Professional Documents
Culture Documents
Gauging Office
STRP Swap
Project
Author:
Asfand Tariq
Date: 01-12-2011
Version:
OPT-1.2/DT/ PTCL HQ/ 24-09-2010
Status:
Sec. Class: Internal Drive Test Report
Copyright 2010 PTCL - All rights reserved. No part of this work, which is protected by copyright, may be reproduced in any form or
by any means - graphic, electronic or mechanical, including photocopying, recording, taping or storage in an information retrieval
system without the written permission of the copyright owner.
Contents
Pre-Post Analysis Report ........................................................................................................1
1 Document Control..................................................................................................................3
1.1 Document Management History......................................................................................3
1.2 Reviewers........................................................................................................................3
2 Executive Summary [Editable]...............................................................................................4
2.1 Objective..........................................................................................................................4
Single Site Drive Test will be conducted as per the Scope of Work........................4
2.2 BTS Audit Info Pre - DT..................................................................................................4
2.3 BTS Audit Info Post - DT.................................................................................................4
3 Drive Test Results Summary..................................................................................................4
3.1 Site Health related Information........................................................................................4
3.2 DT Map with Topography, Alarms and BTS Data............................................................5
..........................................................................................................................................5
3.3 Number of Active Subscribers at the time of DT..............................................................5
Author: Asfand Tariq
Drive Test Report Template
Page 27 of ................................................................................................................................2
3.4 Call Log Summary Table (Pre DT)...............................................................................6
3.4.1 CDMA 1 x Voice Call Event Statistics.......................................................................6
3.4.2 CDMA 1x Handoff Statistics......................................................................................6
3.4.3 CDMA 1 x EV-DO Rev B/ Rev A Statistics................................................................6
3.5 Call Log Summary Table (Post DT)..............................................................................6
3.5.1 CDMA 1 x Voice Call Event Statistics.......................................................................6
3.5.2 CDMA 1x Handoff Statistics......................................................................................7
3.5.3 CDMA 1 x EV-DO Rev B/ Rev A Statistics................................................................7
4 CDMA2000 1X Report...........................................................................................................8
4.1.1 CDMA 1 x Voice .......................................................................................................8
Received Power (dBm) (Long Call)..........................................................................8
.............................................................................................................................................8
.............................................................................................................................................8
4. 2 Transmitted Power (dBm) (Long Call)..................................................................9
.............................................................................................................................................9
.............................................................................................................................................9
4.2 Best Ec/Io (Long Call)....................................................................................................10
4.3 Active Pilot Count (Long Call)........................................................................................11
4.4 Best PN/ Active PN (Long Call).....................................................................................12
4.5 F-FER (Long Call).........................................................................................................13
5 EV-DO Report......................................................................................................................15
5.1 1x EVDO Connection Setup Statistics (Pre DT).........................................................15
........................................................................................................................................15
5.2 1x EVDO Connection Setup Statistics (Post DT)........................................................15
........................................................................................................................................15
5.3 Event Analysis...............................................................................................................15
5.4 Forward Link Data KPI Maps.........................................................................................16
5.4.1 Best C/I (dB)..........................................................................................................16
5.4.2 Received Power (dBm)...........................................................................................17
5.4.3 Average DRC Rate.................................................................................................18
5.4.4 Active PN Count......................................................................................................20
5.4.5 Best Serving PN .....................................................................................................21
5.4.6 Best ASP SINR.......................................................................................................22
5.4.7 Average PER..........................................................................................................24
5.4.8 Reverse TX Pilot Power..........................................................................................25
5.5 Packet Error Rate (PER)...............................................................................................27
Author: Asfand Tariq
Page 2 of
Date:
...........................................................................................................................................27
...........................................................................................................................................27
Document Control
1.1 Document Management History
Revision
Number
1
Date
Name
01-12-2011
Asfand Tariq
Revision
1.2 Reviewers
Reviewer
Mudassar
Dar
Date
Feedback
Traffic Stats formats and SoP for Optimization and
Acceptance are given as separate documents
2.2
Site
Site ID
1.
Site Name
Height (M)
MUZP-4016
Shoukat
Lane
MUZP-4017
CMH
Muzafaraba
d
2.
Antennas Azimuth
Elect. Tilt
Mech. Tilt
30,30,30
110,195,270
3,3,2
0,0,0
31,31,31
30,180,295
5,5,5
0,0,0
Site
Site ID
1.
Height (M)
MUZP-4016
Shoukat
Lane
MUZP-4017
CMH
Muzafaraba
d
2.
Site Name
Antennas Azimuth
Elect. Tilt
Mech. Tilt
30,30,30
110,195,270
1,3,2
0,0,0
31,31,31
30,180,295
5,5,5
0,0,0
BTS ID
MUZP-4016
MUZP-4017
Alarm
Type
Reason
Pending
Duration
Remarks
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
S.No
Serving
Site/BTS
ID
Serving
Sector
ID
Serving
Channels/Carriers
PN
List
Service
1X/EVDO
Total Active
Subscribers
Dropped
Calls
Access Failures
Device
Call
Attempts
(Dialed +
Excluded)
Successful
Calls
ZTE
Vphone
Terminal
29
27
Normal
Released
Calls
Service
Not
Available
(SNA)
Test
System
Failure
(TSF)
Release
B/F
Normal
Time
(RNT)
27
Nill
Nill
Device
ZTE EVDO
Terminal
HO Request
80
Successful HO
HO Failure
80
Nil
1x EVDO
Connection
Attempts
1x EVDO
Connection
Success
Normal
Connection
Release (AT
Initiated)
Abnormal
Connection
Release
1x EVDO
Connection
Attempt Failure
Dropped
Calls
Access Failures
Device
Call
Attempts
(Dialed +
Excluded)
Successful
Calls
ZTE
Vphone
Terminal
110
109
Normal
Released
Calls
Service
Not
Available
(SNA)
Test
System
Failure
(TSF)
Release
B/F
Normal
Time
(RNT)
109
Nill
Nill
Device
ZTE EVDO
Terminal
HO Request
248
Successful HO
HO Failure
248
Nil
1x EVDO
Connection
Attempts
1x EVDO
Connection
Success
Normal
Connection
Release (AT
Initiated)
Abnormal
Connection
Release
1x EVDO
Connection
Attempt Failure
CDMA2000 1X Report
4.1.1 CDMA 1 x Voice
4.2
4.3
(Post -DT)
4.4
Active PN Plot
4.5
EV-DO Report
5.1
5.2
5.3
Event Analysis
S.No
5.4
Also the C/I distribution on each available carrier is to be provided in form of Chart/ Table
Also the Received Power distribution on each available carrier is to be provided in form of
Chart/ Table
Also the DRC distribution on each available carrier is to be provided in form of Chart/
Table
5.4.4
Active PN Count
Best Serving PN
Also the Best ASP SINR distribution on each available carrier is to be provided in form of
Chart/ Table
5.5
Conclussion:
As all KPIs are improved after optimization activity. Therefore, this site is well
optimized.