Model :- 18M TOWER FOR 4NOs.
10m3 PLASTIC TANK
Phase name Qty
Phase 1 2
100
45
°
100
°
45
100
1 814
100
46
46 1 768
0
25
1 ~Ø 10 1 ~Ø 10
50 50
0
50
1 816
1 866
Top View
CTT5
1 866
Front View
Rev Mark Revision Description Date
GENERAL NOTE:
1.) ALL DIMENSIONS AND LEVELS ARE TO BE VERIFIED ON SITE BY THE
CONTRACTOR BEFORE COMMENCING ANY WORK.
2.) THE STRUCTURAL DRAWINGS TO BE READ IN CONJUCTION WITH
ARCHITECTURAL & M.E DRAWINGS.
CLIENT/OWNER: PROJECT DESIGNATION:
3.) ALL STRUCTURAL TO BE GRADE S355
4.) ALL STEELWORK SHALL BE PRIMED WITH ONE COAT OF RED OXIDE
Material list for 2 parts named 'CASTING TEMPLATE' PRIMER AT SHOP AND ONE COAT AFTER ERECTION.
CONSULTANT: PROPOSED ELEVATED H20 TANK SUPPORT FRAME
Cransfield Engineers
5.) ENDS OF HOLLOW SECTIONS SHALL BE BLANKED WITH 3MM THICK
PLATE
Mark Profile Grade Length Paint Area Mass
6.) THE FABRICATOR SHALL CHECK ON SITE TO VERIFY ALL (Consulting Civil & Structural Engineers) ADDRESS/LOCATION: TITLE:
CTT5 RSA50*50*4 S355JR 1866 0.4 5.7 PO BOX 59401-000100
DIMENSIONS.
BOMET COUNTY
NAIROBI
Tekla structures
7.) APPROVAL OF SHOPDRAWINGS TO BE SOUGHT FROM THE CASTING TEMPLATE
ENGINEER BEFORE COMMENCEMENT OF FABRICATION.
Total for 2 parts 3732 0.7 11.4
Issued:
The part shown is required for the following assemblies:- Scale: 1:2 Workshop Drawing Rev
Revised:
2 required for 2 'CASTING TEMPLATE' marked CTT5 Drawn By: Date:28.08.2023 Checked by: Approved By: Project Number: 0719 W [CTT.5] 0