P09N C09B

ITEM NO. PGCA-HT-2030A / 2035A


SIS RO
NAME INLET COOLER 55.5 mm
BDV 2031 C09B C01B
QUANTITY 2x50%
2031 MIN. 1m MIN.
NO POCKET TO HP FLARE HEADER
DESIGN PRESSURE (BARG) HOT SIDE: 118.6 / FV 10"-PT-20010-C09B 10"-VH-43031-C01B
PR-PID-1-107
COLD SIDE: 18 IG

3/4"-VB-9-061
10"x8" FALL 1:200
FIRE FB LO
DESIGN TEMP. MAX/MIN (°C) HOT SIDE: 80 / -29

NC
2H3 FO 10"-VB-9-038-FB
PSV SET @ 118.6 barg
COLD SIDE: 80

3/4"-VB-1-119
2037
OPERATING PRESSURE MAX/MIN (BARG) HOT SIDE: 102 / 24.7 (IN) / 101.3 / 24 (OUT) 300#

30
15

NC
0#
COLD SIDE: 5 - 6 0 0# C01B LO TO HP FLARE HEADER
4"x3" 8"-VH-43036-C01B
OPERATING TEMP. MAX/MIN (°C) HOT SIDE: 65 (IN) / 45 (OUT) PR-PID-1-107
1500# FALL 1:200
COLD SIDE: 40 (IN) / 50 (OUT) IG 8"x4" NOTE 12
SET @ 45 °C P09N 3"x2" 8"-VB-1-120-FB

8"-PT-20008-P09N-P
DUTY/DESIGN CAPACITY 6.26 MW EACH TRAIN (NOTE 10) 6"x3" SP SIS
SIZE (mm) H SET @ HH SET @
- PIA 8 barg PZA 10 barg SC7
912
6"-VD-9-065-FB 6"-PT-20009-P09N-P
2034 2035 TV SDV
MATERIAL TUBE SIDE: DSS (NACE) TO COOLING MEDIUM

LO
2034 2033
RETURN HEADER

FALL
SHELL SIDE: CS + 3mm CA NOTE 3 NC
12"-WC-40612-A03B 12"-WC-40602-A01B
PR-PID-1-097
MOTOR RATING (kW) - PI TI FO
FC
2031 2031 NOTE 5
NOTE 8 TUBE RUPTURE PSE ZIO
SET @
20"-VD-9-014 18 barg 2036-B 2036-B
FROM INLET PRE-COOLER 300#
28"-PT-20003-P09N-P 6"-VB-1-123-FB
PR-PID-1-016 (MIN) 6"-VB-1-121-FB
28"x20"

28"x20"
TI A03B A01B

NC
ILC ILC

NC
2036 TUBE RUPTURE 3/4"-VB-1-903
TO INLET COOLER B PSE ZIO
20"-PT-20004-P09N-P NOTE 9 SET @ A03B C01B
PR-PID-1-018 NOTE 3
18 barg 2036-A 2036-A
6"-VB-1-122-FB
ILO 6"-VB-1-124-FB TO HP FLARE HEADER
6"-WC-40603-A03B 6"-VH-43021-C01B
TO HP FLARE HEADER NC PR-PID-1-107
2"-VH-43060-C01B 2"-VL-9-010 2"-PG-20029-P09N FALL 1:200

3/4"-VB-1-904
PR-PID-1-107 MIN. ILO
NOTE 1

NC
SP

3/4"-VB-9-032
FALL 1:200 IG NC
2"-VB-9-031 2"-VB-1-129 A03B C01B

24"x20"
855

NC

RS
C01B P09N

NC
NC
2"-VB-9-029
INTERLOCK SYSTEM
NOTE 6
N1 N4 N8 N12 N11
Rupture Disk
PGCA-HT-2030A Tag No:
PSE-2036A
PSE-2036B FROM INLET COOLER B
(HT-2030B) DRAIN
N10 N6 N3 N2 3"-DC-57025-A01D
PR-PID-1-018

2"-VB-9-030

2"-VB-1-130
NC

NC
H SET @
TIA 55 C 2"-VB-9-027
2"-VL-9-011 3"x2" IG TO CLOSED DRAIN HEADER
2032 2"-PT-20032-P09N 3"-DC-57021-A01D

12"-WC-40606-A03B
PR-PID-1-118
NC FALL 1:100
PI PI NC P09N A01D
2040 2032
TUBE RUPTURE
PSE ZIO
SET @
2"-VB-9-033 18 barg 2038-B 2038-B
TI
NOTE 11 NC 6"-VB-1-125-FB 6"-VB-1-127-FB
2038

24"x20"
RS
NOTE 1 ILC ILC Rupture Disk

NC
20"-PT-20017-P09N TUBE RUPTURE 3/4"-VB-1-905
SET @
PSE ZIO A03B C01B Tag No:
18 barg 2038-A 2038-A PSE-2038A
6"-WC-40605-A03B
6"-VB-1-126-FB 6"-VB-1-128-FB PSE-2038B
6"-VH-43028-C01B
TO HP FLARE HEADER
PR-PID-1-107

3/4"-VB-1-906
FALL 1:200
MIN. ILO SP ILO

NC
NOTES: A03B C01B
856

2"-VB-9-037

2"-VB-1-131
1. DROPOUT SPOOL TO FACILITATE REMOVAL OF CHANNEL HEAD. NOTE 1

24"x20"
INTERLOCK SYSTEM

RS
2. MINIMUM UPSTREAM/ DOWNSTREAM LENGTH OF 5D/ 2D SHALL BE PROVIDED.

NC
NC
NOTE 6
3. TI TO BE LOCATED CLOSE TO COOLER.
4. DELETED.
N11 N12 N8 N4 N1
5. MECHANICAL STOPPER SET AT 30% OF DESIGN FLOWRATE SHALL BE PROVIDED TO AVOID THERMAL SHOCK.
6. 4 VALVE INTERLOCK SYSTEM FOR UPSTREAM AND DOWNSTREAM VALVES OF PSE-2036A/B AND PSE-2038A/B.
7. DELETED.
8. SDV WILL BE CLOSED IN THE EVENT OF COOLER TUBE RUPTURE TO MINIMIZE CONDENSATE CONTAMINATION
PGCA-HT-2035A
TO COOLING MEDIUM SYSTEM.
9. SYMMETRICAL PIPE ROUTING.
10. HEAT EXCHANGER THERMAL DUTY. N2 N3 N6 N5
11. HIGH POINT VENT.

2"-VB-9-035
2"-VB-1-132
24"x20"

12. SWEEPOLET FITTING SHALL BE USED AS PER AIV STUDY.

NC
NC
RS

2"-VL-9-012
NC
NOTE 1
PI
PI 2039 3"x2" IG TO CLOSED DRAIN HEADER
2"-PT-20033-P09N 3"-DC-57026-A01D
2030 NC PR-PID-1-118
2"-VB-9-036 FALL 1:100
P09N A01D
SET @ TI SIS
H 50 C NOTE 3 FI
TICA 2037 A03B A01B 2031 SDV
2034 FROM COOLING
2032
MEDIUM SUPPLY HEADER
12"-WC-40611-A03B 12"-WC-40601-A01B
M PR-PID-1-096
12"-VC-1-009 12"x6" 12"x6" HH SET @
NOTE 2 TZA FC
55 C NOTE 8
2033
20"-VD-9-015
26"x20" TO HP SEPARATOR
20"-PT-20005-P09N NOTE 9 26"-PT-20007-P09N
PR-PID-1-019

FROM INLET COOLER

26"x20"
NC

TRAIN B
20"-PT-20006 -P09N NOTE 9
PR-PID-1-018

CONTRACTOR CONSULTANT DRAWN BY DATE COMPANY DRAWING TITLE COMPANY PROJECT NO.
Z1 19.06.2021 AS-BUILT LIN ZHA/ISW MRY AJT
LIN 08.05.2018
PEGAGA INTEGRATED CENTRAL PROCESSING PLATFORM (ICPP)
C3 18.10.2019 APPROVED FOR CONSTRUCTION (AFC) LIN JGS/KMT RJ AJT
PIPING & INSTRUMENTATION DIAGRAM
C2 15.04.2019 APPROVED FOR CONSTRUCTION (AFC) LIN JGS/KMT RJ AJT CHECKED BY DATE INLET COOLER (A)
F7001
C1 28.11.2018 APPROVED FOR CONSTRUCTION (AFC) LIN JGS/KMT RJ AJT JGS/KMT 08.05.2018 PROJECT TITLE
PROVISION OF ENGINEERING , PROCUREMENT , CONSTRUCTION ,
COPYRIGHT C 2.4 30.08.2018 ISSUED FOR APPROVAL (IFA) LIN JGS/KMT RJ AJT INSTALLATION AND COMMISSIONING ( EPCIC )
THIS DRAWING REMAINS THE PROPERTY OF MDC OIL & APP BY DATE
GAS (SK 320) LTD AND MAY NOT BE COPIED IN ANY WAY MDC OIL & GAS (SK 320) LTD SCALE SIZE DRAWING NO. SHEET REV
SFSB MDC
EXCEPT FOR FULLFILING THE SPECIFIC PURPOSE FOR RJ 08.05.2018
WHICH IT IS ISSUED
REFERENCE DRAWING NUMBER REFERENCE DRAWING TITLE N0. DATE REVISION DESCRIPTION PREPARED REVIEWED APPROVED ENDORSED (A MUBADALA PETROLEUM AFFILIATE) N.T.S A1 PGCA-PR-PID-1-017 01 OF 01 Z1
BY BY BY BY

You might also like