0% found this document useful (0 votes)
66 views8 pages

Proposed Design

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
66 views8 pages

Proposed Design

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

RESIDENTIAL DEVELOPMENT

AYINGBA, KOGI STATE

DECEMBER 2023

Architectural Drawings Arclits Studio


CONSTRUCTION DOCUMENT
30m

1343 TANK

3750
8
08
69

5021

4406

FUTURE DEVELOPMENT
MAIN BUILDING

34m

10583

13
9893
PARKING

02
9
ACCESS ROAD

18/12/2023 13:05:47
NOTE : APRN :
PROJECT Architectural Drawing
Date
- DO NOT SCALE DRAWING, USE FIGURED DIMENSIONS ONLY.
CLIENT DRAWING TITLE DECEMBER 2023
----
- ALL DIMENSIONS ARE GIVEN IN METRIC SYSTEM AND TO NEAREST MILLIMETER [mm]

Arclits Studio Matthew oko-oboh SITE PLAN


- ANY DISCREPANCY ON SITE SHOULD BE REFERRED TO THE ARCHITECT FOR
Design by IKECHUKWU ONEUGBU
CLARIFICATIONS BEFORE PROCEEDING WITH NEW WORKS.
- ARCHITECTURAL DRAWING ARE TO BE READ IN CONJUNCTION WITH RELEVANT
ENGINEERING DRAWINGS.
A001
- STANDARD OF CONSTRUCTION SHOULD CONFORM WITH ARCHITECTS AND Drawn by IKECHUKWU ONUEGBU

Akhigbe
ENGINEERING DRAWINGS.
- ALL CRITICAL CONSTRUCTION STAGES SHOULD BE APPROVED BY THE ARCHITECT.
Checked by DELE ODEDIRAN Scale 1 : 200
Email : arclits@gmail.com
1 2 3 4 5 6 7 8 9 10

855 275 2700 1020 1430 1450 1280 2637 613


230 1005 1200 1395 230 1610 150 1910 230 1195 1200 1290 230

A A

230

230 765 230


995

995
1665
1575
B B

2400

2400
BATH BATH

1000 555
3578 4 m² 5 m²

1595

1595
3685

3945
250 750

2015
1200
C C

1395 150

150
BEDROOM 3

4500
1395
1585

1585
15 m²

230 1170

1945

1200
2945
D D

230

230
2400 5135
BEDROOM 4

1550

1550
BATH

885 230 1285


1360

1360

1510

900
3 m² 21 m²

E E

230
150
1200 165
1550 1000 2070

1915
4620

4950
2

1200
A005

425

3440
3630

3630
1200 230 5750 230

1270
1200
BEDROOM 2

940
19 m²

230450

775
LIVING ROOM
F F

1200
45 m²

7675

7675
20708

20730
1730 3720

2055

1565
3485

3485
3255

3255

3255
LOBBY DINING
6 m² 11 m²

1200

1200
G G
1055 230

1500 4250

745 230 1200 230685


790

790
4620
H H

230 1200 230


230457
KITCHEN V.TOILET

3230
1430

1430
2980
1200

14 m² 1730 748 230 3 m²2430

I I
ANTE ROOM
1010

1010
230 745

3285
9 m² GREEN
J J

230

2300
6 m²
5195 230 2500

1568
2400
1547

1547
1317

1317
1500

BEDROOM 1

230

230
K 150 K
750 213

17 m²

BATH
4200
1200

ENTRANCE
4 m² 1955

1955
2170

2170
5 m²
3370 1595 2960 505
2710
1920
1500

L L

230
713

713
230

M M
230

230 1173 1200 998 230 1595 230


0 750 527 1223 230 2407 230

18/12/2023 13:05:51
855 275 2700 1020 1430 1450 1280 2637 613

13090

1 23 4 5 6 7 8 9 10
NOTE : APRN :
PROJECT 1
Architectural Drawing
Date
- DO NOT SCALE DRAWING, USE FIGURED DIMENSIONS ONLY.
CLIENT DRAWING TITLE January 2016
---- A005
- ALL DIMENSIONS ARE GIVEN IN METRIC SYSTEM AND TO NEAREST MILLIMETER [mm]

Arclits Studio Matthew oko-oboh GROUND FLOOR


- ANY DISCREPANCY ON SITE SHOULD BE REFERRED TO THE ARCHITECT FOR
Design by Onuegbu . I .
CLARIFICATIONS BEFORE PROCEEDING WITH NEW WORKS.
- ARCHITECTURAL DRAWING ARE TO BE READ IN CONJUNCTION WITH RELEVANT
ENGINEERING DRAWINGS.
A002
PLAN
- STANDARD OF CONSTRUCTION SHOULD CONFORM WITH ARCHITECTS AND Drawn by Onuegbu . I .

Akhigbe
ENGINEERING DRAWINGS.
- ALL CRITICAL CONSTRUCTION STAGES SHOULD BE APPROVED BY THE ARCHITECT.
Checked by ---- Scale 1 : 100
Email : arclits@gmail.com
1 23 4 5 6 7 8 9 10

2
A005

G
H

L
M

18/12/2023 13:05:51
1
A005

NOTE : APRN :
PROJECT Architectural Drawing
Date
- DO NOT SCALE DRAWING, USE FIGURED DIMENSIONS ONLY.
CLIENT DRAWING TITLE January, 2106
----
- ALL DIMENSIONS ARE GIVEN IN METRIC SYSTEM AND TO NEAREST MILLIMETER [mm]

Arclits Studio Matthew oko-oboh ROOF PLAN


- ANY DISCREPANCY ON SITE SHOULD BE REFERRED TO THE ARCHITECT FOR
Design by Onuegbu . I .
CLARIFICATIONS BEFORE PROCEEDING WITH NEW WORKS.
- ARCHITECTURAL DRAWING ARE TO BE READ IN CONJUNCTION WITH RELEVANT
ENGINEERING DRAWINGS.
A004
- STANDARD OF CONSTRUCTION SHOULD CONFORM WITH ARCHITECTS AND Drawn by Onuegbu . I .

Akhigbe
ENGINEERING DRAWINGS.
- ALL CRITICAL CONSTRUCTION STAGES SHOULD BE APPROVED BY THE ARCHITECT.
Checked by ---- Scale 1 : 100
Email : arclits@gmail.com
ROOF TOP
8494

4594
1728
8485

ROOF LEVEL

300
300

3900
6282

150

3300
3600

3020
2870
Ground Floor
300 75

300
300

18/12/2023 13:05:54
NOTE : APRN :
PROJECT Architectural Drawing
Date
- DO NOT SCALE DRAWING, USE FIGURED DIMENSIONS ONLY.
CLIENT DRAWING TITLE 02/04/16
----
- ALL DIMENSIONS ARE GIVEN IN METRIC SYSTEM AND TO NEAREST MILLIMETER [mm]

Arclits Studio Matthew oko-oboh APPROACH


- ANY DISCREPANCY ON SITE SHOULD BE REFERRED TO THE ARCHITECT FOR
Design by Onuegbu . I
CLARIFICATIONS BEFORE PROCEEDING WITH NEW WORKS.
- ARCHITECTURAL DRAWING ARE TO BE READ IN CONJUNCTION WITH RELEVANT
ENGINEERING DRAWINGS.
A007
ELEVATION
- STANDARD OF CONSTRUCTION SHOULD CONFORM WITH ARCHITECTS AND Drawn by Onuegbu . I .

Akhigbe
ENGINEERING DRAWINGS.
- ALL CRITICAL CONSTRUCTION STAGES SHOULD BE APPROVED BY THE ARCHITECT.
Checked by ---- Scale 1 : 75
Email : arclits@gmail.com
10 9 8 7 6 5 4 32 1

ROOF TOP
8494

4594
3214

1728
8485

ROOF LEVEL

300
3900

3300
Ground Floor

300
300

18/12/2023 13:05:58
NOTE : APRN :
PROJECT Architectural Drawing
Date
- DO NOT SCALE DRAWING, USE FIGURED DIMENSIONS ONLY.
CLIENT DRAWING TITLE January, 2016
----
- ALL DIMENSIONS ARE GIVEN IN METRIC SYSTEM AND TO NEAREST MILLIMETER [mm]

Arclits Studio Matthew oko-oboh REAR ELEVATION


- ANY DISCREPANCY ON SITE SHOULD BE REFERRED TO THE ARCHITECT FOR
Design by Onuegbu . I .
CLARIFICATIONS BEFORE PROCEEDING WITH NEW WORKS.
- ARCHITECTURAL DRAWING ARE TO BE READ IN CONJUNCTION WITH RELEVANT
ENGINEERING DRAWINGS.
A008
- STANDARD OF CONSTRUCTION SHOULD CONFORM WITH ARCHITECTS AND Drawn by Onuegbu . I .

Akhigbe
ENGINEERING DRAWINGS.
- ALL CRITICAL CONSTRUCTION STAGES SHOULD BE APPROVED BY THE ARCHITECT.
Checked by ---- Scale 1 : 75
Email : arclits@gmail.com
A B C D E F G H I J K L M

ROOF TOP
8494

4594
ROOF LEVEL

300
3900

900

3300
3600

2400
Ground Floor

300
300

18/12/2023 13:06:01
NOTE : APRN :
PROJECT Architectural Drawing
Date
- DO NOT SCALE DRAWING, USE FIGURED DIMENSIONS ONLY.
CLIENT DRAWING TITLE 02/18/15
----
- ALL DIMENSIONS ARE GIVEN IN METRIC SYSTEM AND TO NEAREST MILLIMETER [mm]

Arclits Studio Matthew oko-oboh LEFT ELEVATION


- ANY DISCREPANCY ON SITE SHOULD BE REFERRED TO THE ARCHITECT FOR
Design by Designer
CLARIFICATIONS BEFORE PROCEEDING WITH NEW WORKS.
- ARCHITECTURAL DRAWING ARE TO BE READ IN CONJUNCTION WITH RELEVANT
ENGINEERING DRAWINGS.
A009
- STANDARD OF CONSTRUCTION SHOULD CONFORM WITH ARCHITECTS AND Drawn by Arc. Ikechukwu Onuegbu

Akhigbe
ENGINEERING DRAWINGS.
- ALL CRITICAL CONSTRUCTION STAGES SHOULD BE APPROVED BY THE ARCHITECT.
Checked by ---- Scale 1 : 75
Email : arclits@gmail.com
M L K J I H G F E D C B A

ROOF TOP
8494

4594
2707

ROOF LEVEL
150 430

300
3900

730
150

3300
2645
3020

2870

2870
Ground Floor
300

300
300

18/12/2023 13:06:05
NOTE : APRN :
PROJECT Architectural Drawing
Date
- DO NOT SCALE DRAWING, USE FIGURED DIMENSIONS ONLY.
CLIENT DRAWING TITLE 02/18/15
----
- ALL DIMENSIONS ARE GIVEN IN METRIC SYSTEM AND TO NEAREST MILLIMETER [mm]

Arclits Studio Matthew oko-oboh RIGHT ELEVATION


- ANY DISCREPANCY ON SITE SHOULD BE REFERRED TO THE ARCHITECT FOR
Design by Designer
CLARIFICATIONS BEFORE PROCEEDING WITH NEW WORKS.
- ARCHITECTURAL DRAWING ARE TO BE READ IN CONJUNCTION WITH RELEVANT
ENGINEERING DRAWINGS.
A010
- STANDARD OF CONSTRUCTION SHOULD CONFORM WITH ARCHITECTS AND Drawn by Arc. Ikechukwu Onuegbu

Akhigbe
ENGINEERING DRAWINGS.
- ALL CRITICAL CONSTRUCTION STAGES SHOULD BE APPROVED BY THE ARCHITECT.
Checked by ---- Scale 1 : 75
Email : arclits@gmail.com

You might also like