2X600 MW MAHAN THERMAL POWER PROJECT

Report Date : 01/Dec/2010 Progress as on : 30/Nov/2010


DAILY PROGRESS REPORT OF 400KV SWITCHYARD/SWITCHYARD CONROL ROOM/TRANSFORMER YARD/LILO LINE
Sl No. Iteam Description Unit SCOPE Completed up to Previous day Today Planned Qty. Today Progress Cumilative Balance Reason for slippage / Constraints / Remarks

400 KV SWITCHYARD
Circuit Breaker with PIR Structure Erection Equipment Erection 2 Circuit Breaker without PIR Structure Erection Equipment Erection 3 CVTs Structure Erection Equipment Erection 4 EMVT Structure Erection Equipment Erection 5 Current Transformers 5a 5-Core Structure Erection Equipment Erection 5b 4-Core Structure Erection Equipment Erection 5c 2-Core Structure Erection Equipment Erection 6 Lighting Arrestor Structure Erection Equipment Erection 7 Pantograph Structure Erection Equipment Erection 8 Isolator Structure Erection Equipment Erection 9 Bus Post Insulators (H/L) Structure Erection Equipment Erection 10 Bus Post Insulators (L/L) Structure Erection Equipment Erection 11 Wave Trap Structure Erection

Set Set Set Set Nos Nos Nos Nos

8 8 5 5 20 20 12 12

4 4 2 1 13 13 5 0

0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0

4 4 2 1 0 13 13 0 5 0

4 4 3 4 0 7 7 0 7 12

Work under progress

service engineer awaited

Erection on available foundations complete

Structure erection done on completed foundation and material is awaited

Nos Nos Nos Nos Nos Nos Nos Nos Nos


Nos

54 54 12 12 12 12 33 33 45 45 23 23 298 298 166 166 8 8 18 32 6 21 9 16 14 1 2400 3500 3000 4 2 12 7150 15.9 1 1 1 1 2 1 1 11 620 1

36 32 6 0 6 0 5 5 24 0 17 12 245 238 129 119 4 3 17 21 6 11 7 10 12 0 0 0 1124 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 1 0 0 3 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 1 6 8 3 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

36 32 6 0 6 0 0 5 5 24 0 0 17 13 0 251 246 0 132 119 0 4 3 17 21 6 11 7 10 12 0 0 0 1124 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

18 22 6 12 6 12 0 28 28 21 45 0 6 10 0 47 52 0 34 47 0 4 5 1 11 0 10 2 6 2 1 2400 3500 1876 4 2 12 7150 15.9 0 0 0 0 0 0 0 0 0 0

Work in progress

Material is awaited

Material is awaited

Erection on available foundations complete

Equipment unavailable 6 Nos of isolator alignment completed. Double E/S Isiolator erection work progress. HBPI structure assembly in progress & Fixing of clamps on the already erected BPI equipment in progress Erection work in progress

Nos Set Nos Nos Nos. Nos. Nos Nos. Nos Nos Nos Nos. Nos. Nos. No. of Span Lot Mtr Mtr Mtr. Nos. Set Nos Mtr KM Set Set Set Set Set Lot Set Nos Mtr Set

Equipment erected on available Foundation

Earthing STR/EQI 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 1 2 3 4 5 6 7 8 9 10 1
Erection of Towers Tower T 1 Tower T 2 Tower T X Lighting Mast Beam B1 Beam B2 Twin moose conductor stringing Jumpering & connections Al Bus Bars 4" Al Bus Bars 4.5" Shield wire stringing Erection of AC Kiosk Erection of PLCC Erection of relay Panels Cable Tray Erection & Fabrication Cable Laying (Power & Control) Erection of battery 220V Erection of battery 48 V Erection of battery charger 220V Erection of battery charger 48V Erection of SAS & UPS Erection of 48 V & 220 V DCDB Erection of 415 V & Emergency ACDB Erection of 33 KV Panels Cable Tray Erection & Fabrication AC & Ventilation System 250MVA Trafo(GT) Trafo Erection Oil filtration with Vaccum 70/45/20 MVA Trafo(ST) Trafo Erection Oil filtration with Vaccum 45MVA Trafo(UT) Trafo Erection Oil filtration with Vaccum 10MVA Trafo Trafo Erection Oil filtration with Vaccum 16MVA Trafo(UAT) Trafo Erection Oil filtration with Vaccum 2.5MVA Trafo Trafo Erection Oil filtration with Vaccum 2 MVA Trafo Trafo Erection Oil filtration with Vaccum 150 KVA Trafo Trafo Erection Oil filtration with Vaccum 80 MVAR Bus Reactor

Earthing of the towers in progress Remaining fnds in progress 7 LMs charged Beam at the 400 KV side already completed

Al welding work in progress Bus erection work start from Monday Work in progress Material unavailable Material awaited AC KIOSK is not ready Including Switchyard,Transfoyard & swyd control Room Civil work is not completed Civil work is not completed Civil work is not completed Civil work is not completed Civil work is not completed Civil work is not completed Civil work is not completed Civil work is not completed Civil work is not completed Civil work is not completed

SWITCHYARD CONTROL ROOM

TRANSFORMER YARD

Nos. Nos. Nos. Nos. Nos. Nos. Nos. Nos. Nos. Nos. Nos. Nos. Nos. Nos. Nos. Nos. Nos KM
KM Nos Nos KM Nos Nos Nos Nos Nos Nos Nos Nos KM

7 7 2 2

2 0 2 0

0 0 0 0

0 0 0 0

2 0 0 2 0 0 4 0 0 0 0 0 4 0 0 0 0 0 0 0 0 0 0 0 11 11 22 0

5 7 0 2

Two nos of GT erected with out assessrios

Only Transformer erected without assessrios

4 4 2 2 4 4 10 10 16 16 2 2 1 17.9 18.21 136 12 10.425 72 49 939 67 67 67 67 67 22.5

4 0 0 0 4 0 0 0 0 0 0 0 0 11 11 22 0 0 0 0 0 130

0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 4 2 2 0 4 10 10 16 16 2 2 1 6.9 7.21 114 12 10.425 72 49 0

1 Nos Transformer erected with accesseries and for 1 more under progress

Only Transformer erected without assessrios

9 10

Earthing
Switchyard area

Material not available Riser in line 1 & line 2 to be completed soon

Earth mat layed with risers Untreated pit Treated pit


Transformer yard Earth mat layed

11 1 2 3 4 5 6

Untreated pit Treated pit No of Risers Details Survey Check Survey Foundation Structure Erection Tower Earthing Conductor Strining

47 29 21 0

20 15 VINDHAYACHAL-KORBA LINE(LILO) Completed Completed 0 2 0 1 0 0 0 0

0 0 0 145

49 30 21 0

20 38 46 22.5

Work under Progress Work under Progress To be started from 5-Dec-10

Note :1.)Switchyard control room work in progress


2.) Connection of equipment statrted through droppers 3.) Eqipment/Structure Erathing work in progress 4.) Approx 350 Aluminium bus joint has been completed 5.) VK-1 civil foundation work is under progress 6.) Switchyard Control room civil work is under progress 7.) Cable Trench work in VK-1& VK-2 is in progress

8.) Foundation rectification work in progress 9.)Unit Transformer auxiliary erection in progress 10.) GT#3 reached site