You are on page 1of 12
‘Jasa Engineering FEED a Design Package Cadet iiten Pree ant Pr flan Pertaine NiewAsional™ | PROCESS DESIGN Internasional Unit IV Cilacap pa eCT Ee BASIS Doc.No._: FEED-J-154-PR-DB-001 1 PT. KILANG PERTAMINA Date 98-Dec-2021 INTERNASIONAL UNIT IV aaikerat LOCATION : PERTAMINA RU. IV, CILACAP, CENTRAL JAVA, INDONESIA OWNER : PT. KILANG PERTAMINA INTERNASIONAL UNIT IV CILACAP ™ |CONTRACTNO. : 012/KPI47000/2021-S2 = MT” PERTAMINA SERTAMINA 1Jasa Engineering FEED Design Package Demineralization Water Pant PT Kilang Pertamina intemasional Unit WV Glacap A appRovED APPROVED EXCEDT MINOR COMMENT, WORK MAY 'PROCEDD FOR APPROVAL ITEM _REWSED.AS COMMENT, WORK CAN NOT PROCEED Feed rtamina RU tv Bf \ciracar S5SUED FOR oo 00 FORINFORMATION Date ey BATE 1S18 [2023 N | 2A Tssued for Design Sbec21 Wo SA AR 1B | Re-lssued for Approval [29-Nov-27 wo | Sapoe AR 1A. Issued for Approval 15-Oct-21 i} SA AR Rev Description Date Prepared by | Reviewedby | Approved by SPT ue INDONESIA 1112 a s* Jasa Engineering FEED Design Package PERTAMINA Project: Demmeralaton Water YSSSGR"* | PROCESS DESIGN Inemesionl UV Clscap aie ae ae BASIS Doe. Ne. i FEED184-PR-DB-Ot PI KLANG PERTAMINA Date: 8Deoz021 INTERNASIONAL UNIT IY areas Sheet Rot 2 REVISION HISTORICAL SHEET Rev. | Page/Paragraph [| Item a ee 8 eset Projet name a see Unttrame In Baneon indonesia see (ees COMPANY name update anon ees eens 6 |sccsas, | Add acer & aya of freanrenacta | Tales ati cha ecg cs od vnc copa 3 seco Update table of feedstock properties joe) |e (ANGE eed eis open 11 __|See.42.4 | Add table for tino izing erteria [2x all Tssued for Design PT JGC INDONESIA 2112 vasa Engineering FEED = Design Package A” PERTAMINA Project: Demineralzation Water ane PeeTAMINA Plant PT Kilang Pertamina hekinconat’’ | PROCESS DESIGN Interasional Unt WV Glacap edie BASIS. Doe, No, _: FEED~-154-PR-DB-001 PT. KILANG PERTAMINA Date: 9-Dee-2021 1 TV IN] SS Nae 0 Shiast Sena TABLE OF CONTENT 1. TUJUAN 4 4, PURPOSE 4 2. PENDAHULUAN 4 2. INTRODUCTION 4 3. DEFINIS! 5 3. DEFINITION 5 ” 4, REFERENS! 6 4, REFERENCE 6 5. SINGKATAN 6 5. ABBREVIATION 6 6. SISTEM PENGUKURAN 6 6, SYSTEM OF MEASUREMENT é 7, LINGKUP PEKERJAAN 7 7. SCOPE OF WORK 7 8. KAPASITAS 9 8. CAPACITY 9 9. PROPERTI FEEDSTOCK 9 9, FEEDSTOCK PROPERTIES 9 10. SPESIFIKASI PRODUK 10 10.PRODUCT SPECIFICATION 10 44. KONDISI BATTERY LIMIT 11 14. BATTERY LIMIT CONDITIONS "1 12. PERSYARATAN DESAIN KHUSUS 11 12.SPECIFIC DESIGN REQUIREMENT 11 13. DATA PELENGKAP 412 13,.SUPPLEMENTARY DATA 12 ae PT JGC INDONESIA = radon INTERNASIONAL PROCESS DESIGN Internasional Unit IV Cilacap eee BASIS Doe. No, _? FEED-154-PR-DB-001 acne enraans Dae ea se Seite Lingkup pekerjaan untuk New Demin Plant Package antara Vendor dan Kontraktor adalah sebagai berikut (1) Lingkup Vendor - Bagian Desalinasi (AC Filter, cation exchanger, degasser tower, anion ‘exchanger dan sistem pompa) - Bagian Demineralisasi (Mixed Bed dan blower) - _Bagian Regenerasi (Pompa regenerasi, sistem chemical dosing dan dilution, pompa netralisesi) (2) Lingkup Kontraktor = Feed Tank - Feed Pump - New Demin Water Tank = Product Demin Water Pump = Neutralization Pit Kontraktor akan metakukan adequacy check dan verifikasi dari Tangki Air Demin eksisting 154-T-502A/B, Tangki Air Umpan Boiler eksisting 54-T-1/2, 540-T-401/402, 054-T- 101/102 beserta pompa-pompanya dan jelur eksisting untuk menampung adanya kapasitas tambahan dari New Demin Prant. Air limbah dari New Demin Plant setelah dinetralkan di Pit Netralisasi akan dibuang ke Scope of work for New Demin Plant Package between Vendor and Contractor is as follows: (1) By Vendor Desalination Section (AC Filter, cation exchanger, degasser tower, anion exchanger and related pumping system) - Demineralization Section (Mixed Bed and blower) - Regeneration Section (Regeneration pump, chemical dosing and dilution system, neutralization pump) (2) By Contractor - Feed Tank - Feed Pump - New Demin Water Tank - Product Demin Water Pump - Neutralization Pit Contractor will check and verify the adequacy of existing Demin Water Tank 154-T-502A/B, existing Boiler Feed Water Tank 54-T-1/2, 540-T-401/402, 054-T-101/102 along with its pumps and existing lines to accommodate additional capacity from New Demin Plant. Waste water from New Demin Plant after itis neutralized in Neutralization Pit will be 8/12 “asa Enginearing FEED = Design Package M™ PERTAMINA Project: Demineralzation Water KLANG PERTAMNA Plant PT Kilang Pertaina wtesiasiowal’” | PROCESS DESIGN Intemasional UnitV Gicap i GER BASIS Doe. No: FEED-154-PR-DB-001 PT. KILANG PERTAMINA Date: SDeo2021 INTERNASIONAL UNIT IV CILAGAP Sheet Gof 12 or Holding Pit eksisting 166-PIT-505. Kontraktor akan melakukan adequacy check dan verifikasi terkait operasi dan kapasitas Holding Pit eksisting (166-PIT-505). KAPASITAS Unit demin water package harus dirancang untuk mengolah umpan masuk dengan laju alir kapasitas operasi normal 200. m*jam dengan minimal menghesilkan produk 87% atau minimal 174 m*jam regenerasi dalam 8.760 jam operasi tahunan jadwal regenerasi). Kapasitas desain maksimum adalah 230 m°fjam. luar Iaju_alir (termasuk disposed to existing Holding Pit 168-PIT-505. Contractor will check and verify the adequacy of Existing Holding Pit _(166-PIT-505) ‘operation and capacity, CAPACITY The demin water package unit shall be designed to process inlet flowrate feed at the normal operating capacity of 200 m*/hr with minimum product yield net 87% or mi 174 m*thr exclude regeneration flowrate in 8,760 operating hours per year (including um. regeneration schedules). Maximum design capacity is 230 mY/hr. PROPERTI FEEDSTOCK FEEDSTOCK PROPERTIES Unit harus didesain untuk mengolah umpan The unit shall be designed to process feed dengan spesifikasi sebagai berikut : with following specification Parameter Unit | Value Scien Nommal 5 200 Iniet Flow Rat aa mh me Min 88 pH Max - 79) Average 74 Min 0.25 Turbidity Max NTU 2 Average 11 Min 140. Conductivity Max hSfom 350. Average 188. Min 40 Ca Hardness Max ppm Ca 90 ‘Average 54 ‘Min 50. Total Hardness Max] ppm CaCOs 2 9/12 Jasa Engineering FEED = Design Package A” PERTAMINA Project: Demineralzation Water TANG PERTAMINA Plant PT Kilang Pertamina TNTERNASIONAL PROCESS DESIGN | PROJECT ENGINEERING BASIS proce bes | PT. KILANG PERTAMINA Date @-Dec-2021 INTERNASIONAL UNIT IV ee Sheet: 100f 12 [Average 76 ‘Min 20 Total Alkalinity Max] ppm CaCOs 20 Averags 35, Min 3 Chioride Max | ppmCt 40 Average 13 Win 1s ~ Silica Max] ppm SiOz 30 ‘Average 2 Min 0.07 Total Fe Max] ppm Fe 02 Auerags 0.08 Min 20 Magnesium ‘Max | ppm Mg 50 Ruerage a3 Min aes SOs Max ppmso, [25 _ Tuerage 75.65 Min Ta Natrium Max | ppmNa | 93 Averase | B12 Note: *) Flowrate inlet feed 200 m‘/hr with minimum product yield net 87% ‘or minimum 174 m*/hr pure demin water (exclude regeneration flowrate) 10. SPESIFIKASI PRODUK 10. PRODUCT SPECIFICATION po Produk air demineral harus memenuhi Demineralized Water product shall meet the spesifikasi sebagai berikut following specification: Parameter Specification Hardness Zero Total ion (as Fe) (ppm) Max. 0.01 ‘Oil Content Nil Total Copper and Nickel | Max. 0.003 (as Cu) (ppm) es . Silica (as SiOz) (ppm) Max. 0.01 Conductivity (uS/cm) Max. 5 pH 6-8 Sodium + Potassium (ppm) Max. 0.04 Chloride (ppm) Max, 4 pH Effluent Waste Water 6-9 PERTAMINA Project: Demineralzation Water GaN peeTAMINA Plant PT Kilang Pertamina ivekasenal’ | PROCESS DESIGN Intemasional Uri V Ghacap in ee aren BASIS Doe. No, = FEED-V-164-PR-DB-O01 PT_KILANG PERTAMINA Date: #Deo2021 INTERNASIONAL UNIT IY areas Sheet: 120f12 (Referensi: JGC Standard Practice 210-120-1- (Reference: JGC Standard Practice 210-120- ‘37E) 1-37E) 13. DATA PELENGKAP- 13. SUPPLEMENTARY DATA Data utilitas dan kondisi iklim di area RFCC Utility and climatic condition data in RFCC a RU-IV Cilacap mengacu pada dokumen Basic area RU-IV Cilacap shall refer to Basic Engineering Design Data (no.doc. FEED-J- _ Engineering Design Data document (doc.no. 154-PR-SP-001). FEED-J-154-PR-SP-001). oN PT JGG INDONESIA 12112

You might also like