Professional Documents
Culture Documents
Gate Valve
Double Check Valve
LANDING
TB To Below
25⌀TB
FA From Above
25⌀CIW 32⌀CIC 40⌀FA CIC Chased In Ceiling
550
500
25⌀TB CIW Chased In Wall
1,000
MALE 32⌀CIC
500
25⌀TB
800
25⌀TB 32⌀CIC
500
25⌀TB
800
32⌀CIC
RAMP
500
25⌀CIW 25⌀TB
1,100
40⌀FA
12,060
32⌀TB
32⌀CIC
25⌀TB
25⌀CIW
25⌀TB
200
9.38 %
25⌀CIC
MALE 25⌀TB 32⌀FA
1,302
25⌀TB 25⌀FA
500
200
25⌀CIW
9.38 %
FEMA LE 25⌀TB
909
11
32⌀FA 10 25⌀CIC
12
32⌀CIC
THROAT NOSE 9
25⌀TB PEDEATRIC WARD
200
200
200
13
8
EAR CLINIC 7
14
25⌀TB 25⌀TB 25⌀TB
10,925
5,581
15
6
RECOVERY ROOM
19G x 350
20R x 150
16
5
GYNECOLOGIST
WAITING AREA 17
EXAMINATION
3,988
4
18
3
19
ROOM DOCTORS
200 12,381 200 5,852 200 80 2
2,438 200 20 4,206 200 5,375 200 3,895 200 3,903
OFFICE 200 3,608 200 8680 200
1
UP
DOWN
LIFT AREA
2490 200
200
200
2,494 200
2,488 200
20R x 150
UP
19G x 350
10
1
9
11
20
19
18
17
16
15
14
13
12
DOWN
SLUICE
200
200
200
200
200
6,688
MALE ORTHOPEDIC
200 2,670 200 OPERATING 4,404
T 200
HEATER 3,170 200 1,537 200 5,852 200 6,924
WARD 200 5,375 200 3,895 200 7,710 200 4165 200 4320 200
ANESTHEIA ORTHOPEDIC
3,994
3,994
DOCTOR GYM FEMALE AIDS - -
EQUIPMENT ORTHOPEDIC W ARD COUNSELLING
SCRUB CLINIC
ROOM
200
200
32⌀CIC
25⌀TB 32⌀CIC 40⌀FA
32⌀FA
4,365
S-01
NOTES
1. Diameters are in millimetres.
2. Water Supply pipes are PPR type.
3. Do not scale off the drawing.
4. Report any discrepancies to the engineer
in charge
PROJECT: CLIENT: DRAWN BY: I.T.M DRAWING TITLE: WATER SUPPLY - FIRST FLOOR REVISIONS DESCRIPTION
PROPOSED RE-DESIGN OF ST. LUKE'S HOSPITAL - SAN FRANCISCO FOR THE KYAMBOGO UNIVERSITY LAY OUT
STUDENTS OF KYAMBOGO UNIVERSITY CHECKED BY: A.N 1. 6TH APRIL, 2022
SCALE: 1:150 2. 14TH MAY, 2022
APPROVED BY:
DRAWING NO. GROUP 17/WS/002
SHEET NO: 2/6
DATE: 2OTH MAY, 2022