You are on page 1of 1

5 4 3 2 1 NOTES: Owner:

LEGEND

NEW COLD WATER


SUPPLY
General Contractor:
WATER SUPPLY PIPE
TO BE STRIPPED OUT

WM WATER METER

Architectural designer:
ISOLATION VALVE

D D
FLOW DIRECTION

Retained 1 nos existing ø40mm CW pipe with


IV & WM at H/L to proposed Office STUB OUT TO BE
unit-LF-111-RTL-GF1-12A. CAPPED OFF
Existing water meter shall be retained if it has
BMS compatibility else new water meter shall Structural & Electro-Mechanical designer:
be provided with BMS compatibility. New water NEW STUB OUT
meter shall be interfaced with landlord BMS
system.
TENANT UNIT
DEMARCATION LINE
Retained 1 nos existing ø40mm CW pipe with
Existing ø40mm GW pipe with IV & IV & WM at H/L to proposed Office
WM at H/L to proposed Office unit-LF-111-RTL-GF1-11A.
unit-LF-111-RTL-GF1-12A at
OFFICE Bartenbach LichtLabor GmbH
Level-01 shall be capped off Existing water meter shall be retained if it has
-LF-111-RTL-GF1 BMS compatibility else new water meter shall
be provided with BMS compatibility. New water
-11A meter shall be interfaced with landlord BMS
system.

OFFICE
-LF-111-RTL-GF1-12A
Existing ø40mm GW pipe with IV &
WM at H/L to proposed Office
unit-LF-111-RTL-GF1-11A at
Level-01 shall be capped off

DN
UP

C C

KAFD-A1-111-COMN-NSF-XXXXX-WSP-PHE
-DWG-00011

DATE: 01-08-2022
LEVEL:01
TITLE: PARCEL 1.11 WATER SUPPLY
LAYOUT SHEET 1 OF 2

AUTHOR: VR
CHECKED BY: SA

Project:

9147
RISER

Project Code: 1110

PARCEL NO: 1.11


B B

S.B.G. COORDINATION
CHECKED SIGNATURE DATE
Architectural AR / /
Structural ST / /
Civil C / /
Plumbing PL / /
Fire Fighting FF / /
PLOTTED ON: Sunday September 04 2011 LOGIN: slooi

Mechanical ME / /
Electrical EL / /

FINAL DESIGN
02 SEP 2011
LAST EDIT: 09/04/2011 - 12:57:38 PM

- - - - -
- - - - -
PLAN
NORTH - - - - -
- - - - -
- - - - -
- - - - -
- - - - -
QIBLA
FILE NAME: G:\026999 KAFD (Parcel 111)\CAD\CAD Record\110902 MEP REVISED FINAL DESIGN\DWGS\PLUMBING\1110-1.11-CS-M01-1007-1of2-R00-Rev00.dwg

- - - - -
- - - - -
00 CS 02 SEP 2011 FINAL DESIGN 00

CLNT DSNR
Key Plan Legend: Phase Date Description
Rev Rev
Issue:

5.05 1.15
1.11 1.14
FILE NAME:
DRAWN BY: CAD
DESIGN BY: MHG
CHECKED BY: MM
A A
General Key Plan: PLAN APPROVED BY:MM
NORTH

Sheet Title
QIBLA

PLUMBING
WSP NOTES:
1.THIS DWG. IS TO BE READ IN CONJUNCTION WITH ALL OTHER ENGINEERING DRAWINGS, SUCH AS ARCHITECTURAL & STRUCTURAL, 4.10
4.11

4.09
4.12
1ST FLOOR
ELECTRICAL, MECHANICAL AND ALSO THE SPECIFICATION REGULATION AND STANDARDS.
NARRATIVE OF ADDITIONAL WORKS:
2.THE SPECIFIED DIMENSIONS ARE IN MILLIMETERS.
3.WSP HAS UTILIZED IMPORTED BACKGROUNDS DEVELOPED BY DESIGNER ON THIS DRAWING AND THEREFORE ACCEPT NO LIABILITIES
4.03
4.05

4.04
4.06

2.13
PART PLAN A
1.RETAINED 1 NOS EXISTING Ø40MM CW PIPE WITH IV & WM AT H/L TO PROPOSED OFFICE 2.12

UNIT-LF-111-RTL-GF1-12A.EXISTING WATER METER SHALL BE RETAINED IF IT HAS BMS WITH RESPECT TO THE QUALITY, ACCURACY AND EXTENT OF THIS INFORMATION. WSP IS ALSO NOT LIABLE FOR ANY CONSEQUENCES 4.01
4.02
2.11

STEMMING FROM IN-ACCURACIES BETWEEN AS-BUILT INFORMATION AND AS CONSTRUCTED INFORMATION PROVIDED BY OTHERS.
2.10
2.07

COMPATIBILITY ELSE NEW WATER METER SHALL BE PROVIDED WITH BMS COMPATIBILITY. 2.05

4.WSP ASSUMES DESIGN LIABILITY ONLY FOR THE LIMITED COMPONENTS INCLUDED IN THE DESIGN SCOPE OF THE PROPOSED WORKS.
2.08

NEW WATER METER SHALL BE INTERFACED WITH LANDLORD BMS SYSTEM.


2.EXISTING Ø40MM GW PIPE WITH IV & WM AT H/L TO PROPOSED OFFICE 5.WSP INPUT TO THIS DRAWING IS LIMITED TO ONLY THE SPECIFIC COMPONENTS IDENTIFIED / IN THIS DRAWING. 1.09

6. FOR ALL EXISTING MEP INSTALLATIONS, WSP HAS ASSUMED THAT THE CAPACITIES OF MEP EQUIPMENT ARE INLINE WITH THE DATA
5.04

UNIT-LF-111-RTL-GF1-12A AT LEVEL-01 SHALL BE CAPPED OFF.


5.06 1.10
Sheet No.
3.RETAINED 1 NOS EXISTING Ø40MM CW PIPE WITH IV & WM AT H/L TO PROPOSED OFFICE INDICATED IN THE LEGACY DOCUMENTATION AND THE PERFORMANCE OF SUCH EQUIPMENT MEETS THE ORIGINAL DESIGNER’S INTENT. 5.03 5.05
1.11
1.15
1.14

UNIT-LF-111-RTL-GF1-11A.EXISTING WATER METER SHALL BE RETAINED IF IT HAS BMS WHERE THESE EQUIPMENTS ARE UTILISED/REDISTRIBUTED BY WSP, TO COMPLEMENT THE UTILITIES FINDINGS, WSP ASSUMES THAT THE
COMPATIBILITY ELSE NEW WATER METER SHALL BE PROVIDED WITH BMS COMPATIBILITY. RELATED EQUIPMENT/COMPONENTS SHALL BE APPROPRIATELY COMMISSIONED, BY OTHERS. 5.02

NEW WATER METER SHALL BE INTERFACED WITH LANDLORD BMS SYSTEM. 1ST FLOOR - PART PLAN A
7. CONTRACTOR TO ALLOW FOR ASSOCIATED CIVIL WORKS PERTAINING TO INSTALLATION OF PROPOSED NEW WORKS AND 5.01

M01 1007
1
3.10

4.EXISTING Ø40MM GW PIPE WITH IV & WM AT H/L TO PROPOSED OFFICE RELOCATION/DISMANTLING OF EXISTING INSTALLATIONS AND0 ABORTIVE
1000 2000 WORKS 4000
RELATED TO NEW SERVICES OPENINGS THROUGH 3.09

SLAB/WALL 1:100
UNIT-LF-111-RTL-GF1-11A AT LEVEL-01 SHALL BE CAPPED OFF. Sheet 1 of 2
5.CONTRACTOR TO VERIFY AT SITE AND CHECK THE FEASIBILITY FOR THE PROPOSED 8. NEW / RELOCATED MEP SERVICES PASSING THROUGH FIRE RATED PENETRATIONS/BARRIERS SHALL BE SELAED WITH FIRE RATED
5 4 3 2 MATERIALS/INSTALLATIONS CORRESPONDING TO THE FIRE RATING OF THE WALL/BARRIER THROUGH WHICH THEY 1 PASS.
MODIFICATIONS ON SITE.

You might also like