0% found this document useful (0 votes)
980 views3 pages

PID - Instrument Air Distribution

Uploaded by

jatinarendra314
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
980 views3 pages

PID - Instrument Air Distribution

Uploaded by

jatinarendra314
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
  • Technical Diagram 1: Presents a detailed technical flowchart likely outlining an industrial process with labeled components and pipelines.
  • Technical Diagram 2: Illustrates a continuation or different section of the technical process with specific labeled equipment and connections.
  • Technical Diagram 3: Depicts an elaborate schematic detailing a broader scope or aggregate of associated processes.

A B C D E F G H I J K L M N O P Q

REFERENCE DRAWINGS
DRAWING NUMBER DRAWING TITLE

EQUIPMENT NAME AIR COMPRESSOR PACKAGE FOR INSTRUMENT AIR EQUIPMENT NAME AIR DRYER PACKAGE EQUIPMENT NAME AIR RECEIVER FOR INSTRUMENT AIR EQUIPMENT NAME PRE FILTER EQUIPMENT NAME AFTER FILTER

ITEM NO. 02QFA10AN001/02QFA20AN001/02QFA30AN001 ITEM NO. 02QFF21AT001 /02QFF22AT001 ITEM NO. 02QFA10BB001 ITEM NO. 02QFA11AT001 /02QFF12AT001 ITEM NO. 02QFF31AT001/02QFF32AT001
1 1
DUTY 3 X 50% DUTY 2 X 100% DUTY 2 X 100% DUTY 2 X 100% DUTY 2 X 100%

DESIGN CAPACITY 19 Nm3/min DESIGN CAPACITY 37 Nm3/min DESIGN CAPACITY 12 Nm3/min NOTES :
DISCHARGE PRESSURE 10.5 barg DESIGN PRESSURE 12 barg DISCHARGE PRESSURE 12 barg

DRIVER POWER 185 kW

2 REFERENCE DRAWINGS 2
1. P&I DIAGRAMS
- SYMBOL & LEGEND (1/3) : IKCPL-YYG-M-21-001
- SYMBOL & LEGEND (2/3) : IKCPL-YYG-M-21-002
S C - SYMBOL & LEGEND (3/3) : IKCPL-YYG-M-21-003

PS PA
-
REFERENCE DOCUMENTS
3 3
1. PIPING MATERIAL CLASSIFICATION : IKCPL-YYG-P-02-001
TO INSTRUMENT AIR 2. TECHNICAL SPECIFICATION FOR INSULATION : IKCPL-YYG-P-02-002
00QFA10 DISTRIBUTION SYSTEM (2/3) 3. INSTRUMENT SET POINT & ALARM LIST : IKCP1-CKN-I-08-002
BR001 HC3 4. SYSTEM DESCRIPTION : IKCPL-QFA-M-03-001
IKCPL-QFB-M-21-002 (B-7)
DN 100
PI PI
TI
-

4 4
TIT
00QFA10CT101
AIR RECEIVER FOR INSTRUMENT AIR
02QFA10
BB001 PI
00QFA10CP501
AA303
PIT PI

5 PIT 5
XV XV
AA302 00QFA10CP102 TO SERVICE AIR DISTRIBUTION
SYSTEM (1/2)
PIA--/-
- IKCPL-QEB-M-21-001 (N-4)

PIT TI PDI PDI PIT TO INTERCONNECTION SHUT OFF


XV 02QFF22 XV AA301 00QFA10CP101
VALVE
AT001
AIR THIS DWG (C-7)
100 x 80
6 COMPRESSOR 3 6
PACKAGE 3
FOR IA
3 02QFF12 02QFF32
TIT AT001 PS PA AT001 R CIVIL
- CONTRACTOR DOCUMENT REVIEW E
02QFA30 V
MECH
AN001 LOG DATE : I ELECT
E
IN COMM NO. : W I&C
A APPROVED SUPPORT
7 B APPROVED AS NOTE D CONTRACTOR 7
C I
NOT APPROVED RECORD
S
I INFORMATION T WORKING DOCUMENT
PI PI R
APPROVAL DOES NOT RELIEVE APPROVED BY
CONTRACTOR FROM RESPONSIBILITY
I
FOR ERROR OR DEVIATIONS FROM ( ) B
CONTRACT REQUIREMENTS U
T
BY: DATE :
PDI PDI I
LOG DATE : O
AIR FROM AFTER FILTER N
COMPRESSOR DOWNSTREAM PIT
OUT COMM NO. :
8 8
PACKAGE
FOR IA THIS DWG (N-5)
3
3 23.AUG.'19 ISSUED FOR CONSTRUCTION (APPROVED BY OWNER ON SEP.12.'18) S.W.YOON S.W.YOON J.W.SON
FROM SERVICE AIR DISTRIBUTION
2 19.JUL.'18 ISSUED FOR CONSTRUCTION (APPROVED BY OWNER ON JAN.03.'18) S.W.YOON S.W.YOON J.W.SON
02QFA20 SYSTEM
AN001 1 03.NOV.'17 ISSUED FOR CONSTRUCTION (APPROVED BY OWNER ON SEP.12.'17) S.W.YOON S.W.YOON J.W.SON
IKCPL-QFB-M-21-001 (G-7)
FL PRE FILTER XV XV AFTER FILTER 0 25.AUG.'17 ISSUED FOR APPROVAL S.W.YOON S.W.YOON J.W.SON
(2 x 100%) (2 x 100%)
REV. DATE DESCRIPTION DRWN CHKD APPD
02QFF11 02QFF31
9 AT001 AT001 OWNER:
9

PT PLN (PERSERO)
XV XV
Jl. Trunojoyo Blok M I/135, Kebayoran Baru Jakarta 12610
Phone: +62-21-7261875, 7261122, 7262234, Fax : +62-21-7221330
e-mail: webmaster@pln.co.id
Contract Agreement No. : 1594.PJ/DAN.02.01/DIR/2016

AIR
COMPRESSOR PT. PLN (PERSERO) PUSAT ENJINIRING KETENAGALISTRIKAN
10 PACKAGE 10
AIR DRYER PACKAGE
FOR IA
(2 x 100%)
PLN DWG NO.
1 0 1 1 8B - 0 0 - M - 5 2 - QFB - 0 0 1 - 0 1 - 3
3 02QFF21 PROJECT:
AT001
02QFA10 KALSELTENG 2 CFSPP(2x100MW)
AN001
CONTRACTOR:
AIR COMPRESSOR PACKAGE FOR IA CONSORTIUM OF
(3 x 50% FOR PLANT) PT TRUBA JAYA ENGINEERING - HYUNDAI ENGINEERING CO., LTD. - ITOCHU CORPORATION
11 11

DRAWN BY DATE TITLE:


S.W.YOON

CHECKED BY
23.AUG.'19

DATE
P&I DIAGRAM
S.W.YOON 23.AUG.'19 INSTRUMENT AIR DISTRIBUTION
APPROVED BY DATE SYSTEM (1/3)
12 J.W.SON 23.AUG.'19 12
CLASSIFICATION NO. SCALE JOB NO. DRAWING NUMBER REV.

- - IKCPL-QFB-M-21-001 3
A B C D E F G H I J K L M N O P Q A2 (420X594mm)
A B C D E F G H I J K L M N O P Q

REFERENCE DRAWINGS
DRAWING NUMBER DRAWING TITLE

1 1

NOTES :

21QFB13 3 21QFB13 TO ID FAN-A UNIT#2 AREA


3 BR001 HC3 BR002 HC3
IKCP0-HA-BLRM-21-520 (N-12)
DN 25 AA002 DN 25

2 3 REFERENCE DRAWINGS 2

1. P&I DIAGRAMS
- SYMBOL & LEGEND (1/3) : IKCPL-YYG-M-21-001
S C - SYMBOL & LEGEND (2/3) : IKCPL-YYG-M-21-002
- SYMBOL & LEGEND (3/3) : IKCPL-YYG-M-21-003
3 21QFB13 TO ID FAN-B UNIT#2 AREA
BR003 HC3
IKCP0-HA-BLRM-21-520 (N-12)
AA001 DN 25
ASH HANDLING SYSTEM UNIT#2 REFERENCE DOCUMENTS
3 3
(SEE AHS'S DWG NO. IKCP0-11ETK-AHSM-21-001) 1. PIPING MATERIAL CLASSIFICATION : IKCPL-YYG-P-02-001
2. TECHNICAL SPECIFICATION FOR INSULATION : IKCPL-YYG-P-02-002
3. INSTRUMENT SET POINT & ALARM LIST : IKCP1-CKN-I-08-002
4. SYSTEM DESCRIPTION : IKCPL-QFA-M-03-001

4 4
S C

BOILER UNIT#2 AREA


(SEE BOILER'S DWG NO. IKCP0-HA-BLRM-21-520)
5 5

3 3

AA001
TO INSTRUMENT AIR
21QFB10 DISTRIBUTION SYSTEM (3/3)
BR001 HC3
IKCPL-QFB-M-21-003 (B-10)
6 DN 80 6

FROM AIR COMPRESSOR AFTER TO INSTRUMENT AIR R CIVIL


FILTER 00QFA10 00QFA10 DISTRIBUTION SYSTEM (3/3) CONTRACTOR DOCUMENT REVIEW E MECH
BR001 HC3 BR002 HC3 V
IKCPL-QFB-M-21-001 (N-4) IKCPL-QFB-M-21-003 (B-9) LOG DATE : I ELECT
DN 100 DN 100 E
AA001 IN COMM NO. : W I&C
A APPROVED SUPPORT
DN 25
00QFB11
BR001 HC3

7 B APPROVED AS NOTE D CONTRACTOR 7


3 C NOT APPROVED
I
RECORD
S
I INFORMATION T WORKING DOCUMENT
03QFB30
03GMD95AA251 R
AA001

APPROVAL DOES NOT RELIEVE


BR001 HC3 COAL RUN-OFF POND 3 CONTRACTOR FROM RESPONSIBILITY
APPROVED BY I

DN 15 AA002 LEVEL SHUT OFF


FOR ERROR OR DEVIATIONS FROM ( ) B
00QEA10AA251 CONTRACT REQUIREMENTS U
SA RECEIVER TO SERVICE BY: DATE :
T
I
DISTRIBUTION AIR SHUT OFF
LOG DATE : O
N

8
3 OUT COMM NO. :
8
DN 80
01QFB11
BR001 HC3

WT/WWT SYSTEM 02QFB10


3 23.AUG.'19 ISSUED FOR CONSTRUCTION (APPROVED BY OWNER ON SEP.12.'18) S.W.YOON S.W.YOON J.W.SON
BR001 HC3
AA001 IKCP0-WTS-W-21-007 (A-8) AA001 DN 50 2 19.JUL.'18 ISSUED FOR CONSTRUCTION (APPROVED BY OWNER ON JAN.03.'18) S.W.YOON S.W.YOON J.W.SON

1 07.FEB.'18 ISSUED FOR CONSTRUCTION (APPOVED BY OWNER ON JAN.05.'18) S.W.YOON S.W.YOON J.W.SON

0 03.NOV.'17 ISSUED FOR APPROVAL S.W.YOON S.W.YOON J.W.SON

REV. DATE DESCRIPTION DRWN CHKD APPD


9 9
OWNER:

PT PLN (PERSERO)
Jl. Trunojoyo Blok M I/135, Kebayoran Baru Jakarta 12610
Phone: +62-21-7261875, 7261122, 7262234, Fax : +62-21-7221330
S C e-mail: webmaster@pln.co.id
3 Contract Agreement No. : 1594.PJ/DAN.02.01/DIR/2016

00EGD33AA101 03QFB20
AA001 BR001 HC3
FUEL OIL SUPPLY PUMP PT. PLN (PERSERO) PUSAT ENJINIRING KETENAGALISTRIKAN
10 DISCHARGE HEADER DN 25 10
PRESSURE CONTROL VALVE COAL HANDLING SYSTEM
PLN DWG NO.
1 0 1 1 8B - 0 0 - M - 5 2 - QFB - 0 0 2 - 0 1 - 3
3 PROJECT:
TO WORKSHOP BUILDING 03QFB21 3
3 -
AA001 BR001 HC3 KALSELTENG 2 CFSPP(2x100MW)
DN 25
CONTRACTOR:
CONSORTIUM OF
PT TRUBA JAYA ENGINEERING - HYUNDAI ENGINEERING CO., LTD. - ITOCHU CORPORATION
11 11

DRAWN BY DATE TITLE:


S.W.YOON

CHECKED BY
23.AUG.'19

DATE
P&I DIAGRAM
S.W.YOON 23.AUG.'19 INSTRUMENT AIR DISTRIBUTION
APPROVED BY DATE SYSTEM (2/3)
12 J.W.SON 23.AUG.'19 12
CLASSIFICATION NO. SCALE JOB NO. DRAWING NUMBER REV.

- - IKCPL-QFB-M-21-002 3
A B C D E F G H I J K L M N O P Q A2 (420X594mm)
A B C D E F G H I J K L M N O P Q

22QFB59 TURBINE BLDG. AREA #2 12QFB59 TURBINE BLDG. AREA #1 REFERENCE DRAWINGS
BR002 HC3 22QFB32 BR002 HC3 12QFB32 DRAWING NUMBER DRAWING TITLE
NSPBLCP NSPBLCP
DN 25 AA002 BR002 HC3 DN 25 AA001 BR002 HC3
LP BYPASS SYSTEM LP BYPASS SYSTEM
22QFB28 TO CONDENSER VACUUM PUMP A DN 25 AIR TANK 1 12QFB28 TO CONDENSER VACUUM PUMP A DN 25 AIR TANK 1
AA002 AA002
BR001 HC3 BR001 HC3
IKCPL-MAG-CONM-21-001 22QFB30 22QFB59 IKCPL-MAG-CONM-21-001 12QFB30 12QFB59
DN 25 AA001 DN 25 AA001
BR001 HC3 BR001 HC3 BR001 HC3 BR001 HC3
IPBLCP IPBLCP
1 DN 40 DN 25 AA001 DN 40 DN 25 AA001
1

22QFB87 22QFB31 12QFB87 12QFB31


BR001 HC3 BR001 HC3 LP BYPASS SYSTEM
BR001 HC3 BR001 HC3 LP BYPASS SYSTEM NOTES :
22MAG10AA251 22QFB28 DN 25 AIR TANK 2 12MAG10AA251 12QFB28 DN 25 AIR TANK 2
TO CONDENSER VACUUM PUMP B TO CONDENSER VACUUM PUMP B

40 x 25

80 x 25
AA001 AA001
VACCUM AA001 DN 25 VACCUM AA001 DN 25
BREAKER VALVE
BR002 HC3 BREAKER VALVE
BR002 HC3
IKCPL-MAG-CONM-21-001 IKCPL-MAG-CONM-21-001
DN 25 DN 25

TEMPERATURE CONTROL

TEMPERATURE CONTROL
AA002 AA002

START UP FLASH TANK

START UP FLASH TANK


START UP FLASH TANK

START UP FLASH TANK


HP TURBINE EXHAUST

HP TURBINE EXHAUST
CRH STEAM LINE NRV

CRH STEAM LINE NRV


REHEAT DRAIN

COLD REHEAT DRAIN


DRAIN TEMPERATURE

DRAIN TEMPERATURE
12LBS20AA253 12QFB61

HP BALANCE PIPE

HP BALANCE PIPE
BR001 HC3

CONTROL VALVE

CONTROL VALVE
22MAA11AA251

22GHA51AA101

22GHA52AA101

12MAA11AA251

12GHA51AA101

12GHA52AA101
22LBC11AA251

22LBC10AA251

22LBC10AA252

22LCE50AA102

12LBC11AA251

12LBC10AA251

12LBC10AA252

12LCE50AA102
NO2 FEEDWATER

LP BYPASS TCV

LP BYPASS TCV
22QFB61

AA001 DRAIN VALVE

AA001 DRAIN VALVE


AA001 DUMP VALVE

AA001 DUMP VALVE


2 22LBS20AA253 HEATER INLET AA001 DN 40 2
BR001 HC3

SHUT OFF

SHUT OFF
NO2 FEEDWATER STEAM EMERGENCY
HEATER INLET DN 25 DRAIN SHUT OFF 12QFB96

VALVE

VALVE
22QFB78 12QFB78

COLD
AA001
STEAM EMERGENCY 22LBS20AA252 12LBD10AA251 BR001 HC3 12LBS20AA252
DRAIN SHUT OFF 22QFB96 BR001 HC3 DEAERATOR BR001 HC3 REFERENCE DRAWINGS
LP TURBINE EXTRACTION DN 25 LP TURBINE EXTRACTION
DN 25 EXTRACTION LINE NRV AA001 DN 25

AA001

AA001

AA001

AA001

AA001

AA001

AA001

AA001

AA001

AA001
22LBD10AA251 BR001 HC3 AA001 STEAM-2 EMERGENCY DRAIN AA001 STEAM-2 EMERGENCY DRAIN
SHUT OFF 12QFB72 SHUT OFF 1. P&I DIAGRAMS
DEAERATOR DN 25 22QFB53 12LBD10AA253 12QFB53
EXTRACTION LINE NRV AA001 22LCJ31AA101 BR001 HC3 12LCJ31AA101 - SYMBOL & LEGEND (1/3) : IKCPL-YYG-M-21-001

BR001 HC3

BR002 HC3

BR001 HC3

BR001 HC3

BR001 HC3

BR001 HC3

BR001 HC3

BR001 HC3

BR002 HC3

BR001 HC3

BR001 HC3

BR001 HC3

BR001 HC3

BR001 HC3
BR001 HC3 IP TURBINE BR001 HC3 - SYMBOL & LEGEND (2/3) : IKCPL-YYG-M-21-002

22QFB98

22QFB85

22QFB93

22QFB26

22QFB46

22QFB47

22QFB32

12QFB98

12QFB85

12QFB93

12QFB26

12QFB46

12QFB47

12QFB32
22QFB72 NO2 LP HEATER DRAIN TANK EXTRACTION STEAM NO2 LP HEATER DRAIN TANK
22LBD10AA253 DN 25 AA001 DN 25 DN 25 - SYMBOL & LEGEND (3/3) : IKCPL-YYG-M-21-003

DN 25

DN 25

DN 25

DN 25

DN 25

DN 25

DN 25

DN 25

DN 25

DN 25

DN 25

DN 25

DN 25

DN 25
IP TURBINE BR001 HC3 AA001 EMERGENCY DRAIN WATER EMERGENCY DRAIN DN 40 AA001 EMERGENCY DRAIN WATER
EXTRACTION STEAM AA001 DN 25 22QFB51 LEVEL CONTROL VALVE SHUT OFF-2 BR002 HC3 12QFB51 LEVEL CONTROL VALVE
3 EMERGENCY DRAIN 22LCJ11AA101 12QFB70 12LCJ11AA101 3
BR001 HC3 BR001 HC3
SHUT OFF-2 NO3 LP FEEDWATER HEATER NO3 LP FEEDWATER HEATER
22QFB71 DN 25 AA001 EMERGENCY DRAIN WATER 12QFB71 DN 25 AA001 EMERGENCY DRAIN WATER
22LBD10AA252 12LBD10AA252
IP TURBINE BR001 HC3 22QFB56 LEVEL CONTROL VALVE 22QFB50 IP TURBINE BR001 HC3 12QFB56 LEVEL CONTROL VALVE 12QFB50 REFERENCE DOCUMENTS
40 x 25
EXTRACTION STEAM AA001 DN 25 BR001 HC3 22LCJ40AA101 BR001 HC3 EXTRACTION STEAM AA001 DN 25 BR001 HC3 12LCJ40AA101 BR001 HC3 40 x 25
1. PIPING MATERIAL CLASSIFICATION : IKCPL-YYG-P-02-001
EMERGENCY DRAIN NO1 LP FEEDWATER HEATER DN 25 EMERGENCY DRAIN NO1 LP FEEDWATER HEATER DN 40
SHUT OFF-2 DN 25 AA001 SHUT OFF-2 DN 80 AA001 2. TECHNICAL SPECIFICATION FOR INSULATION : IKCPL-YYG-P-02-002

BR003 HC3

BR004 HC3

BR003 HC3

BR004 HC3
DRAIN WATER LEVEL DRAIN WATER LEVEL
3. INSTRUMENT SET POINT & ALARM LIST : IKCP1-CKN-I-08-002

BR001 HC3

BR001 HC3
BR001 HC3

BR001 HC3

BR001 HC3

BR001 HC3

BR001 HC3

BR001 HC3

BR001 HC3

BR001 HC3

BR001 HC3

BR001 HC3
22QFB86

22QFB86

12QFB86

12QFB86
22QFB70 CONTROL VALVE 12QFB70 CONTROL VALVE

22QFB97

12QFB97
22QFB77

22QFB76

22QFB58

22QFB57

22QFB42

12QFB77

12QFB76

12QFB58

12QFB57

12QFB42
4. SYSTEM DESCRIPTION : IKCPL-QFA-M-03-001

DN 25

DN 25

DN 25

DN 25
BR001 HC3 BR001 HC3

DN 25

DN 25
DN 25

DN 25

DN 25

DN 25

DN 25

DN 25

DN 25

DN 25

DN 25

DN 25
DN 80 DN 80
4 22QFB60 PP PP 12QFB60 PP PP 4
BR001 HC3 22QFB62 BR001 HC3 12QFB62
22LCH21AA101 12LCH21AA101

STEAM EMERGENCY INLET AA001

AA001

AA001

AA001

EMERGENCY DRAIN WATER AA001

AA001

STEAM EMERGENCY INLET AA001

AA001

AA001

AA001

EMERGENCY DRAIN WATER AA001

AA001
AA006
BR001 HC3 BR001 HC3
AA005

AA002

AA003

AA002

AA006

AA003
AA005
DN 40 DN 40
DN25

DN25

DN25
DN25
NO7 HP FEEDWATER HEATER NO7 HP FEEDWATER HEATER
DN 25 AA001 EMERGENCY DRAIN WATER DN 25 AA001 EMERGENCY DRAIN WATER

40 x 25
22QFB25
40 x 25

22LBQ30AA252 12LBQ30AA252 12QFB25

NO1 LP HEATER DRAIN TANK

NO1 LP HEATER DRAIN TANK


LEVEL CONTROL VALVE LEVEL CONTROL VALVE

NO3 FEEDWATERT HEATER

NO3 FEEDWATERT HEATER


HP TURBINE BR001 HC3 22QFB66 HP TURBINE BR001 HC3 12QFB66

CONDENSER FLASH TANK

CONDENSER FLASH TANK


LP TURBINE EXTRACTION

LP TURBINE EXTRACTION
EXTRACTION STEAM 22LCH31AA101 EXTRACTION STEAM 12LCH31AA101

LEVEL CONTROL VALVE

LEVEL CONTROL VALVE


FLOW CONTROL VALVE

FLOW CONTROL VALVE


AA001 DN 25 BR001 HC3 AA001 DN 25 BR001 HC3

EXTRACTION LINE NRV

EXTRACTION LINE NRV


SPRAY TEMPERATURE

SPRAY TEMPERATURE
EMERGENCY STEAM-1

EMERGENCY STEAM-1
NO5 HP FEEDWATER HEATER NO5 HP FEEDWATER HEATER
TERM STORAGE)

TERM STORAGE)

TERM STORAGE)

TERM STORAGE)
EMERGENCY DRAIN EMERGENCY DRAIN
DRY UP AIR FOR

DRY UP AIR FOR

DRY UP AIR FOR

DRY UP AIR FOR


STEAM TURBINE

STEAM TURBINE

STEAM TURBINE

STEAM TURBINE
DN 25 DN 25
(DURING LONG

(DURING LONG

(DURING LONG

(DURING LONG
SHUT OFF AA001 EMERGENCY DRAIN WATER LEVEL SHUT OFF AA001 EMERGENCY DRAIN WATER LEVEL
LP FWH NO.3

LP FWH NO.3
CONTROL VALVE

CONTROL VALVE
DRAIN SHUT OFF

DRAIN SHUT OFF


RECIRCULATION

RECIRCULATION
CRH STEAM

CRH STEAM
22LCE40AA101

22LCA32AA101

12LCE40AA101

12LCA32AA101
22LBS30AA252

22LBS30AA251

22LBS30AA253

12LBS30AA252

12LBS30AA251

12LBS30AA253
22LCJ41AA101

12LCJ41AA101
CONTROL VALVE CONTROL VALVE
22LBQ10AA252 22QFB22 22QFB64 12LBQ10AA252 12QFB22 12QFB64

CEP MINIMUM

CEP MINIMUM
22LCH21AA101 12LCH21AA101

LP FWH NO3

LP FWH NO3
IP TURBINE BR001 HC3 BR001 HC3 NO6 HP FEEDWATER HEATER
IP TURBINE BR001 HC3 BR001 HC3 NO6 HP FEEDWATER HEATER
EXTRACTION STEAM EXTRACTION STEAM
5 AA001 DN 25 DN 25 AA001 EMERGENCY DRAIN WATER LEVEL AA001 DN 25 DN 25 AA001 EMERGENCY DRAIN WATER LEVEL 5

DRAIN

DRAIN
EMERGENCY DRAIN EMERGENCY DRAIN
SHUT OFF PP 22QFB68 CONTROL VALVE SHUT OFF PP 12QFB68 CONTROL VALVE
DRY UP AIR FOR BR001 HC3 22LAA10AA251 DRY UP AIR FOR AA004 BR001 HC3 12LAA10AA251

TURBINE EXTRACTION

TURBINE EXTRACTION
AA004

EXTRACTION STEAM

EXTRACTION STEAM
22QFB86 DN25 12QFB86

NO7 HP FEEDWATER

NO7 HP FEEDWATER
AA001 STEAM EMERGENCY

AA001 STEAM EMERGENCY


FOR TURNING GEAR

FOR TURNING GEAR


DN25

EMERGENCY DRAIN

EMERGENCY DRAIN
STEAM TURBINE DN 25 FEEDWATER TANK STEAM TURBINE DN 25 FEEDWATER TANK

DEAERATOR INLET

DEAERATOR INLET
DRAIN SHUT OFF-1

DRAIN SHUT OFF-1


NO 6 FEED WATER

NO 6 FEED WATER
BR002 HC3 AA001 DRAIN WATER SHUT OFF BR002 HC3 AA001 DRAIN WATER SHUT OFF

CONTROL VALVE

CONTROL VALVE
(DURING LONG 22QFB27 (DURING LONG 12QFB27
22LBQ20AA252

12LBQ20AA252
22LCH10AA101

12LCH10AA101
22LBD10AA254

12LBD10AA254
HEATER DRAIN

HEATER DRAIN
22QFB92 22LAE20AA251 12QFB92 12LAE20AA251

HEATER INLET

HEATER INLET
AIR CYLINDER

AIR CYLINDER
AA001 WATER LEVEL

AA001 WATER LEVEL


TERM STORAGE) AA001 DN 25 22MAW21AA101 BR001 HC3 TERM STORAGE) AA001 DN 25 12MAW21AA101 BR001 HC3
HP FWH NO.5 BR001 HC3 HP BYPASS SPRAY HP FWH NO.5 BR001 HC3 HP BYPASS SPRAY

SHUT OFF

SHUT OFF
22QFB94 GLAND STEAM DN 25 AA001 WATER SHUT OFF 12QFB94 GLAND STEAM DN 25 AA001 WATER SHUT OFF
DN 25 DN 25
40 x 25

40 x 25
22LBQ30AA251 AA001 EXHAUST 22QFB35 12LBQ30AA251 AA001 EXHAUST 12QFB35
HP FWH NO.7
BR001 HC3 HP FWH NO.7
BR001 HC3
CONTROL VALVE 22LAE20AA101 CONTROL VALVE 12LAE20AA101
EXTRACTION LINE NRV AA001 DN 25 22QFB48 BR001 HC3 EXTRACTION LINE NRV AA001 DN 25 12QFB48 BR001 HC3
22GHC10AA101 12GHC10AA101
AA001

AA001

AA001

AA001
DN 25 HP BYPASS TCV DN 25 HP BYPASS TCV
6 22LBQ30AA253 22QFB24 BR001 HC3 DEMI. WATER TO
AA001 12LBQ30AA253 12QFB24 BR001 HC3 DEMI. WATER TO
AA001 6
NO 7 FEED WATER BR001 HC3 DN 25 22QFB34 NO 7 FEED WATER BR001 HC3 DN 25 12QFB34
AA001 CONDENSER LEVEL AA001 CONDENSER LEVEL
BR001 HC3

BR001 HC3

BR001 HC3

BR001 HC3

BR001 HC3

BR001 HC3

BR001 HC3

BR001 HC3
HEATER INLET BR001 HC3 HP BYPASS SYSTEM HEATER INLET BR001 HC3 HP BYPASS SYSTEM
AA001 DN 25 CONTROL VALVE AA001 DN 25 CONTROL VALVE
22QFB23

22QFB73

22QFB81

22QFB63

12QFB23

12QFB73

12QFB81

12QFB63
40 x 25

40 x 25
EXTRACTION STEAM 22QFB49 DN 25 AIR TANK EXTRACTION STEAM 12QFB49 DN 25 AIR TANK
BR001 HC3

BR001 HC3
22GHC10AA102 12GHC10AA102
DN 25

DN 25

DN 25

DN 25

DN 25

DN 25

DN 25

DN 25
AA001 AA001
EMERGENCY DRAIN SHUT OFF BR001 HC3 EMERGENCY DRAIN SHUT OFF BR001 HC3
22QFB20

12QFB20
BR001 HC3

BR001 HC3
DEMI. WATER TO DEMI. WATER TO
22QFB80

12QFB80
CIVIL
22QFB95 DN 25 12QFB95 DN 25
DN 40

DN 40
R
22LBQ10AA251 AA001 CONDENSER LEVEL 12LBQ10AA251 AA001 CONDENSER LEVEL CONTRACTOR DOCUMENT REVIEW E
DN 40

DN 40
HP FWH NO.5
BR001 HC3 CONTROL VALVE HP FWH NO.5
BR001 HC3 CONTROL VALVE V
MECH

EXTRACTION LINE NRV AA001 DN 25 EXTRACTION LINE NRV AA001 DN 25


LOG DATE : I ELECT
22QFB40 12QFB40 E
22QFB21 22QFB55 40 x 25 BR001 HC3 12QFB21 12QFB55 40 x 25 BR001 HC3 IN COMM NO. : I&C
22LBQ10AA253 22LCJ36AA251 12LBQ10AA253 12LCJ36AA251 W

NO 5 FEED WATER BR001 HC3 BR001 HC3 LP HATER DRAIN TANK DN 40 NO 5 FEED WATER BR001 HC3 BR001 HC3 LP HATER DRAIN TANK DN 40 A APPROVED SUPPORT
7 HEATER INLET DN 25 AA001 DRAIN WATER HEATER INLET DN 25 AA001 DRAIN WATER 7
BR001 HC3

BR001 HC3

BR001 HC3

BR001 HC3

BR001 HC3

BR001 HC3

BR001 HC3

BR001 HC3

BR001 HC3

BR001 HC3

BR001 HC3

BR001 HC3

BR001 HC3

BR001 HC3
AA001 DN 25 AA001 DN 25
B APPROVED AS NOTE D CONTRACTOR
EXTRACTION STEAM EXTRACTION STEAM
22QFB44

22QFB45

22QFB67

22QFB29

22QFB75

22QFB74

22QFB65

12QFB44

12QFB45

12QFB67

12QFB29

12QFB75

12QFB74

12QFB65
RECIRCULATION RECIRCULATION C NOT APPROVED
I
RECORD
EMERGENCY DRAIN SHUT OFF SHUT OFF EMERGENCY DRAIN SHUT OFF SHUT OFF S
DN 25

DN 25

AA001 DN 25

25

25

25

AA001 DN 25

25

AA001 DN 25

AA001 DN 25

AA001 DN 25

AA001 DN 25

AA001 DN 25

AA001 DN 25
22QFB84 12QFB84 I INFORMATION WORKING DOCUMENT
22MAW21AA251 12MAW21AA251 T
DN

DN

DN

DN
BR001 HC3 BR001 HC3
CONDENSER WATER

CONDENSER WATER
HEADER PRESSURE

HEADER PRESSURE
R
GLAND STEAM GLAND STEAM
DRAIN WATER LEVEL

DRAIN WATER LEVEL


APPROVAL DOES NOT RELIEVE
NO3 LP FEEDWATER

NO3 LP FEEDWATER
APPROVED BY
HEADER DRAIN AA001 DN 25 HEADER DRAIN AA001 DN 25
LEVEL SHUT OFF

LEVEL SHUT OFF


CONTROL-1 VALVE AA001

CONTROL-2 VALVE AA001

AA001

AA001

AA001

CONTROL-1 VALVE AA001


I
CONTROL VALVE

CONTROL VALVE
22LCA21AA101

12LCA21AA101
22LCA33AA251

12LCA33AA251
CONTRACTOR FROM RESPONSIBILITY
MICELLANEOUS

MICELLANEOUS
CONTROL VALVE

CONTROL VALVE
B
CONTROL VALVE

CONTROL VALVE
FOR ERROR OR DEVIATIONS FROM ( )
VALVE VALVE
22LCJ10AA101

22LCJ33AA101

12LCJ10AA101

12LCJ33AA101
NO2 LP HEATER

NO2 LP HEATER
CONDENSER

CONDENSER
HEATER DRAIN

HEATER DRAIN
U
AA001 OVERFLOW

AA001 OVERFLOW
WATER LEVEL

WATER LEVEL
22QFB91 12QFB91 CONTRACT REQUIREMENTS
NO5 HP FEEDWATER

NO5 HP FEEDWATER
NO6 HP FEEDWATER

NO6 HP FEEDWATER
22MAW10AA101 12MAW10AA101
DRAIN TANK

TANK
T
DEAERATOR LEVEL

DEAERATOR LEVEL

DEAERATOR LEVEL

DEAERATOR LEVEL
CONTROL-2 VALVE
STEAM PRESSURE

STEAM PRESSURE
BR001 HC3 BR001 HC3 BY: DATE :
LEVEL SHUT OFF

LEVEL SHUT OFF


CONTROL VALVE

CONTROL VALVE

CONTROL VALVE

CONTROL VALVE
I
CCW HEAD TANK

CCW HEAD TANK


GLAND STEAM GLAND STEAM
CONTROL VALVE

CONTROL VALVE
22LCH30AA101

22LBG14AA101

22LBG14AA251

22LCH20AA101

12LCH30AA101

12LBG14AA101

12LBG14AA251

12LCH20AA101
22LCA60AA101

22LCA60AA102

22LCP10AA251

12LCA60AA101

12LCA60AA102

12LCP10AA251
HEATER DRAIN

HEATER DRAIN
HEATER DRAIN

HEATER DRAIN
SUPPLY CONTROL AA001 DN 25 SUPPLY CONTROL AA001 DN 25
O
STEAM DRAIN

STEAM DRAIN
LOG DATE :
WATER LEVEL

WATER LEVEL
WATER LEVEL

WATER LEVEL
DRAIN
DEAERATOR

DEAERATOR

DEAERATOR

DEAERATOR
N
OVERFLOW

OVERFLOW
VALVE VALVE OUT COMM NO. :
SHUT OFF

SHUT OFF
22QFB82 12QFB82
PEGGING

PEGGING

PEGGING

PEGGING
AA001

AA001
8 8
22MAW12AA251 12MAW12AA251
AA001

AA001

AA001

AA001
BR001 HC3 BR001 HC3
GLAND STEAM GLAND STEAM
AA001 DN 25 AA001 DN 25
BR001 HC3

BR001 HC3

BR001 HC3

BR001 HC3
STOP VALVE STOP VALVE
22QFB43

22QFB41

12QFB43

12QFB41
BR001 HC3

BR001 HC3

BR001 HC3

BR001 HC3

22QFB83 22QFB11 12QFB83 12QFB11 3 23.AUG.'19 ISSUED FOR CONSTRUCTION (APPROVED BY OWNER ON SEP.12.'18) S.W.YOON S.W.YOON J.W.SON
22QFB52

22QFB54

12QFB52

12QFB54
DN 25

DN 25

DN 25

DN 25
22MAW10AA251 BR002 HC3 22LCE10AA101 12MAW10AA251 BR002 HC3 12LCE10AA101
BR001 HC3 BR001 HC3
DN 25

DN 25

DN 25

DN 25

GLAND STEAM GLAND STEAM 2 19.JUL.'18 ISSUED FOR CONSTRUCTION (APPROVED BY OWNER ON JAN.03.'18) S.W.YOON S.W.YOON J.W.SON
DN 25 LETDOWN SPRAY CONTROL VALVE DN 25 LETDOWN SPRAY CONTROL VALVE
DRAIN TRAP AA001 DN 25 AA002 DRAIN TRAP AA001 DN 25 AA002
1 07.FEB.'18 ISSUED FOR CONSTRUCTION (APPOVED BY OWNER ON JAN.05.'18) S.W.YOON S.W.YOON J.W.SON
BYPASS VALVE 22QFB11 BYPASS VALVE 12QFB11
BR001 HC3 22LBG01AA101 BR001 HC3 12LBG01AA101 0 03.NOV.'17 ISSUED FOR APPROVAL S.W.YOON S.W.YOON J.W.SON

DN 25 LETDOWN CONTROL VALVE DN 25 LETDOWN CONTROL VALVE


AA001 AA001 REV. DATE DESCRIPTION DRWN CHKD APPD
9 9
AA001

AA001
OWNER:
DN 80 3
3 BR001 HC3 PT PLN (PERSERO)

BR001 HC3
22QFB10

12QFB10
FROM INSTRUMENT AIR Jl. Trunojoyo Blok M I/135, Kebayoran Baru Jakarta 12610

DN 80
21QFB10 100 x 80
DISTRIBUTION SYSTEM (1/3) Phone: +62-21-7261875, 7261122, 7262234, Fax : +62-21-7221330
e-mail: webmaster@pln.co.id
BR001 HC3
IKCPL-QFB-M-21-002 (M-6) Contract Agreement No. : 1594.PJ/DAN.02.01/DIR/2016
DN 80 DN 100
FROM INSTRUMENT AIR BR002 HC3 PT. PLN (PERSERO) PUSAT ENJINIRING KETENAGALISTRIKAN
10 DISTRIBUTION SYSTEM (2/3) 00QFA10 22QFB10 10
3
IKCPL-QFB-M-21-002 (M-7)
BR002 HC3 PLN DWG NO.
1 0 1 1 8B - 0 0 - M - 5 2 - QFB - 0 0 3 - 0 1 - 3
DN 100 100 x 80
PROJECT:
AA001

KALSELTENG 2 CFSPP(2x100MW)
11QFB10 TO VACUUM CLEANING SYSTEM
3 BR002 HC3 CONTRACTOR:
IKCP0-EBR-VCSM-21-700_04 (I-2) CONSORTIUM OF
DN 25
11QFB10 PT TRUBA JAYA ENGINEERING - HYUNDAI ENGINEERING CO., LTD. - ITOCHU CORPORATION
11 BR001 HC3 11
DN 80 3
BOILER UNIT#1 AREA S C
ASH HANDLING SYSTEM UNIT#1 S C
11QFB11 TO ID FAN-B UNIT#1 AREA
(SEE BOILER'S DWG NO. IKCP0-HA-BLRM-21-520) (SEE ASH'S DWG NO. IKCP0-11ETK-AHSM-21-001) BR003 HC3
IKCP0-HA-BLRM-21-520 (N-12)
DRAWN BY DATE TITLE:

AA003 DN 25 AA004
S.W.YOON

CHECKED BY
23.AUG.'19

DATE
P&I DIAGRAM
11QFB11
BR002 HC3
TO ID FAN-A UNIT#1 AREA
S.W.YOON 23.AUG.'19 INSTRUMENT AIR DISTRIBUTION
IKCP0-HA-BLRM-21-520 (N-12)
DN 25 AA002
APPROVED BY DATE SYSTEM (3/3)
12 J.W.SON 23.AUG.'19 12
11QFB11 11QFB14 TO CEMS
BR001 HC3 BR001 HC3 CLASSIFICATION NO. SCALE JOB NO. DRAWING NUMBER REV.
-
DN 25 DN 25 AA001 - - IKCPL-QFB-M-21-003 3
A B C D E F G H I J K L M N O P Q A2 (420X594mm)