CCTV
14000BTU 14000BTU
Bullet CCTV camera
C Computer Point
T
T.V Point
Consumer Unit
LANDING
MALE
CCTV C C C C
RAMP
RAMP
CAFETERIA
FEMALE
C
KITCHEN
T
9.38 %
C C
MALE
DARK
ROOM
9.38 %
X-RAY
FEMALE
SCAN ROOM
11
10
12
9
13
8
CHANGING ROOM
14
7
15 CONTROL
6
MALE
20R x 150
19G x 350
FEMALE ROOM
16
5
LOCKER
17
LOCKER 4
18
ULTRA SOUND
ROOM ROOM 3
CT SCAN
SCAN
19
2
ROOM
20
OUT PATIENT UP
1
DOWN
LIFT AREA
DEPARTMENT
CCTV
LOBBY
20R x 150
UP
19G x 350
10
1
9
11
20
19
18
17
16
15
14
13
12
CCTV
DOWN
PATIENTS
CONSULTATION DOCTOR'S ROOM
RECOVERY ROOM
ROOM
RECEPTION AREA DISPENSARY
DENTAL CLINIC LABORATORY ROOM - -
C
NURSE'S STATION
EMERGENCY
C C C C C T CCTV
NOTES
1. All cables must be stranded.
DROP OFF 2. All switches to be 1500mm high from
POINT
finished floor level.
ENTRANCE
3. All sockets to be 300mm high from finished
floor level.
4. All worktop switches and sockets are to be
250mm high from the finished worktop level
E-01
PROJECT: CLIENT: DRAWN BY: I.T.M DRAWING TITLE: ELECTRICAL INSTALLATIONS - REVISIONS DESCRIPTION
PROPOSED RE-DESIGN OF ST. LUKE'S HOSPITAL - SAN FRANCISCO FOR THE KYAMBOGO UNIVERSITY POWER LAY OUT AND SECURITY SYSTEMS,
STUDENTS OF KYAMBOGO UNIVERSITY CHECKED BY: A.N GROUND FLOOR LAY OUT 1. 6TH APRIL, 2022
2. 14TH MAY, 2022
APPROVED BY: SCALE: 1:150
DRAWING NO. GROUP 17/SP/002
SHEET NO: 2/5
DATE: 2OTH MAY, 2022