....'":::Ica
~
create subsystem. Define each U associated with a C
ca at
'1
~
.5 !
given process as a single usage subsystem. 0 .. .
1;;
"
Ic Ii- 'j
z:.
With this starting point, logical combinations
and/ or splits can be made. Usage subsystems can be
ALL
SUBSYSTEMS
-E
CD
l-
.
e
CD
"a
0
&L
'm
w
c .
Ii
"a
e
~
:::I
D.

combined where use of the data is similar. Where


create and usage subsystems are highly interdependent,
Engineering design X
a combination may be logical. Where a usage subsys- Order specification X
tem has dissimilar functions included, it can be split
into two or more subsystems. Bills of material X
When the subsystems have been identified, a Routings X
description of the functions of each (approximately one
paragraph) should be written. Product data control X
Analyzing for Prerequisites
With an outline of subsystems at hand, the final step is
a prerequisite analysis~ i.e., which subsystems must be
Sales analysis
--... V
_____ ,..",-
X

-
--
r--.
.-

---,.--
[....,

in place before others can be created. By using the


information architecture just developed and the team's Order entry X
understanding of the business, the interdependencies Business plan assessment X
\ among subsystems can be analyzed. Once more, a
matrix can be used to tabulate the results of the
Figure 35. Prerequisite subsystem analysis
prerequisite analysis. The vertical axis of the matrix
should list all subsystems, while the horizontal should Architecture Use
list the prerequisite subsystems (Figure 35). The information architecture identifies the systems and
subsystems with respect to the data they create, control
and use, and with respect to the business processes they
support. The interdependencies have been analyzed as
a basis for the prioritizing and planning that now take
place. The information architecture provides an
excellent foundation for analysis of distributed infor-
mation systems requirements and data base planning,
subjects covered further in Chapter 16. As each step is
taken in development of the information systems, the
architecture provides a blueprint showing where each
piece of the system fits and what its relationship to the
other pieces is.

57
Chapter 12. Determining Architecture Priorities

The team should select and recommend to manage- 3. Success


ment a portion of the information architecture to be • Degree of business acceptance
implemented first. The purpose of identifying and • Probability of implementation
recommending such a follow-on project is to begin • Prerequisites
implementation as early as practical. This will estab- • Length of implementation
lish a "pay as you go" foundation for implementation • Risk
of information systems. • Resources available
The activity of selecting first subsystem(s) should 4. Demand
rely primarily on a value analysis activity following the • Value of existing systems
interviews. Its purpose is to produce a priority se- • Relationship with other systems
quence ofsubsystem(s) that were identified in the • Political overtones
information architecture activity of the BSP. The tasks • Need
to be performed are:
I. Determine selection criteria and document the Apply Criteria and List Systems
technique to be used The major systems comprising the architecture can
2. Apply criteria to the subsystems then be analyzed as potential first-subsystem candi-
3. List subsystems in priority sequence dates and ranked on a scale of I to 10 for each of the
4. List dependencies or projects that are prerequisite to four categories above. Some type of pictorial represen-
the first subsystems tation can then be drawn to emphasize the most needed
5. Document or describe the recommended subsystems subsystems. Figure 36 is an example of this analysis.

Determine Selection Criteria List Prerequisites


Since data is now being treated as a business resource, During the architecture development activity, the team
liS projects should be able to be evaluated by manage- prepared a matrix to identify system prerequisites
ment in the same way other business projects are (Figure 35). Once a first system has been identified,
evaluated. Therefore, it is recommended that the team the team should review that matrix. Any steps or
use whatever justification technique presently exists projects necessary for successful implementation of the
within the organization for evaluating new projects. selected first system should be sequenced and listed.
This will ease decision making as executive manage- This will be necessary for developing a meaningful
ment makes the necessary trade-offs between, say, action plan. Prerequisite projects should then be
developing a new product, expanding a facility, clearly described and their relationship to the selected
making an acquisition, or implementing a major first system defined.
information system.
Some of the questions to be answered in determin- Document Recommended System
ing the first subsystem(s) are: Finally, the recommended first system (or first subsys-
• Will the subsystem provide a significant near-term tems) should be further documented. The system
saving and a substantial long-term return on should be described in sufficient detail that the execu-
investment? tive can properly evaluate it. The description should
• Whom will it impact, and how many people ",:ill be include an overview of system functions, major purpos-
involved? es and processes supported. It should identify any new
• Will it lay the groundwork for an initial data base technologies and/or special skills that need to be
structure for the architecture? . acquired or developed in order to implement or operate
A method of determining logical priorities is to the recommended new systems. A general description
group the major criteria into four categories: of perceived benefits anticipated should also be
I. Potential benefits (value judgments) included. The recommendation, documentation, and
• Tangibles presentation should be in a format consistent with
• Intangibles standard company practice.
• ROI
2. Impact ,.
• Number of organizations and people affected
• Qualitative effect
• Effect on acc~mplishing overall objectives

58
Because of resource limitations, the defmition of Expansions and Variations
more than the very highest priority systems may be Another method that may be used for priority selection
impossible initially. However, the same method can be is to focus primarily on financial justification. Using
used in making later selections. After the implementa- this technique, the team attempts to focus on tangible
tion of the first system has been completed, the priori- benefits as provided in the value statements during the
ties of the remaining system should be reassessed. For executive interviews. This technique, called risk-
example, after the first four systems have been imple- benefit analysis, is described in Appendix H.
mented, the system initially listed fifth may no longer
be at the top of the list because the requirements and ~
problems of the business have changed.

Potential Benefits Impact Success Demand


Maximum Score _r-r17-r7'"T"7..,-7r-7r-:7r""'17.......,7-r7J-.----~~1:'!"!"!Hl-::.lll!"!"!":lln~nl'0"HH~ln~/~:nl~lH 40

Subsystem Ranking Score

Production Planning ///////,. ,,;,;,;,;,;,;,;,;,:,;,:,;,;,;,;,;,;,;,;,;,;·;·;·133

Production Scheduling ////////A ,.;.;.;.;.;.;.;.;.;.;.;.;.;.;.;.:.;.:.;.:.:.;.;.J32

Plant Status / / / / / /71 (';';';';';';';';';';';':':':':':';';':';';';)29

Order Entry / / / I / I I / /1 t·;·;·;·:·:·:·;·:·;·;·:·;·;·;·;·;·;·;·:·;·;·;·;·;·J29

Order Status _7777777/1 '.;.;.;.;.;.;.;.;.;.;.:.:.;.;.:.;.;.;.12B

Sales Control 7/11/11111 t;·;·;·;·;·:·:) 28

Cost 77 177/ / 7 71 I;·;·;·;·:·;·;·;·:·:.;·;·;:j 27

B ills of Material ///1//71 f·:·;·:·:·;·;·;) 25


Product Data Control 'I//I/IA 1;·;·;·;·:·;·;·:·;·;·;·;·;·;·;·;·)24

Purchasing IZ///A F:';';';';:;:::':':';';';';';'124

Raw Materials Inventory 11/717/1 f:·;·;·;·;·;·;·;·;·;·:·:-:·:) 23

Finished Goods Inventory 77777771 ,.;.;.:.;.;.;.;.:.:.;.;.:-;.;.;.) 23

Sales Analysis /1////1 (';';';';';':';';';';';';';';';';)22

Forecasting 1//1/1 l:l:1:i:;:;:]n 21


Financial Modeling 7777711/ 11:::1:::1:1~ 21

Territory AnalYSis '71///l \;::::::;:J 21


Engineering Design 777A 1::::::;:;:;:;:;::121
Skills Inventory Illl 1;:::::;:;:;:;:120

Compensation Administration 7///A fi;l:l;l;l:l;;m 19


Financial Planning 777/1 1;;:1:1:1:1:119

Figure 36. Sample subsystem ranking


Chapter 13. Reviewing Information Systems
Management

The development and implementation of the informa- • From determining b~~iness requirements:
tion architecture cannot be accomplished without Description of business objectives
adequate planning, measurement, and control in the I/S support problems (from executive interviews)
information systems functions. This chapter deals with Major ISM problems/requirements from DP
those activities required to adequately review the ,. director's liS review)
Information Systems Management (ISM) function so as • From determining architectural priorities:
to recommend immediate changes and to specify ISM New technologies and skills required to support the
activities that are part of the follow-on projects. development of the first subsystem(s)
The BSP study will not encompass all the ISM
functions. The ISM analysis should be at the level of Flow of Activities in the ISM Module
the I/S director's view and should include only the Figure 37 gives an overview of the activities involved in
planning and control aspects of the major I/S processes. the ISM module. The activities in italics are not part of
To put the ISM activities into perspective, this chapter this exercise but are included to help the reader see
starts with a definition of ISM and then goes ,on to the where ISM fits with the other activities. As noted in the
objectives of the ISM module in the BSP study. figure, the required ISM changes.are developed through
three channels:
Purpose of ISM in the BSP Study 1. I/S objectives
The purpose of Information Systems Management is to 2. Information architecture
manage the I/S resources for the most efficient and 3. Problem analysis,
effective support of the business. The management liS problems
, system helps provide the continuous planning, control, ISM problems
measurement, and operation of the information The changes required by each of these are then
systems function. An example of the total spectrum of consolidated into a list,for developing ISM priorities,
ISM processes is represented by Appendix I. which serves as input to the ISM portion of the action
plan resulting from the BSP study.
ISM as Part of the BSP Study
The objectives of the ISM module are to: Compiling the 1/S Objectives
• Study the facts relating to ISM produced in other The liS objectives are required to provide the frame-
modules of the BSP study work to provide consistency in the development and
• Understand the findings and conclusions on liS employment of I/S resources in support of the business.
support of the business in relation to ISM liS objectives must be consistent with the objectives
• Further specify liS objectives and management systems of the business so as to serve
• Ensure that the first subsystems selected will be as a guide for the development of liS plans and strate-
supported by the current or planned ISM functions gies in the BSP follow-on activities.
• Identify those ISM projects that have high priority The current liS objectives were documented in the
and should be follow-on ISM projects BSP study preparation phase and discussed in the liS
director's presentation.
ISM Inputs In determining the present liS objectives to be
There are actions in other study modules prerequisite modified and additional objectives that should be
to performing the ISM activities in the BSP study: defined, the following list can be used as a guide. The
• From study preparation: ' objectives can be specified by defining the long-term
I/S mission and objectives view of each of these categories in information systems.
liS plans and strategies 1. liS Personnel
I/S measurements Organization
liS organization Skill mix
liS budgets Development and training
liS trends (resources, expenses)
I/S inventory and locations (equipment, software,
systems, personnel)

60
* Assess Identify * Define
business
problems I current 1/5
objectives I information
architecture

I I I
I ,
*
Non-lIS
\
lIS support
I Identify I Establish
) I changes and

J
problems
j J
problems
J I additions to
objectives I architectural
priorities

I I
Rearrange 1/5
support prob- I Define
required
I Show technologies
and management
practices requiring
lems by type
Conduct
1/5 review I ISM changes
I support

I I I Define ISM
changes required
Extract ISM
problems I I for architectural
priorities

1 I I
I
Define
I I
required
ISM changes I I
L_ -- -- -I- -- -- -- ....., I- -- -- -- -- ~ - -...- -~

Con sol idate


ISM changes

Establish ISM
recommendations
and action plan

* Develop report
and make ex-
ecutive presen-
tation

-- -- ...,t- -- --
* SSP study
follow-on
projects

*Not involved in this exercise


but added to the chart for
purposes of perspective on ISM

Figure 37. Flow of ISM in a BSP study


61
2. liS Finance support problems and non-liS problems. Although the
Approp~iations I/S support problems may have been aligned with
Expense budget business processes and with data, they should be
User budget for I/S rearranged at this time for better evaluation of their
3. User solutions' through changes to ISM. The rearrangement
Capability should result in the categorizing of the problems by the
Responsibility following ISM processes for ease of defining and
Development implementing changes: sttategicplarining, manage-
Data management ment control, I/S development, systems management,
4. liS Facilities data administration, and organization and administra-
Processing sites (data center - user locations) tion. Categorizing the problems by ISM processes will
Equipment also provide direct input to the follow-on activities.
Software After rearranging·the liS support problems by type,
Communications network check to see that those resulting from inadequate or
5. Applications nonexistent systems have been addressed by the
6. Data proposed information· architecture. This may identify
l'he following'is a sample of liS objectives following changes to existing systems. Such information would
this approach: be given to the liS director for appropriate action. The
Personnel other proQlems should be translated into required ISM
1. Provide staff assistance for planning and control changes. For example, the inaccessibility of existing
to all levels of liS line management. data may require a change to the user function, giving
2. Centralize major development and control the user direct access to selected data through his
functions with decentralized operations. terminal. This would be in line with the objective to
3. Develop I/S personnel who are specialists for each distribute more data processing capability to the users
function of the 'business. and require additional controls. After listing the
User required ISM changes, hold them for combining with
1. Provide maximum data. processing capability and the ones resulting from the next step.
data access to users while maintaining central
control. Extract ISM Problems from lIS Review
2. Establish user responsibility for information During the kickoff, the director of information systems,
requirements and validity of liS outputs during or his representative, gave a review of the status of
the external design phase. information systems in the company. Part of that
Following this procedure.in compiling the liS review covered current problems in information
objectives should result in implied changes to ISM. systems management. There is a significant difference
These changes should be listed and reviewed with the between these problems and those in the preceding
liS director and then held for later consolidation in the paragraph. The liS support problems may imply
establishing of ISM project priorities. problems in ISM or may be attributable to other causes,
whereas specific ISM problems may be spelled out
Ensuring ISM Supports Architectural Priorities during the I/S review. Categorize this set of problems
As Figure 37 shows, the architectural priorities are a also by information systems processes.
major input in determining the changes to ISM. The Because one of the major asp objectives is the
first data bases and information systems will probably development of a long-range information systems plan,
require new technologies that must be provided and it should receive major emphasis during problem
managed. They may also require new management analysis and it must, of course, be one of the follow-on
practices. For example, a move to distributed data projects. Of equal importance with liS planning is the
processing may require new practices regarding' subject of data management. Sin~e data has been
funding, chargeouts, control, and education. List these identified as a corporate resource; a major emphasis
changes and save them for the consolidation. must be put on its management. This also will be one
of the follow-on projects in ISM; both it and I/S plan-
Problem Analysis ning will be elaborated upon more fully in Chapter 16.

Rearrange liS Support Problems by Type Consolidating and Prioritizing ISM Changes
The third channel for identifying ISM changes is Consolidate all of the implied ISM changes from the
problem analysis. The problems that have been three sources. Develop criteria to be used to rank the
identified in the BSP study are separated into I/S ISM changes, such as impact, potential benefits, resour-

62
cesinvolved, and probability of successful implementa- ISM Outputs of a BSP Study
tion. Apply weights for each factor and determine the The following list summarizes the outputs that should
total weight and priority associated with each of the result from the ISM portion of the ..BSP study:
ISM changes. This selection process should parallel 1. Findings and conclusions
that used in establishing the architectural priorities. Major ISM problem analysis
ISM problems deduced from the liS support prob-
Developing Recommendations and Action Plan lems
Although the above activity will give priorities, do not 2. liS objectives
establish schedules until this list is combined with 3. Definition of high-priority ISM projects
actions required for other follow-on activities. The First systems support requirements
developing of recommendations and an action plan is Projects addressing major ISM problems
covered in the next chapter. Immediate actions recommended
4. Action plan for follow-on projects

63
Chapter 14. Developing Recommendations and Action Plan

Specific BSP study recommendations may center on the Potential benefits. Describe anticipated benefits or
areas of: reasons for doing the project.
1. Information architecture People and skills. Describe manning of project in
a. Detailing the subsystems of the information terms of management as well as staffing.
network Tools and techniques. Describe any required prac-
b. Interim improvements to current systems' tices or methods as specifically as possible.
2. Information systems management, including: Training. Describe specific orientation, education,
a. Data management to control the data resource of and study necessary for successful execution of the
the organization project.
b. Information systems planning process to ensure Communications. Identify coordination, liaison,
that the information architecture remains respon- interface points, or functions as well as documenta-
sive to changing conditions tion requirements.
c. Measurement and control to provide a system of Logistics. Define materiel and facility support
procedures, controls and structure for future necessary and indicate when it is needed.
implementations ' Control. Define project control methods and respon-
3. Architecture priorities - development of the first sibilitiesas well as review/approval requirements.
system to be implemented The amount of emphasis placed on the recommend-
For each recommendation, there may be an associ- ed follow-on projects varies greatly from one organiza-
ated project, and for every project an action plan tion to another. Normally, multiple follow-on projects
should be developed identifying the key decisions and will run concurrently. The number of simultaneous
activities required to help management provide proper system projects varies with the needs of the organiza-
direction. The action pl~n should give the project tion, the resources and time available to perform each
manager a firm basis for a smooth tr(;l,nsition from the project, and other factors.
stu9Y work product tp the particular project. The plan The completion of the activities above enables the
should describe the costs, potential benefits, and BSP study team to proceed to its final activities: prepa-
schedules for each project in enough detail that an ration of the study report and presentation of the study
informed executive decision can be made to approve or results to executive management. Thorough prepara-
reject the project. tion of the action plans, potential benefits, and costs
Each action plan should include the following: enables the executive sponsor to evaluate the recom-
Scope ofproject. Describe subject of project, includ- mendations. The study team can then ask for and
ing size and purpose. expect a prompt approval of the recommendations and
Deliverables. List and define each output or result a prompt commitment by management to implement
expected of the project. them.
Schedule. Identify expected start and concluding
dates as specifically as possible.

64
Chapter 15. Reporting Results

Having defined the information architecture, identified The conclusions, recommendations, and an action
the architecture priorities, reviewed and assessed liS plan should be reviewed with the executive sponsor
management, and developed recommendations and the before the team drafts the final report. Controversial
action plan, the BSP study team is ready to complete its areas or areas of high impact on the business may be
mission by preparing the study report and preparing reviewed with the executive involved, to determine
and delivering an executive presentation. The purpose how best to present the recommendations.
of the report and presentation is to obtain further
executive management commitment and involvement Presentation Medium
for implementing recommendations from the BSP The principal factors to consider in determining how
study. the report should be presented are the type and size of
The following activities are performed in preparing the audience and the accepted ways of making such a
the study report and executive presentation: presentation in the particular business environment.
• Report outline is prepared Consultation with the executive sponsor early in the
• Report is written study to obtain his advice on this subject can be most
• Executive presentation medium is determined helpful in establishing the proper direction.
• Executive presentation is prepared and delivered If the presentation is made to a small group, easel
flipcharts are adequate and popular. If the audience
Report Outline numbers more than a dozen, viewgraphs or slides
During the initial steps of preparing for the study and should be considered. If slides are to be used, adequate
developing a work plan for conducting the study, the time should be allotted to have them prepared, whether
team prepared a preliminary report outline. Since the in-house or by an outside vendor.
report now materializing from that outline is to be a
consensus of the entire team, each of its sections should ~xecutive Presentation
be reviewed by each of the members so that the final The executive presentation can be developed complete-
document reflects all their comments. ly from material contained in the final draft of the
The report may be structured in many ways, de- report. The principal aims of this presentation are to
pending upon precedent and methods of presentation inform management of the study'S findings, make
within the business conducting the study. However, to recommendations, and secure approval of the action
assist the team in its consideration of pertinent areas, plan.
an extensive list of topics is presented in Appendix J. The presentation should be consise - preferably no
,_ The most significant findings, conclusions, and longer than an hour. It should be logical and factual
recommendations should be summarized in the first and should end with recommendations for the follow-
few pages of the report for the use of top management. on activities. For example, it may take the following
Supporting details should be included later and in the form:
appendices for other members of the organization and 1. Introduction
for team members who will participate in future Background and overview
follow-on activities. Objectives
Scope
Report Preparation Study team
The primary writing responsibility for each of the 2. Study approach
sections of the report was assigned during study Business and I/S review
preparation. As the study progresses, changes, addi- Business processes
tions, and deletions can be made to the preliminary Business/information systems relationships
outline. By the time the executive interviews have· been "- 3. Major problem identified
completed, agreement should have been reached on the 4. Conclusions and recommendations
final table of contents, and the individual study team Information architecture and priorities
members should have available to them most of the liS management requirements
information needed to complete their assigned sections. 5. Action plan for follow-on project activities
The study team leader usually assumes the responsibil- Description(s)
ity for writing the background and overview because Deliverables
much of this material comes directly from the orienta- Resource requirements
tion information presented to the team at the kickoff Schedules
meeting.
65
Chapter 16. Overview of Follow-On Activities

The BSP study ended with the development of an action activities and the emphasis placed on each of them will
plan for the follow-on activities and a presentation for vary from one BSP study to another. For purposes of
management approval to proceed in the execution of this discussion, the following assumptions are made:
that plan. This final chapter of the BSP Planning Guide 1. ISM functions must be changed or added to provide
gives an overview of the follow-on activities and serves a controlled environment for the development and
three purposes: implementation of the information architecture
I. To relate the follow-on activities to the BSP study identified in the BSP study. A detailed information
2. To show how to capitalize on the results of the BSP systems plan will be developed that will reflect these
study planned changes.
3. To further explain the major follow-on projects 2. The information architecture must be further
The following section helps in putting the follow-on defined and data bases identified.
activities in perspective and in emphasizing their 3. A first system has been chosen for development and
importance. It also explains how to get the maximum implementation.
use of the output from the BSP study. The latter part of
this chapter attempts to give enough of an understand- Orientation of Teams
ing of the follow-on projects to allow for scheduling Before the beginning of each of the follow-on projects,
them in the action plan and to help preparing for them. the liS director should provide orientation for project
team members. Since many of the team members will
Perspective on Follow-on Activities not be familiar with BSP, its principles and objectives
should be summarized. It is very important that
Relation of BSP Study to Follow-on Activities everyone on the project teams understand exactly how
The follow-on activities are a continuation and expan- the BSP study was conducted and become familiar with
sion of the major activities in the BSP study. The major the outputs so as to be able to build upon them.
thrust of the study was one of understanding, develop- A review of the BSP study report for the areas to be
ing findings and conclusions, and making recommen- studied in the follow-on projects will help to determine
dations. While the thrust in follow-on projects is still whether team members need special education. A
to understand, greater emphasis is put on detailed specification of tools and techniques may also reveal
definitions and planning. the need for special education. If required, appropriate
There is a great need for communications among the classes can be scheduled on an individual basis. If the
project teams if project implementation is to be suc- l/S director was not a member of the BSP study team, it
cessful. Therefore, the information systems director might be advisable for him to attend the IBM Informa-
should take overall responsibility for the projects, since tion Systems Planning course.
the functions performed during the follow-on activities The following is a sample list of topics for project
are a part of the ISM responsibilities. Because the team orientation:
follow-on activities build upon the results of and the Introduction by the sponsor
information gathered in the BSP study, there is a need Objectives of the orientation
for continuity of team members. At least one person Information systems concepts and perspectives
on the BSP study team should have been chosen from Data base concepts
the data processing function, with the idea that he Overview of the BSP study methodology
would remain for the follow-on activities. Detailed discussion of the BSP study
The functions performed by the executive sponsor Business environment
for the BSPstudyshould be performed by a steering Objectives
committee for the follow-on projects, unless there is a Major processes identified
management committee that will perform them. Major problems
Business processes continue to be the vehicle for Current l/S support for the business
understanding detailed business requirements and for Interviews
further defining the information architecture with Information architecture
special emphasis on the definition of the first system. Major findings andiconclusions
Recommendations
Preparation for Follow-on Activities Introduction to the follow-on activities
Because of the variations in the findings and conclu- Relation to the BSP study
sions that may result from BSP studies, the follow-on Relation to the BSP study deliverables

66
Discussion of deliverables from the follow-on Perhaps the most important action to be taken after
activities the BSP study is to decide what person or group of
Explanation of follow-on projects persons is responsible for continuing the liS planning
Introduction of tools and techniques using the BSP study as a base. While the BSP study
Introduction of preparation activities culminated in an approved action plan, the overall
Activities already performed objective of an ISM project will be to develop a long-
Activities to be performed by team members range liS plan that will direct the design, development,
Interviewing strategies and selection of interviewees and implementation of an information architecture. It
Use of matrices should include sufficient detail on projects, resources,
Pilots of forms, tools, techniques and interviews and schedules to guide all levels of management on
Introduction to HIPO and its use in the follow-on what is to be done, when, and by whom in the organi-
projects zation. Since the long-range liS plan is an integral part
Assignment of responsibilities of the business plan and is prepared with full m.anage-
Development of task descriptions by team members ment involvement, it should help to provide that the liS
Explanation of project control systems resources of the business will be used to effectively
support the business.
Information Systems Management Also, since data, management is a complex area
ISM is the keystone of effective support of the business requiring long lead times, the data administrator
by information systems. It can be defined as the should be decided upon as early as possible so that this
management of the information systems resources for function can be properly coordinated.
the most efficient and effective support of the business. The importance of I/S planning and data adminis-
The importance of continual emphasis on ISM is tration cannot be overemphasized, and they will nearly
summarized by the following statements: always be a part of the follow-on activity. The activi-
• Development of the information architecture will ties will not be explained further here since they are
take place over a period of years. covered thoroughly in IBM, GUIDE. SHARE, and trade
• Changes to business strategies and plans as well as publications.
liS technology will be continual during the develop- Some of the close-in projects should be done
ment of the information architecture. immediately after the BSP study recommendations are
• The processes of managing I/S will have to be approved and before most of the follow-on activities
refined and changed continually to properly plan, are started. The establishment of a steering committee
measure, and control required I/S resourCes. and a project control system are excellent examples
• The BSP study is a one-time effort that should be' since a steering committee should be available to direct
followed by continuall/s planning to fully capitalize the follow-on activities and a project control system
on the results. should be in place to help the liS director adequately
control and coordinate the activities.
ISM in Perspective The major ISM follow-on project will probably be a
As covered in Chapter 13, the ISM follow-on projects long-range activity such as I/S planning or data admin-
will emanate from (1) requirements to support I/S istration or a combination of both.
objectives, (2) changes resulting from the development Becau~e of the size of these projects and their
and implementation of the first system, and (3) recom- interactions with all the· liS processes, it is important to
mended changes to solve liS support problems and ISM fully understand all the functions of ISM before under-
problems. taking any recommended change to any part of ISM,
From this it is safe to assume that th~ recommenda- just as it was important to fully understand the busi-
tions included: ness before starting to fulfill the information require-
I. Emphasis on information systems planning and ments. Some mechanism should exist to get the broad
control and on data administration. view of ISM, and BSP can be used as that mechanism.
2. Some close-in projects, such as the establishment of You may treat I/S as a business-within-a-business and
a steering committee and refinements to project apply to it the same BSP techniques that you have
contr6l. Capacity planning is also a natural follow- applied to the business in which it is located.
on to a BSP study since it examines the data process-
ing capacity and determines whether changes are Information Systems as a Business
required to accommodate the architectural priorities Many of the activities for performing a BSP study in the
or to solve some of the liS support problems. liSfunction have already been accomplished:
3. A major project(s) in ISM, e.g., establishing an action • Facts relating to information systems were gathered
plan to'move to distributed data processing. as part of the study preparation phase.

67
• ISM responsibilities, activities, and problems were selling tool if some executives are skeptical of the
identified by the liS director during the kickoff~ methodology. It must be recognized that a major
.• Many of the findings and conclusions have already deficiency exists in the understanding of part of the liS
. been put together as a result of examining the liS environment, which in this case is the rest of the
facts and the problems. business.
• A first ISM project has been identified and an action BSP is so demanding of a team's time that running
plan established. . the two studies concurrently will require two teams,
While some of these activities will have to be closely coordinated. The added emphasis on ISM may
expanded, they make a significant start in understand- detract from the major goal of understanding the
ing the whole I/S function. The following identifies business and may give the entire study a much greater
other steps that should be performed: flavor of an I/S project than is desired. The major
1. Defining ISM processes. Appendix I suggests the advantage is the ability to relate· liS problems directly
. processes that take place in ISM. This may be used to ISM problems and make sound recommendations on
as a checklist to identify the ISM processes. Other- ISM in the action plan and report of the business BSP
wise, you may wish to identify the information study.
systems resources and the activities and decisions Ideally, the I/S study should be done immediately
found in their management cycle. The following is a after the business study, since (1) the required inputs
list of resources to be considered: are readily available, (2) the momentum will carry over
Programs and systems from the business study, and (3) the best environment
Functional modules will exist for conducting all the follow-on activities.
Data bases
Hardware/software/communications facilities Information Architecture
User facilities (terminals, languages, data bases, etc.) The amount of follow-on effort required in the archi-
Physical facilities tecture area depends on the level of detail in the BSP
Finance study. If the information architecture was not com-
People pletely defined as outlined in Chapter 11, the basic
2. Analyzing relationships of organization, processes, architecture definition should be completed as the
information systems, and data. This is an exact beginning of a follow-on project.
parallel to the development of the matrices to show The architecture refinement to be accomplished in a
relationships in the business BSP study, except that follow-on project should include a confirmation of the
the information systems are those that support the major I/S groupings, the subsystem breakout of each
liS functions, such as equipment utilization systems system, subsystem interrelation, and data flow among
and chargeout systems. The data is that needed to subsystems.
support these and other systems used to manage the Several other activities should be included in the
liS function. information architecture project:
3. Interviewing. The interviewing in ISM will normally • Examination of current data processing systems to
be with the upper two levels of information systems determine how they can evolve (provided they can
managers, selective interactive users, the executive at all) into the new systems architecture
to whom the liS director reports, and selected • Establishment of a continuing link between the
functional users. architecture and the business plan to ensure that the
The remaining steps are the same as the BSP metho- liS plan will be based upon a viable information
dology for the business and should be conducted by a architecture
small team led by the individual responsible for I/S • Documentation of alternative architectures that
planning or another person with a broad responsibility were tried or investigated and rejected, with the
in liS. reasons for rejection
The BSP study of, the I/S function may be done as • Evaluation of the technical implications of the
part of the ISM follow-on project, as suggested. It information architecture, including control systems,
should also be considered as an effort that can be made" DB/DC requirements, and potential distribution of
either concurrently with the business BSP study, before both information and systems
it, or immediately after it and before the start of any
follow-on projects. Architecture Refinement
As an activity before the business study, the liS U sing the information architecture defined in the BSP
study provides experience in the methodology, offers study, a description of each subsystem should be
an excellent view of I/S as input to the business study, prepared. Each description should include the purpose
allows an early start on ISM projects, and can serve as a of the subsystem, business problems addressed, data

68
created and used, dependencies on other subsystems, system can support subsystem needs independently and
general requirements for implementation, and priority currently.
of the subsystem with respect to all other subsystems. A comparison of the data base environment with the
traditional approach to systems development and
Current Systems Examination maintenance reveals the advantages of the data base
F or data processing systems currently in use or under concept. In the traditional approach, a system is
development, a careful examination should be con- usually designed, programmed, tested, and then
ducted to determine how each one relates to the implemented as a total entity. Its advantages cannot be
subsystems described in the information architecture. realized by the end user until the entire syste~ is
Possible modifications to current systems should be completed. The amount of time involved can cause
documented with respect to interfacing them to the frustration, since business requirements cannot be kept
future architecture. Where modified systems could be frozen long enough to avoid changes, delays, and false
used in lieu of new subsystems, a description should b,e starts. Also, when data or logic changes are required,
included in the architecture documentation. For considerable testing may be necessary to determine
systems already under development, an evaluation how the change affects other programs or systems
should be made of possible modifications to make the functions.
developing system compatible with the new informa- By contrast, the data base approach allows a gradual
tion architecture. Analysis should be made of the transition from existing systems to online, transaction-
impact on current development schedules versus the driven systems. The data base is created gradually"
avoidance of modifying the system after implementa- with just a few transactions implemented at a time.
tion, keeping in mind present commitments and future Current data base techniques facilitate this type of data
priorities. base and system implementation. With gradual
implementation of transactions, user department
Data Base signoff can be obtained more easily and the user can
Integral to information architecture definition in the enjoy the benefits earlier. This approach also helps
BSP study were the data classes supporting the business overcome the problem of not being able to freeze
processes. A logical grouping of related data classes business requirements and technological advances
will yield the set of data bases that will support the during the development cycle. Changes that must be
architecture implementation. made along the way impact individual transactions or
A data base can be defined as a nonredundant become new transaction.s themselves. Changing data
collection of interrelated data items processable by one needs can be accommodated without affecting pro-
or more applications. Some of the terms in the defini- grams that do not use that specific area or segment of
tion itself may need explaining: the data base. Thus, the data base environment can be
• N onredundant means that individual data items a better way to accommodate change, deliver benefits
appear only once (or at least less frequently than in to the user, and control development costs.
normal file organizations) in the data base.
• Interrelated means that the files are constructed with Distributed Information Systems
an ordered and planned relationship that allows The general purpose of distributed, information systems
data elements to be tied together, even though they is to provide the user with a level of computing re-
may not necessarily be in the same physical record. source best suited to his operational requirements. The
• Processable by one or more applications means elements that can be considered for distribution
simply that data is shared and used by several include hardware, program execution, program
different subsystems. development, and data. Degree of distribution can
Development of a data base has some obvious vary from totally centralized to totally decentralized.
benefits. By consolidating files, the user can obtain The information architecture defined in the BSP study
better control of data and reduce storage space and c~n provide a good foundation for the additional
processing time. Equally important are the resultant planning necessary to address liS distrybution require-
data synchronization and timeliness. Use of a single ments.
information source makes processing more accurate If the information architecture follow-on project is
because all subsystems refer to the same data. to add distributed I/S parameters to the architecture,
A data base system can help overcome some of the the project team must:
complexities of data management. It can provide • Thoroughly understand the degree of distribution of
additional data relationships while minimizing storage each element
redundancy. Figure 38 illustrates how a data base • Understand the arguments for and against distr:ibu-

69
User File inquiry File change Report request

Device

Subsystem Subsystem A Subsystem B Subsystem C

DB/DC Data management component


system

I
Operating system I
I
I I
,..- L-l ( -...... ,,-1-
I Logical I I Logical
I I Logical
'1
I
Subsystem
data I ~e I I file
B I I file
C

I I I I I I
l...~ ..........
\
l........ /
'" .-/

System
data

Integrated
data
base

Figure 38. Data base system

70
tion of the various elements as data security, data integrity, data communications,
• Be able to put into perspective all the factors that rapid availability of large amounts of data, and backup
affect distribution and sharing of data processing, and recovery requirements complicate the tasks that
resources must be performed on a project. They also add to
• Appreciate the need for a long-range lIS plan and requirements for skilled personnel to perform such
for development of a facilities plan to support the lIS tasks.
plan I In many areas technical risks may be reduced by
Several of the matrices developed in the BSP study incorporating appropriate hardware/software products,
can be very useful in developing the architecture productivity techniques, and procedures. An invest-
extensions with respect to distribution. The process ment of time in evaluating existing products and
and data flow analysis should be extended to include applying them to the recommended system will reap
physical locations for systems and data requirements. ample rewards in a better system implementation.
Location/ organization, location/process and
location/ data matrices should be prepared. A Effective Communication
process/data matrix for each location (or group of Effective communication is indispensable to successful
similar locations) should be prepared wi~h additional system development, which entails the communication
parameters on the axes to include data use, security, and translation of management and user business
a:uditability, data occurrence (all or parti3.1), activity requirements into achievable data processing solutions.
volumes, response required, and criticality\ Figure 39 Only users can determine the business requirements
shows this type of matrix for a manufacturing plant of the system to be developed. Their involvement and
site. continued participation are, therefore, essential.
These additions to the architectural description of Developers sometimes try to second-guess the needs
the information systems can then be input to the of users and to create systems they believe will do the
individual subsystem requirement studies to determine job. More often than not, this approach is unsatisfacto-
detail distributed systems requirements. They will also ry. While the technical aspects of such a system may be
give an overall feel for the applicability of distributed sound, the real business needs of the organization may
systems to the information architecture. not be addressed or met.
Users and developers need a mutual understanding
Developing the First System of what is to be done and a commitment to their
The sSP team has recommended that a particular respective responsibilities. The development process
high-priority system be developed and implemented itself must ensure communication and commitment
first. As development of that system begins, care between the two groups.
should be taken that this system is not developed "by Communications may be greatly facilitated by the
itself." The BSP study has set a certain direction for use of standardized documentation techniques such as
implementation of systems. This first development and HIPO, structured walk-throughs, and the like. These
implementation must support the business processes not only reduce misunderstandings but contribute to
and must: increased productivity, which in turn should speed up
I. Fit properly into and interface with the other implementation of the system or application. Where
(future) systems of the overall architecture described appropriate, such aids should be evaluated, adopted,
in the BSP study and incorporated in the development project.
2. Provide for proper implementation of the appropri-
ate data base(s) Priorities and Conflicts
As described in the ISM section of this chapter, these The need to set priorities for conflicting objectives is
concurrent projects must be carefully managed (ISM) to crucial. Conflicts can make even simple situations
ensure that they lead toward an integrated whole rather complex and can cause many serious project difficul-
than perpetuate "separatist" or "standalone" applica- ties.
tions development. Even before a project is under way, the new system
System development is a complex process. It must compete with the demands of trained personnel to
requires technical expertise, effective communications, maintain old systems. Application development
and skillful handling of conflicting objectives of users, resources are in short supply, and experienced develop-
management, and data processing. ment skills may be hard to find because everybody has
a backlog of applications waiting to be developed.
Technical Factors The project manager, therefore, must be qualified
There is no doubt that developing information systems both in project management techniques and in the
is more complex today than in the past. Factors ;uch business area to be supported by the first system.

71
i i=...
Location: Plant Site
c
:I
DATA CLASS II .5 c
> II
.5 E
~ e ~ IC
$
i
8. !' 8 I
ii
j
'80
CJ J "a
!
...I
';
i
S
~
~ =
,
II
Iii
,~ :a
t; :E :EII II ii 'iii
:E i.c .:ac
II ,5 II
~ a: 'uc E c0
PROCESS ::J
'3 .s
'cc :e 0. ~ c
:cu E B
~ 8 'EIii I!
c
"a
t!II iII E
"a ,!.!! ::J :s ~ a.
e as
D.
::J
D.
0
a: it
II
u. w
C
II
>
~
II
a:
~
u:: ;: ~ 08.
C
CJ 0 u:: 8 cJ ~
c(
"0 IB
> a:
Design and Develop. A A A L L
Product Spec. Maint. A A A C L M
Information Control A C C L M
Planning
Research
Forecasting
Financial Planning A A A A L L
Capital Acquisition
Funds Management A A A A A M M
Workflow ~yout A A C C M H
Maintenance A A L L
Equip. Performance A A M M
Personnel Planning C A C C M L
Recruiting/Development A L M
Compensation A A A L L
Purchasing A A H H
Receiving A A M H
I nventory Control C C A C M H
Shipping A A A H M
Scheduling A A A C A A C M H
Capacity Planning A A A C A A A M H
Material Reqmts, A A C ...! C M H.
Operations A A A A L H
Territory Mgmt.
Selling
Sales Administration
Order Servicing A A A H H
General Accounting A A A C C H L
Cost Planning A A A L L
Budget Accounting A A A A A M L
Business Planning A A L L

Organization Analysis A L L
Review and Control A A L L
Risk Management A L L

Use A A A C A C C A C C C C C A A C A

Security Ii. A A A C A A A C
Auditability A A
Data Occurrence T T T T T T P P T T T T T P P P T
Currency I I S S L L L 0 I I I S 0 0 S L 0

Use and Audit: A = Access only C = Access and Change


Security: A = Unauthorized Access protection
C = Unauthorized Change protection
Occurrence: T = Total record needed
P = Partial record needed
Currency: I = Immediate; S = Same day
o = Overnight; L = Longer
Volume/Response: H = High/quick; M = Medium; L = Low/slow

Figure 39, Distributed information require:nents analysis

72
Ample education, documentation, and products are The project manager and appropriate team mem-
available for both. A thorough analysis of support bers should be thoroughly prepared in these areas
should be made and a technical support plan should be before the start of the project. This should result in
put together to utilize the education, documentation, effective project management, which in turn will
and products wherever possible. You should work reduce risks and optimize the business value of the first
with your IBM marketing representative to develop implementation.
such a plan.

73
Appendix A. Sample Executive Announcement Letter

To: All executives


Subject: Business Systems Planning Study

I am sure all of you are aware of the dynamic nature of


our business. Our success in the future will depend
greatly on how we plan and react to the business envi-
ronment. I am pleased to inform you that we are initiat-
ing a major effort to analyze our current and future in-
formation needs. I have authorized a study group that
will conduct an in-depth study on how we use information
and its relation to our business.

The study project will be directed by Ms. Marilyn Jordan,


with other company personnel involved on both a full-time
and part-time basis. Assisting us in an advisory capacity
will be personnel from the IBM Corporation. We will be
using a methodology called Business Systems Planning
(BSP), which has been helpful to other companies in eval-
uating and planning for their information requirements.

Key to the study's success is the precise identification


and clear statement of our individual and collective in-
formation needs. To this end, the study team will want to
discuss our information needs with us in detail in a series
of individual interviews. It is essential that each in-
dividual who is asked to participate in an interview be com-
pletely candid in discussing problems, needs, and plans with
the team members. You will be contacted by Ms. Jordan in
the near future to set up interview dates and times. I urge
you to give full cooperation in this valuable enterprise and
work as closely and cooperatively with the study group as
possible.

I am confident the study will be of tremendous value to the


company and help us accomplish our overall objectives.

Sincerely,

Edward J. Bissel
President

EJB/rth

/
74
Appendix B. Sample Interview Confirmation Letter

To: Mr. H.R. Zimmer


Vice President of Planning

Subject: Business Systems Planning Study

Mr. Bissell's recent memorandum announced the initiation of an in-


depth information systems planning study for our business. The
objectives of the study team are to:
• Develop an overall understanding of the business
• Understand how information systems currently supports the business
I
• Identify an information architecture that will support the business
• Identify the first or most needed subsystems within the network
• Make recommendations for improvements
• Develop an action plan

To assist the study team in this effort, we intend ~o interview the


key executives of our business. Each interview is estimated to take
2-4 hours. I have Wednesday, April 9, at 1:00 p.m. scheduled on
your calendar for me and other selected members of the BSP team to
meet with you. The meeting will be in the former EDP office at the
south end of Building 2.

The purpose of the meeting is for us to learn about your area of


responsibility, the information you consider essential to manage
your area, and the problems you currently have in obtaining this
needed information. The discussion of these topics will enable us
to better understand your information needs to evaluate the current
information systems, and to define systems that are responsive to
your information needs. Attached is a list of topics we wish to
discuss with you.

If you have any questions before our meeting on April 9, please call
me. Thank you for your cooperation.

Sincerely,

M.e. Jordan, BSP Study Team Leader


Attachment

75
Appendix C. Examples of Process Groups and·Processes by Industry

Insurance Manpower management


Management Planning External services management
Corporate direction planning Systems planning .
Long-range planning System development/maintenance and operatIons
Business planning
Acquisition/ventures planning
Product Management
Finance
Management Planning and Control
Managing the book of business
Objectives planning
Product service monitoring
Forecasting alternatives
Product reevaluation
Measurement and control
Control and Measurement
Organization
Financial planning
Operational planning Policy setting
Resource allocation
Performance evaluation
External relations
Product Development and Maintenance
Product Development
Product design
Review and approval
Pricing
Resource evaluation
Product goals and measurement
Strategy development
Product implementation
Facilities, Equipment and Supplies Education development
Pricing
Facility planning
Marketing
Facility services management
Market definition
Equipment and supplies management
Market research
Warehousing and distribution
Advertising and promotion
Merchandising
Public relations
Lead development
Product implementation
Selling
Competitive analysis
Customer qualification
Money Management
Risk engineering
Investment management
Establishing and maintaining customer record
Money market instruments
Billing and collections
Customer servicing Customer
Investigation and acceptance
Product Service
Account establishment
Insurance
Account control
Insurance claim evaluation and disposition
Account maintenance
Non-insurance processing service
Account termination
Non-insurance professional service
Funds Transfer Services
Financial
Letter of credit
Cash management
Money transfer
Asset accounting
Bond transfer
Expense allocation
Stock transfer
Claim reserves
Tax processing Loan
Corporate books and ledgers admin. Deposit/withdrawal checking
Investment management Collections
Lock box
Administration
Automatic dividend reinvestment
Legal serviCes
Foreign. exchange
External relations
Cash management
Advertising
Auditing Trust
Accounting services
Information development
Asset management
Operational support

76
Operations Advertising/promotion
Communications Pricing
Data processing Selling/contracting
Transaction servicing Order entry
Inquiry servicing Customer service
Corrections Sales analysis
Mail Manufacturing
Finance Production forecasting
Budget planning and control Scheduling
Financial analysis Inventory
Asset management Plant operations
Liability management Packaging
Capital management Warehousing
Financial reporting Shipping
Personnel Maintenance
Planning Quality control
Recruiting and hiring Product cost control
Training Distribution
Wage and salary administration Carrier and rate negotiations
Employee relations Supply /demand planning
Benefits management Order processing
Career development Rating and routing
Retirement or separation Terminal operations
Government compliance Warehouse planning/operations
Legal Fleet planning
Litigation Fleet operations
Tax consequence advising Inventory control
Contracts review Financial
Legislation impact analysis Financial planning
Legal compliance review Financial analysis
Administration Capital transaction and control
Accounting Budgeting
Audit General accounting
Facilities Cost accounting
Regulatory compliance Taxes
Taxes Government report
Payroll Payroll
Security Administration
Personnel development
Process (Chemical) Salary and benefits administration
Planning Labor and personnel relations
Strategic planning External affairs
Market research Legal
Technical feasibility Insurance
Economic analysis Information services
Forecasting Facilities services
Resource requirements
Product Development Process (Paper)
Exploration Product Development
Engineering development Product design
Licensing Raw material requirements
Engineering design Facility planning
Construction Market forecast
Marketing Financial requirements
Sales forecasting Market planning
77
Marketing Drafting and records
Sales planning Product perfOl:mance
Product plan Produc( Planning
Sales analysis Determination of business case
Order entry Evaluation of business case
Customer services Marketing
Pricing Marketing planning
Production Market research, market development
Requirement planning Pricing
Production scheduling Publications, advertising, promotions
Raw material planning Sales analysis and forecasting
Receiving Warranty policy and other software
Production reporting Market operations
Quality control Distribution network
Inventory Field sales and service
Shipping OEM sales and service
Maintenance Order entry
Engineering Support Financial Management
Project engineering Funds management
Environment Cash
Energy requirements Short-term financing
Standards Long-term financing
Material handling Financial control
Financial Budget!expense
Cash management Managerial accounting
Budgeting General accounting
Capital expenditures Bookkeeping
Cost analysis Internal control
Financial reporting Administration
Payroll Legal
Customer billing Public relations
Accounts receivable and payable Security
Audit Governmental reporting
Administration Office management
Purchasing Planning, Control and Measurement
Personnel services Fiscal year business plan
Traffic Annual operating plan
Salary administration Quarterly operating plan
Information services Reporting and control
Legal Personnel Management
Stockholder relations Planning
Public affairs Acquiring
Industry Relations Development and administration
Labor relations Reporting
Personnel development Termination
Safety Operations Control
Master production plan
Manufacturing Transportation planning
Product pevelopment and Application Performance reporting
'\
Technology development Inventory control
Product application Capacity Management
New product Determination of optimum capacity
Old product Capacity allocation
Application engineering Acquisition of capacity
Specifications
78
Material Acquisition Financial negotiation
Vendor evaluation New business
Order control Administration
Receiving and inspection Accounts payable
Plant Operations Accounts receivable
Planning, schedule and control Payroll
Performance reporting Statistical and financial reporting
Expediting Audit
Planning of material, manpower Merchandise processing
Order processing - plant order boards Personnel/training
Product and process specifications
Execution Government
Order release Judicial
Dispatching Prosecution
Storage/warehousing Defense
Quality Court procedures
Preventive maintenance Control
Material transfer - to/from supplier/customer Civil
Public Facilities
Definition
Distribution Construction
Buying Maintenance
Vendor selection Property management
Requirements Public Protection Process
When to buy Enforcement
Allocation Confinement
Sales planning Rehabilitation
Inventory control Prevention
Pricing Inspection
Markdowns Finance
Selling Taxing
Presentation Licensing
Display Accounting
Manpower planning Collections
New item introduction Funds management
Advertising Payroll
Customer service Purchasing
General Operations Personnel
Purchasing Recruiting/hiring/ terminating
Facilities maintenance Career development
Security Job classification
Public relations Labor relations
Audit, Compensation and benefits
Inventory control Employee/position management
Physical inventory control Management
Internal communications Conflict
Facilities development Measurement and control
Management and Financial Control Policy determination
Budgets Budgeting
Cash management Security/privacy
Profit planning External relations
Measurement and control Recordkeeping
Capital expenditure planning
Credit granting

_ 79
Community Service Financial Management
Library Income acquisition
PubJic records Stewardship of funds
Election administration Receipting and disbursement of funds
Cultural and recreational support Cash management
Environmental control Protection against financial liabilities
Public Aid Process Financial services
Eligibility determination Financial recordkeeping
Financial assistance Personnel
Manpower Recruiting
Social services Hiring/termination
Residential care Career development and evaluation
Health ~ervices Salary and benefit administration
Admissions Employee relations
Inpatient care Assignment of responsibilities
Outpatient care Job classification
Education and research Recordkeeping
Emergency care Institutional Planning and Management
Community health services Goals development
Strategic planning (long-term)
Education - University Tactical planning (short-term)
Student Allocation of resources
Promotion/ recruiting Monitor and control
Evaluation and admissions Internal communications
Class registration Physical Plant Management
Academic and career advising Program statement
Financial aid Design
Student activities/life Construction and procurement
Student services Maintenance/ operation
Student status/archives Disposition
Protection
Credit Instruction
Rental property management
Curriculum development
Goods and Services
Scheduling instructional resources
Assessment of needs
Teaching and learning
Acquisition
Evaluation and measurement
Inventory of expendables
Research and Artistic Creativity
Inventory of non-expendables
Project identification and definition
Distribution
Procurement of resources
Alumni Affairs
Project execution
Tracking
Evaluation
Programs and services
Dissemination of results
Institutional evaluation
Public Services and Extension
External Communication and Relations
Activity development
Publicity
Administrative and logistical services for clientele
Negotiation
Resource procurement and organization
Public service
Activity delivery'
Extra-university affiliation
Activity evaluation

80
Appendix D. Examples of Planning and Control Processes

Cyclical Planning and Control from the test cell through the field use; inCludes
measuring warranty exposure and cost along with
Five-Year Business Planning failure rates. .
Establishment of a long-range business plan, taking
into consideration such things as product, product Capacity Planning
demand, capacity, manpower, financial strategies, and The determination of production and test capacity
information systems to achieve company goals. required to meet the planned production volume,
allocation of this within the company and supplier
Annual Operation Planning facilities, and acquisition of any additional capacity.
Development of a medium-range operating directive to
control the business activities in achieving the five-year Determination of Optimum Capacity
business plan. Required productive and test capacity is determined on
the basis of the planned production volume.
Quarterly Operation Planning
Quarterly restatement of annual operating plan, Capacity Allocation
reflecting a 'firm' operating plan for three months and The assignment of productive and test capacity among
a 'forecasted' operating plan for the following three the company and supplier plants. Make-vs-buy
months. analyses are made to determine internal and external
(supplier) requirements.
Reporting and Control
Review of the performance of operating units to ensure Market Planning and Strategies
the success of the plans. Change directions of operat-
ing units and/or plans when necessary to meet the Market Research, Market Development
objectives of the company. Identify markets, lay plans, and set strategies for
penetrating those markets.
Product Planning and Development
Pricing
Technology Development Establish as part of market penetration and product
Includes applied research on new engines, combustion , planning strategies.
systems, material, etc., and basic research on new
power systems. Publications, Advertising, Promotion
Support and augment strategies and tactics of market
Product Application development.
Application of research results to existing product line
and new products. Sales Analysis and Forecasting
New Product -.Development, testing and release of Provide necessary information to plan and measure
new products (components, engines or "software"). strategies and tactics.
Old Product - Application of improvements to
existing products. Warranty, Policy and Other "Software"
Application Engineering - Applying the basic engine Establish as integral with strategies and tactics of
to different customer applications (requirements). market penetration.
Specifications - The process of developing and
recording standard company specifications for Personnel Planning
products, material, inspection, process, supplier
certification, etc. Policies
Drafting and Records - Production of drawings that The establishment and implementation of policies and
describe the product, its characteristics, and its practices concerning employment, development,
applications. compensation and evaluation of employees.

Product Performance
Tracking and measuring the performance of an engine

81
Requirements Performance Reporting
Determination of manpower requirements in line with The process of feeding back information on actual
business objectives. production against the master production plan on a
periodic basis, and provision of input for any required
Financial Control modification of plans and schedules.
Establish, coordinate, and administer, as an integral
part of management, an adequate plan for the control Inventory Control
of operations. Determination and control of the levels of inventory
required to meet a predetermined level of production
Budget/Expense and service, with the objective of minimizing the
Provide expense budgets and cost standards together overall cost.
with the necessary procedures to effectuate the plan.
Plant Operations
Managerial Accounting The process of producing products or parts according
Compare the results of operations with plans and to a given schedule and specifications in the most
standards; interpret them for all management levels. efficient manner.

Operations Control Planning, Scheduling and Control


Development of a sourcing plan with and between the Determination of quantities to be produced on a daily
plants, the review of delivery performance, and correc- basis and the corrective action taken if necessary.
tive action necessary to accomplish the business Performance Reporting - Communicating the
commitments. quantities produced in a given time.
Expediting - Short-term replanning as required.
Master Production Planning Planning of material, manpower, and optimum use of
Translation of a central order board into a coordinated equipment
production plan and placing requirements in plants at Order Processing - The process of maintaining a
a meaningful part .level. plant order board of all products to be shipped,
including finished engines, components, kits and
Transportation Planning service parts, both to customers and other plants.
Determination of transportation strategies and capabil- Product and Process Specification - Maintenance of
ities necessary to support the operations plan. records regarding product definition and the incor-
poration of engineering changes.

82
Appendix E. Sample Descriptions of Processes

Market Process Customer Service


The activities necessary to identify and satisfy the Activities of service and support to communicate to the
wants and needs of chosen customers at a profit. buyer and to the stores the status of all products at all
times. This includes the traditional concept of order
Marketing Planning entry and order allocation. This is a service to buyers
Setting marketing objectives and strategies to support which provides actionable trade information.
overall company objectives. '
Inventory Levels - Determining raw material and Customer Service/Retailing
finished goods inventory levels to meet profit Use of credit cards, refunds made at retail stores,
objectives and supply the customers' needs. customer complaints.

Marketing Research Distribution Process


Systematic, objective, detailed search for and study of Activities required to move finished products to
facts and information relevant to any marketing customers on time.
problem or opportunity.
Consumer Research - Measurement and interpreta- Receiving
tion of consumer attitudes. The act of identifying, counting, verifying, and inspect-
Product Research - Securing facts relating to desired ing finished products.
product characteristics; the measurement and Inspection - The determination and classification of
evaluation of product sales potential. the quality of finished goods.
Sales Research - Measurement and evaluation of the Returns - The handling of finished products re-
company's sales potential by geographic area. turned from a customer, the determination of action
necessary, and the return of goods to inventories.
Merchandising
A creative activity having as its purpose the develop- Storing
ment of the products necessary to meet predetermined The safeguarding, recounting and internal handling of
profit, volume and "niche" objectives. finished products to ensure accountability for location
Product Development - Styling, i.e., the mating of and cycle inventory checks.
distinctive aspects of a product to appropriate Packing and Repacking - An activity that results in a
materials and trim from selected sources; determin- recombination of units or styles into a
ing the proper fold, package and labeling of the shipping/order unit.
finished product. Marking - The affixing of identifying information
Pricing - Matching manufacturer's cost to custorner and/ or price to an individual unit of finished
requirements. Includes preliminary costing. product.
Price Lining - Building the proper depth at each Inventorying - The counting of units of individual
price point. products for comparison to recorded quantities.
Forecasting - Sales forecasting and reforecasting. Liquidating - Sale of obsolete finished goods.
Quality level - The intrinsic value level of product
agreed upon between buyer and seller. Shipping
The activity of moving stock to a customer on time.
Advertising and Promotion Documentation - The recording and recordkeeping
The activity that communicates the need-satisfying relative to the picking, packing, and shipping of
benefit of the product to potential consumers. customer orders.
Sales Promotion - Those methods used to create Traffic - The determination of routing and carriers
customer traffic at the retail level. for customer shipment.
Vehicles - The scheduling and maintenance of
Sales company-owned or leased trucks.
Matching customer needs to products.
Selling - Coordinates with Advertising and Promo- Unique Retailing Operations
tion, Distribution, Inventory Levels, and Production The activities related to the distribution of supplemen-
Planning. tal finished products to a customer.

83
Stock Replenishment - The acquisition and distribu- ductive, satisfied work force; to commit to employ-
tion of finished products in relation to units of stock ees only what has been approved and then to follow
sold. up on any commitments made.
Point of Sale - The collection and analysis of Communications - Developing and administering
statistics concerning actual unit sales. policies, procedures and programs to keep employ-
ees well informed on things they need to know to
Personnel Process perform their work, and to promote positive atti-
Development and administration of policies and tudes and job satisfaction.
programs to attract, develop and hold qualified em- Separation/ Retirement - Development and adminis-
ployees and ensure their equitable treatment and tration of policies, proc~dures and programs pertain-
advancement to their highest level of competence. ing to the separation and retirement of employees.

Manpower Planning and Development Employee Safety and Health


Planning, selecting, educating, and training the man- Establishing -and administering policies and programs
power required to accomplish the company's objec- to protect the safety and health of all employees.
tives.
Affirmative Action - Development and administra- Financial Process
tion of policies, procedures and programs that result The activities involved in the acquisition and manage-
in hiring, rewarding, and promoting qualified ment of the fiscal resources of the company.
minorities.
Manpower' Planning - Determination of the quanti- Financial Planning
tative and qualitative manpower requirements of the The process ofsetting financial objectives and strate-
organization and the development and administra- gies to support overall company objectives.
tion of programs to acquire and/or develop the Cash Requirements Forecasting - Determining total
manpower needed. cash needs by period, on the basis of annual plans,
Recruitment and Selection - Searching out, evaluat- and weekly accounting unit needs.
ing 'and selecting employees to meet the specified Capital Requirements Forecasting - Reviewing
requirements and accomplish company objectives. long-term needs for capital and leased equipment,
Education and Training - Aiding in the determina- on the basis of annual plans.
tion of the education and training needs of employ- Profitability Analysis Forecasting - Predicting
ees and arranging for the development and conduct profitability trends by units, on the basis of annual
of such education and training. plans and historical information.
Manpower Development - Aiding in the determina-
tion of the personal development needs of individual Funds Acquisition and Management
employees, and in the planning of ways and means The process of securing the funds necessary to run the
to provide that development in order that each company.
employee is aided in achieving his highest level of Capital Structure - Determining the source of funds
competence. such as retained earnings, sale of stock, short-term
borrowing, long-term debt, lease obligations.
Employee Compensation and Benefits Banking Relationships - Developing avenues of
Development and administration of policies, proce- short-term capital to satisfy cyclical requirements;
dures and programs designed to attract and hold establishing deposit banks to speed up cash collec-
employees and to reward them equitably according to tion.
the quality of their work, by means of salaries, wages, Investment Community Relationships - Supplying
benefits, etc. information to financial analysts to develop sources
of long-term borrowing, improving performance of
Employee Attitudes/Relations stock, and meeting SEC requirements.
Development and administration of policies, proce-
dures and programs to develop and maintain a high Financial Operations
state of employee morale and productivity, and to The process of controlling the assets of the company.
monitor that activity and recommend action as neces- Tax Accounting - Filing appropriate tax returns,
sary to accomplish objectives. optimizing savings whenever possible.
Employee Morale - Development and administra- Government Reporting - Filing appropriate forms for
tion of programs to monitor employee morale and to use of agencies as required by law.
recommend action to maintain a motivated, pro-

84
Budgets - Preparing period plans with the assistance Accounts Payable - Recording, verifying and
of marketing and production. satisfying obligations of the company.
Cash Management - Controlling borrowing and cash Fixed Asset Accounting - Maintaining records for
flow within established guidelines. security, production and tax needs.
Payroll - Maintaining records and paying employees
Financial Reporting and Analysis of the company according to established procedures.
Compiling and analyzing financial data, determining Credit and Billing - Authorizing credit, billing at
trends, and recommending actions to be taken. established prices, recording payments, and effecting
collections.
Risk Management Inventory Valuation - Physical counting of assets of
Determining areas of risk and obtaining coverage the company, determining values, and recording
where needed. differences.
Overhead Allocation - Spreading fixed or common
General Accounting expenses by various methods appropriate to the
The process of doing the day-by-day accounting work particular item or location.
of the company. Cost Accounting - Maintaining standard cost records
General Ledger - Maintaining records of original of all products, recognizing variances, and recording
entry for all financial transactions of the company. them within established procedures.

85
98
...... x ® Management Planning

i..
Prepare & Admin. Budget
II II II Document Financial Trans. X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X )c X X)( X X X X ~ xTx
(f) Control Revenue & Expenses X X X X X X X X X X X X X X X X X X X )(~ X X XX X X X X 18 XI8 X.• 818
o ~ ~ Audit 88 .181
3 ~ O· II AI
III .,.,
Disburse
Collect Cash 18 X 161 X 8 18 1.18 A 11111 III X X X

~~i
~ < !6 ~~
Ana yllS •
,. X
~ X
<"
1113
~
III
0
a Reouisition
Maintain Equipment
181" 18 8
X 8...... 11161 . . . 18
...... ...... ...... ......1.18......
18...... a...... ............
8 X
X
.. X
...... ~
18] X
......
III 3 iT Rent ...... ...... ......111.................. X ...... ...... ...... I...... ...... . . . . . .1 ......
::I g =: Dispatch 18 ...... 8 ...... ...... ...... ...... 18 ......" . . . . . . . . . . . . e I
:. ~. :( Purchase Over $1,000 X X X ...... X X X X X X X X ...... X X X X
::I ::I PaY-abies
Ql X ...... X X
g. g.
CD CD Q.
g,
Contract
Administration X X X X X X X X X X X X
8X. . . .
X X X XX
. .X.X.X X
1818 I.....
ilC X X X X X X X • X X X X X
XI8 ac
X
a
~,~ ~ Payroll Personnel X X X X X X X X X X X X X X X X X X X X X a X X X X XI8 X X X X X X X 18 X
g ,g;;; Clean 18 ...... II!P...... e Ie
~ ,III 0" Maintain Facilities X X ...... 18 ............ IA t--......
1/1:::::1 Generate 8
3 Maintain D a t a e
~ Use
~ f-_Store
Use Materials & Supplies
X......
~
'
aa ee
e ... i'
X X lax
...... X X

X '{. . . ,
:& I I I I I I I I
......
I

~
:::~:ate
18
Licenses & Permits I1I1111 rlllllll:!II!1 Clalllll: 11:111:11: re
X

~=
r- Store Utilities
FTi11T I ti I ! IIIIIXIIIIII:IIIIIIIII~
X
~Treat
~
Bill X X
Insurance & Claims Employee ...... ~ e X/X X X~/X
Training & Safety Services 'X
I......I....../...... Ixi ...... ~ ......
I.'. . '. . "
Design I. . . . . . I I......
Construct Streets
Maintain Maps & Reds. ...... ......1...... 1...... 1 I...... ....../ I 18 ...... ......
Review Land Dev. Plans Engineering
Assessment Districts
Leased Housing
&
Development
......
...... xl
X
IX X
I.

Ix/......'8/X
X
X X
e
xl xix

Construct (Other) ...... ...... 1 ...... ' ...... 1...... 18 ......


Design Streets ...... xl I I 181 X
Maintain Streets Transportation X I I I I I I I9lx
Operate Airports xiX 18
Purchase/Main. Equip. ...... 1...... • ...... ...... 1 ...... ' ...... ' , ...... , ...... 1'- ...... 1...... 1...... ......1 X
Review All Projects X xl I I 18 X XI Xi Ix X X
Process Noise Compl. Env, Quality X xl I Je X
Review Plans 181 [€I X
Inspect Bldgs. Bldg. Inspection ~I :e
Acquire/Sell/Lease ...... 1...... ......r-. ...... 1 I...... ' ...... r-.j!
le' II I"......
...... 1...... 1 I...... ...... '

Manage Lease Property I. . . . . .


~I al ......1
Manage/Operate Facilities l8l"e 18l8l• •T€I 81 T 1.1 ]8 X
Inspect 18 X
Suppress Fire XI8 X X X
Patrol & Traffic )( a X X X
Identify & Arrest Police IB i
Investigate 1$
Enforce Parki~ Ie
Operate Branches 18
Acquire/Circ./lnv. Books Library e
Collect/Dispose Trash - Gen, Services e
Negotiate X ......
Process Grievances Labor Relations
I@
e X
Affirmative Action
Admin. Fed. Funds Human Resources 18 X
Admin. Citizen Aid X I@
Design P... ks 18
Maintain Flds. & Gnds.
Administer HecreltlOn
Parks & Rec.

Process Complaints - Citizen Assist. re-


~
.. xiX
X )(

Emergency Medical Care ]e- 8~ X


Prepere Gen. Plan XiX XIXIX )( X XiX X ]"I
Rezone Plaoning X X X xl I IX lfI
Review Land Use
Review Subdivisions
File Official Documents
X IX
X
X
X
X all Ie X
••rene
Manage Elections City Clerk 18
Prosecute Offenders City xl I I I I I I I IX' , /X'X, 1.lxl I I I I I I I I I I Ixi Ixi I I I I TI ...... I--T4!!I
Civil Litigation & Liab. Attorney xl Ixl I I I I Ixlxlx'x' / , / /X/ /x/XI I I I IxI81xlxI I Ixi Ixlxlxle
l1eVIew Legoslation
" , , , , , , , , , , , , , , , , I.
e
aI ..I81e18I.leI9l&lal8le18Tef9l8fele
Represent City Legislative Rep.
Output Measures 18I8I8IeI8181818IeI818Iale~~.lel_lelel8l
~ --
,,-----------~I'
7 Proc_ --~ Il'
~.
(').~
~ i
'"
~ ~ ~
r-
~
"0 'TI "0 ,CD

i- ;" i
m'
~ ~. ~ ~ ~ ~ !! ~ ~ ~
, I , -i' " 'm
~ ~.
m
~
"0.,

~ ar~' ~.
'TI r- :!1 (')
g!
» (')
~ ~.
- 3- -< ::l;·C~·ii'Ql3t1&.2Ci·:lftl Q)~O i" _. ;)1,
'8 a
CDC 0
~ 5: ~. a: ~. ca' 0 ~ to' a: ~
o ~
§ Q
;:;' =, 3' i i
< ca :l
;-i;:\ n' !J " ; .. !l m :li 3'
S' <
:li .s!!!. 2~ ~~ 'i'" ~ ~ !I
Q.O I
i~' ; ~ 'a " ~ i ~..
!!!. !J ~ S' ~ ~ ~ 5'; ~ ~,~;, ~ ~
~. ~ i ~i g.~ §~~~~,i ~~ Q' =~:o "
g' ~' :. "j ! I~ ~ ~! ~ ~ i
~---------------------~
Sa~!Jl8"1 d!qsOO!l8Iall SmalSAS/SSaO!SDg JO saldm8X3: .~. X!poaddV
~
Vehicle Vehicle Vehicle
Disposal Rent & Lease Acqu isition Marketing Finance Management

Systems

c c c Accounts Payable
c c c Annual Volume Rebate
ccccccc c Air Care
c Credit Cards
cc Centrex Phones
c Data Entry Stats
c Deposits
c Documentation· Library
c p Daily Reporting
cc c Floating Fleet
General File Support
c c p p p C CCCCCP General Ledger - Car Leasing
p p cc c c CCCCCP General Ledger
p c Input Processing (Car RIA's)
p c Truck Entry (Truck RIA's)
c c Leasing Commission
c c Licensee Lease
c c Licensee Receivables
p c Market Penetration
c Reservations
c National Discount Bulletin
P C C Pool Control
c P CC C C C C P P Open Receivables
C P C C C C C C P Car Leasing - Receivables
C C C Payroll
C RIA Control
C Rental Properties
C C System Fees
C Systems and Programming
C Tabs
C Taxes
c C C Ppee c c c c c c c c c c c c C C C Car Lease - Vehicles
c cc c c c c c c c p Vehicle Master .- Corporate
cc c c c c c c c c Vehicle Purchase Order
C Current p Planned

87
/

/Student
SYSTEMS

Admissions o.!tho o o
Registration o~o o 0 o
Financial Aid 0 0 0 0 0 •.!.1)0 o o o 0 o
Evaluation o 0 o 000 o 0 0 0
Status Reporting 0000000 o o 0 0
Student Flow 0000000 o o 0 0 0
Facilities & Cap. Equip.
library Ordering & Circ.
Order Control %"1 000
Project Control o 0 0
Space Management o o 0 0 o 0 000
Capital Equip. Mgmt. o 0 0 o 0 o 0
Supplies Management 000 o
Food Services o
Alumni/Development
Grant/Donation Status o~
Alumni/Donor Contact o o0 o
Alumni Profile o
Gift & Grant Tracking o~
Financial
Receivables o o !Yhl~
~bles
Payroll
Portfolio Mgmt.
Accounting
Planning & Control
Records Maintenance I I I I I
Models o 0 0 0 0 o 0 0 0 0 o 0 0 o 0 0 o 0 0 0 000 o 0 0 0
Budget Prep.lTracking o 0 0 0 0 000 o 0 0 o 0
Manpower
Salary & Benefits Admin. o
Personnel Eval./Tracking o o 0 I~I~I~I~I~ o 0
Manpower Track.lForecast o 000 000
Curriculum/Instruction
Course Offering/Reqmnts. o 0 0 o 000 o o 000 0
Degree Programs o o 000
Trends/Statistics Anal. o 0 0 0 o o o o o o 0 0 0
t--- Course/Section Sche'-d-u-Ie-s-----+-+---~~+-+- o IJ.6 0

Input o Output

88
Appendix G. Sample List of Wall Charts for Control Room

• Ob.jectives of the Study • Products/Markets Data


• Scope of the Study • Map of the Distribution System
• Organization Chart - Business and Data Processing • Definitions of BSP Terminology
• List of Interviewees - Time and Day Schedule • Study Work Plan (Chart or Study Calendar)
• Names of the Study Teafll Members • Study Report Outline
• Business Goals and Objectives • Business Environment - External and Internal
• Data Processing Budget Information • Process/Organization Matrix
• Current Systems/Organization Matrix
• Current Systems/Master Data File Matrix

89
Appendix H. Risk - Potential Benefit Analysis

This technique attempts to quantify each perceived required as a result of the new system. An exam-
potential benefit. The textbook solution is to have the ple might be displacement of keypunch operators
executive make a "ballpark" estimate of potential through remote data entry.
savings or gains. However, it is often difficult, though b. Increased productivity (reducing widely varying
not impossible, to assign dollar savings to such areas as workload, applying information to all areas of
faster response time, tighter management control, and business. etc.). Another benefit accrues because
improved product performance. the new system should allow existing or future
Assess potential values conservatively. Remember facilities or people to do more work. This catego-
that estimates are useless unless the executive believes ry may be viewed, therefore, as one of increased
they are possible and really apply to his situation. productivity and accuracy on the part of a clerical
When asking questions that will help the executive to staff through online data entry. Future personnel
make estimates: requirements can potentially be held to a mini-
• Use a conservative guess, with a range of potential mum.
return of savings. c. Increased income or revenue (automatic decision
• When at all doubtful, use figures the executive sees making, more data to aid decision, exception,
as absolute minimums. reporting, etc.). This final category addresses the
• When you refer to similar situations, be sure that use ofadvanced computer applications to in-
they really are similar and that the executive can crease income. For example, freedom from
verify them. routine decision making may enable management
• Look for previous or currently existing data and to spend more time on the really important
statistics that indicate the range of potential return decisions. Attainment of this benefit depends on
or savings. business policy and the ability to effectively use
The team should focus on broad benefits to the the computer resource.
point that they can be operationally defined. In the example of production planning, the benefits
Probability prediction is a valuable tool, because it estimated during the interviews with the vice president
lends credibility to the estimates upon which justifica- of production, the director of production planning and
tion is based. Use of the benefits matrix arrangement the manager of electronic sales might be:
shown here may be particularly valuable in helping to $1,000,000 - materials reduction
assign approximate dollar values to benefits. 300,000 - labor reductions
600,000 - increased production
High Medium Low 500,000 - sales increase
Probability Probability Probability
2. Using the estimated maximum potential savings, the
team then estimates a dollar amount of that total
Displaced
Costs
possible return for which there is:
m 131 161 a. High probability of realization
b. Medium probability of realization
Increased
Productivity
c. Low probability of realization
~ 51 81 F or instance, as shown in the following illustration,
an automated production planning system might result
Increased
Income
in a toal materials saving of $1,000,000 annually but
41 71 91 that total may not be immediate or certain. However,
it is estimated that:
a. There is a high. probability that raw materials
The potential benefits matrix is used in the follow- may be reduced by $500,000.
ingmanner: b. There is a moderate probability of an additional
I. The potential benefits from each subsystem are saving of $200,000 in finished goods inventory.
totaled by the following categories: c. While it isn't certain that the entire $1,000,000
a. Displaced costs (increasing speed, reducing could be saved, it is possible. In this case, a
redundancy, etc.). Data processing has tradition- further saving would result for an additional
ally been evaluated in terms of cost displacement. $300,000.
This condition exists when a task, machine,
supplies, or other expenses should no longer be

90
High Medium Low Notice that a number has been assigned to each cell
Probability Probability Probability
of the matrix for illustration purposes orily. These
500,000 200,000 300,000 Materials
Displaced reduction numbers show the likelihood that the potential benefit
Costs 100,000 100,000 Labor will happen. After the data has been collected, the
reduction
team lists the dollar estimates for each system on the
Increased Increased potential benefit level - risk level table shown. Each
Productivity
100,000
production
system is listed down the side of the table and the
dollar amounts from each cell are entered in the
Increased Profit
100,000 correspondingly numbered column.
Income increase
The rows are then totaled. The completed table is a
Total 1,100,000 700,000 600,000 useful tool for summarizing in dollar terms the poten-
tial benefits of the system the team recommends. The
systems areas may now be compared (and/or ranked)
3. This procedure is repeated for each I/S potential on the basis of total (right-hand column) or any
benefit for which there is high potential saving. combination of risk levels (from left to right).
Depending upon time available, estimates should be Note: When recommending the first system for
developed for all areas that could be quantified implementation, the study team should be alert to a
during the interviews. Totals are then developed in potential problem. The most needed system may prove
each category and for each subsystem. to be impractical to implement until another system is
installed to furnish necessary input data. In such a
case, management should be informed so that the
RISK LEVEL reason for recommending a lower-priority system is
understood.
1 2 3 4 5 6 7 8 9 TOTAL
SUBSYSTEM

Production Planning 600 300 300 200 200 400 200 100 100 2,400

Production Scheduling

Plant Status

Order Entry

Order Status

Sales Control

Cost

Bills of Material

Product Data Control

Purchasing

Raw Materials Inventory

Finished Goods Inventory

Sales Analysis

Forecasting

Financial Modeling

Territory Analysis

Engineering Design

Skills Inventory

Compensation Administration

Financial Planning

91
Appendix~. ISM Processes

Planning a~d Control Data Administration


Planning and Control
Strategic Planning Data planning
Assumptions Management Data acquisition
Environmental analysis Dictionary/ directory management
Tracking business objectives Standards management
Human resource projections and skill requirements Documentation and training
Technology direction Plan measurement
Determining Policies Performance Control
Setting I/S Objectives Physical design
Defining & Maintaining Information Architecture Modeling
Business direction Performance evaluation
Information requirements Tuning
Resource projections (installations, Reorganization
headcount and expense levels) Usage Control
Logical design
Management Control Security, availability, auditability, arid
Project and Resource Planning integrity management
Long-range planning U sage measurement
Capacity planning Recovery
Justification and funding Query
Short-range planning (projects,
resources, organization, technologies, Organization and Administration
and skills) Manage the Organization Structure
Budgeting Define management practices (funding,
Software, and Communication Facilities project initiation, project control, auditing,
Monitor technological development justification, methods and standards, planning
Financial analysis and budgeting, personnel, key measurements,
Benchmark/testing data, and security)
Utilization Control Manage Personnel
Data usage Recruiting and hiring
Equipment usage Career development
Communication facilities usage Evaluation and productivity improvement
Functional modules usage Accounting
Performance Measurement Project accounting
Budget performance Chargeouts
Project phase reviews Recordkeeping
Quarterly project status reporting Purchasing
User satisfaction Used Equipment Sales
Application installation follow-up
,Security and recovery analysis Information Systems Development
Change status review Requirements Definition
Operations analysis Define subprocesses
Capacity status review Define information requirements
Vendor performance Determine objectives and control points
Adherence to management practices Analyze cost/benefits
Auditing Prepare design/development plan
Operations External.Design
Project External functions
Management User inputs, output, data r~quirements

92
Depict systems flow and controls Change Management
Data security Propose and document changes
Build test cases Plan/coordinate changes
Internal Design Iinplement changes
Design internal modules Report, track and analyze changes
Develop test plan Problem Management
Design walkthroughs Report problems
Model systems performance Monitor problems
Program Development Resolve problems
Develop program specifications Analyze and prevent problems
Code and test Operations Management
Integrate Monitor/modify network, workload
Systems Test and configuration
Perform systems test Schedule workload
Test user documentation Operate/process
Test documentation for operations and maintenance Interface to users (problems
Test installation and conversion plan and job requests)
Test security Recovery Management
Installation and Maintenance Determine recovery requirements
Train users Define recovery process
Train operators I Test and update recovery process
Convert data Performance Management
Cutover Set objectives
Monitor reliability Measure and analyze performance
Post-installation audit Modify /tune performance
Requirements analysis Security/Audit Management
Change management Assess current audit and security status
Functional Modules Set requirements for authorizations,
Specify requirements documentation and reconciliations
Develop standards Identify owners, users, and
Make-or-buy decision custodians of data
Develop/purchase Control 110, error handling, and retention
Install Provide physical security
Dictionary / directory and library maintenance Monitor for compliance
Audit Executive Reporting
Identify summary data
Collect and analyze summary data
Systems Management Distribute reports/modification information
Capacity Management
Define current system and load
Forecast future workload
Evaluate configurations/designs
Track and analyze development

93
Appendix J. Potential Topics for BSP Study Report

Executive Summary Report Geographic distribution (map of


Purpose, scope and objectives equipment, terminals, etc.)
Methodology and study team Information Systems Profile
Summary of conclusions and .recommendations Hardware and software (chart)
Action plan for follow-on activities· Operational and planned systems
Data files
Detail Report Major users
Purpose, Scope and Objectives Financial
Reasons for conducting study Budgets
Level of organization selected Justification and funding processes
Objectives of the study team Findings and Conclusions
Method of Study Definition of data classes
BSP concepts
Relationship of data class to current data
Overview of study approach files (matrix)
Study team members Relationship of data class to business entity
Business Perspective (matrix)
External environment Relationship of data class to business processes
Economic, government, competition (matrix)
Technology, customers, suppliers Analysis of business/systems relationships
Internal environment Process relationships (diagram)
Policies, practices, constraints Process/organization relationship (matrix)
Business planning Application support/organization (matrix)
Goals, objectives, strategies Application support of processes (matrix)
Planning approach and horizons Relationship of applications to data class (matrix)
Measurements and controls Executive interview results
Organization Summary of major problems, solutions, and
Relationships (chart) Information System needs (chart)
N umbers of people Information Systems Management requirements
Geographic distribution (map) Method used to determine ISM solutions
Products/ services and priorities
Description, volume Description of projects that address major
ISM problems
Markets, trends
Industry position and industry trends Recommendations
Financial Information Systems Management
Statistics Data management, liS planning functions
Revenue-profit trends (chart) (additions/changes)
Business processes Control and measurement procedures
Definition(s) Requirements for a detailed Information Systems
Information Systems Pespective plan
External environment First system or subsystems
Technology, customers (users), vendors Requirements for definition
Internal environment Information architecture
Policies, practices, constraints Must be further defined - in particular, the
liS planning databases
Goals, objectives, strategies Action Plan for Follow-On Projects
Resources, project schedules (For the above recommendations)
Planning approach and horizons Description(s)
Organization Deliverables
Relationships (chart) Schedules
N umbers of people Resource requirements
Project control methods

94
Appendices Narrative descriptions - processes
Glossary of terms Narrative descriptions - current applications/
Key correspondence systems
Interviewee list and questions Supporting statistics

95
Glossary

Action plan - The group of activities, schedules, and Goal - A broad, general direction or intent.
resources recommended as a result of a BSP study (may Information architecture - The structure of information
be referred to as a general information systems plan). systems and data that will provide information to
Application - A data processing activity providing support the business.
information to one or more organizational units. Information system (liS) - A logical group ofsubsys-
Architectural priorities - The recommended sequence terns and data required to support the information
for implementation of the information architecture. needs of one or more processes.
Business - The organizational entity being studied, Information systems management - Those functions
regardless of its size or purpose, either private or public required to manage the information systems resources
sector. for the most efficient and effective support of the
Business process - A group of logically related decisions business.
and activities required to manage the resources of the Information systems plan - A plan that gives specific
business. goals, strategies, project descriptions, resources, and
Business Systems Planning - A structured approach to schedules for the design, development, and implemen-
assist a business in establishing an information systems tation of an information architecture.
plan to satisfy its near- and long-term information Objective - A specific and measurable item or element
needs. ofa goal.
Control room - A work and interview room set aside Resource - That which is used or consumed by the
for the continuous use of the team throughout the BSP business in the fulfillment of its objectives.
study. Scope - The defined boundaries of the business being
Data class - A category of logically related informa- studied - divisions, function and geographic locations
_tion. ,Examples are customer, vendor, customer orders, included and excluded.
parts inventory, and appropriations. Sponsor - The executive who gives approval for the BSP
Data base - A non-redundant collection of interrelated study and to whom the team is responsible.
data items processable by one or more applications. Strategy - A planned action for achieving an objective.
Data file - An individual group of data related to or Team leader - The person who directs the study team,
used by an existing application before implementation participates full time, and is responsible for the success
of a data base approach. of the study.
External environment - Influences that exist outside the Work plan - A plan that is developed to show activities,
business being studied and over which the business has responsibilities and schedules for the work to be
little or no control, e.g., government regulations, performed during the BSP study.
industry, competition, economy.
Follow-on projects - Activities that occur after and as a
result of the BSP study.

96
READER'S
Business Systems Planning - Information Systems Planning Guide
COMMENT
Application Manual FORM
GE20-0527-2

This form may be used to communicate your views about this publication. They will be sent to the
author's department for whatever review and action, if any, is deemed appropriate. Comments may be
written in your own language; use of English is not required.
IBM may use or distribute any of the information you supply in any way it believes appropriate with-
out incurring any obligation whatever. You may, of course, continue to use the information yo~ supply.
Note: Copies of IBM publications are not stocked at the location to which this form is addressed.
Please direct any requests for copies of publications, or for assistance in using your IBM system, to
your IBM representative or to the IBM branch office serving your locality.
Possible topics for comment are:
Clarity Accuracy Completeness Organization Coding Retrieval Legibility
...c: E
....
If you wish a reply, give your name and mailing address:
Q) 0
E ....
Q. en
-5 :.c
tr .....
Q) -
co
CI Q)
c: en
-- 0
t: .....
oen Q)
Q.
=co co
.....
E~
Q)
] E
<4-' E
E",:::J
o CI
..... ....
:::J Q)
co~
.....
~ 0
_t:: "-
~ 0
-en Q)

E -~
_Q) en --
.0 c:
o.... Q)
en
Q.

~
o
Z

What is your occupation? _______________________________________________________

Number of latest Newsletter associated with this pUblication:


----------------------------
Thank you for-your cooperation. No postage stamp necessary if mailed in the U.S.A. (Elsewhere, an IBM
office or representative will be happy to forward your comments or you may mail directly to the address
in the Edition Notice on the back of the title page.)
l
I
I
't
GE20~0527-2 I
I
(")
S.
~

"
0
0:
»
0'
Reader's Comment Form ::s
\C
r
:;'
(1)
»
"C
"2-
c;'

r+

;:,
s:

;:,
c:
~

Fold and tape Please Do Not Staple Fold and tape

First Class
Permit 40
Armonk
New York

Business Reply Mail


No postage stamp necessary if mailed in the U.S.A.

Postage will be paid by:

International Business Machines Corporation


Department 824
1133 Westchester Avenue
White Plains, New York 10604

.....................................................................................................................................................................••••••••••••••••••••••••••••••••••• ..1

Fold and tape Please Do Not Staple Fold and tape

==-=
-- =®
- --_-.....-
- -
- - - .... --
----_
-------
-...
-~-

International Business Machines Corporation


Data Processing Division
1133 Westchester Avenue, White Plains, N.Y. 10604

IBM World Trade Americas/Far East Corporation


Town of Mount Pleasant, Route 9, North Tarrytown, N.Y., U.S.A. 10591

IBM World Trade Europe/Middle East/Africa Corporation


360 Hamilton Avenue, White Plains, N.Y., U.S.A. 10601
GE20·0527·2

OJ
C
V>
:;,
(1)
V>
V>
en
-<
....
V>
(1)

3
V>

::2
'":;,:;,
:i'
to

:;,
.....
o
3
....'"
0'
:;,
en
-<
~
(1)

3
V>
."
Qj
:;,
:;,
:i'
to
Cl
C
c.:
(1)

...,
."
:;,
....
(1)
a.
:;,
C
en
~
Cl
m
N
o
6
01
N
-..J
,:."

---
-- -
---
- - ----
--
-
-
-
--_.- ---
- - ------
--
<!l

International Business Machines Corporation


Data Processing Division
1133 Westchester Avenue, White Plains, N .Y . 10604

IBM World Trade Americas/Far East Corporation


Town of Mount Pleasant, Route 9, North Tarrytown, N.Y, U.S .A . 10591

I BM World Trade Europe/Middle East/Africa Corporation


360 Hamilton Avenue, White Plains, N .Y ., U .S.A. 10601

You might also like