Pre-Post Analysis Report

Gauging Office
STRP Swap
Project

Author:
Asfand Tariq
Date: 01-12-2011
Version:
OPT-1.2/DT/ PTCL HQ/ 24-09-2010
Status:
Sec. Class: Internal Drive Test Report

Copyright 2010 PTCL - All rights reserved. No part of this work, which is protected by copyright, may be reproduced in any form or
by any means - graphic, electronic or mechanical, including photocopying, recording, taping or storage in an information retrieval
system without the written permission of the copyright owner.

Internal-Drive Test Report

Contents
Pre-Post Analysis Report ........................................................................................................1
1 Document Control..................................................................................................................3
1.1 Document Management History......................................................................................3
1.2 Reviewers........................................................................................................................3
2 Executive Summary [Editable]...............................................................................................4
2.1 Objective..........................................................................................................................4
Single Site Drive Test will be conducted as per the Scope of Work........................4
2.2 BTS Audit Info Pre - DT..................................................................................................4
2.3 BTS Audit Info Post - DT.................................................................................................4
3 Drive Test Results Summary..................................................................................................4
3.1 Site Health related Information........................................................................................4
3.2 DT Map with Topography, Alarms and BTS Data............................................................5
..........................................................................................................................................5
3.3 Number of Active Subscribers at the time of DT..............................................................5
Author: Asfand Tariq
Drive Test Report Template
Page 27 of ................................................................................................................................2
3.4 Call Log Summary Table (Pre DT)...............................................................................6
3.4.1 CDMA 1 x Voice Call Event Statistics.......................................................................6
3.4.2 CDMA 1x Handoff Statistics......................................................................................6
3.4.3 CDMA 1 x EV-DO Rev B/ Rev A Statistics................................................................6
3.5 Call Log Summary Table (Post DT)..............................................................................6
3.5.1 CDMA 1 x Voice Call Event Statistics.......................................................................6
3.5.2 CDMA 1x Handoff Statistics......................................................................................7
3.5.3 CDMA 1 x EV-DO Rev B/ Rev A Statistics................................................................7
4 CDMA2000 1X Report...........................................................................................................8
4.1.1 CDMA 1 x Voice .......................................................................................................8
Received Power (dBm) (Long Call)..........................................................................8
.............................................................................................................................................8
.............................................................................................................................................8
4. 2 Transmitted Power (dBm) (Long Call)..................................................................9
.............................................................................................................................................9
.............................................................................................................................................9
4.2 Best Ec/Io (Long Call)....................................................................................................10
4.3 Active Pilot Count (Long Call)........................................................................................11
4.4 Best PN/ Active PN (Long Call).....................................................................................12
4.5 F-FER (Long Call).........................................................................................................13
5 EV-DO Report......................................................................................................................15
5.1 1x EVDO Connection Setup Statistics (Pre DT).........................................................15
........................................................................................................................................15
5.2 1x EVDO Connection Setup Statistics (Post DT)........................................................15
........................................................................................................................................15
5.3 Event Analysis...............................................................................................................15
5.4 Forward Link Data KPI Maps.........................................................................................16
5.4.1 Best C/I (dB)..........................................................................................................16
5.4.2 Received Power (dBm)...........................................................................................17
5.4.3 Average DRC Rate.................................................................................................18
5.4.4 Active PN Count......................................................................................................20
5.4.5 Best Serving PN .....................................................................................................21
5.4.6 Best ASP SINR.......................................................................................................22
5.4.7 Average PER..........................................................................................................24
5.4.8 Reverse TX Pilot Power..........................................................................................25
5.5 Packet Error Rate (PER)...............................................................................................27
Author: Asfand Tariq
Page 2 of
Date:

1st Decemeber 2011

Drive Test Report Template

Internal-Drive Test Report

...........................................................................................................................................27
...........................................................................................................................................27

Document Control
1.1 Document Management History
Revision
Number
1

Date

Name

01-12-2011

Asfand Tariq

Revision

1.2 Reviewers
Reviewer
Mudassar
Dar

Date

Author: Asfand Tariq


Page 3 of
Date:

1st Decemeber 2011

Feedback
Traffic Stats formats and SoP for Optimization and
Acceptance are given as separate documents

Drive Test Report Template

Internal-Drive Test Report

Executive Summary [Editable]


2.1 Objective
Single Site Drive Test will be conducted as per the Scope of Work

2.2

BTS Audit Info Pre - DT

Site

Actual Site Audit


Sr.
No

Site ID

1.

Site Name

Height (M)

MUZP-4016

Shoukat
Lane

MUZP-4017

CMH
Muzafaraba
d

2.

Antennas Azimuth

Elect. Tilt

Mech. Tilt

30,30,30

110,195,270

3,3,2

0,0,0

31,31,31

30,180,295

5,5,5

0,0,0

2.3 BTS Audit Info Post - DT

Site

Actual Site Audit


Sr.
No

Site ID

1.

Height (M)

MUZP-4016

Shoukat
Lane

MUZP-4017

CMH
Muzafaraba
d

2.

Site Name

Antennas Azimuth

Elect. Tilt

Mech. Tilt

30,30,30

110,195,270

1,3,2

0,0,0

31,31,31

30,180,295

5,5,5

0,0,0

Drive Test Results Summary


3.1 Site Health related Information
S.No

BTS ID

MUZP-4016

MUZP-4017

Author: Asfand Tariq


Page 4 of
Date:

1st Decemeber 2011

Alarm
Type

Reason

Pending
Duration

Remarks

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

Drive Test Report Template

Internal-Drive Test Report

3.2 DT Map with Topography, Alarms and BTS Data

DT Route with Notifications

3.3 Number of Active Subscribers at the time of DT

S.No

Serving
Site/BTS
ID

Author: Asfand Tariq


Page 5 of
Date:

1st Decemeber 2011

Serving
Sector
ID

Serving
Channels/Carriers

Drive Test Report Template

PN
List

Service
1X/EVDO

Total Active
Subscribers

Internal-Drive Test Report

3.4 Call Log Summary Table (Pre DT)


3.4.1 CDMA 1 x Voice Call Event Statistics

Dropped
Calls

Access Failures

Device

Call
Attempts
(Dialed +
Excluded)

Successful
Calls

ZTE
Vphone
Terminal

29

27

Normal
Released
Calls

Service
Not
Available
(SNA)

Test
System
Failure
(TSF)

Release
B/F
Normal
Time
(RNT)

27

Nill

Nill

3.4.2 CDMA 1x Handoff Statistics

Device
ZTE EVDO
Terminal

HO Request
80

Successful HO

HO Failure

80

Nil

3.4.3 CDMA 1 x EV-DO Rev B/ Rev A Statistics

1x EVDO
Connection
Attempts

1x EVDO
Connection
Success

Normal
Connection
Release (AT
Initiated)

Abnormal
Connection
Release

1x EVDO
Connection
Attempt Failure

3.5 Call Log Summary Table (Post DT)


3.5.1 CDMA 1 x Voice Call Event Statistics

Author: Asfand Tariq


Page 6 of
Date:

1st Decemeber 2011

Drive Test Report Template

Internal-Drive Test Report

Dropped
Calls

Access Failures

Device

Call
Attempts
(Dialed +
Excluded)

Successful
Calls

ZTE
Vphone
Terminal

110

109

Normal
Released
Calls

Service
Not
Available
(SNA)

Test
System
Failure
(TSF)

Release
B/F
Normal
Time
(RNT)

109

Nill

Nill

3.5.2 CDMA 1x Handoff Statistics

Device
ZTE EVDO
Terminal

HO Request
248

Successful HO

HO Failure

248

Nil

3.5.3 CDMA 1 x EV-DO Rev B/ Rev A Statistics

1x EVDO
Connection
Attempts

1x EVDO
Connection
Success

Normal
Connection
Release (AT
Initiated)

Abnormal
Connection
Release

1x EVDO
Connection
Attempt Failure

Author: Asfand Tariq


Page 7 of
Date:

1st Decemeber 2011

Drive Test Report Template

Internal-Drive Test Report

CDMA2000 1X Report
4.1.1 CDMA 1 x Voice

Received Power (dBm) (Long Call)

RX Level Plot (Pre DT)

RX Level Plot (Post DT)

Author: Asfand Tariq


Page 8 of
Date:

1st Decemeber 2011

Drive Test Report Template

Internal-Drive Test Report

4. 2 Transmitted Power (dBm) (Long Call)

TX Level Plot (Pre DT)

TX Level Plot (Post DT)

Author: Asfand Tariq


Page 9 of
Date:

1st Decemeber 2011

Drive Test Report Template

Internal-Drive Test Report

4.2

Best Ec/Io (Long Call)

Ec/Io Level Plot (Pre DT)

Author: Asfand Tariq


Page 10 of
Date:

1st Decemeber 2011

Drive Test Report Template

Internal-Drive Test Report

Ec/Io Level Plot

4.3

(Post -DT)

Active Pilot Count (Long Call)

Active Pilot Count Plot (Pre DT)

Author: Asfand Tariq


Page 11 of
Date:

1st Decemeber 2011

Drive Test Report Template

Internal-Drive Test Report

Active Pilot Count Plot (Post DT)

4.4

Best PN/ Active PN (Long Call)

Active PN Plot (Pre DT)

Author: Asfand Tariq


Page 12 of
Date:

1st Decemeber 2011

Drive Test Report Template

Internal-Drive Test Report

Active PN Plot

4.5

F-FER (Long Call)

Author: Asfand Tariq


Page 13 of
Date:

1st Decemeber 2011

Drive Test Report Template

Internal-Drive Test Report

FER Plot (Pre- DT)

FER Plot (Post DT)

Author: Asfand Tariq


Page 14 of
Date:

1st Decemeber 2011

Drive Test Report Template

Internal-Drive Test Report

EV-DO Report
5.1

1x EVDO Connection Setup Statistics (Pre DT)

5.2

1x EVDO Connection Setup Statistics (Post DT)

5.3

Event Analysis

S.No

Author: Asfand Tariq


Page 15 of
Date:

1st Decemeber 2011

1x EVDO Connection Setup Failure Logs


Time stamp
Call Failure
Analysis/Remarks
Reason

Drive Test Report Template

Internal-Drive Test Report

5.4

Forward Link Data KPI Maps


5.4.1

Best C/I (dB)

Also the C/I distribution on each available carrier is to be provided in form of Chart/ Table

C/I (dB) Plot (Pre- DT)

Author: Asfand Tariq


Page 16 of
Date:

1st Decemeber 2011

Drive Test Report Template

Internal-Drive Test Report

C/I (dB) Plot (Post DT)


5.4.2

Received Power (dBm)

Also the Received Power distribution on each available carrier is to be provided in form of
Chart/ Table

RX Level Plot (Pre DT)


Author: Asfand Tariq
Page 17 of
Date:

1st Decemeber 2011

Drive Test Report Template

Internal-Drive Test Report

RX Level Plot (Post DT)


5.4.3

Average DRC Rate

Also the DRC distribution on each available carrier is to be provided in form of Chart/
Table

Author: Asfand Tariq


Page 18 of
Date:

1st Decemeber 2011

Drive Test Report Template

Internal-Drive Test Report

DRC Rate Plot (Pre DT)

DRC Rate Plot (Post DT)

Author: Asfand Tariq


Page 19 of
Date:

1st Decemeber 2011

Drive Test Report Template

Internal-Drive Test Report

5.4.4

Active PN Count

Active PN Count Plot (Pre- DT)

Author: Asfand Tariq


Page 20 of
Date:

1st Decemeber 2011

Drive Test Report Template

Internal-Drive Test Report

Active PN Count Plot (Post DT)


5.4.5

Best Serving PN

Author: Asfand Tariq


Page 21 of
Date:

1st Decemeber 2011

Drive Test Report Template

Internal-Drive Test Report

Best Pilot Graph (Pre- DT)

Best Pilot Graph (Post DT)


5.4.6

Best ASP SINR

Also the Best ASP SINR distribution on each available carrier is to be provided in form of
Chart/ Table

Author: Asfand Tariq


Page 22 of
Date:

1st Decemeber 2011

Drive Test Report Template

Internal-Drive Test Report

SINR Plot (Pre- DT)

SINR Plot (Post DT)

Author: Asfand Tariq


Page 23 of
Date:

1st Decemeber 2011

Drive Test Report Template

Internal-Drive Test Report

5.4.7 Average PER


Also the Average PER distribution on each available carrier is to be provided in form of
Chart/ Table

Average PER Plot (Pre DT)

Author: Asfand Tariq


Page 24 of
Date:

1st Decemeber 2011

Drive Test Report Template

Internal-Drive Test Report

Average PER Plot (Post DT)


5.4.8 Reverse TX Pilot Power

TX Power Plot (Pre DT)

Author: Asfand Tariq


Page 25 of
Date:

1st Decemeber 2011

Drive Test Report Template

Internal-Drive Test Report

TX Power Plot (Post DT)

Author: Asfand Tariq


Page 26 of
Date:

1st Decemeber 2011

Drive Test Report Template

Internal-Drive Test Report

5.5

Packet Error Rate (PER)

Instantaneous PER (Pre- DT)

Instantaneous PER (Post DT)

Author: Asfand Tariq


Page 27 of
Date:

1st Decemeber 2011

Drive Test Report Template

Internal-Drive Test Report

Conclussion:

As all KPIs are improved after optimization activity. Therefore, this site is well
optimized.