‘Jasa Engineering FEED
a Design Package
Cadet iiten Pree ant Pr flan Pertaine
NiewAsional™ | PROCESS DESIGN Internasional Unit IV Cilacap
pa eCT Ee BASIS Doc.No._: FEED-J-154-PR-DB-001
1 PT. KILANG PERTAMINA Date 98-Dec-2021
INTERNASIONAL UNIT IV aaikerat
LOCATION : PERTAMINA RU. IV, CILACAP, CENTRAL JAVA, INDONESIA
OWNER : PT. KILANG PERTAMINA INTERNASIONAL UNIT IV CILACAP
™ |CONTRACTNO. : 012/KPI47000/2021-S2
=
MT” PERTAMINA
SERTAMINA
1Jasa Engineering FEED Design Package Demineralization Water Pant
PT Kilang Pertamina intemasional Unit WV Glacap
A appRovED
APPROVED EXCEDT MINOR COMMENT, WORK MAY
'PROCEDD FOR APPROVAL ITEM
_REWSED.AS COMMENT, WORK CAN NOT PROCEED
Feed rtamina RU tv
Bf \ciracar
S5SUED FOR
oo 00
FORINFORMATION
Date ey
BATE
1S18 [2023
N
| 2A Tssued for Design Sbec21 Wo SA AR
1B | Re-lssued for Approval [29-Nov-27 wo | Sapoe AR
1A. Issued for Approval 15-Oct-21 i} SA AR
Rev Description Date Prepared by | Reviewedby | Approved by
SPT ue INDONESIA
1112a
s*
Jasa Engineering FEED
Design Package
PERTAMINA Project: Demmeralaton Water
YSSSGR"* | PROCESS DESIGN Inemesionl UV Clscap
aie ae ae BASIS Doe. Ne. i FEED184-PR-DB-Ot
PI KLANG PERTAMINA Date: 8Deoz021
INTERNASIONAL UNIT IY
areas Sheet Rot 2
REVISION HISTORICAL SHEET
Rev. | Page/Paragraph [| Item
a ee
8 eset Projet name
a see Unttrame In Baneon indonesia
see (ees COMPANY name update
anon ees eens
6 |sccsas, | Add acer & aya of freanrenacta
| Tales ati cha ecg cs od vnc copa
3 seco Update table of feedstock properties
joe) |e (ANGE eed eis open
11 __|See.42.4 | Add table for tino izing erteria
[2x all Tssued for Design
PT JGC INDONESIA
2112vasa Engineering FEED
= Design Package
A” PERTAMINA Project: Demineralzation Water
ane PeeTAMINA Plant PT Kilang Pertamina
hekinconat’’ | PROCESS DESIGN Interasional Unt WV Glacap
edie BASIS. Doe, No, _: FEED~-154-PR-DB-001
PT. KILANG PERTAMINA Date: 9-Dee-2021
1 TV
IN] SS Nae 0 Shiast Sena
TABLE OF CONTENT
1. TUJUAN 4 4, PURPOSE 4
2. PENDAHULUAN 4 2. INTRODUCTION 4
3. DEFINIS! 5 3. DEFINITION 5
” 4, REFERENS! 6 4, REFERENCE 6
5. SINGKATAN 6 5. ABBREVIATION 6
6. SISTEM PENGUKURAN 6 6, SYSTEM OF MEASUREMENT é
7, LINGKUP PEKERJAAN 7 7. SCOPE OF WORK 7
8. KAPASITAS 9 8. CAPACITY 9
9. PROPERTI FEEDSTOCK 9 9, FEEDSTOCK PROPERTIES 9
10. SPESIFIKASI PRODUK 10 10.PRODUCT SPECIFICATION 10
44. KONDISI BATTERY LIMIT 11 14. BATTERY LIMIT CONDITIONS "1
12. PERSYARATAN DESAIN KHUSUS 11 12.SPECIFIC DESIGN REQUIREMENT 11
13. DATA PELENGKAP 412 13,.SUPPLEMENTARY DATA 12
ae PT JGC INDONESIA
= radon
INTERNASIONAL PROCESS DESIGN Internasional Unit IV Cilacap
eee BASIS Doe. No, _? FEED-154-PR-DB-001
acne enraans Dae ea
se Seite
Lingkup pekerjaan untuk New Demin Plant
Package antara Vendor dan Kontraktor adalah
sebagai berikut
(1) Lingkup Vendor
- Bagian Desalinasi (AC Filter, cation
exchanger, degasser tower, anion
‘exchanger dan sistem pompa)
- Bagian Demineralisasi (Mixed Bed dan
blower)
- _Bagian Regenerasi (Pompa regenerasi,
sistem chemical dosing dan dilution,
pompa netralisesi)
(2) Lingkup Kontraktor
= Feed Tank
- Feed Pump
- New Demin Water Tank
= Product Demin Water Pump
= Neutralization Pit
Kontraktor akan metakukan adequacy check
dan verifikasi dari Tangki Air Demin eksisting
154-T-502A/B, Tangki Air Umpan Boiler
eksisting 54-T-1/2, 540-T-401/402, 054-T-
101/102 beserta pompa-pompanya dan jelur
eksisting untuk menampung adanya kapasitas
tambahan dari New Demin Prant.
Air limbah dari New Demin Plant setelah
dinetralkan di Pit Netralisasi akan dibuang ke
Scope of work for New Demin Plant Package
between Vendor and Contractor is as follows:
(1) By Vendor
Desalination Section (AC Filter, cation
exchanger, degasser tower, anion
exchanger and related pumping
system)
- Demineralization Section (Mixed Bed
and blower)
- Regeneration Section (Regeneration
pump, chemical dosing and dilution
system, neutralization pump)
(2) By Contractor
- Feed Tank
- Feed Pump
- New Demin Water Tank
- Product Demin Water Pump
- Neutralization Pit
Contractor will check and verify the adequacy
of existing Demin Water Tank 154-T-502A/B,
existing Boiler Feed Water Tank 54-T-1/2,
540-T-401/402, 054-T-101/102 along with its
pumps and existing lines to accommodate
additional capacity from New Demin Plant.
Waste water from New Demin Plant after itis
neutralized in Neutralization Pit will be
8/12“asa Enginearing FEED
= Design Package
M™ PERTAMINA Project: Demineralzation Water
KLANG PERTAMNA Plant PT Kilang Pertaina
wtesiasiowal’” | PROCESS DESIGN Intemasional UnitV Gicap
i GER BASIS Doe. No: FEED-154-PR-DB-001
PT. KILANG PERTAMINA Date: SDeo2021
INTERNASIONAL UNIT IV
CILAGAP Sheet Gof 12
or
Holding Pit eksisting 166-PIT-505. Kontraktor
akan melakukan adequacy check dan
verifikasi terkait operasi dan kapasitas Holding
Pit eksisting (166-PIT-505).
KAPASITAS
Unit demin water package harus dirancang
untuk mengolah umpan masuk dengan laju
alir kapasitas operasi normal 200. m*jam
dengan minimal menghesilkan produk 87%
atau minimal 174 m*jam
regenerasi dalam 8.760 jam operasi tahunan
jadwal regenerasi). Kapasitas
desain maksimum adalah 230 m°fjam.
luar Iaju_alir
(termasuk
disposed to existing Holding Pit 168-PIT-505.
Contractor will check and verify the adequacy
of Existing Holding Pit _(166-PIT-505)
‘operation and capacity,
CAPACITY
The demin water package unit shall be
designed to process inlet flowrate feed at the
normal operating capacity of 200 m*/hr with
minimum product yield net 87% or mi
174 m*thr exclude regeneration flowrate in
8,760 operating hours per year (including
um.
regeneration schedules). Maximum design
capacity is 230 mY/hr.
PROPERTI FEEDSTOCK FEEDSTOCK PROPERTIES
Unit harus didesain untuk mengolah umpan The unit shall be designed to process feed
dengan spesifikasi sebagai berikut : with following specification
Parameter Unit | Value
Scien Nommal 5 200
Iniet Flow Rat aa mh me
Min 88
pH Max - 79)
Average 74
Min 0.25
Turbidity Max NTU 2
Average 11
Min 140.
Conductivity Max hSfom 350.
Average 188.
Min 40
Ca Hardness Max ppm Ca 90
‘Average 54
‘Min 50.
Total Hardness Max] ppm CaCOs 2
9/12Jasa Engineering FEED
= Design Package
A” PERTAMINA Project: Demineralzation Water
TANG PERTAMINA Plant PT Kilang Pertamina
TNTERNASIONAL PROCESS DESIGN |
PROJECT ENGINEERING BASIS proce bes
| PT. KILANG PERTAMINA Date @-Dec-2021
INTERNASIONAL UNIT IV
ee Sheet: 100f 12
[Average 76
‘Min 20
Total Alkalinity Max] ppm CaCOs 20
Averags 35,
Min 3
Chioride Max | ppmCt 40
Average 13
Win 1s
~ Silica Max] ppm SiOz 30
‘Average 2
Min 0.07
Total Fe Max] ppm Fe 02
Auerags 0.08
Min 20
Magnesium ‘Max | ppm Mg 50
Ruerage a3
Min aes
SOs Max ppmso, [25 _
Tuerage 75.65
Min Ta
Natrium Max | ppmNa | 93
Averase | B12
Note: *) Flowrate inlet feed 200 m‘/hr with minimum product yield net 87%
‘or minimum 174 m*/hr pure demin water (exclude regeneration flowrate)
10. SPESIFIKASI PRODUK 10. PRODUCT SPECIFICATION
po Produk air demineral harus memenuhi Demineralized Water product shall meet the
spesifikasi sebagai berikut following specification:
Parameter Specification
Hardness Zero
Total ion (as Fe) (ppm) Max. 0.01
‘Oil Content Nil
Total Copper and Nickel | Max. 0.003
(as Cu) (ppm) es .
Silica (as SiOz) (ppm) Max. 0.01
Conductivity (uS/cm) Max. 5
pH 6-8
Sodium + Potassium (ppm) Max. 0.04
Chloride (ppm) Max, 4
pH Effluent Waste Water 6-9
PERTAMINA Project: Demineralzation Water
GaN peeTAMINA Plant PT Kilang Pertamina
ivekasenal’ | PROCESS DESIGN Intemasional Uri V Ghacap
in ee aren BASIS Doe. No, = FEED-V-164-PR-DB-O01
PT_KILANG PERTAMINA Date: #Deo2021
INTERNASIONAL UNIT IY
areas Sheet: 120f12
(Referensi: JGC Standard Practice 210-120-1- (Reference: JGC Standard Practice 210-120-
‘37E) 1-37E)
13. DATA PELENGKAP- 13. SUPPLEMENTARY DATA
Data utilitas dan kondisi iklim di area RFCC Utility and climatic condition data in RFCC
a RU-IV Cilacap mengacu pada dokumen Basic area RU-IV Cilacap shall refer to Basic
Engineering Design Data (no.doc. FEED-J- _ Engineering Design Data document (doc.no.
154-PR-SP-001). FEED-J-154-PR-SP-001).
oN PT JGG INDONESIA
12112